JENIS MATERIAL : Batu Pasir Batu Bubungan Pasir Tanah Portland Cement Keramik Sirtu
Kali / Gunung Pasang Merah BJLS 0.20 Urug Urug Type I 50 Kg 40 * 40 (Putih Polos)
SATUAN BAHAN : (M3) (M3) (M2) (Lembar) (M3) (M3) (Zak) (Dos) (M3)
1 2 3 9 5 6 7 1 9
A. CIF COST
1 Harga di Quarry (a) Rp. #NAME? #NAME? #NAME? 14,000.00 #NAME? #NAME? #NAME? 51,000.00 #NAME?
2 Retribusi (b) Rp. 2,000.00 2,000.00 - - - - - 2,000.00
3 APPKD (c) Rp. - - - - - - - - -
4 Cif Cost a+b+c (d) Rp. #NAME? #NAME? #NAME? 14,000.00 #NAME? #NAME? #NAME? 51,000.00 #NAME?
TOTAL BIAYA
NO URAIAN PEKERJAAN
( Rp )
1 2 3
A. JUMLAH #NAME?
B. FEE OVER HEAD (10% x A) #NAME?
C. TOTAL (A + B) #NAME?
D. PPN (10% x C) #NAME?
E. GRAND TOTAL (C + D) #NAME?
F. DIBULATKAN MENJADI #NAME?
325,000,000.00
RENCANA ANGGARAN BIAYA
###
### : KONSTRUKSI REHAB ATAP PENGADILAN NEGRI LARANTUKA
PEKERJAAN
LOKASI : KANTOR PENGADILAN NEGRI LARANTUKA - KEC. LARANTUKA - KAB. FLORES TIMUR
TAHUN ANGGARAN : 2019
I PEKERJAAN PERSIAPAN
1 Mobilisasi & Demobilisasi, Bangunan Direksi Keet, Barak Tenaga Kerja, 1.000 Ls 1,000,000.00 1,000,000.00
2 Pek. Pembongkaran Bangunan Lama 1.000 Ls 4,000,000.00 4,000,000.00
3 Pek. Membersihkan Lokasi 1.000 Ls 500,000.00 500,000.00
4 Pengukuran dan Pemasangan Bouwplank 34.000 M1 #NAME? #NAME?
5 Bekesting Untuk Sloof, Balok Latei Dan Ring Balk #REF! M2 #NAME? #REF!
6 Bekesting Untuk Kolom #REF! M2 #NAME? #REF!
7 Bekesting Untuk Plat 65.950 M2 #NAME? #NAME?
8 Bekesting Untuk Balok #REF! M2 #NAME? #REF!
9 Penyediaan Air Kerja 1.000 Ls 2,000,000.00 2,000,000.00
10 Administrasi Proyek 1.000 Ls 1,000,000.00 1,000,000.00
11 Papan Nama Proyek 1.000 Ls 250,000.00 250,000.00
SUB JUMLAH I #NAME?
II PEKERJAAN TANAH DAN URUNGAN
1 Galian Tanah Pondasi Menerus + Tangga, < 1 M #REF! M3 #NAME? #REF!
2 Galian Tanah Pondasi Foot Plate, < 2 M #REF! M3 #NAME? #REF!
3 Urugan Pasir di Bawah Pondasi ( Menerus + Foot Plate ) #REF! M3 #NAME? #REF!
4 Urugan Kembali Galian Tanah ( 1/4 Galian ) #REF! M3 #NAME? #REF!
5 Pek. Urugan tanah peninggian lantai dalam bangunan #REF! M3 #NAME? #REF!
6 Pek. Urugan Pasir di bawah Lantai bangunan t. 5 cm #REF! M3 #NAME? #REF!
SUB JUMLAH II #REF!
III PEKERJAAN BETON
A. LANTAI DASAR
1 Pek Beton Foot Plate 1pc : 2psr : 3krkl
a. Pek. Rabat Beton Lantai Kerja t. 10 cm camp 1pc:3psr:5krl #REF! M3 #NAME? #NAME?
b. Pek Telapak Beton Bertulang t.20 cm, Camp. 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
c. Pek Beton Kolom Foot Plate (27/27 cm) 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
c. Pek Beton Kolom Foot Plate (15/15 cm) 1pc : 2psr : 3krkl, ( Tangga ) 0.0720 M3 #NAME? #NAME?
2 Pek Beton Sloof (20/25 cm) 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
3 Pek Beton Sloof (12/20 cm) 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
4 Pek Beton Kolom Struktur (27/27 cm) 1pc : 2psr : 3krkl, ( K.1, K.2, K.3 ) #REF! M3 #NAME? #NAME?
5 Pek Beton Kolom (17/17 cm) 1pc : 2psr : 3krkl, ( K.4 ) #REF! M3 #NAME? #NAME?
6 Pek Beton Kolom (12/12 cm) 1pc : 2psr : 3krkl, ( K.5, K.5.1,K.6 ) #REF! M3 #NAME? #NAME?
7 Pek Beton Balok Latei (10/15 cm) 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
8 Pek Beton Balok Latei (10/20 cm) 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
9 Pek Beton Balok (25/50 cm) 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
10 Pek Beton Balok (20/50 cm) 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
11 Pek Beton Balok (20/35 cm) 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
12 Pek Beton Balok (12/35 cm) 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
13 Pek Beton Balok Bordes (12/40 cm) 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
14 Pek Plat Lantai I, t.12 cm 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
15 Pek Plat Over Stek, t.6 cm 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
16 Pek Plat Bordes, t.18 cm 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
17 Pek Plat Tangga 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
B. LANTAI I ( SATU )
18 Pek Beton Kolom Struktur (17/17 cm) 1pc : 2psr : 3krkl, ( K.4, K.7, K.8 ) #REF! M3 #NAME? #REF!
19 Pek Beton Kolom (12/17 cm) 1pc : 2psr : 3krkl, ( K.10 ) #REF! M3 #NAME? #NAME?
20 Pek Beton Kolom (12/12 cm) 1pc : 2psr : 3krkl, ( K.9, K.5, K.5.3, K.5.2, K.5.2.1 ) #REF! M3 #NAME? #NAME?
21 Pek Beton Kolom Sais Screen (12/12 cm) 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
22 Pek Beton Balok Latei (10/15 cm) 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
23 Pek Beton Balok Latei (10/20 cm) 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
24 Pek Beton Ring Balk (10/20 cm) 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
25 Pek Beton Ring Balk (12/40 cm) 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
26 Pek Plat Over Stek, t.6 cm 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
27 Pek Plat Talang, t.12 cm 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
28 Pek Plat Sais Screen cm 1pc : 2psr : 3krkl #REF! M3 #NAME? #NAME?
29 Pek. Neut Beton 0.0025 M3 #NAME? #NAME?
SUB JUMLAH III #NAME?
IV PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas.Batu Kosong (Aanstamping) di Bawah Pondasi Menerus #REF! M3 #NAME? #NAME?
2 Pas. Pondasi Batu Kali / Batu Belah, 1 Pc : 5 Psr ( Pondasi Menerus + Tangga ) #REF! M3 #NAME? #NAME?
3 Pek. Pas Dinding Bata , Tebal 1/2 Bata, camp 1 pc : 5 psr #REF! M2 #NAME? #NAME?
4 Pek. Plesteran Dinding , camp. 1 pc : 5 psr #REF! M2 #NAME? #NAME?
5 Pek. Plesteran Beton , camp. 1 pc : 5 psr #REF! M2 #NAME? #NAME?
6 Pek Plesteran Pondasi 1 Pc : 5 Psr 14.9080 M2 #NAME? #NAME?
7 Pek. Acian Tembok + Beton #REF! M2 #NAME? #NAME?
8 Pek. Acian Plat Lantai + Plat Talang #REF! M2 #NAME?
9 Pek. Plamur Dinding Tembok #REF! M2 10,220.19
SUB JUMLAH IV #NAME?
V PEK. KUSEN, DAUN PINTU DAN JENDELA DAN BOVEN
1 Pek. Kusen Kayu Klas I (uk. 5 / 11 cm) diprofil (bayam) 1.0155 M3 #NAME? #NAME?
2 Pek. Kisi - kisi Daun Jendela, Papan Kayu Klas II (uk. 2 / 11 cm) 2.4552 M2 #NAME? #NAME?
3 Pek. Daun Pintu Paniel Kayu Kls I ( bayam ) 4.3044 M2 #NAME? #NAME?
4 Pek. Daun Pintu Double Teakwood 3 mm 1.7302 M2 #NAME? #NAME?
5 Pek. Daun Pintu Tripleks lapis Alumunium foil 1.4137 M2 #NAME? #NAME?
6 Pek. Daun Jendela Panil Kaca Polos 5 mm, Rangka Kayu Klas I 6.6096 M2 #NAME? #NAME?
SUB JUMLAH V #NAME?
VI PEK. KUNCI DAN GANTUNGAN
1 Pas Kunci Tanam Double Slaag 5.0000 Bh #NAME? #NAME?
2 Pas. Engsel Daun Pintu kupu-kupu merk ARCH 21.0000 Bh #NAME? #NAME?
3 Pas. Grendel Daun Pintu 5.0000 Bh #NAME? #NAME?
4 Pas. Engsel Daun Jendela 36.0000 Bh #NAME? #NAME?
5 Pas. Grendel Daun Jendela 18.0000 Bh #NAME? #NAME?
6 Pas. Kait Angin Jendela 36.0000 Bh 26,584.15 957,029.40
7 Pas. Angker Kusen 78.0000 Bh 1,500.00 117,000.00
SUB JUMLAH VI #NAME?
VII PEKERJAAN ATAP
1 Pek. Rangka Kuda-kuda, Kayu Klas II. Uk. 6/12 dan 2 X 3/12 cm 1.4718 M3 #NAME? #NAME?
2 Pek. Balok Jurai Luar + Dalam, Kayu Klas II. Uk. 6/12 cm 0.5904 M3 #NAME? #NAME?
3 Pek. Gording + Ikatan Angin, Kayu Klas II (5/10 cm) 1.3733 M3 #NAME? #NAME?
4 Pek. Balok Bubungan Kayu Klas II uk. 5/10 cm 0.0410 M3 #NAME? #NAME?
5 Pek. Papan Jurai Dalam Kayu Kelas II (Ukuran 2/20) cm 3.9000 M1 #NAME? #NAME?
6 Pek. Listplank Kayu Kelas II 2/22 cm (diprofil) 35.9600 M1 #NAME? #NAME?
7 Pek. Listplank Kayu Kelas II 2/12 cm (diprofil) 35.9600 M1 #NAME? #NAME?
8 Pek. Penutup Atap Seng Gelombang BJLS 0,30 156.8210 M2 #NAME? #NAME?
9 Pas. Seng Plat BJLS 0.30 untk Bubungan & Jurai Luar + Dalam 40.2500 M1 91,389.60 3,678,431.40
10 Pas. Besi strip - Bh 8,750.00 -
11 Pas. Beugel U Besi Plat tebal 5 mm - Bh #NAME? #NAME?
12 Pas. Beugel U Besi bulat diameter 12 mm 6.0000 Bh #NAME? #NAME?
13 Mur Bout Diameter 12 mm, p = 17 cm - Bh #NAME? #NAME?
14 Mur Bout Diameter 12 mm, p = 25 cm - Bh #NAME? #NAME?
15 Ring Bout Diameter 12 mm - Bh 1,000.00 -
16 Pasang Angker Kuda - Kuda 6.0000 Bh 10,500.00 63,000.00
17 Residu Rangka Atap (kuda-kuda dan gording) 1.0000 Ls 500,000.00 500,000.00
SUB JUMLAH VII #NAME?
VIII PEKERJAAN LANTAI
1 Cor Rabat Beton Lantai t. 7 cm camp 1pc:3psr:5krl (dlm bangunan + Teras) #REF! M3 #NAME? #NAME?
2 Pek. Lantai Keramik 20 x 20 ( KM/WC ) 2.6325 M2 #NAME?
3 Pek. Dinding Keramik 20 x 25, t.1,8 m (KM/WC) 10.3860 M2 #NAME?
SUB JUMLAH VIII #NAME?
IX PEKERJAAN INSTALASI LISTRIK
1 Pek. Penyambungan Listrik 1300 Kwh Ls 4,000,000.00 -
2 Pas. Lampu TL 40 Watt + Instalasi Ttk 10,000.00 -
3 Pas. Lampu Philips 15 Watt + Instalsai Ttk 10,000.00 -
4 Pas. Sekring Box + Instalasi Bh 48,066.21 -
5 Pas. Kuartet Saklar Bh 45,566.21 -
6 Pas. Stop Kontak + instalasi Bh 50,000.00 -
SUB JUMLAH IX -
X PEKERJAAN INSTALASI AIR BERSIH DAN AIR LIMBAH
1 Pas. Kran air dia. 1/2 " 1.000 Bh 153,370.00
2 Pas. Instalasi Air Bersih Pipa Gip dia. 1/2" 41.000 M1 48,645.90
3 Pas. Instalasi Air Limbah ( Pipa PVC 3") 15.600 M 1
60,784.77
4 Pas. Kloset JongkokPorselen (INA) 1.000 Bh 653,202.00
5 Pek. Pas. Floor Drain 1.000 Bh 36,561.00
6 Pek. Pemasangan Pipa PVC 4" ( Jaringan Tinja ) 6.400 M1 85,084.77
SUB JUMLAH X
XI PEKERJAAAN PENGECATAN/FINISHING
1 Pek. Menie Kayu Kusen 57.6288 M2 13,470.19 776,270.89
2 Pek. Menie Atap Seng 156.8210 M2 #NAME?
3 Pek. Pengecatan Kilap Kayu Kusen 37.8189 M2 29,920.19 1,131,548.67
4 Pek. Pengecatan Dinding Tembok + Beton #REF! M 2
14,730.19 #REF!
5 Pek. Politur Daun Pintu Panil 8.6088 M2 39,953.30 343,949.97
6 Pek. Politur Rangka Jendela 17.1520 M2 39,953.30 685,279.00
7 Pek. Pengecatan Atap Seng 156.8210 M2 34,685.40
8 Pek. Pengecatan Listplank 10.7880 M2 29,920.19 322,779.01
SUB JUMLAH XI #REF!
XII PEKERJAAN SEPTICKTANK ( 1 UNIT )
1 Galian Tanah < 2 M 8.415 M3 #NAME? #NAME?
2 Urugan Pasir di Bawah Pondasi 0.220 M3 #NAME? #NAME?
3 Pasangan Batu Kosong ( Aanstamping ) 1.177 M 3
#NAME? #NAME?
4 Pasang Dinding Transram Campuran ( 1Pc : 3 Psr ) 10.113 M3 #NAME? #NAME?
5 Plester Dinding Transram ( 1 Pc : 3 Psr ) Tebal 1.5 cm 11.613 M3 #NAME? #NAME?
6 Rabat Beton 1 Pc : 3 Psr : 5 Bpc 0.336 M2 #NAME? #NAME?
7 Plesteran Beton ( 1 Pc : 3 Psr ) Tebal 1.5 cm 3.479 M2 #NAME? #NAME?
8 Sloof Beton Bertulang ( 12/20 ) 0.185 M3 #NAME? #NAME?
9 Kolom Praktis Beton Bertulang (10/10) 0.069 M3 #NAME? #NAME?
10 Ringbalk Beton Bertulang ( 10/20 ) 0.233 M3 #NAME? #NAME?
11 Plat Beton Bertulang Tebal 10 cm 0.277 M3 #NAME? #NAME?
12 Pasang Pipa AW Ø 4" 2.350 M 1
85,084.77 199,949.21
13 Pasang Pipa Hawa Ø 1" 1.000 Ls 35,000.00 35,000.00
14 Pasang Angker Plat 2.000 Bh 1,500.00 3,000.00
SUB JUMLAH XII
XIII PEKERJAAN PERESAPAN ( 1 UNIT )
1 Galian Tanah < 2 M Err:509 M3 #NAME? #NAME?
2 Urugan Pasir Err:509 M3 #NAME? #NAME?
3 Pasangan Batu Kosong ( Aanstamping ) Err:509 M3 #NAME? #NAME?
4 Pasangan Lapisan Koral Err:509 M3 #NAME? #NAME?
5 Pasangan Lapisan Ijuk Err:509 M3 #NAME? #NAME?
6 Pasangan Dinding Tembok Bata Tanpa Spesi Err:509 M 2
#NAME? #NAME?
7 Pasangan Dinding Bata Transram Campuran ( 1Pc : 3 Psr ) Err:509 M2 #NAME? #NAME?
8 Plat Beton Bertulang Tebal 10 cm Err:509 M3 #NAME? #NAME?
9 Pasang Pipa AW Ø 2" Err:509 M1 60,784.77 Err:509
10 Pasang Angker Plat 1.000 Bh 1,500.00 1,500.00
SUB JUMLAH XIII
XIV PEKERJAAN AKHIR DAN LAIN - LAIN
1 Pasang Raling Tangga, Besi Holoww Galvalum 5.680 M2 #NAME? #NAME?
2 Pas. Penangkal Petir 1.000 Unit 1,800,000.00 1,800,000.00
3 Pembersihan Akhir Pekerjaan 1.000 Ls 500,000.00 500,000.00
#NAME?
1.17
6.5509
#REF!
#NAME?
DAFTAR HARGA SATUAN UPAH DAN BAHAN
: KONSTRUKSI REHAB ATAP PENGADILAN NEGRI LARANTUKA
PEKERJAAN
LOKASI : KANTOR PENGADILAN NEGRI LARANTUKA - KEC. LARANTUKA - KAB. FLORES TIMUR
TAHUN ANGGARAN : 2019
1 2 3 4
A. UPAH
1 Pekerja Org/Hr 73,700.00
2 Mandor Org/Hr 112,200.00
3 Tukang Org/Hr 92,400.00
4 Kepala Tukang Org/Hr 102,300.00
B BAHAN
TOTAL BIAYA
NO URAIAN PEKERJAAN
( Rp )
1 2 3
I BIAYA KONSTRUKSI
A PEKERJAAN PERSIAPAN #NAME?
I PEKERJAAN PERSIAPAN #NAME?
C PEKERJAAN PEMBANGUNAN RUANG PRAKTEK ( 4 RUANGAN ) #NAME?
D PEKERJAAN PEMBANGUNAN KM/WC ( 2 UNIT BANGUNAN ) #NAME?
TERBILANG : # SATU MILYAR TUJUH RATUS TUJUH PULUH JUTA ENAM RATUS DUA PULUH EMPAT RIBU RUPIAH #
LARANTUKA, ………………………….2013
KEBUTUHAN BAHAN
1. Kayu Terpakai
KAYU KELAS 1
a. Kuda - Kuda #NAME? m3
B. Kusen #NAME? m3
KAYU KELAS 2
b. Gording + DLL #NAME? m3
2. Semen
a. Pondasi #NAME? zak
b. Plester Pondasi #NAME? zak
c. Pasangan Bata Dinding #NAME? zak
d. Plesteran Dinding
#NAME?
1,528,494,342.12
160,000,000.00 MEBEL
#NAME? PERENCANA
#NAME? PENGAWAS
15,735,000.00 ADMIN
TOTAL BIAYA
NO URAIAN PEKERJAAN
( Rp )
1 2 3
A. JUMLAH #NAME?
B. FEE OVER HEAD (10% x A) #NAME?
C. TOTAL (A + B) #NAME?
D. PPN (10% x C) #NAME?
E. GRAND TOTAL (C + D) #NAME?
F. DIBULATKAN MENJADI #NAME?
LARANTUKA, ………………………….2013
300,000,000.0
#NAME?
RENCANA ANGGARAN BIAYA
: KONSTRUKSI REHAB ATAP PENGADILAN NEGRI LARANTUKA
PEKERJAAN
LOKASI : KANTOR PENGADILAN NEGRI LARANTUKA - KEC. LARANTUKA - KAB. F
TAHUN ANGGARAN : 2019
N
JENIS KEGIATAN
O
1 2
I PEKERJAAN PERSIAPAN
1 Bangunan Direksi Keet, Gudang Dan Barak Tenaga Kerja,
2 Pembongkaran Atap, Kuda-kuda, Gording & Plafound
3 Administrasi Dan Dokumentasi
4 Papan Nama Proyek
II PEKERJAAN ATAP
1 Pek. Kuda - Kuda + Rangka Atap Kayu kls.II. uk.6/12 & 3/12
2 Pek. Pasang Gording Kayu Kls. II, uk 5/10 cm
3 Pek. Pasang Kaso Kayu Kls. II, uk 4/6 cm
4 Pek. Pasang Reng Kayu Kls. II, uk 2/3 cm
5 Pek. Balok Bubungan + Jurai, Kayu Klas II uk. 6/12 cm
6 Pek. Papan Bubungan + Jurai Kayu Klas II uk. 3/12 cm
7 Pek. Pasang Ikatan Angin, Kayu Kls. II, uk 5/10 cm
8 Pas. Besi strip
9 Pas. Beugel U Besi bulat diameter 12 mm
10 Pas. Beugel U Besi Plat tebal 5 mm
11 Mur Bout Diameter 12 mm, p = 17 cm
12 Mur Bout Diameter 12 mm, p = 25 cm
13 Ring Bout Diameter 12 mm
14 Pasang Angker Kuda - Kuda
15 Residu Rangka Atap (kuda-kuda, gording, Kaso & Reng )
16 Pek. Listplank Kayu Kelas II, Uk. 2 X 2/22 cm (diprofil)
17 Pek. Penutup Atap Genteng Metal 0,3 mm
18 Pek. Bubungan Genteng Metal
19 Pek. Seng Plat BJLS 0,30 ( Jurai Dalam )
V PEKERJAAAN PENGECATAN/FINISHING
1 Pek. Pengecatan Plafound
2 Pek. Pengecatan List Plank
NA ANGGARAN BIAYA
KONSTRUKSI REHAB ATAP PENGADILAN NEGRI LARANTUKA
HARGA SATUAN
JUMLAH HARGA
VOL SAT
(RP)
(RP)
3 4 5 6 = 3*5
HARGA SATUAN
JUMLAH HARGA
NO JENIS KEGIATAN VOL SAT
(RP)
(RP)
1 2 3 4 5 6 = 3*5
I PEKERJAAN PERSIAPAN
1 Gudang Dan Barak Tenaga Kerja, 1.000 Ls 250,000.00 250,000.00
2 Pengukuran dan Pemasangan Bouwplank 32.000 M1 68,820.00 2,202,240.00
3 Pek. Pembongkaran Bangunan Lama 1.000 Ls 2,500,000.00 2,500,000.00
4 Penyediaan Air Kerja 1.000 Ls 2,884,000.00 2,884,000.00
5 Administrasi Dan Dokumentasi 1.000 Ls 1,000,000.00 1,000,000.00
6 Papan Nama Proyek 1.000 Ls 250,000.00 250,000.00
SUB JUMLAH I 9,086,240.00
II PEKERJAAN PONDASI BANGUNAN
1 Galian Tanah Pondasi Bangunan 24.924 M3 39,400.00 982,005.60
2 Urugan Pasir di Bawah Pondasi Bangunan 2.077 M3 150,160.00 311,882.32
3 Pas.Batu Kosong (Aanstamping) Pondasi Bangunan 6.231 M3 333,648.00 2,078,960.69
4 Pas. Pond. Batu Kali/Batu Belah, 1 Pc : 5 Psr 16.102 M3 637,520.00 10,265,028.28
5 Urugan Kembali Galian Tanah ( 1/4 Galian ) 6.231 M3 13,133.33 81,833.80
SUB JUMLAH II 13,719,710.69
III PEKERJAAN BETON BANGUNAN
1 Pek Beton Bertulang Sloof Bangunan (12/20 cm) 1pc : 2psr : 3 Bpc. 1.6068 M3 6,076,434.17 9,763,614.43
2 Pek Beton Bertulang Kolom Praktis (13/13 cm) 1pc : 2psr : 3 Bpc. 1.100 M 3
10,344,435.52 11,377,348.10
3 Pek Beton Bertulang Balok Latei (10/20 cm) 1pc : 2psr : 3 Bpc. 0.475 M3 6,389,518.37 3,035,021.22
4 Pek Beton Bertulang Ringbalk (12/20 cm) 1pc : 2psr : 3 Bpc. 0.772 M3 6,076,434.17 4,692,951.64
5 Pek Beton Bertulang Balok Gewel (10/20 cm) 1pc : 2psr : 3 Bpc. 0.243 M3 7,098,876.72 1,724,175.18
6 Pek Plat Atap Beton Bertulang, Tebal 8 cm , 1pc : 2psr : 3 Bpc. 0.550 M3 3,661,377.93 2,014,167.93
SUB JUMLAH III 32,607,278.50
IV PEKERJAAN DINDING ,PLESTERAN DAN ACIAN
1 Pek. Pasangan Dinding Trasraam Batu Merah, camp 1 pc : 3 psr 13.633 M2 113,458.00 1,546,716.19
2 Pek. Pas. Dinding Biasa Tembok Bangunan Batu Merah, camp 1 pc : 5 psr 86.280 M2 107,792.00 9,300,272.20
3 Pek. Plesteran Dinding Trasraam , camp. 1 pc : 3 psr 13.633 M2 41,666.40 568,017.20
4 Pek. Plesteran Dinding Biasa , camp. 1 pc : 5 psr 149.502 M2 38,577.60 5,767,432.21
5 Pek. Acian Dinding Tembok Baru + Dinding Tembok Eksisting + Beton 183.282 M2 22,310.00 4,089,023.65
SUB JUMLAH IV 21,271,461.45
V PEK. KUSEN, DAUN PINTU DAN JENDELA DAN BOVEN
1 Pek. Kusen Kayu Klas I (uk. 5 / 11 cm) diprofil 1.048 M3 11,824,100.00 12,389,481.17
2 Pek. Kisi - kisi Buven Kayu Kls I 0.264 M2 635,848.00 167,863.87
3 Pek. Daun Pintu Paniel Kayu Kls I 3.234 M2 643,800.00 2,082,049.20
4 Pek. Daun Pintu Tripleks lapis Alumunium Foil 1.512 M2 442,740.00 669,422.88
5 Pek. Daun Jendela Panil Kaca Papan Tebal 2 cm, Rangka Kayu Klas I 1.662 M2 747,800.00 1,242,544.48
6 Pek. Daun Jendela Kaca Mati 5 mm 1.300 M2 268,272.00 348,753.60
SUB JUMLAH V 16,900,115.20
XI PEKERJAAAN PENGECATAN/FINISHING
HARGA SATUAN
JUMLAH HARGA
NO JENIS KEGIATAN VOL SAT
(RP)
(RP)
1 2 3 4 5 6 = 3*5
1 Pek. Pengecatan Dinding Tembok Interior ( JOTUN INTERIOR ) 111.758 M2 23,150.00 2,587,193.07
2 Pek. Pengecatan Eksterior, Dinding Bangunan ( JOTUN EKSTERIOR ) 71.524 M 2
25,680.00 1,836,744.02
3 Pek. Pengecatan Plafound ( Matex ) 54.672 M2 10,925.00 597,290.51
4 Pek. Menie Kayu Kusen 22.588 M 2
18,495.00 417,765.06
5 Pek. Pengecatan Kilap Kayu Kusen 14.934 M2 25,877.00 386,447.12
6 Pek. Politur Daun Pintu Panil 6.468 M2 33,790.00 218,553.72
7 Pek. Politur Rangka jendela + Kisi - kisi 1.8560 M 2
33,790.00 62,714.24
SUB JUMLAH XI 6,106,707.74
XII PEKERJAAN SEPTICKTANK ( 1 UNIT )
1 Galian Tanah < 2 M 8.415 M3 30,252.00 254,577.22
2 Urugan Pasir di Bawah Pondasi 0.220 M3 150,160.00 33,083.25
3 Pasangan Batu Kosong ( Aanstamping ) 1.177 M3 333,648.00 392,554.22
4 Pasang Dinding Transram Campuran ( 1Pc : 3 Psr ) 10.113 M3 113,458.00 1,147,434.79
5 Plester Dinding Transram ( 1 Pc : 3 Psr ) Tebal 1.5 cm 10.113 M3 41,666.40 421,384.80
6 Rabat Beton 1 Pc : 3 Psr : 5 Bpc 0.336 M 2
648,503.92 218,130.78
7 Plesteran Beton ( 1 Pc : 3 Psr ) Tebal 1.5 cm 3.479 M2 41,666.40 144,957.41
8 Sloof Beton Bertulang ( 12/20 ) 0.185 M3 6,076,434.17 1,124,626.44
9 Kolom Praktis Beton Bertulang (10/10) 0.069 M3 7,174,558.32 497,196.89
10 Ringbalk Beton Bertulang ( 10/20 ) 0.233 M3 6,389,518.37 1,490,546.84
11 Plat Beton Bertulang Tebal 10 cm 0.277 M3 3,661,377.93 1,014,348.14
12 Pasang Pipa AW Ø 4" 2.350 M1 78,611.60 184,737.26
13 Pasang Pipa Hawa Ø 1" 2.000 Ls 30,000.00 60,000.00
14 Pasang Angker Plat 2.000 Bh 3,000.00 6,000.00
SUB JUMLAH XV 6,989,578.05
XIII PEKERJAAN PERESAPAN ( 1 UNIT )
1 Galian Tanah < 2 M 5.780 M3 30,252.00 174,856.56
2 Urugan Pasir 0.225 M3 150,160.00 33,786.00
3 Pasangan Batu Kosong ( Aanstamping ) 0.160 M3 333,648.00 53,383.68
4 Pasangan Lapisan Koral 1.955 M 3
224,400.00 438,702.00
5 Pasangan Lapisan Ijuk 0.256 M3 68,640.00 17,571.84
6 Pasangan Dinding Tembok Bata Tanpa Spesi 0.880 M 2
90,640.00 79,763.20
7 Pasangan Dinding Bata Transram Campuran ( 1Pc : 3 Psr ) 1.016 M2 113,458.00 115,273.33
8 Plat Beton Bertulang Tebal 10 cm 0.100 M3 3,661,377.93 366,137.79
9 Pasang Pipa AW Ø 3" 1.100 M 3
54,311.60 59,742.76
10 Pasang Angker Plat 2.000 M3 3,000.00 6,000.00
SUB JUMLAH XVI 1,345,217.16
REKAPITULASI
: KONSTRUKSI REHAB ATAP PENGADILAN NEGRI LARANTUKA
PEKERJAAN
LOKASI : KANTOR PENGADILAN NEGRI LARANTUKA - KEC. LARANTUKA - KAB. FLORES TIMUR
TAHUN ANGGARAN : 2019
1 2 3
TERBILANG : TUJUH RATUS TIGA PULUH LIMA JUTA DUA RATUS DUA PULUH RIBU RUPIAH
LARANTUKA, ………………………….2019
MENGETAHUI : MENYETUJUI :
KUASA PENGGUNA ANGGARAN PLT. KEPALA DINAS PEKERJAAN UMUM DAN
PENGADILAN NEGERI LARANTUKA KABUPATEN FLORES TIMUR PENATAAN RUANG KABUPATEN FLORES TIMUR
KABUPATEN FLORES TIMUR
MARIA MARCELLA KOLO, S.KOM
DOMINIKUS DEMON, SH
NIP. 198810052011012012 Pembina Utama Muda
NIP. 19610924 199203 1 005
RENCANA ANGGARAN BIAYA
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN : PEMBANGUNAN KANTOR LARANTUKA
PEKERJAAN : PERENCANAAN TEKNIS PEMBANGUNAN KANTOR LURAH POHON BAO
LOKASI : KELURAHAN POHON BAO - KECAMATAN LARANTUKA
TAHUN ANGGARAN : 2014
I PEKERJAAN PERSIAPAN
1 Mobilisasi & Demobilisasi, Bangunan Direksi Keet, Barak Tenaga Kerja, 1.00 Ls 1,000,000.00 1,000,000.00
2 Pek. Membersihkan Lokasi Dan Perataan 1.00 Ls 850,000.00 850,000.00
3 Pengukuran dan Pemasangan Bouwplank 48.02 M1 65,005.00 3,121,540.10
4 Bekesting Untuk Sloof, Balok Latei Dan Ring Balk 34.40 M2 170,639.00 5,869,981.60
5 Bekesting Untuk Kolom 37.31 M2 190,187.00 7,095,876.97
6 Penyediaan Air Kerja 1.00 Ls 2,500,000.00 2,500,000.00
7 Administrasi Proyek 1.00 Ls 1,500,000.00 1,500,000.00
8 Papan Nama Proyek 1.00 Ls 250,000.00 250,000.00
SUB JUMLAH I 22,187,398.67
II PEKERJAAN PONDASI
1 Galian Tanah Pondasi 53.83 M3 22,200.00 1,195,026.00
2 Urugan Pasir di Bawah Pondasi 3.85 M3 153,150.00 588,861.75
3 Pas.Batu Kosong (Aanstamping) 11.54 M3 250,365.00 2,887,960.28
4 Pasangan Pondasi Batu Kali / Batu Belah , 1 Pc : 5 Psr 46.99 M3 610,665.00 28,693,682.75
5 Urugan Kembali Galian Tanah ( 1/4 Galian ) 13.46 M3 10,641.00 143,201.26
SUB JUMLAH II 33,508,732.04
III PEKERJAAN BETON
1 Pek Beton Sloof (12/20 cm) 1pc : 2psr : 3krkl 2.31 M3 4,202,450.47 9,695,053.23
2 Pek Beton Kolom Struktur (20/20 cm) 1pc : 2psr : 3krkl, 0.30 M3 2,901,595.35 870,478.61
3 Pek Beton Kolom Praktis (15/15 cm) 1pc : 2psr : 3krkl, 2.16 M3 3,991,696.01 8,622,063.39
4 Pek Beton Ringbalk (10/20 cm) 1pc : 2psr : 3krkl 1.57 M3 4,269,434.06 6,703,011.47
5 Pek Beton Balok Latei (10/20 cm) 1pc : 2psr : 3krkl 1.41 M3 3,585,166.35 5,055,084.55
6 Pek Beton Balok Gewel (10/20 cm) 1pc : 2psr : 3krkl 0.07 M3 4,269,434.06 298,860.38
7 Pek Beton Kolom Teras (25/25 cm) 1pc : 2psr : 3krkl, 0.46 M3 3,100,903.87 1,426,415.78
8 Pek Plat Beton Cantilever camp. 1pc : 2psr : 3krkl 1.10 M3 4,667,318.96 5,134,050.86
SUB JUMLAH III 37,805,018.27
IV PEKERJAAN DINDING ,PLESTERAN DAN ACIAN
1 Pek. Dinding Tembok Batu Merah, camp 1 pc : 5 psr 180.07 M2 108,770.00 19,586,213.90
2 Pek. Dinding Partisi Double Taekwood + Rangka Kayu Kelas II 2.48 M2 250,290.00 620,719.20
3 Pek. Dinding Kaca Mati 5 mm 3.8016 M2 154,111.25 585,869.33
4 Pek. Plesteran Dinding Tembok , camp. 1 pc : 5 psr 360.14 M2 31,190.00 11,232,766.60
5 Pek. Plesteran Pondasi , camp. 1 pc : 5 psr 37.95 M2 31,190.00 1,183,660.50
6 Pek. Acian Tembok 396.91 M2 13,942.50 5,533,917.68
SUB JUMLAH IV 38,743,147.20
V PEK. KUSEN, DAUN PINTU DAN JENDELA DAN BOVEN
1 Pek. Kusen Kayu Klas I (uk. 5 / 11 cm) diprofil (bayam) 1.48 M3 12,038,500.00 17,839,431.80
2 Pek. Daun Pintu Paniel Kayu Kls I, Panil Kaca 2.52 M2 735,000.00 1,852,200.00
3 Pek. Daun Pintu Paniel Kayu Kls I, 1.68 M2 592,000.00 994,560.00
4 Pek. Daun Pintu Double Teakwood 3 mm 3.40 M2 474,070.00 1,612,786.14
5 Pek. Daun Pintu Tripleks lapis Alumunium foil 1.37 M2 427,970.00 584,179.05
6 Pek. Daun Jendela Panil Kaca Polos 5 mm, Rangka Kayu Klas I 21.08 M2 441,200.00 9,298,290.00
Pek. Daun Boven Panil Kaca Polos 5 mm, Rangka Kayu Klas I 0.77 M2 441,200.00 337,518.00
7 Pek. Daun Boven Kaca Mati 5 mm 1.68 M2 154,111.25 258,906.90
SUB JUMLAH V 32,777,871.89
0.14818650
0.25200000
0.14913800
0.13222000
0.02941400
1.58800000
6.32000000
6.32000000
1.79 12.12020000
15.07200000
17.59980000
4.03900000
0.00820000
3.40000000
0.40000000
2.20000000
11.10000000
8.20000000
44.80000000
2.80000000
0.10000000
3,419,406.36
3,419,406.36
RENCANA ANGGARAN BIAYA
PEMBERI TUGAS : DEPARTEMEN PENDIDIKAN DAN KEBUDAYAAN, DIREKTORAT JENDRAL MENENGAH,
DIREKTORAT PENDIDIKAN SMK
PEKERJAAN : PEMBANGUNAN SMK WITIHAMA
LOKASI : KECAMATAN WITIHAMA - KABUPATEN FLORES TIMUR - PROVINSI NUSA TENGGARA TIMUR
SUMBER DANA : APBN 2013
A PEKERJAAN PERSIAPAN
1 Mobilisasi Peralatan :
a. Concrete Mixer 6.0000 Unit 75,000.00 450,000.00
b. Dump Truck 2.0000 Unit 350,000.00 700,000.00
c. Exavator 1.0000 Unit 2,500,000.00 2,500,000.00
d. Wheel Loader/Motor Grader 1.0000 Unit 2,000,000.00 2,000,000.00
e. Concrete Vibrator 2.0000 Unit 75,000.00 150,000.00
f. Stamper 1.0000 Unit 50,000.00 50,000.00
g. Profile Tank 3.0000 Unit 100,000.00 300,000.00
h. Peralatan Tukang Kayu, Batu, Besi, Las, dll 1.0000 Set 50,000.00 50,000.00
2 Demobilisasi 1.0000 Ls 5,450,000.00 5,450,000.00
3 Fasilitas Tenaga Kerja :
a. Base Camp 1.0000 Ls 1,000,000.00 1,000,000.00
b. Gudang dan lain-lain 1.0000 Ls 1,000,000.00 1,000,000.00
4 Fasilitas Direksi Teknis : -
a. Kantor/ Direksi Keet 1.0000 Ls 1,000,000.00 1,000,000.00
5 Lain-lain :
a. Papan Nama Proyek 1.0000 Ls 200,000.00 200,000.00
b. Perataan Dan Pembersihan Lokasi 1.0000 Ls 10,000,000.00 10,000,000.00
c. Pengukuran Dan Pemasangan Bouwplank 202.0000 M1 #NAME? #NAME?
d. Penyediaan Air Kerja 1.0000 Ls 7,500,000.00 7,500,000.00
JUMLAH A #NAME?
REKAPITULASI C
PEMBERI TUGAS : DEPARTEMEN PENDIDIKAN DAN KEBUDAYAAN, DIREKTORAT JENDRAL MENENGAH,
DIREKTORAT PENDIDIKAN SMK
PEKERJAAN : PEMBANGUNAN SMK WITIHAMA
LOKASI : KECAMATAN WITIHAMA - KABUPATEN FLORES TIMUR - PROVINSI NUSA TENGGARA TIMUR
SUMBER DANA : APBN 2013
TOTAL BIAYA
NO URAIAN PEKERJAAN
( Rp )
1 2 3
JUMLAH C #NAME?
#NAME?
586,342,712.28
#NAME?
RENCANA ANGGARAN BIAYA
PEMBERI TUGAS : DEPARTEMEN PENDIDIKAN DAN KEBUDAYAAN, DIREKTORAT JENDRAL MENENGAH,
DIREKTORAT PENDIDIKAN SMK
PEKERJAAN : PEMBANGUNAN SMK WITIHAMA
LOKASI : KECAMATAN WITIHAMA - KABUPATEN FLORES TIMUR - PROVINSI NUSA TENGGARA TIMUR
SUMBER DANA : APBN 2013
JUMLAH C #NAME?
1.78
3.871
4.259
REKAPITULASI
PEMBERI TUGAS : DEPARTEMEN PENDIDIKAN DAN KEBUDAYAAN, DIREKTORAT JENDRAL MENENGAH,
DIREKTORAT PENDIDIKAN SMK
PEKERJAAN : PEMBANGUNAN SMK WITIHAMA
LOKASI : KECAMATAN WITIHAMA - KABUPATEN FLORES TIMUR - PROVINSI NUSA TENGGARA TIMUR
SUMBER DANA : APBN 2013
TOTAL BIAYA
NO URAIAN PEKERJAAN
( Rp )
1 2 3
JUMLAH D #NAME?
LARANTUKA, ………………………….2013
1. Kayu Terpakai
KAYU KELAS 1
a. Kuda - Kuda #NAME? m3
B. Kusen #NAME? m3
KAYU KELAS 2
b. Gording + DLL #NAME? m3
2. Semen
a. Pondasi #NAME? zak
b. Plester Pondasi #NAME? zak
c. Pasangan Bata Dinding #NAME? zak
d. Plesteran Dinding
#NAME? #NAME?
237,904,212.69
300,000,000.0
291,029,766.12
RENCANA ANGGARAN BIAYA
PEMBERI TUGAS : DEPARTEMEN PENDIDIKAN DAN KEBUDAYAAN, DIREKTORAT JENDRAL MENENGAH,
DIREKTORAT PENDIDIKAN SMK
PEKERJAAN : PEMBANGUNAN SMK WITIHAMA
LOKASI : KECAMATAN WITIHAMA - KABUPATEN FLORES TIMUR - PROVINSI NUSA TENGGARA TIMUR
SUMBER DANA : APBN 2013
JUMLAH D #NAME?
CV. A
Kel Waihali - K
0 0
Err:509
PEMBERI TUGAS : DEPARTEMEN PENDIDIKAN DAN KEBUDAYAAN, DIREKTORAT JENDRAL MENENGAH,
Err:509
PEKERJAAN : PEMBANGUNAN SMK WITIHAMA
LOKASI : KECAMATAN WITIHAMA - KABUPATEN FLORES TIMUR - PROVINSI NUSA TENGGARA TIMUR
0 0
BULAN / MINGGU
NO URAIAN PEKERJAAN BOBOT I II
1 2 3 4 5 6 7
JUMLAH #NAME?
PROGRES RENCANA (%) - #NAME? #NAME? #NAME? #NAME? Err:509 Err:509 #NAME?
PROGRESS PROGRES REALISASI (%) - #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
SURPLUS/DEVIASI -
CV. ARSI KONSULTAN
Kel Waihali - Kec Larantuka Perwakilan Kab. Flores Timur
BULAN / MINGGU
II III KET.
8 9 10 11 12
100
#NAME?
###
#NAME? 80 ###
###
###
60
#NAME? ###
#NAME? #NAME? #NAME? ###
Err:509 Err:509 40
Err:509 Err:509
Err:509
Err:509 Err:509 Err:509 20
Err:509 Err:509
Err:509 Err:509 Err:509
0
###
#NAME? Err:509 Err:509 Err:509 Err:509
#NAME? #NAME? #NAME? #NAME? #NAME?
KATHARINA RIBERU
JUMLAH A 75,000,000.00
JUMLAH B 53,700,000.00
6.00 0.222 12.00 2.664 Kg
8.00 0.395 12.00 4.736 Kg
10.00 0.617 12.00 7.400 Kg
12.00 0.888 12.00 10.656 Kg
16.00 1.579 12.00 18.944 Kg
18.00 1.998 12.00 23.976 Kg
20.00 2.467 12.00 29.600 Kg
22.00 2.985 12.00 35.816 Kg
SLOOF
ukuran
beton 15 / 20 cm ; bila tebal selimut beton :
2.00 cm
maka dimensi pengecoran 11.00 x 16.00 cm
SLOOF
ukuran
beton 0/ 0 cm ; bila tebal selimut beton :
2.00 cm
maka dimensi pengecoran (4.00) x (4.00) cm
RINGBALK
ukuran
beton 12 / 35 cm ; bila tebal selimut beton :
1.50 cm
maka dimensi pengecoran 9.00 x 32.00 cm
SLOOF
ukuran
beton 12 / 20 cm ; bila tebal selimut beton :
SLOOF
ukuran
beton 0/ 0 cm ; bila tebal selimut beton :
BALOK 12/25
ukuran
beton 12 / 25 cm ; bila tebal selimut beton :
BALOK 20/50
ukuran
beton 20 / 50 cm ; bila tebal selimut beton :
Jumlah
Ø Besi Sengkang
Jarak
BALOK 20/35
ukuran
beton 20 / 35 cm ; bila tebal selimut beton :
Jumlah
Ø Besi Sengkang
Jarak
BALOK 12/20
ukuran
beton 12 / 20 cm ; bila tebal selimut beton :
BALOK LATAI
ukuran
beton 10 / 25 cm ; bila tebal selimut beton :
BALOK 25/50
ukuran
beton 25 / 50 cm ; bila tebal selimut beton :
= 10.00 mm
= 4.00 Buah
= 8.00 mm
= 15.00 cm
= 0.617 kg/m
= 0.395 kg/m
= 41.6667 m¹
10.00 mm = 166.6667 m¹
8.00 mm = 278.7778 Buah
≈ 279.0000 Buah
= 0.5800 m¹
= 161.8200 m¹
1.00 m³ = 102.7778 Kg
1.00 m³ = 63.8650 Kg
= 166.6427 Kg
= 16.6667 m²
2.00 cm
(4.00) cm
= 12.00 mm
= 6.00 Buah
= 8.00 mm
= 15.00 cm
= 0.888 kg/m
= 0.395 kg/m
= #DIV/0! m¹
12.00 mm = #DIV/0! m¹
8.00 mm = #DIV/0! Buah
≈ #DIV/0! Buah
= (0.0600) m¹
= #DIV/0! m¹
1.00 m³ = #DIV/0! Kg
1.00 m³ = #DIV/0! Kg
= #DIV/0! Kg
= #DIV/0! m²
1.50 cm
47.00 cm
= 16.00 mm
= 12.00 mm
= 8.00 Buah
= 4.00 Buah
= 8.00 mm
= 12.50 cm
= 1.579 kg/m
= 0.395 kg/m
= 8.0000 m¹
16.00 mm = 64.0000 m¹
12.00 mm 32.0000 m¹
8.00 mm = 65.0000 Buah
≈ 65.0000 Buah
= 1.4800 m¹
= 96.2000 m¹
1.00 m³ = 113.6640 Kg
1.00 m³ = 37.9669 Kg
= 151.6309 Kg
= 8.0000 m²
1.50 cm
22.00 cm
= 12.00 mm
= 4.00 Buah
= 8.00 mm
= 15.00 cm
= 0.888 kg/m
= 0.395 kg/m
= 33.3333 m¹
12.00 mm = 133.3333 m¹
8.00 mm = 223.2222 Buah
≈ 224.0000 Buah
= 0.7200 m¹
= 161.2800 m¹
1.00 m³ = 118.4000 Kg
1.00 m³ = 63.6518 Kg
= 182.0518 Kg
= 16.6667 m²
1.50 cm
47.00 cm
= 16.00 mm
= 12.00 mm
= 8.00 Buah
= 2.00 Buah
= 8.00 mm
= 12.50 cm
= 1.579 kg/m
= 0.395 kg/m
= 10.0000 m¹
16.00 mm = 80.0000 m¹
12.00 mm 20.0000 m¹
8.00 mm = 81.0000 Buah
≈ 81.0000 Buah
= 1.3800 m¹
= 111.7800 m¹
1.00 m³ = 134.1867 Kg
1.00 m³ = 44.1158 Kg
= 178.3025 Kg
= 10.0000 m²
1.50 cm
32.00 cm
= 16.00 mm
= 12.00 mm
= 8.00 Buah
= 2.00 Buah
= 8.00 mm
= 12.50 cm
= 1.579 kg/m
= 0.395 kg/m
= 14.2857 m¹
16.00 mm = 114.2857 m¹
12.00 mm 28.5714 m¹
8.00 mm = 115.2857 Buah
≈ 116.0000 Buah
= 1.0800 m¹
= 125.2800 m¹
1.00 m³ = 191.6952 Kg
1.00 m³ = 49.4438 Kg
= 241.1391 Kg
= 10.0000 m²
2.00 cm
16.00 cm
= 12.00 mm
= 4.00 Buah
= 8.00 mm
= 15.00 cm
= 0.888 kg/m
= 0.395 kg/m
= 41.6667 m¹
12.00 mm = 166.6667 m¹
8.00 mm = 278.7778 Buah
≈ 279.0000 Buah
= 0.5800 m¹
= 161.8200 m¹
1.00 m³ = 148.0000 Kg
1.00 m³ = 63.8650 Kg
= 211.8650 Kg
= 16.6667 m²
2.00 cm
21.00 cm
= 10.00 mm
= 6.00 Buah
= 8.00 mm
= 15.00 cm
= 0.617 kg/m
= 0.395 kg/m
= 40.0000 m¹
mm = 240.0000 m¹
mm = 267.6667 Buah
≈ 268.0000 Buah
= 0.6400 m¹
= 171.5200 m¹
m³ = 148.0000 Kg
m³ = 67.6932 Kg
= 215.6932 Kg
= 20.0000 m²
2.00 cm
46.00 cm
= 12.00 mm
= 6.00 Buah
= 8.00 mm
= 15.00 cm
= 0.888 kg/m
= 0.395 kg/m
= 16.6667 m¹
12.00 mm = 100.0000 m¹
8.00 mm = 112.1111 Buah
≈ 113.0000 Buah
= 1.1800 m¹
= 133.3400 m¹
1.00 m³ = 88.8000 Kg
1.00 m³ = 52.6249 Kg
= 141.4249 Kg
= 16.6667 m²
2.00 cm
46.00 cm
= 12.00 mm
= 6.00 Buah
= 8.00 mm
= 15.00 cm
= 0.888 kg/m
= 0.395 kg/m
= 8.0000 m¹
12.00 mm = 48.0000 m¹
8.00 mm = 54.3333 Buah
≈ 55.0000 Buah
= 1.4400 m¹
= 79.2000 m¹
1.00 m³ = 42.6240 Kg
1.00 m³ = 31.2576 Kg
= 73.8816 Kg
= 8.0000 m²
BUKAAN T L J V KUSEN P L T J V MENI CAT KILAP
1. PINTU P1.2 2.15 0.9 1 1.935 1. PINTU P1.2 5.3 0.05 0.11 1 0.02915 1.696 1.113
P1.3 2.15 0.8 1 1.72 P1.3 5.2 0.05 0.11 1 0.0286 1.664 1.092
P1.4 2.15 0.8 1 1.72 P1.4 5.2 0.05 0.11 1 0.0286 1.664 1.092
2. JENDLA J.1.BV1 1.15 0.7 2 1.61 2. JNDELA J.1.BV1 3.9 0.05 0.11 2 0.0429 2.496 1.638
0.35 0.7 2 0.49 2.3 0.05 0.11 2 0.0253 1.472 0.966
J.1.SUDUT 1.15 0.55 1 0.6325 2. JNDELA J.1.SUDUT 3.5 0.05 0.11 1 0.01925 1.12 0.735
1.15 0.55 1 0.6325 2.35 0.05 0.11 1 0.012925 0.752 0.4935
0.35 0.55 1 0.1925 1.9 0.05 0.11 1 0.01045 0.608 0.399
0.35 0.55 1 0.1925 1.55 0.05 0.11 1 0.008525 0.496 0.3255
0 0
3. BV BV.1 0.3 0.35 15 1.575 3. BV BV.1 1.5 0.06 0.12 15 0.162 8.1 5.4
BV.KISI2 .1 1.1 0.4 1 0.44 BV.KISI2 .1 7 0.06 0.12 1 0.0504 2.52 1.68
3.234
1.512
1.6616
1.3
DINDING
8.6 3.1 26.66
3 3.1 9.3
1.6 0.65 1.04
4.3 3.1 13.33
3 3.1 9.3
8.6 3.1 26.66
5.2 3.1 16.12
1.6 3.1 4.96
5.2 3.1 16.12
1.6 3.1 4.96
4.2 3.1 13.02
5.6 3.1 17.36
2.6 0.5 1.3
1.4 0.5 0.7
1.4 0.5 0.7
1.3 0.7 0.91
2.6 1.42 3.692
2.6 1.42 3.692
169.824
158.68
15. PLAFOND
LANTAI.1
* RUANG 1 2.9 2.9 1 8.41
* RUANG 2 2.9 2.9 1 8.41
* RUANG 3 8.9 5.9 1 52.51
* RUANG 4 5.9 4.7 1
* RUANG 5 2.9 4.7 1
* RUANG 6 7.4 6.3 1
* RUANG 7 5.9 4.7 1
* RUANG 8 2.9 4.7 1
* RUANG 9 5.9 7.4 1 43.66
* RUANG 10 5.9 5.65 1 33.335
LANTAI.2
* RUANG 1 5.9 4.7 1 27.73
* RUANG 2 2.9 4.7 1 13.63
* RUANG 3 1.4 4.7 1 6.58
* RUANG 4 5.9 4.7 1 27.73
* RUANG 5 5.9 4.7 1 27.73
* RUANG 6 2.4 4.7 1 11.28
PLAFOUND LUAR
* GEDUNG UTAMA ( TINGKAT )
LUAR KANAN 1.05 1 0
LUAR KIRI 1.05 1 0
DEPAN 35.19 1.5 1 52.785
BELAKANG 1.05 1 0
* SAYAP KIRI
LUAR DEPAN 6.9 1.25 1 8.625
KANAN 14 1.25 1 17.5
BELAKANG 2.5 1.25 1 3.125
5.4 1.97 1 10.638
KIRI 8 1.97 1 15.76
* SAYAP KANAN
LUAR DEPAN 6.9 1.25 1 8.625
KANAN 14 1.25 1 17.5
BELAKANG 2.5 1.25 1 3.125
5.4 1.97 1 10.638
KIRI 8 1.97 1 15.76
* RUANG SIDANG
LUAR DEPAN 1 0
KANAN 18 1.5 1 27
BELAKANG 9 1.5 1 13.5
1 0
KIRI 18 1.5 1 27
766.1536 M2
16.ATAP SENG
* DPAN 1 7.9 4.15 32.785
* BLKANG 1 2.14 3.9 8.346
* BLAKANG 2 2.82 2.305 6.5001
* BLAKANG 3 3.07 2.03 6.2321
* SAMPING KIRI 4.15 4.39 18.2185
1.92 2.195 4.2144
* SAMPING KANAN 2.75 4.47 12.2925
2.71 2.235 6.05685
94.64545 M2
17 .BUBUNGAN
7.9 1 7.9
6.07 1 6.07
4.5 1 4.5
6.2 1 6.2
24.67 M1
18. LISPLANK
*BELAKANG 4.23 2 8.46
* DEPAN 7.86 1 7.86
* SMPING KANAN 3.68 2 7.36
4.11 1 4.11
* SAMPING KIRI 2.53 1 2.53
30.32 M1
SALURAN
1. GALIAN TANAH 74.88 0.83 0.4 1 24.86016
2. PASIR 74.88 0.83 0.052 1 3.2318208
3. PAS BATA 76.62 0.5 1 38.31
4. PAS BATU KALI 72.8 0.65 0.2 1 9.464
5. BATU KOSONG 72.8 1 0
6. PLESTER SAL 74.88 1.23 1 92.1024
7. RABAT 74.88 0.33 0.05 1 1.23552
PLAT PENYEBERANGAN
TANGGA
RAM
RABAT DEPAN 1.37 0.77 0.05 1 0.052745
0.3 0.77 0.125 1 0.028875
SAMPING 2.27 1.47 0.05 1 0.166845
0.3 1.47 0.125 1 0.055125
2.27 1.19 0.05 1 0.135065
0.3 1.19 0.125 1 0.044625
0.48328
0.354655
2.035901
212.0085
dinding granite
7.8 2.4 10.2 TEMPAT CUCI/TROLY
4.1 DEKONTAMINASI
3.9 DEKONTAMINASI
3.03 DEKONTAMINASI
4.95 PENGEMASAN
6.9 PROSESING + PENGEMASAN
3 TN.4
3 PROSESING
39.08 1.2 46.896
18.9 2 37.8 KM/WC
84.696
151.09 105.11
LAT PENYEBERANGAN
1.19 0.1 0.53 0.06307
1.47 0.1 0.53 0.07791
0.77 0.1 0.53 0.04081
0.18179
64.119 39.38
64.2 39.4
KUDA-KUDA
KK.1 )
6.3 BLK TEKAN
5.6 BLK TEKAN
6.6 BLK TARIK
2.3 NOK
1.52 PENYIKONG
1.52 PENYIKONG
2.62 PENGAPIT DATAR
1.32 SKUR.1
1.32 SKUR.1
1.1 SKUR.2
1.1 SKUR.2
1.25 KONSOL BAWAH
0.7 KONSOL TEGAK
3 SAMB
MUR.17 CM 174
MUR.25 CM 24
BESI STRIP 12
BEUGEL U PLAT 6
BEUGEL U BULAT 12
ANGKER KK 12
KK.2 7 BLK TEKAN
7.7 BLK TEKAN
11.7 BLK TARIK
4 NOK
2.8 PENYIKONG
2.8 PENYIKONG
4 PENGAPIT DATAR
2.5 SKUR.1
2.5 SKUR.1
1.8 SKUR.2
1.8 SKUR.2
4 SAMB
GEWEL.1 7.7
7.7
GEWEL.2 4.9
4.9
9.8 0.06 0.12 1 0.07056
GEWEL.2 3.3
3.3
3.07008
GORDING
BELAKANG/ RUANG SIDANG 20.1 2 40.2
19.81 2 39.62
19.34 2 38.68
18.76 2 37.52
19.02 2 38.04
19.68 2 39.36
20.33 2 40.66
20.99 2 41.98
0
4.94 2 9.88
6.25 2 12.5
7.56 2 15.12
9.07 2 18.14
0
0
0
0
0
0
0
0
0
0
KASO
BELAKANG/ RUANG SIDANG 14.38 45 647.1
3.288 4 13.152
3.024 4 12.096
2.88 4 11.52
2.82 4 11.28
2.808 4 11.232
2.736 4 10.944
5.7 11 62.7
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
RENG
BELAKANG/ RUANG SIDANG 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 0.04 0.06 0
K BUBUNGAN + JURAI
19 1 19
4 1 4
5.1 1 5.1
8 1 8
8 1 8
8 1 8
8 1 8
BELAKANG 0
222.3552
16. LIST PLAFOND
14.6 21.4 36 36
3.7 6 9.7 9.7
4.8 6 10.8 10.8
11.6 6 2.8 20.4 17.6
( TINGKAT ) 311.9
( TINGKAT )
70.38 3 73.38
701.94 M1
KUDA-KUDA
LANTE.2
KK.5
6.3 BLK TEKAN
5.6 BLK TEKAN
6.6 BLK TARIK
2.3 NOK
1.52 PENYIKONG
1.52 PENYIKONG
2.62 PENGAPIT DATAR
1.32 SKUR.1
1.32 SKUR.1
1.1 SKUR.2
1.1 SKUR.2
1.25 KONSOL BAWAH
0.7 KONSOL TEGAK
3 SAMB
MUR.17 CM 116
MUR.25 CM 16
BESI STRIP 8
BEUGEL U PLAT 4
BEUGEL U BULAT 8
ANGKER KK 8
KK.5'
3.6 BLK TEKAN
3.6 BLK TEKAN
6.6 BLK TARIK
2.3 NOK
1.52 PENYIKONG
1.52 PENYIKONG
2.62 PENGAPIT DATAR
1.32 SKUR.1
1.32 SKUR.1
1.1 SKUR.2
1.1 SKUR.2
KONSOL BAWAH
KONSOL TEGAK
1 SAMB
MUR.17 CM 46
MUR.25 CM 8
BESI STRIP 4
BEUGEL U PLAT 2
BEUGEL U BULAT 4
ANGKER KK 4
KK.3
6.3 BLK TEKAN
6.3 BLK TEKAN
9.4 BLK TARIK
3.1 NOK
2.25 PENYIKONG
2.25 PENYIKONG
3.85 PENGAPIT DATAR
1.73 SKUR.1
1.73 SKUR.1
1.44 SKUR.2
1.44 SKUR.2
3 SAMB
MUR.17 CM 32
MUR.25 CM 24
BESI STRIP 4
BEUGEL U PLAT 2
BEUGEL U BULAT 4
ANGKER KK 4
KK.4
5.9 BLK TEKAN
5.9 BLK TEKAN
9 BLK TARIK
3.1 NOK
2.3 PENYIKONG
2.3 PENYIKONG
3.8 PENGAPIT DATAR
1.75 SKUR.1
1.75 SKUR.1
1.45 SKUR.2
1.45 SKUR.2
3 SAMB
MUR.17 CM 14
MUR.25 CM 12
BESI STRIP 2
BEUGEL U PLAT 1
BEUGEL U BULAT 2
ANGKER KK 2
KK.4'
3.4 BLK TEKAN
3.4 BLK TEKAN
1.4 NOK
4 PENGAPIT DATAR
MUR.17 CM 14
MUR.25 CM 12
BESI STRIP 2
BEUGEL U PLAT 1
BEUGEL U BULAT 2
ANGKER KK 2
1/2 KK.5
6.4 BLK TEKAN
3.1 BLK TARIK
2 SKUR.1
1.1 SKUR.2
1.2 KONSOL BAWAH
0.7 KONSOL TEGAK
1 SAMB
MUR.17 CM 24
MUR.25 CM
BESI STRIP
BEUGEL U PLAT
BEUGEL U BULAT 2
ANGKER KK 2
1/2 KK.3
7.2 BLK TEKAN
4.6 BLK TARIK
2.3 SKUR.1
2.7 SKUR.2
1.6 SKUR.3
1.3 SKUR.4
2 SAMB
MUR.17 CM 20
MUR.25 CM 8
BESI STRIP
BEUGEL U PLAT
BEUGEL U BULAT 2
ANGKER KK 2
1/2 KK.4
5.9 BLK TEKAN
4.4 BLK TARIK
2 SKUR.1
2.7 SKUR.2
1.52 SKUR.3
1.25 SKUR.4
1 SAMB
MUR.17 CM 11
MUR.25 CM 4
BESI STRIP 1
BEUGEL U PLAT
BEUGEL U BULAT 1
ANGKER KK 1
1/2 KK.5'
3.2 BLK TEKAN
1.1 BLK TARIK
1.7 KONSOL
MUR.17 CM 32
MUR.25 CM
BESI STRIP
BEUGEL U PLAT
BEUGEL U BULAT 4
ANGKER KK 4
1/2 KK.5"
2.4 BLK TEKAN
1.1 BLK TARIK
MUR.17 CM 12
MUR.25 CM
BESI STRIP
BEUGEL U PLAT
BEUGEL U BULAT 4
ANGKER KK 4
1/2 KK.3'
3.4 BLK TEKAN
1.7 BLK TARIK
1.2 SKUR
MUR.17 CM 12
MUR.25 CM
BESI STRIP
BEUGEL U PLAT
BEUGEL U BULAT 6
ANGKER KK 6
1/2 KK.4'
5.32 BLK TEKAN
3.3 BLK TARIK
2.1 SKUR
1 SAMB
MUR.17 CM 4
MUR.25 CM
BESI STRIP
BEUGEL U PLAT
BEUGEL U BULAT 2
ANGKER KK 2
1/2 KK.4"
2.9 BLK TEKAN
1.3 BLK TARIK
4.2 0.06 0.12 4 0.12096
MUR.17 CM
MUR.25 CM
BESI STRIP
BEUGEL U PLAT
BEUGEL U BULAT 4
ANGKER KK 4
MUR.17 CM 224
MUR.25 CM 32
BESI STRIP 16
BEUGEL U PLAT 8
BEUGEL U BULAT 16
ANGKER KK 16
MUR.17 CM 36
MUR.25 CM
BESI STRIP
BEUGEL U PLAT
BEUGEL U BULAT 4
ANGKER KK 4
MUR.17 CM 48
MUR.25 CM
BESI STRIP
BEUGEL U PLAT
BEUGEL U BULAT 12
ANGKER KK 12
RUANG SIDANG
KK.2
7.1 BLK TEKAN
7.1 BLK TEKAN
9 BLK TARIK
3.1 NOK
2.3 PENYIKONG
2.3 PENYIKONG
3.8 PENGAPIT DATAR
1.75 SKUR.1
1.75 SKUR.1
1.45 SKUR.2
1.45 SKUR.2
2 SAMB
MUR.17 CM 162
MUR.25 CM 24
BESI STRIP 12
BEUGEL U PLAT 6
BEUGEL U BULAT 12
ANGKER KK 12
1/2 KK.2
7.11 BLK TEKAN
5.08 BLK TARIK
1.8 SKUR.1
2.7 SKUR.2
1.6 SKUR.3
1.3 SKUR.4
1 SAMB
MUR.17 CM 12
MUR.25 CM
BESI STRIP
BEUGEL U PLAT
BEUGEL U BULAT 1
ANGKER KK 1
1/2 KK.2"
3.2 BLK TEKAN
1.6 BLK TARIK
1.1 SKUR.1
MUR.17 CM 16
MUR.25 CM 9.146592
BESI STRIP
BEUGEL U PLAT
BEUGEL U BULAT 4
ANGKER KK 4
PAPAN BUBUNGAN
DEPAN/BELAKANG 10 2 20
2.9 2 5.8
KIRI /KANAN 7.2 2 14.4
19 1 19
IKATAN ANGIN
SAYAP 3.2 6 19.2
LT.2 3.8 2 7.6
3.5 8 28
SIDANG 3.8 10 38
* SAMBUNGAN CANOPY
KIRI 4.2 6.7 28.14
KANAN 4.2 6.7 28.14
BELAKANG 1.9 6.3 11.97
1.9 6.3 11.97
* TINGKAT LANTE.2
DEPAN 8.95 5.2 46.54
8.95 5.2 46.54
KIRI 5.1 0.8 4.08
4.4 5.2 22.88
KANAN 5.1 0.8 4.08
4.4 5.2 22.88
BELAKANG 8.95 5.9 52.805
8.95 5.9 52.805
* SAYAP KIRI
DEPAN 5.175 5.51 28.51425
KIRI 10.6 5.51 58.406
KANAN 7.76 5.9 45.784
BELAKANG 6.4 0.8 5.12
4.7 5.51 25.897
2.7 5.45 14.715
* SAYAP KANAN
DEPAN 5.175 5.2 26.91
KIRI 10.6 5.45 57.77
KANAN 7.76 5.9 45.784
BELAKANG 6.4 0.8 5.12
4.7 5.45 25.615
2.7 5.45 14.715
* RUANG SIDANG
DEPAN 0
KIRI 19.4 6.6 128.04
KANAN 19.4 6.6 128.04
BELAKANG 5.4 6.6 35.64
0
1070.744
LIST PLANK BUBUNGAN
7.35
15.7
7.76
9.15
2.7
7.35
15.7
7.76
9.15
2.7
19.4
19.4
10.6
222.12 154.584
TOTAL KUDA - KUDA 9.146592
TOTAL MUR.17 CM 835
TOTAL MUR.25 CM 140
TOTAL BESI STRIP 49
TOTAL BEUGEL U PLAT 24
TOTAL BEUGEL U BULAT 94
TOTAL ANGKER KK 94
* SAMBUNGAN CANOPY
KIRI 4.2 6.7 28.14
KANAN 4.2 6.7 28.14
BELAKANG 1.9 6.3 11.97
1.9 6.3 11.97
* TINGKAT LANTE.2
DEPAN 8.95 5.2 46.54
8.95 5.2 46.54
KIRI 5.1 0.8 4.08
4.4 5.2 22.88
KANAN 5.1 0.8 4.08
4.4 5.2 22.88
BELAKANG 8.95 5.9 52.805
8.95 5.9 52.805
* SAYAP KIRI
DEPAN 5.175 5.51 28.51425
KIRI 10.6 5.51 58.406
KANAN 7.76 5.9 45.784
BELAKANG 6.4 0.8 5.12
4.7 5.51 25.897
2.7 5.45 14.715
* SAYAP KANAN
DEPAN 5.175 5.2 26.91
KIRI 10.6 5.45 57.77
KANAN 7.76 5.9 45.784
BELAKANG 6.4 0.8 5.12
4.7 5.45 25.615
2.7 5.45 14.715
* RUANG SIDANG
DEPAN 0
KIRI 19.4 6.6 128.04
KANAN 19.4 6.6 128.04
BELAKANG 5.4 6.6 35.64
0
1070.744
LIST PLANK BUBUNGAN
10.8 9.045
4.1 9.045
6.885
4.1 6.885
7.3575
7.3575
8.9
8.9
4.3 2.9
4.3 2.9
1.8 6.885
1.8 6.885
6.885
9.8 6.885
9.8 6.1
3.6 6.1
5 6.3
3.6 17.2
5 8.883
9.7 8.883
9.7
7.35
15.7
7.76
9.15
2.7
7.35
15.7
7.76
9.15
2.7
19.4
19.4
10.6
222.12 151.181
GORDING
SAYAP KIRI KANAN
DEPAN 3.21 2 6.42
3.93 2 7.86
5.37 2 10.74
6.2 2 12.4
6.9 2 13.8
7.8 2 15.6
KANAN 6.6 8 52.8
6.95 2 13.9
7.8 2 15.6
8.3 2 16.6
KIRI 7.05 2 14.1
8.95 2 17.9
10.65 2 21.3
12.25 2 24.5
14.2 2 28.4
15.8 2 31.6
BELAKANG 0.3 2 0.6
1.12 2 2.24
2 2 4
2.8 2 5.6
0.55 2 1.1
2.2 2 4.4
4 2 8
6 2 12
7.61 2 15.22
9.6 2 19.2
6.6 2 13.2
RUANG SIDANG
KANAN 18.65 4 74.6
20.45 1 20.45
21.25 1 21.25
22.3 1 22.3
KIRI 18.65 4 74.6
20.45 1 20.45
21.25 1 21.25
22.3 1 22.3
BELAKANG 0.7 1 0.7
2.32 1 2.32
4 1 4
6.1 1 6.1
7.8 1 7.8
9.65 1 9.65
11.25 1 11.25
TINGKAT
DEPAN 9.8 12 117.6
0.8 1 0.8
2.4 1 2.4
4.1 1 4.1
6.2 1 6.2
7.8 1 7.8
9.75 1 9.75
11.35 1 11.35
KANAN 0.4 1 0.4
1.45 1 1.45
3.1 1 3.1
5.3 1 5.3
6.9 1 6.9
8.5 1 8.5
5.5 1 5.5
4.9 7 34.3
4.5 7 31.5
KIRI 0.4 1 0.4
1.45 1 1.45
3.1 1 3.1
5.3 1 5.3
6.9 1 6.9
8.5 1 8.5
5.5 1 5.5
4.9 7 34.3
4.5 7 31.5
3 2 6
RUANG SIDANG
KANAN 6.83 27 184.41
1.599 1 1.599
1.469 1 1.469
2.249 1 2.249
3.029 1 3.029
3.809 1 3.809
4.589 1 4.589
5.343 1 5.343
6.123 1 6.123
KIRI 6.83 27 184.41
1.599 1 1.599
1.469 1 1.469
2.249 1 2.249
3.029 1 3.029
3.809 1 3.809
4.589 1 4.589
5.343 1 5.343
6.123 1 6.123
BELAKANG 6.83 1 6.83
1.599 2 3.198
1.469 2 2.938
2.249 2 4.498
3.029 2 6.058
3.809 2 7.618
4.589 2 9.178
5.343 2 10.686
6.123 2 12.246
TINGKAT
DEPAN 5.5 18 99
4.563 2 9.126
3.783 2 7.566
3.003 2 6.006
2.223 2 4.446
1.443 2 2.886
0.663 2 1.326
4.524 2 9.048
3.744 2 7.488
2.964 2 5.928
2.08 2 4.16
1.742 2 3.484
1.521 2 3.042
7 1 7
6.175 2 12.35
5.395 2 10.79
4.615 2 9.23
3.835 2 7.67
3.055 2 6.11
2.275 6 13.65
5.278 11 58.058
5.3 14 74.2
5.278 11 58.058
5.3 14 74.2
BELAKANG 5.5 18 99
4.563 2 9.126
3.783 2 7.566
3.003 2 6.006
2.223 2 4.446
1.443 2 2.886
0.663 2 1.326
4.524 2 9.048
3.744 2 7.488
2.964 2 5.928
2.08 2 4.16
1.742 2 3.484
1.521 2 3.042
2.65 16 42.4
RUANG SIDANG
KANAN 21.56 17 366.52
TINGKAT
DEPAN 9.5 26 247
5.72 17 97.24
KANAN 4.6 15 69
3.95 17 67.15
4.2 17 71.4
KIRI 4.6 15 69
3.95 17 67.15
4.2 17 71.4
20.63 10.315
9.84 4.92
CAT EXTERIOR BUKAAN
621.376
CAT INTERIOR
* Panjang Lantai Dasa 311.9 2.9 904.51
* Panjang Lantai 2 113.6 3.4 386.24
0383)-21130 - Larantuka
BUKAAN T L J V KUSEN P L T J V ANKER
1. PINTU P.1 2.25 1.5 1 3.375 1. PINTU P.1 6.1 0.05 0.11 1 0.03355 6
P.2 2.25 1.3 1 2.925 P.2 5.9 0.05 0.11 1 0.03245 6
P.3 2.25 1 1 2.25 P.3 5.6 0.05 0.11 1 0.0308 6
1 0.45 1 0.45 3.55 0.05 0.11 1 0.019525 4
P.4 2.25 0.85 1 1.9125 P.4 5.39 0.05 0.11 1 0.029645 6
P.5 2.25 0.85 7 13.3875 P.5 5.39 0.05 0.11 7 0.207515 42
P.5 2.25 0.85 1 1.9125 P.5 5.39 0.05 0.11 1 0.029645 6
2. JENDLA J.1. BV.1 1.65 0.6 6 5.94 2. JNDELA J.1. BV.1 5.3 0.05 0.11 6 0.1749 24
0.45 0.6 6 1.62 2.3 0.05 0.11 6 0.0759 24
J.1 1.25 0.35 3 1.3125 J.1 3.4 0.05 0.11 3 0.0561 12
J1.LOKET.1 1.25 1.35 1 1.6875 J1.LOKET.1 6.65 0.05 0.11 1 0.036575 4
J.2. BV.2 1.25 1.35 2 3.375 J.2. BV.2 6.65 0.05 0.11 2 0.07315 8
0.45 1.35 2 1.215 4.25 0.05 0.11 2 0.04675 8
0.05 0.11
BV.2 1.35 0.45 8 4.86 BV.2 4.25 0.05 0.11 8 0.187 32
BV.3 2 0.45 4 3.6 BV.3 6 0.05 0.11 4 0.132 16
LOKET.1 1.5 0.7 2 2.1 LOKET.1 4.6 0.05 0.11 2 0.0506 8
25.7625
18.899 M2
DAUN BOVEN
#REF! 0.47 0.17 2 0.1598
0.1598 M2
ENGSEL KT AGN GRENDEL MENI CAT KILAP politur jendela
3 1 1.952 1.44875
3 1 1.888 1.40125
3 1 1.792 1.33
4 4 1 1.136 0.843125 1.136
3 1 1.7248 1.280125
21 1 12.0736 8.960875
3 1 1.7248 1.280125