Anda di halaman 1dari 1

DIGAMBAR OLEH DIRENCANAKAN OLEH DISETUJUI OLEH DIKETAHUI Judul Gambar : No.

Gbr :
PT. WASKITA KARYA RENCANA TEKNIK AKHIR
(DETAILED ENGINEERING DESIGN) PLAN & PROFIL STRUKTUR PILE SLAB E.1-10
PT. MULTI PHI BETA
JALAN TOL PEMATANG PANGGANG~KAYUAGUNG CONSULTING ENGINEERS STA 169+392.5 ~ 169+595 Skala :
M RIDWAN NUR R A MARDI PRABAWA ABDURRAHMAN GUNADI SOEKARDJO
SEKSI - III Sta.161+600 - Sta.177+600 DRAFTMAN STRUCTURE ENGINEER
1 : 500
TEAM LEADER GENERAL MANAGER

PLAN STA 169+392.5 ~ 169+595

PROFIL STA 169+392.5 ~ 169+595