Boq Jasri
Boq Jasri
(BOQ)
…................,…..........................
DIBUAT OLEH
PT/CV
…...........................................
DIREKTUR/DIREKTRIS
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
A Tenaga Kerja
1 Pekerja L.01 OH 0.5630 - -
2 Mandor L.04 OH 0.0563 - -
A Tenaga Kerja
1 Pekerja L.01 OH 0.300 - -
2 Tukang Batu L.02 OH 0.150 - -
3 Kepala Tukang Batu L.03 OH 0.015 - -
4 Mandor L.04 OH 0.030 - -
A Tenaga Kerja
1 Pekerja L.01 OH 0.300 - -
2 Tukang Batu L.02 OH 0.150 - -
3 Kepala Tukang Batu L.03 OH 0.015 - -
4 Mandor L.04 OH 0.030 - -
A Tenaga Kerja
1 Pekerja L.01 OH 2.700 - -
2 Tukang Batu L.02 OH 0.900 - -
3 Mandor L.04 OH 0.270 - -
A Tenaga Kerja
1 Pekerja L.01 OH 1.320 - -
2 Tukang Batu L.02 OH 0.220 - -
3 Kepala Tukang L.03 OH 0.022 - -
4 Mandor L.04 OH 0.132 - -
HARGA
NO URAIAN KODE SAT. KOEF
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.25 - -
2 Tukang Besi L.02 OH 0.25 - -
3 Kepala Tk. Besi L.03 OH 0.025 - -
4 Mandor L.04 OH 0.025 - -
Jumlah Harga Tenaga Kerja -
B Bahan
1 Wire mesh M6 M.94.a Kg 102 - -
2 Kawat beton M.60 Kg 0.5 - -
Jumlah Harga Bahan -
C Peralatan
A Tenaga Kerja
1 Pekerja L.01 OH 1.650 - -
2 Tukang Batu L.02 OH 0.275 - -
3 Kepala Tukang L.03 OH 0.028 - -
4 Mandor L.04 OH 0.165 - -
A Tenaga Kerja
1 Pekerja L.01 OH 0.700 - -
2 Tukang besi L.02 OH 0.700 - -
3 Kepala Tukang Besi L.03 OH 0.070 - -
4 Mandor L.04 OH 0.070 - -
A Tenaga Kerja
1 Pekerja L.01 OH 0.240 - -
2 Tukang Kayu L.02 OH 0.120 - -
3 Kepala Tukang L.03 OH 0.012 - -
4 Mandor L.04 OH 0.024 - -
A Tenaga Kerja
1 Pekerja L.01 OH 0.040 - -
4 Mandor L.04 OH 0.004 - -
II HARGA BAHAN
1 Batu Kali/Batu belah M3
2 Tanah Urug M3
3 Pasir Urug M3
4 Pasir Pasang M3
5 Pasir Beton M3
6 Koral Beton M3
7 Semen Portland @ 50 Kg Zak
8 Besi Beton Biasa Kg
9 Kawat Beton Kg
10 Paku Kg
11 Kayu Begisting M3
12 Solar (BBM non Subsidi) Ltr
13 Oli Ltr
14 Kamper Balok M3
15 Kayu Kruing Balok M3
16 Kayu Kruing Usuk M3
17 Kayu Kamper Papan M3
18 Kayu Kamper Reng M3
19 Lem Kayu Ltr
20 Genteng Bh
21 Genteng Bubungan Bh
22 Sirtu M3
23 Batako Buntu Bh
24 Gedeg M2
25 Eternit Lbr
26 Kawat Bronjong 2 x 1 x 0,5 dia 2,70/mm Unit
27 Pipa Galvanis dia 2" M'
28 Multiflex 12 mm Lbr
29 Multiflex 9 mm Lbr
29 Kaso 5/7 cm M3
30 Cat besi setara emco Kg
31 Cat Meni Kayu setara altex Kg
32 Dempul setara deiwa Kg
HARGA SATUAN
NO URAIAN SATUAN
( Rp)
a b c d
33 Cat Dasar setara emco Kg
34 Cat Kayu (emco) Kg
35 Cat Dinding/Tembok setara Vinilex Kg
36 Minyak Begisting Ltr
37 Batu andesite 30 kg- 50 kg m3
38 Batu andesite 100 kg- 200 kg m3
39 Batu andesite 650 kg- 800 kg m3
40 Geotekstil m2
41 Kramik 20 x 20 cm Anti Slip Bh
42 Keramik 20x25 cm KW I Bh
43 Keramik Border Artistik 8 x 20 Bh
44 Kramik 40 x 40 cm Bh
45 Semen Warna Kg
46 Kaca Bening 5 mm M2
47 Kloset Jongkok Bh
48 Bak Air Fiber Bh
49 Pipa Baja dia 3" M'
50 Welding Electroda Kg
51 Paving Block t = 6 cm M2
52 Besi Strip Kg
53 Batu candi M2
54 Helm Pelindung Bh
55 Masker Bh
56 Rompi Bh
57 Sarung Tangan Ps
58 Sepatu Boot Ps
59 Spanduk/Banner M'
60 Peralatan P3K (Kotak P3K, Obat Luka, Per Ls
61 Hollow 4 x 4 cm Bt
62 Seng Spandek 0,25 mm, P 6,2 m Lbr
63 Seng Spandek 0,30 mm, P 6,2 m Lbr
64 Buis Beton Diameter 30 cm Bh
65 Buis Beton Diameter 40 cm Bh
66 Buis Beton Diameter 50 cm Bh
67 Buis Beton Diameter 60 cm Bh
68 Buis Beton Diameter 80 cm Bh
69 Buis Beton Diameter 100 cm Bh