Anda di halaman 1dari 1

GAMBAR PERENCANAAN

NO REVISI TANGGAL
DETAIL "C"
PIPA BENDING 1440 1
/ ELBOW 45° - 4" MANHOLE 2
1200 3
PIPA OUTLET MENUJU B A 4
5
UNIT ABR - 4"
UNIT
PROYEK
SETTLING TANK

BIOGAS
PIPA ELBOW 45° - 4" 1250 1490 +0.00 MT

-400.00 MA OWNER

PIPA OUTLET LUMPUR CHECK VALVE 5"


B A UNIT ST -1250.00 (KEDALAMAN PIPA OUTLET
MENUJU UNIT AD - 5" LUMPUR UNIT ST)
250 LOKASI
PIPA INLET GREY & BLACK UNIT AD -1500.00 (KEDALAMAN PIPA INLET
LUMPUR UNIT AD)
WATER DARI WC - 4"

DENAH UNIT SETTLING TANK (ST) DETAIL "C"


SKALA 1 : 40 SKALA 1 : 40

DIPERIKSA

DISETUJUI

DITETAPKAN
PIPA OUTLET LIMBAH CAIR
MENUJU ABR - 4"

MANHOLE MANHOLE KONSULTAN PERENCANA


SLAB BETON
SLAB BETON
AD 1:2:3 TEBAL 100 MM
AD 1:2:3 TEBAL 100 MM
MT +0.00 MT +0.00 PIPA INLET LIMBAH
DARI TOILET - 4"
700
MA -400.00 100 PLESTERAN DALAM MA -400.00
150 AD 1:3 TEBAL 20 MM NAMA GAMBAR
1053
DENAH DAN DETAIL UNIT
PAS. BATU BATA
PENGOLAHAN SETTLING TANK
-1100.00 AD 1:4 TEBAL 100 MM -1100.00
-1250.00 -1250.00 PLESTERAN DALAM CATATAN :
AD 1:3 TEBAL 20 MM
-1558.00 LANTAI KERJA -1558.00 1.

AD 1:3:5 TEBAL 50 MM PAS. BATU BATA 2.

1250 AD 1:4 TEBAL 100 MM 3.

1490 URUGAN PASIR LANTAI KERJA 4.


TEBAL 100 MM URUGAN PASIR AD 1:3:5 TEBAL 50 MM
PIPA OUTLET LUMPUR TEBAL 100 MM
MENUJU AD - 5" NAMA TENAGA AHLI PARAF TGL
TEAM LEADER/
KOORDINATOR
PERENCANAAN
POTONGAN B-B POTONGAN A-A PERENCANA
ARSITEKTUR

SKALA 1 : 40 SKALA 1 : 40 PERENCANA


INTERIOR

PERENCANA
MEKANIKAL

PERENCANA
ELEKTRIKAL

DIGAMBAR

KODE GAMBAR NO GAMBAR UNIT / SATUAN SKALA

MM 1/40

Anda mungkin juga menyukai