KEBUTUHAN MATERIAL PERUMAHAN

NO MATERIAL JUMLAH SATUAN HARGA SATUAN TOTAL HARGA KET

1 BESI CANAL C 55 BTG

2 RING ATAP 35 BTG

3 SPANDEK MERAH MAROON 5,5 M 18 LBR

4 SPANDEK MERAH MAROON 7 M 4 LBR

5 BAUT DRILL 1,6 1 DOS

6 BAUT SPANDEK 5 CM 2 DOS

7 DYNABOLT 7X15 20 BH

8 CAT DASAR WARNA PUTIH 1 PAIL


MATERIAL

NO TANGGAL URAIAN PENGELUARAN


1 12/2/2019 SEMEN TONASA DO
2 12/7/2019 BAYAR MATERIAL PERUMAHAN TYPE 45 (BATU MERAH)
3 12/11/2019 MATERIAL PERUMAHAN TYPE 45 (BELANJA IBU)
4 12/11/2019 SEMEN 20 SAK (BELANJA IBU)
5 12/11/2019 BAYAR MATERIAL PERUMAHAN TYPE 45 (BATU MERAH)
6 12/11/2019 BAYAR PASIR HALUS (NOTA TGL 3/9/2019)
7 12/11/2019 UANG KAS PERUMAHAN
8 12/16/2019 UANG KAS PERUMAHAN
9 12/17/2019 UANG KAS PERUMAHAN
10 12/17/2019 MATERIAL PERUMAHAN TYPE 45
11 12/20/2019 PEMBELIAN KALANG2 1/2 KUBIK
12 12/23/2019 MATERIAL PERUMAHAN TYPE 36
13 12/23/2019 MATERIAL PERUMAHAN TYPE 45
14 12/23/2019 BAYAR MATERIAL PERUMAHAN TYPE 45 (BATU MERAH)
15 12/26/2019 PINTU PERUMAHAN TYPE 36
16 12/27/2019 BAYAR MATERIAL PERUMAHAN TYPE 45 (BATU MERAH)
17 12/27/2019 UANG KAS PERUMAHAN
18 1/3/2020 UANG KAS PERUMAHAN
19 1/6/2020 UANG KAS PERUMAHAN
20
21
22
23

TOTAL PENGELUARAN
MATERIAL

HARGA SATUAN JUMLAH UANG KET


63,000 200 12,600,000
2,340,000 1 2,340,000 BAYAR SETENGAH
10,745,000 1 10,745,000
68,000 20 1,360,000
2,000,000 1 2,000,000 PELUNASAN
1,500,000 1 1,500,000
500,000 1 500,000
500,000 1 500,000
500,000 1 500,000
6,000,000 1 6,000,000
1,000,000 1 1,000,000
2,000,000 1 2,000,000
2,500,000 1 2,500,000
2,340,000 1 2,340,000 BAYAR SETENGAH
3,000,000 1 3,000,000 PANJAR
2,000,000 1 2,000,000 PELUNASAN
1,000,000 1 1,000,000
1,000,000 1 1,000,000
1,000,000 1 1,000,000

37 53,885,000
UPAH KERJA IAN

NO TANGGAL URAIAN PENGELUARAN


1 9/27/2019 UPAH KERJA PERUMAHAN
2 12/7/2019 UPAH KERJA PERUMAHAN type 45
3 12/7/2019 UPAH KERJA PERUMAHAN type 36
4 12/14/2019 UPAH KERJA PLAFON PERUMAHAN TYPE 36
5 12/14/2019 UPAH KERJA PERUMAHAN TYPE 36
6 12/20/2019 UPAH KERJA PERUMAHAN type 45
7 12/31/2019 UPAH KERJA PERUMAHAN type 45
8 1/3/2020 UPAH KERJA PLAFON PERUMAHAN TYPE 36
9 1/8/2020 UPAH KERJA PLAFON PERUMAHAN TYPE 36
10
11
12
13
14
15
16
17
18
19
20

TOTAL PENGELUARAN
IAN

JUMLAH UANG KET


8,000,000
6,500,000
2,000,000
3,000,000 PANJAR
5,000,000
8,500,000
7,800,000
2,500,000
3,000,000

46,300,000
REKAP
NO URAIAN PEKERJAAN JUMLAH PENGELUARAN

1 MATERIAL 53,885,000

2 UPAH KERJA 46,300,000

TOTAL 100,185,000