2
Index
GENERAL PRESENTATION AND OVERVIEW OF GEO’S
GEO S POLYMER PRODUCTS
11. Environmental issues and legal regulation
12. Storage and storage life
13. Cost savings comparison
14. General equipment and site set up requirements (e.g. containment capacities,
specification for pumps, mixing facilities, laboratories, other equipment etc.)
15 Polymer used for bored piles - In comparison with bentonite slurry suspensions or
15.
water - Experiences/ References
16. Polymer used for diaphragm or Cut-off walls (trench cutter/clamshell technique) -In
comparison with bentonite slurry suspensions-Experiences/ References
17. Open Discussion
3
Mission
PolyMud®
MicroBond® G3® System
AlfaBond®
G3 System
membrane
Technical teams
On site personnel
Project
Planning Analysis Implementation
Closing
W
Warranty
t off quality
lit and
d competence
t iin th
the excavation
ti process!!
9Human Factor
Knowledge transfer
Change management
9Documentation
Reduced bibliography
St d d
Standards
9Technical
Soil voids
• Mechanical Factor 86
Viscosity (sec)
66
46
pH 7
Cadeia Unitária
Unit Chain Tridimensional PolyMud Matrix
Cadeia de PolyMud
PolyMud Chain
Pólo Associativo
Associative Group
P Carga
Ci i Charge
Positive P iti
Positiva
Ch Cargai Negativa
Negative
N Ch
Charge
• Charge
h density
d is higher
h h
in clayey soils than in
sand.
Density
Distribuição da charges distribution
densidade de cargas
Clean excavations
Clean Tanks
Regular excavation geometry
Consumption parameters controlled and
i constant
in t td descend
d
Low sand contents
Environmentally friendly fluid
Non pollutant elimination
Clean working area
SLURRY PROPERTIES
Mixing Tank
Compressed air
Positive displacement pumps
Storage tanks
S di
Sedimentation
t ti Tanks
T k
Initial mixing under 5 minutes
pH Adjustment 11 - 12
PolyMud addition 1.00 kg/m3
Density 1.00 g/cm3
PolyMud Consumption
2.000
1.800
1.600
1.400
1.000
0.800
0.600
0.400
0.200
0.000
1 2 3 4 5 6 7 8 9 10 11 12 13
F h t l
Fresh water slurry mixing
i i
Favourable Unfavourable
Geological Geological
Conditions Conditions
Reinforcement cage
setup
Immediate concrete
pouring
Concrete
C t surfaced
f d iis nott
contaminated
Full Polymer retrieval
Fluid adjustment
C a ++ C a ++
C a ++ pH14 C a ++ pH14 Border limits
Concrete
CaCO3
PolyMud improves the contact of concrete with the formation thus improving skin friction
++ ++
pH14 Ca
pH 14
Ca Border limits
Concrete
AlfaBond®
MicroBond®
Super DSand
ADDITIONAL ADDITIVES
Sodium Silicate
Sodium Aluminate
Bentonite
Sodium Hydroxide
y
8. Additives 39
G3 System - Additives
GEO ADDITIVES
ADDITIONAL ADDITIVES
Sodium Silicate & Sodium Aluminate Collapse & Fluid Loss control
G3 System & Bentonite Increase slurryy densityy & Fluid Loss control
AlfaBond
Alf B d® & Sodium
S di H
Hydroxide
d id Collapse control & Membrane
reinforcement
8. Additives 40
G3 System – QA/QC
SIX SIGMA - DMAIC
1. Define
2. Measure
3 Analyze
3.
4. Improve
5. Control
9. QA/QC Sampling 41
G3 System – QA/QC
SIX SIGMA - DMAIC
9. QA/QC Sampling 42
G3 System – QA/QC
SIX SIGMA - DMAIC
Viscosity
Cone Marsh API (s)
65-140 55-140 50-140
Density (kg/m3)
1,00-1,04 ≤1,08 ≤1,06
pH
11 - 12 11 -12 7 – 12
9. QA/QC Sampling 43
G3 System – QA/QC
SIX SIGMA - DMAIC
Viscosity
Cone Marsh API (s)
65-140 55-140 50-140
Density (kg/m3)
1,00-1,04 ≤1,08 ≤1,04
pH
11 - 12 11 -12 7 – 12
9. QA/QC Sampling 44
G3 System – QA/QC
SAMPLING
When
Bottom of the When
applicable Always
excavation applicable
When
Half depth of When When
applicable
the column applicable applicable
When When
When
Surface applicable applicable
applicable
9. QA/QC Sampling 45
Removal and disposal
REMOVAL
DISPOSAL
Disposal procedure (30min):
1. Correct pH to 6 – 9 with hydrochloric acid (HCl)
2. Break the polymer chain with Calcium Hypochlorite
After the treatment the polymer is ready to be disposed on the
environment
i t without
ith t any risk
i k (city
( it sewage, rivers,
i on soil)
il)
10. Removal and Disposal 46
Environmental issues and legal regulation
ENVIRONMENTAL ISSUES
LEGAL REGULATION
GEO’s products where approved to be disposed on the environment in:
Example: Spain (CEDEX – Government lab for civil engineering and
environment)
STORAGE LIFE
Compared to BENTONITE
Compared to BENTONITE
• Mixing
• Storage
• Sedimentation
• Pumps
• Air Compressor
• Variable Volume
• Connected to all tanks
• Water flow head oriented to a
plate
• Air
Ai agitation
i i
Slurry recommended
ACHIEVEMENTS
ACHIEVEMENTS
ACHIEVEMENTS
Slurry mixing done with salt water from the bay or fresh water
Concrete overbreaks under 8% .
Environmental authorities approved G3 System.
Direct polymer discharge in the Cadiz Bay
Major
j technical and environmental advantages g compared
p to bentonite or casing
g
ACHIEVEMENTS
Polymud production met deadlines
Concrete overbreaks under 8%
Execution of 1 pile per day per rig
Local environmental authorities allowed fluid disposal
Fluid desanding takes 15 minutes
Cross hole testing proved sound integrity piles
ACHIEVEMENTS
ACHIEVEMENTS
Production met deadlines
Concrete overbreaks under 8%
Completion of 1,5 pile/12h per rig
Local environmental authorities allowed fluid disposal
Slurry desanding takes 15 minutes
Cross hole testing proved sound integrity piles
Foundations
d i implanted
i l d in
i 6 areas off 3 000m2
000 2
1270 piles Ø 1000 depths up to 17 meters; 3 drilling
Rigs and 2 auxiliary cranes.
Products used: PolyMud, SuperDSand
ACHIEVEMENTS
Project specifications required tight Quality Control: Sand Contents of 0,5-1,0%
7 Static load test pperformed on production
p piles.
p
load test showed peripherical skin friction absorbed 2 times the pile working load
Production rates of 15 piles per day with 2-3 meters sockets in Gneiss.
Concrete Overbreak under 12%.
y direct discharged
Slurry g to environment approved
pp byy Brazilian Environmental Agency
g y
after demonstrating there was no negative impact
ACHIEVEMENTS
D Wall of : 0,400m
0 400m
Depth: 19 meters
Place: Near Tagus River, Lisbon
Products : PolyMud, MicroBond, AlfaBond y Silicate
ACHIEVEMENTS
Chisel application
Execution in urban environment with space and movement restriction
Tough geological conditions
Concrete contamination was less than 20 cm on panel cap.
Concrete over pour above cut-off level reduced
Slurry was disposed to city sewage system without any additional cost
DWalls :0,600m
:0 600m
Depth- 20m
Place: Pinhal Novo, Portugal
y
Products: PolyMud, MicroBond
ACHIEVEMENTS
Project executed near an active rail train track, without compromising soil stabilization
PolyMud was able to stabilize the soil despite the vibration from trains
Project executed with space and movement restrictions
Low concrete contamination by slurry reduced concrete over pour above cut off level
Slurry disposed to the environment without any additional costs
70
Projects
ASIA
71
Projects
ASIA
Project: Johor Bahru Stainless steel plant Phase 1&2– Diaphragm wall
Client: Bauer Malaysia
Location: Kuala Lumpur - Malaysia
72
Projects
EUROPE
73
Projects
EUROPE
74
Projects
EUROPE
75
Projects
EUROPE
76
Projects
EUROPE
77
Projects
EUROPE
78
Projects
EUROPE
79
Projects
EUROPE
80
Projects
EUROPE
81
Projects
EUROPE
82
Projects
EUROPE
oject
Project: TECMAIA
C - J bu
building
d g
Client: HIDRONORTE, S.A.
Location: OPorto-Maia – Portugal
83
Projects
CENTRAL AND SOUTH AMERICA
84
Projects
CENTRAL AND SOUTH AMERICA
85
Projects
CENTRAL AND SOUTH AMERICA
86
Projects
CENTRAL AND SOUTH AMERICA
87
Projects
AFRICA
Project: Dry Bulk Jetty – Main Port- Drilling with salt water
Client: GEL / Interbeton
Location: Richard’s Bay – South Africa
88
Projects
AFRICA
89
Solving 95% of the challenges
ADVANTAGES IN WORKING WITH GEO
90
Contacts
OFFICES in Asia
www.geosoil.com
email: info@geosoil.com
91
Contacts
OFFICES in Europe
www.geosoil.com
email: info@geosoil.com
92