PROJECT
PROYEK
1600
POS POLISI
1000 600
PROJECT LOCATION
LOKASI PROYEK
KECAMATAN : MOROSI
KABUPATEN : KONAWE
40
ZHOU YUAN (TONY)
POTONGAN
REVIEWED BY
40
350 800
1700 KP KP 1700
600 SUKARNO
CONTRACTOR
KONTRAKTOR
KP KP KP
HARUN HARIS
DRAWN BY
DIGAMBAR OLEH :
MUHLIS
500 500 350 250 TITLE
RENCANA PONDASI, SLOOF JUDUL
1:100 02 PP
SHOP DRAWING
PROJECT
PROYEK
POS POLISI
PROJECT LOCATION
LOKASI PROYEK
PAS. TEGEL LANTAI 50X50
SPESI LANTAI 1:3 KECAMATAN : MOROSI
KABUPATEN : KONAWE
SLAB LANTAI
APPROVED BY
3
0
5
WISMA BHARUNA
DESIGN BY
DIDESAIN OLEH :
10
LANTAI KERJA
SLOOF 15/30
10
PASIR URUG
CERUCUK
TANAH URUG SUKARNO
CONTRACTOR
PONDASI BATU KALI KONTRAKTOR
60
15
80
25
60
70
10
LANTAI KERJA
10
PASIR URUG
CERUCUK
PT. CINTA KREASI INTERIOR
Interior Design, Renovate & Build
DETAIL PONDASI A
15
SKALA 1:20 25
60
70 HARUN HARIS
DRAWN BY
DIGAMBAR OLEH :
DENAH BANGUNAN
1:100 02 PP
SHOP DRAWING
PROJECT
PROYEK
1600
POS POLISI
1000 600
KECAMATAN : MOROSI
KABUPATEN : KONAWE
400 400
SLOOF 15/30 APPROVED BY
REVIEWED BY
200
SLOOF 15/30 SLOOF 15/30
WISMA BHARUNA
SLOOF 15/30 DESIGN BY
DETAIL PENULANGAN SLOOF DIDESAIN OLEH :
KONTRAKTOR
HARUN HARIS
SLOOF 15/30
DRAWN BY
DIGAMBAR OLEH :
MUHLIS
500 500 350 250 TITLE
JUDUL
1:100 02 PP
SHOP DRAWING
PROJECT
PROYEK
1600
POS POLISI
1000 600
PROJECT LOCATION
LOKASI PROYEK
KECAMATAN : MOROSI
KABUPATEN : KONAWE
600
ZHOU YUAN (TONY)
REVIEWED BY
200
WISMA BHARUNA
DESIGN BY
DIDESAIN OLEH :
350 800
1700 1700
600 SUKARNO
CONTRACTOR
KONTRAKTOR
250
HARUN HARIS
DRAWN BY
DIGAMBAR OLEH :
MUHLIS
500 500 350 250 TITLE
JUDUL
1:100 02 PP
SHOP DRAWING
PROJECT
PROYEK
POS POLISI
KECAMATAN : MOROSI
SLOOF 15/30
KABUPATEN : KONAWE
APPROVED BY
100
120
ZHOU YUAN (TONY)
REVIEWED BY
BESI D16-150
20
PONDASI FOOTPLAT
PASIR URUG
5 5
LANTAI KERJA
WISMA BHARUNA
DESIGN BY
CERUCUK DIPANCANG SEDALAM 4-6 M DIDESAIN OLEH :
(MASUK KE DALAM FOOTPLATE 10 CM)
SUKARNO
CONTRACTOR
KONTRAKTOR
D 16- 150
4 BESI D 19
2 BESI D 19
2 BESI D 19
90
40
80
4 BESI D 19
D 16- 150 PT. CINTA KREASI INTERIOR
Interior Design, Renovate & Build
LANTAI KERJA
40
80
HARUN HARIS
90 DRAWN BY
DIGAMBAR OLEH :
MUHLIS
DETAIL PONDASI FOOTPLAT
TITLE
SKALA 1:20 JUDUL
DENAH BANGUNAN
1:100 02 PP
SHOP DRAWING
PROJECT
PROYEK
1600
POS POLISI
1000 600
RB 1 RB 1 RB 1 PROJECT LOCATION
LOKASI PROYEK
KECAMATAN : MOROSI
RB 1 KABUPATEN : KONAWE
RB 1
400 400 APPROVED BY
RB 1
600
RB 1
ZHOU YUAN (TONY)
REVIEWED BY
200
RB 1 RB 1 RB 1
WISMA BHARUNA
DETAIL PENULANGAN RINGBALK
DESIGN BY
KODE RB 1 DIDESAIN OLEH :
RB 1
350 800
POTONGAN
15
1700 RB 1
RB 1
1700
600 SUKARNO
20
CONTRACTOR
KONTRAKTOR
RB 1
DIMENSI 15X20 CM RB 1
TULANGAN ATAS
TULANGAN TENGAH -
250
TULANGAN BAWAH RB 1 RB 1
BEGEL
HARUN HARIS
DRAWN BY
DIGAMBAR OLEH :
MUHLIS
500 500 350 250 TITLE
JUDUL
1:100 02 PP