No. Volume Satuan Harga Satuan Total
1 2 3 4 5 6
I. Bahan Yang di Perlukan sbb :
1. Besi Dia. 16 Ulir 135 Btg Rp 235,000 Rp 31,725,000 2. Besi Dia. 13 Ulir 180 Btg Rp 185,000 Rp 33,300,000 3. Besi Dia. 12 Polos 60 Btg Rp 117,000 Rp 7,020,000 4. Besi Dia. 10 Polos 560 Btg Rp 85,000 Rp 47,600,000 5. Besi Dia. 8 Polos 85 Btg Rp 55,000 Rp 4,675,000 6. Kawat Beton 50 Kg Rp 27,000 Rp 1,350,000 7. Beton Cor K.300 78 M3 Rp 1,250,000 Rp 97,500,000 8. Triplek 8 MM 225 Lbr Rp 93,000 Rp 20,925,000 9. Paku Campur 40 Kg Rp 25,000 Rp 1,000,000 10. Batu Bata 25000 Bh Rp 550 Rp 13,750,000 11. Semen 160 Zak Rp 60,000 Rp 9,600,000 12. Pasir 35 M3 Rp 120,000 Rp 4,200,000 13. Kusen+Jendela Alma/Kaca 12 Set Rp 1,750,000 Rp 21,000,000 14. Kusen+Pintu Alma/Kaca 5 Set Rp 5,000,000 Rp 25,000,000 15. Kayu 5/5 4 M3 Rp 2,750,000 Rp 11,000,000 . Total Rp 329,645,000 Dibulatkan Rp 330,000,000 Terbilang : "Tiga Ratus Tiga Puluh Juta Rupiah ".
Panitia Pembangunan Masjid DARUL HIJRAH Lingkar Istana