II Jembatan
Bag. I-KI Bag. I-KA
Pilar B
Pilar A-KI Pilar B Pilar B Pilar A-KA
100
50
220.4
50 220.4 50
248
1100 1200 1200 1100
4600
100
20
50
JEMBATAN PENYEBERANGAN SUNGAI URANG, PAKET 1
SKALA 1:400 20 248
50 287.5 200 287.5 50 40 50 287.5 200 287.5 50 Tampak Atas Bag. Atas
432.5
50.29
50.29
50.29
35
900
900
900
900
250 120 230 100 300
150 50
150 50
150 50
150 50
470 Beton K-225 600 Beton K-225
187.5 200 187.5 225 225 202.5 187.5 200 187.5 Footplat type B 50 200 50
350
350
350
350
Pondasi sumuran Pondasi sumuran
∅150cm (K-225) ∅150cm (K-225)
150 150 150 150 150 150 150 150
Tampak Samping Kiri Tampak Depan Tampak Samping Kanan Tampak Depan Tampak Samping
50 237.5 300 237.5 50 600 875 470 600
50
252.5
300
347.5
470
70
600
600
600
300
347.5
875
775
70
252.5
70
875 50 775 50
Tampak Atas Bag. Bawah
Tampak Atas Bag. Bawah Tampak Atas Bag. Bawah
Detail Pilar B
50
Detail Pilar A-KI & A-KA Tampak Atas Bag. Bawah Skala 1:150
Skala 1:150