Anda di halaman 1dari 122

A. PEKERJAAN PERSIAPAN (P.

Ps)

1m1 Pembuatan Pagar Sementara dari Seng Gelombang Tinggi 2 meter (P.Ps. 01)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 0.200 16,160.00
2 Pekerja OH 50,000.00 0.400 20,000.00
3 Kepala Tukang OH 120,000.00 0.020 2,400.00
4 Mandor OH 80,000.00 0.020 1,600.00
Jumlah 40,160.00
B BAHAN
1 Kayu Pancang (Dolken) d = 10cm, p = 4m Btg 25,000.00 1.250 31,250.00
2 Seng Gelombang BJLS 0.20 Lbr 65,500.00 1.200 78,600.00
3 Kayu Kelas II uk. 4/6 M3 2,830,000.00 0.072 203,760.00
4 Paku Kg 12,000.00 0.060 720.00
Jumlah 314,330.00
C Jumlah A + B 354,490.00
D Harga Satuan 354,490.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.2

1m1 Pengukuran dan Pemasangan Bouwplank (P.Ps. 02)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 0.100 8,080.00
2 Pekerja OH 50,000.00 0.100 5,000.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.005 400.00
Jumlah 14,680.00
B BAHAN
1 Kayu Pancang (Dolken) d = 6-8 cm, p = 4m Btg 15,000.00 1.000 15,000.00
2 Paku Kg 12,000.00 0.020 240.00
3 Papan Kayu Kelas III M3 1,075,000.00 0.007 7,525.00
Jumlah 22,765.00
C Jumlah A + B 37,445.00
D Harga Satuan 37,445.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.4

1m2 Membersihkan Lapangan dan Perataan (P.Ps. 03)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.100 5,000.00
2 Mandor OH 80,000.00 0.050 4,000.00
Jumlah 9,000.00

Pekerjaan Persiapan 1
B Jumlah A 9,000.00
C Harga Satuan 9,000.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.8

Pekerjaan Persiapan 2
1m2 Pembuatan Direksi Keet / Gudang Bahan Bangunan dan Alat / Bedeng Pekerja (P.Ps. 04)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 2.000 161,600.00
2 Pekerja OH 50,000.00 1.000 50,000.00
3 Kepala Tukang OH 120,000.00 0.200 24,000.00
4 Mandor OH 80,000.00 0.050 4,000.00
Jumlah 239,600.00
B BAHAN
1 Kayu Pancang (Dolken) d = 10cm, p = 4m Btg 25,000.00 1.250 31,250.00
2 Kayu Kelas III M3 2,830,000.00 0.186 526,380.00
3 Paku Kg 12,000.00 0.300 3,600.00
4 Seng Gelombang BJLS 0.20 Lbr 65,500.00 1.500 98,250.00
5 Triplek 4mm Lbr 68,900.00 1.3500 93,015.00
Jumlah 752,495.00
C Jumlah A + B 992,095.00
D Harga Satuan 992,095.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.9

Pekerjaan Persiapan 3
Menggali 1m3 Tanah Biasa sedalam 1 meter (P.T. 01)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.750 37,500.00
2 Mandor OH 80,000.00 0.025 2,000.00
Jumlah 39,500.00
B Jumlah A 39,500.00
C Harga Satuan 39,500.00
Acuan : SNI DT-91-0006-2007

Mengurug Kembali 1m3 Galian (P.T. 09)


Mengurug kembali 1m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.250 12,500.00
2 Mandor OH 80,000.00 0.0083 666.67
Jumlah 13,166.67
B Jumlah A 13,166.67
C Harga Satuan 13,166.67
Acuan : SNI DT-91-0006-2007

Mengurug 1m3 Pasir Urug (P.T. 13)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.300 15,000.00
2 Mandor OH 80,000.00 0.010 800.00
Jumlah 15,800.00
B BAHAN
1 Pasir Urug M3 112,000.00 1.200 134,400.00
Jumlah 134,400.00
C Jumlah A + B 150,200.00
D Harga Satuan 150,200.00
Acuan : SNI DT-91-0006-2007
Memasang 1m3 Pondasi Batu Belah, Campuran 1Pc : 4Ps (P.PB. 02)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 1.500 75,000.00
2 Tukang Batu OH 80,800.00 0.750 60,600.00
3 Kepala Tukang OH 120,000.00 0.075 9,000.00
4 Mandor OH 80,000.00 0.075 6,000.00
Jumlah 150,600.00
B BAHAN
1 Batu Belah 15-20 cm M3 209,300.00 1.200 251,160.00
2 Semen Portland Kg 1,400.00 163.000 228,200.00
3 Pasir M3 112,000.00 0.520 58,240.00
Jumlah 537,600.00
C Jumlah A + B 688,200.00
D Harga Satuan 688,200.00
Acuan : SNI DT 91-0007-2007
Membuat 1m3 Beton Mutu f'c = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0,87 (P.BB. 02)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 1.650 82,500.00
2 Tukang Batu OH 80,800.00 0.275 22,220.00
3 Kepala Tukang OH 120,000.00 0.028 3,360.00
4 Mandor OH 80,000.00 0.083 6,640.00
Jumlah 114,720.00
B BAHAN
1 Semen Portland Kg 1,400.00 247.000 345,800.00
2 Pasir Kg 80.00 869.000 69,520.00
3 Batu pecah 1-2 cm (Kerikil) Kg 203.70 999.000 203,500.00
4 Air Liter 0.00 0.000 0.00
Jumlah 618,820.00
C Jumlah A + B 733,540.00
D Harga Satuan 733,540.00
Acuan : SNI DT 91-0008-2007

Membuat 1m3 Beton Mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0,78 (P.BB. 03)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 1.650 82,500.00
2 Tukang Batu OH 80,800.00 0.275 22,220.00
3 Kepala Tukang OH 120,000.00 0.028 3,360.00
4 Mandor OH 80,000.00 0.083 6,640.00
Jumlah 114,720.00
B BAHAN
1 Semen Portland Kg 1,400.00 276.000 386,400.00
2 Pasir Kg 80.00 828.000 66,240.00
3 Batu pecah 1-2 cm (Kerikil) Kg 203.70 1,012.000 206,148.15
4 Air Liter 0.00 0.000 0.00
Jumlah 658,788.15
C Jumlah A + B 773,508.15
D Harga Satuan 773,508.15
Acuan : SNI DT 91-0008-2007

Pembesian 10Kg dengan Besi Polos atau Ulir (P.BB. 08)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.070 3,500.00
2 Tukang Besi OH 80,800.00 0.070 5,656.00
3 Kepala Tukang OH 120,000.00 0.007 840.00
4 Mandor OH 80,000.00 0.004 320.00
Jumlah 10,316.00
B BAHAN
1 Besi Beton (polos/ulir) Kg 24,500.00 10.500 257,250.00
2 Kawat Ikat Beton (bendrat) Kg 18,000.00 0.150 2,700.00
Jumlah 259,950.00
C Jumlah A + B 270,266.00
D Harga Satuan 270,266.00
E Harga Satuan per 1 Kg 27,026.60
Acuan : SNI DT 91-0008-2007

1m2 Pasang Bekisting untuk Kolom (P.BB. 12.a)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.660 33,000.00
1m2 Pasang Batako uk. 15/30/7(P.Dnd. 01)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.32 16,000.00
2 Tukang Batu OH 80,800.00 0.10 8,080.00
3 Kepala Tukang OH 120,000.00 0.01 1,200.00
4 Mandor OH 80,000.00 0.015 1,200.00
Jumlah 26,480.00
B BAHAN
1 Batako 15/30/7 (cetak mesin) Bh 2,000.00 22.000 44,000.00
2 Semen Portland Kg 1,400.00 7.500 10,500.00
3 Pasir Beton / Pasang M3 112,000.00 0.027 3,024.00
Jumlah 57,524.00
C Jumlah A + B 84,004.00
D Harga Satuan 84,004.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.20

Memasang 1m2 Dinding Terawang (roster) ukuran (40x40) cm, campuran 1Pc : 4Ps (P.Dnd. 06.a)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.300 15,000.00
2 Tukang Batu OH 80,800.00 0.100 8,080.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.015 1,200.00
Jumlah 25,480.00
B BAHAN
1 Terawang (roster) Bh 40,000.00 6.25 250,000.00
2 Semen Portland Kg 1,400.00 11.000 15,400.00
3 Pasir M3 112,000.00 0.035 3,920.00
Jumlah 269,320.00
C Jumlah A + B 294,800.00
D Harga Satuan 294,800.00
Acuan : SNI DT 91-0009-2007
Memasang 1m2 Plesteran 1PC : 2PP, tebal 15 mm (P.Pls. 01)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.300 15,000.00
2 Tukang Batu OH 80,800.00 0.150 12,120.00
3 Kepala Tukang OH 120,000.00 0.015 1,800.00
4 Mandor OH 80,000.00 0.015 1,200.00
Jumlah 30,120.00
B BAHAN
1 Semen Portland Kg 1,400.00 10.224 14,313.60
2 Pasir M3 112,000.00 0.020 2,240.00
Jumlah 16,553.60
C Jumlah A + B 46,673.60
D Harga Satuan 46,673.60
Acuan : SNI DT 91-0010-2007
Memasang 1m2 Plesteran 1PC : 4PP, tebal 15 mm (P.Pls. 02)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.300 15,000.00
2 Tukang Batu OH 80,800.00 0.150 12,120.00
3 Kepala Tukang OH 120,000.00 0.015 1,800.00
4 Mandor OH 80,000.00 0.015 1,200.00
Jumlah 30,120.00
B BAHAN
1 Semen Portland Kg 1,400.00 6.240 8,736.00
2 Pasir M3 112,000.00 0.024 2,688.00
Jumlah 11,424.00
C Jumlah A + B 41,544.00
D Harga Satuan 41,544.00
Acuan : SNI DT 91-0010-2007

Memasang 1m2 Acian (P.Pls. 07)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.200 10,000.00
2 Tukang Batu OH 80,800.00 0.100 8,080.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.010 800.00
Jumlah 20,080.00
B BAHAN
1 Semen Portland Kg 1,400.00 3.250 4,550.00
Jumlah 4,550.00
C Jumlah A + B 24,630.00
D Harga Satuan 24,630.00
Acuan : SNI DT 91-0010-2007

Memasang 1m2 Plesteran 1PC : 3PP, tebal 15 mm (P.Pls. 08)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.300 15,000.00
2 Tukang Batu OH 80,800.00 0.150 12,120.00
3 Kepala Tukang OH 120,000.00 0.015 1,800.00
4 Mandor OH 80,000.00 0.015 1,200.00
Jumlah 30,120.00
B BAHAN
1 Semen Portland Kg 1,400.00 7.776 10,886.40
2 Pasir M3 112,000.00 0.023 2,576.00
Jumlah 13,462.40
C Jumlah A + B 43,582.40
D Harga Satuan 43,582.40
Acuan : SNI DT 91-0010-2007
G. PEKERJAAN KAYU (P.K.)

1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau, Topangan
Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian Uk. 9/9 (P.K. 01)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 24.000 1,939,200.00
2 Pekerja OH 50,000.00 8.000 400,000.00
3 Kepala Tukang OH 120,000.00 2.400 288,000.00
4 Mandor OH 80,000.00 0.400 32,000.00
Jumlah 2,659,200.00
B BAHAN
1 Kayu Belian (Tidak Ketam uk. 9/9) M3 8,500,500.00 1.100 9,350,550.00
2 Paku beton Kg 25,000.00 3.000 75,000.00
Jumlah 9,425,550.00
C Jumlah A + B 12,084,750.00
D Harga Satuan 12,084,750.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.3

1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau, Topangan
Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian Uk. 10/10 (P.K. 02)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 24.000 1,939,200.00
2 Pekerja OH 50,000.00 8.000 400,000.00
3 Kepala Tukang OH 120,000.00 2.400 288,000.00
4 Mandor OH 80,000.00 0.400 32,000.00
Jumlah 2,659,200.00
B BAHAN
1 Kayu Belian (Tidak Ketam uk 10/10) M3 4,888,000.00 1.100 5,376,800.00
2 Paku beton Kg 25,000.00 3.000 75,000.00
Jumlah 5,451,800.00
C Jumlah A + B 8,111,000.00
D Harga Satuan 8,111,000.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.3

1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau,
Topangan Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian
Uk. 12/12 - 15/15 (P.K. 03)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 24.000 1,939,200.00
2 Pekerja OH 50,000.00 8.000 400,000.00
3 Kepala Tukang OH 120,000.00 2.400 288,000.00
4 Mandor OH 80,000.00 0.400 32,000.00
Jumlah 2,659,200.00
B BAHAN
1 Kayu Belian (Tidak Ketam uk. 12/12 - 15/15) M3 5,015,000.00 1.100 5,516,500.00
2 Paku beton Kg 25,000.00 3.000 75,000.00
Jumlah 5,591,500.00
C Jumlah A + B 8,250,700.00
D Harga Satuan 8,250,700.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.3
1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau,
Topangan Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian
Uk. 18/18 - 20/20 (P.K. 04)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 24.000 1,939,200.00
2 Pekerja OH 50,000.00 8.000 400,000.00
3 Kepala Tukang OH 120,000.00 2.400 288,000.00
4 Mandor OH 80,000.00 0.400 32,000.00
Jumlah 2,659,200.00
B BAHAN
1 Kayu Belian (Tidak Ketam uk. 18/18 - 20/20) 3 7,075,000.00 1.100 7,782,500.00
M
2 Paku beton Kg 25,000.00 3.000 75,000.00
Jumlah 7,857,500.00
C Jumlah A + B 10,516,700.00
D Harga Satuan 10,516,700.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.3

1m3 Pekerjaan Rangka Badan Kayu Belian Uk. 7/7 (P.K. 05)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 36.000 2,908,800.00
2 Pekerja OH 50,000.00 12.000 600,000.00
3 Kepala Tukang OH 120,000.00 3.600 432,000.00
4 Mandor OH 80,000.00 0.600 48,000.00
Jumlah 3,988,800.00
B BAHAN
1 Kayu Belian (Ketam uk. 7/7) M3 5,342,400.00 1.100 5,876,640.00
2 Paku beton Kg 25,000.00 6.000 150,000.00
Jumlah 6,026,640.00
C Jumlah A + B 10,015,440.00
D Harga Satuan 10,015,440.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.27

1m3 Pekerjaan Rangka Badan Kayu Belian Uk. 8/8 (P.K. 06)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 36.000 2,908,800.00
2 Pekerja OH 50,000.00 12.000 600,000.00
3 Kepala Tukang OH 120,000.00 3.600 432,000.00
4 Mandor OH 80,000.00 0.600 48,000.00
Jumlah 3,988,800.00
B BAHAN
1 Kayu Belian (Ketam uk. 8/8) M3 5,432,500.00 1.100 5,975,750.00
2 Paku belian Kg 25,000.00 6.000 150,000.00
Jumlah 6,125,750.00
C Jumlah A + B 10,114,550.00
D Harga Satuan 10,114,550.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.27

1m3 Pekerjaan Rangka Badan Kayu Kelas I Uk. 7/7 (P.K. 07)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 24.000 1,939,200.00
2 Pekerja OH 50,000.00 8.000 400,000.00
3 Kepala Tukang OH 120,000.00 2.400 288,000.00
4 Mandor OH 80,000.00 0.400 32,000.00
Jumlah 2,659,200.00
B BAHAN
1 Kayu Kelas I (Ketam Uk. 7/7) M3 3,441,500.00 1.100 3,785,650.00
2 Paku Kg 12,000.00 6.000 72,000.00
Jumlah 3,857,650.00
C Jumlah A + B 6,516,850.00
D Harga Satuan 6,516,850.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.27.a
1m3 Pekerjaan Rangka Badan Kayu Kelas I Uk. 8/8 (P.K. 08)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 24.000 1,939,200.00
2 Pekerja OH 50,000.00 8.000 400,000.00
3 Kepala Tukang OH 120,000.00 2.400 288,000.00
4 Mandor OH 80,000.00 0.400 32,000.00
Jumlah 2,659,200.00
B BAHAN
1 Kayu Kelas I (Ketam Uk. 8/8) M3 3,441,500.00 1.100 3,785,650.00
2 Paku Kg 12,000.00 6.000 72,000.00
Jumlah 3,857,650.00
C Jumlah A + B 6,516,850.00
D Harga Satuan 6,516,850.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.27.a

1m1 Melancip Tiang / Batang (P.K. 09)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 0.250 20,200.00
2 Kepala Tukang OH 120,000.00 0.025 3,000.00
3 Pekerja OH 50,000.00 0.100 5,000.00
4 Mandor OH 80,000.00 0.005 400.00
Jumlah 28,600.00
B Jumlah A 28,600.00
C Harga Satuan 28,600.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - E.1

Membuat Puting dan Lobang / Pasang (P.K. 10)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 0.600 48,480.00
2 Kepala Tukang OH 120,000.00 0.060 7,200.00
Jumlah 55,680.00
B Jumlah A 55,680.00
C Harga Satuan 55,680.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - E.4

1 m1 Memancang Tiang ke Dalam Tanah (P.K. 11)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 1.800 90,000.00
2 Tukang kayu OH 80,800.00 0.040 3,232.00
3 Kepala Tukang OH 120,000.00 0.004 480.00
4 Mandor OH 80,000.00 0.043 3,440.00
Jumlah 97,152.00
B Jumlah A 97,152.00
C Harga Satuan 97,152.00
E Harga Upah 1/2 x Harga Satuan 48,576.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - E.13
Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas I (P.K. 12)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 7.000 350,000.00
2 Tukang Kayu OH 80,800.00 21.000 1,696,800.00
3 Kepala Tukang OH 120,000.00 2.100 252,000.00
4 Mandor OH 80,000.00 0.350 28,000.00
Jumlah 2,326,800.00
B BAHAN
1 Kayu Kelas 1 uk. 5/10 (Ketam - utk Kusen) M3 3,441,500.00 1.100 3,785,650.00
2 Paku 10 cm kg 12,000.00 1.250 15,000.00
3 Lem Kayu kg 18,550.00 1.000 18,550.00
Jumlah 3,819,200.00
C Jumlah A + B 6,146,000.00
D Harga Satuan 6,146,000.00
Acuan : SNI DT 91-0011-2007

Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela Kayu Belian (P.K. 12.a)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 7.000 350,000.00
2 Tukang Kayu OH 80,800.00 21.000 1,696,800.00
3 Kepala Tukang OH 120,000.00 2.100 252,000.00
4 Mandor OH 80,000.00 0.350 28,000.00
Jumlah 2,326,800.00
B BAHAN
1 Kayu Belian (Ketam) M3 5,342,400.00 1.100 5,876,640.00
2 Paku 10 cm kg 12,000.00 1.250 15,000.00
3 Lem Kayu kg 18,550.00 1.000 18,550.00
Jumlah 5,910,190.00
C Jumlah A + B 8,236,990.00
D Harga Satuan 8,236,990.00
Acuan : SNI DT 91-0011-2007
Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas II (P.K. 13)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 6.000 300,000.00
2 Tukang Kayu OH 80,800.00 18.000 1,454,400.00
3 Kepala Tukang OH 120,000.00 1.800 216,000.00
4 Mandor OH 80,000.00 0.300 24,000.00
Jumlah 1,994,400.00
B BAHAN
1 Kayu Kelas II uk. 5/10 (Tidak Ketam) M3 2,775,700.00 1.200 3,330,840.00
2 Paku 10 cm kg 12,000.00 1.250 15,000.00
3 Lem Kayu kg 18,550.00 1.000 18,550.00
Jumlah 3,364,390.00
C Jumlah A + B 5,358,790.00
D Harga Satuan 5,358,790.00
Acuan : SNI DT 91-0011-2007

Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu Kelas I (P.K. 14)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 1.000 50,000.00
2 Tukang Kayu OH 80,800.00 3.000 242,400.00
3 Kepala Tukang OH 120,000.00 0.300 36,000.00
4 Mandor OH 80,000.00 0.050 4,000.00
Jumlah 332,400.00
B BAHAN
1 Papan kayu klas I ketam M3 5,379,500.00 0.040 215,180.00
2 Lem Kayu kg 18,550.00 0.500 9,275.00
Jumlah 224,455.00
C Jumlah A + B 556,855.00
D Harga Satuan 556,855.00
Acuan : SNI DT 91-0011-2007

Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu Kelas II (P.K. 15)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 1.000 50,000.00
2 Tukang Kayu OH 80,800.00 3.000 242,400.00
3 Kepala Tukang OH 120,000.00 0.300 36,000.00
4 Mandor OH 80,000.00 0.050 4,000.00
Jumlah 332,400.00
B BAHAN
1 Papan Kayu Kelas II (Ketam) 3 5,755,600.00 0.040 230,224.00
M
2 Lem Kayu kg 18,550.00 0.500 9,275.00
Jumlah 239,499.00
C Jumlah A + B 571,899.00
D Harga Satuan 571,899.00
Acuan : SNI DT 91-0011-2007
Membuat dan Memasang 1m2 Pintu dan Jendela Jalusi Kayu Kelas I (P.K. 16)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 1.000 50,000.00
2 Tukang Kayu OH 80,800.00 3.000 242,400.00
3 Kepala Tukang OH 120,000.00 0.300 36,000.00
4 Mandor OH 80,000.00 0.050 4,000.00
Jumlah 332,400.00
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 5,379,500.00 0.064 344,288.00
2 Lem Kayu kg 18,550.00 0.500 9,275.00
Jumlah 353,563.00
C Jumlah A + B 685,963.00
D Harga Satuan 685,963.00
Acuan : SNI DT 91-0011-2007

Membuat dan Memasang 1m2 Pintu dan Jendela Jalusi Kayu Kelas II (P.K. 17)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 1.000 50,000.00
2 Tukang Kayu OH 80,800.00 3.000 242,400.00
3 Kepala Tukang OH 120,000.00 0.300 36,000.00
4 Mandor OH 80,000.00 0.050 4,000.00
Jumlah 332,400.00
B BAHAN
1 Papan Kayu Kelas II (Ketam) M3 5,755,600.00 0.024 138,134.40
2 Lem Kayu kg 18,550.00 0.500 9,275.00
Jumlah 147,409.40
C Jumlah A + B 479,809.40
D Harga Satuan 479,809.40
Acuan : SNI DT 91-0011-2007

Membuat 1m2 Daun Pintu Kayu Lapis (Plywood) Rangkap, Rangka Tertutup Kayu Kelas II
(Lebar sampai 90 cm) (P.K. 18)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.700 35,000.00
2 Tukang Kayu OH 80,800.00 2.100 169,680.00
3 Kepala Tukang OH 120,000.00 0.210 25,200.00
4 Mandor OH 80,000.00 0.035 2,800.00
Jumlah 232,680.00
B BAHAN
1 Papan Kayu Kelas II (Ketam) M3 5,755,600.00 0.025 143,890.00
2 Paku 1/2" -1" Kg 12,000.00 0.030 360.00
3 Lem Kayu Lt 18,550.00 0.500 9,275.00
4 Plywood 4' x 8' x 4mm Lbr 99,400.00 1.000 99,400.00
Jumlah 252,925.00
C Jumlah A + B 485,605.00
D Harga Satuan 485,605.00
Acuan : SNI DT 91-0011-2007
Membuat 1m2 Pintu Plywood Rangkap, Rangka Expose Kayu Kelas I (P.K. 19)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.800 40,000.00
2 Tukang Kayu OH 80,800.00 2.400 193,920.00
3 Kepala Tukang OH 120,000.00 0.240 28,800.00
4 Mandor OH 80,000.00 0.040 3,200.00
Jumlah 265,920.00
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 5,379,500.00 0.0256 137,715.20
2 Paku 1/2" -1" Kg 12,000.00 0.030 360.00
3 Lem Kayu Lt 18,550.00 0.500 9,275.00
4 Plywood 4' x 8' x 4mm Lbr 99,400.00 1.000 99,400.00
Jumlah 246,750.20
C Jumlah A + B 512,670.20
D Harga Satuan 512,670.20
Acuan : SNI DT 91-0011-2007

Membuat 1m2 Pintu Plywood Rangkap, Rangka Expose Kayu Kelas II (P.K. 20)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.800 40,000.00
2 Tukang Kayu OH 80,800.00 2.400 193,920.00
3 Kepala Tukang OH 120,000.00 0.240 28,800.00
4 Mandor OH 80,000.00 0.040 3,200.00
Jumlah 265,920.00
B BAHAN
1 Papan Kayu Kelas II (Ketam) M3 5,755,600.00 0.0256 147,343.36
2 Paku 1/2" -1" Kg 12,000.00 0.030 360.00
3 Lem Kayu Lt 18,550.00 0.500 9,275.00
4 Plywood 4' x 8' x 4mm Lbr 99,400.00 1.000 99,400.00
Jumlah 256,378.36
C Jumlah A + B 522,298.36
D Harga Satuan 522,298.36
Acuan : SNI DT 91-0011-2007

Membuat 1m2 Jalusi Kusen, Kayu Kelas I (P.K. 21)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.670 33,500.00
2 Tukang Kayu OH 80,800.00 2.000 161,600.00
3 Kepala Tukang OH 120,000.00 0.200 24,000.00
4 Mandor OH 80,000.00 0.335 26,800.00
Jumlah 245,900.00
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 5,379,500.00 0.060 322,770.00
2 Paku 1/2" -1" Kg 12,000.00 0.150 1,800.00
Jumlah 324,570.00
C Jumlah A + B 570,470.00
D Harga Satuan 570,470.00
Acuan : SNI DT 91-0011-2007
Membuat 1m2 Jalusi Kusen, Kayu Kelas II (P.K. 22)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.670 33,500.00
2 Tukang Kayu OH 80,800.00 2.000 161,600.00
3 Kepala Tukang OH 120,000.00 0.200 24,000.00
4 Mandor OH 80,000.00 0.335 26,800.00
Jumlah 245,900.00
B BAHAN
1 Papan Kayu Kelas II (Ketam) M3 5,755,600.00 0.060 345,336.00
2 Paku 1/2" -1" Kg 12,000.00 0.150 1,800.00
Jumlah 347,136.00
C Jumlah A + B 593,036.00
D Harga Satuan 593,036.00
Acuan : SNI DT 91-0011-2007

1m2 Pemasangan Ventilasi Kaca


Setiap luas 1 m2 bidang daun ventilasi, luas kacanya adalah 0.60 m2 (P.K. 23)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 0.800 64,640.00
2 Pekerja OH 50,000.00 0.280 14,000.00
3 Kepala Tukang OH 120,000.00 0.080 9,600.00
4 Mandor OH 80,000.00 0.014 1,120.00
Jumlah 89,360.00
B BAHAN
1 List Kayu M' 4,400.00 8.000 35,200.00
2 Kaca Polos tebal 5 mm M2 94,000.00 0.600 56,400.00
3 Paku triplek Kg 26,250.00 0.050 1,312.50
Jumlah 92,912.50
C Jumlah A + B 182,272.50
D Harga Satuan 182,272.50
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.37.c
Memasang 1m3 Konstruksi Kuda-kuda Konvensional, Kayu Kelas I Bentang 6 m (P.K. 24)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 4.000 200,000.00
2 Tukang Kayu OH 80,800.00 12.000 969,600.00
3 Kepala Tukang OH 120,000.00 1.200 144,000.00
4 Mandor OH 80,000.00 0.200 16,000.00
Jumlah 1,329,600.00
B BAHAN
1 Balok Kayu Kelas I (Tidak Ketam) M3 3,441,500.00 1.100 3,785,650.00
2 Besi Strip Kg 43,000.00 15.000 645,000.00
3 Paku 12 cm Kg 12,000.00 5.600 67,200.00
Jumlah 4,497,850.00
C Jumlah A + B 5,827,450.00
D Harga Satuan 5,827,450.00
Acuan : SNI DT 91-0011-2007

Memasang 1m3 Konstruksi Gordeng, Kayu Kelas II (P.K. 27)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 2.400 120,000.00
2 Tukang Kayu OH 80,800.00 7.200 581,760.00
3 Kepala Tukang OH 120,000.00 0.720 86,400.00
4 Mandor OH 80,000.00 0.120 9,600.00
Jumlah 797,760.00
B BAHAN
1 Balok Kayu Kelas II (Tidak Ketam) M3 3,385,600.00 1.100 3,724,160.00
2 Besi Strip Btg 43,000.00 15.000 645,000.00
3 Paku 12 cm Kg 12,000.00 3.000 36,000.00
Jumlah 4,405,160.00
C Jumlah A + B 5,202,920.00
D Harga Satuan 5,202,920.00
Acuan : SNI DT 91-0011-2007
Memasang 1m2 Rangka Atap Genteng Keramik, Kayu Kelas II (P.K. 28)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.100 5,000.00
2 Tukang Kayu OH 80,800.00 0.100 8,080.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.005 400.00
Jumlah 14,680.00
B BAHAN
1 Kaso-kaso (5x7) cm M3 2,830,000.00 0.014 39,620.00
2 Reng M3 2,866,000.00 0.036 103,176.00
3 Paku 7 cm - 10 cm Kg 12,000.00 0.250 3,000.00
Jumlah 145,796.00
C Jumlah A + B 160,476.00
D Harga Satuan 160,476.00
Acuan : SNI DT 91-0011-2007

Memasang 1m2 Rangka Atap Genteng Beton, Kayu Kelas II (P.K. 29)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.100 5,000.00
2 Tukang Kayu OH 80,800.00 0.100 8,080.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.005 400.00
Jumlah 14,680.00
B BAHAN
1 Kaso-kaso (5x7) cm M3 2,830,000.00 0.014 39,620.00
2 Reng M3 2,866,000.00 0.057 163,362.00
3 Paku 7 cm - 10 cm Kg 12,000.00 0.250 3,000.00
Jumlah 205,982.00
C Jumlah A + B 220,662.00
D Harga Satuan 220,662.00
Acuan : SNI DT 91-0011-2007

Memasang 1m3 Konstruksi Gordeng, Kayu Kelas I (P.K. 30)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 2.400 120,000.00
2 Tukang Kayu OH 80,800.00 7.200 581,760.00
3 Kepala Tukang OH 120,000.00 0.720 86,400.00
4 Mandor OH 80,000.00 0.120 9,600.00
Jumlah 797,760.00
B BAHAN
1 Balok Kayu Kelas I (Tidak Ketam) M3 3,441,500.00 1.100 3,785,650.00
2 Besi Strip Btg 43,000.00 15.000 645,000.00
3 Paku 12 cm Kg 12,000.00 3.000 36,000.00
Jumlah 4,466,650.00
C Jumlah A + B 5,264,410.00
D Harga Satuan 5,264,410.00
Acuan : SNI DT 91-0011-2007
Memasang 1m3 Konstruksi Gordeng, Kayu Belian (P.K. 30.a)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 2.400 120,000.00
2 Tukang Kayu OH 80,800.00 7.200 581,760.00
3 Kepala Tukang OH 120,000.00 0.720 86,400.00
4 Mandor OH 80,000.00 0.120 9,600.00
Jumlah 797,760.00
B BAHAN
1 Balok Kayu Belian (Tidak Ketam) M3 10,421,400.00 1.100 11,463,540.00
2 Besi Strip Btg 43,000.00 15.000 645,000.00
3 Paku 12 cm Kg 12,000.00 3.000 36,000.00
Jumlah 12,144,540.00
C Jumlah A + B 12,942,300.00
D Harga Satuan 12,942,300.00
Acuan : SNI DT 91-0011-2007

Memasang 1m2 Rangka Atap Sirap, Kayu Kelas II (P.K. 31)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 0.120 9,696.00
2 Pekerja OH 50,000.00 0.120 6,000.00
3 Kepala Tukang OH 120,000.00 0.012 1,440.00
4 Mandor OH 80,000.00 0.006 480.00
Jumlah 17,616.00
B BAHAN
1 Kayu Kelas II (Tidak Ketam) M3 3,385,600.00 0.165 558,624.00
2 Paku 5 cm - 10 cm Kg 12,000.00 0.200 2,400.00
Jumlah 561,024.00
C Jumlah A + B 578,640.00
D Harga Satuan 578,640.00
Acuan : SNI DT 91-0011-2007

1m2 Pemasangan Rangka Atap Seng (P.K. 32)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 0.100 8,080.00
2 Pekerja OH 50,000.00 0.150 7,500.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.0080 640.00
Jumlah 17,420.00
B BAHAN
1 Kayu Kelas II (Tidak Ketam) M3 3,385,600.00 0.0111 37,617.78
2 Paku Kg 12,000.00 0.075 900.00
Jumlah 38,517.78
C Jumlah A + B 55,937.78
D Harga Satuan 55,937.78
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.19

1m2 Pasang Kasau + Reng Atap Genteng Metal Kayu Kelas II (P.K. 33)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.100 5,000.00
2 Tukang Kayu OH 80,800.00 0.100 8,080.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.005 400.00
Jumlah 14,680.00
B BAHAN
1 Kayu Kelas II (Tidak Ketam) M3 3,385,600.00 0.014 47,398.40
2 Paku Kg 12,000.00 0.150 1,800.00
Jumlah 49,198.40
C Jumlah A + B 63,878.40
D Harga Satuan 63,878.40
Acuan : ABK Bangunan Gedung dan Perumahan - 6.35
Memasang 1m2 Rangka Langit-langit (50 x 100) cm, Kayu Kelas II atau III (P.K. 34)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.150 7,500.00
2 Tukang Kayu OH 80,800.00 0.300 24,240.00
3 Kepala Tukang OH 120,000.00 0.030 3,600.00
4 Mandor OH 80,000.00 0.075 6,000.00
Jumlah 41,340.00
B BAHAN
1 Kaso-kaso (5x7) cm M3 2,830,000.00 0.0154 43,582.00
2 Paku 7 cm - 10 cm Kg 12,000.00 0.200 2,400.00
Jumlah 45,982.00
C Jumlah A + B 87,322.00
D Harga Satuan 87,322.00
Acuan : SNI DT 91-0011-2007
Memasang 1m2 Rangka Langit-langit (60 x 60) cm, Kayu Kelas II atau III (P.K. 35)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.200 10,000.00
2 Tukang Kayu OH 80,800.00 0.300 24,240.00
3 Kepala Tukang OH 120,000.00 0.030 3,600.00
4 Mandor OH 80,000.00 0.010 800.00
Jumlah 38,640.00
B BAHAN
1 Kaso-kaso (5x7) cm M3 2,830,000.00 0.0163 46,129.00
2 Paku 7 cm - 10 cm Kg 12,000.00 0.250 3,000.00
Jumlah 49,129.00
C Jumlah A + B 87,769.00
D Harga Satuan 87,769.00
Acuan : SNI DT 91-0011-2007
1m2 Pasang Rangka Langit-langit (30 x 60)cm Kayu Kelas II (P.K. 36)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.200 10,000.00
2 Tukang Kayu OH 80,800.00 0.300 24,240.00
3 Kepala Tukang OH 120,000.00 0.030 3,600.00
4 Mandor OH 80,000.00 0.010 800.00
Jumlah 38,640.00
B BAHAN
1 Kayu Kelas II (Tidak Ketam) M3 3,385,600.00 0.023 77,868.80
2 Paku Kg 12,000.00 0.150 1,800.00
Jumlah 79,668.80
C Jumlah A + B 118,308.80
D Harga Satuan 118,308.80
Acuan : ABK Bangunan Gedung dan Perumahan - 6.41

1m2 Pasang Rangka Langit-langit (30 x 30)cm Kayu Kelas II (P.K. 37)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.250 12,500.00
2 Tukang Kayu OH 80,800.00 0.350 28,280.00
3 Kepala Tukang OH 120,000.00 0.035 4,200.00
4 Mandor OH 80,000.00 0.0125 1,000.00
Jumlah 45,980.00
B BAHAN
1 Kayu Kelas II (Tidak Ketam) M3 3,385,600.00 0.027 91,411.20
2 Paku Kg 12,000.00 0.200 2,400.00
Jumlah 93,811.20
C Jumlah A + B 139,791.20
D Harga Satuan 139,791.20
Acuan : ABK Bangunan Gedung dan Perumahan - 6.44

Memasang 1m1 Lisplank Ukuran (3 x 20) cm, Kayu Kelas I (P.K. 38)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.100 5,000.00
2 Tukang Kayu OH 80,800.00 0.200 16,160.00
3 Kepala Tukang OH 120,000.00 0.020 2,400.00
4 Mandor OH 80,000.00 0.005 400.00
Jumlah 23,960.00
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 5,379,500.00 0.0108 58,098.60
2 Paku Kg 12,000.00 0.100 1,200.00
Jumlah 59,298.60
C Jumlah A + B 83,258.60
D Harga Satuan 83,258.60
Acuan : SNI DT 91-0011-2007
Memasang 1m1 Lisplank Ukuran (3 x 20) cm, Kayu Kelas II (P.K. 39)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.100 5,000.00
2 Tukang Kayu OH 80,800.00 0.200 16,160.00
3 Kepala Tukang OH 120,000.00 0.020 2,400.00
4 Mandor OH 80,000.00 0.005 400.00
Jumlah 23,960.00
B BAHAN
1 Papan Kayu Kelas II (Ketam) M3 5,755,600.00 0.0108 62,160.48
2 Paku Kg 12,000.00 0.100 1,200.00
Jumlah 63,360.48
C Jumlah A + B 87,320.48
D Harga Satuan 87,320.48
Acuan : SNI DT 91-0011-2007

1m1 Pasang Lisplank Ukuran 2 x (3 x 20cm) Kayu Kelas I (P.K. 40)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.150 7,500.00
2 Tukang Kayu OH 80,800.00 0.250 20,200.00
3 Kepala Tukang OH 120,000.00 0.025 3,000.00
4 Mandor OH 80,000.00 0.075 6,000.00
Jumlah 36,700.00
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 5,379,500.00 0.0145 78,002.75
2 Paku Kg 12,000.00 0.060 720.00
Jumlah 78,722.75
C Jumlah A + B 115,422.75
D Harga Satuan 115,422.75
Acuan : ABK Bangunan Gedung dan Perumahan - 6.51

1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Belian (P.K. 41)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.100 5,000.00
2 Tukang Kayu OH 80,800.00 0.100 8,080.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.050 4,000.00
Jumlah 18,280.00
B BAHAN
1 Papan Kayu Belian (Ketam) M3 15,416,700.00 0.0088 135,666.96
2 Paku Beton Kg 25,000.00 0.060 1,500.00
Jumlah 137,166.96
C Jumlah A + B 155,446.96
D Harga Satuan 155,446.96
Acuan : ABK Bangunan Gedung dan Perumahan - 6.53
1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Kelas I (P.K. 42)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.100 5,000.00
2 Tukang Kayu OH 80,800.00 0.100 8,080.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.050 4,000.00
Jumlah 18,280.00
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 5,379,500.00 0.0088 47,339.60
2 Paku Kg 12,000.00 0.060 720.00
Jumlah 48,059.60
C Jumlah A + B 66,339.60
D Harga Satuan 66,339.60
Acuan : ABK Bangunan Gedung dan Perumahan - 6.53

1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Kelas II (P.K. 43)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.100 5,000.00
2 Tukang Kayu OH 80,800.00 0.100 8,080.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.050 4,000.00
Jumlah 18,280.00
B BAHAN
1 Papan Kayu Kelas II (Ketam) M3 5,755,600.00 0.0088 50,649.28
2 Paku Kg 12,000.00 0.060 720.00
Jumlah 51,369.28
C Jumlah A + B 69,649.28
D Harga Satuan 69,649.28
Acuan : ABK Bangunan Gedung dan Perumahan - 6.53

1m2 Pasang Rangka Dinding Pemisah Kayu Kelas I (P.K. 44)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.150 7,500.00
2 Tukang Kayu OH 80,800.00 0.450 36,360.00
3 Kepala Tukang OH 120,000.00 0.045 5,400.00
4 Mandor OH 80,000.00 0.075 6,000.00
Jumlah 55,260.00
B BAHAN
1 Balok Kayu Kelas I (Tidak Ketam) M3 3,441,500.00 0.0195 67,109.25
2 Papan Kayu Kelas I (Tidak Ketam) M3 3,226,500.00 0.007 22,585.50
3 Paku Kg 12,000.00 0.100 1,200.00
Jumlah 90,894.75
C Jumlah A + B 146,154.75
D Harga Satuan 146,154.75
Acuan : ABK Bangunan Gedung dan Perumahan - 6.54
Memasang 1m2 Rangka Dinding Pemisah (60x120) cm Kayu Kelas II (P.K. 45)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.150 7,500.00
2 Tukang Kayu OH 80,800.00 0.450 36,360.00
3 Kepala Tukang OH 120,000.00 0.045 5,400.00
4 Mandor OH 80,000.00 0.075 6,000.00
Jumlah 55,260.00
B BAHAN
1 Balok Kayu Kelas II (Tidak Ketam) M3 3,385,600.00 0.0195 66,019.20
2 Paku 5 cm dan 7 cm Kg 12,000.00 0.100 1,200.00
Jumlah 67,219.20
C Jumlah A + B 122,479.20
D Harga Satuan 122,479.20
Acuan : SNI DT 91-0011-2007

Memasang 1m2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kelas II (P.K. 46)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.200 10,000.00
2 Tukang Kayu OH 80,800.00 0.600 48,480.00
3 Kepala Tukang OH 120,000.00 0.060 7,200.00
4 Mandor OH 80,000.00 0.010 800.00
Jumlah 66,480.00
B BAHAN
1 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) M3 3,385,600.00 0.0280 94,796.80
2 Paku Kg 12,000.00 0.150 1,800.00
3 Plywood 4' x 8' x 4mm Kg 99,400.00 0.860 85,484.00
4 Lem Kayu Ltr 18,550.00 0.560 10,388.00
Jumlah 192,468.80
C Jumlah A + B 258,948.80
D Harga Satuan 258,948.80
Acuan : SNI DT 91-0011-2007

Memasang 1m2 Dinding Lambriziring dari Papan Kayu Kelas I (P.K. 47)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.600 30,000.00
2 Tukang Kayu OH 80,800.00 1.800 145,440.00
3 Kepala Tukang OH 120,000.00 0.180 21,600.00
4 Mandor OH 80,000.00 0.030 2,400.00
Jumlah 199,440.00
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 5,379,500.00 0.007 37,656.50
2 Paku Kg 12,000.00 0.100 1,200.00
3 Sekrup Kg 60,000.00 0.150 9,000.00
Jumlah 47,856.50
C Jumlah A + B 247,296.50
D Harga Satuan 247,296.50
Acuan : SNI DT 91-0011-2007
Memasang 1m2 Dinding Lambriziring dari Papan Kayu Belian (P.K. 47.a)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.600 30,000.00
2 Tukang Kayu OH 80,800.00 1.800 145,440.00
3 Kepala Tukang OH 120,000.00 0.180 21,600.00
4 Mandor OH 80,000.00 0.030 2,400.00
Jumlah 199,440.00
B BAHAN
1 Papan Kayu Belian (Ketam) M3 15,416,700.00 0.007 107,916.90
2 Paku Beton Kg 25,000.00 0.100 2,500.00
3 Sekrup Kg 60,000.00 0.150 9,000.00
Jumlah 119,416.90
C Jumlah A + B 318,856.90
D Harga Satuan 318,856.90
Acuan : SNI DT 91-0011-2007

Memasang 1m2 Dinding Lambriziring dari Plywood ukuran (120 x 240) cm (P.K. 48)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.025 1,250.00
2 Tukang Kayu OH 80,800.00 0.075 6,060.00
3 Kepala Tukang OH 120,000.00 0.008 960.00
4 Mandor OH 80,000.00 0.001 80.00
Jumlah 8,350.00
B BAHAN
1 Plywood 4' x 8' x 4mm Lbr 99,400.00 0.400 39,760.00
2 Paku 1/2 " - 1" Kg 12,000.00 0.050 600.00
Jumlah 40,360.00
C Jumlah A + B 48,710.00
D Harga Satuan 48,710.00
Acuan : SNI DT 91-0011-2007

1m1 Pasang List Plafond, Kayu Profil (P.K. 49)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.021 1,050.00
2 Tukang Kayu OH 80,800.00 0.021 1,696.80
3 Kepala Tukang OH 120,000.00 0.002 240.00
4 Mandor OH 80,000.00 0.001 80.00
Jumlah 3,066.80
B BAHAN
1 Kayu Profil M1 4,700.00 1.050 4,935.00
Jumlah 4,935.00
C Jumlah A + B 8,001.80
D Harga Satuan 8,001.80
Acuan : ABK Bangunan Gedung dan Perumahan - 6.60
1m2 Pemasangan Lantai Papan Kayu Belian (P.K. 50)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 1.800 145,440.00
2 Pekerja OH 50,000.00 0.600 30,000.00
3 Kepala Tukang OH 120,000.00 0.180 21,600.00
4 Mandor OH 80,000.00 0.030 2,400.00
Jumlah 199,440.00
B BAHAN
1 Papan Kayu Belian (Ketam) M3 15,416,700.00 0.0240 370,000.80
2 Paku Beton Kg 25,000.00 0.200 5,000.00
Jumlah 375,000.80
C Jumlah A + B 574,440.80
D Harga Satuan 574,440.80
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.38

1m2 Pemasangan Lantai Papan Kayu Kelas I (P.K. 51)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 1.800 145,440.00
2 Pekerja OH 50,000.00 0.600 30,000.00
3 Kepala Tukang OH 120,000.00 0.180 21,600.00
4 Mandor OH 80,000.00 0.030 2,400.00
Jumlah 199,440.00
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 5,379,500.00 0.0240 129,108.00
2 Paku Kg 12,000.00 0.200 2,400.00
Jumlah 131,508.00
C Jumlah A + B 330,948.00
D Harga Satuan 330,948.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.38
H. PEKERJAAN PENUTUP ATAP (P.PA.)

1m2 Pasang Atap Genteng Metal Type PRIMA 0.35 (P.PA. 01)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.200 10,000.00
2 Tukang kayu OH 80,800.00 0.100 8,080.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.001 80.00
Jumlah 19,360.00
B BAHAN
1 Genteng Metal Type PRIMA 0.35 Lbr 58,300.00 1.840 107,272.00
2 Paku Kg 12,000.00 0.200 2,400.00
Jumlah 109,672.00
C Jumlah A + B 129,032.00
D Harga Satuan 129,032.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32

1m2 Pasang Atap Genteng Metal Type ROYAL 0.35 (P.PA. 02)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.200 10,000.00
2 Tukang kayu OH 80,800.00 0.100 8,080.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.001 80.00
Jumlah 19,360.00
B BAHAN
1 Genteng Metal Type ROYAL 0.35 Lbr 58,300.00 1.710 99,693.00
2 Paku Kg 12,000.00 0.200 2,400.00
Jumlah 102,093.00
C Jumlah A + B 121,453.00
D Harga Satuan 121,453.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32

1m2 Pasang Atap Genteng Metal Type CLASSIC 0.35 (P.PA. 03)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.200 10,000.00
2 Tukang kayu OH 80,800.00 0.100 8,080.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.001 80.00
Jumlah 19,360.00
B BAHAN
1 Genteng Metal Type CLASSIC 0.35 Lbr 58,300.00 1.620 94,446.00
2 Paku Kg 12,000.00 0.200 2,400.00
Jumlah 96,846.00
C Jumlah A + B 116,206.00
D Harga Satuan 116,206.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32

Pekerjaan Penutup Atap 29


1m2 Pasang Atap Genteng Metal Stone Type CLASSIC 0.35 (P.PA. 04)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.200 10,000.00
2 Tukang kayu OH 80,800.00 0.100 8,080.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.001 80.00
Jumlah 19,360.00
B BAHAN
1 Genteng Metal Stone Type CLASSIC 0.35 Lbr 80,800.00 1.620 130,896.00
2 Paku Kg 12,000.00 0.200 2,400.00
Jumlah 133,296.00
C Jumlah A + B 152,656.00
D Harga Satuan 152,656.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32

1m2 Pasang Atap Genteng Metal Stone Type PRIMA 0.35 (P.PA. 05)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.200 10,000.00
2 Tukang kayu OH 80,800.00 0.100 8,080.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.001 80.00
Jumlah 19,360.00
B BAHAN
1 Genteng Metal Stone Type PRIMA 0.35 Lbr 80,800.00 1.840 148,672.00
2 Paku Kg 12,000.00 0.200 2,400.00
Jumlah 151,072.00
C Jumlah A + B 170,432.00
D Harga Satuan 170,432.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32

1m2 Pasang Atap Sirap Belian (P.PA. 06)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.166 8,300.00
2 Tukang kayu OH 80,800.00 0.250 20,200.00
3 Kepala Tukang OH 120,000.00 0.025 3,000.00
4 Mandor OH 80,000.00 0.008 640.00
Jumlah 32,140.00
B BAHAN
1 Genteng Sirap Belian Bh 5,000.00 60.000 300,000.00
2 Paku 1/2" - 1" Kg 12,000.00 0.200 2,400.00
Jumlah 302,400.00
C Jumlah A + B 334,540.00
D Harga Satuan 334,540.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.33

Pekerjaan Penutup Atap 30


1m1 Pekerjaan Bubungan dengan Seng Datar Color 0.35 / 10 m 1 (P.PA. 07)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.250 12,500.00
2 Tukang kayu OH 80,800.00 0.250 20,200.00
3 Kepala Tukang OH 120,000.00 0.025 3,000.00
Jumlah 35,700.00
B BAHAN
1 Paku Kg 12,000.00 0.100 1,200.00
2 Seng Datar Color 0.35 Lbr 55,000.00 6.000 330,000.00
3 Papan Kayu Kelas II (tdk ketam) M3 4,128,900.00 0.072 297,280.80
Jumlah 628,480.80
C Jumlah A + B 664,180.80
D Harga Satuan 664,180.80
Jadi 1 M1 66,418.08
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - H.10

1m1 Pasang Nok / Bumbungan Genteng Metal 1/2 Lingkaran 0.35 (P.PA. 08)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.250 12,500.00
2 Tukang kayu OH 80,800.00 0.150 12,120.00
3 Kepala Tukang OH 120,000.00 0.015 1,800.00
4 Mandor OH 80,000.00 0.013 1,040.00
Jumlah 27,460.00
B BAHAN
1 Nok / Bubungan Genteng Metal 1/2 lingk 0.35 Bh 65,000.00 2.500 162,500.00
2 Paku 1/2" - 1" Kg 12,000.00 0.050 600.00
Jumlah 163,100.00
C Jumlah A + B 190,560.00
D Harga Satuan 190,560.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.36

1m1 Pasang Nok / Bumbungan Genteng Metal Kotak 0.35 (P.PA. 09)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.250 12,500.00
2 Tukang kayu OH 80,800.00 0.150 12,120.00
3 Kepala Tukang OH 120,000.00 0.015 1,800.00
4 Mandor OH 80,000.00 0.013 1,040.00
Jumlah 27,460.00
B BAHAN
1 Nok / Bubungan Genteng Metal Kotak 0.35 Meter 77,600.00 1.000 77,600.00
2 Paku 1/2" - 1" Kg 12,000.00 0.050 600.00
Jumlah 78,200.00
C Jumlah A + B 105,660.00
D Harga Satuan 105,660.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.36

Pekerjaan Penutup Atap 31


1m1 Pasang Nok / Bumbungan Genteng Metal Stone Kotak 0.35 (P.PA. 10)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.250 12,500.00
2 Tukang kayu OH 80,800.00 0.150 12,120.00
3 Kepala Tukang OH 120,000.00 0.015 1,800.00
4 Mandor OH 80,000.00 0.013 1,040.00
Jumlah 27,460.00
B BAHAN
1 Nok / Bubungan Genteng Metal Stone Kotak Meter 92,000.00 1.000 92,000.00
2 Paku 1/2" - 1" Kg 12,000.00 0.050 600.00
Jumlah 92,600.00
C Jumlah A + B 120,060.00
D Harga Satuan 120,060.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.36

1m1 Pasang Bumbungan Atap Sirap (P.PA. 11)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.125 6,250.00
2 Tukang kayu OH 80,800.00 0.250 20,200.00
3 Kepala Tukang OH 120,000.00 0.025 3,000.00
4 Mandor OH 80,000.00 0.006 480.00
Jumlah 29,930.00
B BAHAN
1 Seng Plat 3" x 6" BJLS 0.30 Lbr 76,000.00 0.400 30,400.00
2 Paku 1/2" - 1" Kg 12,000.00 0.060 720.00
3 Paku 2" - 5" Kg 12,000.00 0.050 600.00
4 Papan Kayu Kelas 1 M3 3,226,500.00 0.004 12,906.00
Jumlah 44,626.00
C Jumlah A + B 74,556.00
D Harga Satuan 74,556.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.37

1m2 Pasang Atap Seng Gelombang BJLS 30 (P.PA. 12)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.120 6,000.00
2 Tukang kayu OH 80,800.00 0.060 4,848.00
3 Kepala Tukang OH 120,000.00 0.006 720.00
4 Mandor OH 80,000.00 0.006 480.00
Jumlah 12,048.00
B BAHAN
1 Seng Gelombang 3" x 6" BJLS 0.30 Lbr 70,000.00 0.700 49,000.00
2 Paku 1/2" - 1" ( paku atap seng ) Kg 50,800.00 0.020 1,016.00
Jumlah 50,016.00
C Jumlah A + B 62,064.00
D Harga Satuan 62,064.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.38

Pekerjaan Penutup Atap 32


1m2 Pasang Atap Metal Supersheet 0.35 (polos) (P.PA. 13)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.150 7,500.00
2 Tukang kayu OH 80,800.00 0.750 60,600.00
3 Kepala Tukang OH 120,000.00 0.008 960.00
4 Mandor OH 80,000.00 0.006 480.00
Jumlah 69,540.00
B BAHAN
1 Atap Metal Supersheet 0.35 (polos) M2 106,300.00 1.050 111,615.00
2 Paku Zincalume Kg 35,000.00 0.020 700.00
Jumlah 112,315.00
C Jumlah A + B 181,855.00
D Harga Satuan 181,855.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.38

1m2 Pasang Zincalume Gelombang Persegi 0.30 (Polos) (P.PA. 14)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.150 7,500.00
2 Tukang kayu OH 80,800.00 0.750 60,600.00
3 Kepala Tukang OH 120,000.00 0.008 960.00
4 Mandor OH 80,000.00 0.006 480.00
Jumlah 69,540.00
B BAHAN
1 Zincalume 0.30 (polos) M2
91,250.00 1.050 95,812.50
2 Paku Zincalume Kg 35,000.00 0.020 700.00
Jumlah 96,512.50
C Jumlah A + B 166,052.50
D Harga Satuan 166,052.50
Acuan : ABK Bangunan Gedung dan Perumahan - 6.38

1m2 Pasang Zincalume Gelombang Persegi 0.30 (Colour) (P.PA. 15)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.150 7,500.00
2 Tukang kayu OH 80,800.00 0.750 60,600.00
3 Kepala Tukang OH 120,000.00 0.008 960.00
4 Mandor OH 80,000.00 0.006 480.00
Jumlah 69,540.00
B BAHAN
1 Zincalume 0.30 (Colour) M2 103,750.00 1.050 108,937.50
2 Paku Zincalume Kg 35,000.00 0.020 700.00
Jumlah 109,637.50
C Jumlah A + B 179,177.50
D Harga Satuan 179,177.50
Acuan : ABK Bangunan Gedung dan Perumahan - 6.38

Pekerjaan Penutup Atap 33


1m2 Pasang Zincalume Gelombang Persegi 0.35 (Polos) (P.PA. 16)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.150 7,500.00
2 Tukang kayu OH 80,800.00 0.750 60,600.00
3 Kepala Tukang OH 120,000.00 0.008 960.00
4 Mandor OH 80,000.00 0.006 480.00
Jumlah 69,540.00
B BAHAN
1 Zincalume 0.35 (polos) M2 103,750.00 1.050 108,937.50
2 Paku Zincalume Kg 35,000.00 0.020 700.00
Jumlah 109,637.50
C Jumlah A + B 179,177.50
D Harga Satuan 179,177.50
Acuan : ABK Bangunan Gedung dan Perumahan - 6.38

1m2 Pasang Zincalume Gelombang Persegi 0.35 (Colour) (P.PA. 17)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.150 7,500.00
2 Tukang kayu OH 80,800.00 0.750 60,600.00
3 Kepala Tukang OH 120,000.00 0.008 960.00
4 Mandor OH 80,000.00 0.006 480.00
Jumlah 69,540.00
B BAHAN
1 Zincalume 0.35 (Colour) M2
116,250.00 1.050 122,062.50
2 Paku Zincalume Kg 35,000.00 0.020 700.00
Jumlah 122,762.50
C Jumlah A + B 192,302.50
D Harga Satuan 192,302.50
Acuan : ABK Bangunan Gedung dan Perumahan - 6.38

1m1 Pekerjaan Bubungan Atap Seng BJLS 30 / 10m 1 (P.PA. 18)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 0.250 20,200.00
2 Kepala Tukang Kayu OH 120,000.00 0.025 3,000.00
3 Pekerja OH 50,000.00 0.250 12,500.00
Jumlah 35,700.00
B BAHAN
1 Paku Kg 12,000.00 0.100 1,200.00
2 Seng Plat BJLS 0.30 Lbr 76,000.00 6.000 456,000.00
3 Papan Kayu Kelas II (Tidak Ketam) M3 4,128,900.00 0.072 297,280.80
Jumlah 754,480.80
C Jumlah A + B 790,180.80
D Harga Satuan 790,180.80
Jadi 1 M1 79,018.08
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - H.10

1m2 Pasang Aluminium Foil / Sealation (P.PA. 19)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.150 7,500.00
2 Tukang Kayu OH 80,800.00 0.050 4,040.00
3 Kepala Tukang OH 120,000.00 0.005 600.00
4 Mandor OH 80,000.00 0.008 640.00
Jumlah 12,780.00
B BAHAN
1 Aluminium Foil M2 50,000.00 1.050 52,500.00
Jumlah 52,500.00
C Jumlah A + B 65,280.00
D Harga Satuan 65,280.00

Pekerjaan Penutup Atap 34


Acuan : ABK Bangunan Gedung dan Perumahan - 6.42

Pekerjaan Penutup Atap 35


1m2 Pasang Atap Seng Gelombang BJLS 20 (P.PA. 12.a)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.120 6,000.00
2 Tukang kayu OH 80,800.00 0.060 4,848.00
3 Kepala Tukang OH 120,000.00 0.006 720.00
4 Mandor OH 80,000.00 0.006 480.00
Jumlah 12,048.00
B BAHAN
1 Seng Gelombang 3" x 6" BJLS 0.20 Lbr 65,500.00 0.700 45,850.00
2 Paku 1/2" - 1" ( paku atap seng ) Kg 50,800.00 0.020 1,016.00
Jumlah 46,866.00
C Jumlah A + B 58,914.00
D Harga Satuan 58,914.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.38

1m1 Pekerjaan Bubungan Atap Seng BJLS 20 / 10m 1 (P.PA. 18.a)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 0.250 20,200.00
2 Kepala Tukang Kayu OH 120,000.00 0.025 3,000.00
3 Pekerja OH 50,000.00 0.250 12,500.00
Jumlah 35,700.00
B BAHAN
1 Paku Kg 12,000.00 0.100 1,200.00
2 Seng Plat BJLS 0.20 Lbr 65,500.00 6.000 393,000.00
3 Papan Kayu Kelas II (Tidak Ketam) M3 4,128,900.00 0.072 297,280.80
Jumlah 691,480.80
C Jumlah A + B 727,180.80
D Harga Satuan 727,180.80
Jadi 1 M1 72,718.08
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - H.10

Pekerjaan Penutup Atap 36


1m2 Langit-langit GRC (P.Pf. 05)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.100 5,000.00
2 Tukang Kayu OH 80,800.00 0.050 4,040.00
3 Kepala Tukang OH 120,000.00 0.005 600.00
4 Mandor OH 80,000.00 0.005 400.00
Jumlah 10,040.00
B BAHAN
1 GRC Board (120 x 240 x 4) Lbr 59,000.00 0.364 21,476.00
2 Paku GRC Kg 26,250.00 0.110 2,887.50
Jumlah 24,363.50
C Jumlah A + B 34,403.50
D Harga Satuan 34,403.50
Acuan : ABK Bangunan Gedung dan Perumahan - 6.24
J. PEKERJAAN SANITASI (P. Snt.)

Pemasangan 1 Buah Kloset Duduk / Monoblok (P.Snt. 01)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Batu OH 80,800.00 1.100 88,880.00
2 Pekerja OH 50,000.00 3.300 165,000.00
3 Kepala Tukang OH 120,000.00 0.001 120.00
4 Mandor OH 80,000.00 0.160 12,800.00
Jumlah 266,800.00
B BAHAN
1 Kloset Duduk Monoblok Bh 742,000.00 1.000 742,000.00
2 Perlengkapan Ls 742,000.00 6% Harga Kloset 44,520.00
Jumlah 786,520.00
C Jumlah A + B 1,053,320.00
D Harga Satuan 1,053,320.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.1

Pemasangan Kloset Jongkok Keramik (P.Snt. 02)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Batu OH 80,800.00 1.500 121,200.00
2 Pekerja OH 50,000.00 1.000 50,000.00
3 Kepala Tukang OH 120,000.00 1.500 180,000.00
4 Mandor OH 80,000.00 0.160 12,800.00
Jumlah 364,000.00
B BAHAN
1 Kloset Jongkok Keramik Bh 125,000.00 1.000 125,000.00
2 Semen Portland Kg 1,400.00 6.000 8,400.00
3 Pasir Pasang/Beton M3 112,000.00 0.010 1,120.00
Jumlah 134,520.00
C Jumlah A + B 498,520.00
D Harga Satuan 498,520.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.2

Memasang 1m1 Pipa Galvanis Ø 1/2" (P.Snt. 03)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.054 2,700.00
2 Tukang Batu OH 80,800.00 0.090 7,272.00
3 Kepala Tukang OH 120,000.00 0.009 1,080.00
4 Mandor OH 80,000.00 0.027 2,160.00
Jumlah 13,212.00
B BAHAN
1 Pipa Galvanis Ø 1/2 " M1 24,166.67 1.200 29,000.00
2 Perlengkapan Ls 24,166.67 35% Harga Pipa 8,458.33
Jumlah 37,458.33

Pekerjaan Sanitasi 38
C Jumlah A + B 50,670.33
D Harga Satuan 50,670.33
Acuan : ABK Bangunan Gedung dan Perumahan - 6.19

Memasang 1m1 Pipa Galvanis Ø 3/4" (P. Snt. 04)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.054 2,700.00
2 Tukang Batu OH 80,800.00 0.090 7,272.00
3 Kepala Tukang OH 120,000.00 0.009 1,080.00
4 Mandor OH 80,000.00 0.027 2,160.00
Jumlah 13,212.00
B BAHAN
1 Pipa Galvanis Ø 3/4 " M1 30,000.00 1.200 36,000.00
2 Perlengkapan Ls 30,000.00 35% Harga Pipa 10,500.00
Jumlah 46,500.00
C Jumlah A + B 59,712.00
D Harga Satuan 59,712.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.20

Memasang 1m1 Pipa Galvanis Ø 1" (P.Snt. 05)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.054 2,700.00
2 Tukang Batu OH 80,800.00 0.090 7,272.00
3 Kepala Tukang OH 120,000.00 0.009 1,080.00
4 Mandor OH 80,000.00 0.027 2,160.00
Jumlah 13,212.00
B BAHAN
1 Pipa Galvanis Ø 1" M1 37,500.00 1.200 45,000.00
2 Perlengkapan Ls 37,500.00 35% Harga Pipa 13,125.00
Jumlah 58,125.00
C Jumlah A + B 71,337.00
D Harga Satuan 71,337.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.21

Memasang 1m1 Pipa Galvanis Ø 11/2" (P.Snt. 06)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN

Pekerjaan Sanitasi 39
No. URAIAN PEKERJAAN SATUAN KUANTITAS
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.108 5,400.00
2 Tukang Batu OH 80,800.00 0.180 14,544.00
3 Kepala Tukang OH 120,000.00 0.018 2,160.00
4 Mandor OH 80,000.00 0.005 432.00
Jumlah 22,536.00
B BAHAN
1 Pipa Galvanis 11/2 " M1 64,166.67 1.200 77,000.00
2 Perlengkapan Ls 64,166.67 35% Harga Pipa 22,458.33
Jumlah 99,458.33
C Jumlah A + B 121,994.33
D Harga Satuan 121,994.33
Acuan : ABK Bangunan Gedung dan Perumahan - 6.22

Memasang 1m1 Pipa Galvanis Ø 3" (P.Snt. 07)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.108 5,400.00
2 Tukang Batu OH 80,800.00 0.180 14,544.00
3 Kepala Tukang OH 120,000.00 0.018 2,160.00
4 Mandor OH 80,000.00 0.005 432.00
Jumlah 22,536.00
B BAHAN
1 Pipa Galvanis Ø 3" M1 93,083.33 1.200 111,700.00
2 Perlengkapan Ls 93,083.33 35% Harga Pipa 32,579.17
Jumlah 144,279.17
C Jumlah A + B 166,815.17
D Harga Satuan 166,815.17
Acuan : ABK Bangunan Gedung dan Perumahan - 6.23

Memasang 1m1 Pipa Galvanis Ø 4" (P.Snt. 08)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.135 6,750.00
2 Tukang Batu OH 80,800.00 0.225 18,180.00
3 Kepala Tukang OH 120,000.00 0.0225 2,700.00

Pekerjaan Sanitasi 40
4 Mandor OH 80,000.00 0.0068 544.00
Jumlah 28,174.00
B BAHAN
1 Pipa Galvanis Ø 4" M1 66,300.00 1.200 79,560.00
2 Perlengkapan Ls 66,300.00 35% Harga Pipa 23,205.00
Jumlah 102,765.00
C Jumlah A + B 130,939.00
D Harga Satuan 130,939.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.24

Memasang 1m1 Pipa PVC Tipe AW Ø 1/2" (P.Snt. 09)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.036 1,800.00
2 Tukang Batu OH 80,800.00 0.060 4,848.00
3 Kepala Tukang OH 120,000.00 0.006 720.00
4 Mandor OH 80,000.00 0.0018 144.00
Jumlah 7,512.00
B BAHAN
1 Pipa PVC Ø 1/2" M1 3,775.00 1.200 4,530.00
2 Perlengkapan Ls 3,775.00 35% Harga Pipa 1,321.25
Jumlah 5,851.25
C Jumlah A + B 13,363.25
D Harga Satuan 13,363.25
Acuan : ABK Bangunan Gedung dan Perumahan - 6.25

Memasang 1m1 Pipa PVC Tipe AW Ø 3/4" (P.Snt. 10)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.036 1,800.00
2 Tukang Batu OH 80,800.00 0.060 4,848.00
3 Kepala Tukang OH 120,000.00 0.006 720.00
4 Mandor OH 80,000.00 0.0018 144.00
Jumlah 7,512.00
B BAHAN
1 Pipa PVC Ø 3/4" M1 4,775.00 1.200 5,730.00
2 Perlengkapan Ls 4,775.00 35% Harga Pipa 1,671.25

Pekerjaan Sanitasi 41
Jumlah 7,401.25
C Jumlah A + B 14,913.25
D Harga Satuan 14,913.25
Acuan : ABK Bangunan Gedung dan Perumahan - 6.26

Memasang 1m1 Pipa PVC Tipe AW Ø 1" (P.Snt. 11)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.036 1,800.00
2 Tukang Batu OH 80,800.00 0.060 4,848.00
3 Kepala Tukang OH 120,000.00 0.006 720.00
4 Mandor OH 80,000.00 0.0018 144.00
Jumlah 7,512.00
B BAHAN
1 Pipa PVC Ø 1" M1 8,750.00 1.200 10,500.00
2 Perlengkapan Ls 8,750.00 35% Harga Pipa 3,062.50
Jumlah 13,562.50
C Jumlah A + B 21,074.50
D Harga Satuan 21,074.50
Acuan : ABK Bangunan Gedung dan Perumahan - 6.27

Memasang 1m1 Pipa PVC Tipe AW Ø 2" (P.Snt. 12)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.054 2,700.00
2 Tukang Batu OH 80,800.00 0.090 7,272.00
3 Kepala Tukang OH 120,000.00 0.009 1,080.00
4 Mandor OH 80,000.00 0.0027 216.00
Jumlah 11,268.00
B BAHAN
1 Pipa PVC Ø 2" M1 10,900.00 1.200 13,080.00
2 Perlengkapan Ls 10,900.00 35% Harga Pipa 3,815.00
Jumlah 16,895.00
C Jumlah A + B 28,163.00
D Harga Satuan 28,163.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.29

Pekerjaan Sanitasi 42
Memasang 1m1 Pipa PVC Tipe AW Ø 3" (P.Snt. 13)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.081 4,050.00
2 Tukang Batu OH 80,800.00 0.135 10,908.00
3 Kepala Tukang OH 120,000.00 0.0135 1,620.00
4 Mandor OH 80,000.00 0.0041 328.00
Jumlah 16,906.00
B BAHAN
1 Pipa PVC Ø 3" M1 16,800.00 1.200 20,160.00
2 Perlengkapan Ls 16,800.00 35% Harga Pipa 5,880.00
Jumlah 26,040.00
C Jumlah A + B 42,946.00
D Harga Satuan 42,946.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.31

Memasang 1m1 Pipa PVC Tipe AW Ø 4" (P.Snt. 14)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.081 4,050.00
2 Tukang Batu OH 80,800.00 0.135 10,908.00
3 Kepala Tukang OH 120,000.00 0.0135 1,620.00
4 Mandor OH 80,000.00 0.0041 328.00
Jumlah 16,906.00
B BAHAN
1 Pipa PVC Ø 4" M1 27,050.00 1.200 32,460.00
2 Perlengkapan Ls 27,050.00 35% Harga Pipa 9,467.50
Jumlah 41,927.50
C Jumlah A + B 58,833.50
D Harga Satuan 58,833.50
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32

Memasang 1 Buah Kran Air Ø 3/4" atau Ø 1/2" (P.Snt. 15)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.010 500.00
2 Tukang Batu OH 80,800.00 0.100 8,080.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.005 400.00
Jumlah 10,180.00
B BAHAN
1 Kran Air Bh 35,000.00 1.000 35,000.00
2 Seal Tape Set 2,000.00 0.025 50.00
Jumlah 35,050.00
C Jumlah A + B 45,230.00
D Harga Satuan 45,230.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.35

Pekerjaan Sanitasi 43
K. PEKERJAAN BESI DAN ALUMINIUM (P. BA.)

Memasang 1 kg besi profil (P.BA 01)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.060 3,000.00
2 Tukang las OH 80,800.00 0.060 4,848.00
3 Kepala Tukang OH 120,000.00 0.006 720.00
4 Mandor OH 80,000.00 0.003 240.00
Jumlah 8,808.00
B BAHAN
1 Besi Profil Kg 16,300.00 1.150 18,745.00
Jumlah 18,745.00
C Jumlah A + B 27,553.00
D Harga Satuan 27,553.00
Acuan : SNI DT 91-0014-2007

Memasang 1 Kg rangka kuda-kuda baja IWF (P. BA 02)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.060 3,000.00
2 Tukang las OH 80,800.00 0.060 4,848.00
3 Kepala Tukang OH 120,000.00 0.006 720.00
4 Mandor OH 80,000.00 0.0030 240.00
Jumlah 8,808.00
B BAHAN
1 Besi baja IWF kg 16,300.00 1.150 18,745.00
Jumlah 18,745.00
C Jumlah A + B 27,553.00
D Harga Satuan 27,553.00
Acuan : SNI DT 91-0014-2007

Mengerjakan 100 kg pekerjaan perakitan (P. BA 03)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.100 5,000.00
2 Tukang Besi OH 80,800.00 0.100 8,080.00
3 Kepala Tukang OH 120,000.00 0.001 120.00
4 Mandor OH 80,000.00 0.0050 400.00
Jumlah 13,600.00
B BAHAN
1 Solar Liter 4,500.00 1.000 4,500.00
2 Minyak Pelumas Liter 50,000.00 0.100 5,000.00
Jumlah 9,500.00
C ALAT
1 Sewa Alat Jam 62,500.00 0.800 50,000.00

Pekerjaan Besi & Aluminium 44


Jumlah 50,000.00
D Jumlah A + B + C 73,100.00
E Harga Satuan 73,100.00
Acuan : SNI DT 91-0014-2007

Pekerjaan Besi & Aluminium 45


Mengerjakan 10 cm pengelasan dengan las listrik (P. BA 04)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.040 2,000.00
2 Tukang Besi OH 80,800.00 0.020 1,616.00
3 Kepala Tukang OH 120,000.00 0.002 240.00
4 Mandor OH 80,000.00 0.002 160.00
Jumlah 4,016.00
B BAHAN
1 Kawat las listrik kg 100,000.00 0.400 40,000.00
2 Solar Liter 4,500.00 0.300 1,350.00
2 Minyak pelumas Liter 50,000.00 0.040 2,000.00
Jumlah 43,350.00
C ALAT
1 Sewa Alat Jam 62,500.00 0.170 10,625.00
Jumlah 10,625.00
D Jumlah A + B + C 57,991.00
E Harga Satuan 57,991.00
Acuan : SNI DT 91-0014-2007

Memasang 1m kusen pintu alluminium (P. BA 05)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.043 2,150.00
2 Tukang Besi kontruksi OH 80,800.00 0.043 3,474.40
3 Kepala Tukang OH 120,000.00 0.0043 516.00
4 Mandor OH 80,000.00 0.0021 168.00
Jumlah 6,308.40
B BAHAN
1 Profil alluminium m' 75,000.00 1.100 82,500.00
2 Skrup fixer Buah 300.00 2.000 600.00
3 Sealant Tube 125,000.00 0.060 7,500.00
Jumlah 90,600.00
C Jumlah A + B 96,908.40
D Harga Satuan 96,908.40
Acuan : SNI DT 91-0014-2007

Memasang 1m' talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm (P. BA 06)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.150 7,500.00
2 Tukang Besi OH 80,800.00 0.300 24,240.00
3 Kepala Tukang OH 120,000.00 0.0300 3,600.00
4 Mandor OH 80,000.00 0.0080 640.00
Jumlah 35,980.00
B BAHAN
1 Seng plat m' 19,000.00 1.050 19,950.00

Pekerjaan Besi & Aluminium 46


2 Paku 1/2" - 1" Kg 12,000.00 0.010 120.00
3 Besi tulangan kg 24,500.00 0.500 12,250.00
Jumlah 32,320.00
C Jumlah A + B 68,300.00
D Harga Satuan 68,300.00
Acuan : SNI DT 91-0014-2007

Pekerjaan Besi & Aluminium 47


1m2 Pasang Kawat Harmonika (P.BA. 07)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.100 5,000.00
2 Tukang Kayu OH 80,800.00 0.100 8,080.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.0005 40.00
Jumlah 14,320.00
B BAHAN
1 Kawat Harmonika M2 59,400.00 1.100 65,340.00
2 Paku 1/2" - 1" Kg 12,000.00 0.020 240.00
3 Papan Kayu Kelas 2 Ketam M3 5,755,600.00 0.0018 10,360.08
Jumlah 75,940.08
C Jumlah A + B 90,260.08
D Harga Satuan 90,260.08
Acuan : ABK Bangunan Gedung dan Perumahan - 6.13

1m2 Pasang Kawat Kassa (P.BA. 08)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.100 5,000.00
2 Tukang Kayu OH 80,800.00 0.100 8,080.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.0005 40.00
Jumlah 14,320.00
B BAHAN
1 Kawat Kassa M2 12,500.00 1.100 13,750.00
2 Paku 1/2" - 1" Kg 12,000.00 0.020 240.00
3 Papan Kayu Kelas 2 Ketam M3 5,755,600.00 0.0018 10,360.08
Jumlah 24,350.08
C Jumlah A + B 38,670.08
D Harga Satuan 38,670.08
Acuan : ABK Bangunan Gedung dan Perumahan - 6.15

1m2 Pasang Jendela Nako (P.BA. 09)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.200 10,000.00
2 Tukang Kayu OH 80,800.00 0.200 16,160.00
3 Kepala Tukang OH 120,000.00 0.020 2,400.00
4 Mandor OH 80,000.00 0.001 80.00
Jumlah 28,640.00
B BAHAN
1 Jendela Nako M2 195,000.00 1.100 214,500.00
2 Paku 1/2" - 1" / Skrup Kg 12,000.00 0.020 240.00

Pekerjaan Besi & Aluminium 48


Jumlah 214,740.00
C Jumlah A + B 243,380.00
D Harga Satuan 243,380.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.17

Pekerjaan Besi & Aluminium 49


1m2 Pasang Talang Datar Seng BJLS 30 / Talang Sembunyi (P.BA. 10)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.150 7,500.00
2 Tukang Kayu OH 80,800.00 0.400 32,320.00
3 Kepala Tukang OH 120,000.00 0.025 3,000.00
4 Mandor OH 80,000.00 0.00125 100.00
Jumlah 42,920.00
B BAHAN
1 Seng Plat 3' x 6' BJLS 30 Lbr 76,000.00 0.500 38,000.00
2 Paku 1/2" - 1" Kg 12,000.00 0.015 180.00
3 Papan Kayu Kelas 2 Tidak Ketam M3 4,128,900.00 0.0096 39,637.44
4 Meni Kg 40,200.00 0.250 10,050.00
Jumlah 87,867.44
C Jumlah A + B 130,787.44
D Harga Satuan 130,787.44
Acuan : ABK Bangunan Gedung dan Perumahan - 6.18

1m2 Pasang Talang Miring Seng BJLS 30 / Jurai Dalam (P.BA. 11)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.040 2,000.00
2 Tukang Kayu OH 80,800.00 0.400 32,320.00
3 Kepala Tukang OH 120,000.00 0.025 3,000.00
4 Mandor OH 80,000.00 0.00125 100.00
Jumlah 37,420.00
B BAHAN
1 Seng Plat 3' x 6' BJLS 30 Lbr 76,000.00 0.50 38,000.00
2 Paku 1/2" - 1" Kg 12,000.00 0.015 180.00
3 Papan Kayu Kelas 2 Tidak Ketam M3 4,128,900.00 0.019 78,449.10
4 Meni Kg 40,200.00 0.300 12,060.00
Jumlah 128,689.10
C Jumlah A + B 166,109.10
D Harga Satuan 166,109.10
Acuan : ABK Bangunan Gedung dan Perumahan - 6.19

10m1 Talang Cucuran Atap 1/2 Lingkaran Ø 15cm BJLS 30 (P.BA. 12)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 5.000 404,000.00
2 Kepala Tukang Kayu OH 120,000.00 0.500 60,000.00
3 Pekerja OH 50,000.00 3.000 150,000.00
4 Mandor OH 80,000.00 0.150 12,000.00
Jumlah 626,000.00
B BAHAN
1 Seng Plat BJLS 30 Lbr 76,000.00 3.000 228,000.00

Pekerjaan Besi & Aluminium 50


2 Besi Penahan Bh 10,500.00 9.000 94,500.00
Jumlah 322,500.00
C Jumlah A + B 948,500.00
D Harga Satuan 948,500.00
Jadi 1m1 94,850.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - H.17

Pekerjaan Besi & Aluminium 51


10m1 Pemasangan Pipa Pembuangan dari Talang Atap Ø 8cm BJLS 30 (P.BA. 13)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 3.750 303,000.00
2 Kepala Tukang Kayu OH 120,000.00 0.375 45,000.00
3 Pekerja OH 50,000.00 2.250 112,500.00
4 Mandor OH 80,000.00 0.110 8,800.00
Jumlah 469,300.00
B BAHAN
1 Seng Plat BJLS 30 Lbr 76,000.00 2.500 190,000.00
Jumlah 190,000.00
C Jumlah A + B 659,300.00
D Harga Satuan 659,300.00
Jadi 1m1 65,930.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - H.18

Pekerjaan Besi & Aluminium 52


L. PEKERJAAN KUNCI DAN KACA (P.KK.)

1 Buah Pemasangan Kunci Tanam Antik (P.KK. 01)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.060 3,000.00
2 Tukang Kayu OH 80,800.00 0.600 48,480.00
3 Kepala Tukang OH 120,000.00 0.060 7,200.00
4 Mandor OH 80,000.00 0.003 240.00
Jumlah 58,920.00
B BAHAN
1 Kunci Tanam Antik Bh 162,750.00 1.000 162,750.00
Jumlah 162,750.00
C Jumlah A + B 221,670.00
D Harga Satuan 221,670.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.1

1 Buah Pemasangan Kunci Tanam Biasa (P.KK. 02)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.010 500.00
2 Tukang Kayu OH 80,800.00 0.500 40,400.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.005 400.00
Jumlah 42,500.00
B BAHAN
1 Kunci Tanam Biasa Bh 79,000.00 1.000 79,000.00
Jumlah 79,000.00
C Jumlah A + B 121,500.00
D Harga Satuan 121,500.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.2

1 Buah Pemasangan Kunci Silinder (P.KK. 03)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.005 250.00
2 Tukang Kayu OH 80,800.00 0.500 40,400.00
3 Kepala Tukang OH 120,000.00 0.005 600.00
4 Mandor OH 80,000.00 0.00025 20.00
Jumlah 41,270.00
B BAHAN
1 Kunci Tanam Silinder Bh 97,500.00 1.000 97,500.00
Jumlah 97,500.00
C Jumlah A + B 138,770.00
D Harga Satuan 138,770.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.4

1 Buah Pemasangan Engsel Pintu (P.KK. 04)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN

Pekerjaan Kunci & Kaca 53


No. URAIAN PEKERJAAN SATUAN KUANTITAS
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.015 750.00
2 Tukang Kayu OH 80,800.00 0.150 12,120.00
3 Kepala Tukang OH 120,000.00 0.015 1,800.00
4 Mandor OH 80,000.00 0.00075 60.00
Jumlah 14,730.00
B BAHAN
1 Engsel Pintu Bh 15,900.00 1.000 15,900.00
Jumlah 15,900.00
C Jumlah A + B 30,630.00
D Harga Satuan 30,630.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.5

1 Buah Pemasangan Engsel Jendela (P.KK. 04.a)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.015 750.00
2 Tukang Kayu OH 80,800.00 0.150 12,120.00
3 Kepala Tukang OH 120,000.00 0.015 1,800.00
4 Mandor OH 80,000.00 0.00075 60.00
Jumlah 14,730.00
B BAHAN
1 Engsel Jendela Bh 12,700.00 1.000 12,700.00
Jumlah 12,700.00
C Jumlah A + B 27,430.00
D Harga Satuan 27,430.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.5

1 Buah Pemasangan Kait Angin (P.KK. 05)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.015 750.00
2 Tukang Kayu OH 80,800.00 0.150 12,120.00
3 Kepala Tukang OH 120,000.00 0.015 1,800.00
4 Mandor OH 80,000.00 0.00075 60.00
Jumlah 14,730.00
B BAHAN
1 Kait Angin Bh 16,500.00 1.000 16,500.00
Jumlah 16,500.00
C Jumlah A + B 31,230.00
D Harga Satuan 31,230.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.9

1 Buah Pemasangan Door Closer (P.KK. 06)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.05 2,500.00
2 Tukang Kayu OH 80,800.00 0.500 40,400.00
3 Kepala Tukang OH 120,000.00 0.05 6,000.00

Pekerjaan Kunci & Kaca 54


4 Mandor OH 80,000.00 0.0025 200.00
Jumlah 49,100.00
B BAHAN
1 Door Closer Bh 112,500.00 1.000 112,500.00
Jumlah 112,500.00
C Jumlah A + B 161,600.00
D Harga Satuan 161,600.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.10

1 Buah Pemasangan Slot Pintu (P.KK. 07)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.020 1,000.00
2 Tukang Kayu OH 80,800.00 0.200 16,160.00
3 Kepala Tukang OH 120,000.00 0.020 2,400.00
4 Mandor OH 80,000.00 0.001 80.00
Jumlah 19,640.00
B BAHAN
1 Slot Pintu Bh 18,500.00 1.000 18,500.00
Jumlah 18,500.00
C Jumlah A + B 38,140.00
D Harga Satuan 38,140.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.11

Pekerjaan Kunci & Kaca 55


1 Buah Pemasangan Slot Jendela (P.KK. 07.a)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.020 1,000.00
2 Tukang Kayu OH 80,800.00 0.200 16,160.00
3 Kepala Tukang OH 120,000.00 0.020 2,400.00
4 Mandor OH 80,000.00 0.001 80.00
Jumlah 19,640.00
B BAHAN
1 Slot Pintu Bh 10,500.00 1.000 10,500.00
Jumlah 10,500.00
C Jumlah A + B 30,140.00
D Harga Satuan 30,140.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.11

1 Buah Pemasangan Door Stoper (P.KK. 08)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.010 500.00
2 Tukang Kayu OH 80,800.00 0.100 8,080.00
3 Kepala Tukang OH 120,000.00 0.010 1,200.00
4 Mandor OH 80,000.00 0.0005 40.00
Jumlah 9,820.00
B BAHAN
1 Door Stoper Bh 20,000.00 1.000 20,000.00
Jumlah 20,000.00
C Jumlah A + B 29,820.00
D Harga Satuan 29,820.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.13

1 m2 Pemasangan Kaca Tebal 5mm (P.KK. 09)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.015 750.00
2 Tukang Kayu OH 80,800.00 0.150 12,120.00
3 Kepala Tukang OH 120,000.00 0.015 1,800.00
4 Mandor OH 80,000.00 0.00075 60.00
Jumlah 14,730.00
B BAHAN
1 Kaca tebal 5mm M2 94,000.00 1.100 103,400.00
Jumlah 103,400.00
C Jumlah A + B 118,130.00
D Harga Satuan 118,130.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.17

1 m2 Pemasangan Kaca Tebal 12mm (P.KK. 10)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )

Pekerjaan Kunci & Kaca 56


1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.025 1,250.00
2 Tukang Kayu OH 80,800.00 0.250 20,200.00
3 Kepala Tukang OH 120,000.00 0.025 3,000.00
4 Mandor OH 80,000.00 0.00125 100.00
Jumlah 24,550.00
B BAHAN
1 Kaca tebal 12mm M2 384,000.00 1.100 422,400.00
2 Sealent Kg 101,500.00 0.050 5,075.00
Jumlah 427,475.00
C Jumlah A + B 452,025.00
D Harga Satuan 452,025.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.19

1 m2 Pemasangan Kaca Cermin, Tebal 3mm (P.KK. 11)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.015 750.00
2 Tukang Kayu OH 80,800.00 0.150 12,120.00
3 Kepala Tukang OH 120,000.00 0.015 1,800.00
4 Mandor OH 80,000.00 0.00075 60.00
Jumlah 14,730.00
B BAHAN
1 Kaca Cermin 3mm M2 84,800.00 1.100 93,280.00
Jumlah 93,280.00
C Jumlah A + B 108,010.00
D Harga Satuan 108,010.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.20

1 m2 Pemasangan Kaca Patri (P.KK. 12)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.015 750.00
2 Tukang Kayu OH 80,800.00 0.150 12,120.00
3 Kepala Tukang OH 120,000.00 0.015 1,800.00
4 Mandor OH 80,000.00 0.00075 60.00
Jumlah 14,730.00
B BAHAN
1 Kaca Patri tebal 5mm M2 950,000.00 1.100 1,045,000.00
Jumlah 1,045,000.00
C Jumlah A + B 1,059,730.00
D Harga Satuan 1,059,730.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.24

Pekerjaan Kunci & Kaca 57


Memasang 1m2 Lantai Keramik ukuran (20 x 20) cm (P.LD. 01)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.700 35,000.00
2 Tukang Batu OH 80,800.00 0.350 28,280.00
3 Kepala Tukang OH 120,000.00 0.035 4,200.00
4 Mandor OH 80,000.00 0.035 2,800.00
Jumlah 70,280.00
B BAHAN
1 Ubin keramik Bh 3,900.00 26.500 103,350.00
2 Portland Cement (PC) Kg 1,400.00 10.400 14,560.00
3 Pasir Pasang M3 112,000.00 0.045 5,040.00
4 Semen Warna Kg 42,400.00 0.1620 6,868.80
129,818.80
C Jumlah A + B 200,098.80
D Harga Satuan 200,098.80
Acuan : SNI DT 91-0012-2007

Memasang 1m2 Lantai Keramik ukuran (30 x 30) cm (P.LD. 02)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.700 35,000.00
2 Tukang Batu OH 80,800.00 0.350 28,280.00
3 Kepala Tukang OH 120,000.00 0.035 4,200.00
4 Mandor OH 80,000.00 0.035 2,800.00
Jumlah 70,280.00
B BAHAN
1 Ubin keramik Bh 9,333.33 11.870 110,786.67
2 Portland Cement (PC) Kg 1,400.00 10.000 14,000.00
3 Pasir Pasang M3 112,000.00 0.045 5,040.00
4 Semen Warna Kg 42,400.00 0.1500 6,360.00
136,186.67
C Jumlah A + B 206,466.67
D Harga Satuan 206,466.67
Acuan : SNI DT 91-0012-2007

1m2 Pasang Lantai Keramik 40 x 40cm Anti Gores (P.LD. 04)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.620 31,000.00
2 Tukang Batu OH 80,800.00 0.350 28,280.00
3 Kepala Tukang OH 120,000.00 0.035 4,200.00
4 Mandor OH 80,000.00 0.030 2,400.00
Jumlah 65,880.00
B BAHAN
1 Keramik 40 x 40cm Anti Gores Bh 15,900.00 6.250 99,375.00
2 Semen Portland Kg 1,400.00 11.380 15,932.00
3 Pasir Pasang M3 112,000.00 0.042 4,704.00
4 Semen Warna Kg 42,400.00 0.1500 6,360.00
126,371.00
C Jumlah A + B 192,251.00
D Harga Satuan 192,251.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.47
1m2 Pasang Dinding Keramik 20 x 25cm (P.LD. 07)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.600 30,000.00
2 Tukang Batu OH 80,800.00 0.450 36,360.00
3 Kepala Tukang OH 120,000.00 0.045 5,400.00
4 Mandor OH 80,000.00 0.030 2,400.00
Jumlah 74,160.00
B BAHAN
1 Keramik 20 x 25 cm Bh 5,000.00 20.000 100,000.00
2 Semen Kg 1,400.00 9.300 13,020.00
3 Pasir Pasang M3 112,000.00 0.018 2,016.00
4 Oker Pengisi Nat Keramik Kg 42,400.00 0.200 8,480.00
123,516.00
C Jumlah A + B 197,676.00
D Harga Satuan 197,676.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.63
1m2 Pasang Dinding Keramik 30 x 30cm (P.LD. 07.a)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.600 30,000.00
2 Tukang Batu OH 80,800.00 0.450 36,360.00
3 Kepala Tukang OH 120,000.00 0.045 5,400.00
4 Mandor OH 80,000.00 0.030 2,400.00
Jumlah 74,160.00
B BAHAN
1 Keramik 30 x 30cm Bh 9,333.33 9.000 84,000.00
2 Semen Kg 1,400.00 9.300 13,020.00
3 Pasir Pasang M3 112,000.00 0.018 2,016.00
4 Oker Pengisi Nat Keramik Kg 42,400.00 0.200 8,480.00
107,516.00
C Jumlah A + B 181,676.00
D Harga Satuan 181,676.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.63

1m2 Pasang Dinding Keramik 40 x 40cm (P.LD. 07.b)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.600 30,000.00
2 Tukang Batu OH 80,800.00 0.450 36,360.00
3 Kepala Tukang OH 120,000.00 0.045 5,400.00
4 Mandor OH 80,000.00 0.030 2,400.00
Jumlah 74,160.00
B BAHAN
1 Keramik 40 x 40cm Bh 10,600.00 6.000 63,600.00
2 Semen Kg 1,400.00 9.300 13,020.00
3 Pasir Pasang M3 112,000.00 0.018 2,016.00
4 Oker Pengisi Nat Keramik Kg 42,400.00 0.200 8,480.00
87,116.00
C Jumlah A + B 161,276.00
D Harga Satuan 161,276.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.63
Memasang 1 m2 Floor Hardener (P.LD. 08)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.120 6,000.00
2 Tukang Batu OH 80,800.00 0.120 9,696.00
3 Kepala Tukang OH 120,000.00 0.012 1,440.00
4 Mandor OH 80,000.00 0.006 480.00
Jumlah 17,616.00
B BAHAN
1 Floor Hardener Kg 7,500.00 5.000 37,500.00
37,500.00
C Jumlah A + B 55,116.00
D Harga Satuan 55,116.00
Acuan : SNI DT 91-0012-2007

1m2 Pemasangan Paving Block (P.LD. 09)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.400 20,000.00
2 Tukang Batu OH 80,800.00 0.100 8,080.00
Jumlah 28,080.00
B BAHAN
1 Paving Block Bh 2,000.00 50.000 100,000.00
100,000.00
C Jumlah A + B 128,080.00
D Harga Satuan 128,080.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - G.60

1m2 Pemasangan Paving Stone (P.LD. 10)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.400 20,000.00
2 Tukang Batu OH 80,800.00 0.100 8,080.00
Jumlah 28,080.00
B BAHAN
1 Paving Stone M2 3,300.00 50.000 165,000.00
165,000.00
C Jumlah A + B 193,080.00
D Harga Satuan 193,080.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - G.60.a
1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, 2Lapis Cat Penutup) (P.Ct. 04)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.070 3,500.00
2 Tukang Cat OH 80,800.00 0.009 727.20
3 Kepala Tukang OH 120,000.00 0.006 720.00
4 Mandor OH 80,000.00 0.0025 200.00
Jumlah 5,147.20
B BAHAN
1 Cat Meni Kg 40,200.00 0.200 8,040.00
2 Dempul Kg 19,000.00 0.150 2,850.00
3 Cat Dasar Kg 15,900.00 0.170 2,703.00
4 Cat Kilat Penutup 2 Kali Kg 48,000.00 0.260 12,480.00
26,073.00
C Jumlah A + B 31,220.20
D Harga Satuan 31,220.20
Acuan : ABK Bangunan Gedung dan Perumahan - 6.8

1m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Dengan Cat Mutu Baik. (P.Ct. 11)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.020 1,000.00
2 Tukang Cat OH 80,800.00 0.063 5,090.40
3 Kepala Tukang OH 120,000.00 0.0063 756.00
4 Mandor OH 80,000.00 0.0025 200.00
Jumlah 7,046.40
B BAHAN
1 Plamur (dempul tembok) Kg 19,000.00 0.100 1,900.00
2 Cat Dasar tembok Kg 15,900.00 0.120 1,908.00
3 Cat Tembok Penutup 2 x Kg 36,600.00 0.260 9,516.00
13,324.00
C Jumlah A + B 20,370.40
D Harga Satuan 20,370.40
Acuan : ABK Bangunan Gedung dan Perumahan - 6.14
1m2 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Dengan Cat Mutu Baik. (P.Ct. 12)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.028 1,400.00
2 Tukang Cat OH 80,800.00 0.042 3,393.60
3 Kepala Tukang OH 120,000.00 0.0042 504.00
4 Mandor OH 80,000.00 0.0025 200.00
Jumlah 5,497.60
B BAHAN
1 Cat Dasar tembok Kg 15,900.00 0.120 1,908.00
2 Cat Tembok Penutup 2 x Kg 80,000.00 0.180 14,400.00
16,308.00
C Jumlah A + B 21,805.60
D Harga Satuan 21,805.60
Acuan : ABK Bangunan Gedung dan Perumahan - 6.15

1m2 Pengecatan Permukaan Baja dengan Meni Besi (P.Ct. 13)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Cat OH 80,800.00 0.020 1,616.00
2 Kepala Tukang OH 120,000.00 0.200 24,000.00
3 Pekerja OH 50,000.00 0.02 1,000.00
4 Mandor OH 80,000.00 0.01 800.00
Jumlah 27,416.00
B BAHAN
1 Meni Besi Kg 40,200.00 0.100 4,020.00
2 Kuas Bh 16,100.00 0.010 161.00
4,181.00
C Jumlah A + B 31,597.00
D Harga Satuan 31,597.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.20

1m2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah (P.Ct. 14)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Cat OH 80,800.00 0.250 20,200.00
2 Kepala Tukang OH 120,000.00 0.225 27,000.00
3 Pekerja OH 50,000.00 0.0225 1,125.00
4 Mandor OH 80,000.00 0.0075 600.00
Jumlah 48,925.00
B BAHAN
1 Meni Besi Kg 40,200.00 0.100 4,020.00
2 Kuas Bh 16,100.00 0.010 161.00
3 Perancah Kayu Kelas II M3 3,385,600.00 0.002 6,771.20
10,952.20
C Jumlah A + B 59,877.20
D Harga Satuan 59,877.20
Acuan : ABK Bangunan Gedung dan Perumahan - 6.21

1m2 Pengecatan Atap Seng (P.Ct. 15)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Cat OH 80,800.00 0.075 6,060.00
2 Pekerja OH 50,000.00 0.050 2,500.00
3 Kepala Tukang OH 120,000.00 0.0075 900.00
4 Mandor OH 80,000.00 0.0025 200.00
Jumlah 9,660.00
B BAHAN
1 Meni Besi Kg 40,200.00 0.525 21,105.00
21,105.00
C Jumlah A + B 30,765.00
D Harga Satuan 30,765.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - K.23.e
O. PEKERJAAN MEKANIKAL ELEKTRIKAL ( P. ME.)

Pekerjaan Mekanikal Elektrikal 66


P. PEKERJAAN BONGKARAN (P. Bkr.)

1m3 Pekerjaan Bongkaran Beton Bertulang (P.Bkr. 01)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 6.667 333,350.00
2 Mandor OH 80,000.00 0.333 26,640.00
Jumlah 359,990.00
B Jumlah A 359,990.00
C Harga Satuan 359,990.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.13

1m2 Pekerjaan Bongkaran Dinding Tembok Plesteran Simpai (P. Bkr. 02)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 1.000 50,000.00
2 Mandor OH 80,000.00 0.050 4,000.00
Jumlah 54,000.00
B Jumlah A 54,000.00
C Harga Satuan 54,000.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - L.4

1m2 Pekerjaan Bongkaran Lantai Ubin / Keramik (P.Bkr. 03)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.050 2,500.00
2 Mandor OH 80,000.00 0.0025 200.00
Jumlah 2,700.00
B Jumlah A 2,700.00
C Harga Satuan 2,700.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - L.5

1m2 Pekerjaan Bongkaran Atap Genteng / Sirap (P.Bkr. 04)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.010 500.00
2 Mandor OH 80,000.00 0.005 400.00
Jumlah 900.00
B Jumlah A 900.00
C Harga Satuan 900.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - L.7

Pekerjaan Bongkaran 67
1m2 Pekerjaan Bongkaran Atap Seng (P.Bkr. 05)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 0.100 5,000.00
2 Mandor OH 80,000.00 0.050 4,000.00
Jumlah 9,000.00
B Jumlah A 9,000.00
C Harga Satuan 9,000.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - L.8

Pekerjaan Bongkaran 68
1m2 Pekerjaan Bongkaran Rangka Atap Kayu (P.Bkr. 06)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 50,000.00 1.000 50,000.00
2 Mandor OH 80,000.00 0.050 4,000.00
Jumlah 54,000.00
B Jumlah A 54,000.00
C Harga Satuan 54,000.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - L.9

1m3 Pekerjaan Bongkaran Rangka Badan Kayu (P.Bkr. 07)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH 80,800.00 4.000 323,200.00
2 Pekerja OH 50,000.00 2.6667 133,333.33
3 Kepala Tukang OH 120,000.00 0.400 48,000.00
4 Mandor OH 80,000.00 0.1333 10,666.67
Jumlah 515,200.00
B Jumlah A 515,200.00
C Harga Satuan 515,200.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - L.13

Pekerjaan Bongkaran 69
REKAPITULASI ANALISA BIAYA KONSTRUKSI ( ABK )
BANGUNAN GEDUNG DAN PERUMAHAN KOTA PONTIANAK
PERIODE JANUARI - JUNI 2010
HARGA SATUAN
NO KODE ANALISA URAIAN PEKERJAAN HAL
(Rp)
1 2 3 4 5
A. PEKERJAAN PERSIAPAN
1 P. Ps. 01 1m1 Pembuatan Pagar Sementara dari Seng Gelombang Tinggi 2 meter (P.Ps. 01) 354,490.00
2 P. Ps. 02 1m1 Pengukuran dan Pemasangan Bouwplank (P.Ps. 02) 37,445.00
3 P. Ps. 03 1m2 Membersihkan Lapangan dan Perataan (P.Ps. 03) 9,000.00
4 P. Ps. 04 1m2 Pembuatan Direksi Keet / Gudang Bahan Bangunan dan Alat / Bedeng Pekerja (P.Ps. 04) 992,095.00
B. PEKERJAAN TANAH
1 P. T. 01 Menggali 1m3 Tanah Biasa sedalam 1 meter (P.T. 01) 39,500.00
2 P. T. 02 Menggali 1m3 Tanah Biasa sedalam 2 meter (P.T. 02) 48,600.00
3 P. T. 03 Menggali 1m3 Tanah Biasa sedalam 3 meter (P.T. 03) 57,860.00
4 P. T. 04 Menggali 1m3 Tanah Keras sedalam 1 meter (P.T. 04) 52,560.00
5 P. T. 05 Menggali 1m3 Tanah Cadas sedalam 1 meter (P.T. 05) 79,800.00
6 P. T. 06 Menggali 1m3 Tanah Lumpur sedalam 1 meter (P.T. 06) 63,600.00
7 P. T. 07 Membuang 1m3 Tanah sejauh 30 meter (P.T. 07) 17,300.00
8 P. T. 08 Mengerjakan 1m2 Stripping Tebing setinggi 1 meter (P.T. 08) 2,900.00
9 P. T. 09 Mengurug Kembali 1m3 Galian (P.T. 09) 13,166.67
10 P. T. 10 1m3 Menimbun dengan Tanah Peladis (P.T. 10) 83,670.00
11 P. T. 11 1m3 Menimbun dengan Tanah Peniraman (P.T. 11) 83,670.00
12 P. T. 12 Memadatkan 1m3 Tanah (per 20 cm) (P.T. 12) 29,000.00
13 P. T. 13 Mengurug 1m3 Pasir Urug (P.T. 13) 150,200.00
C. PEKERJAAN PONDASI BATU
1 P. PB. 01 Memasang 1m3 Pondasi Batu Belah, Campuran 1Pc : 3Ps (P.PB. 01) 738,880.00
2 P. PB. 02 Memasang 1m3 Pondasi Batu Belah, Campuran 1Pc : 4Ps (P.PB. 02) 688,200.00
Memasang 1m3 Pondasi Siklop, 60% Beton Campuran 1 PC : 2 PB : 3 KR
3 P. PB. 03 4,011,188.00
dan 40% Batu Belah (P.PB. 03)
D. PEKERJAAN BETON BERTULANG
1 P. BB. 01 Membuat 1m3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87 (P.BB. 01) 686,003.70
2 P. BB. 02 Membuat 1m3 Beton Mutu f'c = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0,87 (P.BB. 02) 733,540.00
2 P. BB. 03 Membuat 1m3 Beton Mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0,78 (P.BB. 03) 773,508.15
3 P. BB. 04 Membuat 1m3 Beton Mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66 (P.BB. 04) 841,531.11
4 P. BB. 05 Membuat 1m3 Beton Mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 (P.BB. 05) 903,237.78
5 P. BB. 06 Membuat 1m3 Beton Mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 (P.BB. 06) 919,328.15
6 P. BB. 07 Membuat 1m3 Beton Mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 (P.BB. 07) 955,381.48
7 P. BB. 08 Pembesian 10Kg dengan Besi Polos atau Ulir (P.BB. 08) 27,026.60
8 P. BB. 09 Memasang 10Kg Jaring Kawat Baja/Wire Mesh (P.BB. 09) 17,147.00
9 P. BB. 10 Memasang 1m2 Bekisting untuk Pondasi (P.BB. 10) 169,458.00
10 P. BB. 10.a Memasang 1m2 Bekisting untuk Pondasi (P.BB. 10.a) 63,029.00
11 P. BB. 11 Memasang 1m2 Bekisting untuk Sloof (P.BB. 11) 183,608.00
12 P. BB. 12 Memasang 1m2 Bekisting untuk Kolom (P.BB. 12) 330,114.00
13 P. BB. 12.a 1m2 Pasang Bekisting untuk Kolom (P.BB. 12.a) 280,364.00
14 P. BB. 13 Memasang 1m2 Bekisting untuk Balok (P.BB. 13) 338,604.00
15 P. BB. 13.a 1m2 Pasang Bekisting untuk Balok (P.BB. 13.a) 288,854.00
16 P. BB. 14 Memasang 1m2 Bekisting untuk Lantai (P.BB. 14) 430,114.00
17 P. BB. 14.a 1m2 Pasang Bekisting untuk Lantai (P.BB. 14.a) 340,364.00
18 P. BB. 15 Memasang 1m2 Bekisting untuk Tangga (P.BB. 15) 301,589.00
19 P. BB. 16 Memasang 1m2 Jembatan untuk Pengecoran Beton (P.BB. 16) 107,192.00
20 P. BB. 17 Membuat 1m3 Pondasi Beton Bertulang (150 kg besi + bekisting) (P.BB. 17) 5,768,420.00
21 P. BB. 18 Membuat 1m3 Sloof Beton Bertulang (200 kg besi + bekisting) (P.BB. 18) 7,348,718.00
22 P. BB. 19 Membuat 1m3 Kolom Beton Bertulang (300 kg besi + bekisting) (P.BB. 19) 11,944,950.00
23 P. BB. 20 Membuat 1m3 Balok Beton Bertulang (200 kg besi + bekisting) (P.BB. 20) 8,771,590.00
24 P. BB. 21 Membuat 1m3 Kolom Beton Bertulang (150 kg besi + bekisting) (P.BB. 21) 7,693,780.00
25 P. BB. 22 Membuat 1m3 Dinding Beton Bertulang (150 kg besi + bekisting) (P.BB. 22) 7,380,220.00
26 P. BB. 23 Membuat 1m3 Dinding Beton Bertulang (200 kg besi + bekisting) (P.BB. 23) 8,328,968.00
27 P. BB. 24 Membuat 1m' Kolom Praktis Beton Bertulang (11 x 11) cm (P.BB. 24) 111,415.00
28 P. BB. 25 Membuat 1m' Ring Balok Beton Bertulang (10 x 15) cm (P.BB. 25) 135,912.20
E. PEKERJAAN DINDING
1 P. Dnd. 01 1m2 Pasang Batako uk. 15/30/7(P.Dnd. 01) 84,004.00
2 P. Dnd. 02 1m2 Pasang Batako uk. 20/40/9 (P.Dnd. 02) 68,754.00
3 P. Dnd. 03 1m2 Pasang Batako uk. 20/40/7(P.Dnd. 03) 66,254.00
4 P. Dnd. 04 Memasang 1m2 Dinding Bata Merah ukuran (5x11x22) cm tebal 1 Bata campuran 1Pc : 4Ps (P.Dnd. 04) 420,546.00
5 P. Dnd. 05 Memasang 1m2 Dinding Bata Merah ukuran (5x11x22) cm tebal 1/2 Bata campuran 1Pc : 4Ps (P.Dnd. 05) 207,396.00
6 P. Dnd. 06 Memasang 1m2 Dinding Terawang (roster) ukuran (18x18) cm, campuran 1Pc : 4Ps (P.Dnd. 06) 1,244,800.00
F. PEKERJAAN PLASTERAN
1 P. Pls. 01 Memasang 1m2 Plesteran 1PC : 2PP, tebal 15 mm (P.Pls. 01) 46,673.60
2 P. Pls. 02 Memasang 1m2 Plesteran 1PC : 4PP, tebal 15 mm (P.Pls. 02) 41,544.00
3 P. Pls. 03 Memasang 1m2 Plesteran 1PC : 2PP, tebal 20 mm (P.Pls. 03) 62,428.80
4 P. Pls. 04 Memasang 1m2 Plesteran 1PC : 4PP, tebal 20 mm (P.Pls. 04) 55,552.00
5 P. Pls. 05 Memasang 1m2 Berapen 1PC : 5PP, tebal 15mm (P.Pls. 05) 25,329.60
6 P. Pls. 06 Memasang 1m2 Plesteran Skoning 1PC : 2PP (P.Pls. 06) 43,596.00
7 P. Pls. 07 Memasang 1m2 Acian (P.Pls. 07) 24,630.00

Rekapitulasi 70
HARGA SATUAN
NO KODE ANALISA URAIAN PEKERJAAN HAL
(Rp)
1 2 3 4 5
8 P. Pls. 08 Memasang 1m2 Plesteran 1PC : 3PP, tebal 15 mm (P.Pls. 08) 43,582.40
G. PEKERJAAN KAYU
1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau, Topangan
1 P. K. 01 12,084,750.00
Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian Uk. 9/9 (P.K. 01)
1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau, Topangan
2 P. K. 02 8,111,000.00
Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian Uk. 10/10 (P.K. 02)
1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau,
3 P. K. 03 Topangan Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian 8,250,700.00
Uk. 12/12 - 15/15 (P.K. 03)
1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau,
4 P. K. 04 Topangan Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian 10,516,700.00
Uk. 18/18 - 20/20 (P.K. 04)
5 P. K. 05 1m3 Pekerjaan Rangka Badan Kayu Belian Uk. 7/7 (P.K. 05) 10,015,440.00
6 P. K. 06 1m3 Pekerjaan Rangka Badan Kayu Belian Uk. 8/8 (P.K. 06) 10,114,550.00
7 P. K. 07 1m3 Pekerjaan Rangka Badan Kayu Kelas I Uk. 7/7 (P.K. 07) 6,516,850.00
8 P. K. 08 1m3 Pekerjaan Rangka Badan Kayu Kelas I Uk. 8/8 (P.K. 08) 6,516,850.00
9 P. K. 09 1m1 Melancip Tiang / Batang (P.K. 09) 28,600.00
10 P. K. 10 Membuat Puting dan Lobang / Pasang (P.K. 10) 55,680.00
11 P. K. 11 1 m1 Memancang Tiang ke Dalam Tanah (P.K. 11) 48,576.00
12 P. K. 12 Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas I (P.K. 12) 6,146,000.00
13 P. K. 12.a Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela Kayu Belian (P.K. 12.a) 8,236,990.00
14 P. K. 13 Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas II (P.K. 13) 5,358,790.00
15 P. K. 14 Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu Kelas I (P.K. 14) 556,855.00
16 P. K. 15 Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu Kelas II (P.K. 15) 571,899.00
17 P. K. 16 Membuat dan Memasang 1m2 Pintu dan Jendela Jalusi Kayu Kelas I (P.K. 16) 685,963.00
18 P. K. 17 Membuat dan Memasang 1m2 Pintu dan Jendela Jalusi Kayu Kelas II (P.K. 17) 479,809.40
Membuat 1m2 Daun Pintu Kayu Lapis (Plywood) Rangkap, Rangka Tertutup Kayu Kelas II
19 P.K. 18 485,605.00
(Lebar sampai 90 cm) (P.K. 18)
20 P. K. 19 Membuat 1m2 Pintu Plywood Rangkap, Rangka Expose Kayu Kelas I (P.K. 19) 512,670.20
21 P. K. 20 Membuat 1m2 Pintu Plywood Rangkap, Rangka Expose Kayu Kelas II (P.K. 20) 522,298.36
22 P. K. 21 Membuat 1m2 Jalusi Kusen, Kayu Kelas I (P.K. 21) 570,470.00
23 P. K. 22 Membuat 1m2 Jalusi Kusen, Kayu Kelas II (P.K. 22) 593,036.00
1m2 Pemasangan Ventilasi Kaca
24 P. K. 23 182,272.50
Setiap luas 1 m2 bidang daun ventilasi, luas kacanya adalah 0.60 m2 (P.K. 23)
25 P. K. 24 Memasang 1m3 Konstruksi Kuda-kuda Konvensional, Kayu Kelas I Bentang 6 m (P.K. 24) 5,827,450.00
26 P. K. 25 Memasang 1m3 Konstruksi Kuda-kuda Konvensional, Kayu Kelas II Bentang 6 m (P.K. 25) 5,765,960.00
27 P. K. 26 Memasang 1m3 Konstruksi Kuda-kuda Expose, Kayu Kelas I (P.K. 26) 7,069,080.00
28 P. K. 27 Memasang 1m3 Konstruksi Gordeng, Kayu Kelas II (P.K. 27) 5,202,920.00
29 P. K. 28 Memasang 1m2 Rangka Atap Genteng Keramik, Kayu Kelas II (P.K. 28) 160,476.00
30 P. K. 29 Memasang 1m2 Rangka Atap Genteng Beton, Kayu Kelas II (P.K. 29) 220,662.00
31 P. K. 30 Memasang 1m3 Konstruksi Gordeng, Kayu Kelas I (P.K. 30) 5,264,410.00
32 P. K. 30.a Memasang 1m3 Konstruksi Gordeng, Kayu Belian (P.K. 30.a) 12,942,300.00
33 P. K. 31 Memasang 1m2 Rangka Atap Sirap, Kayu Kelas II (P.K. 31) 578,640.00
34 P. K. 32 1m2 Pemasangan Rangka Atap Seng (P.K. 32) 55,937.78
35 P. K. 33 1m2 Pasang Kasau + Reng Atap Genteng Metal Kayu Kelas II (P.K. 33) 63,878.40
36 P. K. 34 Memasang 1m2 Rangka Langit-langit (50 x 100) cm, Kayu Kelas II atau III (P.K. 34) 87,322.00
37 P. K. 35 Memasang 1m2 Rangka Langit-langit (60 x 60) cm, Kayu Kelas II atau III (P.K. 35) 87,769.00
38 P. K. 36 1m2 Pasang Rangka Langit-langit (30 x 60)cm Kayu Kelas II (P.K. 36) 118,308.80
39 P. K. 37 1m2 Pasang Rangka Langit-langit (30 x 30)cm Kayu Kelas II (P.K. 37) 139,791.20
40 P. K. 38 Memasang 1m1 Lisplank Ukuran (3 x 20) cm, Kayu Kelas I (P.K. 38) 83,258.60
41 P. K. 39 Memasang 1m1 Lisplank Ukuran (3 x 20) cm, Kayu Kelas II (P.K. 39) 87,320.48
42 P. K. 40 1m1 Pasang Lisplank Ukuran 2 x (3 x 20cm) Kayu Kelas I (P.K. 40) 115,422.75
43 P. K. 41 1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Belian (P.K. 41) 155,446.96
44 P. K. 42 1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Kelas I (P.K. 42) 66,339.60
45 P. K. 43 1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Kelas II (P.K. 43) 69,649.28
46 P. K. 44 1m2 Pasang Rangka Dinding Pemisah Kayu Kelas I (P.K. 44) 146,154.75
47 P. K. 45 Memasang 1m2 Rangka Dinding Pemisah (60x120) cm Kayu Kelas II (P.K. 45) 122,479.20
48 P. K. 46 Memasang 1m2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kelas II (P.K. 46) 258,948.80
50 P. K. 47 Memasang 1m2 Dinding Lambriziring dari Papan Kayu Kelas I (P.K. 47) 247,296.50
49 P. K. 47.a Memasang 1m2 Dinding Lambriziring dari Papan Kayu Belian (P.K. 47.a) 318,856.90
51 P. K. 48 Memasang 1m2 Dinding Lambriziring dari Plywood ukuran (120 x 240) cm (P.K. 48) 48,710.00
52 P. K. 49 1m1 Pasang List Plafond, Kayu Profil (P.K. 49) 8,001.80
53 P. K. 50 1m2 Pemasangan Lantai Papan Kayu Belian (P.K. 50) 574,440.80
54 P. K. 51 1m2 Pemasangan Lantai Papan Kayu Kelas I (P.K. 51) 330,948.00
H. PEKERJAAN PENUTUP ATAP
1 P. PA. 01 1m2 Pasang Atap Genteng Metal Type PRIMA 0.35 (P.PA. 01) 129,032.00
2 P. PA. 02 1m2 Pasang Atap Genteng Metal Type ROYAL 0.35 (P.PA. 02) 121,453.00
3 P. PA. 03 1m2 Pasang Atap Genteng Metal Type CLASSIC 0.35 (P.PA. 03) 116,206.00
4 P. PA. 04 1m2 Pasang Atap Genteng Metal Stone Type CLASSIC 0.35 (P.PA. 04) 152,656.00
5 P. PA. 05 1m2 Pasang Atap Genteng Metal Stone Type PRIMA 0.35 (P.PA. 05) 170,432.00
6 P. PA. 06 1m2 Pasang Atap Sirap Belian (P.PA. 06) 334,540.00
7 P. PA. 07 1m1 Pekerjaan Bubungan dengan Seng Datar Color 0.35 / 10 m1 (P.PA. 07) 66,418.08
8 P. PA. 08 1m1 Pasang Nok / Bumbungan Genteng Metal 1/2 Lingkaran 0.35 (P.PA. 08) 190,560.00
9 P. PA. 09 1m1 Pasang Nok / Bumbungan Genteng Metal Kotak 0.35 (P.PA. 09) 105,660.00
10 P. PA. 10 1m1 Pasang Nok / Bumbungan Genteng Metal Stone Kotak 0.35 (P.PA. 10) 120,060.00
11 P. PA. 11 1m1 Pasang Bumbungan Atap Sirap (P.PA. 11) 74,556.00

Rekapitulasi 71
HARGA SATUAN
NO KODE ANALISA URAIAN PEKERJAAN HAL
(Rp)
1 2 3 4 5
12 P. PA. 12 1m2 Pasang Atap Seng Gelombang BJLS 30 (P.PA. 12) 62,064.00
13 P. PA. 13 1m2 Pasang Atap Metal Supersheet 0.35 (polos) (P.PA. 13) 181,855.00
14 P. PA. 14 1m2 Pasang Zincalume Gelombang Persegi 0.30 (Polos) (P.PA. 14) 166,052.50
15 P. PA. 15 1m2 Pasang Zincalume Gelombang Persegi 0.30 (Colour) (P.PA. 15) 179,177.50
16 P. PA. 16 1m2 Pasang Zincalume Gelombang Persegi 0.35 (Polos) (P.PA. 16) 179,177.50
17 P. PA. 17 1m2 Pasang Zincalume Gelombang Persegi 0.35 (Colour) (P.PA. 17) 192,302.50
18 P. PA. 18 1m1 Pekerjaan Bubungan Atap Seng BJLS 30 / 10m1 (P.PA. 18) 79,018.08
19 P. PA. 19 1m2 Pasang Aluminium Foil / Sealation (P.PA. 19) 65,280.00
I. PEKERJAAN PLAFOND
1 P. Pf. 01 Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm (P.Pf. 01) 41,305.00
2 P. Pf. 02 Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 6 mm (P.Pf. 02) 60,842.50
3 P. Pf. 03 Memasang 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 mm (P.Pf. 03) 38,844.00
4 P. Pf. 04 Memasang 1 m' list langit-langit kayu profil (P.Pf. 04) 12,435.00
5 P. Pf. 05 1m2 Langit-langit GRC (P.Pf. 05) 34,403.50
6 P. Pf. 06 1m2 Pekerjaan Plafond Renglat Kayu Kelas I (P.Pf. 06) 146,513.60
J. PEKERJAAN SANITASI
1 P. Snt. 01 Pemasangan 1 Buah Kloset Duduk / Monoblok (P.Snt. 01) 1,053,320.00
2 P. Snt. 02 Pemasangan Kloset Jongkok Keramik (P.Snt. 02) 498,520.00
3 P. Snt. 03 Memasang 1m1 Pipa Galvanis Ø 1/2" (P.Snt. 03) 50,670.33
4 P. Snt. 04 Memasang 1m1 Pipa Galvanis Ø 3/4" (P. Snt. 04) 59,712.00
5 P. Snt. 05 Memasang 1m1 Pipa Galvanis Ø 1" (P.Snt. 05) 71,337.00
6 P. Snt. 06 Memasang 1m1 Pipa Galvanis Ø 11/2" (P.Snt. 06) 121,994.33
7 P. Snt. 07 Memasang 1m1 Pipa Galvanis Ø 3" (P.Snt. 07) 166,815.17
8 P. Snt. 08 Memasang 1m1 Pipa Galvanis Ø 4" (P.Snt. 08) 130,939.00
9 P. Snt. 09 Memasang 1m1 Pipa PVC Tipe AW Ø 1/2" (P.Snt. 09) 13,363.25
10 P. Snt. 10 Memasang 1m1 Pipa PVC Tipe AW Ø 3/4" (P.Snt. 10) 14,913.25
11 P. Snt. 11 Memasang 1m1 Pipa PVC Tipe AW Ø 1" (P.Snt. 11) 21,074.50
12 P. Snt. 12 Memasang 1m1 Pipa PVC Tipe AW Ø 2" (P.Snt. 12) 28,163.00
13 P. Snt. 13 Memasang 1m1 Pipa PVC Tipe AW Ø 3" (P.Snt. 13) 42,946.00
14 P. Snt. 14 Memasang 1m1 Pipa PVC Tipe AW Ø 4" (P.Snt. 14) 58,833.50
15 P. Snt. 15 Memasang 1 Buah Kran Air Ø 3/4" atau Ø 1/2" (P.Snt. 15) 45,230.00
K. PEKERJAAN BESI DAN ALUMINIUM
1 P. BA. 01 Memasang 1 kg besi profil (P.BA 01) 27,553.00
2 P. BA. 02 Memasang 1 Kg rangka kuda-kuda baja IWF (P. BA 02) 27,553.00

Rekapitulasi 72
HARGA SATUAN
NO KODE ANALISA URAIAN PEKERJAAN HAL
(Rp)
1 2 3 4 5
3 P. BA. 03 Mengerjakan 100 kg pekerjaan perakitan (P. BA 03) 73,100.00
4 P. BA. 04 Mengerjakan 10 cm pengelasan dengan las listrik (P. BA 04) 57,991.00
5 P. BA. 05 Memasang 1m kusen pintu alluminium (P. BA 05) 96,908.40
6 P. BA. 06 Memasang 1m' talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm (P. BA 06) 68,300.00
7 P. BA. 07 1m2 Pasang Kawat Harmonika (P.BA. 07) 90,260.08
8 P. BA. 08 1m2 Pasang Kawat Kassa (P.BA. 08) 38,670.08
9 P. BA. 09 1m2 Pasang Jendela Nako (P.BA. 09) 243,380.00
10 P. BA. 10 1m2 Pasang Talang Datar Seng BJLS 30 / Talang Sembunyi (P.BA. 10) 130,787.44
11 P. BA. 11 1m2 Pasang Talang Miring Seng BJLS 30 / Jurai Dalam (P.BA. 11) 166,109.10
12 P. BA. 12 10m1 Talang Cucuran Atap 1/2 Lingkaran Ø 15cm BJLS 30 (P.BA. 12) 94,850.00
13 P. BA. 13 10m1 Pemasangan Pipa Pembuangan dari Talang Atap Ø 8cm BJLS 30 (P.BA. 13) 65,930.00
L. PEKERJAAN KUNCI DAN KACA
1 P. KK. 01 1 Buah Pemasangan Kunci Tanam Antik (P.KK. 01) 221,670.00
2 P. KK. 02 1 Buah Pemasangan Kunci Tanam Biasa (P.KK. 02) 121,500.00
3 P. KK. 03 1 Buah Pemasangan Kunci Silinder (P.KK. 03) 138,770.00
4 P. KK. 04 1 Buah Pemasangan Engsel Pintu (P.KK. 04) 30,630.00
5 P. KK. 04.a 1 Buah Pemasangan Engsel Jendela (P.KK. 04.a) 27,430.00
6 P. KK. 05 1 Buah Pemasangan Kait Angin (P.KK. 05) 31,230.00
7 P. KK. 06 1 Buah Pemasangan Door Closer (P.KK. 06) 161,600.00
8 P. KK. 07 1 Buah Pemasangan Slot Pintu (P.KK. 07) 38,140.00
9 P. KK. 07.a 1 Buah Pemasangan Slot Jendela (P.KK. 07.a) 30,140.00
10 P. KK. 08 1 Buah Pemasangan Door Stoper (P.KK. 08) 29,820.00
11 P. KK. 09 1 m2 Pemasangan Kaca Tebal 5mm (P.KK. 09) 118,130.00
12 P. KK. 10 1 m2 Pemasangan Kaca Tebal 12mm (P.KK. 10) 452,025.00
13 P. KK. 11 1 m2 Pemasangan Kaca Cermin, Tebal 3mm (P.KK. 11) 108,010.00
14 P. KK. 12 1 m2 Pemasangan Kaca Patri (P.KK. 12) 1,059,730.00
M. PEKERJAAN PENUTUP LANTAI DAN DINDING
1 P. LD. 01 Memasang 1m2 Lantai Keramik ukuran (20 x 20) cm (P.LD. 01) 200,098.80
2 P. LD. 02 Memasang 1m2 Lantai Keramik ukuran (30 x 30) cm (P.LD. 02) 206,466.67
3 P. LD. 03 1m2 Pasang Lantai Keramik 40 x 40cm Polos (P.LD. 03) 159,126.00
4 P. LD. 04 1m2 Pasang Lantai Keramik 40 x 40cm Anti Gores (P.LD. 04) 192,251.00
5 P. LD. 05 Memasang 1 m2 lantai marmer ukuran (100 x 100) cm (P.LD. 05) 526,792.00
6 P. LD. 06 Memasang 1 m2 dinding keramik ukuran (20 x 20) cm (P.LD. 06) 216,971.60
7 P. LD. 07 1m2 Pasang Dinding Keramik 20 x 25cm (P.LD. 07) 197,676.00
8 P. LD. 07.a 1m2 Pasang Dinding Keramik 30 x 30cm (P.LD. 07.a) 181,676.00
9 P. LD. 07.b 1m2 Pasang Dinding Keramik 40 x 40cm (P.LD. 07.b) 161,276.00
10 P. LD. 08 Memasang 1 m2 Floor Hardener (P.LD. 08) 55,116.00
11 P. LD. 09 1m2 Pemasangan Paving Block (P.LD. 09) 128,080.00
12 P. LD. 10 1m2 Pemasangan Paving Stone (P.LD. 10) 193,080.00
N. PEKERJAAN PENGECATAN
1 P. Ct. 01 1m2 Mengikis / Mengerok Permukaan Cat Tembok Lama (P.Ct. 01) 18,300.00
2 P. Ct. 02 1m2 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual (P.Ct. 02) 8,625.00
3 P. Ct. 03 1m2 Pengecatan Bidang Kayu Lama (P.Ct. 03) 24,373.00
4 P. Ct. 04 1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, 2Lapis Cat Penutup) (P.Ct. 04) 31,220.20
5 P. Ct. 05 1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, 3Lapis Cat Penutup) (P.Ct. 05) 43,057.00
6 P. Ct. 06 1m2 Pelaburan Bidang Kayu dengan Teak Oil (P.Ct. 06) 29,250.40
7 P. Ct. 07 1m2 Pelaburan Bidang Kayu dengan Politur (P.Ct. 07) 34,272.00
8 P. Ct. 08 1m2 Pekerjaan Melamic (P.Ct. 08) 66,908.60
9 P. Ct. 09 1m2 Pelaburan Bidang Kayu Dengan Cat Residu dan Ter (P.Ct. 09) 16,850.00
10 P. Ct. 10 1m2 Pelaburan Bidang Kayu Dengan Vernis (P.Ct. 10) 29,639.00
1m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
11 P. Ct. 11 20,370.40
Dengan Cat Mutu Baik. (P.Ct. 11)
1m2 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
12 P. Ct. 12 21,805.60
Dengan Cat Mutu Baik. (P.Ct. 12)
13 P. Ct. 13 1m2 Pengecatan Permukaan Baja dengan Meni Besi (P.Ct. 13) 31,597.00
14 P. Ct. 14 1m2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah (P.Ct. 14) 59,877.20
15 P. Ct. 15 1m2 Pengecatan Atap Seng (P.Ct. 15) 30,765.00
O. PEKERJAAN MEKANIKAL ELEKRIKAL
1 P. ME. 01
P. PEKERJAAN BONGKARAN
1 P. Bkr. 01 1m3 Pekerjaan Bongkaran Beton Bertulang (P.Bkr. 01) 359,990.00
2 P. Bkr. 02 1m2 Pekerjaan Bongkaran Dinding Tembok Plesteran Simpai (P. Bkr. 02) 54,000.00
3 P. Bkr. 03 1m2 Pekerjaan Bongkaran Lantai Ubin / Keramik (P.Bkr. 03) 2,700.00
4 P. Bkr. 04 1m2 Pekerjaan Bongkaran Atap Genteng / Sirap (P.Bkr. 04) 900.00
5 P. Bkr. 05 1m2 Pekerjaan Bongkaran Atap Seng (P.Bkr. 05) 9,000.00
6 P. Bkr. 06 1m2 Pekerjaan Bongkaran Rangka Atap Kayu (P.Bkr. 06) 54,000.00
7 P. Bkr. 07 1m3 Pekerjaan Bongkaran Rangka Badan Kayu (P.Bkr. 07) 515,200.00

Rekapitulasi 73
LAMPIRAN 1 : KEPUTUSAN WALIKOTA PONTIANAK
NOMOR : …………………... TAHUN 2010
TANGGAL : ……………-…………2010

TENTANG
STANDARISASI HARGA SATUAN BAHAN, UPAH DAN ANALISA
BIAYA PEKERJAAN YANG TERDIRI DARI ANALISA E DAN ANALISA
BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN (ABK-SNI) KOTA PONTIANAK
TAHUN ANGGARAN 2010

( Periode Januari s/d Desember 2010 )

HARGA

TANPA HARGA TERMASUK


NO TENAGA KERJA SATUAN KODE KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN
(OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp) (Rp) (Rp)

A. UPAH
1 Mandor Lapangan Org/hari L.061 80,000.00 - 80,000.00
2 Mekanik Org/hari L.071 85,000.00 - 85,000.00
3 Kepala Tukang Org/hari L.073 120,000.00 - 120,000.00
4 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang Org/hari L.079 80,800.00 - 80,800.00
5 Operator terlatih Org/hari L.081 180,000.00 - 180,000.00
6 Operator semi terlatih Org/hari L.082 130,000.00 - 130,000.00
7 Sopir Org/hari L.091 80,000.00 - 80,000.00
8 Pekerja / Buruh Lapangan Tak terlatih Org/hari L.101 50,000.00 - 50,000.00
9 Pekerja / Buruh Lapangan terlatih Org/hari L.106 70,000.00 - 70,000.00

HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA HARGA TERMASUK
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp) (Rp) (Rp)

B. BAHAN PENGISI
1 Batu Kong M³ M.101 175,000.00 - - - - 175,000.00
2 Batu Sap Pinang M³ - 195,500.00 - - - - 195,500.00
3 Batu pecah 15-20 cm M³ - 209,300.00 - - - - 209,300.00
4 Batu pecah 10-15 cm M³ M.020 155,000.00 - - - - 155,000.00
5 Batu pecah 5-7 cm M³ M.022 170,000.00 - - - - 170,000.00
6 Batu pecah 3-5 cm M³ M.023 178,000.00 - - - - 178,000.00
7 Batu pecah 2-3 cm M³ M.024 234,000.00 - - - - 234,000.00
8 Batu pecah 1-2 cm M³ M.025 275,000.00 - - - - 275,000.00
9 Batu pecah 1-1 cm M³ - 380,000.00 - - - - 380,000.00
10 Batu pecah 0,5 cm M³ M.026 475,000.00 - - - - 475,000.00
11 Stone Dust M³ - 492,000.00 - - - - 492,000.00
12 Aspal Kg - 9,800.00 - - - - 9,800.00
13 Pasir M³ M.040 112,000.00 - - - - 112,000.00
14 Semen PC Zak M.080 70,000.00 - - - - 70,000.00
15 Semen PC Kg - 1,400.00 - - - - 1,400.00
16 Tanah Ex. Peniraman M³ M.050.a 39,200.00 - - - - 39,200.00
17 Tanah EX. Peladis M³ M.050 39,200.00 - - - - 39,200.00
18 Paving Block Bh - 2,000.00 - - - - 2,000.00
19 Paving Stone Bh - 3,300.00 - - - - 3,300.00
20 Batu Bata 5 x 11 x 22cm Bh - 2,300.00 - - - - 2,300.00
21 Bataco 15 x 30 x 7 cm Bh - 2,000.00 - - - - 2,000.00
22 Bataco 20 x 40 x 9 cm ( press ) Bh - 2,300.00 - - - - 2,300.00
23 Bataco 20 x 40 x 7 cm ( press ) Bh - 2,100.00 - - - - 2,100.00
24 Kerawang ( roster ) 18 x 18 cm Bh - 40,000.00 - - - - 40,000.00
25 Kerawang press ( roster ) 30 x 30 cm Bh - 24,000.00 - - - - 24,000.00
26 Keramik 20 x 20 cm Kotak - 97,500.00 - - - - 97,500.00
27 Keramik 30 x 30 cm Kotak - 84,000.00 - - - - 84,000.00
28 Keramik 30 x 30 cm Unpolished Kotak - 70,000.00 - - - - 70,000.00
29 Keramik 30 x 30 cm Artistik Kotak - 58,300.00 - - - - 58,300.00
30 Keramik 40 x 40 cm (biasa) Kotak - 63,600.00 - - - - 63,600.00
31 Keramik 40 x 40 cm (anti gores) Kotak - 95,400.00 - - - - 95,400.00
32 Keramik 40 x 40 cm Unpolished Kotak - 63,600.00 - - - - 63,600.00
33 Keramik 60 x 60 cm (anti gores) Kotak - 252,000.00 - - - - 252,000.00
34 Granito 40 x 40 cm Kotak - 172,200.00 - - - - 172,200.00
35 Marmer M² - 412,500.00 - - - - 412,500.00
36 Wood Flooring M² - 250,000.00 - - - - 250,000.00
37 List Keramik WC. 8 x 20 cm Bh - 220,000.00 - - - - 220,000.00
38 Plint Kayu uk. 2 x 10 cm M1 - 42,500.00 - - - - 42,500.00
39 Keramik dinding 20 x 20 cm Kotak - 97,500.00 - - - - 97,500.00
40 Keramik dinding 20 x 25 cm Kotak - 100,000.00 - - - - 100,000.00
41 Floor Hardener Kg - 7,500.00 - - - - 7,500.00
42 Beton Ready Mix B 0 M³ - 720,000.00 - - - - 720,000.00
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA HARGA TERMASUK
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp) (Rp) (Rp)

43 Beton Ready Mix 125 M³ - 755,000.00 - - - - 755,000.00


44 Beton Ready Mix 175 M³ - 800,000.00 - - - - 800,000.00
45 Beton Ready Mix 225 M³ - 925,000.00 - - - - 925,000.00
46 Beton Ready Mix 300 M³ - 995,000.00 - - - - 995,000.00
47 Additive Ready Mix M³ - 40,000.00 - - - - 40,000.00
48 Karung Goni Curing Beton ( 0.7m² ) Gulung - 10,500.00 - - - - 10,500.00
49 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 300 - 6m Btg - 1,050,000.00 - - - - 1,050,000.00
50 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 300 - 6m Btg - 1,350,000.00 - - - - 1,350,000.00
51 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 300 - 6m Btg - 900,000.00 - - - - 900,000.00
52 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 300 - 6m Btg - 1,005,000.00 - - - - 1,005,000.00
53 Papan Turap Uk. 15/50 - 5m Kpg - 800,000.00 - - - - 800,000.00
54 Papan Turap Uk. 15/50 - 6m Kpg - 1,020,000.00 - - - - 1,020,000.00
55 Pemancangan Mini Pile - 6m Btg - 125,500.00 - - - - 125,500.00
56 Sewa Pompa Ready Mix (Min. 100 M³) M³ - 50,000.00 - - - - 50,000.00
57 Bahan Plastik Cor Beton M² - 3,500.00 - - - - 3,500.00
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA HARGA TERMASUK
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp) (Rp) (Rp)

-
C. BAHAN KAYU -
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M M³ - 8,851,200.00 - - - - 8,851,200.00
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M M³ - 10,421,400.00 - - - - 10,421,400.00
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M M³ - 8,239,300.00 - - - - 8,239,300.00
4 Ky. Belian tdk ketam Uk. 9/9 - 4 M M³ M.181.a 8,500,500.00 - - - - 8,500,500.00
5 Ky. Belian tdk ketam Uk. 10/10 - 4 M M³ M.181.b 4,888,000.00 - - - - 4,888,000.00
6 Ky. Belian tdk ketam Uk. 12/12 - 4 M M³ - 5,015,000.00 - - - - 5,015,000.00
7 Ky. Belian tdk ketam Uk. 18/18 - 4 M M³ - 7,075,000.00 - - - - 7,075,000.00
8 Ky. Belian ketam Uk. 6/6 - 4 M M³ - 5,459,000.00 - - - - 5,459,000.00
9 Ky. Belian ketam Uk. 7/7 - 4 M M³ - 5,342,400.00 - - - - 5,342,400.00
10 Ky. Belian ketam Uk. 8/8 - 4 M M³ - 5,432,500.00 - - - - 5,432,500.00
11 Ky. Belian ketam Uk. 5/10 - 4 M M³ - 9,792,000.00 - - - - 9,792,000.00
12 Ky. Belian ketam Uk. 4/8 - 4 M M³ - 8,593,750.00 - - - - 8,593,750.00
13 Papan belian ketam (4m) M³ M.181.e 15,416,700.00 - - - - 15,416,700.00
14 Papan belian tdk ketam (4m) M³ M.181.d 4,303,000.00 - - - - 4,303,000.00
15 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam ) M³ M.181.f 3,441,500.00 - - - - 3,441,500.00
16 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam ) M³ M.181.g 3,441,500.00 - - - - 3,441,500.00
17 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam ) M³ - 3,441,500.00 - - - - 3,441,500.00
18 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam ) M³ - 3,441,500.00 - - - - 3,441,500.00
19 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam / untuk kusen ) M³ - 3,441,500.00 - - - - 3,441,500.00
20 Kusen Ky Kelas I Bangkirai uk. 5/10 M³ - 3,441,500.00 - - - - 3,441,500.00
21 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M³ M.181.h 2,200,000.00 - - - - 2,200,000.00
22 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam ) M³ M.181.i 2,200,000.00 - - - - 2,200,000.00
23 Ky. klas II Mabang uk. 7/7 - 4 M ( tdk ketam ) M³ - 3,385,600.00 - - - - 3,385,600.00
24 Ky. klas II Mabang uk. 7/7 - 4 M ( ketam ) M³ - 2,880,500.00 - - - - 2,880,500.00
25 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M³ - 2,830,000.00 - - - - 2,830,000.00
26 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) M³ - 2,830,000.00 - - - - 2,830,000.00
27 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam ) M³ - 2,775,700.00 - - - - 2,775,700.00
28 Ky. klas II Mabang uk. 6/10 - 4 M ( tdk ketam ) M³ - 2,949,100.00 - - - - 2,949,100.00
29 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) M³ - 3,590,900.00 - - - - 3,590,900.00
30 Ky. klas II Mabang uk. 4/8 - 4 M ( tdk ketam ) M³ - 3,736,200.00 - - - - 3,736,200.00
31 Ky. klas II Mabang uk. 8/15 - 4 M ( tdk ketam ) M³ - 2,291,700.00 - - - - 2,291,700.00
32 Ky. klas II Mabang uk. 8/12 - 4 M ( tdk ketam ) M³ - 3,011,500.00 - - - - 3,011,500.00
33 Ky klas III uk. 3/5 - 4 M ( tdk ketam) M³ - 2,866,000.00 - - - - 2,866,000.00
34 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³ - 2,830,000.00 - - - - 2,830,000.00
35 Papan kayu klas II (mabang) tdk ketam M³ M.181.j 4,128,900.00 - - - - 4,128,900.00
36 Papan kayu klas II (mabang) ketam M³ M.181.k 5,755,600.00 - - - - 5,755,600.00
37 Papan kayu klas I tdk ketam M³ - 3,226,500.00 - - - - 3,226,500.00
38 Papan kayu klas I ketam M³ - 5,379,500.00 - - - - 5,379,500.00
39 Papan mal klas III M³ M.181.l 1,075,000.00 - - - - 1,075,000.00
40 Papan Simpiran M³ - 549,800.00 - - - - 549,800.00
41 Renglat kayu klas I uk 1/8 cm Btg - 17,600.00 - - - - 17,600.00
42 Kayu profil 10cm Btg - 18,800.00 - - - - 18,800.00
43 Kayu cerucuk /dolken ø 6 - 8 - Pj. 4 M Btg - 15,000.00 - - - - 15,000.00
44 Kayu cerucuk /dolken ø10 - Pj. 4 M Btg - 25,000.00 - - - - 25,000.00
45 Kayu cerucuk /dolken ø12 - Pj. 12 M Btg - 25,000.00 - - - - 25,000.00
46 Kayu cerucuk /dolken ø 15 - Pj. 12 M Btg - 75,000.00 - - - - 75,000.00
47 Kayu Simpiran / Bakar M³ - 100,000.00 - - - - 100,000.00
48 Alas kayu hutan Btg - 15,000.00 - - - - 15,000.00
-
D. BAHAN CAT -
1 Amplas Lbr - 5,300.00 - - - - 5,300.00
2 Minyak cat Kg - 26,500.00 - - - - 26,500.00
3 Cat kilat Kg - 48,000.00 - - - - 48,000.00
4 Plamur Kg - 21,200.00 - - - - 21,200.00
5 Cat dasar Kg - 15,900.00 - - - - 15,900.00
6 Cat tembok Kg - 80,000.00 - - - - 80,000.00
7 Cat tembok type weather shield Kg - 36,600.00 - - - - 36,600.00
8 Cat tembok type weather coat (acrylic) Kg - 72,800.00 - - - - 72,800.00
9 Cat seng Kg - 56,000.00 - - - - 56,000.00
10 Dempul Kg - 19,000.00 - - - - 19,000.00
11 Plitur Kg - 32,000.00 - - - - 32,000.00
12 Thiner Ltr M.090.f 25,000.00 - - - - 25,000.00
13 Thiner ND Ltr - 29,500.00 - - - - 29,500.00
14 Melamic Ltr - 51,400.00 - - - - 51,400.00
15 Vernis Ltr - 33,000.00 - - - - 33,000.00
16 Meni Kg - 40,200.00 - - - - 40,200.00
17 Oker Kg - 42,400.00 - - - - 42,400.00
18 Lem Kayu Kg - 18,550.00 - - - - 18,550.00
19 Sealent Tube - 125,000.00 - - - - 125,000.00
20 Soda Api Kg - 10,600.00 - - - - 10,600.00
21 Sabun / cream pembersih kotoran Kg - 18,500.00 - - - - 18,500.00
22 Teak Oil Ltr - 40,000.00 - - - - 40,000.00
23 Ter / Residu Ltr - 23,000.00 - - - - 23,000.00
24 Kuas 4" Bh - 16,100.00 - - - - 16,100.00
25 Road Line Paint ( Cat Marka ) Ltr M.090.e 45,000.00 - - - - 45,000.00
26 Glass Bit Kg M.090.g 33,200.00 - - - - 33,200.00
27 Weatherbond Emulsion ( cat kerb ) Kg M.090.h 72,000.00 - - - - 72,000.00
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA HARGA TERMASUK
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp) (Rp) (Rp)

28 Termoplast Kg - 31,000.00 - - - - 31,000.00


-
E. BAHAN BESI DAN ALUMINIUM -
1 Besi Tulangan Beton Kg M.167 24,500.00 - - - - 24,500.00
2 Besi wire mesh ø 5 Kg - 16,100.00 - - - - 16,100.00
3 Kawat baja/bendrat Kg M.168 18,000.00 - - - - 18,000.00
4 Simpai roll Kg - 64,700.00 - - - - 64,700.00
5 Kawat simpai Kg - 24,200.00 - - - - 24,200.00
6 Baut dia 4/8 " pj = 20 cm Btg M.163 11,000.00 - - - - 11,000.00
7 Besi Penahan bh - 10,500.00 - - - - 10,500.00
8 Beugel plat L. 3 cm bh - 43,000.00 - - - - 43,000.00
9 Plat 1,2 x 2,4 x 12 Bh - 479,000.00 - - - - 479,000.00
10 Besi Konstruksi (I, H) Kg - 16,300.00 - - - - 16,300.00
11 Besi Konstruksi ( C ) Kg - 16,900.00 - - - - 16,900.00
12 Besi Konstruksi (siku ) Kg - 16,900.00 - - - - 16,900.00
13 Kawat Las Btg - 5,000.00 - - - - 5,000.00
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA HARGA TERMASUK
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp) (Rp) (Rp)

14 Kawat Las Kg - 100,000.00 - - - - 100,000.00


15 Kawat harmonika M² - 59,400.00 - - - - 59,400.00
16 Kawat kasa M² - 12,500.00 - - - - 12,500.00
17 Pipa galvanis dia 3/4" Btg - 180,000.00 - - - - 180,000.00
18 Pipa galvanis dia 1/2" Btg - 145,000.00 - - - - 145,000.00
19 Pipa galvanis dia 1" Btg - 225,000.00 - - - - 225,000.00
20 Pipa galvanis dia 1 1/4" Btg - 245,300.00 - - - - 245,300.00
21 Pipa galvanis dia 1 1/2" Btg - 385,000.00 - - - - 385,000.00
22 Pipa galvanis dia 2" Btg - 425,000.00 - - - - 425,000.00
23 Pipa galvanis dia 3" Btg - 558,500.00 - - - - 558,500.00
24 Pipa galvanis dia 4" Btg - 397,800.00 - - - - 397,800.00
25 Folding gate M² - 500,000.00 - - - - 500,000.00
26 Rangka Aluminium 1 1/2" x 3" Meter - 75,000.00 - - - - 75,000.00
27 Rangka Aluminium 1 3/4" x 4" Meter - 96,000.00 - - - - 96,000.00
28 Pintu Aluminium std IKP, lengkap 4" Unit - 2,175,000.00 - - - - 2,175,000.00
29 Rangka Baja Ringan Zincalume (truss/color) + Pemasangan M² - 230,000.00 - - - - 230,000.00
30 Rangka Baja Ringan Zincalume (truss/polos) + Pemasangan M² - 150,000.00 - - - - 150,000.00
31 Alumatek Unit - 1,900,000.00 - - - - 1,900,000.00
-
F. BAHAN PENGANTUNG -
1 Pintu Plastik untuk WC Bh - 275,000.00 - - - - 275,000.00
2 Kait angin Bh - 16,500.00 - - - - 16,500.00
3 Handle Jendela Bh - 13,500.00 - - - - 13,500.00
4 Handle Pintu Bh - 125,000.00 - - - - 125,000.00
5 Engsel jendela Bh - 12,700.00 - - - - 12,700.00
6 Engsel pintu Bh - 15,900.00 - - - - 15,900.00
7 Slot pintu Bh - 18,500.00 - - - - 18,500.00
8 Slot jendela Bh - 10,500.00 - - - - 10,500.00
9 Kunci tanam 2 slag (setaraf Belluci) Bh - 167,500.00 - - - - 167,500.00
10 Kunci tanam 1 slag Bh - 107,500.00 - - - - 107,500.00
11 Kunci tanam antik Bh - 162,750.00 - - - - 162,750.00
12 Kunci tanam biasa Bh - 79,000.00 - - - - 79,000.00
13 Kunci silinder Bh - 97,500.00 - - - - 97,500.00
14 Door Closer Bh - 112,500.00 - - - - 112,500.00
15 Door Stoper Bh - 20,000.00 - - - - 20,000.00
16 Paku Seng Kg M.166.a 50,800.00 - - - - 50,800.00
17 Paku campuran 1" - 5 " Kg M.166.b 12,000.00 - - - - 12,000.00
18 Paku beton Kg - 25,000.00 - - - - 25,000.00
19 Paku Atap Seng Kg M.166.c 50,800.00 - - - - 50,800.00
20 Paku triplek Kg - 26,250.00 - - - - 26,250.00
21 Paku GRC Kg - 26,250.00 - - - - 26,250.00
22 Paku Zincallume Kg - 35,000.00 - - - - 35,000.00
23 Sekrup Gypsum Kg - 60,000.00 - - - - 60,000.00
24 Sekrup Fixer Bh - 300.00 - - - - 300.00
25 Engsel Angin Bh - 10,000.00 - - - - 10,000.00
-
G. BAHAN ATAP -
1 Sirap belian Lbr - 5,000.00 - - - - 5,000.00
2 Asbes Lbr - 50,000.00 - - - - 50,000.00
3 Eternit M² - 65,000.00 - - - - 65,000.00
4 Genteng Metal Type Prima 0.35 Lbr - 58,300.00 - - - - 58,300.00
5 Genteng Metal Type Royal 0.35 Lbr - 58,300.00 - - - - 58,300.00
6 Genteng Metal Type Classic 0.35 Lbr - 58,300.00 - - - - 58,300.00
7 Genteng Metal Stone ( Type Classic 0.35 ) Lbr - 80,800.00 - - - - 80,800.00
8 Genteng Metal Stone ( Type Prima 0.35 ) Lbr - 80,800.00 - - - - 80,800.00
9 Atap Metal Supersheet 0.35 (polos) M' - 85,000.00 - - - - 85,000.00
10 Atap Metal Supersheet 0.35 (polos) M² - 106,300.00 - - - - 106,300.00
11 Atap Trim Deck 0.3 (polos) M² - 95,029.59 - - - - 95,020.00
12 Atap Trim Deck 0.33 (color) M² - 106,745.56 - - - - 106,740.00
13 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm) Bh - 65,000.00 - - - - 65,000.00
14 Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm) Bh - 80,000.00 - - - - 80,000.00
15 Nok bubungan genteng metal kotak 0.35 M' - 77,600.00 - - - - 77,600.00
16 Nok bubungan genteng metal stone kotak 0.35 M' - 92,000.00 - - - - 92,000.00
17 Nok bubungan Trim Deck (polos) M' - 104,000.00 - - - - 104,000.00
18 Nok bubungan Trim Deck (color) M' - 117,000.00 - - - - 117,000.00
19 Seng Gelombang Bjls 30 Lbr - 70,000.00 - - - - 70,000.00
20 Seng Gelombang Bjls 20 Lbr - 65,500.00 - - - - 65,500.00
21 Seng Plat Bjls 20 Lbr - 43,000.00 - - - - 43,000.00
22 Seng Plat Bjls 30 Lbr - 76,000.00 - - - - 76,000.00
23 Seng Plat Bjls 30 (lebar 45 cm) M' - 19,000.00 - - - - 19,000.00
24 Plat Datar Color 0.35 Lbr - 55,000.00 - - - - 55,000.00
25 Zincalume Gelombang Persegi 0.35 (polos) M² - 103,750.00 - - - - 103,750.00
26 Zincalume Gelombang Persegi 0.30 (polos) M² - 91,250.00 - - - - 91,250.00
27 Zincalume Gelombang Persegi 0.35 (color) M² - 116,250.00 - - - - 116,250.00
28 Zincalume Gelombang Persegi 0.30 (color) M² - 103,750.00 - - - - 103,750.00
29 Zincalume Plat 0.2 Lbr - 119,000.00 - - - - 119,000.00
30 Aluminium Foil M² - 50,000.00 - - - - 50,000.00
-
H. BAHAN KACA -
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA HARGA TERMASUK
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp) (Rp) (Rp)

1 Kaca Polos, t = 5 mm M² - 94,000.00 - - - - 94,000.00


2 Kaca Polos, t = 12mm M² - 384,000.00 - - - - 384,000.00
3 Kaca Rayben, t = 5 mm M² - 138,000.00 - - - - 138,000.00
4 Kaca Cermin t = 3mm M² - 84,800.00 - - - - 84,800.00
5 Kaca Patri M² - 950,000.00 - - - - 950,000.00
6 Sealent Kg - 101,500.00 - - - - 101,500.00
7 Nako + Bingkai (80 x 15) x 10 daun polos Bh - 195,000.00 - - - - 195,000.00
8 Nako + Bingkai (80 x 15) x 10 daun rayben Bh - 205,000.00 - - - - 205,000.00
9 Kaca Es M² - 123,000.00 - - - - 123,000.00
-
I. BAHAN TRIPLEK -
1 Triplek t = 3 mm Lbr - 68,900.00 - - - - 68,900.00
2 Triplek t = 6 mm Lbr - 121,000.00 - - - - 121,000.00
3 Triplek t =9 mm Lbr - 150,000.00 - - - - 150,000.00
4 Multiplek t = 10 mm Lbr - 170,000.00 - - - - 170,000.00
5 Multiplek t = 12 mm Lbr - 202,000.00 - - - - 202,000.00
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA HARGA TERMASUK
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp) (Rp) (Rp)

6 Plywood 4' x 8' x 4mm Lbr - 99,400.00 - - - - 99,400.00


7 Panel GRC 120 x 240 x 40 Lbr - 59,000.00 - - - - 59,000.00
8 GypsumBoard t = 9mm Lbr - 61,000.00 - - - - 61,000.00
-
J. BAHAN SANITASI -
1 Kloset duduk monoblok Bh - 742,000.00 - - - - 742,000.00
2 Kloset duduk putih (setaraf TOTO) Bh - 1,950,000.00 - - - - 1,950,000.00
3 Kloset duduk warna (setaraf TOTO) Bh - 2,130,000.00 - - - - 2,130,000.00
4 Kloset jongkok (setaraf TOTO) Bh - 212,500.00 - - - - 212,500.00
5 Kloset jongkok (setaraf INA) Bh - 125,000.00 - - - - 125,000.00
6 Kran air uk 1/2" Bh - 35,000.00 - - - - 35,000.00
7 Pipa paralon dia 1/2" Btg - 15,100.00 - - - - 15,100.00
8 Pipa paralon dia 3/4" Btg - 19,100.00 - - - - 19,100.00
9 Pipa paralon dia 1" Btg - 35,000.00 - - - - 35,000.00
10 Pipa paralon dia 2" Btg - 43,600.00 - - - - 43,600.00
11 Pipa paralon dia 3" Btg - 67,200.00 - - - - 67,200.00
12 Pipa paralon dia 4" Btg - 108,200.00 - - - - 108,200.00
-
K. BAHAN MINYAK (TANPA KEUNTUNGAN) -
1 Minyak solar Ltr M.183 4,500.00 - - - - 4,500.00
2 Minyak solar industri Ltr - 5,750.00 - - - - 5,750.00
3 Bensin premium Ltr M.184 4,500.00 - - - - 4,500.00
4 Minyak pelumas Ltr M.185 50,000.00 - - - - 50,000.00
5 Oli BEO 154W40/Cat Ltr - 42,400.00 - - - - 42,400.00
6 Minyak tanah Ltr M.064 5,000.00 - - - - 5,000.00
7 Minyak tanah industri Ltr - 6,100.00 - - - - 6,100.00
8 Gas Elpiji Kg - 8,300.00 - - - - 8,300.00
9 Alat-alat bantu Set M.170 57,000.00 - - - - 57,000.00
10 Sewa Alat Untuk Pengelasan Jam - 62,500.00 - - - - 62,500.00
11 Sewa Molen Set - 150,000.00 - - - - 150,000.00
12 Sewa kuali termasuk angkutan Set - 63,300.00 - - - - 63,300.00
-
L. BAHAN ALAT-ALAT LISTRIK -
1 Armatur lampu High Mass Holovent 400 watt (lengkap) Unit 11,970,000.00 - - - - 11,970,000.00
2 Armatur lampu SGP 338 / SONT 400 Watt Unit - 4,962,300.00 - - - - 4,962,300.00
3 Armatur lampu SGP 328 / SONT 250 Watt Unit - 3,386,350.00 - - - - 3,386,350.00
4 Armatur lampu SGP 338 / SONT 400 Watt (lengkap) Unit - 4,641,000.00 - - - - 4,641,000.00
5 Armatur lampu SGP 368 / SONT 250 Watt (lengkap) Unit - 3,886,350.00 - - - - 3,886,350.00
6 Armatur lampu LVD 100 Watt (lengkap) Unit - 4,490,000.00 - - - - 4,490,000.00
7 Armatur lampu Ekorola TRX 800 - 20 Watt (set) Set - 495,000.00 - - - - 495,000.00
8 Armatur lampu Sorot HPIT 250 Watt (lengkap) Set - 6,069,000.00 - - - - 6,069,000.00
9 Sorot HPIT 250 watt (lengkap) Set - 5,057,500.00 - - - - 5,057,500.00
10 XKS SON T 250 watt (lengkap) Set - 3,272,500.00 - - - - 3,272,500.00
11 Tiang Artagonal Cabang 2 T = 11 M Tiang - 7,049,916.67 - - - - 7,049,910.00
12 Tiang Artagonal Cabang 1 T = 11 M Tiang - 6,187,166.67 - - - - 6,187,160.00
13 Tiang Oktagonal Cabang 2 T = 11 M Btg - 6,579,100.00 - - - - 6,579,100.00
14 Tiang Oktagonal Cabang 1 T = 11 M Btg - 6,910,000.00 - - - - 6,910,000.00
15 Tiang high mass 22 m cab. 5 ring Tiang - 61,106,500.00 - - - - 61,106,500.00
16 Tiang high mass 22 m cab. 4 ring Tiang - 73,327,000.00 - - - - 73,327,000.00
17 Tiang lampu oktagonal 11 m Btg - 9,853,200.00 - - - - 9,853,200.00
18 Tiang lampu oktagonal 12 m Btg - 11,238,300.00 - - - - 11,238,300.00
19 Tiang lampu oktagonal cab. 4 Ring 12 Mtr Btg - 9,853,000.00 - - - - 9,853,000.00
20 Tiang lampu oktagonal cab. 2 (11m) Btg - 10,353,000.00 - - - - 10,353,000.00
21 Stang Ornamen Galvanis dia 2" Pj. 7 M + Klem Tiang Btg - 893,650.00 - - - - 893,650.00
22 Stang Ornamen Galvanis dia 2" Pj. 6 M + Klem Tiang Btg - 893,625.00 - - - - 893,620.00
23 Stang Ornamen Galvanis dia 2" Pj. 5 M + Klem Tiang Btg - 832,000.00 - - - - 832,000.00
24 Stang Ornamen Galvanis dia 2" Pj. 3 M + Klem Tiang 12 - 620,000.00 - - - - 620,000.00
25 Stang Ornamen Galvanis dia 2" Pj. 2 M + Klem Tiang Btg - 470,000.00 - - - - 470,000.00
26 Box Panel PJU Uk. 60x90x30 Cm lengkap Time Swich Set - 4,240,000.00 - - - - 4,240,000.00
27 Box Panel PJU Uk. 50x45x25 Cm lengkap Time Swich Set - 3,069,250.00 - - - - 3,069,250.00
28 Box KWH Meter Uk. 35 x 50 x 25 cm Buah - 725,000.00 - - - - 725,000.00
29 Traffo HPL 400 Watt Buah - 227,000.00 - - - - 227,000.00
30 Traffo HPL 250 Watt Buah - 183,666.67 - - - - 183,660.00
31 Traffo HPL 125 Watt Buah - 113,500.00 - - - - 113,500.00
32 Traffo SOX 135 Watt Buah - 766,250.00 - - - - 766,250.00
33 Traffo SOX 180 Watt Buah - 766,250.00 - - - - 766,250.00
34 Traffo SON T 400 Watt Buah - 417,666.67 - - - - 417,660.00
35 Traffo SON T 250 Watt Buah - 340,333.33 - - - - 340,330.00
36 Traffo SON T 125 Watt Buah - 225,750.00 - - - - 225,750.00
37 Traffo SON T 70 Watt Buah - 131,416.67 - - - - 131,410.00
38 Traffo SON H 400 Watt Buah - 372,083.33 - - - - 372,080.00
39 Traffo SON H 250 Watt Buah - 255,416.67 - - - - 255,410.00
40 Traffo SON H 125 Watt Buah - 225,750.00 - - - - 225,750.00
41 Traffo SON H 70 Watt Buah - 134,750.00 - - - - 134,750.00
42 Traffo HPiT 400 Buah - 245,916.67 - - - - 245,910.00
43 Traffo Neon 40 Watt Buah - 17,833.33 - - - - 17,830.00
44 Traffo Neon 20 Watt Buah - 14,875.00 - - - - 14,870.00
45 Traffo Neon 10 Watt Buah - 13,083.33 - - - - 13,080.00
46 HPL 400 Watt Buah - 184,500.00 - - - - 184,500.00
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA HARGA TERMASUK
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp) (Rp) (Rp)

47 HPL 250 Watt Buah - 134,833.33 - - - - 134,830.00


48 HPL 125 Watt Buah - 63,833.33 - - - - 63,830.00
49 SOX 135 Watt Buah - 441,416.67 - - - - 441,410.00
50 SOX 180 Watt Buah - 441,416.67 - - - - 441,410.00
51 MLL 160 Watt Buah - 63,833.33 - - - - 63,830.00
52 Bola SON T 1000 Watt Buah - 675,000.00 - - - - 675,000.00
53 Bola SON T 400 Watt Buah - 306,000.00 - - - - 306,000.00
54 Bola SON T 250 Watt Buah - 295,000.00 - - - - 295,000.00
55 Bola SON T 125 Watt Buah - 225,750.00 - - - - 225,750.00
56 Bola Lampu SON 70 Watt Buah - 153,200.00 - - - - 153,200.00
57 SON H 400 Watt Buah - 255,416.67 - - - - 255,410.00
58 SON H 250 Watt Buah - 255,416.67 - - - - 255,410.00
59 SON H 125 Watt Buah - 225,750.00 - - - - 225,750.00
60 SON H 70 Watt Buah - 127,666.67 - - - - 127,660.00
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA HARGA TERMASUK
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp) (Rp) (Rp)

61 Bola Lampu HPIT 400 Watt Buah - 306,000.00 - - - - 306,000.00


62 HPIT 400 Watt Buah - 295,100.00 - - - - 295,100.00
63 Seri 200 Biji Kotak - 50,416.67 - - - - 50,410.00
64 Seri Kuning Kotak - 50,416.67 - - - - 50,410.00
65 Neon Sen Meter - 37,841.67 - - - - 37,840.00
66 Pijar 5 Watt Buah - 1,916.67 - - - - 1,910.00
67 Pijar 20 Watt Buah - 3,166.67 - - - - 3,160.00
68 Pijar 25 Watt Buah - 3,166.67 - - - - 3,160.00
69 Pijar 40 Watt Buah - 3,166.67 - - - - 3,160.00
70 Pijar 60 Watt Buah - 4,500.00 - - - - 4,500.00
71 Pijar 75 Watt Buah - 4,500.00 - - - - 4,500.00
72 Pijar 80 Watt Buah - 3,583.33 - - - - 3,580.00
73 Pijar 100 Watt Buah - 5,666.67 - - - - 5,660.00
74 Pijar 200 Watt Buah - 12,583.33 - - - - 12,580.00
75 Neon 40 Watt Buah - 11,916.67 - - - - 11,910.00
76 Neon 20 Watt Buah - 8,250.00 - - - - 8,250.00
77 Neon 10 Watt Buah - 4,750.00 - - - - 4,750.00
78 Lampu Ekorola TRX 800 - 20 watt (set) Set - 489,166.67 - - - - 489,160.00
79 Lampu Light Grick Buah - 119,833.33 - - - - 119,830.00
80 Lampu Genite 16 Watt Buah - 37,833.33 - - - - 37,830.00
81 Lampu XL 14 Watt Buah - 31,500.00 - - - - 31,500.00
82 Lampu Sorot 300 Watt Buah - 125,000.00 - - - - 125,000.00
83 Lampu Nepalos 25 Watt Buah - 31,500.00 - - - - 31,500.00
84 Lampu Superlox 25 Watt Buah - 5,000.00 - - - - 5,000.00
85 Lampu Superlox 40 Watt Buah - 5,666.67 - - - - 5,660.00
86 Lampu Fisikom 25 Watt Buah - 31,500.00 - - - - 31,500.00
87 Lampu Fisikom 23 Watt Buah - 31,500.00 - - - - 31,500.00
88 Lampu Fisikom 18 Watt Buah - 25,250.00 - - - - 25,250.00
89 Lampu Mercury 125 Watt Buah - 63,833.33 - - - - 63,830.00
90 Lampu Mercury 250 Watt Buah - 134,750.00 - - - - 134,750.00
91 Lampu Sunyco 45 Watt Buah - 75,666.67 - - - - 75,660.00
92 Lampu Matsuka 8 Watt Buah - 18,916.67 - - - - 18,910.00
93 Lampu Matsuka 14 Watt Buah - 20,166.67 - - - - 20,160.00
94 Lampu Matsuka 18 Watt Buah - 29,000.00 - - - - 29,000.00
95 Lampu Matsuka 20 Watt Buah - 34,083.33 - - - - 34,080.00
96 Lampu Matsuka 25 Watt Buah - 35,333.33 - - - - 35,330.00
97 Lampu Par 38 Watt Buah - 46,666.67 - - - - 46,660.00
98 Lampu Taman Buah - 31,500.00 - - - - 31,500.00
99 SL 15 Watt Buah - 105,000.00 - - - - 105,000.00
100 SL 18 Watt Buah - 40,900.00 - - - - 40,900.00
101 SL 25 Watt Buah - 52,900.00 - - - - 52,900.00
102 TL Rina 32 Watt Buah - 25,166.67 - - - - 25,160.00
103 Bola Essetial Buah - 30,333.33 - - - - 30,330.00
104 Bola Spot Light Buah - 47,250.00 - - - - 47,250.00
105 Bola Lampu Sorot 300 Watt Buah - 125,000.00 - - - - 125,000.00
106 Hologen 500 Watt Buah - 36,583.33 - - - - 36,580.00
107 Hologen 1.000 Watt Buah - 71,916.67 - - - - 71,910.00
108 Hologen 1.500 Watt Buah - 81,916.67 - - - - 81,910.00
109 NYY 1 x 1.5 mm Meter - 2,700.00 - - - - 2,700.00
110 NYY 1 x 2.5 mm Meter - 4,200.00 - - - - 4,200.00
111 NYY 1 x 4 mm Meter - 6,600.00 - - - - 6,600.00
112 NYY 1 x 6 mm Meter - 10,200.00 - - - - 10,200.00
113 NYY 2 mm Meter - 5,583.33 - - - - 5,580.00
114 NYY 2 x 2.5 mm Meter - 11,100.00 - - - - 11,100.00
115 NYY 2 x 4 mm Meter - 15,910.00 - - - - 15,910.00
116 NYY 2 x 6 mm Meter - 15,100.00 - - - - 15,100.00
117 NYY 2 x 10 mm Meter - 19,916.67 - - - - 19,910.00
118 NYY 3 x 4 mm Meter - 21,583.33 - - - - 21,580.00
119 NYY 4 x 2.5 mm Meter - 21,300.00 - - - - 21,300.00
120 NYY 4 x 4 mm Meter - 31,500.00 - - - - 31,500.00
121 NYY 4 x 6 mm Meter - 51,150.00 - - - - 51,150.00
122 NYY 4 x 10 mm Meter - 69,600.00 - - - - 69,600.00
123 NYY 4 x 16 mm Meter - 59,916.67 - - - - 59,910.00
124 NYY 4 x 25 mm Meter - 248,500.00 - - - - 248,500.00
125 NYY 4 x 35 mm Meter - 277,500.00 - - - - 277,500.00
126 NYY 4 x 50 mm Meter - 340,500.00 - - - - 340,500.00
127 NYY 4 x 70 mm Meter - 122,333.33 - - - - 122,330.00
128 NYYFYGBY 4 x 6 mm Meter - 78,800.00 - - - - 78,800.00
129 NYYFYGBY 4 x 10 mm Meter - 116,300.00 - - - - 116,300.00
130 NYN 2 x 2,5 mm Meter - 5,916.67 - - - - 5,910.00
131 NYN 3 x 1,5 mm Meter - 5,416.67 - - - - 5,410.00
132 NYN 3 x 2,5 mm Meter - 7,166.67 - - - - 7,160.00
133 NYA 1 x 1,5 mm Meter - 8,900.00 - - - - 8,900.00
134 NYA 1 x 2,5 mm Meter - 10,000.00 - - - - 10,000.00
135 NYA 1 x 4 mm Meter - 11,500.00 - - - - 11,500.00
136 NYA 1 x 6 mm Meter - 15,900.00 - - - - 15,900.00
137 NYA 2 x 2,5 mm Meter - 11,100.00 - - - - 11,100.00
138 NYA 2 x 4 mm Meter - 16,000.00 - - - - 16,000.00
139 NYA 2 x 30 mm Meter - 11,166.67 - - - - 11,160.00
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA HARGA TERMASUK
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp) (Rp) (Rp)

140 NYA 4 x 6 mm Meter - 20,750.00 - - - - 20,750.00


141 NYA 1,5 mm Meter - 1,250.00 - - - - 1,250.00
142 NYA 4 mm Meter - 3,250.00 - - - - 3,250.00
143 NYA 10 mm Meter - 7,916.67 - - - - 7,910.00
144 NYA 16 mm Meter - 2,166.67 - - - - 2,160.00
145 NYF6BY 4 x 10 mm Meter - 55,000.00 - - - - 55,000.00
146 NYF6BY 4 x 16 mm Meter - 80,250.00 - - - - 80,250.00
147 NYF6BY 4 x 25 mm Meter - 111,000.00 - - - - 111,000.00
148 NYF6BY 4 x 35 mm Meter - 141,250.00 - - - - 141,250.00
149 NYF6BY 4 x 50 mm Meter - 181,583.33 - - - - 181,580.00
150 NYF6BY 4 x 70 mm Meter - 247,250.00 - - - - 247,250.00
151 NYM 4 mm Meter - 3,250.00 - - - - 3,250.00
152 NYM 3 x 4 mm Meter - 17,916.67 - - - - 17,910.00
153 NYM 2 x 2 mm Meter - 5,416.67 - - - - 5,410.00
154 NYM 2 x 4 mm Meter - 13,333.33 - - - - 13,330.00
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA HARGA TERMASUK
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp) (Rp) (Rp)

155 NYM 2 x 2,5 mm Meter - 9,250.00 - - - - 9,250.00


156 NYM 2 x 1,5 mm Meter - 4,000.00 - - - - 4,000.00
157 NYM 3 x 1,5 mm Meter - 5,000.00 - - - - 5,000.00
158 NYM 3 x 2,5 mm Meter - 7,166.67 - - - - 7,160.00
159 NYM 3 x 10 mm Meter - 25,166.67 - - - - 25,160.00
160 NYM 4 x 2,5 mm Meter - 9,166.67 - - - - 9,160.00
161 NYM 4 x 4 mm Meter - 23,166.67 - - - - 23,160.00
162 NYMHYM 2 x 0,75 mm Meter - 2,833.33 - - - - 2,830.00
163 NYMHYM 2 x 1,5 mm Meter - 4,833.33 - - - - 4,830.00
164 Traffo SON T 1000 Watt Buah - 845,000.00 - - - - 845,000.00
165 Traffo SON T 400 Watt Buah - 501,200.00 - - - - 501,200.00
166 Traffo SON T 250 Watt Buah - 408,400.00 - - - - 408,400.00
167 Traffo SON T 70 Watt Buah - 157,700.00 - - - - 157,700.00
168 Kabel Snur Roll - 50,416.67 - - - - 50,410.00
169 Kabel Tester Meter - 25,166.67 - - - - 25,160.00
170 Kabel Box Meter - 50,416.67 - - - - 50,410.00
171 Kabel Mic Transparan Roll - 163,916.67 - - - - 163,910.00
172 Kabel 3 x 2,5 mm Meter - 7,166.67 - - - - 7,160.00
173 Kabel Antena Roll - 31,500.00 - - - - 31,500.00
174 Kabel H / M Meter - 1,833.33 - - - - 1,830.00
175 Kabel Transparan Meter - 2,500.00 - - - - 2,500.00
176 Kabel Telepon Meter - 1,500.00 - - - - 1,500.00
177 Kabel TC 2 x 10 mm Meter - 6,450.00 - - - - 6,450.00
178 Kabel TC 2 x 16 mm Meter - 9,000.00 - - - - 9,000.00
179 Box TL 20 Watt Buah - 7,500.00 - - - - 7,500.00
180 Box MCB 1 Group Buah - 3,750.00 - - - - 3,750.00
181 Cal Gulung Buah - 50,416.67 - - - - 50,410.00
182 Contactor 100 A Buah - 1,005,500.00 - - - - 1,005,500.00
183 Conector Buah - 7,250.00 - - - - 7,250.00
184 Dop 3" Buah - 6,333.33 - - - - 6,330.00
185 Esensial Buah - 31,500.00 - - - - 31,500.00
186 Fitting Gantung Buah - 1,333.33 - - - - 1,330.00
187 Fitting Duduk Buah - 3,166.67 - - - - 3,160.00
188 Fitting Atom Buah - 25,250.00 - - - - 25,250.00
189 Fitting Gantung E 27 Buah - 15,855.00 - - - - 15,850.00
190 Fitting Duduk E 27 Buah - 15,855.00 - - - - 15,850.00
191 Fitting Duduk E 40 Buah - 20,100.00 - - - - 20,100.00
192 Fitting Hologen Buah - 25,250.00 - - - - 25,250.00
193 Full Breket Buah - 11,365.00 - - - - 11,360.00
194 Gulung Spul Buah - 63,083.33 - - - - 63,080.00
195 Gulung Coil Contactor Buah - 63,083.33 - - - - 63,080.00
196 Isolasi Unibel Buah - 7,500.00 - - - - 7,500.00
197 Icnitor SN 58 Buah - 90,800.00 - - - - 90,800.00
198 Inector Buah - 75,666.67 - - - - 75,660.00
199 Ignator Buah - 50,455.83 - - - - 50,450.00
200 Indiktor Buah - 118,333.33 - - - - 118,330.00
201 Insuluk Buah - 291.67 - - - - 290.00
202 Kapasitor Buah - 142,000.00 - - - - 142,000.00
203 Kap Hijau E 27 Buah - 25,000.00 - - - - 25,000.00
204 Kap Hijau E 40 Buah - 40,000.00 - - - - 40,000.00
205 Kap Lampu Buah - 88,250.00 - - - - 88,250.00
206 Kap To2 Buah - 88,250.00 - - - - 88,250.00
207 Kop Skring Buah - 3,812.50 - - - - 3,810.00
208 Klem Tiang Buah - 10,125.00 - - - - 10,120.00
209 k. Skum 10-8 Buah - 770.83 - - - - 770.00
210 MCB 1.A Buah - 12,625.00 - - - - 12,620.00
211 MCB 2.A Buah - 12,625.00 - - - - 12,620.00
212 MCB 25 A Buah - 12,625.00 - - - - 12,620.00
213 MCB 63 A Buah - 113,500.00 - - - - 113,500.00
214 MCB 40 A Buah - 47,916.67 - - - - 47,910.00
215 MCB 45 A Buah - 47,916.67 - - - - 47,910.00
216 MCB 50 A Buah - 214,200.00 - - - - 214,200.00
217 MCB 10 A Buah - 61,820.00 - - - - 61,820.00
218 MCB 16 A Buah - 31,500.00 - - - - 31,500.00
219 MCB 6 A Buah - 31,500.00 - - - - 31,500.00
220 MCB 2 A Buah - 12,625.00 - - - - 12,620.00
221 MCB 4 A Buah - 31,500.00 - - - - 31,500.00
222 MCB 32 A Buah - 31,500.00 - - - - 31,500.00
223 MCB Box Buah - 3,166.67 - - - - 3,160.00
224 Multi Tester Buah - 56,750.00 - - - - 56,750.00
225 MC Se-3 N Buah - 828,750.00 - - - - 828,750.00
226 Macon Mec gmg-50 aC Buah - 454,083.33 - - - - 454,080.00
227 Magnetic Contactor 100 A Buah - 1,206,600.00 - - - - 1,206,600.00
228 NH Fuse 80 A Buah - 22,729.17 - - - - 22,720.00
229 Ornamen Pijar Buah - 44,145.83 - - - - 44,140.00
230 Ornamen Gantung Buah - 44,145.83 - - - - 44,140.00
231 Obeng Plus Buah - 17,833.33 - - - - 17,830.00
232 Obeng Minus Buah - 17,833.33 - - - - 17,830.00
233 Open Steker Buah - 1,904.17 - - - - 1,900.00
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA HARGA TERMASUK
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp) (Rp) (Rp)

234 On - Off Buah - 5,708.33 - - - - 5,700.00


235 Pat 38 Buah - 47,291.67 - - - - 47,290.00
236 Solar Seal / Photo Seal Buah - 113,500.00 - - - - 113,500.00
237 Opstic 1/2" lengkap klem Batang - 208,250.00 - - - - 208,250.00
238 Pipa Paralon 1/2" Batang - 6,958.33 - - - - 6,950.00
239 Pipa L 1/2" Batang - 1,904.17 - - - - 1,900.00
240 Pipa Paralon 1' Batang - 8,208.33 - - - - 8,200.00
241 Pipa Paralon 3/4" Batang - 7,583.33 - - - - 7,580.00
242 Pipa Paralon 3' Batang - 15,166.67 - - - - 15,160.00
243 Pipa PVC 1,5" Batang - 39,545.00 - - - - 39,540.00
244 Pipa PVC Galvanis 1,5" Batang - 136,360.00 - - - - 136,360.00
245 Pipa Besi Batang - 75,666.67 - - - - 75,660.00
246 Pipa Galvanis Batang - 88,291.67 - - - - 88,290.00
247 Pipa ornamen dia 2" x 2m Batang - 398,666.67 - - - - 398,660.00
248 Pipa ornamen dia 2" x 3m lengkap klem Batang - 517,666.67 - - - - 517,660.00
249 Pipa ornamen dia 2" x 6m lengkap klem Batang - 1,041,250.00 - - - - 1,041,250.00
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA HARGA TERMASUK
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp) (Rp) (Rp)

250 Pipa ornamen dia 2" x 7m lengkap klem Batang - 1,160,250.00 - - - - 1,160,250.00
251 Pondasi tiang lampu oktagonal (11 meter) Unit - 1,309,000.00 - - - - 1,309,000.00
252 Pres Conector Buah - 2,562.50 - - - - 2,560.00
253 Rangka Ring 32 Watt Buah - 12,583.33 - - - - 12,580.00
254 Rel MCB Buah - 18,916.67 - - - - 18,910.00
255 Roset Telpon Buah - 4,458.33 - - - - 4,450.00
256 Saklar Double Buah - 5,711.67 - - - - 5,710.00
257 Saklar Engkel Buah - 3,916.67 - - - - 3,910.00
258 Saklar Tripel Buah - 15,166.67 - - - - 15,160.00
259 Spul Contactor Buah - 50,416.67 - - - - 50,410.00
260 Sekring 63 A Buah - 8,208.33 - - - - 8,200.00
261 Solder Pistol Buah - 277,500.00 - - - - 277,500.00
262 Solder Buah - 18,916.67 - - - - 18,910.00
263 Solar Seal / Photo Seal Buah - 113,500.00 - - - - 113,500.00
264 Stop Kontak Buah - 3,812.50 - - - - 3,810.00
265 Steker Arde Buah - 7,583.33 - - - - 7,580.00
266 Steker T Buah - 8,833.33 - - - - 8,830.00
267 Steker PH Buah - 2,562.50 - - - - 2,560.00
268 Sadel No. 6 Bungkus - 895.83 - - - - 890.00
269 Sadel No. 8 Bungkus - 1,187.50 - - - - 1,180.00
270 Sadel No. 9 Bungkus - 1,312.50 - - - - 1,310.00
271 Sadel No. 10 Bungkus - 3,500.00 - - - - 3,500.00
272 Sadel No. 12 Bungkus - 4,500.00 - - - - 4,500.00
273 Sadel No. 14 Bungkus - 2,562.50 - - - - 2,560.00
274 Sadel No. 19 Bungkus - 3,812.50 - - - - 3,810.00
275 Sadel No. 22 Bungkus - 7,612.50 - - - - 7,610.00
276 Skun RS-16 Buah - 895.83 - - - - 890.00
277 Stater Buah - 2,562.50 - - - - 2,560.00
278 Ston 63 A Buah - 113,529.17 - - - - 113,520.00
279 Stost 40 A + Ip Buah - 47,958.33 - - - - 47,950.00
280 Stost 32 A + Ip Buah - 31,535.00 - - - - 31,530.00
281 Tedus Hitam Buah - 654.17 - - - - 650.00
282 Tali Tester Buah - 18,916.67 - - - - 18,910.00
283 Tang Amper Buah - 819,912.50 - - - - 819,910.00
284 Tang Buaya Buah - 25,229.17 - - - - 25,220.00
285 Tang Potong Buah - 25,229.17 - - - - 25,220.00
286 Tang Kombinasi Buah - 25,229.17 - - - - 25,220.00
287 Tang Jepit Buah - 25,229.17 - - - - 25,220.00
288 Tang Skun Buah - 252,279.17 - - - - 252,270.00
289 Time Swicht Theben Buah - 538,350.00 - - - - 538,350.00
290 Taping Buah - 416,250.00 - - - - 416,250.00
291 Taping Conector 1 baut Buah - 9,725.00 - - - - 9,720.00
292 Taping Conector 2 baut Buah - 15,855.00 - - - - 15,850.00
293 Tespen Buah - 6,291.67 - - - - 6,290.00
294 Timah Solder Buah - 18,916.67 - - - - 18,910.00
295 Terminal 25 ml Buah - 31,541.67 - - - - 31,540.00
296 Tolkit Buah - 56,750.00 - - - - 56,750.00
297 Wedge Klem Buah - 3,812.50 - - - - 3,810.00
298 Wide Klem Buah - 5,840.00 - - - - 5,840.00
299 WD 40 Buah - 31,537.50 - - - - 31,530.00
300 Klem Tiang uk. 5" s/d 8" x 2" Set - 175,000.00 - - - - 175,000.00
-
M. ALAT-ALAT PEMADAM KEBAKARAN -
1 Helm pemadam kebakaran Buah - 573,500.00 - - - - 573,500.00
2 Baju tahan panas Buah - 6,500,000.00 - - - - 6,500,000.00
3 Baret lengkap Buah - 50,000.00 - - - - 50,000.00
4 Celana tahan api Buah - 5,500,000.00 - - - - 5,500,000.00
5 Sepatu pemadam Pasang - 500,000.00 - - - - 500,000.00
6 Sarung tangan Pasang - 333,500.00 - - - - 333,500.00
7 Chainsaw Buah - 8,000,000.00 - - - - 8,000,000.00
8 Dahrem Buah - 60,000.00 - - - - 60,000.00
9 Handy Talky Buah - 2,500,000.00 - - - - 2,500,000.00
10 Tali pengaman Buah - 150,000.00 - - - - 150,000.00
11 Kapak Pemadam Buah - 300,000.00 - - - - 300,000.00
12 Kopel rem Buah - 45,000.00 - - - - 45,000.00
13 Y Connection 1.5" Buah - 4,500,000.00 - - - - 4,500,000.00
14 Y Connection 2.5" Buah - 5,000,000.00 - - - - 5,000,000.00
15 Pilar Hydrant Unit - 4,900,000.00 - - - - 4,900,000.00
16 Nozzle multi spray jet 1.5' Buah - 7,500,000.00 - - - - 7,500,000.00
17 Nozzle multi spray jet 2.5' Buah - 8,000,000.00 - - - - 8,000,000.00
18 Selang pemadan uk. 1.5 " x 20m - - - -
Roll - 2,750,000.00 2,750,000.00
+ Machino Coupling -
19 Selang pemadan uk. 2.5 " x 20m - - - -
Roll - 2,950,000.00 2,950,000.00
+ Machino Coupling -
20 Tac stick (alat pendeteksi kebocoran listrik) Buah - 9,600,000.00 - - - - 9,600,000.00
21 Hydrant tester (alat ukur hydrant) - 8,800,000.00 - - - - 8,800,000.00
22 Tabung pernapasan - - - -
Unit - 16,250,000.00 16,250,000.00
(continued breathing aparatus) -
23 Floating Pump (pompa apung) Unit - 82,916,700.00 - - - - 82,916,700.00
24 Hydrant Pillar Two Way 2,5" Machino Unit - 4,750,000.00 - - - - 4,750,000.00
25 Tabung Apar 3 Kg Unit - 666,666.67 - - - - 666,660.00
26 Tabung Apar 6 Kg Unit - 1,000,000.00 - - - - 1,000,000.00
27 Sepeda Motor 110 cc Unit - 10,000,000.00 - - - - 10,000,000.00
28 Sepeda Motor (Modifikasi) Unit - 15,833,333.33 - - - - 15,833,330.00
29 Repiter Unit - 35,182,250.00 - - - - 35,182,250.00
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA HARGA TERMASUK
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp) (Rp) (Rp)

30 Mesin DF (Daug Feng) Unit - 5,000,000.00 - - - - 5,000,000.00


31 Pump Niagara Unit - 8,666,666.67 - - - - 8,666,660.00

WALIKOTA PONTIANAK

H. SUTARMIDJI, SH, M.Hum


LAMPIRAN 2 : KEPUTUSAN WALIKOTA PONTIANAK
NOMOR : ………………… TAHUN 2010
TANGGAL : ……………-…………2010

TENTANG
DAFTAR HARGA SATUAN TANAMAN HIAS
DI KOTA PONTIANAK TAHUN 2010
Periode : Januari 2010

NO JENIS BAHAN PERTAMANAN UKURAN HARGA HARGA TERMASUK


PAJAK
TINGGI DIAMETER UNIT BAHAN + PAJAK
(cm) (cm) UPAH (Rp.) (Rp.)
1 2 3 4 5 6 7 8

I. RUMPUT (LAWN)
1 Rumput gajah ( Axonopus sp )
a. Tandur 100 Titik/M2 M2 9,450 945 10,395
b. Lempeng, jarak lempeng + 2 cm 25 x 25 cm M2 32,550 3,255 35,805
2 Rumput golf (Tifton grass) Tandur 100 Titik/M2 M2 10,750 1,075 11,825
3 Rumput manila (Zoysia matrela),jrk lempeng 2 cm 25 x 25 cm M2 9,450 945 10,395
4 Rumput manila (Zoysia matrela) Tandur 100 Titik/M2 M2 5,250 525 5,775

II PENUTUP TANAH
1 Anggrek tanah (Sphatoglotis plicata), rumpun 35 - 40 2 btg, 3 anakan Polybag 8,400 840 9,240
2 Bayam merah (Alteanthera ficoidea), rumpun 20 - 25 1 btg/rumpun Polybag 2,100 210 2,310
3 Beludru coklat (Episcia reptans) 7 - 10 Tajuk 10 - 15 Polybag 3,150 315 3,465
4 Beludru Hijau (Episcia reptans) 7 - 10 Tajuk 10 - 15 Polybag 3,150 315 3,465
5 Botan (Centaurea candisina) 25 - 30 1 btg Polybag 4,750 475 5,225
6 Cendrawasih (Phyllantus sp) 15 - 20 Tajuk 20 - 25 Polybag 12,618 1,262 14,600
7 Cocor bebek (Kalanchoe pinnata) 15 - 20 1 btg Polybag 5,250 525 5,775
8 Crossandra 20 - 40 Tajuk 20 - 25 Polybag 11,550 1,155 12,705
9 Dinding ari (Hemigraphis colorata) 7 - 10 3 s/d 4 btg/rpn Polybag 10,500 1,050 11,550
10 Dracaena Tricolor 30 Polybag 18,400 1,840 20,240
11 Gandarusa 15 3 s/d 4 btg/rpn Polybag 3,650 365 4,015
12 Jengger ayam air mancur daun besar 15 - 20 dia. 1 btg Polybag 6,300 630 6,930
13 Jengger ayam air mancur daun kecil 15 - 20 dia. 1 btg Polybag 6,300 630 6,930
14 Jengger ayam a.m. protol besar 20 - 25 dia. Btg 1 cm Polybag 6,300 630 6,930
15 Jengger ayam a.m. protol kecil 20 - 25 dia. Btg 1 cm Polybag 7,350 735 8,085
16 Kembang coklat putih (Zyphyranthes sp) 15 - 20 Tajuk 15 - 20 Polybag 3,450 345 3,795
17 Kembang coklat merah muda (Zyphyranthes sp) 15 - 20 Tajuk 15 - 20 Polybag 3,450 345 3,795
18 Krokot (Althernantera amoenna) 10 5 btg/rpn Polybag 1,050 105 1,155
19 Lili paris bintang (Chlorophytum sp) 10 - 12 1 btg/rpn Polybag 3,450 345 3,795
20 Lili paris kasar (Ophiopogon jaburan) 20 - 25 5 s/d 7 btg/rpn Polybag 5,250 525 5,775
21 Lili paris kasar (Ophiopogon jaburan) 25-35 5 s/d 7 btg/rpn Polybag 11,200 1,120 12,320
22 Lili paris kucai (Chlorophytum sp) 10 3 s/d 5 btg/rpn Polybag 3,650 365 4,015
21 Lili paris umbi (Chlorophytum sp) 10 3 s/d 5 btg/rpn Polybag 3,450 345 3,795
22 Lili paris brazil (Chlorophytum sp) 15 - 20 3 s/d 5 btg/rpn Polybag 4,700 470 5,170
24 Mirten perak (Malphigia sp) 20 - 25 3 s/d 5 btg/rpn Polybag 12,600 1,260 13,860
25 Mirten rebah (Malphigia sp) 10 - 15 Tajuk 10 - 15 Polybag 18,350 1,835 20,185
26 Mirten tegak (Malphigia sp) 30 - 35 3 btg/rpn Polybag 21,000 2,100 23,100
27 Nanas kerang (Rhoeo discolor) 3-5 1 btg Polybag 3,450 345 3,795
28 Nanas merah (Ananas sp) 15-20 Tajuk 20 - 25 Polybag 4,700 470 5,170
28 Nanas merah (Ananas sp) 30-40 Tajuk 20 - 25 Polybag 7,900 790 8,690
29 Seruni rambat (Wedelia trilobata) 10 3 s/d 5 btg/rpn Polybag 12,595 1,260 14,575
30 Sutra bombai banci (Portulacca sp) 7 - 10 3 s/d 5 btg/rpn Polybag 1,550 155 1,705
31 Sutra bombai ungu (Portulacca sp) 7 - 10 3 s/d 5 btg/rpn Polybag 2,600 260 2,860
32 Tagetes (Tagetes erecta) 20 - 25 Tajuk 15 - 20 Polybag 2,500 250 2,750
33 Nanas kerang (Rhoeo discolor) 20 1 btg Polybag 5,250 525 5,775
34 Katis kodok hijau (Sansiviera sp) isi 10 10 10 btg/pot Polybag 4,950 495 5,445
35 Katis kodok kuning (Sansiviera sp) isi 10 10 10 btg/pot Polybag 6,550 655 7,205
NO JENIS BAHAN PERTAMANAN UKURAN HARGA HARGA TERMASUK
PAJAK
TINGGI DIAMETER UNIT BAHAN + PAJAK
(cm) (cm) UPAH (Rp.) (Rp.)
1 2 3 4 5 6 7 8
36 Pedang-pedangan strip kuning (Sansiviera sp) 30 - 35 5 s/d 7 btg/rpn Polybag 6,750 675 7,425
37 Pedang-pedangan strip hijau (Sansiviera sp) 30 - 35 5 s/d 7 btg/rpn Polybag 5,250 525 5,775
38 Pandan Kuning Africa 30 Polybag 10,000 1,000 11,000
39 Pangkas kuning kecil (Duranta repens) 10 3 s/d 5 btg/rpn Polybag 2,000 200 2,438
40 Pangkas kuning sedang (Duranta repens) 15 3 s/d 5 btg/rpn Polybag 3,250 325 3,575
41 Lantana Warna-Warni 15 3 s/d 5 btg/rpn Polybag 6,000 600 6,600
42 Taiwan Beauty bunga ungu (Cuphea sp) 25 Tajuk 15 Polybag 10,500 1,050 11,550
44 Taiwan Beauty bunga ungu (Cuphea sp) 16 Tajuk 15 Polybag 4,000 400 4,400
45 Cover Crop (Kacang-kacangan) 7-10 10 btg / rpn Polybag 1,500 150 1,650

III PERDU
1 Agave putih (Agave sp) 40 dia. Tajuk 30 Polybag 57,750 5,775 63,525
2 Agave biasa (Agave sp) 50 dia. Tajuk 40 Polybag 39,350 3,935 43,285
3 Aglonema (Aglaonema sp) 40 3 btg Polybag 31,500 3,150 34,650
4 Bilawan (Plumbago aphylia) 10 - 15 3 btg Polybag 42,000 4,200 46,200
5 Bougenvil berbunga bentukan penuh 60 dia.Tajuk 60 Polybag 131,250 13,125 144,375
6 Bougenvil hawai (Bougainvillea sp) 60 dia.Tajuk 60 Polybag 157,500 15,750 173,250
7 Bougenvil Biasa 60 dia.Tajuk 60 Polybag 52,500 5,250 57,750
8 Dendron biasa (Phillodendron sp) 15 - 20 1 btg Polybag 21,000 2,100 23,100
9 Dendrose lokal Jkt Merah 20 - 40 dia.Tajuk 10-15 Polybag 18,350 1,835 20,185
10 Balanceng india (Dieffenbachia sp) 30 3 daun/btg Polybag 23,600 2,360 25,960
11 Dracena tricolor (Dracena sp) 30 dia. Tajuk 30 Polybag 15,750 1,575 17,325
12 Kacapiring (Gardenia sp) 50 dia. Tajuk 30 Polybag 13,150 1,315 14,465
13 Pisang-pisangan (Heliconia sp) bunga
kuning / merah 50 2 s/d 3 btg/rpn Polybag 5,250 525 5,775
14 Spatiphylum lokal (Spatiphylum sp) 15 - 20 3 bth/pot Polybag 11,550 1,155 12,705
15 Spatiphylum luar (Spatiphylum sp) 15 - 20 3 btg Polybag 26,250 2,625 28,875
16 Beringin putih kecil (Ficus hybrida) ex Jkt 30 diaTajuk 15 -20 Polybag 152,250 15,225 167,475
17 Kamboja jepang (Adenium cutanium) bercabang 30 dia.Tajuk 15-20 Polybag 28,850 2,885 31,735
18 Kamboja putih 100 dia. Btg 3 Polybag 105,000 10,500 115,500
19 Kamboja rantai 100 dia. Btg 3 Polybag 90,000 9,000 99,000
20 Kana (Canna hibrida) 40 2 s/d 3 btg/rpn Polybag 10,500 1,050 11,550
21 Kastuba (Euphorbia pulcherima) 25 - 30 dia. Tajuk 30 Polybag 36,750 3,675 40,425
22 Kembang sepatu putih (Hibiscus mutabilis) 30 1 btg/pot Polybag 28,900 2,890 31,790
23 Lusiana 50 - 75 dia. Btg 1,5 Polybag 23,650 2,365 26,015
24 Mawar putih (Rosa Hybrida) 25 dia.Tajuk15 -20 Polybag 5,250 525 5,775
25 Mawar merah (Rosa Hybrida) 30 dia.Tajuk 15-20 Polybag 5,250 525 5,775
26 Melati costa (Jasminum sp) 50 2 anakan/rpn Polybag 23,650 2,365 26,015
27 Melati Gambir (Jasminum sp) 50 2 anakan/rpn Polybag 23,650 2,365 26,015
28 Melati Malaysia Polybag 23,650 2,365 26,015
29 Oleander (Nerium indicum) 30 1 rpn Polybag 11,550 1,155 12,705
30 Pepayungan (Cyperus altemifolius) 60 5 anakan/pot Polybag 8,950 895 9,845
31 Pandan hijau jepang (Pandanus sp) 50 1 rpn Polybag 36,750 3,675 40,425
32 Pandan kuning afrika 50 1 rpn Polybag 39,400 3,940 43,340
33 Pangkas Hijau 10 3 s/d 5 btg/rpn Polybag 1,600 160 1,760
33 Pangkas Hijau 20-40 3 s/d 5 btg/rpn Polybag 2,350 235 2,585
34 Variegata Polybag 15,750 1,575 17,325
34 Sambang darah 50 dia. Tajuk 30 Polybag 42,000 4,200 46,200
35 Siklok Polybag 97,150 9,715 106,865
36 Wali songo daun kecil (Scheffera sp) 50 1 btg/pot Polybag 21,000 2,100 23,100
37 Soka bangkok (Ixora sp) 20 1 btg/pot Polybag 6,850 685 7,535
38 Soka jepang bunga orange (Ixora sp) 20 1 btg/pot Polybag 4,200 420 4,620
39 Soka philipina (Ixora sp) 20 1 btg/pot Polybag 4,200 420 4,620
40 Soka siantan (Ixora tricia) 20 1 btg/pot Polybag 4,200 420 4,620
NO JENIS BAHAN PERTAMANAN UKURAN HARGA HARGA TERMASUK
PAJAK
TINGGI DIAMETER UNIT BAHAN + PAJAK
(cm) (cm) UPAH (Rp.) (Rp.)
1 2 3 4 5 6 7 8
41 Soka singapura (Ixora cocineae) bunga
putih, pink 30 1 btg/pot Polybag 4,200 420 4,620
42 Soka jawa/hawai (Ixora sp) 30 1 btg/pot Polybag 5,250 525 5,775
43 Terang bulan daun putih/kuning (Thitonia sp) 20 3 s/d 5 btg/rpn Polybag 6,300 630 6,930
44 Tombak raja (Yucca gloriosa) 40 3 s/d 5 btg/rpn Polybag 55,150 5,515 60,665
45 Tapak dara 10 - 15 3 s/d 5 btg/rpn Polybag 3,700 370 4,070
46 Pangkas Hijau 3-5 3 s/d 5 btg/rpn Polybag 1,600 160 1,760
47 Pangkas Hijau 20 4 s/d 7 btg/rpn Polybag 2,650 265 2,915
48 Bayam Merah 10 - 15 3 s/d 5 btg/rpn Polybag 2,100 210 2,310
49 Soka Merah 20 1 btg/pot Polybag 6,850 685 7,535
50 Bawang-bawangan 15-20 f5 s/d 7 btg/rpn Polybag 5,300 530 5,830
51 Bawang-bawangan 20-25 f5 s/d 7 btg/rpn Polybag 6,300 630 6,930
52 Veberia Polybag 7,900 790 8,690
53 Vinolia 20-30 5 s/d 10btg/rpn Polybag 6,300 630 6,930
54 Vinolia 10-15 2 s/d 4 btg/rpn Polybag 6,050 605 6,655
55 Vinolia 35-40 12sd 20 btg/rpn Polybag 6,850 685 7,535
56 Variegata Polybag 15,750 1,575 17,325
57 Aires Polybag 5,200 520 5,720
58 Ketela Merah 10 1sd 2 btg/rpn Polybag 3,850 385 4,235
59 Kana Presiden 15 - 20 1sd 2 btg/rpn Polybag 5,250 525 5,775

IV TANAMAN PAGAR -
1 Kedondong laut (Nothopanax sp) 30-65 3 s/d 4 btg/rpn Polybag 6,300 630 6,930
2 Kedondong laut (Nothopanax sp) 60 - 75 3 s/d 4 btg/rpn Polybag 9,200 920 10,120
3 Kemuning (Murraya paniculata) 75 1 btg/rpn Polybag 36,750 3,675 40,425
4 Lantana pagar (Lantana camara) 30 1rpn Polybag 18,350 1,835 20,185
5 Mangkokan (Nothopanax sp) 50 3 s/d 4 btg/rpn Polybag 15,750 1,575 17,325
6 Mirten pagar (Malphigia sp) 50 3 s/d 4 btg/rpn Polybag 15,750 1,575 17,325
7 The-tehan tinggi (Durantha repens) 30 3 s/d 4 btg/rpn Polybag 14,200 1,420 15,620
8 The-tehan tinggi (Durantha repens) 50 3 s/d 4 btg/rpn Polybag 24,680 2,468 27,148
9 The-tehan tinggi (Durantha repens) 70 3 s/d 4 btg/rpn Polybag 31,500 3,150 34,650
10 Krokot 15 Polybag 1,050 105 1,155

V TANAMAN MERAMBAT
1 Air mata pengantin ( Antigonon leptapus) 30 dia. Tajuk 430 Polybag 4,200 420 4,620
2 Air mata pengantin ( Antigonon leptapus) 50 dia. Tajuk 40 Polybag 49,900 4,990 54,890
2 Alamanda (Alamanda cathartica) 30 dia. Tajuk 20 Polybag 13,150 1,315 14,465
3 Alamanda (Alamanda cathartica) 50 dia. Tajuk 40 Polybag 15,750 1,575 17,325
4 Arabidea (Arabidea sp) 40 dia. Tajuk 30 Polybag 52,500 5,250 57,750
5 Flame of irian (Orange) 40 dia. Tajuk 30 Polybag 36,750 3,675 40,425
6 Kembang kelinci (Ipomea sp) 40 dia. Tajuk 30 Polybag 42,000 4,200 46,200
7 Kembang sungsang (Gloriosa superba) 30 dia. Tajuk 20 Polybag 42,000 4,200 46,200
8 Lantana rambut ungu (Lantana sp) 20 3 s/d 4 btg/rpn Polybag 78,900 7,890 86,790
9 Pasiflora 60 dia. Tajuk 40 Polybag 21,000 2,100 23,100
10 Sirih Gading daun strip kuning (Scindapsus sp) 30 3 s/d 4 btg/rpn Polybag 10,500 1,050 11,550
11 Sthephanot bunga putih
(Sthepanothis floribunda) 30 dia. Tajuk 40 Polybag 31,500 3,150 34,650
12 Nona Makan Sirih 30 Polybag 15,750 1,575 17,325
13 Ubi rambat Kuning 30 Polybag 2,650 265 2,915

VI TANAMAN HIAS
1 Anjuang hijau (Dracaena sp) 60 dia. Tajuk 40 Polybag 10,500 1,050 11,550
2 Anjuang kribo (Dracaerna sp) 60 dia. Tajuk 40 Polybag 11,550 1,155 12,705
3 Anjuang kuning (Dracaerna sp) 60 dia. Tajuk 40 Polybag 13,150 1,315 14,465
NO JENIS BAHAN PERTAMANAN UKURAN HARGA HARGA TERMASUK
PAJAK
TINGGI DIAMETER UNIT BAHAN + PAJAK
(cm) (cm) UPAH (Rp.) (Rp.)
1 2 3 4 5 6 7 8
4 Anjuang merah (Cordelyne terminalis) 40 dia. Tajuk 20 Polybag 8,400 840 9,240
5 Anjuang merah (Cordelyne terminalis) 60 dia. Tajuk 40 Polybag 11,550 1,155 12,705
6 Anjuang merah (Cordelyne terminalis) 80 dia. Tajuk 50 Polybag 15,750 1,575 17,325
7 Anjuang suji (Dracaena sp) 60 dia. Tajuk 40 Polybag 14,200 1,420 15,620
8 Azalea (Azalea sp) 50 dia. Tajuk 40 Polybag 26,250 2,625 28,875
9 Bakung kecil (Hymenochalys sp) 20 dia. Tajuk 40 Polybag 5,800 580 6,380
10 Beringin bonsai (Ficus benjamina) 100 - 200 dia. Tajuk 100 Polybag 225,000 22,500 247,500
11 Beringin bonsai bentukan (Ficus benjamina) 100 - 200 dia. Tajuk 100 Polybag 393,750 39,375 433,125
12 Beringin bonsai putih (Ficus benjamina) 250 dia. Tajuk 100 Polybag 1,050,000 105,000 1,155,000
13 Bonsai serut 151 - 200 dia. Tajuk 100 Polybag 2,625,000 262,500 2,887,500
14 Nusa indah merah/putih (Nussaenda sp) 50 dia. Tajuk 40 Polybag 21,000 2,100 23,100
15 Rambusa 50 Polybag 31,500 3,150 34,650
16 Pakis kelabang kuning (Neprolephis sp) 40 5 s/d 7 btg/rpn Polybag 10,500 1,050 11,550
17 Pakis krol (Neprolephis sp) 40 5 s/d 7 btg/rpn Polybag 13,200 1,320 14,520
18 Pakis monyet (Alsophila glauca) 150 - 200 dia. Tajuk 40 Polybag 210,000 21,000 231,000
19 Pisang kipas (Ravanela madagaskariensis) 200 - 250 dia. Btg 10 Polybag 498,750 49,875 548,625
20 Puring bor (Codiaeum sp) 75 dia. Tajuk 30 Polybag 21,000 2,100 23,100
21 Puring buntut (Codiaeum sp) 75 dia. Tajuk 30 Polybag 21,000 2,100 23,100
22 Puring gelatik (Codiaeum sp) 75 dia. Tajuk 30 Polybag 21,000 2,100 23,100
23 Puring jet (Codiaeum sp) 40 dia. Tajuk 20 Polybag 15,250 1,525 16,775
24 Puring jet (Codiaeum sp) 75 dia. Tajuk 30 Polybag 31,500 3,150 34,650
25 Puring ketapang (Codiaeum sp) 50 dia. Tajuk 30 Polybag 21,000 2,100 23,100
26 Puring nuri (Codiaeum sp) 60 dia. Tajuk 30 Polybag 21,000 2,100 23,100
27 Puring Kuning 20 dia. Tajuk 30 Polybag 7,900 790 8,690
28 Siklok dia. Btg 5 Polybag 105,000 10,500 115,500
29 Sikas/Pakis haji halus (Cycas revoluta) 80 dia. Btg 7,5 Polybag 945,000 94,500 1,039,500
30 Sikas diameter tajuk daun (Cycas sp) 100 dia. Btg 10 Polybag 1,050,000 105,000 1,155,000
31 Sikas medan (Cycas sp) 100 dia. Btg 10 Polybag 1,417,500 141,750 1,559,250
32 Sikas/pakis haji kasar (Cycas rumpi) 50 - 100 dia. Btg 7,5 Polybag 131,250 13,125 144,375
33 Kamboja kuning (Bali) tinggi (Plumeria sp) 150 - 200 dia. Btg 3 Polybag 420,000 42,000 462,000
34 Kamboja orange tinggi (Plumeria sp) 150 - 200 dia. Btg 3 Polybag 315,000 31,500 346,500
35 Lidah Buaya Besar 10-25 2-3 btg/pot Polybag 42,000 4,200 46,200
36 Lidah Buaya Kecil 50 5-7 btg/pot Polybag 15,750 1,575 17,325

VII PALEM -
1 Kelapa gading (Cocos capitata) 200 - 250 dia. Btg 20 Phn 495,000 49,500 544,500
2 Kelapa sawit (Elais guineensis) 200 - 250 dia. Btg 40 Phn 495,000 49,500 544,500
3 Kelapa sayur (Cocos nucifera) 200 - 250 dia. btg 30 Phn 192,500 19,250 211,750
4 Kurma (Phoenix daetilifera) 100 dia. btg 30 Phn 440,000 44,000 484,000
5 Kurma (Phoenix daetilifera) >200 dia. Btg 40 Phn 3,850,000 385,000 4,235,000
6 Lontar (Borassus flabefiter) 300 dia. Btg 25 Phn 440,000 44,000 484,000
7 Palm anggur (Lalania loglgessu) 100 dia. Btg 15 Phn 165,000 16,500 181,500
8 Palm alexander 150 dia. Btg 10 Phn 137,500 13,750 151,250
9 Palm botol 150 - 200 dia. btg 30 Phn 330,000 33,000 363,000
10 Palm camedoria 100 3 s/d 5 btg/rpn Phn 121,000 12,100 133,100
11 Palm camedoria 200 3 s/d 5 btg/rpn Phn 330,000 33,000 363,000
12 Palm ekor tupai 50-75 Phn 49,500 4,950 54,450
13 Palm ekor tupai 200 dia. Btg 15 Phn 247,500 24,750 272,250
14 Palm jepang (Ptychosperma macarthurii) 100 - 150 5 s/d 7 btg/rpn Rmp 121,000 12,100 133,100
15 Palm jepang (Ptychosperma macarthurii) 150 - 250 5 s/d 7 btg/rpn Rmp 275,000 27,500 302,500
16 Palm kol (Licuala grandis) 100 dia. Btg 10 Phn 72,500 7,250 79,750
18 Palm kuning (Chrysalidocarpus lutescens) 50 - 100 3 s/d 5 btg/rpn Phn 46,750 4,675 51,425
19 Palm kuning (Chrysalidocarpus lutescens) 100 - 150 5 s/d 7 btg/rpn Rmp 137,500 13,750 151,250
20 Palm korembusa 50 dia. Btg 5 Phn 44,000 4,400 48,400
NO JENIS BAHAN PERTAMANAN UKURAN HARGA HARGA TERMASUK
PAJAK
TINGGI DIAMETER UNIT BAHAN + PAJAK
(cm) (cm) UPAH (Rp.) (Rp.)
1 2 3 4 5 6 7 8
21 Palm korembusa 100 dia. Btg 7 Phn 66,000 6,600 72,600
22 Palm korembusa >200 dia. Btg 10 Phn 77,000 7,700 84,700
23 Palm merah (Cyrtotachis lakka) 150 - 200 3 s/d 5 btg/rpn Phn 357,500 35,750 393,250
24 Palm merah (Cyrtotachis lakka) 300 - 350 5 s/d 7 btg/rpn Rmp 357,500 35,750 393,250
25 Palm phoeniks (Phoenix sp) 75 - 100 dia. Btg 8 Phn 192,500 19,250 211,750
26 Palm phoeniks (Phoenix sp) 150 - 200 dia. Btg 10 Phn 412,500 41,250 453,750
26 Palm putri 50 Phn 49,500 4,950 54,450
27 Palm putri 100-150 dia. Btg 10 Phn 154,000 15,400 169,400
28 Palm putri 150 - 200 dia. Btg 10 Phn 330,000 33,000 363,000
29 Palm pigni (Phoenix canariensis) 100 - 150 dia. Btg 10 Phn 8,800,000 880,000 9,680,000
30 Palm raja (Oredoxa regia) 100 - 200 dia. Btg 20 Phn 165,000 16,500 181,500
31 Palm raja (Super oredoxa regia) 200 - 300 dia. Btg 25 Phn 467,500 46,750 514,250
32 Palm ratu 100 - 150 dia. Btg 10 Phn 88,000 8,800 96,800
33 Palm sadeng (Livistonia rotundifolta) 50 dia. Btg 5 Phn 68,750 6,875 75,625
34 Palm saderi (Caroutamiti) 150 dia. Btg 8 Phn 77,000 7,700 84,700
35 Palm seledri tunggal tinggi 150 dia. Btg 8 Phn 165,000 16,500 181,500
36 Palm seledri tunggal putih 200 dia. Btg 8 Phn 440,000 44,000 484,000
37 Palm udang 50 3 s/d 5 btg/rpn Phn 38,500 3,850 42,350
38 Palm waregu (Rhapis excelsa) 150 5 s/d 7 btg/rpn Rmp 55,000 5,500 60,500
39 Pinang sirih (Areca catechu) 200 dia. Btg 10 Phn 275,000 27,500 302,500

VIII BAMBU DAN CEMARA


1 Bambu china (Bambussa vulgaris) 50 5 s/d 7 btg/rpn Dpr 49,500 4,950 54,450
2 Bambu daging (Bambussa venticossa) 150 5 s/d 7 btg/rpn Dpr 42,500 4,250 46,750
3 Bambu jepang (Phyliastachis aurea) 200 5 s/d 7 btg/rpn Dpr 74,250 7,425 81,675
4 Bambu kuning (Bambussa vulgaris) 150 5 s/d 7 btg/rpn Dpr 258,500 25,850 284,350
5 Cemara angin (Casuarina avisatifollia) 200 dia. Btg 4 Phn 220,000 22,000 242,000
6 Cemara gembel (Cupressus papuana) 150 dia. Btg 4 Phn 55,000 5,500 60,500
7 Cemara halus (Araucaria cuninghamii) 150 dia. Btg 4 Phn 82,500 8,250 90,750
8 Cemara kipas 100 - 150 dia. Btg 4 Phn 165,000 16,500 181,500
9 Cemara kuning daun emas (Cupressus sp) 150 dia. Btg 4 Phn 605,000 60,500 665,500
10 Cemara lilin 100 dia. Btg 3 Phn 57,750 5,775 63,525
11 Cemara laut (Casuarina aquasetifolia) 150 dia. Btg 4 Phn 165,000 16,500 181,500
12 Cemara natal (Cupressus sp) 75 dia.tajuk 50 Phn 68,750 6,875 75,625
13 Cemara norfolk (Araucaria sp) 75 dia.tajuk 50 Phn 68,750 6,875 75,625
14 Cemara norfolk (Araucaria sp) 100 - 150 dia.tajuk 60 Phn 165,000 16,500 181,500
15 Cemara norfolk (Araucaria sp) 400 - 500 dia.tajuk 200 Phn 1,375,000 137,500 1,512,500
16 Cemara pipa mas (Compressus sp) 75 dia.tajuk 40 Phn 82,500 8,250 90,750
17 Cemara tiang 100 - 140 dia. Btg 3 Phn 85,250 8,525 93,775
18 Pinus (Pinus merkusii) 200 dia. Btg 4 Phn 302,500 30,250 332,750
19 Pinus (Pinus merkusii) 300 dia. Btg 5 Phn 440,000 44,000 484,000

IX TANAMAN PEMIKAT BURUNG -


1 Aren (Arenga catecu) 100 dia. Btg 3 Phn 302,500 30,250 332,750
2 Belimbing (Averhoa carambola) 75 dia. Btg 3 Phn 63,250 6,325 69,575
3 Bintaro 50 dia. Btg 3 Phn 22,000 2,200 24,200
4 Bintaro 100 dia. Btg 3 Phn 44,000 4,400 48,400
5 Bintaro 150 dia. Btg 4 Phn 77,000 7,700 84,700
6 Buni (Atidesmabunius) 200 - 300 dia. Btg 5 Phn 88,000 8,800 96,800
7 Buni (Atidesmabunius) 400 - 500 dia. Btg 10 Phn 275,000 27,500 302,500
8 Cermai 50-100 dia. Btg 5 Phn 38,500 3,850 42,350
9 Duku condet (Lansium domisticum) 100 dia. Btg 3 Phn 82,500 8,250 90,750
10 Durian (Durio zibenthinus) 150 dia. Btg 4 Phn 192,500 19,250 211,750
11 Gatet 200 - 300 dia. Btg 5 Phn 99,000 9,900 108,900
NO JENIS BAHAN PERTAMANAN UKURAN HARGA HARGA TERMASUK
PAJAK
TINGGI DIAMETER UNIT BAHAN + PAJAK
(cm) (cm) UPAH (Rp.) (Rp.)
1 2 3 4 5 6 7 8
12 Gowok (Eugenia polychephalum) 100 dia. Btg 3 Phn 44,000 4,400 48,400
13 Jambu air (Eugenia aquea) 100-150 dia. Btg 5 Phn 67,950 6,795 74,745
14 Jambu air (Eugenia aquea) 200-300 dia. Btg 10 Phn 330,000 33,000 363,000
15 Jambu bol (Eugenia malaccensis) 100 dia. Btg 3 Phn 192,500 19,250 211,750
16 Jambu mawar (Eugenia jambos) 100 dia. Btg 3 Phn 55,000 5,500 60,500
17 Kaliandra (Caliandra callothyrsus) 100 dia. Btg 3 Phn 44,000 4,400 48,400
18 Kantil (Michelia champaca) 100 dia. Btg 3 Phn 71,500 7,150 78,650
19 Kapilayu 100 dia. Btg 3 Phn 44,000 4,400 48,400
20 Kawista 200 - 300 dia. Btg 5 Phn 99,000 9,900 108,900
21 Kecapi (Sandoricum koetjape) 150 dia. Btg 4 Phn 341,000 34,100 375,100
22 Kecubung 100 dia. Btg 3 Phn 77,000 7,700 84,700
23 Kedondong (Spondias pinnata) 150 - 200 dia. Btg 4 Phn 165,000 16,500 181,500
24 Kemang (Baccaurea dulcis) 100 - 150 dia. Btg 3 Phn 33,000 3,300 36,300
25 Kenanga (Cananga odorata) 50 dia. Btg 3 Phn 52,250 5,225 57,475
26 Kepel (Stelechocarpus burahol) 100 dia. Btg 3 Phn 38,500 3,850 42,350
27 Kersen/serry 150 dia. Btg 4 Phn 132,000 13,200 145,200
28 Kesah 150 dia. Btg 4 Phn 88,000 8,800 96,800
29 Ketapang (Terminalia cattapa) 150 dia. Btg 4 Phn 137,500 13,750 151,250
30 Kelengkeng 100 dia. Btg 3 Phn 164,340 16,434 180,774
31 Kluwih 150 - 200 dia. Btg 4 Phn 27,500 2,750 30,250
32 Kosambi 100 dia. Btg 3 Phn 16,500 1,650 18,150
33 Lobi-lobi (Flacourtia inermis) 150 dia. Btg 4 Phn 38,500 3,850 42,350
34 Melinjo (Gnetum gnemon) 200 dia. Btg 4 Phn 110,000 11,000 121,000
35 Menteng (Baccaurea dulcis) 200 dia. Btg 4 Phn 99,000 9,900 108,900
36 Mindi 100 dia. Btg 3 Phn 38,500 3,850 42,350
37 Nam-nam 200 dia. Btg 5 Phn 93,500 9,350 102,850
38 Nangka (Artocarpus heterophyllus) 100 dia. Btg 3 Phn 121,000 12,100 133,100
39 Pala 200 - 300 dia. Btg 5 Phn 170,500 17,050 187,550
40 Petai 200 - 300 dia. Btg 5 Phn 165,000 16,500 181,500
41 Rambutan 50 dia. Btg 3 Phn 22,000 2,200 24,200
42 Rukem 100 dia. Btg 3 Phn 33,000 3,300 36,300
43 Sirsak 50-100 dia. Btg 5 Phn 38,500 3,850 42,350
44 Sawo kecik (Manilkara kauki) 100 dia. Btg 4 Phn 66,000 6,600 72,600
45 Sawo kecik (Manilkara kauki) 200 dia. Btg 4 Phn 220,000 22,000 242,000
46 Serikaya 50 dia. Btg 3 Phn 66,000 6,600 72,600
47 Yangliu 150 - 200 dia. Btg 4 Phn 165,000 16,500 181,500
48 Maja 200 dia. Btg 5 Phn 99,000 9,900 108,900

X BUNGA POTONG
1 Amarilis (Amarylidaceae) 1 Tangkai 17,050 1,705 18,755
2 Anggrek macan (Arrachnis sp) 1 Tangkai 262,500 26,250 288,750
3 Anyelir 1 Tangkai 13,150 1,315 14,465
4 Apple blossom 1 Tangkai 10,500 1,050 11,550
5 Aster (Asteraceae sp) 1 Tangkai 14,450 1,445 15,895
6 Anggrek Dendrobium 1 Tangkai 65,650 6,565 72,215
7 Gladiol 1 Tangkai 13,150 1,315 14,465
8 Golden shower 1 Tangkai 52,500 5,250 57,750
9 Krisan (Chrysanthemum llini) 1 Tangkai 15,750 1,575 17,325
10 Mawar 1 Tangkai 5,250 525 5,775

XI TANAMAN TEDUH (INDOOR PLANT)


1 Anggrek bulan 40 -50 3 s/d 5 btg/rpn Polybag 105,000 10,500 115,500
2 Anggrek cathalea 40 -50 3 s/d 5 btg/rpn Polybag 78,750 7,875 86,625
3 Anggrek douglas kecil 40 -50 3 s/d 5 btg/rpn Polybag 24,700 2,470 27,170
NO JENIS BAHAN PERTAMANAN UKURAN HARGA HARGA TERMASUK
PAJAK
TINGGI DIAMETER UNIT BAHAN + PAJAK
(cm) (cm) UPAH (Rp.) (Rp.)
1 2 3 4 5 6 7 8
4 Apple blossom 30 - 40 Polybag 52,500 5,250 57,750
5 Asparagus 30 - 40 dia. Tajuk 20 Polybag 21,000 2,100 23,100
6 Begonia daun besar 40 -50 dia. Tajuk 20 Polybag 23,625 2,363 25,988
7 Begonia daun Kecil 40 -50 dia. Tajuk 20 Polybag 23,625 2,363 25,988
8 Begonia Hijau 40-50 dia. Tajuk 20 Polybag 23,625 2,363 25,988
9 Begonia perak 40 -50 dia. Tajuk 20 Polybag 22,050 2,205 24,255
10 Belanceng bintik 40 -50 4 s/d 5 dn/pot Polybag 157,500 15,750 173,250
11 Belanceng putih 40 -50 4 s/d 5 dn/pot Polybag 21,000 2,100 23,100
12 Golden shower 50 dia. Tajuk 20 Polybag 42,000 4,200 46,200
13 Gandasari 30 - 40 dia. Tajuk 15 Polybag 21,000 2,100 23,100
14 Hortensia 30 - 40 dia. Tajuk 30 Polybag 31,500 3,150 34,650
15 Kembang kancing 30 - 40 dia. Tajuk 20 Polybag 10,500 1,050 11,550
16 Kencuran 30 - 40 dia. Tajuk 20 Polybag 10,500 1,050 11,550
17 Krisdoren 30 - 40 dia. Tajuk 15 Polybag 15,750 1,575 17,325
18 Kuping gajah 30 - 40 4 s/d 5 dn/pot Polybag 36,750 3,675 40,425
19 Kuping keledai 30 - 40 4 s/d 5 dn/pot Polybag 47,250 4,725 51,975
20 Maranta macan 30 - 40 dia. Tajuk 25 Polybag 23,650 2,365 26,015
21 Maranta batik 30 - 40 dia. Tajuk 25 Polybag 21,000 2,100 23,100
22 Maranta buntut ayam 30 - 40 dia. Tajuk 25 Polybag 26,250 2,625 28,875
23 Maranta keris 30 - 40 dia. Tajuk 25 Polybag 21,000 2,100 23,100
24 Maranta sepat 30 - 40 dia. Tajuk 25 Polybag 21,000 2,100 23,100
25 Meranti bintik 40 -50 dia. Tajuk 20 Polybag 21,000 2,100 23,100
26 Meranti kol 40 -50 dia. Tajuk 20 Polybag 21,000 2,100 23,100
27 Meranti mas koki 40 -50 dia. Tajuk 20 Polybag 21,000 2,100 23,100
28 Meranti pisang 40 -50 dia. Tajuk 20 Polybag 21,000 2,100 23,100
29 Monstera 50 - 75 4 s/d 5 dn/pot Polybag 10,500 1,050 11,550
30 Mutiara 40 -50 dia. Tajuk 20 Polybag 5,250 525 5,775
31 Pacing 40 -50 dia. Tajuk 20 Polybag 5,250 525 5,775
32 Dona Carmen 40-50 Polybag 39,375 3,938 43,313
33 Sisik Naga 30-40 Polybag 52,500 5,250 57,750
34 Palesota 20-30 Polybag 57,750 5,775 63,525
35 Diefenbachia 30-40 Polybag 78,750 7,875 86,625
36 Chiangmai 20-30 Polybag 42,000 4,200 46,200
37 Chiangmai balon 20-30 Polybag 91,875 9,188 101,063
38 Pilodendron dia. Tajuk 15 Polybag 7,900 790 8,690
39 Sabrina ungu 20 - 30 dia. Tajuk 15 Polybag 5,250 525 5,775
40 Bambu China 20-30 dia. Tajuk 20 Polybag 15,750 1,575 17,325
41 Sirih Gading 40 -50 dia. Tajuk 20 Polybag 15,750 1,575 17,325
42 Sri rejeki 30 - 40 4 s/d 5 dn/pot Polybag 21,000 2,100 23,100
43 Supelir foster kasar 30 - 40 dia. Tajuk 15 Polybag 26,250 2,625 28,875
44 Supelir halus 30 - 40 dia. Tajuk 15 Polybag 26,250 2,625 28,875
45 Tanduk rusa 40 -50 dia. Tajuk 20 Polybag 42,000 4,200 46,200
46 Walisongo biasa 50 - 100 dia. Btg 2 Polybag 42,000 4,200 46,200
47 Walisongo kuning 100 - 150 dia. Btg 3 Polybag 131,250 13,125 144,375
XII POHON PENEDUH
1 Angsana (Pterocarpus indicus) 100 - 200 dia. Btg 3 Phn 100,000 10,000 110,000
2 Asem Keranji (Pithecelluobium dulce) 150 - 200 dia.Btg 2,5s/d 4 Phn 324,500 32,450 356,950
3 Asem (Tamarindus indica) 150 - 200 dia.Btg 2,5s/d 4 Phn 143,000 14,300 157,300
4 Biola cantik 10 - 25 Phn 35,750 3,575 39,325
5 Bumi 10 - 25 Phn 10,000 1,000 11,000
6 Batavia 100 dia. Btg 5 Phn 71,500 7,150 78,650
7 Beringin (Ficus benjamina) 150 - 200 dia.Btg 2,5s/d 4 Phn 393,250 39,325 432,575
8 Beringin (Ficus benjamina) 200 - 300 dia. Btg 4 s/d 5 Phn 572,000 57,200 629,200
9 Beringin putih 200 dia. Btg 3,5 Phn 1,430,000 143,000 1,573,000
NO JENIS BAHAN PERTAMANAN UKURAN HARGA HARGA TERMASUK
PAJAK
TINGGI DIAMETER UNIT BAHAN + PAJAK
(cm) (cm) UPAH (Rp.) (Rp.)
1 2 3 4 5 6 7 8
10 Biola cantik (Ficus pandurata) 150 - 250 dia.Btg 2,5s/d 4 Phn 286,000 28,600 314,600
11 Bisbul (Diospyros discolor) 100 - 200 dia. Btg 3 Phn 28,600 2,860 31,460
12 Bunga kupu-kupu (Bauhunia purpurea) 400 - 500 dia.Btg 8s/d 10 Phn 429,000 42,900 471,900
13 Bunga saputangan(Amherstia nobilis) 0,50-100 dia. Btg 2 Phn 154,200 15,420 169,620
14 Bunga saputangan(Amherstia nobilis) 250-300 dia. Btg 3,5 Phn 171,600 17,160 188,760
16 Bungur (Lagerstromea loudonii) 50-100 Phn 71,500 7,150 78,650
17 Bungur (Lagerstromea loudonii) 100-150 dia. Btg 3,5 Phn 180,750 18,075 198,825
18 Bungur (Lagerstromea loudonii) 150 - 250 dia. Btg 3,5 Phn 214,500 21,450 235,950
19 Cassia golden 50-100 dia. Btg 3 Phn 57,500 5,750 63,250
20 Cassia golden 150-175 dia. Btg 3 Phn 57,600 5,760 57,800
21 Cassia golden 150-200 dia. Btg 3 Phn 78,650 7,865 86,515
22 Cassia sp 200 - 300 dia. Btg 4 s/d 5 Phn 85,800 8,580 94,380
23 Cempaka kuning (Michelia champaca) 300 - 400 dia. Btg 5 s/d 8 Phn 128,700 12,870 141,570
24 Ceremai 400 - 500 dia.Btg 8 s.d 10 Phn 321,750 32,175 353,925
25 Dadap hutan (Erythrina sp) 300 - 400 dia. Btg 5 s/d 8 Phn 250,250 25,025 275,275
26 Dadap kuning (Erythrina veriegata sp) 300 - 400 dia. Btg 5 s/d 8 Phn 286,000 28,600 314,600
27 Dadap kuning (Erythrina veriegata sp) 100 - 200 dia. Btg 5 s/d 8 Phn 143,000 14,300 157,300
28 Dadap merah (Erythrina christagali 150 - 200 dia. Btg 3,5 Phn 250,250 25,025 275,275
29 Dadap merah (Erythrina christagali 300 - 400 dia. Btg 5 s/d 8 Phn 572,000 57,200 629,200
30 Sungkai 50 - 100 Phn 67,100 6,710 73,810
31 Sungkai 150 Phn 357,500 35,750 393,250
31 Damar (Agathis alba) 500 - 700 dia. Btg > 10 Phn 643,500 64,350 707,850
32 Flamboyan (Delonix regia) 150 dia. Btg 2,5 Phn 143,000 14,300 157,300
33 Gemelina 300 dia. Btg 5 Phn 128,700 12,870 141,570
34 Glauka 100 - 150 dia. Btg 3 Phn 50,000 5,000 55,000
33 Glodogan 10 - 25 Phn 7,150 715 7,865
34 Glodogan (Polyalthea longifolia) 100-150 dia. Btg 3,5 Phn 151,250 15,125 166,375
35 Glodogan (Polyalthea longifolia) 150 - 200 dia. Btg 3,5 Phn 178,750 17,875 196,625
36 Glodogan (Polyalthea longifolia) 200 - 300 dia. Btg 4 s/d 5 Phn 286,000 28,600 314,600
37 Glodogan tiang (Sarracca sp) 50 Phn 14,300 1,430 15,730
38 Glodogan tiang (Sarracca sp) 150 - 300 dia. Btg 4 Phn 178,750 17,875 196,625
39 Glodogan tiang (Sarracca sp) 400 - 500 dia.Btg 8 s.d 10 Phn 321,750 32,175 353,925
40 Jatimas 200 - 300 dia. Btg 4 s/d 5 Phn 286,000 28,600 314,600
41 Jakaranda (Jacaranda acutifolia) 150 - 200 dia. Btg 3,5 Phn 50,000 5,000 55,000
42 Johar (Cassia siamea) 150 dia. Btg 3 Phn 107,250 10,725 117,975
43 Kamboja putih ( Plumeria rubra) 200 - 300 dia. Btg 4 s/d 5 Phn 286,000 28,600 314,600
44 Kamboja rantai 300 - 400 dia. Btg 5 s/d 8 Phn 1,144,000 114,400 1,258,400
45 Karet kebo (Ficus elastica) 100 dia. Btg 3 Phn 35,750 3,575 39,325
46 Kasia bunga kuning (Cassia multijuga) 150 - 200 dia. Btg 3,5 Phn 171,600 17,160 188,760
47 Kastuba (Euphorbia pulcherrima) 200 - 300 dia. Btg 4 s/d 5 Phn 357,500 35,750 393,250
48 Kayu manis (Cinnamon bumanni) 200 dia. Btg 3,5 Phn 100,000 10,000 110,000
49 Kayu manis (Cinnamon bumanni) 400 - 600 dia. Btg 8s.d10 Phn 193,000 19,300 212,300
50 Kayu putih (Maleucaa leucadendron) 200 - 300 dia. Btg 4 s/d 5 Phn 85,800 8,580 94,380
51 Kembang kupu-kupu (Bauhinia pupurea) 100-150 dia. Btg 3,5 Phn 121,000 12,100 133,100
52 Kembang kupu-kupu (Bauhinia pupurea) 150 - 200 dia. Btg 3,5 Phn 181,500 18,150 199,650
53 Kembang merak (Caesalpina pulcherrima) 100-150 dia. Btg 3 Phn 90,750 9,075 99,825
54 Kembang merak (Caesalpina pulcherrima) 200 dia. Btg 3 Phn 181,500 18,150 199,650
55 Kembang sepatu kuning (Hibiscus hybridus) 100 - 200 dia. Btg 3,5 Phn 214,500 21,450 235,950
56 Kenari (Canarium commune) 100 - 150 dia. Btg 3 Phn 71,500 7,150 78,650
57 Kenari (Canarium commune) 300 - 400 dia. Btg 5 s/d 8 Phn 171,600 17,160 188,760
58 Ketapang (Terminalia catappa) 150 - 200 dia. Btg 3,5 Phn 321,750 32,175 353,925
59 Ketapang (Terminalia catappa) 500 - 600 dia. Btg > 10 Phn 643,500 64,350 707,850
60 Kepuh 300 - 400 dia. Btg 5 s/d 8 Phn 100,000 10,000 110,000
61 Kiara payung (Filicium decipiens) 150 - 200 dia. Btg 3,5 Phn 143,000 14,300 157,300
NO JENIS BAHAN PERTAMANAN UKURAN HARGA HARGA TERMASUK
PAJAK
TINGGI DIAMETER UNIT BAHAN + PAJAK
(cm) (cm) UPAH (Rp.) (Rp.)
1 2 3 4 5 6 7 8
62 Pucuk Merah Phn 80,000 8,000 88,000
63 Kurma 50 dia. Btg 3 Phn 214,500 21,450 235,950
64 Lampeni 150 - 200 dia. Btg 3,5 Phn 78,650 7,865 86,515
65 Mahoni (Swietania mahagoni) 20-40 dia. Btg 2 s/d 3 Phn 101,900 10,190 112,090
66 Mahoni (Swietania mahagoni) 30-50 dia. Btg 5 s/d 8 Phn 121,000 12,100 133,100
67 Mahoni (Swietania mahagoni) 50-75 dia. Btg 5 s/d 8 Phn 143,000 14,300 157,300
68 Mahoni diameter (Swietania mahagoni) 200 - 300 dia. Btg 4 s/d 5 Phn 214,500 21,450 235,950
69 Mangga (Mangifera indica) 500 - 800 dia. Btg > 10 Phn 2,145,000 214,500 2,359,500
70 Mangga Mardi Malaysia Phn 178,750 17,875 196,625
71 Sawo manila Phn 178,750 17,875 196,625
72 Jeruk Sambal calung Phn 28,600 2,860 31,460
73 Lengkeng Diamond Phn 89,400 8,940 98,340
74 Kedondong bangkok Phn 118,000 11,800 129,800
75 jambu Air bangkok Phn 107,250 10,725 117,975
76 jambu Batu Merah Phn 46,500 4,650 51,150
77 Matoa irian (Pometia pinata) 300 - 400 dia. Btg 5 s/d 8 Phn 1,101,000 110,100 1,211,100
78 Pucuk Merah 75-100 dia. Btg 5 s/d 8 Phn 137,500 13,750 151,250
79 Pule (Alsonia scholaris) 600 - 700 dia. Btg > 10 Phn 572,000 57,200 629,200
80 Salam 50 - 100 dia. Btg 3 Phn 71,500 7,150 78,650
81 Salam 10 - 25 Phn 42,900 4,290 47,190
82 Sikat botol 200 - 300 dia. Btg 4 s/d 5 Phn 357,500 35,750 393,250
83 Santorium 500 - 600 dia. Btg > 10 Phn 520,000 52,000 572,000
84 Sawo duren (Chrysophillium cainito) 150 - 200 dia. Btg 3,5 Phn 250,250 25,025 275,275
85 Sawo kecik (Chrysophillium sp) 200 dia. Btg 3,5 Phn 357,500 35,750 393,250
86 Sono keling/Sengon (Abaziafalcata) 150 - 200 dia. Btg 3,5 Phn 85,800 8,580 94,380
87 Spathodea campanulata 150 - 200 dia. Btg 3,5 Phn 57,200 5,720 62,920
88 Spathodea campanulata 500 - 600 dia. Btg > 10 Phn 643,500 64,350 707,850
89 Tabebuia 100 - 200 dia. Tajuk 50 - 70 Phn 151,250 15,125 166,375
90 Tanjung (Mimusops elengi) 10 - 25 Phn 17,900 1,790 19,690
91 Tanjung (Mimusops elengi) 60 -100 Phn 66,000 6,600 72,600
92 Tanjung (Mimusops elengi) 100-150 Phn 79,860 7,986 87,846
93 Tanjung (Mimusops elengi) 150-200 dia. Btg 3,5 Phn 95,850 9,585 105,435
94 Tanjung (Mimusops elengi) 200-250 dia. Btg 5 s/d 7 Phn 181,500 18,150 199,650
95 Tanjung (Mimusops elengi) 200 - 300 dia. Btg 4 s/d 5 Phn 286,000 28,600 314,600
96 Sirsak Madu 150 -200 dia. Btg 3,5 Phn 89,400 8,940 98,340
97 Melinjo 150 - 200 dia. Btg 3,5 Phn 121,550 12,155 133,705
98 Mahkota Dewa 150 - 200 dia. Btg 3,5 Phn 143,000 14,300 157,300
99 Trembesi (Samanea saman) 10 - 25 Phn 58,650 5,865 64,515
100 Trembesi (Samanea saman) 200 dia. Btg 3,5 Phn 135,850 13,585 149,435
101 Trembesi (Samanea saman) 400 - 500 dia. Btg 8s.d 10 Phn 217,910 21,791 239,701
102 Trembesi (Samanea saman) 600 - 700 dia. Btg > 10 Phn 500,500 50,050 550,550
103 Trenggulin (Cassia fistula) 50 - 150 dia. Btg 3 Phn 42,900 4,290 47,190
104 Walisongo (Alithurium macrolobium) 50 - 100 dia. Btg 3 Phn 107,250 10,725 117,975
104 Walisongo (Alithurium macrolobium) 200 dia. Btg 3,5 Phn 321,750 32,175 353,925
105 Walisongo (Alithurium macrolobium) 300 dia. Btg 5 Phn 500,500 50,050 550,550
106 Waru (Hibiscus tiliaceus) 500 - 600 dia. Btg > 10 Phn 500,500 50,050 550,550
107 Yangliu (Salyx babylonia) 150 - 200 dia. Btg 3,5 Phn 214,500 21,450 235,950
XIII BIJI
1 Bixa (Bixaceae sp) 1 Kg 44,000 4,400 48,400
2 Bunga kupu-kupu (Bauhunia pupurea) 1 Kg 33,000 3,300 36,300
3 Bungur (Largerstroemia loudonii) 1 Kg 22,000 2,200 24,200
4 Buni (Antidesma bunius) 1 Kg 44,000 4,400 48,400
5 Glodogan (Polyalthea longifolia) 1 Kg 44,000 4,400 48,400
6 Mahoni (Swietenia mahagoni) 1 Kg 11,000 1,100 12,100
NO JENIS BAHAN PERTAMANAN UKURAN HARGA HARGA TERMASUK
PAJAK
TINGGI DIAMETER UNIT BAHAN + PAJAK
(cm) (cm) UPAH (Rp.) (Rp.)
1 2 3 4 5 6 7 8
7 Salam (Eugenia Polyanthum) 1 Kg 22,000 2,200 24,200
8 Tanjung (Mimusops elengi) 1 Kg 15,000 1,500 16,500
9 Trembesi (Samanea saman) 1 Kg 30,000 3,000 33,000

XIV TANAMAN HIAS YG MEMILIKI NILAI KHUSUS


1 Anthurium 50 Kondisi optimal Polybag 247,500 24,750 272,250
2 Belenceng yongmay 50 Kondisi optimal Polybag 55,000 5,500 60,500
3 Bonsai bentuk 75 Kondisi optimal Phn 1,100,000 110,000 1,210,000
4 Cemara dent 100 - 150 Kondisi optimal Phn 1,237,500 123,750 1,361,250
5 Cemara udang 50 - 100 Kondisi optimal Phn 1,045,000 104,500 1,149,500
6 Cemara udang 150 - 200 Kondisi optimal Phn 2,475,000 247,500 2,722,500
7 Kamboja jepang bentuk 100 - 200 Kondisi optimal Phn 1,375,000 137,500 1,512,500
8 Kapu-kapu 50 Kondisi optimal Phn 38,500 3,850 42,350
9 Krisan pot 30 - 40 Kondisi optimal Pot 38,500 3,850 42,350
10 Lotus 10 - 30 Kondisi optimal Rmp 143,000 14,300 157,300
11 Melati air 40 - 50 Kondisi optimal Rmp 44,000 4,400 48,400
12 Meranti karet 40 - 50 Kondisi optimal Rmp 44,000 4,400 48,400
13 Meranti pisang 100 Kondisi optimal Phn 44,000 4,400 48,400
14 Nolina 100 Kondisi optimal Phn 165,000 16,500 181,500
15 Pacira tinggi 150 Kondisi optimal Phn 330,000 33,000 363,000
16 Palm segitiga tinggi 150 - 200 Kondisi optimal Phn 495,000 49,500 544,500
17 Pandan bali cabang tinggi 150 - 200 Kondisi optimal Phn 495,000 49,500 544,500
18 Pandan bali tunggal tinggi 100 Kondisi optimal Phn 176,000 17,600 193,600
19 Philodendron hijau 50 Kondisi optimal Phn 22,000 2,200 24,200
20 Philodendron kuning 50 Kondisi optimal Phn 55,000 5,500 60,500
21 Philodendron merah 50 Kondisi optimal Phn 220,000 22,000 242,000
22 Puring kuning 50 Kondisi optimal Phn 13,750 1,375 15,125
23 Sikas antik tinggi 100 Kondisi optimal Phn 1,320,000 132,000 1,452,000
24 Srikit bangkok 40 - 50 Kondisi optimal Phn 66,000 6,600 72,600
25 Teratai biasa 10 - 20 Kondisi optimal Rmp 46,750 4,675 51,425
26 Tipha 50 - 100 Kondisi optimal Rmp 88,000 8,800 96,800
27 Zannia kelompok diameter 100 Kondisi optimal Phn 137,500 13,750 151,250
28 Zannia tunggal 50 Kondisi optimal Phn 121,000 12,100 133,100
XV MATERI LENGKAP
1 Tanah Gambut (10 kg) 10 kg krg 3,150 315 3,465
2 Tanah Gambut (15 Kg) 15 kg krg 3,700 370 4,070
3 Tanah Gambut (20 kg) 20 kg krg 7,350 735 8,085
4 Tanah Merah Gembur m3 115,500 11,550 127,050
5 Tanah Subur m3 101,050 10,105 111,155
6 Tanah Bakar (10 kg) Krg 6,300 630 6,930
7 Tanah Bakar (20 kg) Krg 12,600 1,260 13,860
8 Pupuk Kandang (10 kg) Krg 6,300 630 6,930
9 Pupuk Kandang (15 kg) Krg 6,850 685 7,535
10 Pupuk Kandang (20 kg) Krg 12,600 1,260 13,860
11 Pupuk NPK 50 kg krg 60,900 6,090 66,990
12 Pupuk urea krg 3,150 315 3,465
13 Pupuk Kotoran Ayam krg 6,300 630 6,930
14 Pot Plastik Hitam besar bh 13,650 1,365 15,015
15 pot plastik Hitam Sedang bh 10,500 1,050 11,550
16 Pot Plastik Hitam Kecil bh 7,350 735 8,085
17 Pot Keramik Besar 131,250 13,125
18 Pot Keramik sedang 63,000 6,300
19 Batu api sedang 25 - 40 1 Bh 52,500 5,250 57,750
20 Batu brojol putih ambon dia. 3 - 5 Krg 94,500 9,450 103,950
NO JENIS BAHAN PERTAMANAN UKURAN HARGA HARGA TERMASUK
PAJAK
TINGGI DIAMETER UNIT BAHAN + PAJAK
(cm) (cm) UPAH (Rp.) (Rp.)
1 2 3 4 5 6 7 8
21 Batu cadas besar/sedang 50 dia. 30 Bh 73,500 7,350 80,850
22 Batu kayu besar 75 1 Bh 157,500 15,750 173,250
23 Batu kayu kecil 40 1 Bh 94,500 9,450 103,950
24 Batu tempel cirebon alam berbagai jenis ukuran 8 x 20 M2 84,000 8,400 92,400
25 Batu tempel palimanan hijau dan putih 10 x 20 M2 84,000 8,400 92,400
26 Batu tulang besar 1 Bh 63,000 6,300 69,300
27 Batu tulang kecil 1 Bh 31,500 3,150 34,650
28 Gentong teratai besar 1 Bh 157,500 15,750 173,250
29 Gentong teratai kecil 1 Bh 63,000 6,300 69,300
30 Gentong teratai sedang 1 Bh 94,500 9,450 103,950
31 Kantong plastik dia. 20 Kg 15,750 1,575 17,325
32 Kromb dolken segitiga kawat duri
(0,80 x 0,80 x 1,2 m) 1 Bh 21,000 2,100 23,100
33 Kromb dolken segitiga kawat duri
(0,60 x 0,60 x 1,2 m) 1 Bh 26,250 2,625 28,875
34 Plastik bening tebal 8 mikron M2 3,700 370 4,070
35 Pot dekoratif terra cotta clarris diameter pot 55 Bh 131,250 13,125 144,375
36 Pot dekoratif terra cotta clarris diameter pot 60 Bh 157,500 15,750 173,250
37 Pot plastik diameter terra cotta clarris diameter pot 30 Bh 70,350 7,035 77,385
38 Pot plastik diameter terra cotta clarris diameter pot 40 Bh 99,750 9,975 109,725
39 Pupuk majemuk butir - prill 1 Kg 6,300 630 6,930
40 Pupuk majemuk kaplet uk 10 gr 1 Kg 8,400 840 9,240
41 Pupuk TSP 1 Kg 3,150 315 3,465
42 Pupuk Urea 1 Kg 2,100 210 2,310
43 Pupuk ZA 1 Kg 2,100 210 2,310
44 Serbuk gergaji 1 Krg 7,900 790 8,690
45 Steger bambu bulat 2 - 4 1 Btg 5,250 525 5,775
46 Steger dolken 2 m 1 Btg 5,250 525 5,775
47 Sekam, 50 gr/karung 1 Krg 4,750 475 5,225
48 Polybag Uk. Kecil Kg 26,250 2,625 28,875
49 Polybag Uk. Sedang Kg 26,250 2,625 28,875
50 Polybag Uk. Besar Kg 26,250 2,625 28,875
51 Sarung Tangan Psg 11,550 1,155 12,705
52 Cangkul Uk. Sedang Bh 36,750 3,675 40,425
53 Sendok Dempul Bh 7,350 735 8,085
54 Gembor Penyiram Bunga Bh 47,250 4,725 51,975
55 Ember Bh 11,550 1,155 12,705
56 Gunting Stick Bh 42,000 4,200 46,200
57 Gunting Besar Bh 47,250 4,725 51,975
58 Ayakan Bh 68,250 6,825 75,075

XVI PEMELIHARAAN TAMAN


1 Angkut sampah sistem door to door 1 M3 8,000 8,000
2 Angkut sampah sistem tidak langsung 1 M3 4,500 4,500
3 Jasa pemeliharaan/perawatan 1 Hr 35,000 35,000
4 Jasa pemeliharaan/perawatan 1 Bln 425,000 425,000
5 Pembersihan sampah di lokasi air mancur 1 Lks 10,000 10,000
6 Pengangkutan sampah 1 M3 12,500 12,500
7 Penyapuan sampah halaman/plaza 1 M2 25 25
8 Pohon di halaman
a. Penyiraman 1 Phn 100 100
b. Pemberantasan hama dengan insektisida 1 Phn 1,100 1,100
c. Pemberantasan hama tanpa insektisida 1 Phn 300 300
d. Pemupukan 1 Phn 1,000 1,000
NO JENIS BAHAN PERTAMANAN UKURAN HARGA HARGA TERMASUK
PAJAK
TINGGI DIAMETER UNIT BAHAN + PAJAK
(cm) (cm) UPAH (Rp.) (Rp.)
1 2 3 4 5 6 7 8
e. Pendangiran 1 Phn 150 150
f. Penopingan/pemangkasan 1 Phn 30,000 30,000
9 Pohon dalm pot
a. Penyiraman 1 Phn 50 50
b. Pemberantasan hama dengan insektisida 1 Phn 250 250
c. Pemberantasan hama tanpa insektisida 1 Phn 75 75
d. Pemupukan 1 Phn 175 175
e. Pendangiran 1 Phn 50 50
10 Rumput
a. Penyiraman pd lokasi taman yg mempunyai
sumber air 1 M2 50 50
b. Penyiraman pd lokasi taman tanpa sumber air 1 M2 100 100
c. Pengetrikan di taman/berm 1 M2 50 50
d. Pembabatan 1 M2 50 50
e. Pembabatan rumput liar/alang-alang 1 M2 150 150
11 Tanaman hias dan Perdu
a. Penyiraman 1 M2 100 100
b. Pemberantasan hama dengan insektisida 1 M2 550 550
c. Pemberantasan hama tanpa insektisida 1 M2 150 150
d. Pemangkasan 1 M2 1,000 1,000
e. Pemupukan 1 M2 450 450
f. Pendangiran 1 M2 1,000 1,000

XVII PEKERJAAN PERBAIKAN TAMAN


AKIBAT GALIAN JARINGAN UTILITAS
1 Pengamanan pohon pelindung
a. Diameter batang 5 s/d 10 cm 1 Btg 17,300 17,300
b. Diameter batang 11 s/d 20 cm 1 Btg 18,075 18,075
c. Diameter batang 21 s/d 30 cm 1 Btg 27,545 27,545
d. Diameter batang 31 s/d 40 cm 1 Btg 28,880 28,880
e. Diameter batang 41 s/d 50 cm 1 Btg 32,156 32,156
f. Diameter batang 51 s/d 60 cm 1 Btg 38,774 38,774
g. Diameter batang 61 s/d 100 cm 1 Btg 61,755 61,755
2 Pemindahan pohon (termasuk pemeliharaan
selama 3 bulan)
a. Diameter batang 5 s/d 10 cm 1 Btg 85,995 85,995
b. Diameter batang 11 s/d 20 cm 1 Btg 97,290 97,290
3 Penanaman pohon baru ( termasuk
pemeliharaan selama 3 bln )
a. Penanaman pohon kelas I
- Tinggi 1 s/d 2 m 1 Btg 99,350 99,350
- Tinggi 2,1 s/d 3 m 1 Btg 132,900 132,900
b. Penanaman pohon kelas II
- Tinggi 1 s/d 2 m 1 Btg 86,340 86,340
- Tinggi 2 s/d 3 m 1 Btg 103,915 103,915
c. Penanaman pohon kelas III
- Tinggi 1 s/d 2 m 1 Btg 72,590 72,590
- Tinggi 2 s/d 3 m 1 Btg 92,915 92,915
4 Border (termasuk pemeliharaan selama 3 bulan)
a. Kelas I 1 M2 391,325 391,325
b. Kelas II 1 M2 238,525 238,525
c. Kelas III 1 M2 163,549 163,549
5 Rumput gajah ( termasuk pemeliharaan
selama 3 bulan ) 1 M2 21,165 21,165
NO JENIS BAHAN PERTAMANAN UKURAN HARGA HARGA TERMASUK
PAJAK
TINGGI DIAMETER UNIT BAHAN + PAJAK
(cm) (cm) UPAH (Rp.) (Rp.)
1 2 3 4 5 6 7 8
XVIII SARANA DAN PRASARANA PERTAMANAN

1 Mesin Tebas 1 Unit 3,945,500 394,550 4,340,050

WALIKOTA PONTIANAK

H. SUTARMIDJI, SH, M.Hum


DAFTAR HARGA SATUAN UPAH DAN MATERIAL

NO TENAGA KERJA SATUAN HARGA SATUAN

1 Pekerja Tidak Terlatih Org / hari 50,000.00


2 Pekerja Semi Terlatih Org / hari 60,000.00
3 Pekerja Terlatih Org / hari 70,000.00
4 Mandor Org / hari 80,000.00
5 Tukang Besi Org / hari 90,000.00
6 Tukang Kayu Org / hari 80,800.00
7 Tukang Semen Org / hari 80,800.00
8 Tukang Aspal Org / hari 69,000.00
9 Tukang Batu Org / hari 69,000.00
10 Tukang Cat Org / hari 70,000.00
11 Tukang Pelitur Org / hari 70,000.00
12 Kepala Tukang Org / hari 120,000.00
13 Operator Org / hari 180,000.00
14 Operator Semi Terlatih Org / hari 130,000.00
15 Mekanik Org / hari 85,000.00
16 Supir Org / hari 80,000.00
17 Pembantu Supir Org / hari 45,000.00
18 Pembantu Mekanik Org / hari 45,000.00
19 Pembantu Operator Org / hari 50,000.00
20 Penjaga Malam Org / hari 60,000.00
21 Tukang Las Org / hari 74,000.00
22 Tukang Anyam Bronjong Org / hari 67,200.00
23 Tukang Tebas Org / hari 50,000.00
24 Tukang Pipa Org / hari 90,000.00

NO JENIS MATERIAL SATUAN HARGA SATUAN

1 Tanah Urug /M3 38,000


2 Pasir Urug /M3 85,000
3 Pasir Pasangan /M3 110,000
4 Pasir Beton /M3 120,000
5 Pasir Batu / Sertu /M3 65,000
6 Batu Kali / Batu Gunung /M3 125,000
7 Batu Belah Uk. 10/15 cm /M3 155,000
8 Batu Belah Uk. 5/7 cm /M3 170,000
9 Batu Spelit Uk. 3/5 cm /M3 178,000
10 Batu Spelit Uk. 2/3 cm /M3 230,000
11 Batu Spelit Uk. 1/2 cm /M3 270,000
12 Batu Spelit Uk. 1/1 cm /M3 370,000
13 Batu Spelit Uk. 0/5 cm /M3 420,000
14 Stone Dust /M3 461,000
15 Aspal Drum / Kg 9,500
16 Semen Portland (Tiga Roda) / Zak 70,000
17 Semen Putih Portland (Tiga Roda) / Zak 105,000
18 Alat Bantu / Unit
19 Minyak Tanah / Kerosine / Ltr 4,500
20 Minyak Diesel / Solar / Ltr 5,000
21 Minyak Premium / Bensin / Ltr 4,500
22 Minyak Pelumas / Ltr 50,000
23 Papan Kls.III Tebal 2 cm /M3 1,343,000
24 Papan Kls.IV campur Tebal 1,6 cm /M3 1,074,000
25 Kayu Bulat dia 10 - 12 cm / Btg 31,000
26 Kayu Bulat dia 8 cm / Btg 16,000
27 Ubin Tegel Polos Kepala Basah Uk.20x20 cm / Bh 3,800
28 Ubin Tegel Polos Kepala Kering Uk.20x20 cm / Bh 3,500
29 Pilin Ubin Abu-abu 15/20 cm / Bh 3,500
30 Tegel Kembang Uk. 20/20 cm Polos / Bh 3,500
31 Tegel Kembang Uk. 20/20 cm Warna / Bh 3,500
32 Tegel Kembang Uk. 30/30 cm Polos / Bh 5,800
33 Tegel Kembang Uk. 30/30 cm Warna / Bh 7,700
34 Tegel Kembang Uk. 40/40 cm Polos / Bh 9,500
35 Tegel Kembang Uk. 40/40 cm Warna / Bh 14,300
36 Teraso Uk. 30 x 30 Polos / Bh 4,000
37 Vini Ukuran 20 x 20 cm / Bh 47,800
38 Vini Ukuran 30 x 30 cm / Bh 52,500
39 Keramik Porselen Putih / Ktk 43,000
40 Keramik Porselen Warna / Ktk 14,500
41 Mexoik Ukuran 10 x 10 cm / Lbr 5,200
42 Mexoik Ukuran 30 x 30 cm / Lbr 5,800
43 Vini Tak Berlapis / Lbr 60,000
44 Vini Berlapis Asbes / Lbr 48,000
45 Glotek Halus / Kg 38,000
46 Glotek Kasar / Kg 43,500
47 Sekura Karpet Ukuran 182 cm / M2 45,000
48 Mexoik Karpet Ukuran 100 cm / M2 38,000
49 Besi Beton / Kg 10,500
50 Kawat Ikat / Kg 19,000
51 Amplas Kayu / Lbr 5,000
52 Amplas Besi / Lbr 6,000
53 Dempul / Kg 18,000
54 Cat Dasar Tembok / Kg 15,500
55 Cat Dasar Kilat / Kg 31,000
56 Plamur / Kg 20,000
57 Minyak Cat / Kg 25,000
58 Cat Tembok / Kg 22,000
59 Cat Kilat / Kg 46,000
60 Vernis / Kg 32,000
61 Teak Oli / Kg -
62 Cat Besi / Kg 56,000
63 Metrolite Warna Biasa / Kg 60,000
64 Metrolite Warna Induk / Kg 62,000
65 Oker Kuning / Kg 41,000
66 Oker Merah / Kg 48,000
67 Lem Rakol Prima D / Bh 8,000
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN : PEMBUATAN PARKIR MOTOR, COR HALAMAN & PAGAR GEREJA ST. PIUS BENGKAYANG
TAHUN 2011

HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME ANALISA JUMLAH
SATUAN
A Pekerjaan Pengecetan (Luar / Dalam)
I Pengecatan Luar
- Cat Kilat M2 552.48 P. Ct. 03 24,373 13,465,693
- Cat Tembok M2 1361.73 P. Ct. 12 21,806 29,693,231
2 Pengecetan Dalam
- Cat Kilat M2 567.06 P. Ct. 03 24,373 13,820,953
- Cat Tembok M2 1162.06 P. Ct. 12 21,806 25,339,416
Sub Jumlah 82,319,292
II Pekerjaan Menara
1. Pondasi Beton 80/80
- Bikisting M2 3.16 P. BB. 10.a 63,029 199,172
- Tulangan Kg 110.74 P. BB. 08 27,027 2,992,926
- Beton M3 0.69 P. BB. 04 841,531 582,340
2 Kolom 20/20
- Bekisting M2 4.80 P. BB. 12.a 63,029 302,539
- Tulangan Kg 129.68 P. BB. 08 27,027 3,504,809
- Beton Kolom M3 0.96 P. BB. 04 841,531 807,870
3 Sloof 20/40
- Bekisting M2 9.60 P. BB. 14.a 63,029 605,078
- Tulangan Kg 166.68 P. BB. 08 27,027 4,504,794
- Beton Sloof M3 1.92 P. BB. 04 841,531 1,615,740
4 Dinding 15,115,267
- Pemasangan Batako M2 48.00 P. Dnd. 01 84,004 4,032,192
- Plesteran M2 100.00 P. Pls. 01 46,674 4,667,360
5 Lantai
- Bikisting M2 4.40 P. BB. 14.a 63,029 277,328
- Tulangan Kg 119.39 P. BB. 08 27,027 3,226,760
- Beton Lantai M3 0.80 P. BB. 04 841,531 673,225
6 Kuda-kuda Ls 1.00 - 300,000 300,000
7 Atap Seng Gelombang M2 4.00 P. PA. 12 62,064 248,256
8 Pengecetan M2 48.00 P. Ct. 11 20,370 977,779
Sub Jumlah 44,633,434
Pekerjaan Dinding
III Dinding Pasangan Kerawang M2 10.64 P. Dnd. 06.a 294,800 3,136,672
1 Sub Jumlah 3,136,672
Pekerjaan Pengecatan
VII Cat Tembok M2 1198.78 P. Ct. 11 20,370 24,419,628
1 Sub Jumlah 24,419,628
Jumlah A ###
B PENGECORAN HALAMAN
1 Pasir Urug M3 81.51 P. T. 13 150,200 12,242,802
2 Bekisting M2 8.27 P. BB. 12.a 280,364 2,318,786
3 Cor BetonTumbuk M3 54.34 P. BB. 02 733,540 39,860,564
Sub Jumlah 54,422,151
C TEMPAT PARKIR MOTOR 24 M
REKAPITULASI
PEKERJAAN : PEMBUATAN PARKIR MOTOR, COR HALAMAN & PAGAR GEREJA ST. PIUS BENGKAYANG
TAHUN 2011

NO PEKERJAAN JUMLAH HARGA

A Pekerjaan Pengecetan (Luar / Dalam) 154,509,026

B PENGECORAN HALAMAN 54,422,151

C TEMPAT PARKIR MOTOR 24 M 22,253,951


JUMLAH 231,185,128
PEMBULATAN 231,185,000
TERBILANG : DELAPAN PULUH ENAM JUTA TUJUH RATUS LIMA BELAS RIBU RUPIAH
HARGA SATUAN UPAH DAN BAHAN

HARGA

TANPA
NO TENAGA KERJA SATUAN KODE KEUNTUNGAN KEUNTUNGAN
(OVERHEAD) (OVERHEAD)
(Rp) (Rp)

A. UPAH
1 Mandor Lapangan Org/hari L.061 80,000.00 -
2 Mekanik Org/hari L.071 85,000.00 -
3 Kepala Tukang Org/hari L.073 120,000.00 -
4 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang Org/hari L.079 80,800.00 -
5 Operator terlatih Org/hari L.081 180,000.00 -
6 Operator semi terlatih Org/hari L.082 130,000.00 -
7 Sopir Org/hari L.091 80,000.00 -
8 Pekerja / Buruh Lapangan Tak terlatih Org/hari L.101 50,000.00 -
9 Pekerja / Buruh Lapangan terlatih Org/hari L.106 70,000.00 -

HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD)
(Rp) (Rp)

B. BAHAN PENGISI
1 Batu pecah 10-15 cm M³ M.020 155,000.00 - - - -
2 Batu pecah 5-7 cm M³ M.022 170,000.00 - - - -
3 Batu pecah 3-5 cm M³ M.023 178,000.00 - - - -
4 Batu pecah 2-3 cm M³ M.024 234,000.00 - - - -
5 Batu pecah 1-2 cm M³ M.025 275,000.00 - - - -
6 Batu pecah 1-1 cm M³ - 380,000.00 - - - -
7 Batu pecah 0,5 cm M³ M.026 475,000.00 - - - -
8 Stone Dust M³ - 492,000.00 - - - -
9 Aspal Kg - 9,800.00 - - - -
10 Pasir M³ M.040 112,000.00 - - - -
11 Semen PC Zak M.080 70,000.00 - - - -
12 Semen PC Kg - 1,400.00 - - - -
13 Tanah Ex. Peniraman M³ M.050.a 39,200.00 - - - -
14 Tanah EX. Peladis M³ M.050 39,200.00 - - - -
15 Bataco 15 x 30 x 7 cm Bh - 2,000.00 - - - -
16 Kerawang ( roster ) 40x 40 cm Bh - 40,000.00 - - - -
17 Keramik 20 x 20 cm Kotak - 97,500.00 - - - -
18 Keramik 30 x 30 cm Kotak - 84,000.00 - - - -
19 Keramik 30 x 30 cm Unpolished Kotak - 70,000.00 - - - -
20 Keramik 40 x 40 cm (biasa) Kotak - 63,600.00 - - - -
21 Keramik 40 x 40 cm (anti gores) Kotak - 95,400.00 - - - -
22 Keramik 40 x 40 cm Unpolished Kotak - 63,600.00 - - - -
23 Keramik dinding 20 x 20 cm Kotak - 97,500.00 - - - -
24 Keramik dinding 20 x 25 cm Kotak - 100,000.00 - - - -
-
C. BAHAN KAYU -
1 Ky. Belian tdk ketam Uk. 10/10 - 4 M M³ M.181.b 4,888,000.00 - - - -
2 Ky. Belian tdk ketam Uk. 12/12 - 4 M M³ - 5,015,000.00 - - - -
3 Ky. Belian tdk ketam Uk. 18/18 - 4 M M³ - 7,075,000.00 - - - -
4 Ky. Belian ketam Uk. 6/6 - 4 M M³ - 5,459,000.00 - - - -
5 Ky. Belian ketam Uk. 7/7 - 4 M M³ - 5,342,400.00 - - - -
6 Ky. Belian ketam Uk. 8/8 - 4 M M³ - 5,432,500.00 - - - -
7 Papan belian tdk ketam (4m) M³ M.181.d 4,303,000.00 - - - -
8 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam ) M³ M.181.f 3,441,500.00 - - - -
9 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam ) M³ M.181.g 3,441,500.00 - - - -
10 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M³ M.181.h 2,200,000.00 - - - -
11 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam ) M³ M.181.i 2,200,000.00 - - - -
12 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M³ - 2,830,000.00 - - - -
13 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) M³ - 2,830,000.00 - - - -
14 Ky. klas II Mabang uk. 8/12 - 4 M ( tdk ketam ) M³ - 3,011,500.00 - - - -
15 Ky klas III uk. 3/5 - 4 M ( tdk ketam) M³ - 2,866,000.00 - - - -
16 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³ - 2,830,000.00 - - - -
17 Papan kayu klas I tdk ketam M³ - 3,226,500.00 - - - -
18 Papan kayu klas I ketam M³ - 5,379,500.00 - - - -
19 Papan mal klas III M³ M.181.l 1,075,000.00 - - - -
20 Kayu cerucuk /dolken ø 6 - 8 - Pj. 4 M Btg - 15,000.00 - - - -
21 Kayu cerucuk /dolken ø10 - Pj. 4 M Btg - 25,000.00 - - - -
22 Kayu cerucuk /dolken ø12 - Pj. 12 M Btg - 25,000.00 - - - -
23 Kayu Simpiran / Bakar M³ - 100,000.00 - - - -
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD)
(Rp) (Rp)

-
D. BAHAN CAT -
1 Amplas Lbr - 5,300.00 - - - -
2 Minyak cat Kg - 26,500.00 - - - -
3 Cat kilat Kg - 48,000.00 - - - -
4 Plamur Kg - 21,200.00 - - - -
5 Cat dasar Kg - 15,900.00 - - - -
6 Cat tembok Kg - 80,000.00 - - - -
7 Dempul Kg - 19,000.00 - - - -
8 Vernis Ltr - 33,000.00 - - - -
9 Oker Kg - 42,400.00 - - - -
-
E. BAHAN BESI DAN ALUMINIUM -
1 Besi Tulangan Beton Kg M.167 24,500.00 - - - -
2 Kawat baja/bendrat Kg M.168 18,000.00 - - - -
3 Simpai roll Kg - 64,700.00 - - - -
4 Baut dia 4/8 " pj = 20 cm Btg M.163 11,000.00 - - - -
5 Beugel plat L. 3 cm bh - 43,000.00 - - - -
6 Plat 1,2 x 2,4 x 12 Bh - 479,000.00 - - - -
7 Kawat harmonika M² - 59,400.00 - - - -
8 Pipa galvanis dia 3/4" Btg - 180,000.00 - - - -
9 Pipa galvanis dia 1/2" Btg - 145,000.00 - - - -
10 Pipa galvanis dia 1" Btg - 225,000.00 - - - -
11 Pipa galvanis dia 1 1/2" Btg - 385,000.00 - - - -
12 Pipa galvanis dia 2" Btg - 425,000.00 - - - -
-
F. BAHAN PENGANTUNG -
1 Kait angin Bh - 16,500.00 - - - -
2 Handle Jendela Bh - 13,500.00 - - - -
3 Handle Pintu Bh - 125,000.00 - - - -
4 Engsel jendela Bh - 12,700.00 - - - -
5 Engsel pintu Bh - 15,900.00 - - - -
6 Paku Seng Kg M.166.a 50,800.00 - - - -
7 Paku campuran 1" - 5 " Kg M.166.b 12,000.00 - - - -
8 Paku Atap Seng Kg M.166.c 50,800.00 - - - -
-
G. BAHAN ATAP -
1 Genteng Metal Type Prima 0.35 Lbr - 58,300.00 - - - -
2 Genteng Metal Type Royal 0.35 Lbr - 58,300.00 - - - -
3 Genteng Metal Type Classic 0.35 Lbr - 58,300.00 - - - -
4 Seng Gelombang Bjls 30 Lbr - 70,000.00 - - - -
5 Seng Gelombang Bjls 20 Lbr - 65,500.00 - - - -
6 Seng Plat Bjls 20 Lbr - 43,000.00 - - - -
7 Seng Plat Bjls 30 Lbr - 76,000.00 - - - -
8 Seng Plat Bjls 30 (lebar 45 cm) M' - 19,000.00 - - - -
-
H. BAHAN KACA -
1 Kaca Polos, t = 5 mm M² - 94,000.00 - - - -
2 Kaca Rayben, t = 5 mm M² - 138,000.00 - - - -
3 Kaca Cermin t = 3mm M² - 84,800.00 - - - -
4 Kaca Es M² - 123,000.00 - - - -
-
I. BAHAN TRIPLEK -
1 Triplek t = 3 mm Lbr - 68,900.00 - - - -
-
J. BAHAN SANITASI -
1 Kloset duduk monoblok Bh - 742,000.00 - - - -
2 Kloset jongkok (setaraf TOTO) Bh - 212,500.00 - - - -
3 Kran air uk 1/2" Bh - 35,000.00 - - - -
4 Pipa paralon dia 1/2" Btg - 15,100.00 - - - -
5 Pipa paralon dia 3/4" Btg - 19,100.00 - - - -
6 Pipa paralon dia 1" Btg - 35,000.00 - - - -
7 Pipa paralon dia 2" Btg - 43,600.00 - - - -
8 Pipa paralon dia 3" Btg - 67,200.00 - - - -
9 Pipa paralon dia 4" Btg - 108,200.00 - - - -
-
K. BAHAN MINYAK (TANPA KEUNTUNGAN) -
1 Minyak solar Ltr M.183 4,500.00 - - - -
2 Minyak solar industri Ltr - 5,750.00 - - - -
3 Bensin premium Ltr M.184 4,500.00 - - - -
4 Minyak pelumas Ltr M.185 50,000.00 - - - -
5 Minyak tanah Ltr M.064 5,000.00 - - - -
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD)
(Rp) (Rp)

-
L. BAHAN ALAT-ALAT LISTRIK -
1 Armatur lampu High Mass Holovent 400 watt (lengkap) Unit 11,970,000.00 - - - -
2 Armatur lampu SGP 338 / SONT 400 Watt Unit - 4,962,300.00 - - - -
3 Armatur lampu SGP 328 / SONT 250 Watt Unit - 3,386,350.00 - - - -
4 Armatur lampu SGP 338 / SONT 400 Watt (lengkap) Unit - 4,641,000.00 - - - -
5 Armatur lampu SGP 368 / SONT 250 Watt (lengkap) Unit - 3,886,350.00 - - - -
6 Armatur lampu LVD 100 Watt (lengkap) Unit - 4,490,000.00 - - - -
7 Armatur lampu Ekorola TRX 800 - 20 Watt (set) Set - 495,000.00 - - - -
8 Armatur lampu Sorot HPIT 250 Watt (lengkap) Set - 6,069,000.00 - - - -
9 Sorot HPIT 250 watt (lengkap) Set - 5,057,500.00 - - - -
10 XKS SON T 250 watt (lengkap) Set - 3,272,500.00 - - - -
11 Tiang Artagonal Cabang 2 T = 11 M Tiang - 7,049,916.67 - - - -
12 Tiang Artagonal Cabang 1 T = 11 M Tiang - 6,187,166.67 - - - -
13 Tiang Oktagonal Cabang 2 T = 11 M Btg - 6,579,100.00 - - - -
14 Tiang Oktagonal Cabang 1 T = 11 M Btg - 6,910,000.00 - - - -
15 Tiang high mass 22 m cab. 5 ring Tiang - 61,106,500.00 - - - -
16 Tiang high mass 22 m cab. 4 ring Tiang - 73,327,000.00 - - - -
17 Tiang lampu oktagonal 11 m Btg - 9,853,200.00 - - - -
18 Tiang lampu oktagonal 12 m Btg - 11,238,300.00 - - - -
19 Tiang lampu oktagonal cab. 4 Ring 12 Mtr Btg - 9,853,000.00 - - - -
20 Tiang lampu oktagonal cab. 2 (11m) Btg - 10,353,000.00 - - - -
21 Stang Ornamen Galvanis dia 2" Pj. 7 M + Klem Tiang Btg - 893,650.00 - - - -
22 Stang Ornamen Galvanis dia 2" Pj. 6 M + Klem Tiang Btg - 893,625.00 - - - -
23 Stang Ornamen Galvanis dia 2" Pj. 5 M + Klem Tiang Btg - 832,000.00 - - - -
24 Stang Ornamen Galvanis dia 2" Pj. 3 M + Klem Tiang 12 - 620,000.00 - - - -
25 Stang Ornamen Galvanis dia 2" Pj. 2 M + Klem Tiang Btg - 470,000.00 - - - -
26 Box Panel PJU Uk. 60x90x30 Cm lengkap Time Swich Set - 4,240,000.00 - - - -
27 Box Panel PJU Uk. 50x45x25 Cm lengkap Time Swich Set - 3,069,250.00 - - - -
28 Box KWH Meter Uk. 35 x 50 x 25 cm Buah - 725,000.00 - - - -
29 Traffo HPL 400 Watt Buah - 227,000.00 - - - -
30 Traffo HPL 250 Watt Buah - 183,666.67 - - - -
31 Traffo HPL 125 Watt Buah - 113,500.00 - - - -
32 Traffo SOX 135 Watt Buah - 766,250.00 - - - -
33 Traffo SOX 180 Watt Buah - 766,250.00 - - - -
34 Traffo SON T 400 Watt Buah - 417,666.67 - - - -
35 Traffo SON T 250 Watt Buah - 340,333.33 - - - -
36 Traffo SON T 125 Watt Buah - 225,750.00 - - - -
37 Traffo SON T 70 Watt Buah - 131,416.67 - - - -
38 Traffo SON H 400 Watt Buah - 372,083.33 - - - -
39 Traffo SON H 250 Watt Buah - 255,416.67 - - - -
40 Traffo SON H 125 Watt Buah - 225,750.00 - - - -
41 Traffo SON H 70 Watt Buah - 134,750.00 - - - -
42 Traffo HPiT 400 Buah - 245,916.67 - - - -
43 Traffo Neon 40 Watt Buah - 17,833.33 - - - -
44 Traffo Neon 20 Watt Buah - 14,875.00 - - - -
45 Traffo Neon 10 Watt Buah - 13,083.33 - - - -
46 HPL 400 Watt Buah - 184,500.00 - - - -
47 HPL 250 Watt Buah - 134,833.33 - - - -
48 HPL 125 Watt Buah - 63,833.33 - - - -
49 SOX 135 Watt Buah - 441,416.67 - - - -
50 SOX 180 Watt Buah - 441,416.67 - - - -
51 MLL 160 Watt Buah - 63,833.33 - - - -
52 Bola SON T 1000 Watt Buah - 675,000.00 - - - -
53 Bola SON T 400 Watt Buah - 306,000.00 - - - -
54 Bola SON T 250 Watt Buah - 295,000.00 - - - -
55 Bola SON T 125 Watt Buah - 225,750.00 - - - -
56 Bola Lampu SON 70 Watt Buah - 153,200.00 - - - -
57 SON H 400 Watt Buah - 255,416.67 - - - -
58 SON H 250 Watt Buah - 255,416.67 - - - -
59 SON H 125 Watt Buah - 225,750.00 - - - -
60 SON H 70 Watt Buah - 127,666.67 - - - -
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD)
(Rp) (Rp)

61 Bola Lampu HPIT 400 Watt Buah - 306,000.00 - - - -


62 HPIT 400 Watt Buah - 295,100.00 - - - -
63 Seri 200 Biji Kotak - 50,416.67 - - - -
64 Seri Kuning Kotak - 50,416.67 - - - -
65 Neon Sen Meter - 37,841.67 - - - -
66 Pijar 5 Watt Buah - 1,916.67 - - - -
67 Pijar 20 Watt Buah - 3,166.67 - - - -
68 Pijar 25 Watt Buah - 3,166.67 - - - -
69 Pijar 40 Watt Buah - 3,166.67 - - - -
70 Pijar 60 Watt Buah - 4,500.00 - - - -
71 Pijar 75 Watt Buah - 4,500.00 - - - -
72 Pijar 80 Watt Buah - 3,583.33 - - - -
73 Pijar 100 Watt Buah - 5,666.67 - - - -
74 Pijar 200 Watt Buah - 12,583.33 - - - -
75 Neon 40 Watt Buah - 11,916.67 - - - -
76 Neon 20 Watt Buah - 8,250.00 - - - -
77 Neon 10 Watt Buah - 4,750.00 - - - -
78 Lampu Ekorola TRX 800 - 20 watt (set) Set - 489,166.67 - - - -
79 Lampu Light Grick Buah - 119,833.33 - - - -
80 Lampu Genite 16 Watt Buah - 37,833.33 - - - -
81 Lampu XL 14 Watt Buah - 31,500.00 - - - -
82 Lampu Sorot 300 Watt Buah - 125,000.00 - - - -
83 Lampu Nepalos 25 Watt Buah - 31,500.00 - - - -
84 Lampu Superlox 25 Watt Buah - 5,000.00 - - - -
85 Lampu Superlox 40 Watt Buah - 5,666.67 - - - -
86 Lampu Fisikom 25 Watt Buah - 31,500.00 - - - -
87 Lampu Fisikom 23 Watt Buah - 31,500.00 - - - -
88 Lampu Fisikom 18 Watt Buah - 25,250.00 - - - -
89 Lampu Mercury 125 Watt Buah - 63,833.33 - - - -
90 Lampu Mercury 250 Watt Buah - 134,750.00 - - - -
91 Lampu Sunyco 45 Watt Buah - 75,666.67 - - - -
92 Lampu Matsuka 8 Watt Buah - 18,916.67 - - - -
93 Lampu Matsuka 14 Watt Buah - 20,166.67 - - - -
94 Lampu Matsuka 18 Watt Buah - 29,000.00 - - - -
95 Lampu Matsuka 20 Watt Buah - 34,083.33 - - - -
96 Lampu Matsuka 25 Watt Buah - 35,333.33 - - - -
97 Lampu Par 38 Watt Buah - 46,666.67 - - - -
98 Lampu Taman Buah - 31,500.00 - - - -
99 SL 15 Watt Buah - 105,000.00 - - - -
100 SL 18 Watt Buah - 40,900.00 - - - -
101 SL 25 Watt Buah - 52,900.00 - - - -
102 TL Rina 32 Watt Buah - 25,166.67 - - - -
103 Bola Essetial Buah - 30,333.33 - - - -
104 Bola Spot Light Buah - 47,250.00 - - - -
105 Bola Lampu Sorot 300 Watt Buah - 125,000.00 - - - -
106 Hologen 500 Watt Buah - 36,583.33 - - - -
107 Hologen 1.000 Watt Buah - 71,916.67 - - - -
108 Hologen 1.500 Watt Buah - 81,916.67 - - - -
109 NYY 1 x 1.5 mm Meter - 2,700.00 - - - -
110 NYY 1 x 2.5 mm Meter - 4,200.00 - - - -
111 NYY 1 x 4 mm Meter - 6,600.00 - - - -
112 NYY 1 x 6 mm Meter - 10,200.00 - - - -
113 NYY 2 mm Meter - 5,583.33 - - - -
114 NYY 2 x 2.5 mm Meter - 11,100.00 - - - -
115 NYY 2 x 4 mm Meter - 15,910.00 - - - -
116 NYY 2 x 6 mm Meter - 15,100.00 - - - -
117 NYY 2 x 10 mm Meter - 19,916.67 - - - -
118 NYY 3 x 4 mm Meter - 21,583.33 - - - -
119 NYY 4 x 2.5 mm Meter - 21,300.00 - - - -
120 NYY 4 x 4 mm Meter - 31,500.00 - - - -
121 NYY 4 x 6 mm Meter - 51,150.00 - - - -
122 NYY 4 x 10 mm Meter - 69,600.00 - - - -
123 NYY 4 x 16 mm Meter - 59,916.67 - - - -
124 NYY 4 x 25 mm Meter - 248,500.00 - - - -
125 NYY 4 x 35 mm Meter - 277,500.00 - - - -
126 NYY 4 x 50 mm Meter - 340,500.00 - - - -
127 NYY 4 x 70 mm Meter - 122,333.33 - - - -
128 NYYFYGBY 4 x 6 mm Meter - 78,800.00 - - - -
129 NYYFYGBY 4 x 10 mm Meter - 116,300.00 - - - -
130 NYN 2 x 2,5 mm Meter - 5,916.67 - - - -
131 NYN 3 x 1,5 mm Meter - 5,416.67 - - - -
132 NYN 3 x 2,5 mm Meter - 7,166.67 - - - -
133 NYA 1 x 1,5 mm Meter - 8,900.00 - - - -
134 NYA 1 x 2,5 mm Meter - 10,000.00 - - - -
135 NYA 1 x 4 mm Meter - 11,500.00 - - - -
136 NYA 1 x 6 mm Meter - 15,900.00 - - - -
137 NYA 2 x 2,5 mm Meter - 11,100.00 - - - -
138 NYA 2 x 4 mm Meter - 16,000.00 - - - -
139 NYA 2 x 30 mm Meter - 11,166.67 - - - -
140 NYA 4 x 6 mm Meter - 20,750.00 - - - -
141 NYA 1,5 mm Meter - 1,250.00 - - - -
142 NYA 4 mm Meter - 3,250.00 - - - -
143 NYA 10 mm Meter - 7,916.67 - - - -
144 NYA 16 mm Meter - 2,166.67 - - - -
145 NYF6BY 4 x 10 mm Meter - 55,000.00 - - - -
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD)
(Rp) (Rp)

146 NYF6BY 4 x 16 mm Meter - 80,250.00 - - - -


147 NYF6BY 4 x 25 mm Meter - 111,000.00 - - - -
148 NYF6BY 4 x 35 mm Meter - 141,250.00 - - - -
149 NYF6BY 4 x 50 mm Meter - 181,583.33 - - - -
150 NYF6BY 4 x 70 mm Meter - 247,250.00 - - - -
151 NYM 4 mm Meter - 3,250.00 - - - -
152 NYM 3 x 4 mm Meter - 17,916.67 - - - -
153 NYM 2 x 2 mm Meter - 5,416.67 - - - -
154 NYM 2 x 4 mm Meter - 13,333.33 - - - -
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD)
(Rp) (Rp)

155 NYM 2 x 2,5 mm Meter - 9,250.00 - - - -


156 NYM 2 x 1,5 mm Meter - 4,000.00 - - - -
157 NYM 3 x 1,5 mm Meter - 5,000.00 - - - -
158 NYM 3 x 2,5 mm Meter - 7,166.67 - - - -
159 NYM 3 x 10 mm Meter - 25,166.67 - - - -
160 NYM 4 x 2,5 mm Meter - 9,166.67 - - - -
161 NYM 4 x 4 mm Meter - 23,166.67 - - - -
162 NYMHYM 2 x 0,75 mm Meter - 2,833.33 - - - -
163 NYMHYM 2 x 1,5 mm Meter - 4,833.33 - - - -
164 Traffo SON T 1000 Watt Buah - 845,000.00 - - - -
165 Traffo SON T 400 Watt Buah - 501,200.00 - - - -
166 Traffo SON T 250 Watt Buah - 408,400.00 - - - -
167 Traffo SON T 70 Watt Buah - 157,700.00 - - - -
168 Kabel Snur Roll - 50,416.67 - - - -
169 Kabel Tester Meter - 25,166.67 - - - -
170 Kabel Box Meter - 50,416.67 - - - -
171 Kabel Mic Transparan Roll - 163,916.67 - - - -
172 Kabel 3 x 2,5 mm Meter - 7,166.67 - - - -
173 Kabel Antena Roll - 31,500.00 - - - -
174 Kabel H / M Meter - 1,833.33 - - - -
175 Kabel Transparan Meter - 2,500.00 - - - -
176 Kabel Telepon Meter - 1,500.00 - - - -
177 Kabel TC 2 x 10 mm Meter - 6,450.00 - - - -
178 Kabel TC 2 x 16 mm Meter - 9,000.00 - - - -
179 Box TL 20 Watt Buah - 7,500.00 - - - -
180 Box MCB 1 Group Buah - 3,750.00 - - - -
181 Cal Gulung Buah - 50,416.67 - - - -
182 Contactor 100 A Buah - 1,005,500.00 - - - -
183 Conector Buah - 7,250.00 - - - -
184 Dop 3" Buah - 6,333.33 - - - -
185 Esensial Buah - 31,500.00 - - - -
186 Fitting Gantung Buah - 1,333.33 - - - -
187 Fitting Duduk Buah - 3,166.67 - - - -
188 Fitting Atom Buah - 25,250.00 - - - -
189 Fitting Gantung E 27 Buah - 15,855.00 - - - -
190 Fitting Duduk E 27 Buah - 15,855.00 - - - -
191 Fitting Duduk E 40 Buah - 20,100.00 - - - -
192 Fitting Hologen Buah - 25,250.00 - - - -
193 Full Breket Buah - 11,365.00 - - - -
194 Gulung Spul Buah - 63,083.33 - - - -
195 Gulung Coil Contactor Buah - 63,083.33 - - - -
196 Isolasi Unibel Buah - 7,500.00 - - - -
197 Icnitor SN 58 Buah - 90,800.00 - - - -
198 Inector Buah - 75,666.67 - - - -
199 Ignator Buah - 50,455.83 - - - -
200 Indiktor Buah - 118,333.33 - - - -
201 Insuluk Buah - 291.67 - - - -
202 Kapasitor Buah - 142,000.00 - - - -
203 Kap Hijau E 27 Buah - 25,000.00 - - - -
204 Kap Hijau E 40 Buah - 40,000.00 - - - -
205 Kap Lampu Buah - 88,250.00 - - - -
206 Kap To2 Buah - 88,250.00 - - - -
207 Kop Skring Buah - 3,812.50 - - - -
208 Klem Tiang Buah - 10,125.00 - - - -
209 k. Skum 10-8 Buah - 770.83 - - - -
210 MCB 1.A Buah - 12,625.00 - - - -
211 MCB 2.A Buah - 12,625.00 - - - -
212 MCB 25 A Buah - 12,625.00 - - - -
213 MCB 63 A Buah - 113,500.00 - - - -
214 MCB 40 A Buah - 47,916.67 - - - -
215 MCB 45 A Buah - 47,916.67 - - - -
216 MCB 50 A Buah - 214,200.00 - - - -
217 MCB 10 A Buah - 61,820.00 - - - -
218 MCB 16 A Buah - 31,500.00 - - - -
219 MCB 6 A Buah - 31,500.00 - - - -
220 MCB 2 A Buah - 12,625.00 - - - -
221 MCB 4 A Buah - 31,500.00 - - - -
222 MCB 32 A Buah - 31,500.00 - - - -
223 MCB Box Buah - 3,166.67 - - - -
224 Multi Tester Buah - 56,750.00 - - - -
225 MC Se-3 N Buah - 828,750.00 - - - -
226 Macon Mec gmg-50 aC Buah - 454,083.33 - - - -
227 Magnetic Contactor 100 A Buah - 1,206,600.00 - - - -
228 NH Fuse 80 A Buah - 22,729.17 - - - -
229 Ornamen Pijar Buah - 44,145.83 - - - -
230 Ornamen Gantung Buah - 44,145.83 - - - -
231 Obeng Plus Buah - 17,833.33 - - - -
232 Obeng Minus Buah - 17,833.33 - - - -
233 Open Steker Buah - 1,904.17 - - - -
234 On - Off Buah - 5,708.33 - - - -
235 Pat 38 Buah - 47,291.67 - - - -
236 Solar Seal / Photo Seal Buah - 113,500.00 - - - -
237 Opstic 1/2" lengkap klem Batang - 208,250.00 - - - -
238 Pipa Paralon 1/2" Batang - 6,958.33 - - - -
239 Pipa L 1/2" Batang - 1,904.17 - - - -
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD)
(Rp) (Rp)

240 Pipa Paralon 1' Batang - 8,208.33 - - - -


241 Pipa Paralon 3/4" Batang - 7,583.33 - - - -
242 Pipa Paralon 3' Batang - 15,166.67 - - - -
243 Pipa PVC 1,5" Batang - 39,545.00 - - - -
244 Pipa PVC Galvanis 1,5" Batang - 136,360.00 - - - -
245 Pipa Besi Batang - 75,666.67 - - - -
246 Pipa Galvanis Batang - 88,291.67 - - - -
247 Pipa ornamen dia 2" x 2m Batang - 398,666.67 - - - -
248 Pipa ornamen dia 2" x 3m lengkap klem Batang - 517,666.67 - - - -
249 Pipa ornamen dia 2" x 6m lengkap klem Batang - 1,041,250.00 - - - -
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD)
(Rp) (Rp)

250 Pipa ornamen dia 2" x 7m lengkap klem Batang - 1,160,250.00 - - - -


251 Pondasi tiang lampu oktagonal (11 meter) Unit - 1,309,000.00 - - - -
252 Pres Conector Buah - 2,562.50 - - - -
253 Rangka Ring 32 Watt Buah - 12,583.33 - - - -
254 Rel MCB Buah - 18,916.67 - - - -
255 Roset Telpon Buah - 4,458.33 - - - -
256 Saklar Double Buah - 5,711.67 - - - -
257 Saklar Engkel Buah - 3,916.67 - - - -
258 Saklar Tripel Buah - 15,166.67 - - - -
259 Spul Contactor Buah - 50,416.67 - - - -
260 Sekring 63 A Buah - 8,208.33 - - - -
261 Solder Pistol Buah - 277,500.00 - - - -
262 Solder Buah - 18,916.67 - - - -
263 Solar Seal / Photo Seal Buah - 113,500.00 - - - -
264 Stop Kontak Buah - 3,812.50 - - - -
265 Steker Arde Buah - 7,583.33 - - - -
266 Steker T Buah - 8,833.33 - - - -
267 Steker PH Buah - 2,562.50 - - - -
268 Sadel No. 6 Bungkus - 895.83 - - - -
269 Sadel No. 8 Bungkus - 1,187.50 - - - -
270 Sadel No. 9 Bungkus - 1,312.50 - - - -
271 Sadel No. 10 Bungkus - 3,500.00 - - - -
272 Sadel No. 12 Bungkus - 4,500.00 - - - -
273 Sadel No. 14 Bungkus - 2,562.50 - - - -
274 Sadel No. 19 Bungkus - 3,812.50 - - - -
275 Sadel No. 22 Bungkus - 7,612.50 - - - -
276 Skun RS-16 Buah - 895.83 - - - -
277 Stater Buah - 2,562.50 - - - -
278 Ston 63 A Buah - 113,529.17 - - - -
279 Stost 40 A + Ip Buah - 47,958.33 - - - -
280 Stost 32 A + Ip Buah - 31,535.00 - - - -
281 Tedus Hitam Buah - 654.17 - - - -
282 Tali Tester Buah - 18,916.67 - - - -
283 Tang Amper Buah - 819,912.50 - - - -
284 Tang Buaya Buah - 25,229.17 - - - -
285 Tang Potong Buah - 25,229.17 - - - -
286 Tang Kombinasi Buah - 25,229.17 - - - -
287 Tang Jepit Buah - 25,229.17 - - - -
288 Tang Skun Buah - 252,279.17 - - - -
289 Time Swicht Theben Buah - 538,350.00 - - - -
290 Taping Buah - 416,250.00 - - - -
291 Taping Conector 1 baut Buah - 9,725.00 - - - -
292 Taping Conector 2 baut Buah - 15,855.00 - - - -
293 Tespen Buah - 6,291.67 - - - -
294 Timah Solder Buah - 18,916.67 - - - -
295 Terminal 25 ml Buah - 31,541.67 - - - -
296 Tolkit Buah - 56,750.00 - - - -
297 Wedge Klem Buah - 3,812.50 - - - -
298 Wide Klem Buah - 5,840.00 - - - -
299 WD 40 Buah - 31,537.50 - - - -
300 Klem Tiang uk. 5" s/d 8" x 2" Set - 175,000.00 - - - -
-
M. ALAT-ALAT PEMADAM KEBAKARAN -
1 Helm pemadam kebakaran Buah - 573,500.00 - - - -
2 Baju tahan panas Buah - 6,500,000.00 - - - -
3 Baret lengkap Buah - 50,000.00 - - - -
4 Celana tahan api Buah - 5,500,000.00 - - - -
5 Sepatu pemadam Pasang - 500,000.00 - - - -
6 Sarung tangan Pasang - 333,500.00 - - - -
7 Chainsaw Buah - 8,000,000.00 - - - -
8 Dahrem Buah - 60,000.00 - - - -
9 Handy Talky Buah - 2,500,000.00 - - - -
10 Tali pengaman Buah - 150,000.00 - - - -
11 Kapak Pemadam Buah - 300,000.00 - - - -
12 Kopel rem Buah - 45,000.00 - - - -
13 Y Connection 1.5" Buah - 4,500,000.00 - - - -
14 Y Connection 2.5" Buah - 5,000,000.00 - - - -
15 Pilar Hydrant Unit - 4,900,000.00 - - - -
16 Nozzle multi spray jet 1.5' Buah - 7,500,000.00 - - - -
17 Nozzle multi spray jet 2.5' Buah - 8,000,000.00 - - - -
18 Selang pemadan uk. 1.5 " x 20m - - - -
Roll - 2,750,000.00
+ Machino Coupling -
19 Selang pemadan uk. 2.5 " x 20m - - - -
Roll - 2,950,000.00
+ Machino Coupling -
20 Tac stick (alat pendeteksi kebocoran listrik) Buah - 9,600,000.00 - - - -
21 Hydrant tester (alat ukur hydrant) - 8,800,000.00 - - - -
22 Tabung pernapasan - - - -
Unit - 16,250,000.00
(continued breathing aparatus) -
23 Floating Pump (pompa apung) Unit - 82,916,700.00 - - - -
24 Hydrant Pillar Two Way 2,5" Machino Unit - 4,750,000.00 - - - -
25 Tabung Apar 3 Kg Unit - 666,666.67 - - - -
26 Tabung Apar 6 Kg Unit - 1,000,000.00 - - - -
27 Sepeda Motor 110 cc Unit - 10,000,000.00 - - - -
28 Sepeda Motor (Modifikasi) Unit - 15,833,333.33 - - - -
29 Repiter Unit - 35,182,250.00 - - - -
30 Mesin DF (Daug Feng) Unit - 5,000,000.00 - - - -
31 Pump Niagara Unit - 8,666,666.67 - - - -

WALIKOTA PONTIANAK
HARGA
HARGA DI JARAK ONGKOS
LOKASI ANGKUT ANGKUT TANPA
NO MATERIAL SATUAN KODE RATA-RATA PER UNIT KEUNTUNGAN KEUNTUNGAN
(Rp) (km) (Rp) (OVERHEAD) (OVERHEAD)
(Rp) (Rp)

H. SUTARMIDJI, SH, M.Hum


HARGA SATUAN UPAH DAN BAHAN

HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)

80,000.00
85,000.00
120,000.00
80,800.00
180,000.00
130,000.00
80,000.00
50,000.00
70,000.00

HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)

155,000.00
170,000.00
178,000.00
234,000.00
275,000.00
380,000.00
475,000.00
492,000.00
9,800.00
112,000.00
70,000.00
1,400.00
39,200.00
39,200.00
2,000.00
40,000.00
97,500.00
84,000.00
70,000.00
63,600.00
95,400.00
63,600.00
97,500.00
100,000.00

4,888,000.00
5,015,000.00
7,075,000.00
5,459,000.00
5,342,400.00
5,432,500.00
4,303,000.00
3,441,500.00
3,441,500.00
2,200,000.00
2,200,000.00
2,830,000.00
2,830,000.00
3,011,500.00
2,866,000.00
2,830,000.00
3,226,500.00
5,379,500.00
1,075,000.00
15,000.00
25,000.00
25,000.00
100,000.00
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)

5,300.00
26,500.00
48,000.00
21,200.00
15,900.00
80,000.00
19,000.00
33,000.00
42,400.00

24,500.00
18,000.00
64,700.00
11,000.00
43,000.00
479,000.00
59,400.00
180,000.00
145,000.00
225,000.00
385,000.00
425,000.00

16,500.00
13,500.00
125,000.00
12,700.00
15,900.00
50,800.00
12,000.00
50,800.00

58,300.00
58,300.00
58,300.00
70,000.00
65,500.00
43,000.00
76,000.00
19,000.00

94,000.00
138,000.00
84,800.00
123,000.00

68,900.00

742,000.00
212,500.00
35,000.00
15,100.00
19,100.00
35,000.00
43,600.00
67,200.00
108,200.00

4,500.00
5,750.00
4,500.00
50,000.00
5,000.00
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)

11,970,000.00
4,962,300.00
3,386,350.00
4,641,000.00
3,886,350.00
4,490,000.00
495,000.00
6,069,000.00
5,057,500.00
3,272,500.00
7,049,910.00
6,187,160.00
6,579,100.00
6,910,000.00
61,106,500.00
73,327,000.00
9,853,200.00
11,238,300.00
9,853,000.00
10,353,000.00
893,650.00
893,620.00
832,000.00
620,000.00
470,000.00
4,240,000.00
3,069,250.00
725,000.00
227,000.00
183,660.00
113,500.00
766,250.00
766,250.00
417,660.00
340,330.00
225,750.00
131,410.00
372,080.00
255,410.00
225,750.00
134,750.00
245,910.00
17,830.00
14,870.00
13,080.00
184,500.00
134,830.00
63,830.00
441,410.00
441,410.00
63,830.00
675,000.00
306,000.00
295,000.00
225,750.00
153,200.00
255,410.00
255,410.00
225,750.00
127,660.00
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)

306,000.00
295,100.00
50,410.00
50,410.00
37,840.00
1,910.00
3,160.00
3,160.00
3,160.00
4,500.00
4,500.00
3,580.00
5,660.00
12,580.00
11,910.00
8,250.00
4,750.00
489,160.00
119,830.00
37,830.00
31,500.00
125,000.00
31,500.00
5,000.00
5,660.00
31,500.00
31,500.00
25,250.00
63,830.00
134,750.00
75,660.00
18,910.00
20,160.00
29,000.00
34,080.00
35,330.00
46,660.00
31,500.00
105,000.00
40,900.00
52,900.00
25,160.00
30,330.00
47,250.00
125,000.00
36,580.00
71,910.00
81,910.00
2,700.00
4,200.00
6,600.00
10,200.00
5,580.00
11,100.00
15,910.00
15,100.00
19,910.00
21,580.00
21,300.00
31,500.00
51,150.00
69,600.00
59,910.00
248,500.00
277,500.00
340,500.00
122,330.00
78,800.00
116,300.00
5,910.00
5,410.00
7,160.00
8,900.00
10,000.00
11,500.00
15,900.00
11,100.00
16,000.00
11,160.00
20,750.00
1,250.00
3,250.00
7,910.00
2,160.00
55,000.00
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)

80,250.00
111,000.00
141,250.00
181,580.00
247,250.00
3,250.00
17,910.00
5,410.00
13,330.00
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)

9,250.00
4,000.00
5,000.00
7,160.00
25,160.00
9,160.00
23,160.00
2,830.00
4,830.00
845,000.00
501,200.00
408,400.00
157,700.00
50,410.00
25,160.00
50,410.00
163,910.00
7,160.00
31,500.00
1,830.00
2,500.00
1,500.00
6,450.00
9,000.00
7,500.00
3,750.00
50,410.00
1,005,500.00
7,250.00
6,330.00
31,500.00
1,330.00
3,160.00
25,250.00
15,850.00
15,850.00
20,100.00
25,250.00
11,360.00
63,080.00
63,080.00
7,500.00
90,800.00
75,660.00
50,450.00
118,330.00
290.00
142,000.00
25,000.00
40,000.00
88,250.00
88,250.00
3,810.00
10,120.00
770.00
12,620.00
12,620.00
12,620.00
113,500.00
47,910.00
47,910.00
214,200.00
61,820.00
31,500.00
31,500.00
12,620.00
31,500.00
31,500.00
3,160.00
56,750.00
828,750.00
454,080.00
1,206,600.00
22,720.00
44,140.00
44,140.00
17,830.00
17,830.00
1,900.00
5,700.00
47,290.00
113,500.00
208,250.00
6,950.00
1,900.00
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)

8,200.00
7,580.00
15,160.00
39,540.00
136,360.00
75,660.00
88,290.00
398,660.00
517,660.00
1,041,250.00
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)

1,160,250.00
1,309,000.00
2,560.00
12,580.00
18,910.00
4,450.00
5,710.00
3,910.00
15,160.00
50,410.00
8,200.00
277,500.00
18,910.00
113,500.00
3,810.00
7,580.00
8,830.00
2,560.00
890.00
1,180.00
1,310.00
3,500.00
4,500.00
2,560.00
3,810.00
7,610.00
890.00
2,560.00
113,520.00
47,950.00
31,530.00
650.00
18,910.00
819,910.00
25,220.00
25,220.00
25,220.00
25,220.00
252,270.00
538,350.00
416,250.00
9,720.00
15,850.00
6,290.00
18,910.00
31,540.00
56,750.00
3,810.00
5,840.00
31,530.00
175,000.00

573,500.00
6,500,000.00
50,000.00
5,500,000.00
500,000.00
333,500.00
8,000,000.00
60,000.00
2,500,000.00
150,000.00
300,000.00
45,000.00
4,500,000.00
5,000,000.00
4,900,000.00
7,500,000.00
8,000,000.00

2,750,000.00

2,950,000.00

9,600,000.00
8,800,000.00

16,250,000.00

82,916,700.00
4,750,000.00
666,660.00
1,000,000.00
10,000,000.00
15,833,330.00
35,182,250.00
5,000,000.00
8,666,660.00

WALIKOTA PONTIANAK
HARGA TERMASUK
KEUNTUNGAN
(OVERHEAD)
(Rp)

H. SUTARMIDJI, SH, M.Hum

Anda mungkin juga menyukai