Anda di halaman 1dari 1

KETERANGAN

DUSUN ARBI
ELEVASI +50 MDPL

GIP : 50 MM
L : 660 m PEKERJAAN

GIP : 75 MM
Pembangunan Jaringan SPAM Kiltai - Kilwaru
L : 264 m Kab. Seram Bagian Timur

PEMBERI TUGAS
GIP : 75 MM
L : 174 m
GIP : 50 MM
L : 462 m
GIP : 50 MM
L : 678 m PPK PERENCANAAN BALAI PRASARANA PERMUKIMAN WILAYAH
MALUKU

KOORDINAT
RESERVOIR
RENCANA KILTAI,KILWARU
DUSUN TALAG BARU
ELEVASI +60 MDPL X = 3°53'5,70"S DUSUN WAWASA
Y = 130°55'46,06"E ELEVASI +10 MDPL
Z = +100 m

Naomi Paramita Adhi, S.Ars


NIP.198711262009122001

GIP : 75 MM PERENCANA
GIP : 100 MM RESERVOIR RENCANA 200 M3 L : 384 m
L : 210 m ELEVASI +100 MDPL

GIP : 75 MM
GIP : 100 mm
L : 846 m PT. ANTARIKSA GLOBALINDO
L : 790 m Jl. Borong Raya Kompleks Graha Janna Land I Blok A2 No. 06 -kota Makasar
Kode Pos : 90223

KOORDINAT GIP : 50 MM PENANGGUN JAWAB


GIP : 75 MM RESERVOIR
RENCANA KILTAI,KILWARU
L : 696 m
L : 222 m X = 3°53'26 ,14"S
Y = 130°55'29,74"E DIREKTUR
Z = +40 m
GIP : 50 MM
L : 312 m
GIP : 100 mm
L : 1550 m

RESERVOIR RENCANA 100 M3


ELEVASI +40 MDPL

DUSUN ARKEL Ir. MUHAMMAD DAHIR


ELEVASI + 35 MDPL

TENAGA AHLI
GIP : 75 MM
L : 900 M
DIPERIKSA Sally Octaviana Sari, ST., MT

DIRENCANA Yanto Solihat, ST


Sumber Air
Sumur Dangkal
JUDUL GAMBAR SKALA
DUSUN NAMALAS
ELEVASI +14 MDPL
GIP : 50 MM
L : 390 M
SITE PLAN KESELURUHAN
SPAM KILTAI - KILWARU

DUSUN NAMALOMI
ELEVASI +11 MDPL

NOMOR GAMBAR DISIPLIN

00-02 ARS