Anda di halaman 1dari 8

PEKERJAAN VOLUME

Uraian Pekerjaan Panjang Lebar Tinggi


m m m
Timbunan Tanah 16 16 0.5
Galian Pondasi 92 0.8 0.8
Pondasi Batu Kali (1:3) 92 0.8 0.8
Urugan Tanah Kembali 92 0.8 0.8
Sloof Beton Bertulang 15x20 (1:2:3) 92 0.15
Kolom Beton Bertulang 15x15 (1:2:3) 1 1 5
Balok Praktis Beton Bertulang 15x15 (1:2:3) 92 1 1

Uraian Pekerjaan Panjang Lebar Tinggi


m m m
Lantai Keramik 30x30 20 4
Dinding 1/2 Bata (1:3) 92 5
Plesteran/ Acian (1:3) 46 5
Pekerjaan Plafond t=9mm 20 4
Pengecatan 46 5

PEMBESIAN
1 Kolom Praktis dia L (m) jumlah
Longitudinal 8 4 24
Longitudinal 8 5 52

Tranverse 8 0.45 1780

2 Balok Praktis dia L (m) jumlah


Longitudinal 8 92 8
Tranverse 8 0.45 3680

3 Sloof dia L (m) jumlah


Longitudinal 8 92 4
Tranverse 8 0.45 1840
Volume n (jumlah) Volume Total
m3 m3
128 1 128.00
38.64 1.5 57.96
38.64 1 38.64
38.64 0.5 19.32
13.8 1 13.80
5 19 95.00
92 2 184.00

Volume n (jumlah) Volume Total


m2 m3
80 1 80.00
460 1 460.00
230 1 230.00
80 1 80.00
230 1 230.00

L net (m) Berat (kg/m) Total (kg) TABEL TULANGAN


96 0.39 37.44 DIA BERAT / LJRBERAT / M'
260 0.39 101.4 mm Kg Kg
356 138.84
801 0.39 312.39 6 2.66 0.22
451.23 6.5 3.12 0.26
8 4.73 0.39
L net (m) Berat (kg/m) Total (kg) 9 5.98 0.50
736 0.39 287.04 10 7.39 0.62
1656 0.39 645.84 12 10.64 0.89
932.88 13 12.48 1.04
14 14.48 1.21
L net (m) Berat (kg/m) Total (kg) 16 18.98 1.58
368 0.39 143.52 19 26.77 2.23
828 0.39 322.92 22 35.89 2.99
466.44 25 46.35 3.86
28 58.14 4.85
29 62.37 5.20
32 75.72 6.31
36 96.11 8.01
ERAT / M'
RENCANA ANGGARAN DAN BIAYA (RAB)
PEKERJAAN : PEMBANGUNAN RUKO 1 LANTAI
LOKASI : SIDOARJO

USULAN HARGA
No. URAIAN PEKERJAA HARGA SATUAN
VOLUME SAT ANALIS JUMLAH HARGA
BAHAN
1 2 3 4 5 6 7

I. PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Lahan 256 m2 - 18,900.00 4,838,400.00
4,838,400.00

II. PEKERJAAN TANAH & PONDASI


1 Pekerjaan Urugan Tanah 50 cm 128 m3 - 189,180.00 24,215,040.00
2 Pekerjaan Galian Tanah Pondasi 57.96 m3 - 139,110.00 8,062,815.60
3 Pekerjaan Pondasi Batu kali 38.64 m3 - 1,204,757.00 46,551,810.48
4 Pekerjaan Urugan Kembali Tanah Galian 19.32 m3 - 14,222.00 274,769.04
79,104,435.12
III. PEKERJAAN STRUKTUR
1 Sloof (15x20) 13.80 m3 - 5,805,220.00 80,112,036.00
2 Kolom Praktis (11x11) 95.00 m' - 86,835.00 8,249,325.00
3 Balok Praktis/Ring Balk (10x15) 184.00 m' - 123,072.00 22,645,248.00
111,006,609.00

IV. PEKERJAAN ARSITEKTUR


1 Pasangan Dinding 1/2 Bata 1Pc : 3 Pp 460.00 m2 - 147,813.00 67,993,980.00
2 Plesteran 1,5 cm 1Pc : 3 Pp 230.00 m2 - 71,663.00 16,482,490.00
3 Cat Dinding 230.00 m2 - 25,464.00 5,856,720.00
4 Keramik 30x30 80.00 m2 - 318,155.00 25,452,400.00
5 Plafond Gypsum 9 mm 80.00 m2 - 46,626.00 3,730,080.00
6 Lampu TL 18 W + Trafo 6 titik - 119,000.00 714,000.00
120,229,670.00
V. PEKERJAAN ATAP
1 Rangka Atap Galvalum 0,8 mm 80.00 m2 417,630.00 33,410,400.00
2 Atap Seng Gelombang BJLS 40 104 m2 116,956.00 12,163,424.00
3 Pemasangan Talang PVC 4'' 24 m' 38,449.00 922,776.00
46,496,600.00
VII. PEKERJAAN SANITASI
1 Septic Tank 1 Unit
2 Closed Jongkok 1 Unit 74,790.00
RENCANA ANGGARAN DAN BIAYA (RAB)
PEKERJA : PEMBANGUNAN RUKO 1 LANTAI
LOKASI : SIDOARJO

No. URAIAN PEKERJAAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN 4,838,400.00


II. PEKERJAAN TANAH & PONDASI 79,104,435.12
III. PEKERJAAN STRUKTUR 111,006,609.00
IV. PEKERJAAN ARSITEKTUR 120,229,670.00
V PEKERJAAN ATAP 46,496,600.00
TOTAL 361,675,714.12
AH HARGA

tebal (m) Area (m2) kg/m3 kg Panjang kg/m


0.12 4.6875 2400 1350 5 270
0.12 1.5625 2400 450 2.5 180

Area (m2) kg/m2 kg Panjang kg/m


4.6875 250 1171.875 5 234.375
1.5625 250 390.625 2.5 156.25
Tinggi (cm) BB Ideal (kg)
Pria 160 54
Wanita 160 51

fy = 23.5 kN/cm2
fu = 38 kN/cm2

Asia = 61
Animasi = 16
Indo = 14
West = 133
Animasi west = 65
289
144.5
23500
38000