1 2 3 4 5
BOBOT M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17
KUANTITAS 3-Aug 10-Aug 18-Aug 26-Aug 3-Sep 11-Sep 18-Sep 26-Sep 3-Oct 11-Oct 18-Oct 26-Oct 3-Nov 11-Nov 18-Nov 26-Nov 3-Dec
No. URAIAN PEKERJAAN SATUAN HARGA SATUAN JUMLAH HARGA KONTRAK KET.
KONTRAK s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d
(%) 9-Aug 17-Aug 25-Aug 2-Sep 10-Sep 17-Sep 25-Sep 2-Oct 10-Oct 17-Oct 25-Oct 2-Nov 10-Nov 17-Nov 25-Nov 2-Dec 10-Dec
DIVISI 1. UMUM
1.2 Mobilisasi
100%
1.2 Mobilisasi Ls 1.00 Rp 310,500,000.00 Rp 310,500,000.00 3.519 1.284 1.284 0.952

1.8 Manajemen dan Keselamatan Lalu Lintas


1.8.(1) Manajemen dan Keselamatan Lalu Lintas Ls 1.00 Rp 95,000,000.00 Rp 95,000,000.00 1.077 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063

1.17 Pengamanan Lingkungan Hidup


1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 3.00 Rp 120,000.00 Rp 360,000.00 0.004 0.001 0.001 0.001
1.17.(2a) Pengujian Vibrasi lingkungan untuk kenyamanan dan kesehatan Buah 3.00 Rp 150,000.00 Rp 450,000.00 0.005 0.002 0.002 0.002
1.17.(2b) Pengujian Tingkat getaran kendaraan bermotor Buah 3.00 Rp 330,000.00 Rp 990,000.00 0.011 0.004 0.004 0.004
1.17.(3a) Pengujian NoX Buah 3.00 Rp 150,000.00 Rp 450,000.00 0.005 0.002 0.002 0.002
1.17.(3c) Pengujian Karbondioksida (CO2) Buah 3.00 Rp 150,000.00 Rp 450,000.00 0.005 0.002 0.002 0.002
1.17.(3f) Pengujian Particulate (TSP) debu Buah 3.00 Rp 150,000.00 Rp 450,000.00 0.005 0.002 0.002 0.002
75%

1.19 Keselamatan dan Kesehatan Kerja


1.19 Keselamatan dan Kesehatan kerja Ls 1.00 Rp 66,150,000.00 Rp 66,150,000.00 0.750 0.375 0.375

1.21 Manajemen Mutu


1.21 Manajemen Mutu Ls 1.00 Rp 51,000,000.00 Rp 51,000,000.00 0.578 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034

Rp 525,800,000.00 5.960

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK


3.1.(1) Galian Biasa M3 1,295.00 Rp 45,137.17 Rp 58,452,635.15 0.663 0.331 0.331
3.1.(7) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 112.80 Rp 476,398.73 Rp 53,737,776.74 0.609 0.102 0.102 0.102 0.102 0.102 0.102
50%
3.1.(8) Galian Perkerasan berbutir M3 376.00 Rp 57,483.06 Rp 21,613,630.56 0.245 0.041 0.041 0.041 0.041 0.041 0.041

Rp 133,804,042.45 1.517

DIVISI 5. PERKERASAN BERBUTIR DAN BETON SEMEN


5.1.(1) Lapis Pondasi Agregat Kelas A M3 931.00 Rp 801,147.27 Rp 745,868,108.37 8.454 1.409 1.409 1.409 1.409 1.409 1.409

Rp 745,868,108.37 8.454

DIVISI 6. PERKERASAN ASPAL


6.1 (1a) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 1,503.99 Rp 18,461.25 Rp 27,765,527.87 0.315 0.052 0.052 0.052 0.052 0.052 0.052
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 11,050.00 Rp 19,176.85 Rp 211,904,192.50 2.402 0.600 0.600 0.600 0.600
25%
6.3(5a) Laston Lapis Aus (AC-WC) Ton 3,128.00 Rp 1,569,946.90 Rp 4,910,793,903.20 55.662 13.916 13.916 13.916 13.916
6.3(6a) Laston Lapis Antara (AC-BC) Ton 263.95 Rp 1,513,566.33 Rp 399,505,832.80 4.528 0.755 0.755 0.755 0.755 0.755 0.755
6.3.(8) Bahan anti pengelupasan Kg 608.97 Rp 161,290.32 Rp 98,220,966.17 1.113 0.014 0.014 0.014 0.014 0.014 0.014 0.257 0.257 0.257 0.257

Rp 5,648,190,422.54 64.020

DIVISI 7. STRUKTUR
7.1 (7)a Beton mutu sedang fc’20 Mpa M3 740.00 Rp 1,756,871.70 Rp 1,300,085,058.00 14.736 3.684 3.684 3.684 3.684

Rp 1,300,085,058.00 14.736

DIVISI 9. PEKERJAAN HARIAN DAN PEKERJAAN LAIN LAIN


0%
9.4.(1) Marka Jalan Termoplastik M2 2,336.13 Rp 200,656.27 Rp 468,759,116.26 5.313 4.251 1.063
Rp 468,759,116.26 5.313

Rp 8,822,506,747.63 100.00

RENCANA 1.756 1.768 0.097 0.429 0.429 2.470 2.470 2.470 6.166 6.154 6.154 18.555 14.871 14.871 14.871 4.360 2.112
RENCANA KOMULATIF 0 1.756 3.524 3.621 4.050 4.478 6.948 9.418 11.888 18.054 24.207 30.361 48.916 63.787 78.657 93.528 97.888 100.000