GBR Konstruksi Dari Pak Simmy
GBR Konstruksi Dari Pak Simmy
600 B
③
DETAIL - A DETAIL - B
⑤
DILAS
0 PLAT STRIP 50 X 5 0
BAUT 16 X 50
BAUT 16 X 50
BAUT 12 X 50
20 30 150 30 20
1 ISOLATOR TUMPU 20 KV BH 3
2 CROSS ARM UNP 10 = 2000 mm BH 1
3 ARM TIE L 50.50.5 = 600 mm BH 2
4 ARM BAND UNP 8 = 200 mm SET 1
5 SINGLE POLE BAND BH 1
6 TIANG BESI BH 1
7
8
9
10
B A
4
900
0 DETAIL - B
1
DILAS 4
0
35 40
M. 12
DISESUAIKANDENGANØTIANG
3
2000
900
SKOR SILANG
DIRENCANA LISDES Sulut NO. Gambar
STANDAR KONSTRUKSI JARINGAN DISTRIBUSI
DIPERIKSA
DISETUJUI
3
100
50
200
250
300 400
COR TIANG
DIRENCANA LISDES Sulut NO. Gambar
STANDAR KONSTRUKSI JARINGAN DISTRIBUSI
DIPERIKSA
DISETUJUI
4
②
①
③
③
④⑤
③
⑦
⑥
350 Cm
③
45⁰- 60⁰
⑧⑨
KETERANGAN :
SKOR TARIK
DIRENCANA LISDES Sulut NO. Gambar
STANDAR KONSTRUKSI JARINGAN DISTRIBUSI
DIPERIKSA
DISETUJUI
5
2
225
1 DILAS
25 25
25
60
ANTI PANJAT
DIRENCANA LISDES Sulut NO. Gambar
STANDAR KONSTRUKSI JARINGAN DISTRIBUSI
DIPERIKSA
DISETUJUI
6
SINGLE GUY WIRE BAND
40
M 16 X 75 M 16 X 75
30
Ø₁
55
Ø1 / Ø2 Sesuaikan kebutuhan
Ø 18
DOUBLE GUY WIRE BAND
40
M 16 X 75 M 16 X 75 M 16 X 75
Ø₂
30
55
55
Ø : Sesuaikan kebutuhan
Ø 18
1
2
3
4
5
6
7
8
9
10
Dilas
50
Dilas
(L )
Besi Siku
Dilas
A 400 A
GUY ROD
DIRENCANA LISDES Sulut NO. Gambar
STANDAR KONSTRUKSI JARINGAN DISTRIBUSI
DIPERIKSA
DISETUJUI
8
① ⑥
④⑤
②
①
②
③
⑦
⑥
350 Cm
③
45⁰- 60⁰
⑧⑨
KETERANGAN :
④
⑤ ② ②
⑥
④ ④
⑤ ⑤
⑥ ⑥
③ ③ ③
① ① ①
TM TR3 TR1
1 GROUND ROD BH 1
2 KAWAT BC 50 MM M X
3 PIPA GALVANIS ½" 3 MTR BTG 1
4 STENLISS STEEL SRIP BH 4
5 STOPPPING BUCLE BH 4
6 LING BH 2
7 BIMETAL CONNECTOR BH 1
8
9
10
PENTANAHAN
DIRENCANA LISDES Sulut NO. Gambar
STANDAR KONSTRUKSI JARINGAN DISTRIBUSI
DIPERIKSA
DISETUJUI
10
MAX1.5 Mtr
④
①
③
A ④
④ ⑤
⑤
1200 s/d 1500 Square Pipe
1200 / 1460
C
HANTARAN AAAC 3 X ( SQM )
TIANG UTAMA
35 70 150 240
D 0 0 0
0 0 0
11-350 9-200 9-200 9-200 11-200
11-200 9-200 9-200 11-200
9-200 7-100 9-100
150
UNP.8
TR A FO
BERBAHAYA
TEGANGAN
TINGGI
COR BETON
400
400
PASIR HALUS
3000
1000
UNP.8
TR A F O
BERBAHAYA
TEGANGAN
TINGGI
COR BETON
400
400
PASIR HALUS
3000
1000
L.60.60.6 L.60.60.6
3
300
DETAIL. 3
400
400
2200
1
M16x200
UNP 10
UNP 10
L.60.60.6
BESI. O 19
100
DETAIL. 1
600
1700
40
TANGGA PANJAT
PIPA BESI 2"
COR BETON
400
PASIR HALUS
400
1500
1000
ARRESTER
800
400
800 UNP.8
DILAS
L.50.50.5
UNP.8
1000
860
1 Suspension Braket Bh 1
2 Suspension Clamp Bh 1
3 Stainless steel strap Mtr 1,2
4 Stopping bucle Bh 2
5 Plastic Strap Bh 2
1 Tension Braket Bh 1
2 Strain Clamp Bh 1
3 Stainless steel strap Mtr 1,2
4 Stopping bucle Bh 2
5 Plastic Strap Bh 2
6 Turn Bucle Bh 1
7 Pipa PVC 3" Cm 60
8 Link 25x50 Bh 2
9 Insulating -Tip Bh 4
1 Tension Braket Bh 1
2 Strain Clamp Bh 2
3 Stainless steel strap Mtr 1,2
4 Stopping bucle Bh 2
5 Plastic Strap Bh 2
1 Tension Braket Bh 1
2 Strain Clamp Bh 1
3 Plastic Strap Bh 1
4 Stainless steel strap Mtr 1,2
5 Stopping bucle Bh 2
6 Compression type connector Bh 4
1 Tension Braket Bh 2
2 Strain Clamp Bh 2
3 Stainless steel strIp Mtr 1,2
4 Stopping bucle Bh 2
5 Plastic Strap Bh 4
6 Turn Buckle Bh 1
7 Tension joint sleeve Bh 4
1 H1 Jarak proteksi antara jaringan tegangan menengah - TM dengan tegangan rendah tidak kurang dari 120 Cm
2 H2 Jarak antara jaringan tegangan rendah sirkit ganda tidak kurang dari 30 Cm
3 H3 Jarak proteksi antara jaringan tegangan rendah - TR dengan kabel telekomunikasi tidak kurang dari 100 Cm
4 H Jarak aman TM dengan kabel optik telekomunikasi 250 Cm (H1+H2+H3)
5 Konstruksi kabel pilin tegangan rendah pada sisi jalan raya
JARAK AMAN SALURAN TENAGA LISTRIK DENGAN SALURAN KABEL OPTIK TELEKOMUNIKASI
1 ISOLATOR TUMPU 20 KV BH 1
2 PLASTIC LINE TIE BH 1
1 ISOLATOR TUMPU 20 KV BH 1
2 PLASTIC SIDE TIE BH 1