NO URAIAN SAT VOL HARGA SATUAN JUMLAH HARGA


1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Air Kerja Is 600,000.00 600,000.00
2 Alat Kerja Is 4,000,000.00 4,000,000.00
SUB TOTAL I 4,600,000.00
II PEKERJAAN TANAH
1 Galian Tanah m3 256.00 12,000.00 3,072,000.00
2 Uruga Tanah m3 62.00 9,000.00 558,000.00
3 Pas. Bt Kali 1 . 6 m3 56.70 263,057.20 14,915,343.24
SUB TOTAL II 18,545,343.24
III PEKERJAAN PASANGAN
1 Pas Bata 1 : 6 m2 642.00 53,215.00 34,164,030.00
2 Plesteran 1 : 6 m2 1386.00 20,202.50 28,000,665.00
3 Pas. Sloof 15/20 m3 14.60 3,368,905,29 49,186,017.23
4 Fot plat m3 14.40 3,368,905.29 48,512,236.18
5 Kolom 40/40 m3 40.69 3,368,905,29 137,080,756.25
6 Balok Lantai 50/30 m3 31.35 3,368,905.29 105,615,180.84
7 Plat Lantai 15 cm m3 36.10 3,368,905,29 121,617,480.97
8 Balok Dag 20/35 m3 14.60 3,368,905,29 49,186,017.23
9 Plat dag 10 cm m3 37.10 3,368,905,29 124,986,386.26
10 Tangga m3 6.20 3,368,905,29 20,887,212.80
11 Luifel 8 cm m3 8.22 3,368,905,29 27,692,401.48
12 Kubah 12 cm m3 19.45 3,368,905,29 65,525,207.89
SUB TOTAL III 812,453,592.14
IV PEKERJAAN PALFON
1 Plafon Gipsum 9 mm + CAT m2 2.90 100,665.00 291,899.50
2 Titik Lampu ttk 45.00 80,000.00 3,600,000.00
3 Stop Kontak ttk 4.00 65,000.00 260,000.00
4 MCB ttk 1.00 1,260,000.00 1,260,000.00
SUB TOTAL IV 5,411,899.50
V PEKERJAAN LANTAI + ROSTER
1 Lantai Keramik 60/60 m2 626 75,811.25 47,457,842.50
2 Roster bh 48 17,500.00 840,000.00
3 Pas. Lantai rabat 1 . 3 . 5 = 5 cm m2 162.00 32,598.75 5,280,997,50
SUB TOTAL V 53,578,840.00
VI PEKERJAAN PINTU JENDELA
1 Kosen kayu bengkirai m3 5.10 8,731,250.00 44,529,375.00
2 Daun pintu panil ky bengkirai m2 22.40 399,135.00 8,940,624.00
3 Daun jendela kaca bengkirai m2 12.28 342,150.00 4,201,602.00
4 Engsel jendela bh 64.00 3,000.00 192,000.00
5 Grendel jendela bh 32.00 4,000.00 128,000.00
6 Engsel pintu bh 30.00 3,000.00 90,000.00
7 Kunci pinti bh 6.00 60,000.00 360,000.00
8 kait angin bh 64.00 3,000.00 192,000.00
9 Pas kaca m2 86.00 67,042.50 5,765,655.00
SUB TOTAL VI 64,399,256
VII PEKERJAAN PENGECATAN + RAILING
1 Cat Kayu m2 92.00 18,468.91 1,699,139.72
2 Cat Dinding m2 1386.00 20,579.35 28,522,979.10
3 Railing Tangga Besi 80 cm m' 53.70 485,000.00 26,044,500.00
SUB TOTAL VII 56,266,618.82

TOTAL 1,015,225,549.70
REKAPITULASI RENCANA ANGGARAN BIAYA
PEMBANGUNAN MASJID DESA BROKOH
TAHUN 2009

Desa : Brokoh
Kecamatan : Wonotunggal
Kabupaten : Batang
Propinsi : Jawa Tengah

SUB TOTAL I PEKERJAAN PERSIAPAN Rp 46,00,000,00

SUB TOTAL II PEKERJAAN TANAH Rp 18,454,343,14

SUB TOTAL III PEKERJAAN PASANGAN Rp 812,453,592,14

SUB TOTAL IV PEKERJAAN PLAFON Rp 5,411,899,50

SUB TOTAL V PEKERJAAN LANTAI + ROSTER Rp 53,578,840,00

SUB TOTAL VI PEKERJAAN PINTU JENDELA Rp 64,399,256,00

SUB TOTAL VII PEKERJAAN PENGECATAN + RAILING Rp 56,266,618,82

Jumlah Rp 1,015,255,549,70

Dibulatkan Rp 1,015,255,000,00

Terbilang : Satu milyar lima belas juta dua ratus lima puluh lima ribu rupiah

PANITIA REAHAB MASJID JAMI'


" DARUL MUTTAQIN "
Desa Brokoh Kecamatan Wonotunggal Kab. Batang

Ketua Sekretaris

H. THOYIBIN SUHARDI
DAFTAR DONATUR REHAB MASJID JAMI'
DARUL MUTTAQIN
DESA BROKOH KECAMATAN WONOTUNGGAL
Sekretariat : Jl. Raya Brokoh Km. 1 Wonotunggal - Batang

NO NAMA DONATUR JUMLAH KETERANGAN

10

11

12

13

14

15
16

17

18

19

20

21

22

23

24

25

26

27

28

29
30

31

32

33

34

35

Anda mungkin juga menyukai