1. PEKERJAAN PENDAHULUAN
1 M2 MEMBERSIHKAN LOKASI
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 0.2500 175,000.00 43,750.00
Mandor L.04 Oh 0.0050 250,000.00 1,250.00
JUMLAH TENAGA KERJA 45,000.00
B BAHAN
C PERALATAN
C PERALATAN
C PERALATAN
C PERALATAN
C PERALATAN
C PERALATAN
PENGECATAN BIDANG BESI (1 lapis Plamur, 1 lapis cat dasar, 2 lapis cat Penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 0.0700 175,000.00 12,250.00
Tukang L.02 Oh 0.0090 230,000.00 2,070.00
Kepala Tukang L.03 Oh 0.0060 240,000.00 1,440.00
Mandor L.04 Oh 0.0030 250,000.00 750.00
JUMLAH TENAGA KERJA 16,510.00
B BAHAN
Cat dasar Kg 0.1700 75,000.00 12,750.00
cat Penutup Kg 0.2600 85,000.00 22,100.00
Kuas bh 0.0100 10,500.00 105.00
Pengencer Kg 0.0300 118,400.00 3,552.00
Ampelas Lbr 0.2000 7,500.00 1,500.00
JUMLAH HARGA BAHAN 40,007.00
C PERALATAN
PENGECATAN PLAFOND(1 lapis Plamur, 1 lapis cat dasar, 2 lapis cat Penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 0.0700 175,000.00 12,250.00
Tukang L.02 Oh 0.0090 230,000.00 2,070.00
Kepala Tukang L.03 Oh 0.0060 240,000.00 1,440.00
Mandor L.04 Oh 0.0030 250,000.00 750.00
JUMLAH TENAGA KERJA 16,510.00
B BAHAN
Cat dasar Kg 0.1700 55,000.00 9,350.00
cat Penutup Kg 0.2600 60,000.00 15,600.00
Kuas bh 0.0100 10,500.00 105.00
Pengencer Kg 0.0300 118,400.00 3,552.00
Ampelas Lbr 0.2000 7,500.00 1,500.00
JUMLAH HARGA BAHAN 30,107.00
C PERALATAN