drjt
= 113.20
= 8.31
Dec
27.2
20.4
87
85
49
35
5.8
139
DATA PERHITUNGAN KEBUTUHAN AIR (IR = ET + Pd + P&I -Re)
Dari pertimbangan a & b di atas ditetapkan elevasi puncak mercu adalah: 353.20
m
m
m
m
m
m
m
m
m
m
m
Yang terbesar
0.22
m3/detik
m2/detik
m HC
m H1
m
C d Beff 2
3 H 11.5 2
3 g
m2/detik
PERHITUNGAN HIDROLIKA SUNGAI SEBELUM DIBENDUNG
B= 19.00 INI NYARI Yn PAKE GOALSEEK
n= 0.03 40
So = 0.001
Yn = 2.071547
Q= 40
nQ/(So)^0.5 = AR^2/3 40
37.947 = 37.94733
Energi Spesifik (Es) = 2.124188
ycr = 0.767328
PERHITUNGAN HIDROLIKA SUNGAI DIBENDUNG
Sungai akan mengalami kenaikan kedalaman sungai ketika kenaikan dasar sungai mencapai kenaikan dasar kritis
Escr = 1.150993
∆Zkr = Es-Escr = 0.973196
Maka, Tinggi Mercu harus > ∆Zkr agar air di sungai dapat terbendung
H1/r 1.428571
GOALSEEK
0.666667
Y1 = 0.2772039595
Kecepatan Awal Loncat Air :
𝑉_1=𝑞/𝑌1
V1 = 8.01656017417016
Froud Number Loncat Air :
𝐹𝑟=(𝑉_1 " " )/√(𝑔.ℎ𝑧) hz=y1
Fr = 4.86131584353401
Kedalaman Air di awal loncatan (Yu) :
Yu = q/V1
Yu = 0.277203959546435
Tinggi Loncat Air :
𝑌2=1/2 (√(1+8 〖𝐹𝑟〗 ^2 )−1)𝑌1
Y2 = 1.77219174606049
Kecepatan setelah Loncat Air :
𝑉2=𝑞/𝑌2
V2 = 1.25394005877871
Garis Energi Hilir :
𝐻2=𝑌2+ 〖𝑉 2 〗 ^2/2𝑔
L= 8.97
Panjang Peredam Energi (Lj)
𝐿𝑗=5𝑥(𝑛+𝑌2)
n= 0
Lj = 8.86095873030243
Elevasi Profil
X z
Dasar Sungai Bendung (y)
-2 350.5 350.5
-1.5 350.5 350.5
-1 350.5 350.5
-0.95 350.5 350.5
-0.9 350.5 350.5
-0.85 350.5 350.5
-0.806 350.5 350.5
Jari-jari -0.806 350.5 352.39
-0.800 350.5 352.5
-0.700 350.5 352.8
-0.600 350.5 352.9
-0.5 350.5 353.0
-0.4 350.5 353.1
-0.3 350.5 353.1
-0.2 350.5 353.2
-0.1 350.5 353.2
Puncak 0.00 350.5 353.2 0.0000
0.1 350.5 353.2 0.0062
0.2 350.5 353.2 0.0252
0.3 350.5 353.1 0.0579
0.4 350.5 353.1 0.1063
0.5 350.5 353.0 0.1739
135 derajat 0.57 350.5 353.0 0.2360
0.6 350.5 352.9 0.2680
0.68 350.5 352.8 0.3736
0.78 350.5 352.7 0.4736
0.88 350.5 352.6 0.5736
0.98 350.5 352.5 0.6736
1.08 350.5 352.4 0.7736
1.18 350.5 352.3 0.8736
1.28 350.5 352.2 0.9736
1.38 350.5 352.1 1.0736
1.48 350.5 352.0 1.1736
1.58 350.5 351.9 1.2736
1.68 350.5 351.8 1.3736
1.78 350.5 351.7 1.4736
1.88 350.5 351.6 1.5736
1.98 350.5 351.5 1.6736
2.08 350.5 351.4 1.7736
2.18 350.5 351.3 1.8736
2.28 350.5 351.2 1.9736
2.38 350.5 351.1 2.0736
2.48 350.5 351.0 2.1736
2.58 350.5 350.9 2.2736
2.68 350.5 350.8 2.3736
2.78 350.5 350.7 2.4736
2.88 350.5 350.6 2.5736
loncatan
awal(y1) 2.98 350.5 350.5 2.6736
Akhir Loncatan
11.95 350.5 350.5 2.6736
12.05 350.5 350.5 2.6736
12.15 350.5 350.5 2.6736
12.25 350.5 350.5 2.6736
12.35 350.5 350.5 2.6736
12.45 350.5 350.5 2.6736
12.55 350.5 350.5 2.6736
12.65 350.5 350.5 2.6736
12.75 350.5 350.5 2.6736
12.85 350.5 350.5 2.6736
12.95 350.5 350.5 2.6736
13.05 350.5 350.5 2.6736
13.15 350.5 350.5 2.6736
13.25 350.5 350.5 2.6736
dasar sungai
0.805694792891324
1.89430520710867
B
354.5
354.0
353.5
353.0
352.5
352.0
351.5
351.0
0.6613 3.230354 1.2683 353.86
0.6578 3.247792 1.2785 353.85 350.5
0.6473 3.300372 1.3097 353.82
350.0
0.6304 3.389056 1.3629 353.77
0.6076 3.516076 1.4402 353.70 349.5
0.5795 3.686289 1.5460 353.61
349.0
0.5569 3.835902 1.6411 353.52
0.5463 3.910783 1.6894 353.48 348.5
0.5150 4.148336 1.8456 353.34 -3 -2 -1 0 1 2 3 4
0.4898 4.361415 1.9896 353.22 P
0.4680 4.564558 2.1302 353.09
0.4489 4.759038 2.2678 352.98
0.4319 4.945876 2.4027 352.86
0.4168 5.125909 2.5351 352.74
0.4031 5.299830 2.6652 352.63
0.3907 5.468221 2.7932 352.52
0.3793 5.631580 2.9193 352.41
0.3689 5.790332 3.0436 352.30
0.3594 5.944846 3.1662 352.19
0.3505 6.095445 3.2873 352.08
0.3422 6.242411 3.4069 351.97
0.3345 6.385996 3.5251 351.86
0.3273 6.526423 3.6420 351.75
0.3206 6.663891 3.7577 351.65
0.3142 6.798581 3.8722 351.54
0.3082 6.930653 3.9856 351.43
0.3026 7.060255 4.0979 351.33
0.2972 7.187520 4.2092 351.22
0.2921 7.312571 4.3195 351.12
0.2873 7.435520 4.4289 351.01
0.2827 7.556468 4.5374 350.91
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Cw = 6.251
OK
Cw ijin = 5
GESER
GULING
Angka Keamanan
= 2
(SF) ijin
OK
Angka Keamanan
= 8.61
(SF) bendung
Tabel gaya-gaya yang bekerja
Gaya Berat
L W V H
B (vertikal)
(horizontal) (kN/m2) (kN/m2) (kN/m2)
Gaya Angkat
V1 5.98 1.00 5.98
V2 4.18 3.58 14.96
V3 3.41 9.90 33.76
V4 0.80 9.90 3.96
V5 4.67 1.00 4.67
Tekanan
H1 3 1.78 23.57
H2 3 0.40 10.59
H3 2.00 1.68 16.48
H4 2.00 4.30 84.37
H5 1.50 4.18 -61.51
H6 1.50 1.74 -12.80
H7 1.50 1.26 9.27
H8 1.50 3.41 50.18
H9 2.00 2.30 -45.13
H10 2.00 2.30 -22.56
Daya dukung tanah
Fa1 6.67 *) belum di cek rumusnya
Fa2 -6.67
JUMLAH TOTAL 435.91 63.33 52.46
Perbandingan b : h = 1;1
b= 1h
A (saluran) = (b+mh)h
1.80030497918461 = (h+1.5h)h
1.80030497918461 = 2.5 h2
h= 0.85 ≈
b=1h -> b = 0.85 ≈
BANGUNAN PENGAMBILAN
karena tinggi muka air yang berubah – ubah di sungai, pengambilan harus direncanakan sebagai pintu aliran b
Rumus aliran tenggelam pada pintu :
Q .a .b 2 .g . z
Q = Debit pengambilan (m3/dt)
µ = Koefisien debit untuk bukaan dibawah permukaan air dengan kehilangan energi
a = Tinggi bukaan pintu (tinggi bendung - elevasi bukaan maksimum - tinggi aman agar sedi
b = Lebar bukaan pintu (m)
z (H1-H2) = kehilangan tinggi energi bukaan (m)
DATA :
a = 1.4
µ = 0.8
g = 9.81
H1 = 1.15
H2 = 1.05
Q .a .b 2 .g . z
3.601 = 1.569 b
b= 2.30 m
H1 = 1.60 m a = 1.40 m
+ 449.5 m
P ambang = 1.0 m
+ 448.5 m
BANGUNAN PEMBILAS
KONTROL PERHITUNGAN :
Kecepatan Kritis :
Vc Kritis > Vc Pembilas
2.762 > 0.530 OK
Lebar Pintu
1/10 Lebar normal sungai < 2.0 < 1/6 Lebar normal sungai
1.8 < 2.0 < 3.0
0.5 m
0.75 m
0.5 m
0.75 m
(ke pintu
pengambilan)
PERHITUNGAN :
Volume sedimen yang harus ditampung (Vs)
𝑉𝑠=0.0001 𝑥 𝑇 𝑥 𝑄
Vs = 217.765 m3
Luas saluran yang diperlukan
L.B (Luas) = Q/W = 180.0 m2
Lebar Kantong Lumpur (B)
Lebar yang ditetapkan ≥ 8 m, maka direncanakan B = 10 m DITENTUKAN SENDIRI
sehingga panjang kantong lumpur minimal :
L = Luas (L.B)/B 18.00 m
Kecepatan aliran di kantong lumpur rencana (v) = 0.4 m/det DITENTUKAN SENDIRI
sehingga luas penampang melintang aliran di kantong lumpur :
𝐴=𝑄/𝑣 A= 9.0 m2
𝑖_𝑠= 0.00316
DI SOAL
0.8 m
0.8 m
n : kekasaran manning
t : kehilangan energi di muka pintu 1 h= 0.8
1
1
h : h saluran + 350.5 m
b = 0.8 m
an kehilangan energi
mum - tinggi aman agar sedimen tidak dibawa masuk ke aliran)
a = 1.40 m H2 = 1.50 m
Berdasarkan minimum)
r normal sungai
OK
+451,5 m
+448,5 m
DITENTUKAN SENDIRI
DITENTUKAN SENDIRI
m
kaan Pintu (a) :
aman agar sedimen tidak terbawa masuk = 1 m dari elevasi dasar sungai
ggi bukaan maksimum yang direncanakan = 0.3 m dari puncak mercu