Anda di halaman 1dari 86

LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV
PERENCANAAN STRUKTUR ELEMEN ATAS

Bentang Tumpuan ( - ) Tumpuan ( + ) Lapangan


Keterangan Kombinasi Beban
m kN-m kN-m kN-m

1,4D 47,0 36
B1 250 x 500 5,0 1,2D+1,6L 59,0 37
D+L±Q 123,0 62

1,4D 129,0 29
B2 250 x 500 4,0 1,2D+1,6L 131,0 34
D+L±Q 155,0 118

1,4D 55,0 33
B3 300 x 550 5,0 1,2D+1,6L 68,0 39
D+L±Q 148,0 83

1,4D 36,0 17
S1 250 x 450 5,0 1,2D+1,6L 31,0 15
D+L±Q 34,0 16

1,4D 49,0 26
S2 250 x 450 4,0 1,2D+1,6L 42,0 22
D+L±Q 46,0 24

1,4D 13,0 2
S3 150 x 250 5,0 1,2D+1,6L 11,0 2
D+L±Q 12,0 2

1,4D 12,0 4
B4 150 x 250 4,0 1,2D+1,6L 13,0 4
D+L±Q 17,0 5

1,4D 22,0 26
Bx 200 x 450 2,2 1,2D+1,6L 26,0 32
D+L±Q 35,0 31

1,4D 27,0 18
By 200 x 450 4,3 1,2D+1,6L 32,0 19
D+L±Q 49,0 20

BAB IV - 1
LAPORAN PERHITUNGAN KONSTRUKSI

4.1a Perencanaan dan Pemeriksaan Balok SRPMK B1 250 x 500

Pemeriksaan Balok Lentur SRPMK Dan Perencanaan Tulangan Transversal

Data Perencanaan sbb :


f'c = 25 Mpa Panjang bentang = 5 m
fy = 360 Mpa Beban qd = 28,5 kN/m
balok = 250 x 500 mm Beban ql = 11,2 kN/m
kolom = 350 x 450 mm
tebal pelat = 120 mm
sb = 40 mm
ds = 10 mm
db = 16 mm

1) Tabel 1a Kebutuhan tulangan lentur balok B1


Tabel 1a menunjukkan kebutuhan tulangan lentur untuk balok B1 . Di bagian tumpuan, akibat beban
gempa akan timbul secara bergantian momen positif dan momen negatif, oleh karena itu dibagian tumpuan
perlu disediakan tulangan tarik, baik pada sisi atas maupun sisi bawah
Tabel 1a

Balok Lokasi Mu (kN-m) As (mm2) Terpasang Φ Mn (kN-m)

Tumpuan - 123,00 924,39 5 D 16 (AS = 1004,8 mm2 ) - 126,14


+ 62,00 448,35 3 D 16 (AS = 602,88 mm2 ) + 82,35
250 x 500
Lapangan - 37,00 429,72 3 D 16 (AS = 602,88 mm2 ) - 82,35
+ 37,00 429,72 3 D 16 (AS = 602,88 mm2 ) + 82,35

BAB IV - 2
LAPORAN PERHITUNGAN KONSTRUKSI

2) Tabel 1b Tulangan terpasang pada balok B1


Tabel 1b menunjukkan jumlah tulangan terpasang untuk balok B1 pada potongan penampang di bagian
tumpuan dan lapangan
Tabel 1b

Lokasi Tulangan Terpasang Φ Mn (kN-m)

Atas 5 D 16 ( 1004,8 mm2 ) - 126,14


Tumpuan
Bawah 3 D 16 ( 602,88 mm2 ) + 82,35
Atas 3 D 16 ( 602,88 mm2 ) - 82,35
Lapangan
Bawah 3 D 16 ( 602,88 mm2 ) + 82,35

3) Pemeriksaan persyaratan umum untuk komponen lentur bagian dari SRPMK

a. ln ≥ 4d
4650 > 1768 -------> OK

d = h - selimut beton - diameter sengkang - db/2


d = 442,0 mm

ln = panjang bentang - lebar kolom


ln = 4650 mm

b. bw ≥ 0.3 h atau 250 mm

250 > 150 mm -------> OK


bw = 250 > 250 mm -------> OK

BAB IV - 3
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 4
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 5
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 6
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 7
LAPORAN PERHITUNGAN KONSTRUKSI
Pada jarak 1113 mm, dari muka tumpuan hingga ke bagian lapangan bekerja gaya geser sebesar

Vu = 155,7 - 39,80 ( 1,20 ) 107.914,4 N


Vc = ? ? G? ? ? ? ? bw d ) 93.925,0 N

?? 49.960,8 N
Vs = - ??
?
Cek Vs terhadap Vc1

Vs < Vc1
50,0 < 182,3 -------> PNP OK

Rencana pakai sengkang tertutup 2 kaki diameter = 10 mm


maka jarak sengkang ditentukan nilai yang terkecil antara :
S1 = Av fy d / Vs 500,0 mm
S2 = d/2 221,0 mm
S3 = Av fy / 0.35 bw 645,9 mm
S4 = 600,0 mm

Dipasang sengkang 2 kaki, pada jarak 1113 mm, dari


muka tumpuan hingga ke bagian lapangan 1,0 D 10 - 200

BAB IV - 8
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 9
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 10
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 11
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 12
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 13
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 14
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 15
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 16
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 17
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 18
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 19
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 20
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 21
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 22
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 23
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 24
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 25
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 26
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 27
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 28
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 29
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 30
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 31
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 32
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 33
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 34
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 35
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 36
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 37
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 38
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 39
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 40
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 41
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 42
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 43
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 44
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 45
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 46
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 47
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 48
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 49
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 50
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 51
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 52
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 53
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 54
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 55
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 56
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 57
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 58
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 59
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 60
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 61
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 62
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 63
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 64
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 65
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 66
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 67
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 68
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 69
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 70
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 71
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 72
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 73
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 74
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 75
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 76
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 77
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 78
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 79
LAPORAN PERHITUNGAN KONSTRUKSI

BAB IV - 80
LAPORAN PERHITUNGAN KONSTRUKSI
4.4 Perencanaan Tangga
PERENCANAAN TANGGA BAGIAN BAWAH

Analisis Kelayakan Tangga


Data yang direncanakan sebagai berikut :

fc = 25 Mpa
fy = 360 Mpa
Tinggi tangga h = 400,0 cm
Optrede O = 20 cm

Jumlah Optrede so = ݄ 20,0 buah


ܱ 20 buah

Tangga dibagi 2 bagian, yaitu bagian atas dan bagian bawah


Bagian bawah 10 optrede -> h bawah = O x 10 200 cm
bagian atas optrede -> h atas = O x 0 0 cm

a. Syarat tangga ---> 2 Optrede + 1 antride = 65 cm


Antrede (syarat tangga) A = 25 cm
L pelat tangga Ll = 250 cm
L anak tangga (u/2 org) La = 120 cm
L pelat bordes Lb = 150 cm

Sudut kemiringan < 45o ἀ = ଵȀଶሺ௛ ௧௔௡௚௚௔ሻ 38,66 o


Arc tg x
௅ ௧௔௡௚௚௔

--> Sudut kemiringan tangga OK

Cek kesesuaian lebar Antrede


Cek lebar Antrede = --> lebar terpenuhi OK 25,00 cm
Cek L pelat tangga = --> lebar terpenuhi OK 250,00 cm
--> syarat lebar optrede terpenuhi OK

9.44 kN/m
C
B
320 cm
200 cm
11.76 kN/m

A
250 cm 150 cm

BAB IV - 81
LAPORAN PERHITUNGAN KONSTRUKSI
Perhitungan pembebanan
a. Tangga
Tangga (pjg sisi miring) Lm = ‫ݐݐ݈݌݈ ܮ‬
ܽ݊݃݃ܽ ଶ ൅ ͲǤͷ݄‫ݐ‬
ܽ݊݃݃ܽ ଶ 3,20 m

Tebal pelat tangga Tp = ‫݉ܮ‬ ݂‫ݕ‬ 146,36 mm


‫Ͳ ݔ‬ǤͶ൅ 150 mm
ʹͲ ͹ͲͲ

Cos 38,66 = 0,783


T = O x cos (ἀ ) 15,65 cm
t = 1/2 X T 7,83 cm
t = Tp + t 22,83 cm

Beban Mati (DL)


Berat sendiri pelat tangga = t x La x 2400 kg/m3 6,57 Kn/m
La x 2
Berat penutup lantai/keramik = 24 kg/m 0,29 Kn/m
Berat adukan = La x 21 kg/m2 0,25 Kn/m
Berat sandaran = La x 73 kg/m2 0,88 Kn/m
Total DL = 7,99 Kn/m

Beban Hidup (LL)


LL = 0,85 x La x 133 kg/m2 1,36 Kn/m
Beban terfaktor qu = 1,2 DL + 1,6 LL 11,76 Kn/m

b. Pembebanan bordes
Beban Mati (DL)
Berat sendiri pelat tangga = Tp x La x 2400 kg/m3 4,32 Kn/m
La x 2
Berat penutup lantai/keramik = 24 kg/m 0,29 Kn/m
Berat adukan = La x 21 kg/m2 0,25 Kn/m
Berat sandaran = La x 73 kg/m2 0,88 Kn/m
Total DL = 5,74 Kn/m

Beban Hidup (LL)


LL = La x 133 kg/m2 1,6 Kn/m
Beban terfaktor = 1,2 DL + 1,6 LL 9,44 Kn/m

Analisa Struktur (metode cross)

Mu

Tulangan tumpuan A 9,20


Tulangan tumpuan B 6,13
Tulangan tumpuan B C 0,41
Momen Maximum 9,1974

a. Penulangan Pelat Tangga Dan Pelat Bordes


Tebal pelat tangga Tp = 150 mm
Selimut beton sb = 20 mm
fc = 20 Mpa
fy = 360 Mpa
Tulangan Lentur db = 10 mm
Tulangan susut/bagi ds = 10 mm
d (tinggi efektif) = Tp - sb - 1/2db 125 mm

BAB IV - 82
LAPORAN PERHITUNGAN KONSTRUKSI
Hitung tulangan lentur pelat tangga dan pelat bordes
M maximum = 9,2 kn-m
Lebar pelat yang ditinjau bw pelat = 1000 mm
Reduksi kekuatan beton Φ = 0,9
Reduksi kekuatan beton β1 = 0.85


Ratio tulangan seimbang ρb = ଴Ǥ଼ହఉ ଵǤ௙ ௖ x ଺଴଴ 0,0251
௙௬ ଺଴଴ା௙௬
Ratio tulangan maximum ρmax = 0.625 x ρb 0,0157

Ratio tulangan ρ rencana = ͲǤͺ ͷ ݂ܿ Ͷ‫ݑ ܯ‬ 0,0019


ͳ െ ͳെ
݂‫ݕ‬ ͳǤ͹ Ȱ ݂ܿ ܾ݈݁ܽ‫ݐ ݓ‬ ‫݀ݐ‬ଶ
‫݈ܽ݁݌‬

Ratio tulangan minimum ρ min = jika fc ≤ 30 Mpa 1.4 / fy 0,0039


Ratio tulangan minimum ρ min = jika fy > 30 Mpa sqrt(fc/(4fy)) 0,1179
Ratio tulangan minimum ρ min = 0,0039

ρmax > ρ rencana


0,0157 > 0,0019 --> OK

ρ min > ρ rencana


0,0039 > 0,0019 0,0039
--> pakai ratio minimum

Luas tulangan dibutuhkan As perlu = ρ x bw pelat x d 486 mm2


Jarak antar tulangan utama/pokok s perlu = bw pelat x Asdb x Asperlu 161 mm

Jarak max antar tulangan SNI 2013 s1 = ≤ 3 x Tp 450 mm


Jarak max antar tulangan SNI 2013 s2 = 450 mm 450 mm

Menentukan tulangan utama/pokok = D 10 - 120 As = 654

Periksa kuat momen rencana


Tinggi tegangan blok beton a = ‫ݕ ݂ ݏܣ‬ 13,85 mm
ͲǤͺ ͷ ݂ܿ ܾ݈݁ܽ‫ݐ ݓ‬
‫݈ܽ݁݌‬‫ݐ‬
Kuat momen rencana ΦMn = ܽ 25,03 kn-m
Ȱ ‫ ݕ݂ݏܣ‬ሺ݀െ ሻ
ʹ
ΦMn > Mu
25,03 > 9,20 --> OK

Luas minimum tulangan susut/suhu


fy = 280 - 350 Mpa = 0,0020 250 mm2
fy = 420 Mpa = 0,0018 225 mm2
fy > 420 Mpa = Ͷʹ Ͳ 263 mm2
ͲǤͲͲͳͺ ‫ݔ‬
݂‫ݕ‬

Luas tulangan susut/suhu pilih Ash = 250 mm2


Jarak antar tulangan susut/suhu s susut = bw pelat x Asds x/ Asperlu 314 mm

Jarak max antar tulangan SNI 2013 s1 = ≤ 3 x Tp 450 mm


Jarak max antar tulangan SNI 2013 s2 = 450 mm 450

Menentukan tulangan susut/suhu = D 10 - 200 As = 393 mm2

BAB IV - 83
LAPORAN PERHITUNGAN KONSTRUKSI
b. Penulangan Balok Bordes

h balok h = 300 mm
b balok bw = 200 mm
panjang balok p = 1.200 mm
Tebal pelat tangga Tp = 150 mm
L anak tangga (u/2 org) La = 120 cm
Selimut beton sb = 20 mm
fc = 20 Mpa
fy = 360 Mpa
Es = 200.000
Tulangan Lentur db = 13 mm
Tulangan sengkang ds = 10 mm
d (tinggi efektif) = h - sb - ds-(1/2db) 264 mm

1. Pembebanan balok bordes


Beban Mati (DL)
Berat balok = h x bw x 2400 kg/m3 1,44 Kn/m
Berat plesteran 2 cm = 2 x La x 21 kg/m2 1,01 Kn/m
2 x 2
Berat dinding = 250 kg/m 5,00 Kn/m
Beban sendiri pelat = Tp x La x 2400 kg/m3 4,32 Kn/m
Berat adukan = La x 21 kg/m2 0,25 Kn/m
Berat keramik = La x 24 kg/m2 0,29 Kn/m
Berat sandaran = La x 73 kg/m2 0,88 Kn/m
Total DL = 13,18 Kn/m

Beban Hidup (LL)


LL = La x 133 kg/m2 1,6 Kn/m
Beban terfaktor qu = 1,2 DL + 1,6 LL 18,4 Kn/m

Analisa Struktur

M tumpuan = ͳ 2,20 kn-m


‫ܮ ݔ ݑݍ ݔ‬ଶ
ͳʹ
ͳ
M lapangan = ‫ܮ ݔ ݑݍݔ‬ଶ 1,10 kn-m
ʹͶ
Hitung tulangan lentur balok bordes
Tulangan tumpuan
M tumpuan = 2,20 kn-m
Reduksi kekuatan beton Φ = 0,9
Reduksi kekuatan beton β1 = 0.85


Ratio tulangan seimbang ρb = ଴Ǥ଼ହఉ ଵǤ௙ ௖ x ଺଴଴ 0,0251
௙௬ ଺଴଴ା௙௬
Ratio tulangan maximum ρmax = 0.625 x ρb 0,0157

Ratio tulangan ρ rencana = ͲǤͺ ͷ ݂ܿ Ͷ‫ݑ ܯ‬ 0,0005


ͳ െ ͳെ
݂‫ݕ‬ ‫݀ݐ ݐ‬ଶ
ͳǤ͹ Ȱ ݂ܿ ܾ݈݁ܽ‫݈ܽ݁݌ ݓ‬

Ratio tulangan minimum ρ min = jika fc ≤ 30 Mpa 1.4 / fy 0,0039


Ratio tulangan minimum ρ min = jika fy > 30 Mpa sqrt(fc/(4fy)) 0,1179
Ratio tulangan minimum ρ min = 0,0039

ρmax > ρ rencana


0,0157 > 0,0005 --> OK

ρ min > ρ rencana


0,0039 > 0,0005 0,0039
--> pakai ratio minimum

BAB IV - 84
LAPORAN PERHITUNGAN KONSTRUKSI
Luas tulangan dibutuhkan As perlu = ρ x bw x d 205 mm2

Hitung n (jumlah tulangan) n= ‫ݏܣ‬ 1,5 mm


ͳ
‫ݔ‬ሺ͵ ǤͳͶ‫ݔ‬Ɏ ‫ ܾ݀ ݔ‬ଶሻ
Ͷ
Gunakan Tulangan As pakai = 4 D 13 531 mm2
---->> Tulangan Memenuhi Syarat

Cek momen nominal tulangan lentur (tekan)


a = ‫ݕ ݔ ݂ݔݏܣݔ‬ 56 mm
ͲǤ‫ݔ‬ͺ݂ܿ ‫ݔ‬
‫ݔܾ ݔ‬
ΦMn = Φ As fy (d - ( a / 2 ) ) 40.474.298,0 N-mm

ΦMn > Mu
40.474.298,0 > 2.204.928,0 Tulangan sudah memenuhi syarat ---> ok

Tulangan lapangan
Mu lapangan = 1,10 kn-m
M tumpuan = 1,10 kn-m
Reduksi kekuatan beton Φ = 0,9
Reduksi kekuatan beton β1 = 0.85


Ratio tulangan seimbang ρb = ଴Ǥ଼ହఉଵǤ௙ ௖ x ଺଴଴ 0,0251
௙௬ ଺଴଴ା௙௬
Ratio tulangan maximum ρmax = 0.625 x ρb 0,0157

Ratio tulangan ρ rencana = ͲǤͺ ͷ ݂ܿ Ͷ‫ݑ ܯ‬ 0,0002


ͳ െ ͳെ
݂‫ݕ‬ ͳǤ͹ Ȱ ݂ܿ ܾ݈݁ܽ‫ݐ ݓ‬ ‫݀ݐ‬ଶ
‫݈ܽ݁݌‬

Ratio tulangan minimum ρ min = jika fc ≤ 30 Mpa 1.4 / fy 0,0039


Ratio tulangan minimum ρ min = jika fy > 30 Mpa sqrt(fc/(4fy)) 0,1179
Ratio tulangan minimum ρ min = 0,0039

ρmax > ρ rencana


0,0157 > 0,0002 --> OK

ρ min > ρ rencana


0,0039 > 0,0002 0,0039
--> pakai ratio minimum

Luas tulangan dibutuhkan As perlu = ρ x bw x d 205 mm2

Hitung n (jumlah tulangan) n= ‫ݏܣ‬ 1,5 mm


ͳ
‫ݔ‬ሺɎ ‫ ܾ݀ݔ‬ଶሻ
Ͷ
Gunakan Tulangan As pakai = 2 D 13 265 mm2
---->> Tulangan Memenuhi Syarat

Cek momen nominal tulangan lentur (tekan)


a = ‫ݕ ݔ ݂ݔݏܣݔ‬ 28 mm
ͲǤ݂ܿ‫ݔ‬ͺ ‫ݔ‬
ͷ‫ݔ‬
ܾ ‫ܾ ݂ܿ ݔ‬
ΦMn = Φ As fy (d - ( a / 2 ) ) 21.444.716,2 N-mm

ΦMn > Mu
21.444.716,2 > 1.102.464,0 Tulangan sudah memenuhi syarat ---> ok

BAB IV - 85
LAPORAN PERHITUNGAN KONSTRUKSI
Hitung tulangan geser balok bordes
h balok h = 300 mm
b balok bw = 200 mm
fc = 20 Mpa
fy = 360 Mpa
Tulangan sengkang ds = 10 mm
d (tinggi efektif) = h - sb - ds-(1/2db) 264 mm
ƛ = 1,00
Φ = 0,75
Av = 157 mm2
p balok p = 1.200 mm
qu maksimum = 2,20 kn - m

Hitung Vu ͳ = 1,32 kn
‫ܲݔ ݑݍ ݔ‬
ʹ 1.323 n
1. Komponen momen rencana sesuai dengan SNI 2013

ΦVc = Φ x ( 0.17 x ƛ x √fc x b x d ) 30.049 n


0.5 ΦVc = 15.025 n
Vc1 = 0.33 x √fc x b x d 77.775 n
Vc2 = 0.66 x √fc x b x d 155.550 n

ΦVc > Vu
30.049,40 > 1.322,96 --> Diperlukan tulangan geser minimum

2. hitung jarak tulangan geser

s2 = d/2 131,75 mm

s3 = Av.Fy / (0,35.b) 807 mm

s4 = 600 mm

Jadi pilih jarak minimum ( s ) adalah 132 mm


140 mm
sehingga dipasang D 10 - 140

BAB IV - 86