CLAUSES/SECTIONS
71.1 General
71.2 Scope Of Contract
71.3 Drawings
71.4 Control Clause
The contents of this summary on this page shall not be deemed to be part of the Specifications and
shall not be taken into consideration in the interpretation or construction thereof or of the Contract.
73.aa Reserved
73.bb * Facing Clay Bricks
73.cc * Profiled Steel Roofing Sheets
73.dd * Aluminium False Ceiling For First Storey Lift Lobby
73.ee * Illuminated Estate Block Number Signage
73.ff * Fixing Of Metal Sun-Breakers
73.gg * Lightning Protection To Metallic Roofing System, Wall Cladding And
Metallic Motifs
73.hh * Fluorocarbon Coated Perforated Aluminium Sunbreakers
73.ii * Powder Coated Extruded Aluminium Framed Windows, Openable
Windows, Vents, Fixed Glass Panels, Aluminium Swing Doors
And Aluminium Framed Sliding Doors
73.jj * Laminated Safety Glass For Fixed Panels Below Cill Height
73.kk * Timber Strip Floor And Timber Skirting
73.ll * Glazed Porcelain Ceramic Floor Tiles For Living Rooms, Dining Rooms
And Household Shelter With Door Facing Living Rooms And Dining
Rooms
The contents of this summary on this page shall not be deemed to be part of the Specifications and
shall not be taken into consideration in the interpretation or construction thereof or of the Contract.
73.mm * Glazed Porcelain Ceramic Floor Tiles For Kitchen, Service Yards And
Household Shelter With Door Facing Kitchen
73.nn * Ceramic Floor Tiles For Bath/WC And WC
73.oo * Schedule Of Ceramic Floor Tiles To Kitchen, Bath/WC, WC, Service
Yards And Household Shelter With Door Facing Kitchen
73.pp * Timber Door With High Pressure Plastic Laminate Finish To Bath/WC
(For 3-Room, 4-Room And 5-Room Flats)
73.qq * Solid Timber Veneered Doors With Decorative Inlay To Bedroom
73.rr. * Ironmongery For Solid Timber Veneered Bedroom Doors With
Decorative Inlays
73.ss * Perimeter Joints For Floor Tiles
73.tt * Aluminium Bi-Fold Sliding Door
74.1 *
75.1 *
76.1 *
The contents of this summary on this page shall not be deemed to be part of the Specifications and
shall not be taken into consideration in the interpretation or construction thereof or of the Contract.
SECTION 71
___________________________________________________________
__
71.1 GENERAL
Supplementary Specifications Sections 71, 72, 73, 74*, 75* and 76* shall
be read in conjunction with the Standard Specifications For Building
Works And Other Installations (2009 Edition). In case of discrepancies
between the Supplementary Specifications and the Standard
Specifications, the Supplementary Specifications shall prevail.
(a)
Total
BLDG09/S71.DOC(1)
OCO(010109)
(DPD)
BSS S71
71-2 of 71-3
~(j)
~(k)
~(l)
BLDG09/S71.DOC(2)
OCO(010109)
(DPD)
BSS S71
71-3 of 71-3
71.3 DRAWINGS
71.3.1 The Drawings referred to in the Contract shall be as listed in the Schedule
of Drawings issued by the Employer, including any modifications of such
Drawings approved in writing by the Superintending Officer or the SO Rep
and such other drawings as may from time to time be issued or approved
in writing by the Superintending Officer or the SO Rep.
(a) ~
(b) ~
BSS S72/....
BLDG09/S71.DOC(3)
OCO(010109)
(DPD)