DOSEN PEMBIMBING
BUDI SUSWANTO,ST.,MT.,Ph.D
Supervisor
BUDI SUSWANTO, ST.,MT., Ph.D
ii
originalnya sehingga struktur sekunder relatif tidak mengalami
kerusakan di bandingkan MRF ketika gempa sudah berhenti.
iii
STUDY THE BEHAVIOUR OF STEEK STRUCTURES
USING MRF AND SCMRF SYSTEM
Name of Student : Anugrah Bagus R
NRP : 3110100003
Department : Civil Engineering
Supervisor : Budi Suswanto ST., MT.Ph.D
Abstract
System new earthquake resistant structure and is
currently being developed, namely Self Centering System with
behavioral gap opening dissipate energy without inelastic
deformation and damage to the main structure, which means
the return of elastic energy is given post-tensile steel strand to
restore the structure to its original position after the earthquake.
The purpose of this final project is focused on
analyzing the structure by using a system of Moment Resisting
Frame (MRF) and Self Centering Moment Resisting Frame
(SCMRF) with the use of prestressed on the column. To
analyze the feasibility of the structure of the SC-MRF modeling
portal will be one level and one span MRF and SCMRF with
the help of finite element analysis software.
From the analysis of the structure of the portal MRF
and SCMRF be deduced as follows: MRF system and SCMRF
develop ductility by means of a fairly large inelastic
deformation without losing its strength through the mechanism
of bending (flexural mechanism). In SCMRF system used in
prestressed steel column which serves as a stabilizing force in
the event of an earthquake horizontal direction so that the
deviation of the building will be returned to the starting point
so that there is no out-of-plane deformation. MRF structure is
more ductile compared with SCMRF structure as shown by the
energy dissipation for greater MRF compare SCMRF energy
dissipation. MRF structure out of plane deformation produces
sizeable while SCMRF relative deformation back to the
original position so that the secondary structure relatively no
iv
damage in comparison to the MRF when the earthquake has
stopped.
v
KATA PENGANTAR
Assalamualaikum Wr.Wb
vi
Bpk. Budi Suswanto, ST, MT, P.hd., selaku
dosen pembimbing Tugas Akhir.
Ibu Triwulan, ST.,MT.,DEA , selaku Dosen
Mata Kuliah Bahasa Indonesia
Seluruh teman teman S-53 yang terlibat dalam
penyusunan laporan yang telah memberikan
bantuan selama ini .
Wasasalamualaikum Wr.Wb
Surabaya, April 2015
Penulis
vii
DAFTAR ISI
viii
3.2 Bagan Alir Penyelesaian Tugas Akhir......................................19
3.3 Studi Literatur............................................................................20
3.4 Pre elimenary Desain..................................................................20
3.5 Pembebanan................................................................................20
3.6 Teknik Pelaksanaan Bangunan Struktur SC-MRF.......................24
3.7 Run Pemodelan Struktur..............................................................25
3.8 Analisa Struktur Utama................................................................25
3.9 Kontrol Batasan struktur Baja.......................................................29
3.10 Penjadwalan...............................................................................32
BAB 4 PERENCANAAN STRUKTUR SEKUNDER
4.1 Pelat Lantai.................................................................................33
4.2 Pembebanan Pelat Lantai............................................................34
4.3 Perencanaan Balok Anak............................................................36
BAB 5 PERENCANAAN STRUKTUR UTAMA
5.1 Pembebanan Struktur Utama......................................................41
5.2 Pembebanan Gravitasi……........................................................41
5.3 Pembebanan……………….......................................................41
5.4 Balok Induk………………........................................................43
5.5 Kolom.........................................................................................48
5.6 Desain Sambungan......................................................................59
5.7 Sabungan Balok-Kolom.............................................................65
BAB 6 ANALISA PERILAKU KOLOM
6.1 Umum..........................................................................................79
6.2 Pemodelan Part…………………………………………………79
ix
6.3 Pembebanan Pada Portal..............................................................86
6.4 Hasil Analisa................................................................................90
6.5 Penerapan Sistem SCMRF.........................................................100
6.6 Tahap Akhir SCMRF.................................................................108
BAB 7 KESIMPULAN
7.1 Kesimpulan…………………………………….………………113
7.2 Saran..........................................................................................113
Daftar Pustaka
Biodata Penulis
Lampiran
x
DAFTAR TABEL
BAB 5
Tabel 5.1 Berat struktur per lantai……………………………..…….41
Tabel 5.2 Daftar Beban Mati…………………………………..…….41
Tabel 5.3 Daftar Beban Hidup…………………………………..…..42
Tabel 5.4 Gaya gempa tiap lantai………………………………..….42
BAB 6
Tabel 6.1 Regangan dan Tegangan dari ke 4 titik yang di tinjau
…………………………………………………………….………...97
xvi
DAFTAR LAMPIRAN
Tabel VSL
Tabel HTB
Tabel Profil WF
Nomogram
PPIUG 1983
Brosur Bondex
xvi
DAFTAR GAMBAR
BAB 2
Gambar 2.1 Respon Seismic Yang Ideal dari Kelenturan Suatu Struktur
Bangunan..............................................................................................8
Gambar 2.2 Skema sambungan SC-MRF dengan Top and seat angles
disipator .....................................................................................10
Gambar 2.3.a Skema elevasi satulantai SC-MRF...............................11
Gambar 2.3.b Deformasi dari dekompresi SC-MRF..........................11
Gambar 2.3.c Idealisasi perilaku hubungan M-Ør..............................11
Gambar 2.4 Skema sambungan post-tensioning pada kolom.............12
Gambar 2.5.a.b.c Detailing Strand.....................................................13
Gambar 2.6 Skematik Kolom Pratekan..............................................16
Gambar 2.7 Momen Rotasi Dasar Kolom Bangunan Akibat Terkena
sistem SC-MRF dan Bangunan Umumnya.........................................17
BAB 3
Gambar 3.1 Flowchart metodelogi………………………………….19
Gambar 3.2 Pengukuran lawan lendut dan lendutan ke samping.......26
Gambar 3.3 Denah Struktur................................................................29
BAB 5
Gambar 5.1 Sambungan Balok – Kolom yang direncanakan.............59
xi
Gambar 5.2 Detail Sambungan balok anak dengan balok
induk..........................................................................…………..…..65
BAB 6
Gambar 6.1 Tahap Create...................................................................79
Gambar 6.2 Balok WF 500 X 300 X 11 X 18.....................................80
Gambar 6.3 Kolom WF 400 X 400 x 45 x 70…………………….....80
Gambar 6.4 Jenis material yang digunakan……………………….....81
Gambar 6.5 Tahap section manager…………………………...…….82
Gambar 6.6 Tahap pemilihan material……………………...……….82
Gambar 6.7 Kolom yang di blok……………………………………..83
Gambar 6.8 Kolom yang sudah diputar…………………………..…84
Gambar 6.9 Balok yang di blok………………………………..……84
Gambar 6.10 Balok yang sudah dipindahkan…………………….…85
Gambar 6.11 Portal setelah dilakukan iteraction…………………...83
Gambar 6.12 Portal setelah dilakukan iteraction + 12 plat pengaku
………………………………………………………………………86
Gambar 6.13 Perletakan jepit di ujung-ujung kolom…………….…87
Gambar 6.14 Kotak dialog Step Manager………………………….87
Gambar 6.15 Contoh membuat beban ……………………………..88
Gambar 6.16 Load yang di butuhkan ……………………………..88
Gambar 6.17 Load sudah diterapkan pada balok…………………..89
Gambar 6.18 Meshing portal……………………………………….89
Gambar 6.19 Deformasi struktur portal……………………………90
Gambar 6.20 2 buah dari 4 titik yang akan ditinjau……….……….91
xii
Gambar 6.21 Titik 3 & 4 yang merupakan titik tinjau
lainnya……………………………………………………………...91
Gambar 6.22 Hasil visualisasi akibat beban lateral awal (1
MPa)……………………………………………………………..…92
Gambar 6.23 Hasil visualisasi akibat beban lateral (2 MPa)……....92
Gambar 6.24 Hasil visualisasi akibat beban lateral (5 MPa)……....93
Gambar 6.25 Hasil visualisasi akibat beban lateral
(10 MPa)...........................................................................................93
Gambar 6.26 Hasil visualisasi akibat beban lateral
(15 MPa)………………………………………………………..….94
Gambar 6.27 Hasil visualisasi akibat beban lateral
(20 MPa)………………………………………………………...…94
Gambar 6.28 Hasil visualisasi akibat beban lateral
(25 MPa)…………………………………………….…………..…95
Gambar 6.29 Hasil visualisasi akibat beban lateral
(30 MPa)………………………………………………………...…95
Gambar 6.30 Hasil visualisasi akibat beban lateral
(35MPa)……………………………………………………………96
Gambar 6.31 Hasil visualisasi regangan akibat beban lateral terbesar
(35 MPa)………………………………………………………...…96
Gambar 6.32 Grafik hubungan antara Regangan dan Tegangan di titik
1………………………………………………………………..........97
Gambar 6.33 Grafik hubungan antara Regangan dan Tegangan di titik
2………………………………………………………………........98
xiii
Gambar 6.34 Grafik hubungan antara Regangan dan Tegangan di titik
3…………………………………………………………………...98
Gambar 6.35 Grafik hubungan antara Regangan dan Tegangan di titik
4………………………………………………………………..…..99
Gambar 6.36 Grafik hubungan antara Regangan dan Tegangan di ke 4
titik ……………………………………………………….…….…99
Gambar 6.37 Klik kanan di biru nya kemudian pilih
“create“……………………………………………………..……....99
Gambar 6.38 Cara kedua pembuatan beban………………….…….101
Gambar 6.39 Gambar pembuatan Load untuk strand………….…..102
Gambar 6.40 Lokasi strand di salah sisi kolom ………………..….103
Gambar 6.41 Total ada 11 load untuk kondisi SCMRF………..…..104
Gambar 6.42 Interaction kondisi SCMRF………………….……...104
Gambar 6.43 Meshing portal………………………………….…...105
Gambar 6.44 Deformasi Struktur Portal SCMRF……………..…...105
Gambar 6.45 Tegangan di beban 35 MPa pada S33 SCMRF
………………………………………………………………….….106
Gambar 6.46 Regangan di beban 35 MPa pada E33 SCMRF
………………………………………………………………….….106
Gambar7.47 Gabungan Regangan dan Tegangan kondisi
SCMRF…………………………………………………………….107
Gambar 6.48 Hubungan Regangan dan Tegangan…………………107
Gambar 6.49 Tabel gaya balik………………………………….….107
xiv
Gambar 6.50 Setelah dimasukkan gaya balik………………..109
Gambar 6.51 Grafik acuan SCMRF…………………………….….110
Gambar 6.52 pasca diberikan gaya balik keadaan MRF………..….110
Gambar 6.53 Displacement keadaan MRF……………………..…..111
Gambar 6.54 Grafik Displacement MRF………………………..….111
Gambar 6.55 Displacement keadaan SCMRF………………..…….112
Gambar 6.56 Grafik Displacement SCMRF………………..………112
Gambar 6.57 Perbandingan node displacement……………..……...113
Gambar 6.58 Total tegangan regangan kondisi SCMRF………..….115
Gambar 6.59 Total tegangan regangan kondisi MRF…………..…..114
xv
BAB I
PENDAHULUAN
1.1 Latar Belakang
1
2
3
4
1.3 Tujuan
Tujuan secara detail dari pembahasan tugas akhir ini
yaitu :
5
6
BAB II
TINJAUAN PUSTAKA
2.1 Umum
9
10
11
12
Kolom dasar pra tekan terdiri dari baja pra tekan mutu
tinggi, plat pendisipasi energi, dipasang secara vertical, dan
bekerja dari tengah kolom pada tingkat dasar sampai dasar
basement kolom. Baja Pratekan diangkurkan pada pelat
pengangkur untuk mendistribusikan gaya dari beban gempa
maksimum. Selama terjadi beban lateral gempa, celah bukaan
dan tutupan (gap opening and closing) terjadi antara balok dan
permukaan kolom tingkat dasar. Pelat pendisipasi energi, yang
terpasang pada flens /sayap kolom dan plat keeper, mendisipasi
energi dengan mekanisme pelelehan pada penampang ketika
celah membuka dan menutup dan juga meningkatkan momen
kapasitas pada dasar kolom.
15
16
17
18
BAB III
METODOLOGI
3.1. Umum
Dalam pengerjaan Tugas Akhir diperlukan susunan
langkah – langkah pengerjaan sesuai dengan uraian- uraian
kegiatan yang akan dikerjakan. Urutan pengerjaannya dimulai
dari pengumpulan literatur, referensi dan pedoman
perancangan hingga tujuan akhir dari analisa struktur yang
akan disajikan.
3.5 Pembebanan
Jenis beban yang diperhitungkan dalam perancangan
ini adalah sebagai berikut :
1. Beban Mati
Beban mati adalah berat seluruh bahan
konstruksi bangunan gedung yang terpasang, termasuk
dinding, lantai, atap, plafon, tangga, dinding partisi
tetap, finishing, kulit bangunan gedung dan komponen
arsitektural dan struktural lainnya serta peralatan layan
terpasang lain termasuk berat keran (PPIUG 1983).
21
2. Beban Hidup
Beban yang diakibatkan oleh pengguna dan
penghuni bangunan gedung atau struktur lain yang
tidak termasuk beban konstruksi dan beban
lingkungan, seperti beban angin, beban hujan, beban
gempa,beban banjir,atau beban mati.
3. Beban Gempa
Beban gempa yang digunakan sesuai SNI 03-
1726-2012, dimana wilayah gempa terbagi
berdasarkan sifat- sifat tanah pada situs yaitu kelas
situs SA (Batuan Keras), SB (Batuan), SC (Tanah
Keras, sangat padat dan Batuan lunak), SD (tanah
sedang), SE (tanah Lunak) , atau SF (tanah Khusus).
Beban-beban yang dibebankan kepada struktur
tersebut dibebankan kepada komponen struktur
menggunakan kombinasi beban berdasarkan PPIUG
1983 sehingga struktur memenuhi syarat keamanan.
Kekuatan perlu U paling tidak harus sama
dengan pengaruh beban terfaktor dalam Pers. (1)
sampai (7). Pengaruh salah satu beban atau lebih yang
tidak bekerja secara serentak harus diperiksa (beban S
(salju) dalam persamaan-persamaan di bawah dihapus
karena tidak relevan, lihat Daftar Deviasi.
22
U =1,4D
U =1,2D + 1,6L
U = 1,2D + 0.5L+1.3W
U = 1,2D + 0.5 L – 1.3W
U = 1,2D + 1,0E + 1,0L
U = 0,9D + 1Q
U = 0,9D – 1Q
U = 1.2D + 0.5L - 1Q
U = 1.2D + 0.5L +1Q
U = 0,9D + 1,3W
U = 0,9D – 1.3W (3.1)
Dimana :
D = beban mati
L = beban hidup
Q = beban gempa
W = beban angin
4. Beban Angin
Tekanan Tiup :
daerah jauh dari tepi laut, diambil minimum 25
kg/m2.
Part
Properti
Assembly
Step
Interaction
Load
Mesh
Job
A B
Ø – faktor reduksi
Pu
Pu fy Ag Ag > (3.5)
fy
Ø = 0,90
(pada tengah batang)
Kontrol Putus
Tegangan putus untuk perencanaan ( f y ) tidak boleh
diambil melebihi
nilai yang diberikan Tabel 5.3 SNI 03 1729 2002 pasal 5.1.3.
Kontrol Patah :
Pu fu Ae
Pu
Ae > (3.5)
fu
Ø = 0,75
(pada daerah sambungan)
Kontrol Kelangsingan
𝐿
dibatasi sebesar 300 untuk batang sekunder dan
𝑟
240 untuk batang primer (3.7)
3.10 Penjadwalan
NO NAMA BULAN 1 BULAN 2 BULAN 3 BULAN 4
KEGIATAN 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
1 PENGUMPULAN
DATA
2 STUDI
LITERATUR
3 PERENCANAAN
STRUKTUR
SEKUNDER
4 PRE
ELIMENARY
DESAIN
5 PEMBEBANAN
6 PEMODELAN
STRUKTUR
7 ANALISA
STRUKTUR
BAJA
8 KONTROL
BATASAN
STRUKTUR
BAJA
9 KONTROL
DESAIN
10 GAMBAR
OUTPUT
33
BAB IV
PERENCANAAN STRUKTUR SEKUNDER
= 86 + 100
= 186 kg/m2
- Bentang =2m
- Beban berguna = 200 kg/m2
Untuk Pelat Atap Dengan Bentang Menerus :
- Tebal pelat = 9 cm
- tulangan negatif = 1.07 cm2/m
Digunakan tulangan Ø 10 (As = 0.7854 cm2)
Jumlah tulangan yang di butuhkan tiap 1 meter adalah :
1.07
- n = 0.785 = 2.57 = di pasang 4 buah
1000
- Jarak antar tulangan s = 4 = 250 mm
- Jadi dipasang tulangan negative Ø 10 - 250
4.2 Pembebanan Pelat Lantai
Beban hidup :
qD = 538.1 kg/m2
Data-data perencanaan berdasarkan brosur BONDEX:
W = 66 kg/m tf = 13 mm
r = 16 mm h = d -2.(tf+r) = 342 mm
Zx = 1286 cm3 iy = 4.54 cm
d = 400 mm balok anak = 2 m
Ix = 23700 cm4 Panjang balok (span) L = 6 m
37
Pelat badan
ℎ 342
λ = 𝑡𝑤 = 8
= 42.75
1680 1680
λp = = = 106.3
√𝑓𝑦 √250
λ ≤ λp 42.75 < 106.3 penampang kompak
Kontrol penampang terhadap tekuk lateral
Karena tidak di pasang shear connector pada balok
anak sejarak Lb = 600 cm
𝐸 200000
Lp = 1.76 . iy√𝑓𝑦 = 1.76 x 4.54 x√ 250
= 226.002641 cm
Lr = 658.357 cm
Lp <Lb < Lr ( bentang menengah )
Untuk komponen struktur yang memenuhi Lr > Lb > Lp, kuat
nominal komponen struktur adalah :
39
( Lr Lb)
Mn Cb M r ( M p M r ) Mp
( Lr Lp )
MA = 602181 Kgcm
MB = 802908 Kgcm
MC = 602181 Kgcm
12,5Mmaks
Cb 2,3
2,5Mmaks 3M A 4M B 3M C
12,5.802908
(2,5.802908) (3.602181) (4.802908) (3.602181)
My = Sx.fy
= 1190 . 2500
= 2975000 Kgcm
Mp = fy.Zx
= 2500 . 1286
= 3215000 kgcm < 1,5 My
MR = (fy-fr)Sx = 1800. 1190
= 2322000 kgcm
(658.37 600)
Mn 1,4
, (2322000 3215000 2322000) Mp
(658.37 226.00
, )
40
Persyaratan :
Mu ≤ Mn
8029.08 Kgcm ≤ 0,9. 729162 kgcm
8029.08 Kgcm < 656245.8 kgcm............OK
Jadi Penampang profil baja mampu menahan beban yang
terjadi.
BAB V
PERENCANAAN STRUKTUR UTAMA
5.2Pembebanan Gravitasi
5.2.1 Berat bangunan
Ringkasan berat bangunan dinyatakan dalam Tabel 5.1 berikut ini :
5 20 5139.71
4 16 7019.36
3 12 7019.36
2 8 7019.36
1 4 7707.71
∑ 33905.5
5.3 Pembebanan
5.3.1Perhitungan Beban Mati
Tabel 5.2 Daftar Beban Mati
42
Deskripsi
3 Tegel 24 kg/m3
Hi Wi Wi.Hi 100 % 30 %
Tingkat
(m) (ton) (ton m) Fi x,y (ton) Fi x,y (ton)
∑𝑛
𝑖=1 𝑊𝑖.𝑑𝑖
2
T1 = 6.3 √
𝑔 ∑𝑛
𝑖=1 𝐹𝑖.𝑑𝑖
Di dapatkan T= 0.85
44
Lp = 350.453 cm
Lr = 1050,71 cm
Jadi , Lb < Lp (bentang pendek )
Untuk komponen struktur yang memenuhi Lb < Lp, kuat
nominal komponen struktur adalah : Mn = Mp
My = Sx . fy
= 2910 . 2500
= 7275000 kg.cm
Mp = fy .Zx
= 2500 . 3100
= 7750000 kg.cm < 1.5 My
Syarat : ΦMn ≥ Mu (Φ = 0.9)
0.9 x 7750000 2937768
6975000 2937768 (OK...)
ℎ 1100
karena 𝑡 ≤ Plastis !
𝑤 √𝑓𝑦
maka Vn = 0,6 fy Aw
= 0,6 x 2500 x (48,8 x 1,1) = 80520 kg
Persyaratan :
Ø Vn ≥ Vu
Ø Vn = 0,9 . 80520 kg
= 72468 kg > 6277.39 kg ... OK !
Kontrol lendutan
L = 600 cm
𝐿 600
𝑓𝑖𝑗𝑖𝑛 = = = 1.67 𝑐𝑚
360 360
W = 128 kg/m
Sx = 2910 cm3
r = 26 mm
A = 163,5 cm2
Ix = 71000 cm4
ix = 20,8 cm
tw = 11 mm
Iy = 8110 cm4
iy = 7,04 cm
b = 300 mm
d = 488 mm
tf = 18 mm
47
Pelat sayap
𝑏𝑓 300
𝜆= = 2(18) = 8,33
2𝑡𝑓
170 170
𝜆𝑝 = = = 10,75
𝑓
√ 𝑦 √250
λ ≤ λp 8,33 < 10,75 penampang kompak
Pelat badan
ℎ 400
𝜆= = = 36,36
𝑡𝑤 11
1680 1680
𝜆𝑝 = = = 106,25
√𝑓𝑦 √250
λ ≤ λp 36,36 < 106,25 penampang kompak
- Karena penampang kompak, maka Mn = Mp
Mp = fy . Zx = 2500 . 3100 = 7750000 kg.cm
Cek kemampuan penampang
Øb . Mn ≥ Mu
Øb . Mn = 0,9 . 7750000
= 6975000 kg.cm > 2644812kg.cm ... (OK…!)
48
maka Vn = 0,6 fy Aw
= 0,6 x 2500 x (48,8 x 1,1) = 80520 kg
Ø Vn ≥ Vu
Ø Vn= 0,9 . 80520 kg
= 72468 kg > 10710.57 kg ... OK !
Kontrol lendutan
Lendutan ijin (f’) adalah
L = 600 cm
𝐿 600
𝑓′ = = = 1.67 𝑐𝑚
360 360
49
ix = 19,7 cm
Ix = 298000 cm4
iy = 11,1 cm
Iy = 94400 cm4
Zx = 14385 cm3
Zy = 6713 cm3
Sx = 12000 cm3
fy = 250 Mpa
Sy = 4370 cm3
fy = 250 Mpa
fu = 410 Mpa
50
Bahan :
BJ 41 : fy = 2500 kg/cm2
fu = 4100 kg/cm2
h 314
λ= = = 15.7
tw 20
λ < λr
250
λR = = 42.06
√250
Momen nominal :
bf 407
λ= = = 5.81
2𝑥35
2tf λ < λp ….. Kompak
250
λp = = = 15.811
√250
51
h 407
λ= = 20
= 15.7
tw λ < λp ….. Kompak
1680 1680
λp = = = 106,253
fy 250
Lp = 552.562 cm
Lr = 5942.562 cm
Mn = Mp = Mny
Ib
L b
298000
2( ) 1490
400
GA = 23700 = 79
= 18.86
2( )
600
kc L 3.4 x 400
x = = 19.7
= 69.03
ix
Terhadap sumbu y:
Ic
L c
G=
Ib
L b
94400
2( ) 472
400
GA = 23700 = 79
= 5.97
2( )
600
k c L 2.9 𝑥 400
λ𝑦 = = 11.1 = 104.50
iy
Rumus Interaksi :
terbesar = y = 104.5
fy 104.50 250
λc = = 3.14 𝑥√200000 = 33.28 x 0.035 = 1.16
E
1,43 1.43
0,25 < λc < 1,2 → ω = = 1.6−(0.67𝑥 1.16)
1,6 0,67.c
= 1.73
fy 2500
Pn =Ag . fcr = Ag. = 770.1𝑥 = 1112861.272 kg
1.73
Pu 318203
= = 0.34 > 0.2
.Pn 0.85𝑥1112861.2
ω = factor tekuk
Kontrol Tekan-Lentur
54
Pu
0,34 0.2
Pn
Pu 8 Mux Muy
1,0
Pn 9 bMnx bMny
8 4568550 1160357
0.34 + [ + ] ≤ 1.0
9 0.9 𝑥 35962500 0.9 𝑥 16782500
8
0.34 + 9 [0.141 + 0.08] ≤ 1
Pu = 125580 kg
Mux = 23374.20 kg.m
Muy = 7667.88 kg.m
Bahan :
BJ 41
fy = 2500 kg/cm2
fu = 4100 kg/cm2
Kontrol Penampang :
bf 400
λ= = 2.35 = 5.71
2tf
λ < λr ….. OK
250
λR = = 250 = 15.81
√𝑓𝑦 250
h 256
λ= = = 12.8
tw 20
λ < λr ….. Ok
Terhadap Lentur :
bf 407
λ= = 2.35 = 5.71 λ < λp ….. Kompak
2tf
56
170 170
λp = = = 10,752
fy 250
1680 1680
λp = = = 106,253
fy 250
h 256
λ= = 20 = 12.8 λ < λp ….. Kompak
tw
Lb = 400 cm
Lp = 517.715 cm
Lb ≤ Lp Bentang pendek
Mnx = Mny = Mp
= 15597500 kgcm
My = Sy.fy = (1930)(2500)
57
= 4825000 kgcm
1,5My = 1,5(4825000)
= 7237500 kgcm
= 7337500 kgcm
Jadi diperoleh :
Terhadap sumbu x :
Ic
L c
G=
Ib
Lb
119000
2( ) 595
400
GA = 23700 = 79
= 7.53
2( )
600
kL
Kelangsingan struktur :
i
kc L 2.9 x 400
x = = 18.2
= 63.73
ix
Terhadap sumbu y:
Ic
L
c
G=
Ib
L
b
39400
2( ) 197
400
GA = 23700 = 79
= 2.49
2( )
600
k c L 2.2 𝑥 400
y = =
10.24
= 85.93
iy
Rumus Interaksi :
fy 85.93 250
λc = = 𝑥 √ = 0.96
E 3.14 200000
1,43 1.43
0,25 < λc < 1,2 → ω = =
1,6 0,67.c 1.6−(0.67𝑥0.96)
1.43
= 0.97 = 1.46
fy 2500
Pn = Ag. = 360.7𝑥 = 617636.98 kg
1.46
Pu 125580
=0.85𝑥617636.98 = 0.33 > 0.2 → RUMUS Interaksi 1
.Pn
ω = factor tekuk
= 0.85 →faktor reduksi
Pu = gaya tekan akibat beban beraktor untuk kuat tekan
Pn = Kekuatan tekan nominal batang
Kontrol Tekan-Lentur
𝑃𝑢
= 0.33 > 0.2
∅𝑃𝑛
Pu 8 Mux Muy
1,0
Pn 9 bMnx bMny
8 1051349 589077
0,52 4245420
797792
1,0
,9 x16782500
0.33
9 x 35962500 00.9𝑥7237500
9 0,0.9𝑥20887500
3
8
0.33 + 9 [0.025 + 0.122]
60
= 984.24 + 800
= 1784,24 kg/m
1 1
Vu = 2 x qu x l = 2 x 1784.24 x 6 = 5352.72 kg
Vn = f x r1 x fub x Abaut x m
Dimana :
= 4950 kg
62
Kuat tumpu
Dimana :
= 10276 kg →menentukan
𝑉 5352.72
n = 𝑉𝑢 = 10627.2
= 0.62 ≈ 1 buah
𝑛
Vn = f x r1 x fub x Abaut x m
Kuat tumpu
Dimana :
= 10276 kg →menentukan
𝑉 5352.72
n = 𝑉𝑢 = 10276
= 0,7 ≈ 2 buah
𝑛
Ag = 6 x 6 = 36 cm2
Kuat rencana :
Dimana :
Persyaratan : Vu ≤ Rn
2536.48 kg ≤ Vn
2536.48 kg ≤ 121216.5 kg …… ok
1,5 db = 1,5 x 16 = 24 mm
Dipasang 80 mm
3db = 3x 16 = 48 mm
15 tp = 15 x 4 = 60 mm
Dipasang 50 mm
66
10
20
90 Tulangan negatif
L 60 x 60 x 6
400 Ø 16 mm
WF 400 X 200 X 8 X 13
WF 500 X 300 X 8 X 11
Vu = 16 t.m
67
1 1
= (2 𝑥 11089 x 6 ) 𝑥 (2 𝑥318203) = 52928 kg
Vu = 16 ton Mu = 48 ton
∑ MA =0
V u x L – MB - M A = 0
𝑀𝐴+ 𝑀𝐵 4800000+4800000
Vu = 𝐿
= 600
= 80800 kg
Baut : A 325
Mutu Baut : 8250 kg/cm2
Diameter baut : 22
Ulir pada bidang geser ( r1 = 0,4 )
Siku penyambung ˪ 100 x 100 x 10
Fy = 2500 kg/cm2
Fu = 4100 kg/cm2
tp˪ = 10 mm = 1 cm
tpbalok = 11 mm = 1,1 cm →menentukan
Ab = ¼ π d2 = 3,80 cm2
Kekuatan 1 baut :
Kuat Geser
Vn = 0,75 x r1 x Fu x Ab x m
= 23512.5 kg
Kuat Tumpu
= 17859 kg → menentukan
69
Ag = 10 x 10 =100 cm2
Diameter perlemahan ( dengan bor )
Kuat rencana :
Persyaratan : 𝑉𝑢 ≤ Rn
42623.3 ≤ 𝑉𝑛
1,5 db = 1,5 x 22 = 33 mm
Dipasang 100 mm
3db = 3x 22 = 66 mm
15 tp = 15 x 10 = 150 mm
Dipasang 120 mm
Baut : A 325
Mutu Baut : 8250 kg/cm2
Diameter baut : 22
Ulir pada bidang geser ( r1 = 0,4 )
Siku penyambung ˪ 100 x 100 x 10
Fy = 2500 kg/cm2
fu = 4100 kg/cm2
tp˪ = 10 mm = 1 cm →menentukan
tpkolom = 19 mm = 1,9 cm
Ab = ¼ π d2 = ¼ π 2.22 = 3,80 cm2
Kekuatan 1 baut :
71
Kuat Geser
= 11756.25 kg → menentukan
Kuat Tumpu
= 16236 kg
Ag = 10 x 10 = 100 cm2
= 23,5 mm = 2,35 cm
Kuat rencana :
Persyaratan : 𝑉𝑢 ≤ Rn
16000 ≤ 𝑉𝑛
1,5 db = 1,5 x 22 = 33 mm
Dipasang 100 mm
3db = 3x 16 = 48 mm
15 tp = 15 x 4 = 60 mm
73
Dipasang 50 mm
Profil baja : BJ 41
Geser
= 11756.25 kg (menentukan!)
Tumpu
= 30848.4 kg
Pu 16000
Vu = = 3200 kg < Vd
n 5
Tarik (ulir)
= 17634.375 kg
74
400
Ø 22 mm
CONTINUITY PLATE
END PLATE
WF 400 X 200 X 8 X 13
Ø 22 mm 500
WF 500 X 300 X 11 X 18
5
T 5
10
20
10
T
25 15
T Mu = 86 ton Pu = 16 ton
25 15
10
T
- Kontrol Geser :
20
10
Pu 1600
5
T 5
Vu 320 kg
pelat a n 5
75
Vu 320
f uv 84.21kg / cm 2
f uv f 0,5 f u
b
Ab 3.80
f 0,5 f u b 0,75 0,50 8250 3093.75 kg / cm 2
= 10725 – 126.31
= 10598.68 kg/cm2
ft = 8250 kg/cm2
T 10 17634.375
fy a b = ∑ T a
b fy 30 2500
= 2.35 cm < S = 5 cm ok
(anggapan benar)
76
0,9 f y a 2b
Mn T d
2
0,9 2500 (2.35) 2 30
= 2 17634.375 (2.65 + 22.65 + 42.65 + 57.65 +72.65)
2
= 186384.37 + 6991881
Mn= 71782653 kg cm
Mu = 8600000 kg cm < Mn ok
400
Ø 22 mm
LAS SUDUT
CONTINUITY PLATE
END PLATE
WF 400 X 200 X 8 X 13
Ø 22 mm 500
WF 500 X 300 X 11 X 18
LAS : EE70xx
Baja BJ 41
500
300
Jawab : te = 1 cm
78
Pu = 16 ton
Mu = 48 ton
= 2214 kg/cm2
akibat Pu :
16000
f vp f rp f hm
2 2
= 59.61 kg/cm2 ftotal =
268.4
= 107.79 kg/cm2
f total 123.18
te 1cm 0.05 cm
fn 2214
te 0.05
a = 0.07 cm
0,707 0,707
79
𝑓𝑢
= 1,41 x .t2
𝐹𝐸𝑋𝑋
4100
= 1,41 x 70 𝑥 70.3 .15
jadi a = 15 mm
80
BAB VI
6.1 Umum
a.Part
b.Property
Elastisitas material :
Untuk material baja = 2 x 105 MPa
Poisson ratio = 0.3
Plastisitas material :
Karena material baja yang digunakan adalah bj 41
yaitu fy = 250 MPa dan fu = 410 MPa sehingga
pengisian untuk plastis stress dimulai dari angka 250
untuk batas leleh dengan plastis strain dimulai dari
angka 0 .
c. Assembly
Translate(pindah)
Hal ini dilakukan jika akan memindahkan elemen
balok atau kolom berada pada tempat yang diinginkan
.contoh memindahkan balok .Hal pertama yang
dilakukan yaitu mem-blok balok (Gambar 6.9) yang
akan dipindahkan kemudian mengisi part start point
0,0,0 dan untuk memindahkan arah y sebesar 4700 isi
end point adalah 0,0,4700 sehingga balok tersebut akan
pindah searah sumbu y( Gambar 6.10) .
Ada 2 jenis step yaitu initial step yang menjadi default dari
Abaqus yaitu merupakan pendefinisian dari input-input gaya
interior elemen dan Load Step yang merupakan pendefinisan
dari input beban ( Eksterior Force)
e.Interaction
Dalam hal ini ada dua macam tipe interaction yaitu master
surface dan slave surface .Master surface yaitu elemen yang
menjadi pusat lekatan dari element yang lain pada portal ini
adalah kolom .Slave surface adalah elemen yang melekat pada
master surface yaitu balok .Hal ini dilakukan agar elemen
elemen tidak terpisah satu dengan lainnya ketika portal diberi
beban .
86
Create Load
Membuat beban dimulai dari step .Kemudian klik step
manager (Gambar 6.14) .Kemudian klik create
(Gambar 6.15) .Pada kali ini akan terdapat 9 macam
beban dengan satuan MPa (Gambar 6.16) .
2
1
3 4
KONDISI MRF
1002(TITIK 1) 12(TITIK 2) 1007(TITIK 3) 17(TITIK 4)
REGANGAN TEGANGAN REGANGAN TEGANGAN REGANGAN TEGANGAN REGANGAN TEGANGAN
0.000018 3.4 1.264E-05 2.29 0.000021 3.9 0.0000131 4.84
0.0000524 10.23 0.0000378 6.88 0.000063 11.7 0.0000393 14.54
0.00014 27.3 0.0001 18.36 0.00016 31.228 0.0001 38.77
0.00032 61.43 0.00022 41.31 0.00037 70.253 0.00023 87.224
0.00059 112.63 0.00041 75.74 0.00069 128.798 0.00043 159.957
0.00097 183.734 0.00067 122.331 0.0011 207.727 0.00084 226.807
0.0028 234.179 0.00108 195.35 0.0026 228.531 0.0028 269.706
0.0112 261.07 0.0028 212.77 0.0068 283.617 0.008 310.87
0.026 373.264 0.0199 234.686 0.023 326.477 0.03 402.398
Dari hasil Tabel 6.1 dapat dilihat pada Gambar 6.32 sampai
dengan Gambar 6.35 yaitu didapatkan hasil bahwa di keempat
titik semakin besar beban lateral yang diberikan maka semakin
besar pula tegangannya mendekati leleh 250 MPa
Karena kalau
memilih Initial
maka tidak akan
bias membuat
beban.Maka
273.8311 penulis mengambil
1 MPa untuk
mengisi pilihan
Di coba coba .Penulis
kotak dialog step
mencoba memasukkan 4
ton/strand .Karena tegangan
tidak boleh > 0.9 fy
Tambahan 2 beban
untuk strand .1 beban
mewakili 1 kolom
Gambar 6.41 Total ada 11 load untuk kondisi SCMRF
Gaya tambahan
Gambar 6.49 Tabel gaya balik
TITIK 1
TITIK 2
TITIK 2
TITIK 3
TITIK 3
TITIK 4
113
TITIK 4
BAB VII
KESIMPULAN
7.1 Kesimpulan
Dari hasil analisa struktur portal MRF dan SCMRF ditarik
kesimpulan sebagai berikut:
7.2 Saran
BAB VII
KESIMPULAN
7.1 Kesimpulan
Dari hasil analisa struktur portal MRF dan SCMRF ditarik
kesimpulan sebagai berikut:
7.2 Saran
DAFTAR PUSTAKA
BIODATA PENULIS
Penulis dilahirkan di
Purwokerto, 24 Februari 1992,
merupakan anak pertama dari 3
bersaudara. Penulis telah
menempuh pendidikan formal
yaitu di TK Pertiwi Bekasi, SDN
Margahayu 13 Bekasi, SMPN 16
Bekasi dan SMAN PU
ALBAYAN. Setelah lulus dari
SMAN tahun 2010, Penulis
mengikuti PMDK-Mandiri ITS
dan diterima di Jurusan Teknik
Sipil FTSP-ITS pada tahun 2010 dan terdaftar dengan NRP.
3110100003.