fy = 420 Mpa
fc' = 30 Mpa
Massa Beton = 23.6 kN/m³
Kolom = 0.6 m 600
l1 = 7 m
l2 = 6 m
l3 = 3 m
ln = 6.4 m
T (pelat) = 0.135 m
q (SIDL) = 9.29 kN/m²
q (LL) = 0.96 kN/m²
Hitung momen pada bentang1-2 pada pelat dengan balok diantara dua tumpuan
Mo = 1/8 . qu . l4 . ln²
Mo = 380.325888 kN-m
M = koef . Mo
M (-) interior = 266.228 kN-m
M (+) = 216.786 kN-m
M (-) eksterior = 60.852 kN-m
C(1)
x1 = 300 mm
x2 = 135 mm
y1 = 600 mm
y2 = 135 mm
1 = 0
l4/l1 = 0.643
C(1) =
C(1) =
C(2)
x1 = 135 mm
x2 = 300 mm
y1 = 435 mm
y2 = 465 mm
1 = 0
l4/l1 = 0.643
C(2) =
C(2) =
b = 4500 mm
h = 135 mm
d = T - T.selimut - db
d = 102 mm
b = 2250 mm
Ø Mn = Mu
Ø Mn = (bd² f'c ω (1-0,59ω))
199671091.2 = 702270000 ω -414339300 ω²
ω = 0.248
As = ω bdf'c / fy
As = 4065.873 mm²
Ø Mn = Mu
Ø Mn = (bd² f'c ω (1-0,59ω))
130071453.696 = 702270000 ω -414339300 ω²
ω = 0.168
As = ω bdf'c / fy
As = 2761.708 mm²
Ø Mn = Mu
Ø Mn = (bd² f'c ω (1-0,59ω))
66557030.4 = 936360000 ω -552452400 ω²
ω = 0.068
As = ω bdf'c / fy
As = 1493.416 mm²
Ø Mn = Mu
Ø Mn = (bd² f'c ω (1-0,59ω))
86714302.464 = 936360000 ω -552452400 ω²
ω = 0.088
As = ω bdf'c / fy
As = 1924.199 mm²
d = T - T.selimut - db
d = 102 mm
b = 2250 mm
Ø Mn = Mu
Ø Mn = (bd² f'c ω (1-0,59ω))
25765533.8726 = 702270000 ω -414339300 ω²
ω = 0.036
As = ω bdf'c / fy
As = 588.952 mm²
Ø Mn = Mu
Ø Mn = (bd² f'c ω (1-0,59ω))
2879690.86661 = 936360000 ω -552452400 ω²
ω = 0.003
As = ω bdf'c / fy
As = 67.098 mm²
Ø Vn = 0,17 Öf'c bd
Ø Vn = 498.619230224828 kN
Nilai Syarat
Ø Vn 498.619 kN Vu 37.8081 kN
Ø Vn > Vu OK
Vn = 0,33 Öf'c
Vn = 1.807 Mpa
Hitung tegangan geser langsung pada kolominterior dengan beban terfaktor penuh
bo = 2808 mm
ly = 7 m
lx = 6 m
d = 0.113 m
qu = 16.5072 kN/m²
Vu =
Vu = 686.1879247308 kN
Untuk menambah kuat geser perlu dipertimbangkan penebalan dimensi eksisting pelat, penambahan drop panel, d
f =
f =
f = 0.6
ln = 6400 mm
Jc =
Vu =
Vu = 13.556 Mpa
Vn = 0,33 Öf'c
Vn = 1.807 Mpa
As_min_2 = 0,0014 Ag
As_min_2 = 1323 mm²
Panjang penyaluran
Parameter :
D = 19 mm (asumsi)
db = 13 mm
berdasarkan SNI 2847 : 2019 Tabel 25.4.2.4
Y = 1
= 1
ld =
ld =
ld = 399.356 mm
ld_min = 300 mm
digunakan, ld : 400 mm
As / Ad_19 = 20 buah
Jarak tulangan, 50 mm (spasi minimum)
sehingga digunakan, 20 D19-50
As / Ad_19 = 12 buah
Jarak tulangan, 80 mm
sehingga digunakan, 12 D19-80
As / Ad_19 = 6 buah
Jarak tulangan, 166.667 mm (digunakan spasi minimum : 150 mm)
sehingga digunakan, 6 D19-150
As / Ad_19 = 7 buah
Jarak tulangan, 125 mm
sehingga digunakan, 7 D19-125
0.685
5400000000
0.37
110716875
0.593548387
4185000000
0.804482759
356754375
2.5
75
0.810708989
20.26772474
702270000
-414339300
0.000 199671091.199934
702270000
-414339300
(0.000) 130071453.69625
936360000
-552452400
(0.000) 66557030.4000397
936360000
-552452400
0.000 86714302.4639452
702270000
-414339300
0.000 25765533.8724503
936360000
-552452400
0.000 2879690.86633592
1
40 (kolom interior)
2( c1 + d ) + 2( c2 + d )
2808 mm
42
0.6565
0.43099225
1
1.666666667
9.29 kN/m²
0.96 kN/m²
0.135 m
15.7392
245.76
3868.065792
3679.322112
744968016
124161336
985608
40 (kolom interior)
2( c1 + d ) + 2( c2 + d )
2808 mm
69.71014368
0.440677966
pasi minimum : 150 mm)