BILL OF QUANTITY (BOQ)

REKAPITULASI TOTAL
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENEGAH
KEJURUAN (SMK)
PEKERJAAN : REHAP RPS
: *REHAB RUANG PRAKTEK SISWA (RPS) KAYU DAN ROTAN
: *REHAB RUANG PRAKTEK SISWA (RPS) DKV
: *REHAB AULA
: REHAB RUANG KELAS
: REHAB RUANG GURU
: REHAB RUANG KEPALA SEKOLAH
: REHAB TOILET
: REHAB RUANG IBADAH
LOKASI : SMK NEGERI 5 PALU
SUMBER DANA : APBD 2021
TAHUN ANGGARAN : 2021

NO. URAIAN PEKERJAAN JUMLAH HARGA


1 2 3
I PEKERJAAN REHAB RPS KAYU DAN ROTAN
PEKERJAAN SITE WORK
PEKERJAAN STRUKTUR
PEKERJAAN ARSITEKTURAL
PEKERJAAN ELEKTRIKAL
II PEKERJAAN REHAB RPS DKV
PEKERJAAN SITE WORK
PEKERJAAN STRUKTUR
PEKERJAAN ARSITEKTURAL
PEKERJAAN ELEKTRIKAL
III PEKERJAAN REHAB AULA
PEKERJAAN SITE WORK
PEKERJAAN STRUKTUR
PEKERJAAN ARSITEKTURAL
PEKERJAAN ELEKTRIKAL
IV PEKERJAAN REHAB RUANG KELAS
PEKERJAAN SITE WORK
PEKERJAAN STRUKTUR
PEKERJAAN ARSITEKTURAL
V PEKERJAAN REHAB RUANG GURU
PEKERJAAN SITE WORK
PEKERJAAN STRUKTUR
PEKERJAAN ARSITEKTURAL
PEKERJAAN ELEKTRIKAL
VI PEKERJAAN REHAB RUANG KEPALA SEKOLAH
PEKERJAAN SITE WORK
PEKERJAAN ARSITEKTURAL
PEKERJAAN SANITASI
PEKERJAAN ELEKTRIKAL
VII PEKERJAAN REHAB TOILET
PEKERJAAN SITE WORK
PEKERJAAN STRUKTUR
PEKERJAAN ARSITEKTURAL
PEKERJAAN ELEKTRIKAL
VIII PEKERJAAN REHAB RUANG IBADAH
PEKERJAAN SITE WORK
PEKERJAAN STRUKTUR
PEKERJAAN ARSITEKTURAL
PEKERJAAN ELEKTRIKAL
JUMLAH TOTAL
PPN 10 %
TOTAL KESELURUHAN
DIBULATKAN

Palu, 2021
Dibuat Oleh,
Konsultan Perencana,
CV. PORTAL REKAYASA

Ir. Arzal M. Zain, ST, MT, IPM


BILL OF QUANTITY (BOQ)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENEGAH KEJURUAN (SMK)
PEKERJAAN : REHAB RUANG PRAKTEK SISWA (RPS) KAYU DAN ROTAN
: REHAB RUANG PRAKTEK SISWA (RPS) DKV
: REHAB AULA
LOKASI : SMK NEGERI 5 PALU
SUMBER DANA : APBD 2021
TH. ANGGARAN : 2021

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
A B C D E F
I PEKERJAAN RPS KAYU DAN ROTAN
PEKERJAAN SITE WORK
1.1 Pekerjaan Persiapan
1 Pek. Pembuatan Kantor Direksi Di Lapangan 1.00 Ls Rp -
(ukuran 4*6, dinding kalsiboard, tiang baja ringan, lantai cor,
atap spandek)
2 Pek. Pembuatan Papan Nama Proyek 1.00 Ls Rp -
(ukuran 80x120 cm, tiang pipa besi)
3 Pek. Pembuatan Gudang Dan Barak Pekerja 1.00 Ls Rp -
(ukuran 4*8 m, dinding Papan, atap seng, tiang kayu)
4 Pek. Pagar Pengaman Proyek 1.00 Ls Rp -
(pagar seng gelombang, tiang kayu, tinggi 1.8 m)
Total Pekerjaan Persiapan Rp -
1.2 Biaya Manajemen K3
A Kantor Direksi
1 Helem 25.00 Bh Rp -
2 Sepatu Boot 25.00 Psg Rp -
B Pekerja / Tukang
1 Helem 30.00 Bh Rp -
2 Sepatu Boot 30.00 Psg Rp -
3 Sarung Tangan 15.00 Lsn Rp -
4 Rompi Scotlight 30.00 Bh Rp -
5 Kacamata 10.00 Bh Rp -
C Kelengkapan Lain
1 Kotak P3K + Isinya 1.00 Bh Rp -
D Penanganan Covid-19
1 Masker 10.00 Dos Rp -
2 Hand Sanitizer 20.00 btl Rp -
3 Tempat Cuci Tangan 1.00 Set Rp -
4 Sabun cuci tangan 20.00 btl Rp -
5 Vitamin 3.00 ls Rp -
Total Biaya Manajemen K3 Rp -
1.3 Pekerjaan Pembongkaran dan Pembersihan
1 Pek. Pembersihan Awal 1.00 Ls Rp -
2 Pek. Pembongkaran Lantai 332.88 m2 Rp -
3 Pek. Pembongkaran Rangka + Plafond 289.73 m2 Rp -
4 Pek. Pembongkaran Dinding untuk kusen baru dan balok latei 139.49 m2 Rp -
5 Pek. Pembersihan Akhir 1.00 Ls Rp -
Total Pekerjaan Pembersihan dan Removal Rp -
Total Biaya Site Work Rp -
PEKERJAAN STRUKTUR
II.2 Pekerjaan Struktur Atas

A. Balok Latei 10 x 15 cm (Termasuk Besi dan Bekisting) 56.70 M Rp -

Total Pekerjaan Struktur Atas Rp -


Total Pekerjaan Struktur Rp -
PEKERJAAN ARSITEKTURAL
A Pekerjaan Pasangan Dinding
1 Pek. perbaikan dinding rusak 9.19 M2 Rp -
2 Pek. Pasangan Dinding Bata merah 1 PC : 4 PP 12.00 M2 Rp -
3 Plesteran Dinding + Kolom 1 Pc : 5 Psr 24.00 M2 Rp -
4 Acian Dinding + Kolom 1 Pc : 5 Psr 24.00 M2 Rp -
B Pekerjaan Fasade
Pek. Fasade Eksterior Aluminium Composit Panel (ACP) +
1 265.20 M2 Rp -
Rangka Besi Hollow
2 Pek. Tulisan Acrelic + back light 59.72 M' Rp -
4 Pek. Pasangan tangga+railing 1.00 Set Rp -
D Pekerjaan Atap
1 Pek. Pemasangan Zoca zink 766.08 M2 Rp -
2 Pek. Nok Zoca zink 76.00 m Rp -
3 Pek. Pemasangan Kalsiplank 38.00 m Rp -
E Pekerjaan Plafond
1 Pek. Pemasangan rangka Plafond besi hollow 40.40.2 289.73 M2 Rp -
2 Pek. Pemasangan Plafond PVC 289.73 M2 Rp -
4 Pek. Pemasangan List plafond PVC 82.00 M Rp -
F Pekerjaan Keramik
1 Pek. Pemasangan Lantai Keramik Teras 40x40 cm 332.88 M2 Rp -
G Pekerjaan Pintu dan Jendela
1 Pek Pembuatan Pintu (PJ) + Kusen + Aksesoris 1.00 set Rp -
2 Pek Pembuatan Pintu (P1) + Kusen + Aksesoris 2.00 set Rp -
3 Pek Pembuatan Pintu (P2) + Kusen + Aksesoris 6.00 set Rp -
4 Pek Pembuatan Jendela (J1) + Kusen + Aksesoris 8.00 set Rp -
5 Pek Pembuatan Jendela (J2) + Kusen + Aksesoris 1.00 set Rp -
6 Pek Pembuatan Jendela (J3) + Kusen + Aksesoris 2.00 set Rp -
7 Pek Pembuatan Jendela (J4) + Kusen + Aksesoris 2.00 set Rp -
8 Pek Pembuatan Ventilasi (V1) + Kusen + Aksesoris 10.00 set Rp -
9 Pek Pembuatan Ventilasi (V2) + Kusen + Aksesoris 2.00 set Rp -
H Pekerjaan Pengecatan
1 Pek. Pengecatan Dinding kembali (avitex) 1,127.18 M2 Rp -
Total Pekerjaan Arsitektural Rp -
PEKERJAAN ELEKTRIKAL
A Pekerjaan Instalasi Penerangan
1 Pemasangan 1 titik Lampu/Stop kontak 62.00
Titik Rp -
2 Pemasangan 1 buah lampu LED highbay 50 watt 22.00
bh Rp -
3 Pemasangan 1 downlight 4" + Lampu LED 5 watt 13.00
Buah Rp -
4 Pemasangan lampu RM 2x22 watt 12.00
bh Rp -
5 Pemasangan Saklar Tunggal 2.00
bh Rp -
6 Pemasangan Saklar Ganda 5.00
bh Rp -
7 Pemasangan Stop Kontak 10A 15.00
bh Rp -
Total Divisi Pekerjaan elektrikal Rp -
TOTAL BIAYA PEKERJAAN RPS KAYU DAN ROTAN Rp -
II PEKERJAAN RPS DKV
PEKERJAAN SITE WORK
1.1 Pekerjaan Pembongkaran dan Pembersihan
1 Pek. Pembersihan Awal 1.00 Ls Rp -
2 Pek. Pembongkaran Lantai 180.00 m2 Rp -
3 Pek. Pembongkaran Rangka + Plafond 180.00 m2 Rp -
4 Pek. Pembongkaran Dinding untuk kusen baru dan balok latei 56.79 m2 Rp -
4 Pek. Pembersihan Akhir 1.00 Ls Rp -
Total Pekerjaan Persiapan Rp -
Total Biaya Site Work Rp -
PEKERJAAN STRUKTUR
I Pekerjaan Struktur Atas

A Balok Latei 10 x 15 cm (Termasuk Besi dan Bekisting) 36.00 M Rp -

Total Pekerjaan Struktur Rp -


PEKERJAAN ARSITEKTURAL
A Pekerjaan Fasade
Pek. Fasade Eksterior Aluminium Composit Panel (ACP) +
1 134.33 M2 Rp -
Rangka Besi Hollow
2 Pek. Tulisan Acrelic + back light 20.40 M Rp -
B Pekerjaan Atap
1 Pek. Pemasangan Zoca zink 261.34 M2 Rp -
2 Pek. Nok Zoca zink 30.09 m Rp -
C Pekerjaan Plafond
1 Pek. Pemasangan rangka Plafond besi hollow 40.40.2 180.00 M2 Rp -
2 Pek. Pemasangan Plafond PVC 180.00 M2 Rp -
4 Pek. Pemasangan List plafond PVC 52.00 M Rp -
D Pekerjaan Keramik
1 Pek. Pemasangan Lantai Keramik Teras 40x40 cm 180.00 M2 Rp -
E Pekerjaan Pintu dan Jendela
1 Pek Pembuatan Pintu (P1) + Kusen + Aksesoris 2.00 set Rp -
4 Pek Pembuatan Jendela (J1) + Kusen + Aksesoris 4.00 set Rp -
5 Pek Pembuatan Jendela (J2) + Kusen + Aksesoris 6.00 set Rp -
F Pekerjaan Pengecatan
1 Pek. Pengecatan Dinding kembali (avitex) 87.21 M2 Rp -
Total Divisi Pekerjaan Arsitektural Rp -
PEKERJAAN ELEKTRIKAL
A Pekerjaan Instalasi Penerangan
1 Pemasangan 1 titik Lampu/Stop kontak 27.00 Titik Rp -
2 Pemasangan 1 buah lampu Downlight 18 watt 3.00 bh Rp -
3 Pemasangan 1 buah lampu Downlight 11 watt 4.00 Buah Rp -
4 Pemasangan lampu RM 2x22 watt 8.00 bh Rp -
5 Pemasangan Saklar Tunggal 1.00 bh Rp -
6 Pemasangan Saklar Ganda 5.00 bh Rp -
7 Pemasangan Stop Kontak 10A 12.00 bh Rp -
Total Divisi Pekerjaan elektrikal Rp -
TOTAL BIAYA PEKERJAAN RPS DKV Rp -
III PEKERJAAN AULA
PEKERJAAN SITE WORK
1.1 Pekerjaan Pembongkaran dan Pembersihan
1 Pek. Pembersihan Awal 1.00 Ls Rp -
2 Pek. Pengukuran dan Pemasangan bouwplank 2x pakai 42.30 m Rp -
2 Pek. Pembongkaran Lantai 195.82 m2 Rp -
3 Pek. Pembongkaran Rangka + Plafond 365.16 m2 Rp -
4 Pek. Pembongkaran Dinding untuk kusen baru dan balok latei 117.30 m2 Rp -
5 Pek. Pembersihan Akhir 1.00 Ls Rp -
Total Pekerjaan Persiapan Rp -
1.2 Pekerjaan Tanah
1 Pek. Galian Tanah Biasa 23.15 M3 Rp -
2 Pek. Urugan Pasir 1.37 M3 Rp -
3 Pek. Tanah Urug 69.78 M3 Rp -
Total : Pekerjaan Tanah Rp -
Total Biaya Site Work Rp -
II.1 Pekerjaan Struktur Bawah
A. Pekerjaan Pondasi Poer Plat 80x80 cm
a Beton Site Mix K.250 0.51 M3 Rp -
b Pembesian 22.69 Kg Rp -
c Biksting 3x pakai 2.56 M2 Rp -
d Lantai kerja pondasi 0.40 M3 Rp -
B. Pekerjaan Pondasi Menerus
a Pas. Batu Kosong 6.77 M3 Rp -
b Pas. Batu Kali 18.61 M3 Rp -
c Urugan Pasir di bawah pondasi 1.69 M3 Rp -
C. Kolom Pedestal
1 Beton Site Mix K.250 0.40 M3 Rp -
2 Pembesian 108.74 Kg Rp -
3 Biksting 3x pakai 22.10 M2 Rp -
D. Sloof 20x30
1 Beton Site Mix K.250 3.40 M3 Rp -
2 Pembesian 677.97 Kg Rp -
3 Biksting 3x pakai 34.02 M2 Rp -
II.2 Pekerjaan Struktur Atas
A Kolom 25x40
Beton Site Mix K.250 1.70 M3 Rp -
Pembesian 263.64 Kg Rp -
Biksting 3x pakai 22.10 M2 Rp -

B Kolom Praktis 11x11 cm (Termasuk Besi dan Bekisting) 55.25 M Rp -

C Balok Latei 10 x 15 cm (Termasuk Besi dan Bekisting) 48.49 M Rp -


D Ring Balk 15 x 20 Cm
Beton Site Mix K.250 1.70 M3 Rp -
Pembesian 381.43 Kg Rp -
Biksting 4x pakai 22.68 M2 Rp -
E Plat Dak 0,08 m
Beton Site Mix K.250 2.43 M3 Rp -
Pembesian 295.69 Kg Rp -
Biksting 3x pakai 30.34 M2 Rp -
F Plat Dak 0,01 m
Beton Site Mix K.250 1.35 M3 Rp -
Pembesian 119.47 Kg Rp -
Biksting 3x pakai 13.45 M2 Rp -
Total : Pekerjaan Struktur Rp -
PEKERJAAN ARSITEKTURAL
A Pekerjaan Atap
1 Pek. Pemasangan Rangka atap kuda-kuda baja ringan 375.15 M2 Rp -
2 Pek. Pemasangan Zoca zink 375.15 M2 Rp -
3 Pek. Nok Zoca zink 50.37 m Rp -
4 Pek. Talang air 40.00 m Rp -
B Pekerjaan Plafond
1 Pek. Pemasangan rangka Plafond besi hollow 40.40.2 365.16 M2 Rp -
2 Pek. Pemasangan Plafond PVC 365.16 M2 Rp -
4 Pek. Pemasangan List plafond PVC 91.68 M Rp -
C Pekerjaan Keramik
1 Pek. Pemasangan Lantai Keramik Teras 40x40 cm 195.82 M2 Rp -
D Pekerjaan Pintu dan Jendela
1 Pek Pembuatan Pintu Jendela (PJ1) + Kusen + Aksesoris 4.00 set Rp -
2 Pek Pembuatan Pintu (P1) + Kusen + Aksesoris 1.00 set Rp -
3 Pek Pembuatan Pintu (P2) + Kusen + Aksesoris 1.00 set Rp -
4 Pek Pembuatan Pintu (P3) + Kusen + Aksesoris 2.00 set Rp -
5 Pek Pembuatan Pintu (P4) + Kusen + Aksesoris 1.00 set Rp -
6 Pek Pembuatan Jendela (J1) + Kusen + Aksesoris 2.00 set Rp -
7 Pek Pembuatan Jendela (J2) + Kusen + Aksesoris 4.00 set Rp -
8 Pek Pembuatan Ventilasi (V1) + Kusen + Aksesoris 4.00 set Rp -
E Pekerjaan Fasade
1 Pek. Tulisan Acrelic 17.16 m Rp -
F Pekerjaan Interior
1 Pek. Backdrop Dinding 64.16 M2 Rp -
2 Pek. Aluminium Composite Panel 390.97 M2 Rp -
G Pekerjaan Pengecatan
1 Pek. Pengecatan Dinding kembali (avitex) 367.62 M2 Rp -
Total : Pekerjaan Arsitektural Rp -
PEKERJAAN ELEKTRIKAL
A Pekerjaan Instalasi Penerangan
1 Pemasangan 1 titik Lampu/Stop kontak 46.00 Titik Rp -
2 Pemasangan LED Panel outbow 18 watt 36.00 bh Rp -
5 Pemasangan Saklar Tunggal 3.00 bh Rp -
6 Pemasangan Saklar Ganda 11.00 bh Rp -
7 Pemasangan Stop Kontak 10A 10.00 bh Rp -
Total Divisi 4 : Pekerjaan elektrikal Rp -
TOTAL BIAYA PEKERJAAN AULA Rp -
ENGINEERING ESTIMATE (E.E)

REKAPITULASI TOTAL
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENEGAH
KEJURUAN (SMK)
PEKERJAAN : REHAB RUANG PRAKTEK SISWA (RPS) KAYU DAN ROTAN
: REHAB RUANG PRAKTEK SISWA (RPS) DKV
: REHAB AULA
LOKASI : SMK NEGERI 5 PALU
SUMBER DANA : APBD 2021
TAHUN ANGGARAN : 2021

NO. URAIAN PEKERJAAN JUMLAH HARGA


1 2 3
I PEKERJAAN REHAB RPS KAYU DAN ROTAN
PEKERJAAN SITE WORK
PEKERJAAN STRUKTUR
PEKERJAAN ARSITEKTURAL
PEKERJAAN ELEKTRIKAL
II PEKERJAAN REHAB RPS DKV
PEKERJAAN SITE WORK
PEKERJAAN STRUKTUR
PEKERJAAN ARSITEKTURAL
PEKERJAAN ELEKTRIKAL
III PEKERJAAN REHAB AULA
PEKERJAAN SITE WORK
PEKERJAAN STRUKTUR
PEKERJAAN ARSITEKTURAL
PEKERJAAN ELEKTRIKAL
JUMLAH TOTAL
PPN 10 %
TOTAL KESELURUHAN
DIBULATKAN

Palu, 2021
Dibuat Oleh,
Konsultan Perencana,
CV. PORTAL REKAYASA
CV. PORTAL REKAYASA

Ir. Arzal M. Zain, ST, MT, IPM


ENGINEERING ESTIMATE (E.E)

REKAPITULASI TOTAL
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENEGAH
KEJURUAN (SMK)
PEKERJAAN : REHAP RPS
: *REHAB RUANG PRAKTEK SISWA (RPS) KAYU DAN ROTAN
: *REHAB RUANG PRAKTEK SISWA (RPS) DKV
: *REHAB AULA
: REHAB RUANG KELAS
: REHAB RUANG GURU
: REHAB RUANG KEPALA SEKOLAH
: REHAB TOILET
: REHAB RUANG IBADAH
LOKASI : SMK NEGERI 5 PALU
SUMBER DANA : APBD 2021
TAHUN ANGGARAN : 2021

NO. URAIAN PEKERJAAN JUMLAH HARGA


1 2 3
I PEKERJAAN REHAB RPS KAYU DAN ROTAN
PEKERJAAN SITE WORK Rp 80,383,222.54
PEKERJAAN STRUKTUR Rp 10,801,706.58
PEKERJAAN ARSITEKTURAL Rp 758,510,926.82
PEKERJAAN ELEKTRIKAL Rp 24,530,499.00
II PEKERJAAN REHAB RPS DKV
PEKERJAAN SITE WORK Rp 11,259,813.29
PEKERJAAN STRUKTUR Rp 6,858,226.40
PEKERJAAN ARSITEKTURAL Rp 340,546,292.95
PEKERJAAN ELEKTRIKAL Rp 9,431,240.60
III PEKERJAAN REHAB AULA
PEKERJAAN SITE WORK Rp 32,198,974.33
PEKERJAAN STRUKTUR Rp 102,294,837.69
PEKERJAAN ARSITEKTURAL Rp 789,653,505.90
PEKERJAAN ELEKTRIKAL Rp 15,349,175.60
IV PEKERJAAN REHAB RUANG KELAS
PEKERJAAN SITE WORK Rp 14,690,000.00
PEKERJAAN STRUKTUR Rp 66,410,528.49
PEKERJAAN ARSITEKTURAL Rp 873,444,926.05
V PEKERJAAN REHAB RUANG GURU
PEKERJAAN SITE WORK Rp 21,326,719.69
PEKERJAAN STRUKTUR Rp 94,131,560.46
PEKERJAAN ARSITEKTURAL Rp 243,522,260.74
PEKERJAAN ELEKTRIKAL Rp 4,655,100.00
VI PEKERJAAN REHAB RUANG KEPALA SEKOLAH
PEKERJAAN SITE WORK Rp 22,077,304.69
PEKERJAAN ARSITEKTURAL Rp 146,831,762.69
PEKERJAAN SANITASI Rp 5,934,781.73
PEKERJAAN ELEKTRIKAL Rp 6,974,900.00
VII PEKERJAAN REHAB TOILET
PEKERJAAN SITE WORK Rp 2,638,489.78
PEKERJAAN STRUKTUR Rp 2,149,647.31
PEKERJAAN ARSITEKTURAL Rp 196,536,843.32
PEKERJAAN ELEKTRIKAL Rp 3,220,349.00
VIII PEKERJAAN REHAB RUANG IBADAH
PEKERJAAN SITE WORK Rp 13,512,714.41
PEKERJAAN STRUKTUR Rp 28,356,100.67
PEKERJAAN ARSITEKTURAL Rp 135,229,846.64
PEKERJAAN ELEKTRIKAL Rp 4,719,121.00
JUMLAH TOTAL Rp 4,068,181,378.38
PPN 10 % Rp 406,818,137.84
TOTAL KESELURUHAN Rp 4,474,999,516.22
DIBULATKAN Rp 4,475,000,000.00
Empat Milyar Empat Ratus Tujuh Puluh Lima Juta Rupiah
Palu, 2021
Dibuat Oleh,
Konsultan Perencana,
CV. PORTAL REKAYASA

Ir. Arzal M. Zain, ST, MT, IPM


ENGINEERING ESTIMATE (E.E)

REKAPITULASI TOTAL
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENEGAH
KEJURUAN (SMK)
PEKERJAAN : REHAB RUANG PRAKTEK SISWA (RPS) KAYU DAN ROTAN
: REHAB RUANG PRAKTEK SISWA (RPS) DKV
: REHAB AULA
LOKASI : SMK NEGERI 5 PALU
SUMBER DANA : APBD 2021
TAHUN ANGGARAN : 2021

NO. URAIAN PEKERJAAN JUMLAH HARGA


1 2 3
I PEKERJAAN REHAB RPS KAYU DAN ROTAN
PEKERJAAN SITE WORK Rp 80,383,222.54
PEKERJAAN STRUKTUR Rp 10,801,706.58
PEKERJAAN ARSITEKTURAL Rp 758,510,926.82
PEKERJAAN ELEKTRIKAL Rp 24,530,499.00
II PEKERJAAN REHAB RPS DKV
PEKERJAAN SITE WORK Rp 11,259,813.29
PEKERJAAN STRUKTUR Rp 6,858,226.40
PEKERJAAN ARSITEKTURAL Rp 340,546,292.95
PEKERJAAN ELEKTRIKAL Rp 9,431,240.60
III PEKERJAAN REHAB AULA
PEKERJAAN SITE WORK Rp 32,198,974.33
PEKERJAAN STRUKTUR Rp 102,294,837.69
PEKERJAAN ARSITEKTURAL Rp 789,653,505.90
PEKERJAAN ELEKTRIKAL Rp 15,349,175.60
JUMLAH TOTAL Rp 2,181,818,421.71
PPN 10 % Rp 218,181,842.17
TOTAL KESELURUHAN Rp 2,400,000,263.88
DIBULATKAN Rp 2,400,000,000.00
Dua Milyar Empat Ratus Juta Rupiah
Palu, 2021
Dibuat Oleh,
Konsultan Perencana,
CV. PORTAL REKAYASA
CV. PORTAL REKAYASA

Ir. Arzal M. Zain, ST, MT, IPM


ENGINEERING ESTIMATE (E.E)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENEGAH KEJURUAN (SMK)
PEKERJAAN : REHAB RUANG PRAKTEK SISWA (RPS) KAYU DAN ROTAN
: REHAB RUANG PRAKTEK SISWA (RPS) DKV
: REHAB AULA
LOKASI : SMK NEGERI 5 PALU
SUMBER DANA : APBD 2021
TH. ANGGARAN : 2021

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
A B C D E F
I PEKERJAAN RPS KAYU DAN ROTAN
PEKERJAAN SITE WORK
1.1 Pekerjaan Persiapan
1 Pek. Pembuatan Kantor Direksi Di Lapangan 1.00 Ls Rp 15,000,000.00 Rp 15,000,000.00
(ukuran 4*6, dinding kalsiboard, tiang baja ringan, lantai cor,
atap spandek)
2 Pek. Pembuatan Papan Nama Proyek 1.00 Ls Rp 500,000.00 Rp 500,000.00
(ukuran 80x120 cm, tiang pipa besi)
3 Pek. Pembuatan Gudang Dan Barak Pekerja 1.00 Ls Rp 15,000,000.00 Rp 15,000,000.00
(ukuran 4*8 m, dinding Papan, atap seng, tiang kayu)
4 Pek. Pagar Pengaman Proyek 1.00 Ls Rp 15,000,000.00 Rp 15,000,000.00
(pagar seng gelombang, tiang kayu, tinggi 1.8 m)
Total Pekerjaan Persiapan Rp 45,500,000.00
1.2 Biaya Manajemen K3
A Kantor Direksi
1 Helem 25.00 Bh Rp 65,000.00 Rp 1,625,000.00
2 Sepatu Boot 25.00 Psg Rp 97,000.00 Rp 2,425,000.00
B Pekerja / Tukang
1 Helem 30.00 Bh Rp 65,000.00 Rp 1,950,000.00
2 Sepatu Boot 30.00 Psg Rp 97,000.00 Rp 2,910,000.00
3 Sarung Tangan 15.00 Lsn Rp 65,000.00 Rp 975,000.00
4 Rompi Scotlight 30.00 Bh Rp 25,000.00 Rp 750,000.00
5 Kacamata 10.00 Bh Rp 50,000.00 Rp 500,000.00
C Kelengkapan Lain
1 Kotak P3K + Isinya 1.00 Bh Rp 468,000.00 Rp 468,000.00
D Penanganan Covid-19
1 Masker 10.00 Dos Rp 100,000.00 Rp 1,000,000.00
2 Hand Sanitizer 20.00 btl Rp 25,000.00 Rp 500,000.00
3 Tempat Cuci Tangan 1.00 Set Rp 600,000.00 Rp 600,000.00
4 Sabun cuci tangan 20.00 btl Rp 100,000.00 Rp 2,000,000.00
5 Vitamin 3.00 ls Rp 250,000.00 Rp 750,000.00
Total Biaya Manajemen K3 Rp 16,453,000.00
1.3 Pekerjaan Pembongkaran dan Pembersihan
1 Pek. Pembersihan Awal 1.00 Ls Rp 1,000,000.00 Rp 1,000,000.00
2 Pek. Pembongkaran Lantai 332.88 m2 Rp 23,619.75 Rp 7,862,542.38
3 Pek. Pembongkaran Rangka + Plafond 289.73 m2 Rp 19,723.00 Rp 5,714,275.76
4 Pek. Pembongkaran Dinding untuk kusen baru dan balok latei 139.49 m2 Rp 16,871.25 Rp 2,353,404.41
5 Pek. Pembersihan Akhir 1.00 Ls Rp 1,500,000.00 Rp 1,500,000.00
Total Pekerjaan Pembersihan dan Removal Rp 18,430,222.54
Total Biaya Site Work Rp 80,383,222.54
PEKERJAAN STRUKTUR
II.2 Pekerjaan Struktur Atas

A. Balok Latei 10 x 15 cm (Termasuk Besi dan Bekisting) 56.70 M Rp 190,506.29 Rp 10,801,706.58

Total Pekerjaan Struktur Atas Rp 10,801,706.58


Total Pekerjaan Struktur Rp 10,801,706.58
PEKERJAAN ARSITEKTURAL
A Pekerjaan Pasangan Dinding
1 Pek. perbaikan dinding rusak 9.19 M2 Rp 267,569.43 Rp 2,459,551.71
2 Pek. Pasangan Dinding Bata merah 1 PC : 4 PP 12.00 M2 Rp 184,678.45 Rp 2,216,141.40
3 Plesteran Dinding + Kolom 1 Pc : 5 Psr 24.00 M2 Rp 72,587.06 Rp 1,742,089.54
4 Acian Dinding + Kolom 1 Pc : 5 Psr 24.00 M2 Rp 46,059.20 Rp 1,105,420.80
B Pekerjaan Fasade
Pek. Fasade Eksterior Aluminium Composit Panel (ACP) +
1 265.20 M2 Rp 924,055.00 Rp 245,056,429.02
Rangka Besi Hollow
2 Pek. Tulisan Acrelic + back light 59.72 M' Rp 800,000.00 Rp 47,776,000.00
4 Pek. Pasangan tangga+railing 1.00 Set Rp 5,677,714.42 Rp 5,677,714.42
D Pekerjaan Atap
1 Pek. Pemasangan Zoca zink 766.08 M2 Rp 141,058.50 Rp 108,062,095.68
2 Pek. Nok Zoca zink 76.00 m Rp 168,227.56 Rp 12,785,294.63
3 Pek. Pemasangan Kalsiplank 38.00 m Rp 72,979.50 Rp 2,773,221.00
E Pekerjaan Plafond
1 Pek. Pemasangan rangka Plafond besi hollow 40.40.2 289.73 M2 Rp 162,893.50 Rp 47,194,563.63
2 Pek. Pemasangan Plafond PVC 289.73 M2 Rp 57,371.05 Rp 16,621,913.52
4 Pek. Pemasangan List plafond PVC 82.00 M Rp 31,273.00 Rp 2,564,386.00
F Pekerjaan Keramik
1 Pek. Pemasangan Lantai Keramik Teras 40x40 cm 332.88 M2 Rp 277,808.19 Rp 92,476,790.29
G Pekerjaan Pintu dan Jendela
1 Pek Pembuatan Pintu (PJ) + Kusen + Aksesoris 1.00 set Rp 7,786,478.69 Rp 7,786,478.69
2 Pek Pembuatan Pintu (P1) + Kusen + Aksesoris 2.00 set Rp 5,712,731.10 Rp 11,425,462.19
3 Pek Pembuatan Pintu (P2) + Kusen + Aksesoris 6.00 set Rp 3,165,692.47 Rp 18,994,154.84
4 Pek Pembuatan Jendela (J1) + Kusen + Aksesoris 8.00 set Rp 6,567,846.22 Rp 52,542,769.73
5 Pek Pembuatan Jendela (J2) + Kusen + Aksesoris 1.00 set Rp 4,634,720.49 Rp 4,634,720.49
6 Pek Pembuatan Jendela (J3) + Kusen + Aksesoris 2.00 set Rp 2,969,592.72 Rp 5,939,185.44
7 Pek Pembuatan Jendela (J4) + Kusen + Aksesoris 2.00 set Rp 7,392,998.52 Rp 14,785,997.04
8 Pek Pembuatan Ventilasi (V1) + Kusen + Aksesoris 10.00 set Rp 2,646,181.73 Rp 26,461,817.33
9 Pek Pembuatan Ventilasi (V2) + Kusen + Aksesoris 2.00 set Rp 772,236.38 Rp 1,544,472.75
H Pekerjaan Pengecatan
1 Pek. Pengecatan Dinding kembali (avitex) 1,127.18 M2 Rp 22,963.81 Rp 25,884,256.67
Total Pekerjaan Arsitektural Rp 758,510,926.82
PEKERJAAN ELEKTRIKAL
A Pekerjaan Instalasi Penerangan
1 Pemasangan 1 titik Lampu/Stop kontak 62.00
Titik Rp 181,629.80 Rp 11,261,047.60
2 Pemasangan 1 buah lampu LED highbay 50 watt 22.00
bh Rp 264,000.00 Rp 5,808,000.00
3 Pemasangan 1 downlight 4" + Lampu LED 5 watt 13.00
Buah Rp 138,600.00 Rp 1,801,800.00
4 Pemasangan lampu RM 2x22 watt 12.00
bh Rp 315,000.00 Rp 3,780,000.00
5 Pemasangan Saklar Tunggal 2.00
bh Rp 57,312.20 Rp 114,624.40
6 Pemasangan Saklar Ganda 5.00
bh Rp 64,902.20 Rp 324,511.00
7 Pemasangan Stop Kontak 10A 15.00
bh Rp 96,034.40 Rp 1,440,516.00
Total Divisi Pekerjaan elektrikal Rp 24,530,499.00
TOTAL BIAYA PEKERJAAN RPS KAYU DAN ROTAN Rp 874,226,354.95
II PEKERJAAN RPS DKV
PEKERJAAN SITE WORK
1.1 Pekerjaan Pembongkaran dan Pembersihan
1 Pek. Pembersihan Awal 1.00 Ls Rp 1,000,000.00 Rp 1,000,000.00
2 Pek. Pembongkaran Lantai 180.00 m2 Rp 23,619.75 Rp 4,251,555.00
3 Pek. Pembongkaran Rangka + Plafond 180.00 m2 Rp 19,723.00 Rp 3,550,140.00
4 Pek. Pembongkaran Dinding untuk kusen baru dan balok latei 56.79 m2 Rp 16,871.25 Rp 958,118.29
4 Pek. Pembersihan Akhir 1.00 Ls Rp 1,500,000.00 Rp 1,500,000.00
Total Pekerjaan Persiapan Rp 11,259,813.29
Total Biaya Site Work Rp 11,259,813.29
PEKERJAAN STRUKTUR
I Pekerjaan Struktur Atas

A Balok Latei 10 x 15 cm (Termasuk Besi dan Bekisting) 36.00 M Rp 190,506.29 Rp 6,858,226.40

Total Pekerjaan Struktur Rp 6,858,226.40


PEKERJAAN ARSITEKTURAL
A Pekerjaan Fasade
Pek. Fasade Eksterior Aluminium Composit Panel (ACP) +
1 134.33 M2 Rp 924,055.00 Rp 124,124,149.90
Rangka Besi Hollow
2 Pek. Tulisan Acrelic + back light 20.40 M Rp 800,000.00 Rp 16,320,000.00
B Pekerjaan Atap
1 Pek. Pemasangan Zoca zink 261.34 M2 Rp 141,058.50 Rp 36,864,454.08
2 Pek. Nok Zoca zink 30.09 m Rp 168,227.56 Rp 5,061,967.31
C Pekerjaan Plafond
1 Pek. Pemasangan rangka Plafond besi hollow 40.40.2 180.00 M2 Rp 162,893.50 Rp 29,320,830.00
2 Pek. Pemasangan Plafond PVC 180.00 M2 Rp 57,371.05 Rp 10,326,789.00
4 Pek. Pemasangan List plafond PVC 52.00 M Rp 31,273.00 Rp 1,626,196.00
D Pekerjaan Keramik
1 Pek. Pemasangan Lantai Keramik Teras 40x40 cm 180.00 M2 Rp 277,808.19 Rp 50,005,474.20
E Pekerjaan Pintu dan Jendela
1 Pek Pembuatan Pintu (P1) + Kusen + Aksesoris 2.00 set Rp 6,982,259.82 Rp 13,964,519.65
4 Pek Pembuatan Jendela (J1) + Kusen + Aksesoris 4.00 set Rp 4,654,459.20 Rp 18,617,836.80
5 Pek Pembuatan Jendela (J2) + Kusen + Aksesoris 6.00 set Rp 5,385,233.67 Rp 32,311,402.05
F Pekerjaan Pengecatan
1 Pek. Pengecatan Dinding kembali (avitex) 87.21 M2 Rp 22,963.81 Rp 2,002,673.96
Total Divisi Pekerjaan Arsitektural Rp 340,546,292.95
PEKERJAAN ELEKTRIKAL
A Pekerjaan Instalasi Penerangan
1 Pemasangan 1 titik Lampu/Stop kontak 27.00 Titik Rp 181,629.80 Rp 4,904,004.60
2 Pemasangan 1 buah lampu Downlight 18 watt 3.00 bh Rp 55,000.00 Rp 165,000.00
3 Pemasangan 1 buah lampu Downlight 11 watt 4.00 Buah Rp 77,000.00 Rp 308,000.00
4 Pemasangan lampu RM 2x22 watt 8.00 bh Rp 315,000.00 Rp 2,520,000.00
5 Pemasangan Saklar Tunggal 1.00 bh Rp 57,312.20 Rp 57,312.20
6 Pemasangan Saklar Ganda 5.00 bh Rp 64,902.20 Rp 324,511.00
7 Pemasangan Stop Kontak 10A 12.00 bh Rp 96,034.40 Rp 1,152,412.80
Total Divisi Pekerjaan elektrikal Rp 9,431,240.60
TOTAL BIAYA PEKERJAAN RPS DKV Rp 368,095,573.24
III PEKERJAAN AULA
PEKERJAAN SITE WORK
1.1 Pekerjaan Pembongkaran dan Pembersihan
1 Pek. Pembersihan Awal 1.00 Ls Rp 1,000,000.00 Rp 1,000,000.00
2 Pek. Pengukuran dan Pemasangan bouwplank 2x pakai 42.30 m Rp 27,032.50 Rp 1,143,474.75
2 Pek. Pembongkaran Lantai 195.82 m2 Rp 23,619.75 Rp 4,625,195.83
3 Pek. Pembongkaran Rangka + Plafond 365.16 m2 Rp 19,723.00 Rp 7,202,099.99
4 Pek. Pembongkaran Dinding untuk kusen baru dan balok latei 117.30 m2 Rp 16,871.25 Rp 1,978,963.88
5 Pek. Pembersihan Akhir 1.00 Ls Rp 1,500,000.00 Rp 1,500,000.00
Total Pekerjaan Persiapan Rp 17,449,734.45
1.2 Pekerjaan Tanah
1 Pek. Galian Tanah Biasa 23.15 M3 Rp 70,909.85 Rp 1,641,563.03
2 Pek. Urugan Pasir 1.37 M3 Rp 210,815.00 Rp 289,817.92
3 Pek. Tanah Urug 69.78 M3 Rp 183,683.50 Rp 12,817,858.94
Total : Pekerjaan Tanah Rp 14,749,239.89
Total Biaya Site Work Rp 32,198,974.33
II.1 Pekerjaan Struktur Bawah
A. Pekerjaan Pondasi Poer Plat 80x80 cm
a Beton Site Mix K.250 0.51 M3 Rp 1,193,163.31 Rp 610,899.62
b Pembesian 22.69 Kg Rp 16,826.53 Rp 381,746.81
c Biksting 3x pakai 2.56 M2 Rp 143,931.33 Rp 368,464.21
d Lantai kerja pondasi 0.40 M3 Rp 953,251.59 Rp 381,300.64
B. Pekerjaan Pondasi Menerus
a Pas. Batu Kosong 6.77 M3 Rp 509,896.20 Rp 3,450,977.48
b Pas. Batu Kali 18.61 M3 Rp 999,871.40 Rp 18,609,606.50
c Urugan Pasir di bawah pondasi 1.69 M3 Rp 210,815.00 Rp 356,698.98
C. Kolom Pedestal
1 Beton Site Mix K.250 0.40 M3 Rp 1,193,163.31 Rp 477,265.33
2 Pembesian 108.74 Kg Rp 16,826.53 Rp 1,829,687.55
3 Biksting 3x pakai 22.10 M2 Rp 126,331.33 Rp 2,791,922.47
D. Sloof 20x30
1 Beton Site Mix K.250 3.40 M3 Rp 1,193,163.31 Rp 4,059,141.59
2 Pembesian 677.97 Kg Rp 16,826.53 Rp 11,407,879.24
3 Biksting 3x pakai 34.02 M2 Rp 73,307.67 Rp 2,493,926.82
II.2 Pekerjaan Struktur Atas
A Kolom 25x40
Beton Site Mix K.250 1.70 M3 Rp 1,193,163.31 Rp 2,028,377.63
Pembesian 263.64 Kg Rp 16,826.53 Rp 4,436,153.77
Biksting 3x pakai 22.10 M2 Rp 126,331.33 Rp 2,791,922.47

B Kolom Praktis 11x11 cm (Termasuk Besi dan Bekisting) 55.25 M Rp 147,231.37 Rp 8,134,532.96

C Balok Latei 10 x 15 cm (Termasuk Besi dan Bekisting) 48.49 M Rp 190,506.29 Rp 9,237,649.95


D Ring Balk 15 x 20 Cm
Beton Site Mix K.250 1.70 M3 Rp 1,193,163.31 Rp 2,029,570.79
Pembesian 381.43 Kg Rp 16,826.53 Rp 6,418,186.86
Biksting 4x pakai 22.68 M2 Rp 97,429.75 Rp 2,209,706.73
E Plat Dak 0,08 m
Beton Site Mix K.250 2.43 M3 Rp 1,193,163.31 Rp 2,896,045.99
Pembesian 295.69 Kg Rp 16,826.53 Rp 4,975,393.61
Biksting 3x pakai 30.34 M2 Rp 143,931.33 Rp 4,366,876.65
F Plat Dak 0,01 m
Beton Site Mix K.250 1.35 M3 Rp 1,193,163.31 Rp 1,604,804.66
Pembesian 119.47 Kg Rp 16,826.53 Rp 2,010,221.97
Biksting 3x pakai 13.45 M2 Rp 143,931.33 Rp 1,935,876.43
Total : Pekerjaan Struktur Rp 102,294,837.69
PEKERJAAN ARSITEKTURAL
A Pekerjaan Atap
1 Pek. Pemasangan Rangka atap kuda-kuda baja ringan 375.15 M2 Rp 155,105.32 Rp 58,187,525.72
2 Pek. Pemasangan Zoca zink 375.15 M2 Rp 141,058.50 Rp 52,917,883.62
3 Pek. Nok Zoca zink 50.37 m Rp 168,227.56 Rp 8,473,622.25
4 Pek. Talang air 40.00 m Rp 30,250.00 Rp 1,210,000.00
B Pekerjaan Plafond
1 Pek. Pemasangan rangka Plafond besi hollow 40.40.2 365.16 M2 Rp 162,893.50 Rp 59,482,597.69
2 Pek. Pemasangan Plafond PVC 365.16 M2 Rp 57,371.05 Rp 20,949,756.05
4 Pek. Pemasangan List plafond PVC 91.68 M Rp 31,273.00 Rp 2,867,108.64
C Pekerjaan Keramik
1 Pek. Pemasangan Lantai Keramik Teras 40x40 cm 195.82 M2 Rp 277,808.19 Rp 54,400,121.96
D Pekerjaan Pintu dan Jendela
1 Pek Pembuatan Pintu Jendela (PJ1) + Kusen + Aksesoris 4.00 set Rp 10,225,591.88 Rp 40,902,367.53
2 Pek Pembuatan Pintu (P1) + Kusen + Aksesoris 1.00 set Rp 3,931,330.09 Rp 3,931,330.09
3 Pek Pembuatan Pintu (P2) + Kusen + Aksesoris 1.00 set Rp 3,265,901.56 Rp 3,265,901.56
4 Pek Pembuatan Pintu (P3) + Kusen + Aksesoris 2.00 set Rp 3,115,511.60 Rp 6,231,023.20
5 Pek Pembuatan Pintu (P4) + Kusen + Aksesoris 1.00 set Rp 3,285,843.52 Rp 3,285,843.52
6 Pek Pembuatan Jendela (J1) + Kusen + Aksesoris 2.00 set Rp 7,520,707.82 Rp 15,041,415.64
7 Pek Pembuatan Jendela (J2) + Kusen + Aksesoris 4.00 set Rp 8,649,175.22 Rp 34,596,700.87
8 Pek Pembuatan Ventilasi (V1) + Kusen + Aksesoris 4.00 set Rp 773,974.16 Rp 3,095,896.64
E Pekerjaan Fasade
1 Pek. Tulisan Acrelic 17.16 m Rp 800,000.00 Rp 13,728,000.00
F Pekerjaan Interior
1 Pek. Backdrop Dinding 64.16 M2 Rp 582,368.86 Rp 37,366,533.03
2 Pek. Aluminium Composite Panel 390.97 M2 Rp 924,055.00 Rp 361,277,875.76
G Pekerjaan Pengecatan
1 Pek. Pengecatan Dinding kembali (avitex) 367.62 M2 Rp 22,963.81 Rp 8,442,002.14
Total : Pekerjaan Arsitektural Rp 789,653,505.90
PEKERJAAN ELEKTRIKAL
A Pekerjaan Instalasi Penerangan
1 Pemasangan 1 titik Lampu/Stop kontak 46.00 Titik Rp 181,629.80 Rp 8,354,970.80
2 Pemasangan LED Panel outbow 18 watt 36.00 bh Rp 143,000.00 Rp 5,148,000.00
5 Pemasangan Saklar Tunggal 3.00 bh Rp 57,312.20 Rp 171,936.60
6 Pemasangan Saklar Ganda 11.00 bh Rp 64,902.20 Rp 713,924.20
7 Pemasangan Stop Kontak 10A 10.00 bh Rp 96,034.40 Rp 960,344.00
Total Divisi 4 : Pekerjaan elektrikal Rp 15,349,175.60
TOTAL BIAYA PEKERJAAN AULA Rp 939,496,493.52
ANALISA HARGA SATUAN PEKERJAAN

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENEGAH KEJURUAN


(SMK)
PEKERJAAN : REHAB RUANG PRAKTEK SISWA (RPS) KAYU DAN ROTAN
: REHAB RUANG PRAKTEK SISWA (RPS) DKV
: REHAB AULA
LOKASI : SMK NEGERI 5 PALU
SUMBER DANA : APBD 2021
TAHUN ANGGARAN : 2021

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang Kayu L.02 OH 0.100 125,000.00 12,500.00
Kepala Tukang L.03 OH 0.010 135,000.00 1,350.00
Mandor L.04 OH 0.005 145,000.00 725.00
Jumlah Tenaga Kerja : 24,575.00
B. Bahan
Kayu Balok 5/7 m3 0.012 2,210,000.00 26,520.00
Paku 2"-3" Kg 0.020 20,500.00 410.00
Kayu Papan 3/20 m3 0.007 2,210,000.00 15,470.00
Jumlah Harga Bahan :
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 24,575.00
E. Overhead & Profit (10% x D) Rp 2,457.50
F. Harga Satuan Pekerjaan (D + E) Rp 27,032.50
anl terapan Pembongkaran 1 m2 untuk plafon
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.350 95,000.00 33,250.00
Mandor L.04 OH 0.018 145,000.00 2,610.00
Jumlah Tenaga Kerja : 35,860.00
B. Bahan

Jumlah Harga Bahan : -


C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 35,860.00
E. Overhead & Profit (10% x D) Rp 3,586.00
F. Harga Satuan Pekerjaan (D + E) Rp 19,723.00
(cat. Pembongkaran Plafond 50% dari upah pekerja dan mandor pemasangan)
Anl. terapan Pemabongkaran 1m2 lantai
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.700 95,000.00 66,500.00
Mandor L.04 OH 0.035 145,000.00 5,075.00
Jumlah Tenaga Kerja : 71,575.00
B. Bahan
Jumlah Harga Bahan :
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 71,575.00
E. Overhead & Profit (10% x D) Rp 7,157.50
F. Harga Satuan Pekerjaan (D + E)x50% Rp 23,619.75
(cat. Pembongkaran Lantai 30% dari upah pekerja dan mandor pemasangan)
anl. terapan Pembongkaran 1m2 dinding
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.300 95,000.00 28,500.00
Mandor L.04 OH 0.015 145,000.00 2,175.00
Jumlah Tenaga Kerja : 30,675.00
B. Bahan
Jumlah Harga Bahan :
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 30,675.00
E. Overhead & Profit (10% x D) Rp 3,067.50
F. Harga Satuan Pekerjaan (D + E)*50% Rp 16,871.25
(cat. Pembongkaran Dinding 50% dari upah pekerja dan mandor pemasangan)
A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 13.334 100,000.00 1,333,400.00
Mandor L.04 OH 0.666 145,000.00 96,570.00
Jumlah Tenaga Kerja : 1,429,970.00
B. Bahan

Jumlah Harga Bahan :


C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 1,429,970.00
E. Overhead & Profit (10% x D) Rp 142,997.00
F. Harga Satuan Pekerjaan (D + E) Rp 1,572,967.00
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.563 100,000.00 56,300.00
Mandor L.04 OH 0.056 145,000.00 8,163.50
Jumlah Tenaga Kerja : 64,463.50
B. Bahan

Jumlah Harga Bahan :


C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 64,463.50
E. Overhead & Profit (10% x D) Rp 6,446.35
F. Harga Satuan Pekerjaan (D + E) Rp 70,909.85
A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.500 100,000.00 50,000.00
Mandor L.04 OH 0.050 145,000.00 7,250.00
Jumlah Tenaga Kerja : 57,250.00
B. Bahan

Jumlah Harga Bahan :


C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 57,250.00
E. Overhead & Profit (10% x D) Rp 5,725.00
F. Harga Satuan Pekerjaan (D + E) Rp 62,975.00
A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Mandor L.04 OH 0.010 145,000.00 1,450.00
Jumlah Tenaga Kerja : 31,450.00
B. Bahan
Pasir Urug m3 1.200 133,500.00 160,200.00

Jumlah Harga Bahan : 160,200.000


C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 191,650.00
E. Overhead & Profit (10% x D) Rp 19,165.00
F. Harga Satuan Pekerjaan (D + E) Rp 210,815.00
A.2.3.1.14. Pengurugan 1 m3 sirtu padat
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Mandor L.04 OH 0.025 145,000.00 3,625.00
Jumlah Tenaga Kerja : 28,625.00
B. Bahan
Tanah urug m3 1.200 115,300.00 138,360.00

Jumlah Harga Bahan : 138,360.000


C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 166,985.00
E. Overhead & Profit (10% x D) Rp 16,698.50
F. Harga Satuan Pekerjaan (D + E) Rp 183,683.50
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 1.500 100,000.00 150,000.00
Tukang Batu OH 0.750 125,000.00 93,750.00
Kepala Tukang OH 0.075 135,000.00 10,125.00
Mandor L.04 OH 0.075 145,000.00 10,875.00
Jumlah Tenaga Kerja : 264,750.00
B. Bahan
Batu Belah M3 1.200 223,500.00 268,200.00
Semen Portland Kg 202.000 1,576.00 318,352.00
Pasir Urug M3 0.432 133,500.00 57,672.00
Jumlah Harga Bahan : 644,224.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 908,974.00
E. Overhead & Profit (10% x D) Rp 90,897.40
F. Harga Satuan Pekerjaan (D + E) Rp 999,871.40
A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.780 100,000.00 78,000.00
Tukang Batu OH 0.390 125,000.00 48,750.00
Kepala Tukang OH 0.039 135,000.00 5,265.00
Mandor L.04 OH 0.039 145,000.00 5,655.00
Jumlah Tenaga Kerja : 137,670.00
B. Bahan
Batu Belah M3 1.200 223,500.00 268,200.00
Pasir Urug M 3
0.432 133,500.00 57,672.00
Jumlah Harga Bahan : 325,872.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 463,542.00
E. Overhead & Profit (10% x D) Rp 46,354.20
F. Harga Satuan Pekerjaan (D + E) Rp 509,896.20
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K-100)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang batu OH 0.275 125,000.00 34,375.00
Kepala tukang OH 0.028 135,000.00 3,780.00
Mandor L.04 OH 0.083 145,000.00 12,035.00
Jumlah Tenaga Kerja : 215,190.00
B. Bahan
Portland Cement kg 247.000 1,576.00 389,272.00
Pasir beton (Kg) kg 869.000 95.36 82,865.36
Koral Beton (Kg) kg 999.000 179.44 179,265.00
Air Liter 215.000 -
Jumlah Harga Bahan : 651,402.357
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 866,592.36
E. Overhead & Profit (10% x D) Rp 86,659.24
F. Harga Satuan Pekerjaan (D + E) Rp 953,251.59
A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 MPa (K-250)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang batu OH 0.275 125,000.00 34,375.00
Kepala tukang OH 0.028 135,000.00 3,780.00
Mandor L.04 OH 0.165 145,000.00 23,925.00
Jumlah Tenaga Kerja : 227,080.00
B. Bahan
Portland Cement kg 384.000 1,576.00 605,184.00
Pasir beton (Kg) Kg 692.000 95.36 65,987.14
Koral Beton (Kg) Kg 1039.000 179.44 186,442.78
Air Liter 215.000 - -
Jumlah Harga Bahan : 857,613.921
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 1,084,693.92
E. Overhead & Profit (10% x D) Rp 108,469.39
F. Harga Satuan Pekerjaan (D + E) Rp 1,193,163.31
A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.180 100,000.00 18,000.00
Tukang Batu L.02 OH 0.020 125,000.00 2,500.00
Tukang Kayu OH 0.020 125,000.00 2,500.00
Tukang Besi OH 0.020 125,000.00 2,500.00
Kepala Tukang OH 0.006 135,000.00 810.00
Mandor L.04 OH 0.009 125,000.00 1,125.00
Jumlah Tenaga Kerja : 27,435.00
B. Bahan
Kayu kelas III m3 0.020 2,210,000.00 44,200.00
Paku 5 cm – 12 cm kg 0.010 19,800.00 198.00
Minyak bekisting Liter 1,576.00 -
Besi beton polos kg 3.000 12,458.90 37,376.70
Kawat beton kg 0.450 32,500.00 14,625.00
Semen Portland kg 4.000 1,576.00 6,304.00
Pasir Beton m3 0.006 133,500.00 801.00
Kerikil m3 0.009 323,000.00 2,907.00
Jumlah Harga Bahan : 106,411.696
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 133,846.70
E. Overhead & Profit (10% x D) Rp 13,384.67
F. Harga Satuan Pekerjaan (D + E) Rp 147,231.37
A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.297 100,000.00 29,700.00
Tukang Batu L.02 OH 0.033 125,000.00 4,125.00
Tukang Kayu OH 0.033 125,000.00 4,125.00
Tukang Besi OH 0.033 125,000.00 4,125.00
Kepala Tukang OH 0.010 135,000.00 1,350.00
Mandor L.04 OH 0.015 125,000.00 1,875.00
Jumlah Tenaga Kerja : 45,300.00
B. Bahan
Kayu kelas III m3 0.030 2,210,000.00 66,300.00
Paku 5 cm – 12 cm kg 0.020 19,800.00 396.00
Minyak bekisting Liter 1,576.00 -
Besi beton polos kg 3.600 12,458.90 44,852.04
Kawat beton kg 0.050 32,500.00 1,625.00
Semen Portland kg 5.500 1,576.00 8,668.00
Pasir Beton m3 0.009 133,500.00 1,201.50
Kerikil m3 0.015 323,000.00 4,845.00
Jumlah Harga Bahan : 127,887.535
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 173,187.54
E. Overhead & Profit (10% x D) Rp 17,318.75
F. Harga Satuan Pekerjaan (D + E) Rp 190,506.29
A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.070 100,000.00 7,000.00
Tukang Besi OH 0.070 125,000.00 8,750.00
Kepala Tukang OH 0.007 135,000.00 945.00
Mandor L.04 OH 0.004 145,000.00 580.00
Jumlah Tenaga Kerja : 17,275.00
B. Bahan
Besi Beton (polos/ulir) Kg 10.500 12,458.90 130,818.44
Kawat Beton Kg 0.150 32,500.00 4,875.00
Jumlah Harga Bahan : 135,693.437
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 152,968.44
E. Overhead & Profit (10% x D) Rp 15,296.84
F. Harga Satuan Pekerjaan (D + E) Rp 168,265.28
G. Harga Satuan Pekerjaan 1 kG Rp 16,826.53
A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.520 100,000.00 52,000.00
Tukang Kayu OH 0.260 125,000.00 32,500.00
Kepala Tukang OH 0.026 135,000.00 3,510.00
Mandor L.04 OH 0.026 145,000.00 3,770.00
Jumlah Tenaga Kerja : 91,780.00
B. Bahan
Kayu Kelas III (2x pakai) M3 0.045 2,210,000.00 99,450.00
Paku Biasa 5 cm - 10 cm Kg 0.300 22,000.00 6,600.00
Minyak Bekesting Ltr 0.100 21,000.00 2,100.00
Jumlah Harga Bahan : 108,150.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 199,930.00
E. Overhead & Profit (10% x D) Rp 19,993.00
F. Harga Satuan Pekerjaan (D + E) Rp 73,307.67
A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.660 100,000.00 66,000.00
Tukang Kayu OH 0.330 125,000.00 41,250.00
Kepala Tukang OH 0.033 135,000.00 4,455.00
Mandor L.04 OH 0.033 145,000.00 4,785.00
Jumlah Tenaga Kerja : 116,490.00
B. Bahan
Kayu Kelas III M3 0.040 2,210,000.00 88,400.00
Paku 5 cm – 12 cm Kg 0.400 22,000.00 8,800.00
Minyak bekisting Lt 0.200 21,000.00 4,200.00
Balok Kayu kelas II M3 0.015 3,250,000.00 48,750.00
Plywood 9 mm Lbr 0.350 154,000.00 53,900.00
Btg 2.000 12,000.00 24,000.00
Dolken kayu galam, φ (8–10) cm
Jumlah Harga Bahan : 228,050.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 344,540.00
E. Overhead & Profit (10% x D) Rp 34,454.00
F. Harga Satuan Pekerjaan (D + E) Rp 126,331.33
A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.660 100,000.00 66,000.00
Tukang Kayu OH 0.330 125,000.00 41,250.00
Kepala Tukang OH 0.033 135,000.00 4,455.00
Mandor L.04 OH 0.033 145,000.00 4,785.00
Jumlah Tenaga Kerja : 116,490.00
B. Bahan
Kayu Kelas III M3 0.040 2,210,000.00 88,400.00
Paku 5 cm – 12 cm Kg 0.400 22,000.00 8,800.00
Minyak bekisting Lt 0.200 21,000.00 4,200.00
Balok Kayu kelas II M3 0.018 3,250,000.00 58,500.00
Plywood 9 mm Lbr 0.350 154,000.00 53,900.00
Dolken kayu galam, φ (8–10) cm Btg 2.000 12,000.00 24,000.00
Jumlah Harga Bahan : 237,800.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 354,290.00
E. Overhead & Profit (10% x D) Rp 35,429.00
F. Harga Satuan Pekerjaan (D + E) Rp 97,429.75
A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.660 100,000.00 66,000.00
Tukang Kayu OH 0.330 125,000.00 41,250.00
Kepala Tukang OH 0.033 135,000.00 4,455.00
Mandor L.04 OH 0.033 145,000.00 4,785.00
Jumlah Tenaga Kerja : 116,490.00
B. Bahan
Kayu Kelas III M3 0.040 2,210,000.00 88,400.00
Paku 5 cm – 12 cm Kg 0.400 22,000.00 8,800.00
Minyak bekisting Lt 0.200 21,000.00 4,200.00
Balok Kayu kelas II M3 0.015 3,250,000.00 48,750.00
Plywood 9 mm Lbr 0.350 154,000.00 53,900.00
Dolken kayu galam, φ (8–10) cm Btg 6.000 12,000.00 72,000.00
Jumlah Harga Bahan : 276,050.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 392,540.00
E. Overhead & Profit (10% x D) Rp 39,254.00
F. Harga Satuan Pekerjaan (D + E) Rp 143,931.33
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.043 100,000.00 4,300.00
Tukang Khusus Alumunium OH 0.043 125,000.00 5,375.00
Kepala tukang OH 0.004 135,000.00 580.50
Mandor L.04 OH 0.002 145,000.00 304.50
Jumlah Tenaga Kerja : 10,560.00
B. Bahan
Profil alluminium m 1.1 120,166.67 132,183.33
Skrup fixer buah 2 320.00 640.00
Sealant Tube 0.06 30,500.00 1,830.00
Jumlah Harga Bahan : 134,653.333
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 145,213.33
E. Overhead & Profit (10% x D) Rp 14,521.33
F. Harga Satuan Pekerjaan (D + E) Rp 159,734.67
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60
cm, untuk plafon Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.350 100,000.00 35,000.00
Tukang Besi OH 0.350 125,000.00 43,750.00
Kepala tukang OH 0.035 135,000.00 4,725.00
Mandor L.04 OH 0.018 145,000.00 2,610.00
Jumlah Tenaga Kerja : 86,085.00
B. Bahan
Rangka metal hollow 40.40.2 mm m 4.000 7,750.00 31,000.00
Assesoris (Perkuatan, las dll) Ls 100%xrangka 31,000.00
Jumlah Harga Bahan : 62,000.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 148,085.00
E. Overhead & Profit (10% x D) Rp 14,808.50
F. Harga Satuan Pekerjaan (D + E) Rp 162,893.50
Anl.Praktis Pemasangan 1 m2 alluminium composit panel (ACP) PVDF 3mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 1.200 100,000.00 120,000.00
Tukang OH 0.120 125,000.00 15,000.00
Kepala tukang OH 0.090 135,000.00 12,150.00
Mandor L.04 OH 0.090 145,000.00 13,050.00
Jumlah Tenaga Kerja : 160,200.00
B. Bahan
ACP PVDF 3 mm m2 1.1 380,000.00 418,000.00
Skrup buah 12 320.00 3,840.00
Rangka hollow 40.40.2 m 3.15 7,750.00 24,412.50
Rangka hollow 40.40.1.1 m 3.15 6,500.00 20,475.00
breket besi siku buah 12 5,000.00 60,000.00
Acessoris % 100% rangka 44,887.50 44,887.50
sealant Tube 0.27 30,500.00 8,235.00
Jumlah Harga Bahan : 579,850.000
C. Peralatan
Scafolding (bongkar pasang) LS 1.000 100,000.00 100,000.00
Jumlah Harga Peralatan : 100,000.000
D. Jumlah (A + B + C) Rp 840,050.00
E. Overhead & Profit (10% x D) Rp 84,005.00
F. Harga Satuan Pekerjaan (D + E) Rp 924,055.00
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu OH 0.100 125,000.00 12,500.00
Kepala tukang OH 0.010 135,000.00 1,350.00
Mandor L.04 OH 0.015 145,000.00 2,175.00
Jumlah Tenaga Kerja : 46,025.00
B. Bahan
Bata merah Buah 70.000 1,400.00 98,000.00
Portland Cement kg 11.500 1,576.00 18,124.00
Pasir Pasang m3 0.043 133,500.00 5,740.50
Jumlah Harga Bahan : 121,864.500
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 167,889.50
E. Overhead & Profit (10% x D) Rp 16,788.95
F. Harga Satuan Pekerjaan (D + E) Rp 184,678.45
Anl.terapan 1 m2 perbaikan dinding dan Plesteran kembali 1SP : 4PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.500 380,000.00 190,000.00
Tukang batu OH 0.250 320.00 80.00
Kepala tukang OH 0.250 7,750.00 1,937.50
Mandor L.04 OH 0.125 6,500.00 812.50
Jumlah Tenaga Kerja : 192,830.00
B. Bahan
Besi kg 3.000 12,458.90 37,376.70
Portland Cement kg 6.240 1,576.00 9,834.24
Pasir Pasang m3 0.024 133,500.00 3,204.00
Jumlah Harga Bahan : 50,414.936
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 243,244.94
E. Overhead & Profit (10% x D) Rp 24,324.49
F. Harga Satuan Pekerjaan (D + E) Rp 267,569.43
A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu OH 0.150 125,000.00 18,750.00
Kepala tukang OH 0.015 135,000.00 2,025.00
Mandor L.04 OH 0.015 145,000.00 2,175.00
Jumlah Tenaga Kerja : 52,950.00
B. Bahan
Portland Cement kg 6.240 1,576.00 9,834.24
Pasir Pasang m3 0.024 133,500.00 3,204.00
Jumlah Harga Bahan : 13,038.240
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 65,988.24
E. Overhead & Profit (10% x D) Rp 6,598.82
F. Harga Satuan Pekerjaan (D + E) Rp 72,587.06
A.4.4.2.27. Pemasangan 1 m2 acian
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.200 100,000.00 20,000.00
Tukang batu OH 0.100 125,000.00 12,500.00
Kepala tukang OH 0.010 135,000.00 1,350.00
Mandor L.04 OH 0.020 145,000.00 2,900.00
Jumlah Tenaga Kerja : 36,750.00
B. Bahan
Portland Cement kg 3.250 1,576.00 5,122.00
Jumlah Harga Bahan : 5,122.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 41,872.00
E. Overhead & Profit (10% x D) Rp 4,187.20
F. Harga Satuan Pekerjaan (D + E) Rp 46,059.20
Anl.Terapan 1 m2 Multipleks Lapis Taco HPL
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang OH 0.500 125,000.00 62,500.00
Kepala tukang OH 0.025 135,000.00 3,375.00
Mandor L.04 OH 0.075 145,000.00 10,875.00
Jumlah Tenaga Kerja : 91,750.00
B. Bahan
Multipleks 12 mm m2 1.05 177,000.00 185,850.00
Paku/Skrup Kg 0.2 32,000.00 6,400.00
HPL m2 1.05 150,000.00 157,500.00
Lem Kayu kg 0.1 35,000.00 3,500.00
Jumlah Harga Bahan : 353,250.000
C. Peralatan
Scafolding (bongkar pasang) LS 1.000 50,000.00 50,000.00
Jumlah Harga Peralatan : 50,000.000
D. Jumlah (A + B + C) Rp 495,000.00
E. Overhead & Profit (10% x D) Rp 49,500.00
F. Harga Satuan Pekerjaan (D + E) Rp 544,500.00
Anl.Terapan 1 m2 Multipleks Lapis Taco HPL
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang OH 0.500 125,000.00 62,500.00
Kepala tukang OH 0.025 135,000.00 3,375.00
Mandor L.04 OH 0.075 145,000.00 10,875.00
Jumlah Tenaga Kerja : 91,750.00
B. Bahan
Multipleks 30 mm m2 1.05 390,000.00 409,500.00
Paku/Skrup Kg 0.2 32,000.00 6,400.00
HPL m2 1.05 150,000.00 157,500.00
Lem Kayu kg 0.1 35,000.00 3,500.00
Jumlah Harga Bahan : 576,900.000
C. Peralatan
Scafolding (bongkar pasang) LS 1.000 50,000.00 50,000.00
Jumlah Harga Peralatan : 50,000.000
D. Jumlah (A + B + C) Rp 718,650.00
E. Overhead & Profit (10% x D) Rp 71,865.00
F. Harga Satuan Pekerjaan (D + E) Rp 790,515.00
An. Terapan 1 m2 backdrop Multipleks Lapis Taco HPL
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang OH 0.500 125,000.00 62,500.00
Kepala Tukang OH 0.025 135,000.00 3,375.00
Mandor L.04 OH 0.075 145,000.00 10,875.00
Jumlah Tenaga Kerja : 91,750.00
B. Bahan
Multipleks 12 mm m2 1.050 177,000.00 185,850.00
Paku/Skrup Kg 0.200 32,000.00 6,400.00
HPL m2 1.050 150,000.00 157,500.00
Lem Kayu Kg 0.100 35,000.00 3,500.00
Lis Stainless m 1.050 32,786.89 34,426.23
Jumlah Harga Bahan : 387,676.235
C. Peralatan
Scafolding (bongkar pasang) Ls 1.000 50,000.00 50,000.000
Jumlah Harga Peralatan : 50,000.000
D. Jumlah (A + B + C) Rp 529,426.23
E. Overhead & Profit (10% x D) Rp 52,942.62
F. Harga Satuan Pekerjaan (D + E) Rp 582,368.86
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu OH 0.350 125,000.00 43,750.00
Kepala tukang OH 0.035 135,000.00 4,725.00
Mandor L.04 OH 0.035 145,000.00 5,075.00
Jumlah Tenaga Kerja : 123,550.00
B. Bahan
Ubin Keramik dos 1.050 76,200.00 80,010.00
Semen Portland kg 10.400 1,576.00 16,390.40
Semen Warna kg 0.500 24,000.00 12,000.00
Pasir Pasang m3 0.045 133,500.00 6,007.50
Jumlah Harga Bahan : 114,407.900
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 237,957.90
E. Overhead & Profit (10% x D) Rp 23,795.79
F. Harga Satuan Pekerjaan (D + E) Rp 261,753.69
A.4.4.3.53. Pemasangan 1 m2 dinding keramik 20 cm x 30 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu OH 0.350 125,000.00 43,750.00
Kepala tukang OH 0.035 135,000.00 4,725.00
Mandor L.04 OH 0.035 145,000.00 5,075.00
Jumlah Tenaga Kerja : 123,550.00
B. Bahan
Ubin Keramik dos 1.050 90,000.00 94,500.00
Semen Portland kg 10.400 1,576.00 16,390.40
Semen Warna kg 0.500 24,000.00 12,000.00
Pasir Pasang m3 0.045 133,500.00 6,007.50
Jumlah Harga Bahan : 128,897.900
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 252,447.90
E. Overhead & Profit (10% x D) Rp 25,244.79
F. Harga Satuan Pekerjaan (D + E) Rp 277,692.69
Anl. terapan Pemasangan 1m2 lantai keramik ukuran 40 cm x 40 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu OH 0.350 125,000.00 43,750.00
Kepala tukang OH 0.035 135,000.00 4,725.00
Mandor L.04 OH 0.035 145,000.00 5,075.00
Jumlah Tenaga Kerja : 123,550.00
B. Bahan
Ubin Keramik dos 1.050 90,100.00 94,605.00
Semen Portland kg 10.400 1,576.00 16,390.40
Semen Warna kg 0.500 24,000.00 12,000.00
Pasir Pasang m3 0.045 133,500.00 6,007.50
Jumlah Harga Bahan : 129,002.900
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 252,552.90
E. Overhead & Profit (10% x D) Rp 25,255.29
F. Harga Satuan Pekerjaan (D + E) Rp 277,808.19
A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
Anl. Terapan Pemasangan 1 m2 langit-langit PVC ukuran (20x4000x8)
mm, tebal 8 mm Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang Besi OH 0.050 125,000.00 6,250.00
Kepala tukang OH 0.005 135,000.00 675.00
Mandor L.04 OH 0.005 145,000.00 725.00
Jumlah Tenaga Kerja : 17,650.00
B. Bahan
Plafond PVC Lmbr 0.364 85,125.00 30,985.50
Paku Sekrup Kg 0.110 32,000.00 3,520.00
Jumlah Harga Bahan : 34,505.500
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 52,155.50
E. Overhead & Profit (10% x D) Rp 5,215.55
F. Harga Satuan Pekerjaan (D + E) Rp 57,371.05
Anl.Praktis Pemasangan 1 m list langit-langit PVC
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.050 100,000.00 5,000.00
Tukang Besi OH 0.050 125,000.00 6,250.00
Kepala tukang OH 0.005 135,000.00 675.00
Mandor L.04 OH 0.003 145,000.00 435.00
Jumlah Tenaga Kerja : 12,360.00
B. Bahan
List PVC m 1.050 15,000.00 15,750.00
Sekrup kg 0.010 32,000.00 320.00
Jumlah Harga Bahan : 16,070.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 28,430.00
E. Overhead & Profit (10% x D) Rp 2,843.00
F. Harga Satuan Pekerjaan (D + E) Rp 31,273.00
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
1 m2 Pasang Rangka kuda-kuda baja Ringan
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.247 100,000.00 24,700.00
Tukang Besi OH 0.176 125,000.00 22,000.00
Kepala tukang OH 0.117 135,000.00 15,795.00
Mandor L.04 OH 0.012 145,000.00 1,696.50
Jumlah Tenaga Kerja : 64,191.50
B. Bahan
Smartruss C 75.65 M' 2.100 16,500.00 34,650.00
Reng R 33-0,45 M' 3.500 9,166.67 32,083.33
Self Drilling Screw dia-6x20mm (t Bh 15.000 252.00 3,780.00
Self Drilling Screw dia-4x16mm Bh 25.000 252.00 6,300.00
Jumlah Harga Bahan : 76,813.333
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 141,004.83
E. Overhead & Profit (10% x D) Rp 14,100.48
F. Harga Satuan Pekerjaan (D + E) Rp 155,105.32
Anl. Terapan Pemasangan 1 m2 atap zoka zinc
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.200 100,000.00 20,000.00
Tukang Besi OH 0.100 125,000.00 12,500.00
Kepala tukang OH 0.010 135,000.00 1,350.00
Mandor L.04 OH 0.001 145,000.00 145.00
Jumlah Tenaga Kerja : 33,995.00
B. Bahan
Atap Spandek Zincalum Lmbr 1.300 72,000.00 93,600.00
Sekrup Kg 0.020 32,000.00 640.00
Jumlah Harga Bahan : 94,240.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 128,235.00
E. Overhead & Profit (10% x D) Rp 12,823.50
F. Harga Satuan Pekerjaan (D + E) Rp 141,058.50
Anl. Terapan Pemasangan 1 m’ nok Atap zoca zink
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Tukang Besi OH 0.150 125,000.00 18,750.00
Kepala tukang OH 0.015 135,000.00 2,025.00
Mandor L.04 OH 0.013 145,000.00 1,885.00
Jumlah Tenaga Kerja : 47,660.00
B. Bahan
Nok zoca zink m’ 1.100 95,121.95 104,634.15
Sekrup Kg 0.020 32,000.00 640.00
Jumlah Harga Bahan : 105,274.146
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 152,934.15
E. Overhead & Profit (10% x D) Rp 15,293.41
F. Harga Satuan Pekerjaan (D + E) Rp 168,227.56
Anl Terapan Pemasangan 1 m’ Kalsiplank 3 m x 20 cm x 8 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang Besi OH 0.200 125,000.00 25,000.00
Kepala tukang OH 0.020 135,000.00 2,700.00
Mandor L.04 OH 0.005 145,000.00 725.00
Jumlah Tenaga Kerja : 38,425.00
B. Bahan
Kalsiplank 3mx30cmx8mm m 1.100 24,800.00 27,280.00
Sekrup Kg 0.020 32,000.00 640.00
27,920.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 66,345.00
E. Overhead & Profit (10% x D) Rp 6,634.50
F. Harga Satuan Pekerjaan (D + E) Rp 72,979.50
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan jendela kayu kelas II atau III
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.800 100,000.00 80,000.00
Tukang Kayu OH 2.400 125,000.00 300,000.00
Kepala tukang OH 0.240 135,000.00 32,400.00
Mandor L.04 OH 0.040 145,000.00 5,800.00
Jumlah Tenaga Kerja : 418,200.00
B. Bahan
Balok Kayu m3 1.200 3,250,000.00 3,900,000.00
Paku 10 cm m3 1.250 22,000.00 27,500.00
Lem Kayu Kg 1.000 35,000.00 35,000.00
Jumlah Harga Bahan : 3,962,500.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 4,380,700.00
E. Overhead & Profit (10% x D) Rp 438,070.00
F. Harga Satuan Pekerjaan (D + E) Rp 4,818,770.00
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.800 100,000.00 80,000.00
Tukang Kayu OH 2.400 125,000.00 300,000.00
Kepala tukang OH 0.240 135,000.00 32,400.00
Mandor L.04 OH 0.040 145,000.00 5,800.00
Jumlah Tenaga Kerja : 418,200.00
B. Bahan
Papan Kayu m3 0.024 3,250,000.00 78,000.00
Lem Kayu Kg 0.300 35,000.00 10,500.00
Jumlah Harga Bahan : 88,500.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 506,700.00
E. Overhead & Profit (10% x D) Rp 50,670.00
F. Harga Satuan Pekerjaan (D + E) Rp 557,370.00
Anl. Terapan Pembuatan 1 m2 daun pintu Multipleks 30 mmrangkap, rangka kayu kelas II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang Kayu OH 2.100 125,000.00 262,500.00
Kepala tukang OH 0.210 135,000.00 28,350.00
Mandor L.04 OH 0.035 145,000.00 5,075.00
Jumlah Tenaga Kerja : 365,925.00
B. Bahan
Papan Kayu m3 0.025 3,250,000.00 81,250.00
Paku 1 cm – 2,5 cm kg 0.030 54,900.00 1,647.00
Lem Kayu kg 0.500 35,000.00 17,500.00
Multipleks 30 mm lmbr 1.000 390,000.00 390,000.00
Jumlah Harga Bahan : 490,397.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 856,322.00
E. Overhead & Profit (10% x D) Rp 85,632.20
F. Harga Satuan Pekerjaan (D + E) Rp 941,954.20
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm (Bening)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.015 100,000.00 1,500.00
Tukang kayu OH 0.150 125,000.00 18,750.00
Kepala tukang OH 0.015 135,000.00 2,025.00
Mandor L.04 OH 0.001 145,000.00 116.00
Jumlah Tenaga Kerja : 22,391.00
B. Bahan
Kaca m2 1.100 126,186.37 138,805.00
Sealant kg 0.050 30,500.00 1,525.00
138,805.004
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 161,196.00
E. Overhead & Profit (10% x D) Rp 16,119.60
F. Harga Satuan Pekerjaan (D + E) Rp 177,315.60
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2
lapis cat penutup) Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Pekerja L.01 OH 0.020 100,000.00 2,000.00
Tukang Cat OH 0.063 125,000.00 7,875.00
Kepala tukang OH 0.006 135,000.00 850.50
Mandor L.04 OH 0.003 145,000.00 435.00
Jumlah Tenaga Kerja : 11,160.50
B. Bahan
Plamuur Kg 0.100 7,000.00 700.00
Cat dasar Kg 0.100 25,043.59 2,504.36
Cat penutup Kg 0.260 25,043.59 6,511.33
9,715.692
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 20,876.19
E. Overhead & Profit (10% x D) Rp 2,087.62
F. Harga Satuan Pekerjaan (D + E) Rp 22,963.81
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL
1 Memasang 1 Titik Instalasi Penerangan/stop kontak
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Instalasi dan Pemasangan Ls 1.000 50,000.00 50,000.00
Jumlah Tenaga Kerja : 50,000.00
B. Bahan
T Dos 3 way 20 mm Bh 2.000 3,000.00 6,000.00
Las Dop Bh 2.000 500.00 1,000.00
Kabel NYM 2 x 2,5 mm M' 9.000 9,402.00 84,618.00
Pipa Conduit 20mm M' 9.000 2,500.00 22,500.00
Isolasi Ban Bh 0.200 5,000.00 1,000.00
Jumlah Harga Bahan : 115,118.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 165,118.00
E. Overhead & Profit (10% x D) Rp 16,511.80
F. Harga Satuan Pekerjaan (D + E) Rp 181,629.80
3. Memasang 1 Buah Saklar Tunggal
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Instalasi dan Pemasangan Ls 1.000 15,000.00 15,000.00
Jumlah Tenaga Kerja : 15,000.00
B. Bahan
Saklar Tunggal Tanam Bh 1.000 20,200.00 20,200.00
Kabel NYM 2 x 2,5 mm m 1.000 9,402.00 9,402.00
Inbow Dus m 1.000 5,000.00 5,000.00
Pipa Conduit 20mm Bh 1.000 2,500.00 2,500.00
Jumlah Harga Bahan : 37,102.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 52,102.00
E. Overhead & Profit (10% x D) Rp 5,210.20
F. Harga Satuan Pekerjaan (D + E) Rp 57,312.20
Memasang 1 Buah Saklar Ganda
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Instalasi dan Pemasangan Ls 1.000 15,000.00 15,000.00
Jumlah Tenaga Kerja : 15,000.00
B. Bahan
Saklar Double Tanam Bh 1.000 27,100.00 27,100.00
Kabel NYM 2 x 2,5 mm m 1.000 9,402.00 9,402.00
Inbow Dus m 1.000 5,000.00 5,000.00
Pipa Conduit 20mm Bh 1.000 2,500.00 2,500.00
Jumlah Harga Bahan : 44,002.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 59,002.00
E. Overhead & Profit (10% x D) Rp 5,900.20
F. Harga Satuan Pekerjaan (D + E) Rp 64,902.20
Memasang 1 Buah Stop Kontak 2 mata
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Instalasi dan Pemasangan Ls 1.000 15,000.00 15,000.00
Jumlah Tenaga Kerja : 15,000.00
B. Bahan
Stop Kontak Tanam 1 lubang Bh 1.000 43,500.00 43,500.00
Kabel NYM 2 x 2,5 mm m 2.000 9,402.00 18,804.00
Inbow Dus m 1.000 5,000.00 5,000.00
Pipa Conduit 20mm Bh 2.000 2,500.00 5,000.00
Jumlah Harga Bahan : 72,304.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 87,304.00
E. Overhead & Profit (10% x D) Rp 8,730.40
F. Harga Satuan Pekerjaan (D + E) Rp 96,034.40
pemasangan 1 bh lampu high bay 50 watt LED
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Instalasi dan Pemasangan Ls 1.000 25,000.00 25,000.00
Jumlah Tenaga Kerja : 25,000.00
B. Bahan
Lampu high bay 50 watt bh 1.000 215,000.00 215,000.00
Jumlah Harga Bahan : 215,000.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 240,000.00
E. Overhead & Profit (10% x D) Rp 24,000.00
F. Harga Satuan Pekerjaan (D + E) Rp 264,000.00
Memasang 1 Buah Downlight 4 Inch + Lampu LED 5 watt
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Instalasi dan Pemasangan Ls 1.000 20,000.00 20,000.00
Jumlah Tenaga Kerja : 20,000.00
B. Bahan
Downlight 4 Inch (frame cool whi Bh 1.000 55,000.00 55,000.00
Lampu 5 watt LED Bh 1.000 51,000.00 51,000.00
Jumlah Harga Bahan : 106,000.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 126,000.00
E. Overhead & Profit (10% x D) Rp 12,600.00
F. Harga Satuan Pekerjaan (D + E) Rp 138,600.00
Memasang 1 Buah Lampu RM 2x22 watt
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Instalasi dan Pemasangan Ls 1.000 20,000.00 20,000.00
Jumlah Tenaga Kerja : 20,000.00
B. Bahan
Lampu RM 2x22 watt Bh 1.000 315,000.00 315,000.00
Jumlah Harga Bahan : 315,000.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 335,000.00
E. Overhead & Profit (10% x D) Rp 33,500.00
F. Harga Satuan Pekerjaan (D + E) Rp 368,500.00
Memasang 1 Buah LED panel outbow18 watt
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. Tenaga
Instalasi dan Pemasangan Ls 1.000 20,000.00 20,000.00
Jumlah Tenaga Kerja : 20,000.00
B. Bahan
Lampu 18 watt LED Bh 1.000 110,000.00 110,000.00
Jumlah Harga Bahan : 110,000.000
C. Peralatan

Jumlah Harga Peralatan :


D. Jumlah (A + B + C) Rp 130,000.00
E. Overhead & Profit (10% x D) Rp 13,000.00
F. Harga Satuan Pekerjaan (D + E) Rp 143,000.00
DAFTAR ANALISA PINTU, JENDELA DAN PARTISI
I. Ruang Praktek Siswa kayu dan rotan
1 Pek. Pintu Jendela (PJ1) + Aksesoris
Kusen Alumunium 16.50 m1 159,734.67 2,635,622.00
Kacan Bening Polos 5 mm 3.54 m2 177,315.60 628,495.16
Daun Pintu Multipleks 30 mm 1.82 m2 941,954.20 1,716,711.53
Daun Jendela profil alumunium 3.90 m 26,833.33 104,650.00
Karet Gasket warna putih 17.40 m 110,000.00 1,914,000.00
Engsel Dekkson 4" 4.00 psg 60,000.00 240,000.00
Kunci Tanam Pintu 1.00 bh 151,000.00 151,000.00
Grendel Jendela 1.00 bh 13,000.00 13,000.00
Hak Angin 2.00 bh 16,000.00 32,000.00
Handle Pintu 1.00 set 351,000.00 351,000.00
Jumlah Bahan + Pekerja 7,786,478.69
2 Pek. Pintu (P1) + Aksesoris
Kusen Alumunium 6.40 m1 159,734.67 1,022,301.87
Kacan Bening Polos 5 mm 0.32 m2 177,315.60 55,854.42
Daun Pintu Multipleks 30 mm 3.83 m2 941,954.20 3,602,974.82
Karet Gasket warna putih 1.26 m 110,000.00 138,600.00
Engsel Dekkson 4" 4.00 psg 60,000.00 240,000.00
Kunci Tanam 2.00 bh 151,000.00 302,000.00
Handle Pintu 1.00 set 351,000.00 351,000.00
Jumlah Bahan + Pekerja 5,712,731.10
3 Pek. Pintu (P2) + Aksesoris
Kusen Kayu Kelas 0.07 m3 4,818,770.00 343,481.93
Daun Pintu Multipleks 30 mm 1.64 m2 941,954.20 1,544,804.89
ventilasi kayu kisi-kisi 1.00 Ls 500,000.00 500,000.00
Engsel Dekkson 4" 2.00 psg 60,000.00 120,000.00
Handle Pintu 1.00 set 351,000.00 351,000.00
Kacan Bening Polos 5 mm 0.13 m2 177,315.60 23,405.66
Karet Gasket warna putih 0.53 m 250,000.00 132,000.00
Kunci Tanam 1.00 set 151,000.00 151,000.00
Jumlah Bahan + Pekerja 3,165,692.47
4 Pek. Jendela (J1) + Aksesoris
Kusen Alumunium 16.30 m1 159,734.67 2,603,675.07
Daun Jendela profil alumunium 11.60 m 26,833.33 311,266.67
Kacan Bening Polos 5 mm 4.62 m2 177,315.60 819,304.48
Karet Gasket warna putih 21.26 m 110,000.00 2,338,600.00
Engsel Dekkson 4" 6.00 psg 60,000.00 360,000.00
grendel jendela 3.00 bh 13,000.00 39,000.00
Hak Angin 6.00 bh 16,000.00 96,000.00
Jumlah Bahan + Pekerja 6,567,846.22
5 Pek. Jendela (J2) + Aksesoris
Kusen Alumunium 12.57 m1 159,734.67 2,007,864.76
Daun Jendela profil alumunium 7.80 m 26,833.33 209,300.00
Kacan Bening Polos 5 mm 3.04 m2 177,315.60 538,755.73
Karet Gasket warna putih 14.08 m 110,000.00 1,548,800.00
Engsel Dekkson 4" 4.00 psg 60,000.00 240,000.00
grendel jendela 2.00 bh 13,000.00 26,000.00
Hak Angin 4.00 bh 16,000.00 64,000.00
Jumlah Bahan + Pekerja 4,634,720.49
6 Pek. Jendela (J3) + Aksesoris
Kusen Alumunium 7.90 m1 159,734.67 1,261,903.87
Daun Jendela profil alumunium 5.92 m 26,833.33 158,853.33
Kacan Bening Polos 5 mm 1.54 m2 177,315.60 272,835.52
Karet Gasket warna putih 8.60 m 110,000.00 946,000.00
Engsel Dekkson 4" 4.00 psg 60,000.00 240,000.00
grendel jendela 2.00 bh 13,000.00 26,000.00
Hak Angin 4.00 bh 16,000.00 64,000.00
Jumlah Bahan + Pekerja 2,969,592.72
7 Pek. Jendela (J4) + Aksesoris
Kusen Alumunium 20.28 m1 159,734.67 3,239,419.04
Kaca Bening Polos 5 mm 5.67 m2 177,315.60 1,005,379.48
Karet Gasket warna putih 28.62 m 110,000.00 3,148,200.00
Jumlah Bahan + Pekerja 7,392,998.52
8 Pek. Ventilasi (V1) + Aksesoris
Kusen Alumunium 9.22 m1 159,734.67 1,472,753.63
Kaca Bening Polos 5 mm 0.71 m2 177,315.60 125,628.11
Karet Gasket warna putih 3.48 m 110,000.00 382,800.00
Kayu kisis-kisi 1.00 ls 500,000.00 500,000.00
Engsel Dekkson 4" 2.00 psg 60,000.00 120,000.00
grendel jendela 1.00 bh 13,000.00 13,000.00
Hak Angin 2.00 bh 16,000.00 32,000.00
Jumlah Bahan + Pekerja 2,646,181.73
9 Pek. Ventilasi (V2) + Aksesoris
Kusen Alumunium 2.60 m1 159,734.67 415,310.13
Kaca Bening Polos 5 mm 0.40 m2 177,315.60 70,926.24
Karet Gasket warna putih 2.60 m 110,000.00 286,000.00
Jumlah Bahan + Pekerja 772,236.38
10 Pembuatan tangga + railing
Besi pipe 3/4" 11.47 m 43,333.33 497,033.33
Besi pipe 1/2" 13.35 m 31,666.67 422,750.00
Tanah urug 8.06 m3 183,683.50 1,481,223.74
Urugan Pasir 8.06 m3 210,815.00 1,700,012.16
plesteran halus 17.92 m2 72,587.06 1,300,760.19
Upah Las dan pemasangan 1.00 ls 275,935.00 275,935.00
Jumlah Bahan + Pekerja 5,677,714.42
II. Ruang Praktek Siswa DKV
1 Pek. Pintu Jendela (P1) + Aksesoris
Kusen Alumunium 12.74 m1 159,734.67 2,035,019.65
Kacan Bening Polos 5 mm 1.42 m2 177,315.60 251,805.89
Daun Pintu Multipleks 30 mm 3.40 m2 941,954.20 3,202,644.28
Daun Jendela profil alumunium 4.74 m 26,833.33 127,190.00
Karet Gasket warna putih 6.76 m 110,000.00 743,600.00
Engsel Dekkson 4" 2.00 psg 60,000.00 120,000.00
Kunci Tanam Pintu 1.00 bh 151,000.00 151,000.00
Handle Pintu 1.00 set 351,000.00 351,000.00
Jumlah Bahan + Pekerja 6,982,259.82
2 Pek. Jendela (J1) + Aksesoris
Kusen Alumunium 13.50 m1 159,734.67 2,156,418.00
Daun Jendela profil alumunium 2.62 m 26,833.33 70,169.17
Kaca Bening Polos 5 mm 2.10 m2 177,315.60 373,072.03
Karet Gasket warna putih 11.18 m 110,000.00 1,229,800.00
Engsel Dekkson 4" 10.00 psg 60,000.00 600,000.00
grendel jendela 5.00 bh 13,000.00 65,000.00
Hak Angin 10.00 bh 16,000.00 160,000.00
Jumlah Bahan + Pekerja 4,654,459.20
3 Pek. Jendela (J2) + Aksesoris
Kusen Alumunium 15.50 m1 159,734.67 2,475,887.33
Daun Jendela profil alumunium 3.37 m 26,833.33 90,401.50
Kaca Bening Polos 5 mm 3.08 m2 177,315.60 546,344.84
Karet Gasket warna putih 13.16 m 110,000.00 1,447,600.00
Engsel Dekkson 4" 10.00 psg 60,000.00 600,000.00
grendel jendela 5.00 bh 13,000.00 65,000.00
Hak Angin 10.00 bh 16,000.00 160,000.00
Jumlah Bahan + Pekerja 5,385,233.67
III. AULA
1 Pek. Pintu Jendela (PJ1) + Aksesoris
Kusen Alumunium 26.41 m1 159,734.67 4,218,592.55
Kaca Bening Polos 5 mm 8.54 m2 177,315.60 1,513,566.00
Daun Pintu profil alumunium 5.80 m 26,833.33 155,633.33
Karet Gasket warna putih 33.78 m 110,000.00 3,715,800.00
Engsel Dekkson 4" 2.00 psg 60,000.00 120,000.00
Kunci Tanam Pintu 1.00 bh 151,000.00 151,000.00
Handle Pintu 1.00 set 351,000.00 351,000.00
Jumlah Bahan + Pekerja 10,225,591.88
2 Pek. Pintu (P1) + Aksesoris
Kusen Alumunium 6.32 m1 159,734.67 1,009,523.09
Daun Pintu Multipleks + HPL 3.73 m2 544,500.00 2,028,807.00
Engsel Dekkson 4" 4.00 psg 60,000.00 240,000.00
Kunci Tanam 2.00 bh 151,000.00 302,000.00
Handle Pintu 1.00 set 351,000.00 351,000.00
Jumlah Bahan + Pekerja 3,931,330.09
3 Pek. Pintu (P2) + Aksesoris
Kusen Alumunium 7.40 m1 159,734.67 1,182,036.53
Kacan Bening Polos 5 mm 0.64 m2 52,102.00 33,215.03
Daun Pintu Multipleks + HPL 1.70 m2 544,500.00 925,650.00
Karet Gasket warna putih 3.20 m 110,000.00 352,000.00
Engsel Dekkson 4" 2.00 psg 60,000.00 120,000.00
Kunci Tanam 2.00 bh 151,000.00 302,000.00
Handle Pintu 1.00 set 351,000.00 351,000.00
Jumlah Bahan + Pekerja 3,265,901.56
4 Pek. Pintu (P3) + Aksesoris
Kusen Alumunium 4.95 m1 159,734.67 790,686.60
Daun Pintu Multipleks + HPL 2.85 m2 544,500.00 1,551,825.00
Engsel Dekkson 4" 2.00 psg 60,000.00 120,000.00
Kunci Tanam 2.00 bh 151,000.00 302,000.00
Handle Pintu 1.00 set 351,000.00 351,000.00
Jumlah Bahan + Pekerja 3,115,511.60
5 Pek. Pintu (P4) + Aksesoris
Kusen Alumunium 5.35 m1 159,734.67 854,580.47
Daun Pintu Multipleks 30 mm +
1.87 m2 790,515.00 1,478,263.05
HPL
Engsel Pivot 2.00 psg 150,000.00 300,000.00
Kunci Tanam 2.00 bh 151,000.00 302,000.00
Handle Pintu 1.00 set 351,000.00 351,000.00
Jumlah Bahan + Pekerja 3,285,843.52
6 Pek. Jendela (J1) + Aksesoris
Kusen Alumunium 22.40 m1 159,734.67 3,578,056.53
Kaca Bening Polos 5 mm 7.27 m2 52,102.00 378,651.29
Karet Gasket warna putih 32.40 m 110,000.00 3,564,000.00
Jumlah Bahan + Pekerja 7,520,707.82
7 Pek. Jendela (J2) + Aksesoris
Kusen Alumunium 26.69 m1 159,734.67 4,263,318.25
Kaca Bening Polos 5 mm 7.96 m2 52,102.00 414,856.96
Karet Gasket warna putih 36.10 m 110,000.00 3,971,000.00
Jumlah Bahan + Pekerja 8,649,175.22
8 Pek. Ventilasi (V1) + Aksesoris
Kusen Alumunium 8.08 m1 52,102.00 420,984.16
Kaca Bening Polos 5 mm 0.47 m2 110,000.00 51,590.00
Karet Gasket warna putih 2.74 m 110,000.00 301,400.00
Besi Strip 14.40 m 40,000.00 576,000.00
Jumlah Bahan + Pekerja 773,974.16
9 Pek. Interior
Backdrop Dinding (Type BD1) 24.80 m2 582,368.86 14,439,835.83
Backdrop Dinding (Type BD2) 4.71 m2 582,368.86 2,744,413.24
Backdrop Dinding (Type BD3) 5.69 m2 582,368.86 3,312,222.88
Backdrop Dinding (Type BD4) 5.86 m2 582,368.86 3,411,225.59
Backdrop Dinding (Type BD5) 5.86 m2 582,368.86 3,411,225.59
Backdrop Dinding (Type BD6) 10.15 m2 582,368.86 5,912,791.01
Backdrop Dinding (Type BD7) 7.10 m2 582,368.86 4,134,818.89
Jumlah Bahan + Pekerja 37,366,533.03
10. Pek. Aluminium Composite Panel
Aluminium Composite Panel A 80.72 m2 924,055.00 74,592,491.77
Aluminium Composite Panel B 20.55 m2 924,055.00 18,990,254.31
Aluminium Composite Panel C 11.93 m2 924,055.00 11,026,378.69
Aluminium Composite Panel D 28.35 m2 924,055.00 26,193,725.06
Aluminium Composite Panel E 31.30 m2 924,055.00 28,924,677.20
Aluminium Composite Panel F 32.16 m2 924,055.00 29,720,103.75
Aluminium Composite Panel G 13.20 m2 924,055.00 12,197,526.00
Aluminium Composite Panel H 36.18 m2 924,055.00 33,436,006.12
Aluminium Composite Panel I 34.74 m2 924,055.00 32,105,366.92
Aluminium Composite Panel J 88.44 m2 924,055.00 81,727,490.04
Aluminium Composite Panel K 13.38 m2 924,055.00 12,363,855.90
Jumlah Bahan + Pekerja 361,277,875.76
HARGA SATUAN UPAH DAN BAHAN

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENEGAH KEJURUAN


(SMK)
PEKERJAAN : REHAB RUANG PRAKTEK SISWA (RPS) KAYU DAN ROTAN
: REHAB RUANG PRAKTEK SISWA (RPS) DKV
: REHAB AULA
LOKASI : SMK NEGERI 5 PALU
TAHUN ANGGARAN : 2021

No. Uraian Kode Sat Harga Satuan Keterangan

1 2 3 4 5 6
I. UPAH KERJA
1 Pekerja OH L01 Rp 100,000.00
2 Tukang Batu OH L02 Rp 125,000.00
3 Tukang Kayu OH L02 Rp 125,000.00
### 4 Tukang Besi OH L02 Rp 125,000.00
### 5 Tukang Listrik OH L02 Rp 125,000.00
### 6 Tukang Pipa OH L02 Rp 125,000.00
### 7 Tukang Cat OH L02 Rp 125,000.00
### 8 Tukang terampil OH L02 Rp 125,000.00
### 9 Kepala tukang OH L03 Rp 135,000.00
###10 Mandor OH L04 Rp 145,000.00
II. BAHAN - BAHAN
Batu Pecah Manual
1 Kerikil Sungai m³ Rp 323,000.00
Tanah dan Pasir
1 Pasir Pasang m³ Rp 133,500.00
2 Pasir Beton / Cor m³ Rp 133,500.00
3 Pasir Plesteran m³ Rp 133,500.00
4 Pasir Urug m³ Rp 133,500.00
5 Sirtu m³ Rp 133,500.00
6 Tanah Timbunan m³ Rp 115,300.00
Batu
1 Batu Kali / Batu Sungai m³ Rp 223,500.00
Kayu
1 Kayu Kelas I m³ Rp 3,900,000.00
2 Kayu Kelas II m³ Rp 3,250,000.00
3 Kayu Kelas III m³ Rp 2,210,000.00
4 Kayu Bakar m³ Rp 660,000.00
5 Dolken ( Tiang perancah ) 4 m m³ Rp 530,000.00 12,000.00
6 Lem Kayu Kg Rp 35,000.00
Batu Cetak
1 Batu bata merah (5 x 17 x 23) Bh Rp 1,400.00
Semen
1 Semen Tonasa ( 50 Kg ) Zak Rp 78,800.00
2 Semen Warna kg Rp 24,000.00
BESI
BESI BETON POLOS Rp 12,458.90
1 Besi Beton Polos Uk. Ø 6 mm Btg Rp 37,000.00 13,909.77
2 Besi Beton Polos Uk. Ø 8 mm Btg Rp 57,800.00 12,194.09
3 Besi Beton Polos Uk. Ø 10 mm Btg Rp 88,500.00 11,959.46
4 Besi Beton Polos Uk. Ø 12 mm Btg Rp 128,200.00 11,772.27
BESI SIKU
1 Breket besi siku bh Rp 5,000.00
KAWAT Kg
1 Kawat Beton / Bendrat Rp 32,500.00
PAKU - PAKUAN
1 Paku Beton Uk. 1'' - 2'' Kg Rp 19,800.00
2 Paku Beton Uk. 2,5'' - 3,5'' Kg Rp 20,500.00
3 Paku Beton Uk. 4'' - 6'' Kg Rp 54,900.00
4 Paku Biasa Uk. 2'' - 5'' Kg Rp 22,000.00
5 Paku Biasa Uk. 2,5'' - 3,5'' Kg Rp 22,000.00
6 Paku Biasa Uk. 4'' - 6'' Kg Rp 22,000.00
7 Paku Tripleks Kg Rp 27,900.00
8 Paku Seng Kg Rp 58,500.00
9 Paku Gypsum Kg Rp 37,000.00
10 Paku Sirap Kg Rp 32,000.00
11 Paku Kait Kg Rp 40,000.00
12 Paku Tindis Dos Rp 31,000.00
13 Paku Sekrup 2 Cm Dos Rp 32,000.00
14 Paku Sekrup 4 Cm Dos Rp 27,000.00
15 Baut Atap dos Rp 112,000.00
16 Baut Canal dos Rp 252,000.00
17 Dynabolt Bh Rp 5,500.00
18 Baut Engsel Besi Dos Rp 24,000.00
BAHAN
ATAP ATAP PRESS
CETAK
Rp -
1 Nok zoca zink m Rp 95,121.95
2 Talang Air PVC p = 4 m Btg Rp 121,000.00
RANGKA ATAP BAJA
1 Baja Ringan Profil C 75x75 btg Rp 99,000.00
2 Reng besar btg Rp 55,000.00
3 Atap zoca zink m2 Rp 72,000.00
4 Hollow 20x40 panjang 4 m (Galvalum) btg Rp 31,000.00
5 Hollow 40x40 panjang 4 m (Galvalum) btg Rp 26,000.00
6 Rangka Atap Baja Ringan m2 Rp 120,000.00
7 Allumunium Composit Panel (ACP) m2 Rp 380,000.00
BAHAN LANTAI / KERAMIK
1 Tegel Keramik Uk. 11 x 11 Cm Dos Rp 57,000.00
2 Tegel Keramik Uk. 10 x 20 Cm Dos Rp 64,000.00
3 Tegel Keramik Uk. 20 x 20 Cm Dos Rp 76,200.00
4 Tegel Keramik Uk. 25 x 25 Cm Dos Rp 84,000.00
5 Tegel Keramik Uk. 30 x 30 Cm Dos Rp 90,000.00
6 Tegel Keramik Uk. 40 x 40 Cm Dos Rp 90,100.00
BAHAN PINTU & LANGIT - LANGIT
1 Plafond PVC Lbr Rp 68,100.00 85,125.00
2 List PVC m Rp 15,000.00
3 Kalsiplank 3000x300x8 mm m Rp 24,800.00 74,400.00
MULTIPLEKS
1 Multipleks 120 X 240 X 0,6 cm Lbr Rp 122,000.00
2 Multipleks 120 X 240 X 0,9 cm Lbr Rp 154,000.00
3 Multipleks 120 X 240 X 0,12 cm Lbr Rp 177,000.00
4 Multipleks 120 X 240 X 0,18 cm Lbr Rp 195,000.00
6 Lapis High Pressure Laminate (HPL) m2 Rp 150,000.00
BAHAN KACA
1 Kaca Bening 3 mm ( Uk.122 x 152 Cm ) Lbr Rp 169,000.00
2 Kaca Bening 5 mm ( Uk. 122 x 152 Cm ) Lbr Rp 234,000.00
3 Kaca Cermin 51 M² Rp 78,000.00
4 Rangka Pintu Aluminium P = 6 m btg Rp 176,000.00
5 Rangka Jendela Aluminium P = 6 m btg Rp 161,000.00
6 Kusen Aluminium P = 6 m btg Rp 721,000.00
7 Bingkai Kaca Nako Susun Rp 21,000.00
BAHAN PIPA & AKSESORIS
BAHAN PENGGANTUNG
1 kunci Tanam Royal 2 Slaag Set Rp 151,000.00
2 Kunci Tanam Royal 1 Slaag Set Rp 166,000.00
3 Kunci Tanam 808 ( Sejenis ) Bh Rp 36,000.00
4 Kunci Tanam Kuda Terbang Set Rp 86,000.00
5 Kunci Tanam Yale Set Rp 32,000.00
6 Kunci jendela geser Set Rp 150,000.00
7 Slot tanam Set Rp 296,000.00
8 Slinder Set Rp 126,000.00
9 Handle Pintu Set Rp 351,000.00
10 Handle (pull handle stainless) set Rp 250,000.00
11 Door Stopper Set Rp 526,000.00
12 Door Closer Set Rp 111,000.00
13 Hag Angin Bh Rp 16,000.00
14 Grendel Uk. Kecil Bh Rp 8,000.00
15 Grendel Uk. Sedang Bh Rp 13,000.00
16 Engsel Deckson 4" Psg Rp 60,000.00
16 Engsel Kupu - Kupu 4 x 3 Psg Rp 36,000.00
17 Engsel Nilon Ring Pintu Uk. 3 x 2,5 mm Psg Rp 526,000.00
18 Engsel Jendela Uk. 80 x 5 mm Psg Rp 111,000.00
19 Haag Angin Baut Mur Bh Rp 16,000.00
18 Rel Sliding bh Rp 135,000.00
BAHAN LISTRIK
MACAM - MACAM KABEL
1 NYM. 2 X 2,5 mm Merk SIGERU Roll Rp 940,200.00
SAKLAR / SEKRING
1 Saklar Single ( Broco S/d Panasonic ) Bh Rp 20,200.00
2 Saklar Double Bh Rp 27,100.00
3 Saklar Triple Bh Rp 53,900.00
4 Stop Kontak Bh Rp 43,500.00
BALON LAMPU SL
1 Lampu SL 10 Watt Setara Philips + Fitting Bh Rp 45,000.00
2 Lampu SL 18 Watt Setara Philips + Fitting Bh Rp 55,000.00
3 Lampu SL 20 Watt Setara Philips + Fitting Bh Rp 65,000.00
4 Lampu SL 30 Watt Setara Philips + Fitting Bh Rp 84,000.00
5 Lampu SL 40 Watt Setara Philips + Fitting Bh Rp 94,000.00
6 Lampu RM 2x22watt Bh Rp 315,000.00
BALON LAMPU TL
1 Lampu TL. Biasa 20 Watt Bh Rp 17,500.00
2 Lampu TL. Biasa 40 Watt Bh Rp 31,000.00
3 Downlight/PLC 14 Watt Bh Rp 80,000.00
4 Kap Downlight 4" bh Rp 55,000.00
BALON LAMPU LED
1 Lampu LED 3 Watt + Fitting Bh Rp 41,000.00
2 Lampu LED 5 Watt + Fitting Bh Rp 51,000.00
3 Lampu LED 8 Watt + Fitting Bh Rp 67,000.00
4 Lampu LED 10 Watt + Fitting Bh Rp 77,000.00
5 Lampu LED 12 Watt + Fitting Bh Rp 87,000.00
6 Lampu LED 14 Watt + Fitting Set Rp 97,000.00
7 Lampu highbay 50 watt LED bh Rp 215,000.00
8 Lampu LED Panel outbow 18 watt Set Rp 110,000.00
BAHAN FINISHING
CAT TEMBOK
1 cat tembok (avitex) Kg Rp 25,043.59 125,217.94
2 Plamur Tembok ( Boyo ) Kg Rp 19,000.00
BAHAN LAIN-LAIN
1 Kertas Pasir Lbr Rp 7,000.00
2 Minyak Bekisting Ltr Rp 21,000.00
3 Greace/Gemuk Ltr Rp 59,000.00
4 Seal Tape/Isolasi besar Bh Rp 14,000.00
5 Seal Tape Isolasi kecil Bh Rp 11,000.00
6 Lem Kayu ( Fox ) Kg Rp 35,000.00
7 Kuas Cat Bh Rp 7,000.00
8 Pisau Dempul Bh Rp 10,500.00
9 Amplas lmbr Rp 5,000.00
10 Sealant kaca tube Rp 30,500.00
11 Karet Gasket warna putih m Rp 110,000.00
12 T Dos 3 way 20 mm Bh Rp 3,000.00
13 Las Dop bh Rp 500.00
14 Pipa Conduit 20mm m Rp 2,500.00
15 Isolasi Ban bh Rp 5,000.00
16 Inbow dus bh Rp 5,000.00
17 Pilot Lamp bh Rp 20,000.00
18 Fuse Kubur bh Rp 17,000.00
19 Box Panel ( 30x40x20 ) cm bh Rp 335,000.00

ALAT
1 Concrete Vibrator Alat/Hr Alat/Hr Rp 250,000.00
2 Concrete Mixer / Molen Alat/Hr Alat/Hr Rp 350,000.00
3 Sewa Scafolding Alat/Hr Alat/Hr Rp 150,000.00
Back Up Volume

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENEGAH KEJURUAN (SMK)


PEKERJAAN : REHAB RUANG PRAKTEK SISWA (RPS) KAYU DAN ROTAN
LOKASI : SMK NEGERI 5 PALU
TH. ANGGARAN : 2021

Dimensi Jumlah Luas


No Uraian Pekerjaan Volume
Panjang Lebar Tinggi (Bh) (m2)
A RPS KAYU
I Pekerjaan Persiapan
1 Pek. Pembuatan Kantor Direksi Di Lapangan
2 Pek. Pembuatan Papan Nama Proyek
3 Pek. Pembuatan Gudang Dan Barak Pekerja
4 Pek. Pagar Pengaman Proyek
II Pekerjaan Tanah dan Pasir
1 Pek. Galian Tanah Biasa 23.150
a galian poerplat 1.000 1.00 0.500 4.000 2.00
b galian menerus 42.300 1.00 0.500 21.15
2 Pek. Urugan Pasir di bawah lantai 42.300 0.650 0.050 27.495 1.375
3 Pek. Tanah Urug 2.538 27.495 69.782
III Pekerjaan Struktur
III.1 Pekerjaan Struktur Bawah
A. Pekerjaan poer plat
Beton Site Mix K.250 0.800 0.800 0.200 4.000
Pembesian 22.69
Biksting 2.56
Lantai kerja pondasi 1.000 1.000 0.100 4.000 0.40
B Pekerjaan pondasi menerus
Batu kosong 42.300 0.800 0.200 6.77
batu kali 42.300 0.800 0.440 18.61
Urugan pasir di bawah pondasi 42.300 0.800 0.050 1.69
III.2 Pekerjaan Struktur
1 Rabat Lantai
a Rabat Lantai 0.100
b Rabat keliling bangunan 38.000 1.000 0.100 38.000
2 Sloof 20X30
a Beton Site Mix K.250 56.700 0.200 0.300 3.40
b Pembesian 677.97
c Biksting 34.020
3 Kolom 20x20
a Beton Site Mix K.250 0.250 0.400 4.250 4.000 1.70
b Pembesian 263.640
c Biksting 22.100
4 Kolom Pedestal
a Beton Site Mix K.250 0.250 0.400 1.000 4.000 0.40
b Pembesian 108.738
c Biksting 6.667
5 Kolom Praktis 15x15 (Termasuk Besi dan Bekisting) 55.250 4.250 13.000
6 Balok Latei 12 x 12 48.490
7 Ring Balk 15 x 20 Cm
a Beton Site Mix K.250 56.700 0.150 0.200 1.000 1.70
b Pembesian 381.43
c Biksting 22.680
8 Plat Dak 0,08 m
a Beton Site Mix K.250 9.250 3.280 0.080 2.43
b Pembesian 295.687
c Biksting 30.340
9 Plat Dak 0,1 m
a Beton Site Mix K.250 13.450 1.000 0.100 1.35
b Pembesian 119.467
c Biksting 13.450
IV Pekerjaan Arsitektur
A Pekerjaan Pasangan Dinding
Pek. perbaikan dinding rusak 9.192
area 1 1.380 5.130 7.079
area 2 0.760 2.780 2.113
1 Pek. Pasangan Dinding Bata merah 1 PC : 4 PP
Dinding wc 3.000 4.000 12.000
Dinding Pinggir Atap
12.000
2 Plesteran Dinding + Kolom 1 Pc : 5 Psr 24.00
3 Acian Dinding + Kolom 1 Pc : 5 Psr 24.000
Dinding baru
B Pekerjaan Fasade
1 Pek. Pembuatan dan Pemasangan Material Laser cutting
Bentuk 1 (61x61 cm) 204.000
1 Pek. Fasade Eksterior Aluminium Composit Panel (ACP) + Rangka Besi Hollow
ACP DEPAN
a Luas area acp A
acp ijo 54.400 0.200 10.880
acp silver 23.740 2.360 56.026
14.520 0.460 6.679
b Luas area acp B
acp ijo 17.320 0.200 3.464
acp silver 17.320 1.800 31.176
c Luas area acp C
acp ijo 20.080 0.200 4.016
acp Merah 2.960 3.900 11.544
d Luas area acp D
acp ijo 3.010 0.200 0.602
acp silver 3.420 2.160 7.387
0.900 3.360 3.024
e Luas area acp E
acp Merah 16.560 0.200 3.312
1.500 2.500 3.750
f Luas area acp F
acp Merah 18.680 0.590 11.021
2.500 4.110 10.275
G Luas area acp G 9.560 0.200 1.912

ACP BELAKANG
LUAS 1 16.630 2.260 37.584
LUAS 2 15.560 0.500 7.780
LUAS 3 10.720 0.200 2.144
17.000 1.560 26.520
ACP SAMPING
LUAS 1 18.000 1.260 22.680
LUAS 2 0.300 3.660 1.098
LUAS 3 0.450 5.160 2.322
265.197
2 Pek. Tulisan Acrelic +back light 5,972.000
17 huruf dengan ukuran uruf 19x43 cm 124.000 17.000 2,108.000
23 huruf dengan ukuran uruf 43x41 cm 168.000 23.000 3,864.000
17 huruf dengan ukuran uruf 20x20 cm 80.000 17.000
18 huruf dengan ukuran uruf 31x30 cm 122.000 18.000
B Pekerjaan Atap
1 Pek. Pemasangan Atap Zoca Zink 766.08
area 1 38.000 10.860 412.68
area 2 38.000 7.300 277.40
area 3 38.000 2.000 76.00
2 Pek. Pemasangan Nok Atap Spandek 76.000
3 Pek. Pemasangan Kalsiplank 38.000
C Pekerjaan Plafond
1 Pek. Pemasangan rangka Plafond PVC 289.727
area 1 36.000 5.000 180.000
area teras 56.270 1.950 109.727
3 Pek. Pemasangan Plafond 289.73
4 Pek. List Plafond 82.000
D Pekerjaan Keramik
1 Pek. Pemasangan Lantai keramik 40x40 332.880
area 1 39.000 17.270 313.530
area 2 9.000 2.150 19.350
2 Pek. Pemasangan Lantai keramik 20x20 2.910 3.410 9.923
3 Pek. Pemasangan Dinding keramik 20x30 13.800 2.000 27.600

E Pekerjaan Pintu dan Jendela


1 Pek Pembuatan Pintu (PJ) + Kusen + Aksesoris 2.700 3.45 1.000 7.94
2 Pek Pembuatan Pintu (P1) + Kusen + Aksesoris 2.300 1.800 2.000 8.28
3 Pek Pembuatan Pintu (P2) + Kusen + Aksesoris 1.050 3.450 6.000 21.74
4 Pek Pembuatan Jendela (J1) + Kusen + Aksesoris 2.700 2.350 8.000 50.76
5 Pek Pembuatan Jendela (J2) + Kusen + Aksesoris 1.840 2.350 1.000 4.32
6 Pek Pembuatan Jendela (J3) + Kusen + Aksesoris 2.430 0.760 2.000 3.69
7 Pek Pembuatan Jendela (J4) + Kusen + Aksesoris 2.690 2.380 2.000 12.80
8 Pek Pembuatan Ventilasi (V1) + Kusen + Aksesoris 2.430 1.200 10.000 29.16
9 Pek Pembuatan Ventilasi (V2) + Kusen + Aksesoris 0.800 0.500 2.000 0.80
139.492
F Pekerjaan Pengecatan
1 Pek. Pengecatan kembali 1,127.176
172.770 4.000 551.588
1,103.176
DIVISI 4 : PEKERJAAN ELEKTRIKAL
B Pekerjaan Instalasi Penerangan
1 Pemasangan 1 titik Lampu/Stop kontak 62.000
2 Pemasangan 1 buah lampu LED highbay 50 watt 22.000
3 Pemasangan 1 downlight 4" + Lampu LED 5 watt 13.000
4 Pemasangan lampu RM 2x22 watt 12.000
5 Pemasangan Saklar Tunggal 2.000
6 Pemasangan Saklar Ganda 5.000
7 Pemasangan Stop Kontak 1 mata 15.000
B RPS DKV
I Pekerjaan Struktur
1 Balok Latei 10 x 15 36.000
II Pekerjaan Arsitektur
A Pekerjaan Atap
1 Pek. Pemasangan Atap Zoca Zink 261.34 0.90630779
area 1 14.520 13.580 197.18
area 2 4.010 8.000 32.08
area 3 4.010 8.000 32.08
3 Pek. Pemasangan Nok Atap Spandek 30.090
B Pekerjaan Plafond
1 Pek. Pemasangan rangka Plafond PVC 180.000
area 1 18.000 10.000 180.000

3 Pek. Pemasangan Plafond 180.00


4 Pek. List Plafond 52.000
C Pekerjaan Keramik
1 Pek. Pemasangan Lantai keramik 40x40 180.000
area 1 18.000 10.000 180.000
C PEKERJAAN FASADE
ACP DEPAN
a Luas area acp A
acp 1 20.610 3.770 77.700
acp 2 4.690 3.420 16.040
acp 3 0.700 7.150 5.005
acp 4 0.700 3.430 2.401
ACP BELAKANG
LUAS 1 11.850 1.800 21.330
LUAS 2 11.850 1.000 11.850
134.326
2 Pek. Tulisan Acrelic +back light
17 huruf dengan ukuran uruf 30x30 cm 120.000 17.000 2,040.000

E Pekerjaan Pintu dan Jendela


1 Pek Pembuatan Pintu (P1) + Kusen + Aksesoris 2.000 5.895 11.790
4 Pek Pembuatan Jendela (J1) + Kusen + Aksesoris 4.000 3.750 15.000
5 Pek Pembuatan Jendela (J2) + Kusen + Aksesoris 6.000 5.000 30.000
56.790
F Pekerjaan Pengecatan
1 Pek. Pengecatan Dinding kembali (avitex) 18.000 8.000 87.210

III PEKERJAAN ELEKTRIKAL


A Pekerjaan Instalasi Penerangan
1 Pemasangan 1 titik Lampu/Stop kontak
3 Pemasangan 1 downlight 4" + Lampu LED 11 watt 4.000
3 Pemasangan 1 downlight 4" + Lampu TL 18 watt 3.000
4 Pemasangan lampu RM 2x22 watt 8.000
5 Pemasangan Saklar Tunggal 1.000
6 Pemasangan Saklar Ganda 5.000
7 Pemasangan Stop Kontak 10A 12.000
C AULA
II Pekerjaan Tanah dan Pasir
1 Pek. Galian Tanah Biasa 23.150
a galian poerplat 1.000 1.00 0.500 4.000 2.00
b galian menerus 42.300 1.00 0.500 21.15
2 Pek. Urugan Pasir di bawah lantai 42.300 0.650 0.050 27.495 1.375
3 Pek. Tanah Urug 2.538 27.495 69.782
III Pekerjaan Struktur
III.1 Pekerjaan Struktur Bawah
A. Pekerjaan poer plat
Beton Site Mix K.250 0.800 0.800 0.200 4.000 0.51
Pembesian 22.69
Biksting 2.56
Lantai kerja pondasi 1.000 1.000 0.100 4.000 0.40
B Pekerjaan pondasi menerus
Batu kosong 42.300 0.800 0.200 6.77
batu kali 42.300 0.800 0.440 18.61
Urugan pasir di bawah pondasi 42.300 0.800 0.050 1.69
III.2 Pekerjaan Struktur
1 Sloof 20X30
a Beton Site Mix K.250 56.700 0.200 0.300 3.40
b Pembesian 677.97
c Biksting 34.020
3 Kolom 25x40
a Beton Site Mix K.250 0.250 0.400 4.250 4.000 1.70
b Pembesian 263.640
c Biksting 22.100
4 Kolom Pedestal
a Beton Site Mix K.250 0.250 0.400 1.000 4.000 0.40
b Pembesian 108.738
c Biksting 22.100
5 Kolom Praktis 15x15 (Termasuk Besi dan Bekisting) 55.250 4.250 13.000
6 Balok Latei 12 x 12 48.490
7 Ring Balk 15 x 20 Cm
a Beton Site Mix K.250 56.700 0.150 0.200 1.000 1.70
b Pembesian 381.43
c Biksting 22.680
8 Plat Dak 0,08 m
a Beton Site Mix K.250 9.250 3.280 0.080 2.43
b Pembesian 295.687
c Biksting 30.340
9 Plat Dak 0,1 m
a Beton Site Mix K.250 13.450 1.000 0.100 1.35
b Pembesian 119.467
c Biksting 13.450
IV Pekerjaan Arsitektur
1 Pek. Fasade Eksterior Aluminium Composit Panel (ACP) + Rangka Besi Hollow
ACP DEPAN
a Luas area acp A
ACP Merah 80.723 80.723

b Luas area acp B


ACP Hijau 20.551 20.551

c Luas area acp C


ACP Biru 11.933 11.933

d Luas area acp D


ACP Abu-Abu 28.347 28.347

ACP BELAKANG
a Luas area acp K
ACP Merah 13.380 13.380

b Luas area acp J


ACP Abu-Abu 81.985 81.985
ACP Hijau 6.459 6.459

ACP SAMPING KANAN


a Luas area acp E
ACP Abu-Abu 31.302 31.302

b Luas area acp F


ACP Abu-Abu 32.1627 32.1627

b Luas area acp G


ACP Merah 13.2 13.2
ACP SAMPING KIRI
a Luas area acp H
ACP Abu-Abu 36.184 36.184

b Luas area acp I


ACP Abu-Abu 34.744 34.744
390.970

A Pekerjaan Atap
1 Pek. Pemasangan Rangka atap kuda-kuda baja ringan 17 20 375.1484924
2 Pek. Pemasangan Zoca zink 375.1484924
3 Pek. Nok Zoca zink 50.37
4 Pek. Talang air 40
B Pekerjaan Plafond
1 Pek. Pemasangan rangka Plafond besi hollow 40.40.2
RUANG UTAMA 15 19.9 298.5
SELASAR 2 19.9 39.8
TERAS DEPAN 3.07 8.75 26.8625
365.1625

2 Pek. Pemasangan Plafond PVC 365.1625


4 Pek. Pemasangan List plafond PVC
LIST DROP CILING 45.84 91.68

C Pekerjaan Keramik
1 Pek. Pemasangan Lantai Keramik Teras 40x40 cm
RUANG UTAMA 15 19.9 298.5
SELASAR 2 19.9 39.8
TERAS SAMPING 2.2 13.2 29.04
TERAS DEPAN 3.07 8.75 26.8625
Pengurang 198.3835
195.819

E Pekerjaan Fasade
1 Pek. Tulisan Acrelic
depan
galeri 43cm 43cm 1032
smkn 5 palu 20x18 cm 76 9 684
belakang
GALERI 44cmx44cm
1716

1 Pek Pembuatan Pintu Jendela (PJ1) + Kusen + Aksesor 2.95 3.59 4 42.362
2 Pek Pembuatan Pintu (P1) + Kusen + Aksesoris 1.71 2.35 1 4.0185
3 Pek Pembuatan Pintu (P2) + Kusen + Aksesoris 0.95 2.9 1 2.755
4 Pek Pembuatan Pintu (P3) + Kusen + Aksesoris 0.95 2.1 2 3.99
5 Pek Pembuatan Pintu (P4) + Kusen + Aksesoris 0.95 2.25 1 2.1375
6 Pek Pembuatan Jendela (J1) + Kusen + Aksesoris 2.75 3.05 2 16.775
7 Pek Pembuatan Jendela (J2) + Kusen + Aksesoris 2.95 3.2 4 37.76
8 Pek Pembuatan Ventilasi (V1) + Kusen + Aksesoris 2.5 0.75 4 7.5
117.298
G Pekerjaan Pengecatan
1 Pek. Pengecatan Dinding kembali (avitex)
Dinding eksisting 64.53
tmbahan dinding 56.700
121.23 4 367.622
DAFTAR PERHITUNGAN KONVERSI BESI

Luas Berat Besi Besi Berat Beton Bakesting


Dimensi Beton / M¹ Jenis Besi Jml Besi Pjg Besi BesiTotal BesiTotal
No. Beton Bekisting /M Begel / M¹ Besi / M³ Total Total

b h L P M² Ø/D (Kg) Jarak M¹ Batang M¹ Kg M3 M² Kg Kg


Beton Bakesting Besi D12 Besi D8
Sloof
1 0.20 0.30 0.06 16.67 10.00 13.00 1.042 6.000 100.00 104.189 3.402 34.020 354.449 323.521
15x20
0.20 0.30 0.06 16.67 10.00 0.617 0.100 167.667 0.920 95.097
Beton Bakesting Besi D12 Besi D8
Kolom
2 0.25 0.40 0.10 10.00 13.00 13.00 1.042 10.000 100.00 104.189 1.700 22.100 177.120 86.520
25x40
0.25 0.40 0.10 10.00 10.00 0.617 0.150 67.667 1.220 50.894
Beton Bakesting Besi D12 Besi D8
Kolom
3 0.20 0.30 0.06 16.67 16.67 13.00 1.042 10.000 166.67 173.648 0.400 6.667 69.459 39.279
Pedestal
0.20 0.30 0.06 16.67 10.00 0.617 0.100 167.667 0.950 98.198
Beton Bakesting Besi D12 Besi D8
Ring Balk
4 0.15 0.25 0.04 26.67 13.33 12.00 0.888 4.000 106.67 94.694 Err:509 Err:509 Err:509 Err:509
15x25 Cm
0.15 0.25 0.04 26.67 8.00 0.395 0.150 178.778 0.720 50.788
Ring Balk Beton Bakesting Besi D12 Besi D8
1 15x20 0.15 0.20 0.03 33.33 13.33 13.00 1.042 4.000 133.33 138.918 1.701 22.680 236.300 145.133
5 Cm 0.15 0.20 0.03 33.33 10.00 0.617 0.150 223.222 0.620 85.322
PERHITUNGAN BESI PELAT
Panjang/ jmlh besi Pnjang Tot.Pnjg D.Besi Berat besi Berat besi
No Jenis Pelat Sisi Jarak Besi
Lebar (Ptg) besi (m) Besi (m) (mm) (m) (kg)
sisi x 0.800 0.200 5.00 0.920 4.60 10 0.617 2.84
Poerplat
1 sisi y 0.800 0.200 5.00 0.920 4.60 10 0.617 2.84
80x80
Total Berat 5.67
sisi x 9.250 0.150 62.67 3.772 236.38 10 0.617 145.73
Pelat Dak
2 sisi y 3.280 0.150 22.87 10.638 243.24 10 0.617 149.96
Atap 0,08
Total Berat 295.69
sisi x 1.000 0.150 7.66666667 13.450 103.116667 10 0.617 63.57
Pelat Dak
3 sisi y 13.450 0.150 90.67 1.000 90.6666667 10 0.617 55.90
Atap 0,1
Total Berat 119.47
HARGA SATUAN BAHAN DAN UPAH
PEKERJAAN : 0
LOKASI : 0
TAHUN ANGGARAN : 0

Jenis Bahan N
Batu Pecah Fabrikasi Ampibabo
Batu Pecah Pabrikasi 1/2 Rp 485,000.00
Batu Pecah Pabrikasi 2/3 Rp 485,000.00
Batu Pecah Pabrikasi 3/5 Rp 494,000.00
Batu Pecah Pabrikasi 5/7 Rp 369,000.00
Batu Pecah Manual
Batu Pecah Manual 1/2 Rp 213,000.00
Batu Pecah Manual 2/3 Rp 208,000.00
Batu Pecah Manual 3/5 Rp 203,000.00
Batu Pecah Manual 5/7 Rp 201,000.00
Kerikil Sungai Rp 138,000.00
Tanah dan Pasir
Pasir Pasang Rp 170,000.00
Pasir Beton / Cor Rp 138,000.00
Pasir Plesteran Rp 138,000.00
Pasir Urug Rp 138,000.00
Sirtu Rp 135,000.00
Tanah Timbunan Rp 135,000.00
Batu
Batu Kali / Batu Sungai Rp 243,000.00
Kayu
Kayu Kelas I Rp 3,600,000.00
Kayu Kelas II Rp 2,600,000.00
Kayu Kelas III Rp 2,100,000.00
Kayu Bakar Rp 660,000.00
Dolken ( Tiang perancah ) 4 m Rp 530,000.00
Batu Cetak
Batu bata merah (5 x 17 x 23) Rp 900.00
Batako HB10 Rp 2,100.00
Batako Pres Rp 2,300.00
Paving Blok Heksagon Rp 2,100.00
Paving Blok Persegi Rp 2,100.00
Kanstin ( 30 x 50 cm ) Rp 89,000.00
Kanstin ( 50 x 50 cm ) Rp 119,000.00
Roster Beton 20/20 Rp 36,000.00
Roster Beton 25/25 Rp 36,000.00
Kapur Pasang ( Mill ) Rp 45,100.00
Semen
Semen Tonasa ( 50 Kg ) Rp 77,000.00
Semen Tiga Roda Rp 77,000.00
Semen Bosowa Rp 72,000.00
Semen Warna / Putih Rp 3,800.00
AM - 30 Mortar Flex Rp 26,000.00
BUIS BETON
BUIS BETON BERTULANG
Buis Beton Bertulang Dia. 30 Cm Panjang 0,8 m' Rp 385,000.00
Buis Beton Bertulang Dia. 40 Cm Panjang 0,8 m' Rp 490,000.00
Buis Beton Bertulang Dia. 60 Cm Panjang 0,8 m' Rp 580,000.00
Buis Beton Bertulang Dia. 80 Cm Panjang 0,8 m' Rp 620,000.00
Buis Beton Bertulang Dia. 100 Cm Panjang 0,8 m' Rp 650,000.00
BUIS BETON TIDAK BERTULANG
Buis Beton Dia. 30 Cm Panjang 0,8 m' Rp 145,000.00
Buis Beton Dia. 40 Cm Panjang 0,8 m' Rp 170,000.00
Buis Beton Dia. 60 Cm Panjang 0,8 m' Rp 210,000.00
Buis Beton Dia. 80 Cm Panjang 0,8 m' Rp 250,000.00
Buis Beton Dia. 100 Cm Panjang 0,8 m' Rp 380,000.00
BESI
BESI BETON POLOS
Besi Beton Polos Uk. Ø 4 mm Rp 17,000.00
Besi Beton Polos Uk. Ø 6 mm Rp 37,000.00
Besi Beton Polos Uk. Ø 8 mm Rp 63,000.00
Besi Beton Polos Uk. Ø 10 mm Rp 87,000.00
Besi Beton Polos Uk. Ø 12 mm Rp 123,000.00
Besi Beton Polos Uk. Ø 14 mm Rp 182,000.00
Besi Beton Polos Uk. Ø 16 mm Rp 197,500.00
Besi Beton Polos Uk. Ø 18 mm Rp 232,500.00
Besi Beton Polos Uk. Ø 19 mm Rp 247,500.00
Besi Beton Polos Uk. Ø 20 mm Rp 267,500.00
Besi Beton Polos Uk. Ø 22 mm Rp 307,500.00
BESI BETON ULIR
Besi Beton Ulir Uk. Ø 10 mm Rp 104,000.00
Besi Beton Ulir Uk. Ø 13 mm Rp 182,000.00
Besi Beton Ulir Uk. Ø 16 mm Rp 212,500.00
Besi Beton Ulir Uk. Ø 19 mm Rp 312,500.00
Besi Beton Ulir Uk. Ø 22 mm Rp 412,500.00
Besi Beton Ulir Uk. Ø 25 mm Rp 482,500.00
Besi Beton ulir Uk. 32 mm SNI
BESI PLAT Uk. 122 x 244 Cm
Besi Plat Tebal 1,2 mm Rp 455,000.00
Besi Plat Tebal 1,5 mm Rp 555,000.00
Besi Plat Tebal 2,5 mm Rp 365,000.00
Besi Plat Tebal 3 mm Rp 755,000.00
BESI SIKU
Besi Siku 30. 30. 3 mm - 6 m' Rp 102,000.00
Besi Siku 40. 40. 3 mm - 6 m' Rp 92,000.00
Besi Siku 40. 40. 4 mm - 6 m' Rp 127,000.00
Besi Siku 50. 50. 4 mm - 6 m' Rp 282,000.00
Besi Siku 50. 50. 5 mm - 6 m' Rp 322,000.00
Besi Siku 60. 60. 6 mm - 6 m' Rp 382,000.00
Besi Siku 70. 70. 6 mm - 6 m' Rp 453,400.00
Besi Siku 100. 100. 10 mm - 6 m' Rp 1,205,000.00
KAWAT
Kawat Beton / Bendrat Rp 32,000.00
Kawat Duri ( 50 m ) Rp 82,000.00
Kawat Nyamuk dari Logam Rp 32,000.00
Kawat nyamuk dari plastik Rp 30,000.00
Kawat Jaringan / Ayakan Rp 32,000.00
Kawat Harmonika Rp 41,000.00
Kawat Bronjong 50 Kg 3 mm Rp 765,000.00
Kawat bronjong 50 kg 4 mm Rp 795,000.00
Kawat Bronjong Pabrikasi ( 0,5 x 1 x 2 ) m Rp 380,000.00
PAKU - PAKUAN
Paku Beton Uk. 1'' - 2'' Rp 32,000.00
Paku Beton Uk. 2,5'' - 3,5'' Rp 32,000.00
Paku Beton Uk. 4'' - 6'' Rp 32,000.00
Paku Biasa Uk. 2'' - 5'' Rp 22,000.00
Paku Biasa Uk. 2,5'' - 3,5'' Rp 22,000.00
Paku Biasa Uk. 4'' - 6'' Rp 22,000.00
Paku Tripleks Rp 38,000.00
Paku Seng Rp 52,000.00
Paku Gypsum Rp 37,000.00
Paku Sirap Rp 32,000.00
Paku Kait Rp 40,000.00
Paku Tindis Rp 31,000.00
Paku Sekrup 2 Cm Rp 32,000.00
Paku Sekrup 4 Cm Rp 27,000.00
Baut Atap Rp 112,000.00
Baut Canal Rp 252,000.00
Dynabolt Rp 5,500.00
Baut Engsel Besi Rp 24,000.00
BAHAN ATAP
SENG GELOMBANG BESAR
Seng Gelombang Besar BJLS 0,18 Rp 59,000.00
Seng Gelombang Besar BJLS 0,20 Rp 63,500.00
Seng Gelombang Besar BJLS 0,22 Rp 65,000.00

SENG GELOMBANG KECIL


Seng Gelombang Kecil BJLS 0,18 Rp 59,000.00
Seng Gelombang Kecil BJLS 0,20 Rp 63,000.00
Seng Gelombang Kecil BJLS 0,22 Rp 65,500.00

SENG PLAT
Seng Plat BJLS 0,18 Rp 59,000.00
Seng Plat BJLS 0,20 Rp 67,000.00
Seng Plat BJLS 0,22 Rp 71,000.00

SENG PLASTIK
Seng Plastik Gelombang Kecil Rp 75,000.00
Seng Plastik Gelombang Besar Rp 76,000.00

ATAP CETAK PRESS


Genteng Tanah Rp 51,000.00
Genteng Metal Tebal Rp 56,000.00
Genteng Metal Tipis Rp 56,000.00

Bumbungan Genteng Tanah Rp 36,000.00


Genteng Beton Rp 36,000.00
Bumbungan Genteng Beton Rp 26,000.00
Genteng Metal/Multi Roof Rp 40,000.00
Bumbungan Genteng Metal Multiroof Rp 27,000.00
Bumbungan Genteng Metal 2 mm Rp 21,000.00
Bumbungan Genteng Metal 4 mm Rp 31,000.00
Talang Air Plastik Rp 114,000.00
Talang Air Metal L = 45 Rp 109,000.00
Talang Air PVC p = 4 m Rp 121,000.00
RANGKA ATAP BAJA
Baja Ringan Profil C 75x75 Rp 99,000.00
Baja Ringan Profil C 80x75 Rp 99,000.00
Baja Ringan Profil C 80x70 Rp 99,000.00
Baja Ringan Profil C 80x100 Rp 106,000.00
Reng asismetris standar Rp 51,000.00
Reng besar Rp 55,000.00
Atap spandek mini Rp 56,000.00
Atap spandek 5 m Rp 173,000.00
Atap spandek 5,8 m Rp 226,000.00
Atap spandek 4 m Rp 146,000.00
Rangka Metal Furing Rp 63,000.00
Hollow 20x40 panjang 4 m (Galvalum) Rp 31,000.00
Hollow 40x40 panjang 4 m (Galvalum) Rp 26,000.00
Hollow 40x40 panjang 4 m (Galvanis) Rp 26,000.00
Rangka Atap Baja Ringan Rp 120,000.00
BAHAN LANTAI / KERAMIK
Tegel Keramik Uk. 11 x 11 Cm Rp 57,000.00
Tegel Keramik Uk. 10 x 20 Cm Rp 64,000.00
Tegel Keramik Uk. 20 x 20 Cm Rp 79,000.00
Tegel Keramik Uk. 25 x 25 Cm Rp 84,000.00
Tegel Keramik Uk. 30 x 30 Cm Rp 90,000.00
Tegel Keramik Uk. 40 x 40 Cm Rp 95,000.00
Tegel Keramik Uk. 40 x 40 Cm (Granito) Rp 130,000.00
Tegel Keramik Uk. 60 x 60 Cm Rp 165,000.00
Tegel Plint Uk. 10 x 20 Cm Rp 69,000.00
Tegel Plint Uk. 10 x 30 Cm Rp 74,000.00
Tegel Plint Uk. 10 x 40 Cm Rp 79,000.00
kuku tehel 10 cm Rp 154,000.00
kuku tehel 15 cm Rp 176,000.00
kuku tehel 20 cm Rp 200,000.00
Tegel Batu Alam Uk. 10 x 20 Cm Rp 204,000.00
BAHAN PINTU & LANGIT - LANGIT
TRIPLEKS UKURAN :
Tripleks 1200 x 2400 x 2,5 mm Rp 52,000.00
Tripleks 1200 x 2400 x 3 mm Rp 57,000.00
Tripleks 1200 x 2400 x 4 mm Rp 73,000.00
Tripleks 1200 x 2400 x 5 mm Rp 82,000.00
Tripleks 1200 x 2400 x 6 mm Rp 86,000.00
Teakwood 1200 x 2400 x 4 mm Rp 102,000.00
Aluminium 1,2 x 2,40 x 0,04 m Rp 131,000.00

Tripleks Lapis Aluminium 0,9 x 2,00 x 0,03 m Rp 142,000.00


Gypsum 1200 x 2400 x 9 mm Rp 72,000.00
List Profil Gypsum L = 8 cm ; P = 2,15 Rp 18,000.00
Kalsiboard 1200 x 2400 x 3 mm Rp 60,000.00
Kalsiboard 1200 x 2400 x 3,5 mm Rp 61,000.00
Kalsiboard 1200 x 2400 x 4 mm Rp 69,000.00
Kalsiboard 1200 x 2400 x 6 mm Rp 78,000.00
Kalsiplank 300 x 2400 x 8 mm Rp 83,000.00
Kalsiplank 1200 x 2400 x 12 mm Rp 92,000.00
Alcopan (1220 x 2440 x 4 mm)
MULTIPLEKS
Multipleks 120 X 240 X 0,6 cm Rp 122,000.00
Multipleks 120 X 240 X 0,9 cm Rp 154,000.00
Multipleks 120 X 240 X 0,12 cm Rp 177,000.00
Multipleks 120 X 240 X 0,18 cm Rp 195,000.00
BAHAN PINTU
Kusen + Pintu PVC Rp 1,160,000.00
Pintu Wc / Km ( Plastik ) Rp 275,000.00
Pintu Wc / Km Aluminium (Pabrikasi) Rp 375,000.00
BAHAN KACA
Kaca Bening 3 mm ( Uk.122 x 152 Cm ) Rp 135,000.00
Kaca Bening 5 mm ( Uk. 122 x 152 Cm ) Rp 155,000.00
Kaca Bening 8 mm ( Uk. 122 x 152 Cm ) Rp 228,000.00
Kaca Rayband 3 mm ( Uk. 122 x 152 ) Rp 145,000.00
Kaca Rayband 5 mm ( Uk. 122 x 152 ) Rp 173,000.00
Kaca Cermin 51 Rp 78,000.00
Rangka Pintu Aluminium P = 6 m Rp 176,000.00
Rangka Jendela Aluminium P = 6 m Rp 161,000.00
Kusen Aluminium P = 6 m Rp 721,000.00
Bingkai Kaca Nako Rp 21,000.00
BAHAN PIPA & AKSESORIS
PIPA GIP ( BIASA )
Pipa Uk. Ø 1/2 '' GIP Panjang 6 m¹ Rp 130,000.00
Pipa Uk. Ø 3/4 '' GIP Panjang 6 m¹ Rp 230,000.00
Pipa Uk. Ø 1 '' GIP Panjang 6 m¹ Rp 260,000.00
Pipa Uk. Ø 1 1/4 '' GIP Panjang 6 m¹ Rp 354,000.00
Pipa Uk. Ø 1 1/2 '' GIP Panjang 6 m¹ Rp 474,000.00
Pipa Uk. Ø 2 '' GIP Panjang 6 m¹ Rp 600,500.00
Pipa Uk. Ø 2 1/2 '' GIP Panjang 6 m¹ Rp 752,500.00
Pipa Uk. Ø 3 '' GIP Panjang 6 m¹ Rp 982,500.00
Pipa Uk. Ø 4 '' GIP Panjang 6 m¹ Rp 1,200,500.00
AKSESORIS PIPA GIP ( BIASA )
Sock Uk. Ø 1/2 '' Rp 8,300.00
Sock Uk. Ø 3/4 '' Rp 8,500.00
Sock Uk. Ø 1 '' Rp 10,500.00
Sock Uk. Ø 1 1/4 '' Rp 15,500.00
Sock Uk. Ø 1 1/2 '' Rp 25,700.00
Sock Uk. Ø 2 '' Rp 35,500.00
Sock Uk. Ø 2 1/2 '' Rp 40,500.00
Sock Uk. Ø 3 '' Rp 45,500.00
Sock Uk. Ø 4 '' Rp 50,500.00

Knie Uk. Ø 1/2 '' Rp 8,500.00


Knie Uk. Ø 3/4 '' Rp 10,000.00
Knie Uk. Ø 1 '' Rp 15,000.00
Knie Uk. Ø 1 1/4 '' Rp 25,000.00
Knie Uk. Ø 1 1/2 '' Rp 35,000.00
Knie Uk. Ø 2 '' Rp 45,000.00
Knie Uk. Ø 2 1/2 '' Rp 55,000.00
Knie Uk. Ø 3 '' Rp 59,500.00
Knie Uk. Ø 4 '' Rp 64,500.00
Tee Uk. Ø 1/2 '' Rp 9,000.00
Tee Uk. Ø 3/4 '' Rp 11,000.00
Tee Uk. Ø 1 '' Rp 16,000.00
Tee Uk. Ø 1 1/4 '' Rp 26,000.00
Tee Uk. Ø 1 1/2 '' Rp 36,000.00
Tee Uk. Ø 2 '' Rp 41,000.00
Tee Uk. Ø 2 1/2 '' Rp 46,000.00
Tee Uk. Ø 3 '' Rp 51,000.00
Tee Uk. Ø 4 '' Rp 56,000.00
Double Neple Uk. Ø 1/2 '' Rp 9,000.00
Double Neple Uk. Ø 3/4 '' Rp 11,000.00
Double Neple Uk. Ø 1 '' Rp 16,000.00
Double Neple Uk. Ø 1 1/4 '' Rp 26,000.00
Double Neple Uk. Ø 1 1/2 '' Rp 36,000.00
Double Neple Uk. Ø 2 '' Rp 41,000.00
Double Neple Uk. Ø 2 1/2 '' Rp 46,000.00
Double Neple Uk. Ø 3 '' Rp 51,000.00
Double Neple Uk. Ø 4 '' Rp 56,000.00
Water More Uk. Ø 1/2 '' Rp 20,500.00
Water More Uk. Ø 3/4 '' Rp 25,500.00
Water More Uk. Ø 1 '' Rp 35,500.00
Water More Uk. Ø 1 1/4 '' Rp 45,500.00
Water More Uk. Ø 1 1/2 '' Rp 47,500.00
Water More Uk. Ø 2 '' Rp 50,500.00
Water More Uk. Ø 2 1/2 '' Rp 53,500.00
Water More Uk. Ø 3 '' Rp 60,500.00
Water More Uk. Ø 4 '' Rp 65,500.00
Dop Uk. Ø 1/2 '' Rp 9,000.00
Dop Uk. Ø 3/4 '' Rp 11,000.00
Dop Uk. Ø 1 '' Rp 12,000.00
Dop Uk. Ø 1 1/4 '' Rp 20,000.00
Dop Uk. Ø 1 1/2 '' Rp 25,000.00
Dop Uk. Ø 2 '' Rp 29,500.00
Dop Uk. Ø 2 1/2 '' Rp 34,500.00
Dop Uk. Ø 3 '' Rp 39,500.00
Dop Uk. Ø 4 '' Rp 44,500.00
PIPA PVC ( Paralon )
Pipa PVC Uk. Ø 1/2'' PVC Panjang 4 m¹ Rp 28,000.00
Pipa PVC Uk. Ø 3/4'' PVC Panjang 4 m¹ Rp 37,000.00
Pipa PVC Uk. Ø 1'' PVC Panjang 4 m¹ Rp 42,000.00
Pipa PVC Uk. Ø 1 1/4'' PVC Panjang 4 m¹ Rp 57,000.00
Pipa PVC Uk. Ø 1 1/2 '' PVC Panjang 4 m¹ Rp 67,000.00
Pipa PVC Uk. Ø 2'' PVC Panjang 4 m¹ Rp 82,500.00
Pipa PVC Uk. Ø 2 1/2'' PVC Panjang 4 m¹ Rp 102,500.00
Pipa PVC Uk. Ø 3'' klass D PVC Panjang 4 m¹ Rp 107,500.00
Pipa PVC Uk. Ø 4'' klass AW PVC Panjang 4 m¹ Rp 322,500.00
AKSESORIS PIPA PVC ( Paralon )
Sock PVC Uk. Ø 1/2 '' Rp 5,500.00
Sock PVC Uk. Ø 3/4 '' Rp 5,500.00
Sock PVC Uk. Ø 1 '' Rp 5,500.00
Sock PVC Uk. Ø 1 1/4 '' Rp 5,500.00
Sock PVC Uk. Ø 1 1/2 '' Rp 5,500.00
Sock PVC Uk. Ø 2 '' Rp 9,500.00
Sock PVC Uk. Ø 2 1/2 '' Rp 19,500.00
Sock PVC Uk. Ø 3 '' Rp 24,500.00
Sock PVC Uk. Ø 4 '' Rp 31,500.00
Knie PVC Uk. Ø 1/2 '' Rp 6,000.00
Knie PVC Uk. Ø 3/4 '' Rp 6,000.00
Knie PVC Uk. Ø 1 '' Rp 6,500.00
Knie PVC Uk. Ø 1 1/4 '' Rp 7,500.00
Knie PVC Uk. Ø 1 1/2 '' Rp 7,500.00
Knie PVC Uk. Ø 2 '' Rp 8,500.00
Knie PVC Uk. Ø 2 1/2 '' Rp 10,000.00
Knie PVC Uk. Ø 3 '' Rp 24,500.00
Knie PVC Uk. Ø 4 '' Rp 29,500.00
Tee PVC Uk. Ø 1/2 '' Rp 5,000.00
Tee PVC Uk. Ø 3/4 '' Rp 5,000.00
Tee PVC Uk. Ø 1 '' Rp 5,000.00
Tee PVC Uk. Ø 1 1/4 '' Rp 5,000.00
Tee PVC Uk. Ø 1 1/2 '' Rp 7,000.00
Tee PVC Uk. Ø 2 '' Rp 17,000.00
Tee PVC Uk. Ø 2 1/2 '' Rp 23,000.00
Tee PVC Uk. Ø 3 '' Rp 36,000.00
Tee PVC Uk. Ø 4 '' Rp 41,000.00
Double Neple PVC Uk. Ø 1/2 '' Rp 6,000.00
Double Neple PVC Uk. Ø 3/4 '' Rp 7,000.00
Double Neple PVC Uk. Ø 1 '' Rp 8,000.00
Double Neple PVC Uk. Ø 1 1/4 '' Rp 8,000.00
Double Neple PVC Uk. Ø 1 1/2 '' Rp 14,000.00
Double Neple PVC Uk. Ø 2 '' Rp 15,000.00
Double Neple PVC Uk. Ø 2 1/2 '' Rp 15,000.00
Double Neple PVC Uk. Ø 3 '' Rp 17,500.00
Double Neple PVC Uk. Ø 4 '' Rp 24,500.00
BAHAN PENGGANTUNG
kunci Tanam Royal 2 Slaag Rp 151,000.00
Kunci Tanam Royal 1 Slaag Rp 166,000.00
Kunci Tanam 808 ( Sejenis ) Rp 36,000.00
Kunci Tanam Kuda Terbang Rp 86,000.00
Kunci Tanam Yale Rp 32,000.00
Slot tanam Rp 296,000.00
Slinder Rp 126,000.00
Handle Pintu Rp 351,000.00
Door Stopper Rp 526,000.00
Door Closer Rp 111,000.00
Hag Angin Rp 16,000.00
Grendel Uk. Kecil Rp 8,000.00
Grendel Uk. Sedang Rp 13,000.00
Engsel Kupu - Kupu 4 x 3 Rp 36,000.00
Engsel Nilon Ring Pintu Uk. 3 x 2,5 mm Rp 526,000.00
Engsel Jendela Uk. 80 x 5 mm Rp 111,000.00
Haag Angin Baut Mur Rp 16,000.00
BAHAN SANITAIR
CLOSED
Closed Duduk Standar Ex. INA Rp 825,000.00
Closed Duduk Standar Setara Toto Rp 3,325,000.00
Closed Duduk Lokal Rp 435,000.00
Closed Jongkok Terasso Rp 225,000.00
Urinoir Keramik Standar Rp 1,475,000.00
Mono Blok Rp 1,975,000.00
MEJA DAPUR
Wastafel Standar Ex. KIA Rp 400,000.00
Wastafel Standar Ex. INA Rp 330,000.00
Selang Wastavel Rp 52,000.00
Afor wastavel Rp 50,000.00
Kran Wastavel Rp 67,000.00
Kitchenzink Rp 3,150,000.00
Kran Zink Rp 312,000.00
Kran Dinding Rp 342,000.00
Tempat Sabun Rp 353,000.00
Floor Drain Rp 30,000.00
Bak Cuci Piring Stainless Still 1 Lobang Rp 225,000.00
Bak Cuci Piring Stainless Still 2 Lobang Rp 460,000.00
BAK MANDI
Bak Mandi Fiber Glass Rp 300,000.00
Bak Cuci Piring Terasso( 2 Lubang + Meja) Rp 370,000.00
Bak Mandi Terasso ( 2 Lubang + meja ) Rp 385,000.00
Shower Spray Rp 205,000.00
Shower Set Rp 1,890,000.00
POMPA AIR
Mesin Pompa Air Golden Star 100 Watt Rp 370,000.00
Mesin Pompa Air Panasonic 125 Watt Rp 470,000.00
Mesin Pompa Air Panasonic 200 Watt Rp 670,000.00
Dragon DN Rp 370,000.00
Dragon LN Rp 470,000.00
Mesin Pompa Tekan 129 luat lengkap Rp 440,000.00
Mesin Pompa Tekan 125 watt Rp 400,000.00
Mesin Pompa Tekan 200 luat lengkap Rp 890,000.00
TANGKI AIR FIBER GLASS
Tangki Fiber Glass Model Exxel 550 Liter Rp 955,000.00
Tangki Fiber Glass Model Exxel 1100 Liter Rp 1,550,000.00
Tangki Fiber Glass Model Exxel 2200 Liter Rp 3,200,000.00
Tangki Fiber Glass Model Pisun 550 Liter Rp 855,000.00
Tangki Fiber Glass Model Pisun 1100 Liter Rp 1,550,000.00
Tangki Fiber Glass Model Pisun 2200Liter Rp 3,100,000.00
Tangki Fiber Glass Model Penyu 550 Liter Rp 955,000.00
Tangki Fiber Glass Model Penyu 1100 Liter Rp 1,550,000.00
Tangki Fiber Glass Model Penyu 2200 Liter Rp 3,200,000.00
Tangki Fiber Glass Model Bulat 550 Liter Rp 1,005,000.00
Tangki Fiber Glass Model Bulat 1100 Liter Rp 1,750,000.00
Tangki Fiber Glass Model Bulat 2200 Liter Rp 3,250,000.00
Tangki Air Stainles 550 liter Rp 2,625,000.00
Tangki Air Stainles 1100 liter Rp 3,500,000.00
Tangki Air Stainles 2200 liter Rp 6,570,000.00
Stop Kran 1" Rp 30,000.00
Klep 3/4 Rp 35,000.00
Pelampung Otomatis Rp 24,000.00
BAHAN LISTRIK
MACAM - MACAM KABEL
NYA. 1 X 1,5 mm Merk SIGERU Rp 245,000.00
NYA. 2,5 mm Merk SIGERU Rp 350,000.00
NYM. 2 X 1,5 mm Merk SIGERU Rp 750,000.00
NYM. 2 X 2,5 mm Merk SIGERU Rp 1,010,000.00
NYM. 3 X 1,5 mm Merk SIGERU Rp 1,070,000.00
NYY. 3 X 2,5 mm Merk SIGERU Rp 1,320,000.00
Kabel Telephone 4 x 0,5 mm Rp 245,000.00
SAKLAR / SEKRING
Saklar Single ( Broco S/d Panasonic ) Rp 25,500.00
Saklar Double Rp 33,500.00
Saklar Triple Rp 42,500.00
Steker/Stop Kontak 2 Lubang Rp 32,500.00
Steker/Stop Kontak 3 Lubang Rp 38,500.00
Steker/Stop Kontak 4 Lubang Rp 42,500.00
Outlet TV Rp 50,500.00
Outlet Telephone Rp 48,500.00
Sekring Kas 1 Group Rp 10,500.00
Sekring Kas 2 Group Rp 18,500.00
Sekring Kas 3 Group Rp 29,500.00
Sekring Kas 4 Group Rp 39,500.00
MCB 6 A Rp 58,500.00
MCB 4 A Rp 38,500.00
LAMPU PIJAR
Lampu Pijar 5 Watt Merk Chiyoda Rp 8,500.00
Lampu Pijar 10 - 40 Watt Rp 14,500.00
Lampu Pijar 60 - 100 Watt Rp 26,000.00
BALON LAMPU SL
Lampu SL 10 Watt Setara Philips + Fitting Rp 45,000.00
Lampu SL 18 Watt Setara Philips + Fitting Rp 55,000.00
Lampu SL 20 Watt Setara Philips + Fitting Rp 65,000.00
Lampu SL 30 Watt Setara Philips + Fitting Rp 84,000.00
Lampu SL 40 Watt Setara Philips + Fitting Rp 94,000.00
BALON LAMPU TL
Lampu TL. Biasa 20 Watt Rp 25,000.00
Lampu TL. Biasa 40 Watt Rp 31,000.00
Downlight/PLC 14 Watt Rp 80,000.00
Lampu TL. 2 x 18 Watt Grille Rp 247,000.00
Lampu TL. 2 x 36 Watt Grille Rp 257,000.00
Lampu TL. Blok Bambu 20 Watt Rp 207,000.00
Lampu TL. Blok Bambu 40 Watt Rp 227,000.00
BALON LAMPU LED
Lampu LED 3 Watt + Fitting Rp 41,000.00
Lampu LED 5 Watt + Fitting Rp 51,000.00
Lampu LED 8 Watt + Fitting Rp 67,000.00
Lampu LED 10 Watt + Fitting Rp 77,000.00
Lampu LED 12 Watt + Fitting Rp 87,000.00
Lampu LED 14 Watt + Fitting Rp 97,000.00
BAHAN FINISHING
CAT BESI & CAT JALAN
Cat Marka Jalan Rp 68,000.00
Cat Besi Alteks Rp 61,000.00
Meni Besi Rp 41,000.00
CAT KAYU
Cat Glotex Rp 65,000.00
Meni Kayu Rp 23,000.00
Dempul Kayu Rp 17,000.00
Afdur Rp 29,000.00
Vernis Rp 71,000.00
Plamur Kayu Rp 10,500.00
Wood Filler
Politur Rp 71,000.00
Cat Bintang Rp 63,000.00
Vernis Rp 71,000.00
CAT TEMBOK
Cat Tembok Aries Rp 16,000.00
Cat Tembok Virgo Rp 19,000.00
Cat Tembok Yoko Rp 20,000.00
Plamur Tembok ( Boyo ) Rp 19,000.00
Cat Tembok Nippon Exterior Rp 73,000.00
Cat Tembok Nippon Interior Rp 65,000.00
Cat Tembok Metrolite Rp 24,000.00
Cat Tembok Jotun Rp 69,000.00
Cat Tembok Mowilex Rp 65,000.00
BAHAN LAIN-LAIN
Premium
Solar
Minyak Pelumas / Oli 90 Meditran
Minyak Pelumas / Oli 40 Meditran
Minyak Pelumas / Oli 10 Meditran
Aspal
Afdunner
Spritus
Kertas Pasir Rp 7,000.00
Minyak Bekisting Rp 21,000.00
Greace/Gemuk Rp 59,000.00
Seal Tape/Isolasi besar Rp 14,000.00
Seal Tape Isolasi kecil Rp 11,000.00
Lem Kayu ( Fox ) Rp 35,000.00
Kuas Cat Rp 7,000.00
Pisau Dempul Rp 10,500.00
UPAH
Pekerja Rp 95,000.00
Tukang Rp 125,000.00
Kepala Tukang Rp 135,000.00
Mandor Rp 145,000.00
Operator
Pembantu Operator
Supir
Penjaga Malam
besi strip
BAHAN DAN UPAH

Nama Daerah
Mepanga/BOLANO Parigi Parigi Tengah
Rp 667,000.00 Rp 498,000.00 Rp 490,000.00
Rp 667,000.00 Rp 498,000.00 Rp 490,000.00
Rp 650,000.00 Rp 490,000.00 Rp 495,000.00
Rp 650,000.00 Rp 365,000.00 Rp 370,000.00

Rp 218,000.00 Rp 121,000.00 Rp 236,000.00


Rp 215,000.00 Rp 119,000.00 Rp 231,000.00
Rp 211,000.00 Rp 118,000.00 Rp 226,000.00
Rp 207,000.00 Rp 117,000.00 Rp 222,000.00
Rp 231,000.00 Rp 159,000.00 Rp 165,000.00

Rp 193,000.00 Rp 125,000.00 Rp 107,000.00


Rp 195,000.00 Rp 125,000.00 Rp 106,000.00
Rp 193,000.00 Rp 72,000.00 Rp 107,000.00
Rp 121,000.00 Rp 108,000.00 Rp 90,000.00
Rp 91,000.00 Rp 80,000.00 Rp 90,000.00
Rp 88,000.00 Rp 135,000.00 Rp 81,000.00

Rp 220,000.00 Rp 257,000.00 Rp 154,000.00

Rp 3,200,000.00 Rp 4,600,000.00 Rp 3,600,000.00


Rp 2,700,000.00 Rp 2,100,000.00 Rp 2,400,000.00
Rp 2,200,000.00 Rp 1,800,000.00 Rp 1,900,000.00
Rp 450,000.00 Rp 570,000.00 Rp 580,000.00
Rp 650,000.00 Rp 440,000.00 Rp 530,000.00

Rp 800.00 Rp 900.00 Rp 1,100.00


Rp 3,200.00 Rp 1,900.00 Rp 1,800.00
Rp 3,200.00 Rp 1,900.00 Rp 1,900.00
Rp 1,800.00 Rp 1,800.00 Rp 1,400.00
Rp 1,700.00 Rp 1,400.00 Rp 1,600.00
Rp 89,000.00 Rp 89,000.00 Rp 89,000.00
Rp 122,000.00 Rp 119,000.00 Rp 119,000.00
Rp 30,000.00 Rp 21,000.00 Rp 21,000.00
Rp 40,000.00 Rp 26,000.00 Rp 3,000.00
Rp 52,000.00 Rp 47,100.00 Rp 45,100.00

Rp 74,000.00 Rp 72,000.00 Rp 75,000.00


Rp 74,000.00 Rp 77,000.00 Rp 77,000.00
Rp 80,000.00 Rp 72,000.00 Rp 72,000.00
Rp 4,800.00 Rp 3,800.00 Rp 3,700.00
Rp 21,000.00 Rp 33,500.00 Rp 33,500.00

Rp 177,000.00 Rp 370,000.00 Rp 375,000.00


Rp 255,000.00 Rp 430,000.00 Rp 450,000.00
Rp 355,000.00 Rp 515,000.00 Rp 535,000.00
Rp 405,000.00 Rp 535,000.00 Rp 575,000.00
Rp 455,000.00 Rp 565,000.00 Rp 605,000.00

Rp 155,000.00 Rp 175,000.00 Rp 175,000.00


Rp 180,000.00 Rp 200,000.00 Rp 200,000.00
Rp 205,000.00 Rp 225,000.00 Rp 245,000.00
Rp 230,000.00 Rp 305,000.00 Rp 305,000.00
Rp 255,000.00 Rp 385,000.00 Rp 390,000.00

Rp 24,000.00 Rp 14,000.00 Rp 12,000.00


Rp 42,000.00 Rp 37,000.00 Rp 42,000.00
Rp 60,000.00 Rp 57,000.00 Rp 53,000.00
Rp 88,000.00 Rp 86,000.00 Rp 87,000.00
Rp 127,000.00 Rp 122,000.00 Rp 112,000.00
Rp 162,000.00 Rp 142,000.00 Rp 137,000.00
Rp 247,000.00 Rp 230,500.00 Rp 202,500.00
Rp 255,000.00 Rp 232,500.00 Rp 222,500.00
Rp 280,000.00 Rp 244,500.00 Rp 242,500.00
Rp 305,000.00 Rp 262,500.00 Rp 262,500.00
Rp 365,000.00 Rp 302,500.00 Rp 302,500.00

Rp 123,000.00 Rp 80,000.00 Rp 80,000.00


Rp 171,000.00 Rp 142,000.00 Rp 142,000.00
Rp 191,000.00 Rp 192,500.00 Rp 192,500.00
Rp 241,000.00 Rp 282,500.00 Rp 282,500.00
Rp 341,000.00 Rp 442,500.00 Rp 442,500.00
Rp 428,000.00 Rp 522,500.00 Rp 522,500.00
Rp 502,000.00

Rp 455,000.00 Rp 295,000.00 Rp 295,000.00


Rp 457,000.00 Rp 505,000.00 Rp 505,000.00
Rp 755,000.00 Rp 685,000.00 Rp 685,000.00
Rp 720,000.00 Rp 725,000.00 Rp 725,000.00

Rp 92,000.00 Rp 77,000.00 Rp 77,000.00


Rp 132,000.00 Rp 87,000.00 Rp 87,000.00
Rp 147,000.00 Rp 157,000.00 Rp 157,000.00
Rp 127,000.00 Rp 292,000.00 Rp 292,000.00
Rp 252,000.00 Rp 312,000.00 Rp 312,000.00
Rp 202,000.00 Rp 362,000.00 Rp 362,000.00
Rp 502,000.00 Rp 513,400.00 Rp 513,400.00
Rp 1,605,000.00 Rp 1,605,000.00

Rp 32,000.00 Rp 30,000.00 Rp 27,000.00


Rp 97,000.00 Rp 97,000.00 Rp 87,000.00
Rp 47,000.00 Rp 35,000.00 Rp 32,000.00
Rp 37,000.00 Rp 17,000.00 Rp 20,000.00
Rp 37,000.00 Rp 35,000.00 Rp 27,000.00
Rp 42,000.00 Rp 37,000.00 Rp 37,000.00
Rp 900,000.00 Rp 770,000.00 Rp 765,000.00
Rp 1,000,000.00 Rp 790,000.00 Rp 780,000.00
Rp 380,000.00 Rp 360,000.00

Rp 26,000.00 Rp 42,000.00 Rp 42,000.00


Rp 26,000.00 Rp 44,000.00 Rp 44,000.00
Rp 31,000.00 Rp 54,000.00 Rp 54,000.00
Rp 21,000.00 Rp 24,000.00 Rp 22,000.00
Rp 21,000.00 Rp 24,000.00 Rp 22,000.00
Rp 21,000.00 Rp 24,000.00 Rp 22,000.00
Rp 31,000.00 Rp 34,000.00 Rp 34,000.00
Rp 51,000.00 Rp 52,000.00 Rp 47,000.00
Rp 26,000.00 Rp 34,000.00 Rp 32,000.00
Rp 20,000.00 Rp 20,000.00
Rp 34,000.00 Rp 34,000.00
Rp 4,000.00 Rp 29,000.00 Rp 29,000.00
Rp 81,000.00 Rp 17,000.00 Rp 17,000.00
Rp 81,000.00 Rp 17,000.00 Rp 17,000.00
Rp 258,000.00 Rp 112,000.00 Rp 107,000.00
Rp 277,000.00 Rp 247,000.00 Rp 247,000.00
Rp 8,000.00 Rp 5,300.00 Rp 5,300.00
Rp 99,000.00 Rp 17,000.00 Rp 17,000.00
Rp 51,000.00 Rp 57,000.00 Rp 56,000.00
Rp 56,000.00 Rp 60,000.00 Rp 59,000.00
Rp 58,000.00 Rp 62,000.00 Rp 61,000.00

Rp 51,000.00 Rp 57,000.00 Rp 56,000.00


Rp 56,000.00 Rp 60,000.00 Rp 59,000.00
Rp 58,000.00 Rp 62,000.00 Rp 61,000.00

Rp 61,000.00 Rp 56,000.00 Rp 56,000.00


Rp 71,000.00 Rp 61,000.00 Rp 61,000.00
Rp 81,000.00 Rp 65,000.00 Rp 65,000.00

Rp 86,000.00 Rp 71,000.00 Rp 71,000.00


Rp 91,000.00 Rp 91,000.00 Rp 81,000.00

Rp 66,000.00 Rp 51,000.00 Rp 51,000.00


Rp 56,000.00 Rp 56,000.00 Rp 53,000.00
Rp 49,000.00 Rp 41,000.00 Rp 41,000.00

Rp 21,000.00 Rp 21,000.00
Rp 26,000.00 Rp 26,000.00
Rp 21,000.00 Rp 21,000.00
Rp 34,000.00 Rp 34,000.00
Rp 27,000.00 Rp 21,000.00 Rp 21,000.00
Rp 23,000.00 Rp 27,000.00 Rp 27,000.00
Rp 26,000.00 Rp 33,000.00 Rp 33,000.00
Rp 127,000.00 Rp 106,000.00 Rp 106,000.00
Rp 127,000.00 Rp 104,000.00 Rp 104,000.00
Rp 132,000.00 Rp 86,000.00 Rp 86,000.00

Rp 99,000.00 Rp 95,500.00 Rp 95,000.00


Rp 104,000.00 Rp 95,500.00 Rp 95,000.00
Rp 104,000.00 Rp 95,500.00 Rp 95,000.00
Rp 134,000.00 Rp 101,000.00 Rp 99,000.00
Rp 65,000.00 Rp 49,000.00 Rp 48,000.00
Rp 55,000.00 Rp 51,000.00 Rp 51,000.00
Rp 58,000.00 Rp 53,000.00 Rp 53,000.00
Rp 177,000.00 Rp 170,000.00 Rp 170,000.00
Rp 228,000.00 Rp 219,000.00 Rp 219,000.00
Rp 146,000.00 Rp 141,000.00 Rp 141,000.00
Rp 64,000.00 Rp 59,000.00 Rp 59,000.00
Rp 29,000.00 Rp 29,000.00 Rp 29,000.00
Rp 36,000.00 Rp 25,000.00 Rp 25,000.00
Rp 36,000.00 Rp 25,000.00 Rp 25,000.00
Rp 196,000.00 Rp 118,000.00 Rp 118,000.00

Rp 64,000.00 Rp 54,000.00 Rp 54,000.00


Rp 69,000.00 Rp 59,000.00 Rp 59,000.00
Rp 76,000.00 Rp 65,000.00 Rp 66,000.00
Rp 76,000.00 Rp 79,000.00 Rp 72,000.00
Rp 80,000.00 Rp 85,000.00 Rp 85,000.00
Rp 90,000.00 Rp 86,000.00 Rp 86,000.00
Rp 297,000.00 Rp 110,000.00 Rp 110,000.00
Rp 187,000.00 Rp 175,000.00 Rp 175,000.00
Rp 12,000.00 Rp 66,000.00 Rp 66,000.00
Rp 20,000.00 Rp 69,000.00 Rp 69,000.00
Rp 30,000.00 Rp 72,000.00 Rp 72,000.00
Rp 125,000.00 Rp 154,000.00 Rp 148,000.00
Rp 177,000.00 Rp 164,000.00 Rp 163,000.00
Rp 210,000.00 Rp 199,000.00 Rp 198,000.00
Rp 185,000.00 Rp 194,000.00 Rp 194,000.00

Rp 49,000.00 Rp 42,000.00 Rp 42,000.00


Rp 59,000.00 Rp 54,000.00 Rp 53,000.00
Rp 69,000.00 Rp 62,000.00 Rp 67,000.00
Rp 99,000.00 Rp 73,000.00 Rp 74,000.00
Rp 89,000.00 Rp 84,000.00 Rp 85,000.00
Rp 114,000.00 Rp 97,000.00 Rp 97,000.00
Rp 134,000.00 Rp 127,000.00 Rp 127,000.00

Rp 149,000.00 Rp 137,000.00 Rp 140,000.00


Rp 79,000.00 Rp 87,000.00 Rp 87,000.00
Rp 21,000.00 Rp 17,000.00 Rp 17,000.00
Rp 64,000.00 Rp 58,000.00 Rp 59,000.00
Rp 79,000.00 Rp 64,000.00 Rp 60,000.00
Rp 69,000.00 Rp 67,000.00 Rp 63,000.00
Rp 75,000.00 Rp 76,000.00
Rp 81,000.00 Rp 80,500.00
Rp 89,000.00 Rp 89,500.00
Rp 159,000.00 Rp 120,000.00 Rp 119,000.00
Rp 169,000.00 Rp 152,000.00 Rp 152,000.00
Rp 179,000.00 Rp 175,000.00 Rp 176,000.00
Rp 200,000.00 Rp 193,000.00 Rp 194,000.00

Rp 450,000.00 Rp 1,125,000.00 Rp 1,125,000.00


Rp 350,000.00 Rp 275,000.00 Rp 275,000.00
Rp 1,200,000.00 Rp 345,000.00 Rp 355,000.00

Rp 200,000.00 Rp 128,000.00 Rp 130,000.00


Rp 235,000.00 Rp 150,000.00 Rp 153,000.00
Rp 300,000.00 Rp 223,000.00 Rp 225,000.00
Rp 150,000.00 Rp 144,000.00 Rp 144,000.00
Rp 170,000.00 Rp 170,000.00 Rp 170,000.00
Rp 80,000.00 Rp 70,000.00 Rp 70,000.00
Rp 450,000.00 Rp 171,000.00 Rp 171,000.00
Rp 615,000.00 Rp 159,000.00 Rp 159,000.00
Rp 950,000.00 Rp 701,000.00 Rp 701,000.00
Rp 185,000.00 Rp 18,000.00 Rp 18,000.00

Rp 177,000.00 Rp 127,000.00 Rp 129,000.00


Rp 227,000.00 Rp 224,000.00 Rp 227,000.00
Rp 302,000.00 Rp 250,000.00 Rp 252,000.00
Rp 427,000.00 Rp 350,000.00 Rp 352,000.00
Rp 52,000.00 Rp 470,000.00 Rp 472,000.00
Rp 102,500.00 Rp 592,500.00 Rp 597,500.00
Rp 82,500.00 Rp 744,500.00 Rp 750,500.00
Rp 102,500.00 Rp 977,500.00 Rp 980,500.00
Rp 162,500.00 Rp 1,102,500.00 Rp 1,102,500.00

Rp 7,500.00 Rp 8,000.00 Rp 8,000.00


Rp 8,500.00 Rp 8,500.00 Rp 8,500.00
Rp 10,500.00 Rp 10,000.00 Rp 10,000.00
Rp 15,500.00 Rp 13,500.00 Rp 13,500.00
Rp 25,500.00 Rp 25,000.00 Rp 25,000.00
Rp 35,500.00 Rp 35,000.00 Rp 35,000.00
Rp 40,500.00 Rp 40,000.00 Rp 40,000.00
Rp 45,500.00 Rp 45,000.00 Rp 45,000.00
Rp 50,500.00 Rp 49,000.00 Rp 49,000.00

Rp 8,500.00 Rp 8,500.00 Rp 8,500.00


Rp 10,500.00 Rp 9,500.00 Rp 9,500.00
Rp 15,500.00 Rp 14,500.00 Rp 14,500.00
Rp 25,500.00 Rp 24,500.00 Rp 24,500.00
Rp 35,500.00 Rp 33,500.00 Rp 33,500.00
Rp 45,500.00 Rp 44,500.00 Rp 44,500.00
Rp 55,500.00 Rp 54,500.00 Rp 54,500.00
Rp 60,500.00 Rp 58,500.00 Rp 58,500.00
Rp 65,500.00 Rp 64,000.00 Rp 64,000.00
Rp 8,500.00 Rp 8,500.00 Rp 8,500.00
Rp 10,500.00 Rp 10,500.00 Rp 10,500.00
Rp 15,500.00 Rp 15,500.00 Rp 15,500.00
Rp 25,500.00 Rp 25,500.00 Rp 25,500.00
Rp 35,500.00 Rp 35,500.00 Rp 35,500.00
Rp 40,500.00 Rp 40,500.00 Rp 40,500.00
Rp 45,500.00 Rp 45,500.00 Rp 45,500.00
Rp 50,500.00 Rp 50,500.00 Rp 50,500.00
Rp 55,500.00 Rp 55,500.00 Rp 55,500.00
Rp 8,500.00 Rp 8,500.00 Rp 8,500.00
Rp 10,500.00 Rp 10,500.00 Rp 10,500.00
Rp 15,500.00 Rp 15,500.00 Rp 15,500.00
Rp 25,500.00 Rp 25,500.00 Rp 25,500.00
Rp 35,500.00 Rp 35,500.00 Rp 35,500.00
Rp 40,500.00 Rp 40,500.00 Rp 40,500.00
Rp 45,500.00 Rp 45,500.00 Rp 45,500.00
Rp 50,500.00 Rp 50,500.00 Rp 50,500.00
Rp 55,500.00 Rp 55,500.00 Rp 55,500.00
Rp 20,500.00 Rp 19,500.00 Rp 19,500.00
Rp 25,500.00 Rp 24,500.00 Rp 24,500.00
Rp 35,500.00 Rp 34,500.00 Rp 34,500.00
Rp 45,500.00 Rp 44,500.00 Rp 44,500.00
Rp 47,500.00 Rp 45,500.00 Rp 45,500.00
Rp 50,500.00 Rp 49,500.00 Rp 49,500.00
Rp 53,500.00 Rp 52,500.00 Rp 52,500.00
Rp 60,500.00 Rp 59,500.00 Rp 59,500.00
Rp 65,500.00 Rp 64,500.00 Rp 64,500.00
Rp 8,500.00 Rp 8,500.00 Rp 8,500.00
Rp 10,500.00 Rp 10,500.00 Rp 10,500.00
Rp 12,500.00 Rp 11,500.00 Rp 11,500.00
Rp 20,500.00 Rp 19,500.00 Rp 19,500.00
Rp 25,000.00 Rp 24,500.00 Rp 24,500.00
Rp 30,000.00 Rp 28,500.00 Rp 28,500.00
Rp 35,000.00 Rp 33,500.00 Rp 33,500.00
Rp 40,000.00 Rp 38,500.00 Rp 38,500.00
Rp 45,000.00 Rp 43,500.00 Rp 43,500.00
Rp 27,000.00 Rp 26,000.00 Rp 26,000.00
Rp 32,000.00 Rp 37,000.00 Rp 30,000.00
Rp 45,000.00 Rp 47,000.00 Rp 38,000.00
Rp 67,000.00 Rp 72,000.00 Rp 46,000.00
Rp 72,000.00 Rp 82,000.00 Rp 52,000.00
Rp 62,000.00 Rp 65,500.00 Rp 65,500.00
Rp 82,000.00 Rp 87,500.00 Rp 75,500.00
Rp 102,000.00 Rp 117,500.00 Rp 102,500.00
Rp 312,000.00 Rp 317,500.00 Rp 317,500.00

Rp 5,500.00 Rp 4,000.00 Rp 4,000.00


Rp 5,500.00 Rp 4,500.00 Rp 4,500.00
Rp 5,500.00 Rp 4,500.00 Rp 4,500.00
Rp 5,500.00 Rp 4,500.00 Rp 4,500.00
Rp 5,500.00 Rp 4,500.00 Rp 4,500.00
Rp 15,500.00 Rp 9,000.00 Rp 9,000.00
Rp 10,500.00 Rp 19,000.00 Rp 19,000.00
Rp 15,500.00 Rp 23,500.00 Rp 23,500.00
Rp 32,500.00 Rp 30,500.00 Rp 30,500.00
Rp 6,500.00 Rp 5,500.00 Rp 5,500.00
Rp 5,500.00 Rp 5,500.00 Rp 5,500.00
Rp 6,500.00 Rp 6,000.00 Rp 6,000.00
Rp 7,500.00 Rp 7,000.00 Rp 7,000.00
Rp 7,500.00 Rp 7,000.00 Rp 7,000.00
Rp 6,500.00 Rp 8,000.00 Rp 8,000.00
Rp 10,500.00 Rp 9,500.00 Rp 9,500.00
Rp 30,500.00 Rp 23,500.00 Rp 23,500.00
Rp 40,500.00 Rp 30,500.00 Rp 28,500.00
Rp 4,500.00 Rp 4,500.00 Rp 4,500.00
Rp 5,500.00 Rp 4,500.00 Rp 4,500.00
Rp 7,500.00 Rp 5,500.00 Rp 4,500.00
Rp 5,500.00 Rp 6,500.00 Rp 4,500.00
Rp 6,500.00 Rp 9,500.00 Rp 6,500.00
Rp 9,500.00 Rp 16,500.00 Rp 16,500.00
Rp 15,500.00 Rp 22,500.00 Rp 22,500.00
Rp 25,500.00 Rp 35,500.00 Rp 35,500.00
Rp 35,500.00 Rp 40,500.00 Rp 40,500.00
Rp 5,500.00 Rp 5,500.00 Rp 5,500.00
Rp 6,500.00 Rp 6,500.00 Rp 6,500.00
Rp 7,500.00 Rp 7,500.00 Rp 7,500.00
Rp 8,500.00 Rp 7,500.00 Rp 7,500.00
Rp 8,500.00 Rp 13,500.00 Rp 13,500.00
Rp 13,500.00 Rp 14,500.00 Rp 14,500.00
Rp 15,500.00 Rp 14,500.00 Rp 14,500.00
Rp 15,500.00 Rp 16,500.00 Rp 16,500.00
Rp 26,500.00 Rp 23,500.00 Rp 23,500.00

Rp 226,000.00 Rp 191,000.00 Rp 191,000.00


Rp 171,000.00 Rp 161,000.00 Rp 161,000.00
Rp 36,000.00 Rp 35,000.00 Rp 35,000.00
Rp 86,000.00 Rp 85,000.00 Rp 85,000.00
Rp 31,000.00 Rp 31,000.00 Rp 31,000.00
Rp 301,000.00 Rp 291,000.00 Rp 291,000.00
Rp 131,000.00 Rp 121,000.00 Rp 121,000.00
Rp 361,000.00 Rp 346,000.00 Rp 346,000.00
Rp 536,000.00 Rp 521,000.00 Rp 521,000.00
Rp 121,000.00 Rp 106,000.00 Rp 106,000.00
Rp 13,000.00 Rp 10,500.00 Rp 10,500.00
Rp 8,000.00 Rp 7,000.00 Rp 7,000.00
Rp 16,000.00 Rp 12,000.00 Rp 12,000.00
Rp 21,000.00 Rp 28,000.00 Rp 28,000.00
Rp 46,000.00 Rp 521,000.00 Rp 521,000.00
Rp 23,000.00 Rp 106,000.00 Rp 106,000.00
Rp 16,000.00 Rp 10,500.00 Rp 10,500.00

Rp 830,000.00 Rp 775,000.00 Rp 775,000.00


Rp 3,500,000.00 Rp 3,225,000.00 Rp 3,225,000.00
Rp 435,000.00 Rp 425,000.00 Rp 425,000.00
Rp 300,000.00 Rp 215,000.00 Rp 215,000.00
Rp 1,450,000.00 Rp 1,425,000.00 Rp 1,425,000.00
Rp 2,010,000.00 Rp 1,925,000.00 Rp 1,925,000.00

Rp 560,000.00 Rp 395,000.00 Rp 395,000.00


Rp 360,000.00 Rp 320,000.00 Rp 320,000.00
Rp 62,000.00 Rp 50,000.00 Rp 50,000.00
Rp 62,000.00 Rp 49,000.00 Rp 49,000.00
Rp 67,000.00 Rp 66,000.00 Rp 66,000.00
Rp 3,350,000.00 Rp 3,100,000.00 Rp 3,100,000.00
Rp 337,000.00 Rp 307,000.00 Rp 307,000.00
Rp 127,000.00 Rp 337,000.00 Rp 337,000.00
Rp 360,000.00 Rp 350,000.00 Rp 350,000.00
Rp 36,000.00 Rp 29,000.00 Rp 29,000.00
Rp 310,000.00 Rp 220,000.00 Rp 220,000.00
Rp 610,000.00 Rp 460,000.00 Rp 460,000.00
Rp 340,000.00 Rp 290,000.00 Rp 290,000.00
Rp 390,000.00 Rp 360,000.00 Rp 360,000.00
Rp 390,000.00 Rp 380,000.00 Rp 380,000.00
Rp 219,000.00 Rp 200,000.00 Rp 200,000.00
Rp 1,975,000.00 Rp 1,880,000.00 Rp 1,880,000.00

Rp 945,000.00 Rp 360,000.00 Rp 360,000.00


Rp 520,000.00 Rp 485,000.00 Rp 485,000.00
Rp 770,000.00 Rp 700,000.00 Rp 695,000.00
Rp 520,000.00 Rp 360,000.00 Rp 360,000.00
Rp 520,000.00 Rp 460,000.00 Rp 460,000.00
Rp 475,000.00 Rp 430,000.00 Rp 430,000.00
Rp 420,000.00 Rp 390,000.00 Rp 390,000.00
Rp 920,000.00 Rp 880,000.00 Rp 880,000.00

Rp 1,125,000.00 Rp 945,000.00 Rp 945,000.00


Rp 1,800,000.00 Rp 1,450,000.00 Rp 1,450,000.00
Rp 1,850,000.00 Rp 3,150,000.00 Rp 3,150,000.00
Rp 880,000.00 Rp 845,000.00 Rp 845,000.00
Rp 2,050,000.00 Rp 1,450,000.00 Rp 1,450,000.00
Rp 3,200,000.00 Rp 3,050,000.00 Rp 3,050,000.00
Rp 1,725,000.00 Rp 945,000.00 Rp 945,000.00
Rp 1,700,000.00 Rp 1,450,000.00 Rp 1,450,000.00
Rp 3,300,000.00 Rp 3,150,000.00 Rp 3,150,000.00
Rp 1,075,000.00 Rp 995,000.00 Rp 995,000.00
Rp 1,800,000.00 Rp 1,650,000.00 Rp 1,650,000.00
Rp 3,400,000.00 Rp 3,150,000.00 Rp 3,150,000.00
Rp 2,825,000.00 Rp 2,525,000.00 Rp 2,525,000.00
Rp 3,550,000.00 Rp 3,450,000.00 Rp 3,450,000.00
Rp 3,800,000.00 Rp 6,550,000.00 Rp 6,550,000.00
Rp 16,000.00 Rp 31,000.00 Rp 31,000.00
Rp 36,000.00 Rp 33,000.00 Rp 33,000.00
Rp 96,000.00 Rp 23,000.00 Rp 23,000.00

Rp 285,000.00 Rp 240,000.00 Rp 240,000.00


Rp 400,000.00 Rp 340,000.00 Rp 340,000.00
Rp 810,000.00 Rp 740,000.00 Rp 740,000.00
Rp 1,110,000.00 Rp 1,000,000.00 Rp 1,000,000.00
Rp 1,040,000.00 Rp 1,020,000.00 Rp 1,020,000.00
Rp 1,410,000.00 Rp 1,270,000.00 Rp 1,270,000.00
Rp 275,000.00 Rp 240,000.00 Rp 240,000.00
Rp 22,500.00 Rp 18,500.00 Rp 17,500.00
Rp 30,500.00 Rp 27,500.00 Rp 27,500.00
Rp 40,500.00 Rp 40,500.00 Rp 40,500.00
Rp 40,500.00 Rp 30,500.00 Rp 30,500.00
Rp 20,500.00 Rp 36,500.00 Rp 36,500.00
Rp 25,500.00 Rp 40,500.00 Rp 40,500.00
Rp 65,500.00 Rp 50,500.00 Rp 48,500.00
Rp 50,500.00 Rp 46,500.00 Rp 46,500.00
Rp 15,500.00 Rp 9,500.00 Rp 9,500.00
Rp 20,500.00 Rp 17,500.00 Rp 17,500.00
Rp 30,500.00 Rp 28,500.00 Rp 28,500.00
Rp 50,500.00 Rp 37,500.00 Rp 37,500.00
Rp 75,500.00 Rp 57,500.00 Rp 57,500.00
Rp 55,500.00 Rp 37,500.00 Rp 37,500.00

Rp 20,000.00 Rp 8,000.00 Rp 8,000.00


Rp 40,000.00 Rp 14,000.00 Rp 14,000.00
Rp 80,000.00 Rp 25,000.00 Rp 25,000.00

Rp 55,000.00 Rp 44,000.00 Rp 44,000.00


Rp 65,000.00 Rp 54,000.00 Rp 54,000.00
Rp 75,000.00 Rp 64,000.00 Rp 64,000.00
Rp 95,000.00 Rp 82,000.00 Rp 82,000.00
Rp 105,000.00 Rp 92,000.00 Rp 92,000.00

Rp 30,000.00 Rp 24,000.00 Rp 24,000.00


Rp 35,000.00 Rp 30,000.00 Rp 30,000.00
Rp 89,000.00 Rp 80,000.00 Rp 80,000.00
Rp 262,000.00 Rp 242,000.00 Rp 242,000.00
Rp 372,000.00 Rp 252,000.00 Rp 252,000.00
Rp 202,000.00 Rp 202,000.00
Rp 242,000.00 Rp 222,000.00 Rp 222,000.00

Rp 30,000.00 Rp 40,000.00 Rp 40,000.00


Rp 35,000.00 Rp 50,000.00 Rp 50,000.00
Rp 70,000.00 Rp 66,000.00 Rp 66,000.00
Rp 80,000.00 Rp 76,000.00 Rp 76,000.00
Rp 90,000.00 Rp 86,000.00 Rp 86,000.00
Rp 100,000.00 Rp 95,000.00 Rp 95,000.00

Rp 7,500.00 Rp 66,000.00 Rp 66,000.00


Rp 66,000.00 Rp 55,000.00 Rp 55,000.00
Rp 32,000.00 Rp 39,000.00 Rp 39,000.00

Rp 70,000.00 Rp 63,000.00 Rp 63,000.00


Rp 30,000.00 Rp 36,000.00 Rp 21,000.00
Rp 20,000.00 Rp 21,000.00 Rp 16,000.00
Rp 31,000.00 Rp 27,000.00 Rp 27,000.00
Rp 55,000.00 Rp 63,000.00 Rp 63,000.00
Rp 33,000.00 Rp 11,000.00 Rp 10,000.00
Rp 39,300.00
Rp 71,000.00 Rp 62,000.00 Rp 57,000.00
Rp 71,000.00 Rp 61,000.00 Rp 61,000.00
Rp 55,000.00 Rp 63,000.00 Rp 63,000.00

Rp 15,000.00 Rp 19,000.00 Rp 19,000.00


Rp 14,000.00 Rp 17,000.00 Rp 17,000.00
Rp 11,000.00 Rp 19,000.00 Rp 19,000.00
Rp 10,000.00 Rp 18,000.00 Rp 18,000.00
Rp 45,000.00 Rp 71,000.00 Rp 71,000.00
Rp 200,000.00 Rp 63,000.00 Rp 63,000.00
Rp 170,000.00 Rp 21,000.00 Rp 21,000.00
Rp 67,000.00 Rp 67,000.00
Rp 63,000.00 Rp 63,000.00

Rp 7,700.00
Rp 6,600.00
Rp 34,000.00
Rp 33,000.00
Rp 36,000.00
Rp 16,000.00
Rp 25,000.00
Rp 26,000.00
Rp 6,000.00 Rp 6,000.00 Rp 6,000.00
Rp 15,000.00 Rp 20,000.00 Rp 20,000.00
Rp 61,000.00 Rp 58,000.00 Rp 58,000.00
Rp 11,000.00 Rp 13,000.00 Rp 13,000.00
Rp 6,000.00 Rp 10,500.00 Rp 10,500.00
Rp 36,000.00 Rp 34,000.00 Rp 34,000.00
Rp 16,000.00 Rp 6,500.00 Rp 6,500.00
Rp 13,000.00 Rp 10,000.00 Rp 10,000.00

Rp 95,000.00 Rp 95,000.00
Rp 125,000.00 Rp 125,000.00
Rp 135,000.00 Rp 135,000.00
Rp 145,000.00 Rp 145,000.00
Rp 150,000.00
Rp 95,000.00
Rp 100,000.00
Rp 60,000.00
Rp 40,000.00
Rumus
485000

Anda mungkin juga menyukai