Anda di halaman 1dari 1

FORMAT RENCANA ANGGARAN BIAYA

Budged Perapihan Kabel LAN


Jenis Kegiatan : Infrastruktur dasar
Keterangan
(Budget)
No URAIAN Kuantiti Total Biaya
Harga Satuan

-1 -2 -3 (4) (5) = (3) x (4)


1 Kebutuhan Hardware

1. LAN 24 port
Switch HUB 24 Port Gigabit D-LINK DGS- 1 1,050,000 1,050,000 Speed 1gbps non PoE
1024C Rackmount 1000Mbps - Metal Box

2. Power Supply CCTV 2 175,000 350,000


2 Kebutuhan Kabel
1. Kabel LAN
1 1,355,000 1,355,000 305 Meter
Belden Kabel UTP LAN Cat 5e
2,755,000
ESTIMASI TOTAL 2,755,000

Anda mungkin juga menyukai