Zamzama FEC Project

Lift Study Checklist and Study Calculations

Lifting Crane
PIPE SPOOL
LOAD DESCRIPTION
NORTH MANIFOLD
LIFT LOCATION

Planned Lift Date and time Date: Time:


1. Weight of lift components 2. Lift Geometry

2.0 34.0
Weight of item (t) lift radius (m)
BooLength,Extention&
22.35+13.1
2.0 supertop (m)
Crane Hook Block (t) +14.0=49.45
(if applicable)
NA Crane SWL(t) (from Load Chart) 28.6
Hoist Wire (t)
Slings &Shackles
Dual Crane Lift (less 20%for 2
0.5 NA
cranes; 33% for 3 cranes)
Total weight (load 16% of the available capacity 16%
on crane) (t) 4.5 T meets the lift critera
3. Equipment

Crane 500T Type KATO NK 5000,500T

Wire Rope SWL (t)


4. Rigging

Wire slings SWL (each) (t)


CHOCKER HITCH 5@5
Synthetic Slings SWL (each) (t) T,51.850.750.95=6.59T
CHAIN BLOCK 1@3T

Shackles SWL (each) (t) 5@5T

Lifting beam SWL (each) (t)


4. Team Personnel Name Sign-off

Supervisor

Rigging Supervisor

Crane Operator

Rigger 1

Rigger 2

55873723.doc Page 1/3 15-Apr-11


Zamzama FEC Project
Lift Study Checklist and Study Calculations

Lifting Crane
1. SITE ASSESSMENT ACCEPT COMMENTS
ABLE?
1.1
Have ground conditions been assessed for
adequacy to support the total weight of the crane √
and load?
1.2
Have adjacent structures etc. have been examined
to determine movement limitations of crane?

1.3
Are SIMOPS control measures in place? √
2. DOCUMENTATION ATTACH DOCUMENTS
ED ATTACHED

2.1 Crane operator certification



2.2 Basis for weight of item to be lifted Drawings & check crane
√ load sensor during lift ,
2.3 Rigging Supervisor certification

2.4 Rigging Supervisor certification

2.5 Crane certification

2.6 Crane Load chart

2.7 Project Crane inspection checklist

2.8 Project vehicle site entry sticker valid

2.9 Wire rope certification √
2.10 Wire sling certification √
2.11
Sling certification √
2.12
Shackle certification √
3. PRE-START CHECK ACCEPT
ABLE

3.1 Are tag lines in place? (Length is 3 times the max


height)
3.2
Is barrication in place?
3.3
Is crane is suitably positioned to provide shortest
working radius?

Schematic Diagram of Lift Layout

55873723.doc Page 2/3 15-Apr-11


Zamzama FEC Project
Lift Study Checklist and Study Calculations

Lifting Crane

55873723.doc Page 3/3 15-Apr-11