RENCANA ANGGARAN BIAYA


(RAB)

PEKERJAAN :

REVITALISASI PASAR MASOHI

LOKASI :
KEC. KOTA MASOHI -
KAB. MALUKU TENGAH

TAHUN ANGGARAN 2019


REKAPITULASI AKHIR
PASAR RAKYAT MASOHI (TYPE D)

KEGIATAN : PENGEMBANGAN SARABA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN


PEKERJAAN : REVITALISASI PASAR MASOHI
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN : 2019

NO. URAIAN PEKERJAAN JUMLAH HARGA TOTAL

I. BIAYA PEKERJAAN FISIK -

II. BIAYA PENGAWASAN 210,000,000.00

III. BIAYA PENGELOLAAN (TPP) 129,000,000.00

TOTAL 339,000,000.00

Terbilang : Tiga Ratus Tiga Puluh Sembilan Juta Rupiah

Masohi, Agustus 2019

KABID TATA RUANG & PERUMAHAN PEJABAT PEMBUAT KOMITMEN


DINAS PU KAB. MALUKU TENGAH DINAS PERDAGANGAN DAN PERINDUSTRIAN

HASAN FIRDAUSI, ST. MT. FADLY TUARITA, ST.


NIP. 19740703 200312 1 007 NIP. 19760422 200312 1 003
LAPORAN KEMAJUAN FISIK PEKERJAAN BULANAN
PERIODE ( MEI ) TAHUN 2019

PEKERJAAN : PEMBANGUNAN RUANG RKB DAN PERABOT SD


LOKASI : SD NEGERI 5 NAMLEA
KABUPATEN : BURU
TAHUN ANGGARAN : 2019

HARGA JUMLAH REALISASI VOLUME PEKERJAAN


BOBOT BOBOT Vol
NO JENIS PEKERJAAN SAT. VOLUME KONTRAK RENCANA Vol s/d Vol s/d
Tahapan
% % Bulan ini Bulan ini
Saat ini
% %
SATUAN HARGA (Rp) %
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 9,500,000.00 9,500,000.00 1.72 1.72 1.00 100 1.00
2 Survey, Rapat & Transportasi ls 1.00 4,500,000.00 4,500,000.00 0.82 0.82 1.00 100 1.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 65,000.00 130,000.00 0.02 0.02 2.00 100 2.00
Jumlah Sub. A.I 14,130,000.00
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 6,500,000.00 6,500,000.00 1.18 0.29 0.25 25 0.25
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,569,000.00 1,569,000.00 0.28 - - - -
Jumlah Sub. A.II 8,069,000.00
GRAND TOTAL 22,199,000.00
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Gudang dan Barank Kerja ls 1.00 10,000,000.00 10,000,000.00 1.81 1.81 1.00 100 1.00
2 Pembersihan Awal ls 1.00 4,000,000.00 4,000,000.00 0.73 0.73 1.00 100 1.00
3 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.05 0.05 1.00 100 1.00
4 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.18 0.18 1.00 100 1.00
Jumlah Sub. B.I 15,250,000.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 59.87 39,200.00 2,346,904.00 0.43 0.43 59.87 100 59.87
2 Urugan Pasir Bawah Pondasi m3 3.36 378,400.00 1,271,424.00 0.23 0.23 3.36 100 3.36
3 Urugan Pasir bawah Lantai m3 11.10 378,400.00 4,198,786.94 0.76 0.76 11.10 100 11.10
4 Urugan Tanah kembali Bekas Galian m3 14.97 18,790.00 281,239.33 0.05 0.05 14.97 100 14.97
5 Urugan Tanah Bawah lantai m3 39.26 262,100.00 10,290,779.88 1.87 1.87 39.26 100 39.26
Jumlah Sub. B.II 18,389,134.15
HARGA JUMLAH REALISASI VOLUME PEKERJAAN
BOBOT BOBOT Vol
NO JENIS PEKERJAAN SAT. VOLUME KONTRAK RENCANA Vol s/d Vol s/d
Tahapan
% % Bulan ini Bulan ini
Saat ini
% %
SATUAN HARGA (Rp) %
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 6.72 605,930.00 4,071,849.60 0.74 0.74 6.72 100 6.72
2 Pek. Pondasi Batu Karang m3 23.02 1,012,230.00 23,301,534.60 4.23 4.23 23.02 100 23.02
3 Pek. Sloof Beton m3 2.50 4,983,584.00 12,439,025.66 2.26 2.26 2.50 100 2.50
4 Pek. Kolom Beton m3 1.80 5,422,294.00 9,767,937.30 1.77 1.24 1.26 70 1.26
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.88 4,983,584.00 14,358,702.22 2.60 2.60 2.88 100 2.88
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 10.38 919,215.00 9,538,583.75 1.73 - - - -
6 Pek. Rabat Beton keliling Bangunan m3 3.26 919,215.00 2,992,044.83 0.54 - - - -
7 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 20.00 179,756.50 3,595,130.00 0.65 - - - -
8 Pek. Pasangan Dinding Batako 1 : 4 m2 242.25 179,756.50 43,546,551.39 7.90 7.90 242.25 100 242.25
Jumlah Sub. B.III 123,611,359.36
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 468.97 48,870.00 22,918,563.90 4.16 - - - -
2 Acian Dinding Luar Dalam m2 468.97 22,321.00 10,467,879.37 1.90 - - - -
Jumlah Sub. B.IV 33,386,443.27
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 210.94 249,288.00 52,585,608.44 9.54 - - - -
Jumlah Sub. B.V 52,585,608.44
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.61 6,839,000.00 10,981,683.22 1.99 1.99 1.61 100 1.61
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 8.63 682,000.00 5,886,342.00 1.07 - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 14.61 283,883.33 4,147,876.16 0.75 - - - -
4 Pek. Kaca Polos 3 mm m2 30.86 276,522.50 8,533,263.13 1.55 - - - -
Jumlah Sub. B.VI 29,549,164.51
HARGA JUMLAH REALISASI VOLUME PEKERJAAN
BOBOT BOBOT Vol
NO JENIS PEKERJAAN SAT. VOLUME KONTRAK RENCANA Vol s/d Vol s/d
Tahapan
% % Bulan ini Bulan ini
Saat ini
% %
SATUAN HARGA (Rp) %
VII PEKERJAAN ATAP DAN PLAFOND
1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 2.015 5,843,580.00 11,777,665.37 2.14 - - - -
2 Pek. Gording Ky 5/10 kls 2 m3 2.28 4,222,850.00 9,628,098.00 1.75 - - - -
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 347.10 87,295.38 30,300,225.63 5.50 - - - -
4 Pek, Bubungan Atap Zenk Licin m' 24.00 37,330.28 895,926.72 0.16 - - - -
5 Pek. Lisplang Ky. Kls 1 m' 78.70 86,060.00 6,772,922.00 1.23 - - - -
6 List tripleks standar m' 140.08 25,760.00 3,608,460.80 0.65 - - - -
7 Pek. Rangka Plafond ky kls 2 m2 293.73 84,410.00 24,793,631.13 4.50 - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 293.73 43,662.50 12,824,925.00 2.33 - - - -
Jumlah Sub. B.VII 100,601,854.64
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 468.97 26,458.00 12,408,008.26 2.25 - - - -
2 Pek. Cat Lisplank Ky m2 23.61 46,745.00 1,103,649.45 0.20 - - - -
3 Pek. Cat Plafond m2 293.73 26,458.00 7,771,471.30 1.41 - - - -
4 Pek. Cat Kusen Pintu Jendela m2 49.06 46,745.00 2,293,515.38 0.42 - - - -
5 Pek. Cat Daun Pintu/Jendela m2 46.48 46,745.00 2,172,913.28 0.39 - - - -
Jumlah Sub. B.VIII 25,749,557.66
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 12.00 210,600.00 2,527,200.00 0.46 - - - -
2 Pas. Stop Kontak bh 3.00 80,200.00 240,600.00 0.04 - - - -
3 Pas. Saklar Ganda bh 3.00 80,200.00 240,600.00 0.04 - - - -
4 Pas. Lampu Pijar SL 40 watt bh 6.00 135,200.00 811,200.00 0.15 - - - -
5 Pas. Lampu Pijar SL 15 watt bh 6.00 130,200.00 781,200.00 0.14 - - - -
Jumlah Sub. B.IX 4,600,800.00
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 3.00 234,290.00 702,870.00 0.13 - - - -
2 Engsel Pintu bh 18.00 47,122.50 848,205.00 0.15 - - - -
3 Engsel Jendela & Ventilasi bh 138.00 33,115.00 4,569,870.00 0.83 - - - -
4 Grendel Pintu Tanam bh 3.00 46,130.00 138,390.00 0.03 - - - -
5 Grendel Jendela & Ventilasi bh 69.00 46,130.00 3,182,970.00 0.58 - - - -
6 Kait Angin Jendela & Ventilasi bh 69.00 33,122.50 2,285,452.50 0.41 - - - -
Jumlah Sub. B.X 11,727,757.50
HARGA JUMLAH REALISASI VOLUME PEKERJAAN
BOBOT BOBOT Vol
NO JENIS PEKERJAAN SAT. VOLUME KONTRAK RENCANA Vol s/d Vol s/d
Tahapan
% % Bulan ini Bulan ini
Saat ini
% %
SATUAN HARGA (Rp) %
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 5,000,000.00 5,000,000.00 0.91 - - - -
2 Dokumentasi & Pelaporan ls 1.00 7,500,000.00 7,500,000.00 1.36 - - - -
Jumlah Total Sub B.XI 12,500,000.00
GRAND TOTAL 427,951,679.53
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 60.00 500,000.00 30,000,000.00 5.44 - - - -
2 Meja Kerja/Guru bh 3.00 2,500,000.00 7,500,000.00 1.36 - - - -
3 Kursi Siswa Tunggal bh 120.00 450,000.00 54,000,000.00 9.79 - - - -
4 Kursi Kerja/Guru bh 3.00 1,750,000.00 5,250,000.00 0.95 - - - -
5 Papan Tulis White Board bh 3.00 1,500,000.00 4,500,000.00 0.82 - - - -
Jumlah Total Sub XII 101,250,000.00
Grentotal Nilai Fisik 551,400,679.53
Jumlah Fisik Sampai Dengan Bulan ini % 100.00 29.91

Namlea, 19 Agustus 2019


Mengetahui, Dibuat Oleh,
Pejabat Pembuat Komitmen/PPK Tenaga Pengawas

DJUMADI SUKADI, SE AKSA PRAKASA


NIP. 19770401 200501 1 010
REKAPITULASI AKHIR
PASAR RAKYAT MASOHI (TYPE D)

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK


PERDAGANGAN
PEKERJAAN : REVITALISASI PASAR MASOHI
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN : 2019

JUMLAH HARGA TOTAL


NO. URAIAN PEKERJAAN
(Rp)

I. PEKERJAAN PENDAHULUAN #REF!


II. PEKERJAAN TANAH DAN STRUKTUR BAWAH #REF!
III. PEKERJAAN STRUKTUR TENGAH #REF!
IV. PEKERJAAN ATAP, TALANG & LISPLANK #REF!
V. PEKERJAAN DINDING #REF!
VI. PEKERJAAN PELAPIS DINDING #REF!
VII. PEKERJAAN PELAPIS LANTAI #REF!
VIII. PEKERJAAN PENGECATAN #REF!
IX. PEKERJAAN KUSEN #REF!
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN #REF!
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT #REF!
XII. PEKERJAAN LAIN-LAIN #REF!
XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL #REF!
XIV. PEKERJAAN PLUMBING #REF!
XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN #REF!

TOTAL #REF!
PPN 10% #REF!
GRAND TOTAL #REF!
PEMBULATAN #REF!

Terbilang : #REF!

Masohi, Agustus 2019

PEJABAT PEMBUAT KOMITMEN


DINAS PERDAGANGAN DAN PERINDUSTRIAN
KABUPATEN MALUKU TENGAH

FADLY TUARITA, ST.


NIP. 19760422 200312 1 003
KUANTITAS DAN HARGA

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD


LOKASI : SD NEGERI 15 LOLONG GUBA
KABUPATEN : BURU
TAHUN ANGGARAN : 2019

HARGA JUMLAH
NO JENIS PEKERJAAN SAT. VOLUME
SATUAN HARGA (Rp)
1 2 3 4 5 6
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00
Jumlah Sub. A.I 8,110,000.00
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00
Jumlah Sub. A.II 6,000,000.00
GRAND TOTAL 14,110,000.00
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00
Jumlah Sub. B.I 2,250,000.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53
Jumlah Sub. B.II 13,460,471.52
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04
6 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47
7 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00
8 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02
Jumlah Sub. B.III 143,263,113.02
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12
Jumlah Sub. B.IV 33,803,769.12
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 -
Jumlah Sub. B.V -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13
Jumlah Sub. B.VI 20,974,868.58
HARGA JUMLAH
NO JENIS PEKERJAAN SAT. VOLUME
SATUAN HARGA (Rp)
1 2 3 4 5 6
VII PEKERJAAN ATAP DAN PLAFOND
1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.260 5,603,580.00 7,058,717.65
2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08
Jumlah Sub. B.VII 83,212,360.89
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49
Jumlah Sub. B.VIII 18,264,960.43
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00
Jumlah Sub. B.IX 3,067,200.00
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00
2 Engsel Pintu bh 12.00 47,047.50 564,570.00
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00
Jumlah Sub. B.X 7,804,155.00
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00
Jumlah Total Sub B.XI 5,390,000.00
GRAND TOTAL 331,490,898.56
XII PEK. MEBELAIR
1 Meja Siswa Tunggal bh 20.00 500,000.00 10,000,000.00
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00
Jumlah Total Sub XII 22,000,000.00
KUANTITAS DAN HARGA

PEKERJAAN : PEMBANGUNAN SATU RUANG RKB DAN PERABOT SD


LOKASI : SD NEGERI 9 NAMLEA
KABUPATEN : BURU
TAHUN ANGGARAN : 2019

HARGA JUMLAH
NO JENIS PEKERJAAN SAT. VOLUME
SATUAN HARGA (Rp)
1 2 3 4 5 6
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 5,000,000.00 5,000,000.00
2 Survey, Rapat & Transportasi ls 1.00 1,500,000.00 1,500,000.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00
Jumlah Sub. A.I 6,610,000.00
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 2,000,000.00 2,000,000.00
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 700,000.00 700,000.00
Jumlah Sub. A.II 2,700,000.00
GRAND TOTAL 9,310,000.00
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00
Jumlah Sub. B.I 2,250,000.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 23.93 37,200.00 890,289.00
2 Urugan Pasir Bawah Pondasi m3 1.35 376,900.00 508,815.00
3 Urugan Pasir bawah Lantai m3 3.45 376,900.00 1,300,847.74
4 Urugan Tanah kembali Bekas Galian m3 5.98 17,830.00 106,679.12
5 Urugan Tanah Bawah lantai m3 13.07 260,850.00 3,408,015.68
Jumlah Sub. B.II 6,214,646.54
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 2.70 602,030.00 1,625,481.00
2 Pek. Pondasi Batu Karang m3 9.21 1,019,400.00 9,388,674.00
3 Pek. Sloof Beton m3 1.01 5,006,754.00 5,046,808.03
4 Pek. Kolom Beton m3 0.78 5,445,994.00 4,234,804.93
5 Pek. Ring Balk & Kuda - Kuda Beton m3 1.39 5,006,754.00 6,975,409.67
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 3.45 930,415.00 3,211,271.55
7 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 8.00 157,862.00 1,262,896.00
8 Pek. Pasangan Dinding Batako 1 : 4 m2 110.02 157,862.00 17,367,187.93
Jumlah Sub. B.III 49,112,533.12
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 214.39 48,338.00 10,363,183.82
2 Acian Dinding Luar Dalam m2 214.39 21,572.80 4,624,992.59
Jumlah Sub. B.IV 14,988,176.41
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 70.51 241,188.00 17,007,227.11
Jumlah Sub. B.V 17,007,227.11
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 0.54 6,589,000.00 3,526,749.07
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 2.88 669,000.00 1,924,713.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 4.87 275,890.00 1,343,694.66
4 Pek. Kaca Polos 3 mm m2 10.29 248,947.50 2,560,773.56
Jumlah Sub. B.VI 9,355,930.29
HARGA JUMLAH
NO JENIS PEKERJAAN SAT. VOLUME
SATUAN HARGA (Rp)
1 2 3 4 5 6
VII PEKERJAAN ATAP DAN PLAFOND
1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 0.504 5,603,580.00 2,823,487.06
2 Pek. Gording Ky 5/10 kls 2 m3 0.95 4,217,850.00 4,006,957.50
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 133.50 79,350.93 10,593,349.60
4 Pek, Bubungan Atap Zenk Licin m' 10.00 37,210.28 372,102.80
5 Pek. Lisplang Ky. Kls 1 m' 46.70 82,680.00 3,861,156.00
6 List tripleks standar m' 29.52 25,655.00 757,335.60
7 Pek. Rangka Plafond ky kls 2 m2 117.46 84,260.00 9,897,162.75
8 Pek Penutup Plafond Tripleks 3 mm m2 117.46 43,312.50 5,087,477.59
Jumlah Sub. B.VII 37,399,028.90
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 214.39 26,358.00 5,650,891.62
2 Pek. Cat Lisplank Ky m2 14.01 46,395.00 649,993.95
3 Pek. Cat Plafond m2 117.46 26,358.00 3,096,005.41
4 Pek. Cat Kusen Pintu Jendela m2 16.35 46,395.00 758,780.95
5 Pek. Cat Daun Pintu/Jendela m2 15.49 46,395.00 718,881.25
Jumlah Sub. B.VIII 10,874,553.17
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 4.00 210,600.00 842,400.00
2 Pas. Stop Kontak bh 1.00 80,200.00 80,200.00
3 Pas. Saklar Ganda bh 1.00 80,200.00 80,200.00
4 Pas. Lampu Pijar SL 40 watt bh 2.00 135,200.00 270,400.00
5 Pas. Lampu Pijar SL 15 watt bh 2.00 130,200.00 260,400.00
Jumlah Sub. B.IX 1,533,600.00
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 1.00 233,990.00 233,990.00
2 Engsel Pintu bh 6.00 47,047.50 282,285.00
3 Engsel Jendela & Ventilasi bh 46.00 33,065.00 1,520,990.00
4 Grendel Pintu Tanam bh 1.00 46,030.00 46,030.00
5 Grendel Jendela & Ventilasi bh 23.00 46,030.00 1,058,690.00
6 Kait Angin Jendela & Ventilasi bh 23.00 33,047.50 760,092.50
Jumlah Sub. B.X 3,902,077.50
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00
2 Dokumentasi & Pelaporan ls 1.00 4,103,000.00 4,103,000.00
Jumlah Total Sub B.XI 5,103,000.00
GRAND TOTAL 157,740,773.03
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 15.00 450,000.00 6,750,000.00
2 Meja Kerja/Guru bh 1.00 2,000,000.00 2,000,000.00
3 Kursi Siswa Tunggal bh 15.00 350,000.00 5,250,000.00
4 Kursi Kerja/Guru bh 1.00 1,750,000.00 1,750,000.00
5 Papan Tulis White Board bh 1.00 1,000,000.00 1,000,000.00
Jumlah Total Sub XII 16,750,000.00
LAPORAN KEMAJUAN FISIK PEKERJAAN

PEKERJAAN : PEMBANGUNAN SATU RUANG RKB DAN PERABOT SD


LOKASI : SD NEGERI 7 LOLONG GUBA
KABUPATEN : BURU
TAHUN ANGGARAN : 2019

HARGA JUMLAH REALISASI VOLUME PEKERJAAN


BOBOT BOBOT Vol
NO JENIS PEKERJAAN SAT. VOLUME KONTRAK RENCANA Vol s/d
Vol s/d Tahapan
% % Bulan ini
Bulan ini % Saat ini
%
SATUAN HARGA (Rp) %
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 5,000,000.00 5,000,000.00 2.72 2.72 1.00 100 1.00
2 Survey, Rapat & Transportasi ls 1.00 2,500,000.00 2,500,000.00 1.36 1.36 1.00 100 1.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.06 0.06 2.00 100 2.00
Jumlah Sub. A.I 7,610,000.00
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 2,000,000.00 2,000,000.00 1.09 - - - -
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 700,000.00 700,000.00 0.38 - - - -
Jumlah Sub. A.II 2,700,000.00
GRAND TOTAL 10,310,000.00
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.54 0.54 1.00 100 1.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.14 0.14 1.00 100 1.00
3 Bouwplank ls 1.00 700,000.00 700,000.00 0.38 0.38 1.00 100 1.00
Jumlah Sub. B.I 1,950,000.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 23.93 37,200.00 890,289.00 0.48 0.48 23.93 100 23.93
2 Urugan Pasir Bawah Pondasi m3 1.35 376,900.00 508,815.00 0.28 0.28 1.35 100 1.35
3 Urugan Pasir bawah Lantai m3 3.45 376,900.00 1,300,847.74 0.71 0.71 3.45 100 3.45
4 Urugan Tanah kembali Bekas Galian m3 5.98 17,830.00 106,679.12 0.06 0.06 5.98 100 5.98
5 Urugan Tanah Bawah lantai m3 13.07 260,850.00 3,408,015.68 1.85 1.85 13.07 100 13.07
Jumlah Sub. B.II 6,214,646.54
HARGA JUMLAH REALISASI VOLUME PEKERJAAN
BOBOT BOBOT Vol
NO JENIS PEKERJAAN SAT. VOLUME KONTRAK RENCANA Vol s/d
Vol s/d Tahapan
% % Bulan ini
Bulan ini % Saat ini
%
SATUAN HARGA (Rp) %
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 2.70 602,030.00 1,625,481.00 0.88 0.88 2.70 100 2.70
2 Pek. Pondasi Batu Karang m3 9.21 1,061,780.00 9,778,993.80 5.32 5.32 9.21 100 9.21
3 Pek. Sloof Beton m3 1.01 4,988,134.00 5,028,039.07 2.74 2.74 1.01 100 1.01
4 Pek. Kolom Beton m3 0.78 5,429,194.00 4,221,741.25 2.30 2.30 0.78 100 0.78
5 Pek. Ring Balk & Kuda - Kuda Beton m3 1.39 4,988,134.00 6,949,468.29 3.78 3.78 1.39 100 1.39
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 3.45 986,315.00 3,404,207.04 1.85 1.85 3.45 100 3.45
7 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 8.00 184,789.00 1,478,312.00 0.80 0.80 8.00 100 8.00
8 Pek. Pasangan Dinding Batako 1 : 4 m2 110.02 184,789.00 20,329,561.84 11.06 11.06 110.02 100 110.02
Jumlah Sub. B.III 52,815,804.29
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 214.39 49,690.00 10,653,039.10 5.80 - - - -
2 Acian Dinding Luar Dalam m2 214.39 21,578.00 4,626,107.42 2.52 - - - -
Jumlah Sub. B.IV 15,279,146.52
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 70.51 251,188.00 17,712,371.11 9.64 - - - -
Jumlah Sub. B.V 17,712,371.11
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 0.54 6,589,000.00 3,526,749.07 1.92 1.92 0.54 100 0.54
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 2.88 669,000.00 1,924,713.00 1.05 - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 4.87 275,890.00 1,343,694.66 0.73 - - - -
4 Pek. Kaca Polos 3 mm m2 10.29 358,947.50 3,692,277.56 2.01 - - - -
Jumlah Sub. B.VI 10,487,434.29
VII PEKERJAAN ATAP DAN PLAFOND
1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 0.504 5,603,580.00 2,823,487.06 1.54 1.54 0.50 100 0.50
2 Pek. Gording Ky 5/10 kls 2 m3 0.95 3,942,850.00 3,745,707.50 2.04 2.04 0.95 100 0.95
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 133.50 79,350.93 10,593,349.60 5.76 - - - -
4 Pek, Bubungan Atap Zenk Licin m' 10.00 37,210.28 372,102.80 0.20 - - - -
5 Pek. Lisplang Ky. Kls 1 m' 46.70 82,680.00 3,861,156.00 2.10 - - - -
6 List tripleks standar m' 29.52 25,655.00 757,335.60 0.41 - - - -
7 Pek. Rangka Plafond ky kls 2 m2 117.46 81,260.00 9,544,783.35 5.19 - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 117.46 46,312.50 5,439,856.99 2.96 - - - -
Jumlah Sub. B.VII 37,137,778.90
HARGA JUMLAH REALISASI VOLUME PEKERJAAN
BOBOT BOBOT Vol
NO JENIS PEKERJAAN SAT. VOLUME KONTRAK RENCANA Vol s/d
Vol s/d Tahapan
% % Bulan ini
Bulan ini % Saat ini
%
SATUAN HARGA (Rp) %
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 214.39 26,358.00 5,650,891.62 3.07 - - - -
2 Pek. Cat Lisplank Ky m2 14.01 46,395.00 649,993.95 0.35 - - - -
3 Pek. Cat Plafond m2 117.46 26,358.00 3,096,005.41 1.68 - - - -
4 Pek. Cat Kusen Pintu Jendela m2 16.35 46,395.00 758,780.95 0.41 - - - -
5 Pek. Cat Daun Pintu/Jendela m2 15.49 46,395.00 718,881.25 0.39 - - - -
Jumlah Sub. B.VIII 10,874,553.17
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 4.00 210,600.00 842,400.00 0.46 - - - -
2 Pas. Stop Kontak bh 1.00 80,200.00 80,200.00 0.04 - - - -
3 Pas. Saklar Ganda bh 1.00 80,200.00 80,200.00 0.04 - - - -
4 Pas. Lampu Pijar SL 40 watt bh 2.00 135,200.00 270,400.00 0.15 - - - -
5 Pas. Lampu Pijar SL 15 watt bh 2.00 130,200.00 260,400.00 0.14 - - - -
Jumlah Sub. B.IX 1,533,600.00
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 1.00 233,990.00 233,990.00 0.13 - - - -
2 Engsel Pintu bh 6.00 47,047.50 282,285.00 0.15 - - - -
3 Engsel Jendela & Ventilasi bh 46.00 33,065.00 1,520,990.00 0.83 - - - -
4 Grendel Pintu Tanam bh 1.00 46,030.00 46,030.00 0.03 - - - -
5 Grendel Jendela & Ventilasi bh 23.00 46,030.00 1,058,690.00 0.58 - - - -
6 Kait Angin Jendela & Ventilasi bh 23.00 33,047.50 760,092.50 0.41 - - - -
Jumlah Sub. B.X 3,902,077.50
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.54 - - - -
2 Dokumentasi & Pelaporan ls 1.00 5,233,000.00 5,233,000.00 2.85 - - - -
Jumlah Total Sub B.XI 6,233,000.00
GRAND TOTAL 164,140,412.32
HARGA JUMLAH REALISASI VOLUME PEKERJAAN
BOBOT BOBOT Vol
NO JENIS PEKERJAAN SAT. VOLUME KONTRAK RENCANA Vol s/d
Vol s/d Tahapan
% % Bulan ini
Bulan ini % Saat ini
%
SATUAN HARGA (Rp) %
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 3.00 550,000.00 1,650,000.00 0.90 - - - -
2 Meja Kerja/Guru bh 1.00 2,000,000.00 2,000,000.00 1.09 - - - -
3 Kursi Siswa Tunggal bh 6.00 450,000.00 2,700,000.00 1.47 - - - -
4 Kursi Kerja/Guru bh 1.00 1,500,000.00 1,500,000.00 0.82 - - - -
5 Papan Tulis White Board bh 1.00 1,500,000.00 1,500,000.00 0.82 - - - -
Jumlah Total Sub XII 9,350,000.00
Grentotal Nilai Fisik 183,800,412.32
Jumlah Fisik Sampai Dengan Bulan ini % 100.00 42.81

Namlea, 19 Agustus 2019


Mengetahui, Dibuat Oleh,
Pejabat Pembuat Komitmen/PPK Tenaga Pengawas

DJUMADI SUKADI, SE AKSA PRAKASA


NIP. 19770401 200501 1 010
LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD BULAN : 01


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 10 Mei 2019 s/d 02 Juni 2019
KABUPATEN : BURU PROGRES : 1.988 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 - - 1.00 1.103 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 - - 1.00 0.858 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 - - 2.00 0.027 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 - 1.988 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 - - - - - - - -
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 6,000,000.00 1.471 - - - -
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 - - - - - - - -
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
JUMLAH 2,250,000.00 0.552 - - - -
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 - - - - - - - -
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 - - - - - - - -
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 - - - - - - - -
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 - - - -
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 - - - - - - - -
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 - - - - - - - -
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 - - - - - - - -
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 - - - - - - - -
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - - - - - - -
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - - - - -
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 - - - - - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 - - - - - - - -


3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 - - - - - - - -
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - - - - - - -
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - - - - - - -
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 - - - -
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 8,110,000.00 1.988

PPN 10% 40,787,579.24 811,000.00

GRAND TOTAL 448,663,371.62 8,921,000.00

PEMBULATAN 448,600,000.00 8,900,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD MINGGU : 01


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 10 Mei 2019 s/d 12 Mei 2019
KABUPATEN : BURU PROGRES : 1.532 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 - - 1.00 1.103 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 - - 0.50 0.429 0.50 1,750,000.00 0.429 50.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 - - - - - - - -
JUMLAH 8,110,000.00 1.988 - 1.532 6,250,000.00 1.532
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 - - - - - - - -
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 6,000,000.00 1.471 - - - -
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 - - - - - - - -
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
JUMLAH 2,250,000.00 0.552 - - - -
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 - - - - - - - -
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 - - - - - - - -
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 - - - - - - - -
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 - - - -
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 - - - - - - - -
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 - - - - - - - -
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 - - - - - - - -
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 - - - - - - - -
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - - - - - - -
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - - - - -
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 - - - - - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 - - - - - - - -


3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 - - - - - - - -
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - - - - - - -
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - - - - - - -
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 - - - -
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 6,250,000.00 1.532

PPN 10% 40,787,579.24 625,000.00

GRAND TOTAL 448,663,371.62 6,875,000.00

PEMBULATAN 448,600,000.00 6,800,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD MINGGU : 02


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 13 Mei 2019 s/d 19 Mei 2019
KABUPATEN : BURU PROGRES : 1.961 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 0.50 0.429 0.50 0.429 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 - - - - - - - -
JUMLAH 8,110,000.00 1.988 1.532 0.429 8,000,000.00 1.961
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 - - - - - - - -
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 6,000,000.00 1.471 - - - -
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 - - - - - - - -
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
JUMLAH 2,250,000.00 0.552 - - - -
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 - - - - - - - -
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 - - - - - - - -
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 - - - - - - - -
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 - - - -
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 - - - - - - - -
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 - - - - - - - -
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 - - - - - - - -
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 - - - - - - - -
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - - - - - - -
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - - - - -
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 - - - - - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 - - - - - - - -


3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 - - - - - - - -
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - - - - - - -
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - - - - - - -
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 - - - -
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 8,000,000.00 1.961

PPN 10% 40,787,579.24 800,000.00

GRAND TOTAL 448,663,371.62 8,800,000.00

PEMBULATAN 448,600,000.00 8,800,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD MINGGU : 03


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 20 Mei 2019 s/d 26 Mei 2019
KABUPATEN : BURU PROGRES : 1.975 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 - - 1.00 0.013 1.00 55,000.00 0.013 50.00
JUMLAH 8,110,000.00 1.988 1.961 0.013 8,055,000.00 1.975
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 - - - - - - - -
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 6,000,000.00 1.471 - - - -
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 - - - - - - - -
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
JUMLAH 2,250,000.00 0.552 - - - -
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 - - - - - - - -
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 - - - - - - - -
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 - - - - - - - -
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 - - - -
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 - - - - - - - -
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 - - - - - - - -
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 - - - - - - - -
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 - - - - - - - -
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - - - - - - -
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - - - - -
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 - - - - - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 - - - - - - - -


3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 - - - - - - - -
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - - - - - - -
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - - - - - - -
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 - - - -
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 8,055,000.00 1.975

PPN 10% 40,787,579.24 805,500.00

GRAND TOTAL 448,663,371.62 8,860,500.00

PEMBULATAN 448,600,000.00 8,800,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD MINGGU : 04


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 27 Mei 2019 s/d 02 Juni 2019
KABUPATEN : BURU PROGRES : 1.988 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 1.00 0.013 1.00 0.013 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.975 0.013 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 - - - - - - - -
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 6,000,000.00 1.471 - - - -
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 - - - - - - - -
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
JUMLAH 2,250,000.00 0.552 - - - -
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 - - - - - - - -
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 - - - - - - - -
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 - - - - - - - -
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 - - - -
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 - - - - - - - -
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 - - - - - - - -
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 - - - - - - - -
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 - - - - - - - -
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - - - - - - -
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - - - - -
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 - - - - - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 - - - - - - - -


3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 - - - - - - - -
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - - - - - - -
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - - - - - - -
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 - - - -
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 8,110,000.00 1.988

PPN 10% 40,787,579.24 811,000.00

GRAND TOTAL 448,663,371.62 8,921,000.00

PEMBULATAN 448,600,000.00 8,900,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD BULAN : 02


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 03 Juni 2019 s/d 30 Juni 2019
KABUPATEN : BURU PROGRES : 21.580 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 - - 0.31 0.339 0.31 1,384,615.38 0.339 30.77
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 - - 0.31 0.113 0.31 461,538.46 0.113 30.77
JUMLAH 6,000,000.00 1.471 - 0.453 1,846,153.85 0.453
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 - - 1.00 0.245 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 - - 1.00 0.061 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 - - 1.00 0.245 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 - 0.552 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 - - 41.90 0.382 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 - - 2.36 0.218 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 - - 10.48 0.046 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 - 0.646 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 - - 4.71 0.695 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 - - 16.12 7.608 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 - - 1.75 3.190 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 - - 1.29 2.556 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - 2.14 3.892 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - - 17.942 73,179,134.50 17.942
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 - - - - - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 - - - - - - - -


3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 - - - - - - - -
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - - - - - - -
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - - - - - - -
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 - - - -
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 88,018,389.17 21.580

PPN 10% 40,787,579.24 8,801,838.92

GRAND TOTAL 448,663,371.62 96,820,228.08

PEMBULATAN 448,600,000.00 96,800,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD MINGGU : 05


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 03 Juni 2019 s/d 09 Juni 2019
KABUPATEN : BURU PROGRES : 11.602 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 - - 0.08 0.085 0.08 346,153.85 0.085 7.69
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 - - 0.08 0.028 0.08 115,384.62 0.028 7.69
JUMLAH 6,000,000.00 1.471 - 0.113 461,538.46 0.113
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 - - 1.00 0.245 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 - - 1.00 0.061 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 - - 1.00 0.245 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 - 0.552 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 - - 41.90 0.382 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 - - 2.36 0.218 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 - - 10.48 0.046 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 - 0.646 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 - - 4.71 0.695 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 - - 16.12 7.608 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 - - - - - - - -
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 - - - - - - - -
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - - - - - - -
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - - 8.303 33,867,894.50 8.303
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 - - - - - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 - - - - - - - -


3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 - - - - - - - -
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - - - - - - -
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - - - - - - -
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 - - - -
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 47,322,533.78 11.602

PPN 10% 40,787,579.24 4,732,253.38

GRAND TOTAL 448,663,371.62 52,054,787.16

PEMBULATAN 448,600,000.00 52,000,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD MINGGU : 06


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 10 Juni 2019 s/d 16 Juni 2019
KABUPATEN : BURU PROGRES : 17.462 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.08 0.085 0.08 0.085 0.15 692,307.69 0.170 15.38
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.08 0.028 0.08 0.028 0.15 230,769.23 0.057 15.38
JUMLAH 6,000,000.00 1.471 0.113 0.113 923,076.92 0.226
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 - - 1.75 3.190 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 - - 1.29 2.556 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - - - - - - -
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - 8.303 5.746 57,306,077.43 14.050
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 - - - - - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 - - - - - - - -


3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 - - - - - - - -
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - - - - - - -
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - - - - - - -
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 - - - -
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 71,222,255.18 17.462

PPN 10% 40,787,579.24 7,122,225.52

GRAND TOTAL 448,663,371.62 78,344,480.70

PEMBULATAN 448,600,000.00 78,300,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD MINGGU : 06


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 10 Juni 2019 s/d 16 Juni 2019
KABUPATEN : BURU PROGRES : 17.575 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.15 0.170 0.08 0.085 0.23 1,038,461.54 0.255 23.08
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.15 0.057 0.08 0.028 0.23 346,153.85 0.085 23.08
JUMLAH 6,000,000.00 1.471 0.226 0.113 1,384,615.38 0.339
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - - - - - - -
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - 14.050 - 57,306,077.43 14.050
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 - - - - - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 - - - - - - - -


3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 - - - - - - - -
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - - - - - - -
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - - - - - - -
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 - - - -
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 71,683,793.64 17.575

PPN 10% 40,787,579.24 7,168,379.36

GRAND TOTAL 448,663,371.62 78,852,173.01

PEMBULATAN 448,600,000.00 78,800,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD MINGGU : 08


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 24 Juni 2019 s/d 30 Juni 2019
KABUPATEN : BURU PROGRES : 21.580 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.23 0.255 0.08 0.085 0.31 1,384,615.38 0.339 30.77
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.23 0.085 0.08 0.028 0.31 461,538.46 0.113 30.77
JUMLAH 6,000,000.00 1.471 0.339 0.113 1,846,153.85 0.453
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - 2.14 3.892 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - 14.050 3.892 73,179,134.50 17.942
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 - - - - - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 - - - - - - - -


3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 - - - - - - - -
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - - - - - - -
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - - - - - - -
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 - - - -
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 88,018,389.17 21.580

PPN 10% 40,787,579.24 8,801,838.92

GRAND TOTAL 448,663,371.62 96,820,228.08

PEMBULATAN 448,600,000.00 96,800,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD BULAN : 03


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 01 Juli 2019 s/d 28 Juli 2019
KABUPATEN : BURU PROGRES : 60.951 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.31 0.339 0.31 0.339 0.62 2,769,230.77 0.679 61.54
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.31 0.113 0.31 0.113 0.62 923,076.92 0.226 61.54
JUMLAH 6,000,000.00 1.471 0.453 0.453 3,692,307.69 0.905
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - 6.91 3.604 6.91 14,698,225.04 3.604 100.00
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - 2.51 1.309 2.51 5,337,921.47 1.309 100.00
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - 14.00 0.903 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - 176.13 11.367 176.13 46,362,696.02 11.367 100.00
JUMLAH 143,263,113.02 35.124 - 17.942 17.183 143,263,113.02 35.124
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - 341.68 6.471 341.68 26,394,780.00 6.471 100.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - 6.471 26,394,780.00 6.471
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - 1.07 1.729 1.07 7,053,498.14 1.729 100.00
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - 5.75 0.944 5.75 3,849,426.00 0.944 100.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - 9.74 0.659 9.74 2,687,389.31 0.659 100.00
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - 20.57 1.810 20.57 7,384,555.13 1.810 100.00
JUMLAH 20,974,868.58 5.142 - 5.142 20,974,868.58 5.142
KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 - - 1.26 1.731 1.26 7,058,717.65 1.731 100.00
KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gor m3 1.52 3,942,850.00 5,993,132.00 1.469 - - 1.52 1.469 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 - - 240.30 7.236 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - 16.00 0.146 16.00 595,364.48 0.146 100.00
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - 62.70 1.271 62.70 5,184,036.00 1.271 100.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Ran m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 - 10.122 41,286,936.76 10.122
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 252,134,465.71 60.951

PPN 10% 40,787,579.24 25,213,446.57

GRAND TOTAL 448,663,371.62 277,347,912.28

PEMBULATAN 448,600,000.00 277,300,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD MINGGU : 09


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 01 Juli 2019 s/d 07 Juli 2019
KABUPATEN : BURU PROGRES : 30.398 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.31 0.339 0.08 0.085 0.38 1,730,769.23 0.424 38.46
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.31 0.113 0.08 0.028 0.38 576,923.08 0.141 38.46
JUMLAH 6,000,000.00 1.471 0.453 0.113 2,307,692.31 0.566
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - 17.942 - 73,179,134.50 17.942
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 - - 1.26 1.731 1.26 7,058,717.65 1.731 100.00
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 - - 1.52 1.469 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 - - 240.30 7.236 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - - - - - - -
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - - - - - - -
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 - 8.705 35,507,536.28 8.705
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 127,516,822.74 30.398

PPN 10% 40,787,579.24 12,751,682.27

GRAND TOTAL 448,663,371.62 140,268,505.01

PEMBULATAN 448,600,000.00 140,200,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD MINGGU : 10


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 08 Juli 2019 s/d 14 Juli 2019
KABUPATEN : BURU PROGRES : 40.063 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.38 0.424 0.08 0.085 0.46 2,076,923.08 0.509 46.15
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.38 0.141 0.08 0.028 0.46 692,307.69 0.170 46.15
JUMLAH 6,000,000.00 1.471 0.566 0.113 2,769,230.77 0.679
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - 14.00 0.903 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - 134.00 8.648 134.00 35,272,016.00 8.648 76.08
JUMLAH 143,263,113.02 35.124 - 17.942 9.551 112,136,286.50 27.493
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 1.26 1.731 - - 1.26 7,058,717.65 1.731 100.00
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 1.52 1.469 - - 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 240.30 7.236 - - 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - - - - - - -
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - - - - - - -
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 8.705 - 35,507,536.28 8.705
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 166,935,513.20 40.063

PPN 10% 40,787,579.24 16,693,551.32

GRAND TOTAL 448,663,371.62 183,629,064.52

PEMBULATAN 448,600,000.00 183,600,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD MINGGU : 11


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 15 Juli 2019 s/d 21 Juli 2019
KABUPATEN : BURU PROGRES : 50.880 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.46 0.509 0.08 0.085 0.54 2,423,076.92 0.594 53.85
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.46 0.170 0.08 0.028 0.54 807,692.31 0.198 53.85
JUMLAH 6,000,000.00 1.471 0.679 0.113 3,230,769.23 0.792
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 14.00 0.903 - - 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 134.00 8.648 42.13 2.719 176.13 46,362,696.02 11.367 100.00
JUMLAH 143,263,113.02 35.124 - 27.493 2.719 123,226,966.52 30.212
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - 170.84 3.236 170.84 13,197,390.00 3.236 50.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - 3.236 13,197,390.00 3.236
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - 1.07 1.729 1.07 7,053,498.14 1.729 100.00
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - 5.75 0.944 5.75 3,849,426.00 0.944 100.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - 9.74 0.659 9.74 2,687,389.31 0.659 100.00
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - 3.332 13,590,313.46 3.332
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 1.26 1.731 - - 1.26 7,058,717.65 1.731 100.00
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 1.52 1.469 - - 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 240.30 7.236 - - 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - 16.00 0.146 16.00 595,364.48 0.146 100.00
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - 62.70 1.271 62.70 5,184,036.00 1.271 100.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Ran m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 8.705 1.417 41,286,936.76 10.122
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 211,054,835.61 50.880

PPN 10% 40,787,579.24 21,105,483.56

GRAND TOTAL 448,663,371.62 232,160,319.17

PEMBULATAN 448,600,000.00 232,100,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD MINGGU : 12


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 22 Juli 2019 s/d 28 Juli 2019
KABUPATEN : BURU PROGRES : 60.951 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.54 0.594 0.08 0.085 0.62 2,769,230.77 0.679 61.54
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.54 0.198 0.08 0.028 0.62 923,076.92 0.226 61.54
JUMLAH 6,000,000.00 1.471 0.792 0.113 3,692,307.69 0.905
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - 6.91 3.604 6.91 14,698,225.04 3.604 100.00
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - 2.51 1.309 2.51 5,337,921.47 1.309 100.00
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 14.00 0.903 - - 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 176.13 11.367 - - 176.13 46,362,696.02 11.367 100.00
JUMLAH 143,263,113.02 35.124 - 30.212 4.912 143,263,113.02 35.124
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 170.84 3.236 170.84 3.236 341.68 26,394,780.00 6.471 100.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 3.236 3.236 26,394,780.00 6.471
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 1.07 1.729 - - 1.07 7,053,498.14 1.729 100.00
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 5.75 0.944 - - 5.75 3,849,426.00 0.944 100.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 9.74 0.659 - - 9.74 2,687,389.31 0.659 100.00
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - 20.57 1.810 20.57 7,384,555.13 1.810 100.00
JUMLAH 20,974,868.58 5.142 3.332 1.810 20,974,868.58 5.142
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 1.26 1.731 - - 1.26 7,058,717.65 1.731 100.00
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gor m3 1.52 3,942,850.00 5,993,132.00 1.469 1.52 1.469 - - 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 240.30 7.236 - - 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 16.00 0.146 - - 16.00 595,364.48 0.146 100.00
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 62.70 1.271 - - 62.70 5,184,036.00 1.271 100.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Ran m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 10.122 - 41,286,936.76 10.122
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 252,134,465.71 60.951

PPN 10% 40,787,579.24 25,213,446.57

GRAND TOTAL 448,663,371.62 277,347,912.28

PEMBULATAN 448,600,000.00 277,300,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD BULAN : 04


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 29 Juli 2019 s/d 03 September 2019
KABUPATEN : BURU PROGRES : 76.69 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 - - - - - - - -
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 - - - - - - - -
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 - - - - - - - -
JUMLAH 8,110,000.00 1.988 - - - -
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.38 0.424 0.31 0.339 0.69 3,115,384.62 0.764 69.23
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.38 0.141 0.31 0.113 0.69 1,038,461.54 0.255 69.23
JUMLAH 6,000,000.00 1.471 0.566 0.453 4,153,846.15 1.018
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 - - - - - - - -
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
JUMLAH 2,250,000.00 0.552 - - - -
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 - - - - - - - -
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 - - - - - - - -
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 10.62 0.981 - - 10.62 4,002,512.16 0.981 100.00
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 - - - - - - - -
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 26.16 1.673 - - 26.16 6,824,858.53 1.673 100.00
JUMLAH 13,460,471.52 3.300 2.655 - 10,827,370.70 2.655
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 - - - - - - - -
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 - - - - - - - -
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 - - - - - - - -
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 - - - - - - - -
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - - - - - - -
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - 6.91 3.604 6.91 14,698,225.04 3.604 100.00
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - 2.51 1.309 2.51 5,337,921.47 1.309 100.00
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - 14.00 0.903 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - 176.13 11.367 176.13 46,362,696.02 11.367 100.00
JUMLAH 143,263,113.02 35.124 - - 17.183 70,083,978.52 17.183
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - 341.68 6.471 341.68 26,394,780.00 6.471 100.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 341.68 1.816 - - 341.68 7,408,989.12 1.816 100.00
JUMLAH 33,803,769.12 8.288 1.816 6.471 33,803,769.12 8.288
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 140.73 9.874 - - 140.73 40,274,893.81 9.874 100.00
JUMLAH 40,274,893.81 9.874 9.874 - 40,274,893.81 9.874
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - 1.07 1.729 1.07 7,053,498.14 1.729 100.00
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - 5.75 0.944 5.75 3,849,426.00 0.944 100.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - 9.74 0.659 9.74 2,687,389.31 0.659 100.00
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - 20.57 1.810 20.57 7,384,555.13 1.810 100.00
JUMLAH 20,974,868.58 5.142 - 5.142 20,974,868.58 5.142
KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 - - 1.26 1.731 1.26 7,058,717.65 1.731 100.00
KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gor m3 1.52 3,942,850.00 5,993,132.00 1.469 - - 1.52 1.469 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 - - 240.30 7.236 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - 16.00 0.146 16.00 595,364.48 0.146 100.00
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - 62.70 1.271 62.70 5,184,036.00 1.271 100.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 95.04 0.598 - - 95.04 2,438,251.20 0.598 100.00
7 Pek. Ran m2 206.05 81,260.00 16,743,249.20 4.105 206.05 4.105 - - 206.05 16,743,249.20 4.105 100.00
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 206.05 3.846 - - 206.05 15,685,206.08 3.846 100.00
JUMLAH 83,212,360.89 20.401 8.548 10.122 76,153,643.24 18.671
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 341.68 2.208 - - 341.68 9,006,001.44 2.208 100.00
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 18.81 0.214 - - 18.81 872,689.95 0.214 100.00
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 206.05 1.332 - - 206.05 5,430,944.65 1.332 100.00
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 32.71 0.372 - - 32.71 1,517,561.89 0.372 100.00
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 30.99 0.353 - - 30.99 1,437,762.49 0.353 100.00
JUMLAH 18,264,960.43 4.478 4.478 - 18,264,960.43 4.478
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 8.00 0.413 - - 8.00 1,684,800.00 0.413 100.00
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 2.00 0.039 - - 2.00 160,400.00 0.039 100.00
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 2.00 0.039 - - 2.00 160,400.00 0.039 100.00
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 4.00 0.133 - - 4.00 540,800.00 0.133 100.00
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 4.00 0.128 - - 4.00 520,800.00 0.128 100.00
JUMLAH 3,067,200.00 0.752 0.752 - 3,067,200.00 0.752 100.00
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 2.00 0.115 - - 2.00 467,980.00 0.115 100.00
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 12.00 0.138 - - 12.00 564,570.00 0.138 100.00
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 92.00 0.746 - - 92.00 3,041,980.00 0.746 100.00
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 2.00 0.023 - - 2.00 92,060.00 0.023 100.00
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 46.00 0.519 - - 46.00 2,117,380.00 0.519 100.00
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 46.00 0.373 - - 46.00 1,520,185.00 0.373 100.00
JUMLAH 7,804,155.00 1.913 1.913 - 7,804,155.00 1.913
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 1.00 1.076 - - 1.00 4,390,000.00 1.076 100.00
JUMLAH 5,390,000.00 1.321 1.321 - 5,390,000.00 1.321
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 20.00 2.452 - - 20.00 10,000,000.00 2.452 100.00
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 2.00 0.490 - - 2.00 2,000,000.00 0.490 100.00
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 20.00 1.716 - - 20.00 7,000,000.00 1.716 100.00
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 2.00 0.368 - - 2.00 1,500,000.00 0.368 100.00
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 2.00 0.368 - - 2.00 1,500,000.00 0.368 100.00
JUMLAH 22,000,000.00 5.394 5.394 - 22,000,000.00 5.394
TOTAL 407,875,792.38 100.000 316,328,044.38 76.690

PPN 10% 40,787,579.24 31,632,804.44

GRAND TOTAL 448,663,371.62 347,960,848.82

PEMBULATAN 448,600,000.00 347,900,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD MINGGU : 13


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 29 Juli 2019 s/d 04 Agustus 2019
KABUPATEN : BURU PROGRES : 64.794 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.62 0.679 0.08 0.085 0.69 3,115,384.62 0.764 69.23
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.62 0.226 0.08 0.028 0.69 1,038,461.54 0.255 69.23
JUMLAH 6,000,000.00 1.471 0.905 0.113 4,153,846.15 1.018
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 6.91 3.604 - - 6.91 14,698,225.04 3.604 100.00
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 2.51 1.309 - - 2.51 5,337,921.47 1.309 100.00
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 14.00 0.903 - - 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 176.13 11.367 - - 176.13 46,362,696.02 11.367 100.00
JUMLAH 143,263,113.02 35.124 - 35.124 - 143,263,113.02 35.124
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 341.68 6.471 - - 341.68 26,394,780.00 6.471 100.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - 341.68 1.816 341.68 7,408,989.12 1.816 100.00
JUMLAH 33,803,769.12 8.288 6.471 1.816 33,803,769.12 8.288
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 1.07 1.729 - - 1.07 7,053,498.14 1.729 100.00
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 5.75 0.944 - - 5.75 3,849,426.00 0.944 100.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 9.74 0.659 - - 9.74 2,687,389.31 0.659 100.00
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 20.57 1.810 - - 20.57 7,384,555.13 1.810 100.00
JUMLAH 20,974,868.58 5.142 5.142 - 20,974,868.58 5.142
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 1.26 1.731 - - 1.26 7,058,717.65 1.731 100.00
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 1.52 1.469 - - 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 240.30 7.236 - - 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 16.00 0.146 - - 16.00 595,364.48 0.146 100.00
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 62.70 1.271 - - 62.70 5,184,036.00 1.271 100.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 10.122 - 41,286,936.76 10.122
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - 2.00 0.115 2.00 467,980.00 0.115 100.00
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - 12.00 0.138 12.00 564,570.00 0.138 100.00
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - 92.00 0.746 92.00 3,041,980.00 0.746 100.00
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - 2.00 0.023 2.00 92,060.00 0.023 100.00
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - 46.00 0.519 46.00 2,117,380.00 0.519 100.00
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - 46.00 0.373 46.00 1,520,185.00 0.373 100.00
JUMLAH 7,804,155.00 1.913 - 1.913 7,804,155.00 1.913
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 267,809,148.29 64.794

PPN 10% 40,787,579.24 26,780,914.83

GRAND TOTAL 448,663,371.62 294,590,063.12

PEMBULATAN 448,600,000.00 294,500,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD MINGGU : 14


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 05 Agustus 2019 s/d 11 Agustus 2019
KABUPATEN : BURU PROGRES : 69.012 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.69 0.764 0.08 0.085 0.77 3,461,538.46 0.849 76.92
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.69 0.255 0.08 0.028 0.77 1,153,846.15 0.283 76.92
JUMLAH 6,000,000.00 1.471 1.018 0.113 4,615,384.62 1.132
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 6.91 3.604 - - 6.91 14,698,225.04 3.604 100.00
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 2.51 1.309 - - 2.51 5,337,921.47 1.309 100.00
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 14.00 0.903 - - 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 176.13 11.367 - - 176.13 46,362,696.02 11.367 100.00
JUMLAH 143,263,113.02 35.124 - 35.124 - 143,263,113.02 35.124
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 341.68 6.471 - - 341.68 26,394,780.00 6.471 100.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 341.68 1.816 - - 341.68 7,408,989.12 1.816 100.00
JUMLAH 33,803,769.12 8.288 8.288 - 33,803,769.12 8.288
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 1.07 1.729 - - 1.07 7,053,498.14 1.729 100.00
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 5.75 0.944 - - 5.75 3,849,426.00 0.944 100.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 9.74 0.659 - - 9.74 2,687,389.31 0.659 100.00
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 20.57 1.810 - - 20.57 7,384,555.13 1.810 100.00
JUMLAH 20,974,868.58 5.142 5.142 - 20,974,868.58 5.142
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 1.26 1.731 - - 1.26 7,058,717.65 1.731 100.00
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 1.52 1.469 - - 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 240.30 7.236 - - 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 16.00 0.146 - - 16.00 595,364.48 0.146 100.00
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 62.70 1.271 - - 62.70 5,184,036.00 1.271 100.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 - - 206.05 4.105 206.05 16,743,249.20 4.105 100.00
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 10.122 4.105 58,030,185.96 14.227
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 2.00 0.115 - - 2.00 467,980.00 0.115 100.00
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 12.00 0.138 - - 12.00 564,570.00 0.138 100.00
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 92.00 0.746 - - 92.00 3,041,980.00 0.746 100.00
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 2.00 0.023 - - 2.00 92,060.00 0.023 100.00
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 46.00 0.519 - - 46.00 2,117,380.00 0.519 100.00
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 46.00 0.373 - - 46.00 1,520,185.00 0.373 100.00
JUMLAH 7,804,155.00 1.913 1.913 - 7,804,155.00 1.913
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 285,013,935.95 69.012

PPN 10% 40,787,579.24 28,501,393.60

GRAND TOTAL 448,663,371.62 313,515,329.55

PEMBULATAN 448,600,000.00 313,500,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD MINGGU : 15


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 12 Agustus 2019 s/d 18 Agustus 2019
KABUPATEN : BURU PROGRES : 71.348 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.77 0.849 0.08 0.085 0.85 3,807,692.31 0.934 84.62
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.77 0.283 0.08 0.028 0.85 1,269,230.77 0.311 84.62
JUMLAH 6,000,000.00 1.471 1.132 0.113 5,076,923.08 1.245
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 6.91 3.604 - - 6.91 14,698,225.04 3.604 100.00
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 2.51 1.309 - - 2.51 5,337,921.47 1.309 100.00
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 14.00 0.903 - - 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 176.13 11.367 - - 176.13 46,362,696.02 11.367 100.00
JUMLAH 143,263,113.02 35.124 - 35.124 - 143,263,113.02 35.124
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 341.68 6.471 - - 341.68 26,394,780.00 6.471 100.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 341.68 1.816 - - 341.68 7,408,989.12 1.816 100.00
JUMLAH 33,803,769.12 8.288 8.288 - 33,803,769.12 8.288
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 1.07 1.729 - - 1.07 7,053,498.14 1.729 100.00
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 5.75 0.944 - - 5.75 3,849,426.00 0.944 100.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 9.74 0.659 - - 9.74 2,687,389.31 0.659 100.00
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 20.57 1.810 - - 20.57 7,384,555.13 1.810 100.00
JUMLAH 20,974,868.58 5.142 5.142 - 20,974,868.58 5.142
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 1.26 1.731 - - 1.26 7,058,717.65 1.731 100.00
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 1.52 1.469 - - 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 240.30 7.236 - - 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 16.00 0.146 - - 16.00 595,364.48 0.146 100.00
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 62.70 1.271 - - 62.70 5,184,036.00 1.271 100.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 206.05 4.105 - - 206.05 16,743,249.20 4.105 100.00
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 15.958 - 58,030,185.96 15.958
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - 8.00 0.413 8.00 1,684,800.00 0.413 100.00
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - 2.00 0.039 2.00 160,400.00 0.039 100.00
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - 2.00 0.039 2.00 160,400.00 0.039 100.00
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - 0.492 2,005,600.00 0.492 65.39
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 2.00 0.115 - - 2.00 467,980.00 0.115 100.00
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 12.00 0.138 - - 12.00 564,570.00 0.138 100.00
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 92.00 0.746 - - 92.00 3,041,980.00 0.746 100.00
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 2.00 0.023 - - 2.00 92,060.00 0.023 100.00
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 46.00 0.519 - - 46.00 2,117,380.00 0.519 100.00
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 46.00 0.373 - - 46.00 1,520,185.00 0.373 100.00
JUMLAH 7,804,155.00 1.913 1.913 - 7,804,155.00 1.913
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 287,481,074.42 71.348

PPN 10% 40,787,579.24 28,748,107.44

GRAND TOTAL 448,663,371.62 316,229,181.86

PEMBULATAN 448,600,000.00 316,200,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD MINGGU : 16


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 19 Agustus 2019 s/d 25 Agustus 2019
KABUPATEN : BURU PROGRES : 88.693 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.85 0.934 0.08 0.085 0.92 4,153,846.15 1.018 92.31
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.85 0.311 0.08 0.028 0.92 1,384,615.38 0.339 92.31
JUMLAH 6,000,000.00 1.471 1.245 0.113 5,538,461.54 1.358
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - 10.62 0.981 10.62 4,002,512.16 0.981 100.00
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - 26.16 1.673 26.16 6,824,858.53 1.673 100.00
JUMLAH 13,460,471.52 3.300 0.646 2.655 13,460,471.52 3.300
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 6.91 3.604 - - 6.91 14,698,225.04 3.604 100.00
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 2.51 1.309 - - 2.51 5,337,921.47 1.309 100.00
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 14.00 0.903 - - 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 176.13 11.367 - - 176.13 46,362,696.02 11.367 100.00
JUMLAH 143,263,113.02 35.124 - 35.124 - 143,263,113.02 35.124
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 341.68 6.471 - - 341.68 26,394,780.00 6.471 100.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 341.68 1.816 - - 341.68 7,408,989.12 1.816 100.00
JUMLAH 33,803,769.12 8.288 8.288 - 33,803,769.12 8.288
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - 140.73 9.874 140.73 40,274,893.81 9.874 100.00
JUMLAH 40,274,893.81 9.874 - 9.874 40,274,893.81 9.874
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 1.07 1.729 - - 1.07 7,053,498.14 1.729 100.00
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 5.75 0.944 - - 5.75 3,849,426.00 0.944 100.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 9.74 0.659 - - 9.74 2,687,389.31 0.659 100.00
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 20.57 1.810 - - 20.57 7,384,555.13 1.810 100.00
JUMLAH 20,974,868.58 5.142 5.142 - 20,974,868.58 5.142
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 1.26 1.731 - - 1.26 7,058,717.65 1.731 100.00
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 1.52 1.469 - - 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 240.30 7.236 - - 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 16.00 0.146 - - 16.00 595,364.48 0.146 100.00
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 62.70 1.271 - - 62.70 5,184,036.00 1.271 100.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - 95.04 0.598 95.04 2,438,251.20 0.598 100.00
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 206.05 4.105 - - 206.05 16,743,249.20 4.105 100.00
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - 206.05 3.846 206.05 15,685,206.08 3.846 100.00
JUMLAH 83,212,360.89 20.401 15.958 4.443 76,153,643.24 20.401
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 8.00 0.413 - - 8.00 1,684,800.00 0.413 100.00
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 2.00 0.039 - - 2.00 160,400.00 0.039 100.00
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 2.00 0.039 - - 2.00 160,400.00 0.039 100.00
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - 4.00 0.133 4.00 540,800.00 0.133 100.00
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - 4.00 0.128 4.00 520,800.00 0.128 100.00
JUMLAH 3,067,200.00 0.752 0.492 0.260 3,067,200.00 0.752 100.00
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 2.00 0.115 - - 2.00 467,980.00 0.115 100.00
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 12.00 0.138 - - 12.00 564,570.00 0.138 100.00
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 92.00 0.746 - - 92.00 3,041,980.00 0.746 100.00
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 2.00 0.023 - - 2.00 92,060.00 0.023 100.00
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 46.00 0.519 - - 46.00 2,117,380.00 0.519 100.00
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 46.00 0.373 - - 46.00 1,520,185.00 0.373 100.00
JUMLAH 7,804,155.00 1.913 1.913 - 7,804,155.00 1.913
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 358,229,934.66 88.693

PPN 10% 40,787,579.24 35,822,993.47

GRAND TOTAL 448,663,371.62 394,052,928.13

PEMBULATAN 448,600,000.00 394,000,000.00


LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN DUA RUANG RKB DAN PERABOT SD MINGGU : 17


LOKASI : SD NEGERI 15 LOLONG GUBA PERIODE : 26 Agustus 2019 s/d 03 September 2019
KABUPATEN : BURU PROGRES : 100.000 %
TAHUN ANGGARAN : 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA
(Rp) VOLUME VOLUME VOLUME BOBOT (%) PENYELES
(%) (%) (Rp)
AIAN

A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.92 1.018 0.08 0.085 1.00 4,500,000.00 1.103 100.00
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.92 0.339 0.08 0.028 1.00 1,500,000.00 0.368 100.00
JUMLAH 6,000,000.00 1.471 1.358 0.113 6,000,000.00 1.471
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 10.62 0.981 - - 10.62 4,002,512.16 0.981 100.00
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 26.16 1.673 - - 26.16 6,824,858.53 1.673 100.00
JUMLAH 13,460,471.52 3.300 3.300 - 13,460,471.52 3.300
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 6.91 3.604 - - 6.91 14,698,225.04 3.604 100.00
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 2.51 1.309 - - 2.51 5,337,921.47 1.309 100.00
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 14.00 0.903 - - 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 176.13 11.367 - - 176.13 46,362,696.02 11.367 100.00
JUMLAH 143,263,113.02 35.124 - 35.124 - 143,263,113.02 35.124
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 341.68 6.471 - - 341.68 26,394,780.00 6.471 100.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 341.68 1.816 - - 341.68 7,408,989.12 1.816 100.00
JUMLAH 33,803,769.12 8.288 8.288 - 33,803,769.12 8.288
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 140.73 9.874 - - 140.73 40,274,893.81 9.874 100.00
JUMLAH 40,274,893.81 9.874 9.874 - 40,274,893.81 9.874
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 1.07 1.729 - - 1.07 7,053,498.14 1.729 100.00
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 5.75 0.944 - - 5.75 3,849,426.00 0.944 100.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 9.74 0.659 - - 9.74 2,687,389.31 0.659 100.00
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 20.57 1.810 - - 20.57 7,384,555.13 1.810 100.00
JUMLAH 20,974,868.58 5.142 5.142 - 20,974,868.58 5.142
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA
(Rp) VOLUME VOLUME VOLUME BOBOT (%) PENYELES
(%) (%) (Rp)
AIAN

VII PEKERJAAN ATAP DAN PLAFOND


1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.26 5,603,580.00 7,058,717.65 1.731 1.26 1.731 - - 1.26 7,058,717.65 1.731 100.00
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA
(Rp) VOLUME VOLUME VOLUME BOBOT (%) PENYELES
(%) (%) (Rp)
AIAN

2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 1.52 1.469 - - 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 240.30 7.236 - - 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 16.00 0.146 - - 16.00 595,364.48 0.146 100.00
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 62.70 1.271 - - 62.70 5,184,036.00 1.271 100.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 95.04 0.598 - - 95.04 2,438,251.20 0.598 100.00
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 206.05 4.105 - - 206.05 16,743,249.20 4.105 100.00
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 206.05 3.846 - - 206.05 15,685,206.08 3.846 100.00
JUMLAH 83,212,360.89 20.401 20.401 - 76,153,643.24 20.401
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - 341.68 2.208 341.68 9,006,001.44 2.208 100.00
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - 18.81 0.214 18.81 872,689.95 0.214 100.00
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - 206.05 1.332 206.05 5,430,944.65 1.332 100.00
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - 32.71 0.372 32.71 1,517,561.89 0.372 100.00
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - 30.99 0.353 30.99 1,437,762.49 0.353 100.00
JUMLAH 18,264,960.43 4.478 - 4.478 18,264,960.43 4.478
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 8.00 0.413 - - 8.00 1,684,800.00 0.413 100.00
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 2.00 0.039 - - 2.00 160,400.00 0.039 100.00
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 2.00 0.039 - - 2.00 160,400.00 0.039 100.00
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 4.00 0.133 - - 4.00 540,800.00 0.133 100.00
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 4.00 0.128 - - 4.00 520,800.00 0.128 100.00
JUMLAH 3,067,200.00 0.752 0.752 - 3,067,200.00 0.752 100.00
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 2.00 0.115 - - 2.00 467,980.00 0.115 100.00
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 12.00 0.138 - - 12.00 564,570.00 0.138 100.00
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 92.00 0.746 - - 92.00 3,041,980.00 0.746 100.00
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 2.00 0.023 - - 2.00 92,060.00 0.023 100.00
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 46.00 0.519 - - 46.00 2,117,380.00 0.519 100.00
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 46.00 0.373 - - 46.00 1,520,185.00 0.373 100.00
JUMLAH 7,804,155.00 1.913 1.913 - 7,804,155.00 1.913
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - 1.00 0.245 1.00 1,000,000.00 0.245 100.00
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - 1.00 1.076 1.00 4,390,000.00 1.076 100.00
JUMLAH 5,390,000.00 1.321 - 1.321 5,390,000.00 1.321
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - 20.00 2.452 20.00 10,000,000.00 2.452 100.00
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - 2.00 0.490 2.00 2,000,000.00 0.490 100.00
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - 20.00 1.716 20.00 7,000,000.00 1.716 100.00
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - 2.00 0.368 2.00 1,500,000.00 0.368 100.00
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - 2.00 0.368 2.00 1,500,000.00 0.368 100.00
JUMLAH 22,000,000.00 5.394 - 5.394 22,000,000.00 5.394
TOTAL 407,875,792.38 100.000 404,346,433.55 100.000

PPN 10% 40,787,579.24 40,434,643.36

GRAND TOTAL 448,663,371.62 444,781,076.91

PEMBULATAN 448,600,000.00 444,700,000.00


LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 02
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 16 September 2019 s/d 22 September 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 1.00 Err:509 1.00 Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 1.00 Err:509 1.00 Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 2.00 Err:509 2.00 Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 0.06 Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 - Err:509 0.50 Err:509 0.50 2,250,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 - Err:509 0.50 Err:509 0.50 750,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


- Kuda-Kuda 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. PEKERJAAN ATAP, TALANG & LISPLANK
a. Penutup Atap
- Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Atap Sky Light M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Teritisan Keliling M² 1.00 250,000.00 250,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Main Gate M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pasang Insulator Panas M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Bubungan
- Nok Atap Utama M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Nok Atap Main Gate M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Flashing Atap Zincalume M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Pintu Toilet (PT1)


Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Spandrell M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN
- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau Setara Unit 1.52 3,942,850.00 5,993,132.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 240.30 122,823.16 29,514,404.28 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit 16.00 37,210.28 595,364.48 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Door Closer Unit 62.70 82,680.00 5,184,036.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau Setara Unit 206.05 81,260.00 16,743,249.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 206.05 76,125.00 15,685,206.08 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT
a. Plafond Gypsum
- Plafon Ruang Pengelola M² 341.68 26,358.00 9,006,001.44 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Ruang Musholla M² 18.81 46,395.00 872,689.95 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Kios M² 206.05 26,358.00 5,430,944.65 Err:509 - Err:509 - Err:509 - - Err:509 Err:509

b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 60x80 cm)
- COS 160A), 3 phasa Unit 2.00 233,990.00 467,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 60A ,10KA, 3 phasa Unit 12.00 47,047.50 564,570.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 80A ,10KA, 3 phasa Unit 92.00 33,065.00 3,041,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 40A , 3 phasa Unit 2.00 46,030.00 92,060.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 25A , 3 phasa Unit 46.00 46,030.00 2,117,380.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 16A , 3 phasa Unit 46.00 33,047.50 1,520,185.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCB 10A, 6kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 60A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 80A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
MCB 2A, 10kA, 1 phasa (posisi di meja
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
los)
B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY
a. Pekerjaan Kabel Toevoer

- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

b. Pekerjaan Kabel Tray Err:509 Err:509 Err:509


Pekerjaan Pengadaan + Pasang Kabel
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Tray
Pekerjaan Pengadaan Pipa Galvanis
- Sambungan dari Kabel Tray ke Instalasi M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Los
c. Pekerjaan Kabel Grounding Err:509
Pekerjaan Grounding, Nilai Maksimal = 1
- Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Ohm
XIII.2. PEKERJAAN INSTALASI
a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
Pengadaan + Penarikan Instalasi
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Penerangan Down Light, TL
Pengadaan + Penarikan Instalasi Stop
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kontak Normal (1 gang)
- Pengadaan + Penarikan Instalasi Saklar Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Armature
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Downlight
Pengadaan + Pasang Armature Lampu TL
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Emergency TL 2

- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86

- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


XIV. PEKERJAAN PLUMBING
a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air bersih
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay dari PDAM ke profil tank
Pengadaan + pemasangan pipa air bersih
- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke lavatory dan wudlu
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

Pengadaan + pemasangan pipa air bersih


- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay kran ke lavatory dan wudhu

Pengadaan + pemasangan pipa air bersih


- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke kran selasar
Pengadaan + pemasangan pipa air bersih
- supplay dari pipa 1" horisontal ke kran M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
selasar
Pengadaan + pemasangan pipa kuras /
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pembuangan dari profil tank
Pengadaan + pemasangan kran dinding
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1/2"
- Pengadaan + pemasangan washtafel Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengadaan + pemasangan stop kran
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran PVC
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1" posisi pada pompa Out
Pengadaan + pemasangan stop kran PVC
- 1" posisi pada pipa kuras/ pembuangan Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
profil tank
Pengadaan & Pemasangan Profil Tank
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2200 Liter
b. Pekerjaan Plumbing Air Kotor
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari parit los ke grease trap
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 4,390,000.00 4,390,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari grease trap ke Parit Keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
dari parit los ke parit keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
toilet dan wudhu ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
wastafel ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
meja los ke parit los
- Pengadaan + pemasangan floor drain Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Pekerjaan Plumbing Air Kotoran
Pengadaan + pemasangan pipa air
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
kotoran dari closet ke septictank
Pengadaan + pemasangan pipa udara
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank
Pengadaan + pemasangan pipa peresapan
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank

- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan Err:509
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
- Unit 8.00 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
(APAR)
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509 Err:509

PPN 10% Err:509 Err:509

GRAND TOTAL Err:509 Err:509

PEMBULATAN Err:509 Err:509

PROGRES RENCANA

PROGRES REALISASI

DEVIASI
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 03
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 23 September 2019 s/d 29 September 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.50 Err:509 0.25 Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 0.50 Err:509 0.50 Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali -
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof -
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting : -
a. Foot Plat -
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug -
a. Foot Plat -
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


- Kuda-Kuda 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. PEKERJAAN ATAP, TALANG & LISPLANK
a. Penutup Atap
- Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Atap Sky Light M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Teritisan Keliling M² 1.00 250,000.00 250,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Main Gate M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pasang Insulator Panas M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Bubungan
- Nok Atap Utama M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Nok Atap Main Gate M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Flashing Atap Zincalume M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 - Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1) -
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Pintu Toilet (PT1)


Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Spandrell M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN
- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau Setara Unit 1.52 3,942,850.00 5,993,132.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 240.30 122,823.16 29,514,404.28 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit 16.00 37,210.28 595,364.48 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Door Closer Unit 62.70 82,680.00 5,184,036.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau Setara Unit 206.05 81,260.00 16,743,249.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 206.05 76,125.00 15,685,206.08 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT
a. Plafond Gypsum
- Plafon Ruang Pengelola M² 341.68 26,358.00 9,006,001.44 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Ruang Musholla M² 18.81 46,395.00 872,689.95 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Kios M² 206.05 26,358.00 5,430,944.65 Err:509 - Err:509 - Err:509 - - Err:509 Err:509

b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 60x80 cm)
- COS 160A), 3 phasa Unit 2.00 233,990.00 467,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 60A ,10KA, 3 phasa Unit 12.00 47,047.50 564,570.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 80A ,10KA, 3 phasa Unit 92.00 33,065.00 3,041,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 40A , 3 phasa Unit 2.00 46,030.00 92,060.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 25A , 3 phasa Unit 46.00 46,030.00 2,117,380.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 16A , 3 phasa Unit 46.00 33,047.50 1,520,185.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCB 10A, 6kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 60A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 80A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
MCB 2A, 10kA, 1 phasa (posisi di meja
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
los)
B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY
a. Pekerjaan Kabel Toevoer

- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

b. Pekerjaan Kabel Tray Err:509 Err:509 -


Pekerjaan Pengadaan + Pasang Kabel
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Tray
Pekerjaan Pengadaan Pipa Galvanis
- Sambungan dari Kabel Tray ke Instalasi M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Los
c. Pekerjaan Kabel Grounding
Pekerjaan Grounding, Nilai Maksimal = 1
- Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Ohm
XIII.2. PEKERJAAN INSTALASI
a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
Pengadaan + Penarikan Instalasi
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Penerangan Down Light, TL
Pengadaan + Penarikan Instalasi Stop
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kontak Normal (1 gang)
- Pengadaan + Penarikan Instalasi Saklar Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Armature
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 -
Downlight
Pengadaan + Pasang Armature Lampu TL
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 -
1
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 -
Emergency TL 2

- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 -

- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 -
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 -
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86

- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


XIV. PEKERJAAN PLUMBING
a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air bersih
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay dari PDAM ke profil tank
Pengadaan + pemasangan pipa air bersih
- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke lavatory dan wudlu
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

Pengadaan + pemasangan pipa air bersih


- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay kran ke lavatory dan wudhu

Pengadaan + pemasangan pipa air bersih


- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke kran selasar
Pengadaan + pemasangan pipa air bersih
- supplay dari pipa 1" horisontal ke kran M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
selasar
Pengadaan + pemasangan pipa kuras /
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pembuangan dari profil tank
Pengadaan + pemasangan kran dinding
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1/2"
- Pengadaan + pemasangan washtafel Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengadaan + pemasangan stop kran
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran PVC
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1" posisi pada pompa Out
Pengadaan + pemasangan stop kran PVC
- 1" posisi pada pipa kuras/ pembuangan Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
profil tank
Pengadaan & Pemasangan Profil Tank
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2200 Liter
b. Pekerjaan Plumbing Air Kotor
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari parit los ke grease trap
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 4,390,000.00 4,390,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari grease trap ke Parit Keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
dari parit los ke parit keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
toilet dan wudhu ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
wastafel ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
meja los ke parit los
- Pengadaan + pemasangan floor drain Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Pekerjaan Plumbing Air Kotoran
Pengadaan + pemasangan pipa air
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
kotoran dari closet ke septictank
Pengadaan + pemasangan pipa udara
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank
Pengadaan + pemasangan pipa peresapan
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank

- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan -
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
- Unit 8.00 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
(APAR)
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509 Err:509

PPN 10% Err:509 Err:509

GRAND TOTAL Err:509 Err:509

PEMBULATAN Err:509 Err:509

PROGRES RENCANA

PROGRES REALISASI

DEVIASI
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 04
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 30 September 2019 s/d 06 Oktober 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


- Kuda-Kuda 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. PEKERJAAN ATAP, TALANG & LISPLANK
a. Penutup Atap
- Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Atap Sky Light M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Teritisan Keliling M² 1.00 250,000.00 250,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Main Gate M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pasang Insulator Panas M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Bubungan
- Nok Atap Utama M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Nok Atap Main Gate M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Flashing Atap Zincalume M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1) -
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Pintu Toilet (PT1)


Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Spandrell M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN
- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau Setara Unit 1.52 3,942,850.00 5,993,132.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 240.30 122,823.16 29,514,404.28 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit 16.00 37,210.28 595,364.48 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Door Closer Unit 62.70 82,680.00 5,184,036.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau Setara Unit 206.05 81,260.00 16,743,249.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 206.05 76,125.00 15,685,206.08 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT
a. Plafond Gypsum
- Plafon Ruang Pengelola M² 341.68 26,358.00 9,006,001.44 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Ruang Musholla M² 18.81 46,395.00 872,689.95 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Kios M² 206.05 26,358.00 5,430,944.65 Err:509 - Err:509 - Err:509 - - Err:509 Err:509

b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 60x80 cm)
- COS 160A), 3 phasa Unit 2.00 233,990.00 467,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 60A ,10KA, 3 phasa Unit 12.00 47,047.50 564,570.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 80A ,10KA, 3 phasa Unit 92.00 33,065.00 3,041,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 40A , 3 phasa Unit 2.00 46,030.00 92,060.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 25A , 3 phasa Unit 46.00 46,030.00 2,117,380.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 16A , 3 phasa Unit 46.00 33,047.50 1,520,185.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCB 10A, 6kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 60A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 80A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
MCB 2A, 10kA, 1 phasa (posisi di meja
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
los)
B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY
a. Pekerjaan Kabel Toevoer

- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

b. Pekerjaan Kabel Tray Err:509 Err:509


Pekerjaan Pengadaan + Pasang Kabel
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Tray
Pekerjaan Pengadaan Pipa Galvanis
- Sambungan dari Kabel Tray ke Instalasi M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Los
c. Pekerjaan Kabel Grounding -
Pekerjaan Grounding, Nilai Maksimal = 1
- Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Ohm
XIII.2. PEKERJAAN INSTALASI
a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
Pengadaan + Penarikan Instalasi
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Penerangan Down Light, TL
Pengadaan + Penarikan Instalasi Stop
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kontak Normal (1 gang)
- Pengadaan + Penarikan Instalasi Saklar Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Armature
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Downlight
Pengadaan + Pasang Armature Lampu TL
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Emergency TL 2

- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86

- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


XIV. PEKERJAAN PLUMBING
a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air bersih
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay dari PDAM ke profil tank
Pengadaan + pemasangan pipa air bersih
- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke lavatory dan wudlu
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

Pengadaan + pemasangan pipa air bersih


- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay kran ke lavatory dan wudhu

Pengadaan + pemasangan pipa air bersih


- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke kran selasar
Pengadaan + pemasangan pipa air bersih
- supplay dari pipa 1" horisontal ke kran M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
selasar
Pengadaan + pemasangan pipa kuras /
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pembuangan dari profil tank
Pengadaan + pemasangan kran dinding
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1/2"
- Pengadaan + pemasangan washtafel Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengadaan + pemasangan stop kran
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran PVC
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1" posisi pada pompa Out
Pengadaan + pemasangan stop kran PVC
- 1" posisi pada pipa kuras/ pembuangan Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
profil tank
Pengadaan & Pemasangan Profil Tank
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2200 Liter
b. Pekerjaan Plumbing Air Kotor
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari parit los ke grease trap
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 4,390,000.00 4,390,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari grease trap ke Parit Keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
dari parit los ke parit keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
toilet dan wudhu ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
wastafel ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
meja los ke parit los
- Pengadaan + pemasangan floor drain Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Pekerjaan Plumbing Air Kotoran
Pengadaan + pemasangan pipa air
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
kotoran dari closet ke septictank
Pengadaan + pemasangan pipa udara
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank
Pengadaan + pemasangan pipa peresapan
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank

- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan -
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
- Unit 8.00 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
(APAR)
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509

PPN 10% Err:509 Err:509

GRAND TOTAL Err:509 Err:509

PEMBULATAN Err:509 Err:509

PROGRES RENCANA

PROGRES REALISASI

DEVIASI
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 05
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 07 Oktober 2019 s/d 13 Oktober 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi -
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


- Kuda-Kuda 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. PEKERJAAN ATAP, TALANG & LISPLANK
a. Penutup Atap
- Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Atap Sky Light M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Teritisan Keliling M² 1.00 250,000.00 250,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Main Gate M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pasang Insulator Panas M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Bubungan
- Nok Atap Utama M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Nok Atap Main Gate M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Flashing Atap Zincalume M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Pintu Toilet (PT1)


Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Spandrell M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN
- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau Setara Unit 1.52 3,942,850.00 5,993,132.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 240.30 122,823.16 29,514,404.28 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit 16.00 37,210.28 595,364.48 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Door Closer Unit 62.70 82,680.00 5,184,036.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau Setara Unit 206.05 81,260.00 16,743,249.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 206.05 76,125.00 15,685,206.08 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT
a. Plafond Gypsum
- Plafon Ruang Pengelola M² 341.68 26,358.00 9,006,001.44 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Ruang Musholla M² 18.81 46,395.00 872,689.95 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Kios M² 206.05 26,358.00 5,430,944.65 Err:509 - Err:509 - Err:509 - - Err:509 Err:509

b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 60x80 cm)
- COS 160A), 3 phasa Unit 2.00 233,990.00 467,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 60A ,10KA, 3 phasa Unit 12.00 47,047.50 564,570.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 80A ,10KA, 3 phasa Unit 92.00 33,065.00 3,041,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 40A , 3 phasa Unit 2.00 46,030.00 92,060.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 25A , 3 phasa Unit 46.00 46,030.00 2,117,380.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 16A , 3 phasa Unit 46.00 33,047.50 1,520,185.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCB 10A, 6kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 60A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 80A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
MCB 2A, 10kA, 1 phasa (posisi di meja
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
los)
B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY
a. Pekerjaan Kabel Toevoer

- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

b. Pekerjaan Kabel Tray Err:509 Err:509


Pekerjaan Pengadaan + Pasang Kabel
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Tray
Pekerjaan Pengadaan Pipa Galvanis
- Sambungan dari Kabel Tray ke Instalasi M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Los
c. Pekerjaan Kabel Grounding
Pekerjaan Grounding, Nilai Maksimal = 1
- Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Ohm
XIII.2. PEKERJAAN INSTALASI
a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
Pengadaan + Penarikan Instalasi
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Penerangan Down Light, TL
Pengadaan + Penarikan Instalasi Stop
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kontak Normal (1 gang)
- Pengadaan + Penarikan Instalasi Saklar Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Armature
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Downlight
Pengadaan + Pasang Armature Lampu TL
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Emergency TL 2

- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86

- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


XIV. PEKERJAAN PLUMBING
a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air bersih
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay dari PDAM ke profil tank
Pengadaan + pemasangan pipa air bersih
- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke lavatory dan wudlu
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

Pengadaan + pemasangan pipa air bersih


- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay kran ke lavatory dan wudhu

Pengadaan + pemasangan pipa air bersih


- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke kran selasar
Pengadaan + pemasangan pipa air bersih
- supplay dari pipa 1" horisontal ke kran M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
selasar
Pengadaan + pemasangan pipa kuras /
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pembuangan dari profil tank
Pengadaan + pemasangan kran dinding
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1/2"
- Pengadaan + pemasangan washtafel Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengadaan + pemasangan stop kran
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran PVC
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1" posisi pada pompa Out
Pengadaan + pemasangan stop kran PVC
- 1" posisi pada pipa kuras/ pembuangan Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
profil tank
Pengadaan & Pemasangan Profil Tank
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2200 Liter
b. Pekerjaan Plumbing Air Kotor
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari parit los ke grease trap
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 4,390,000.00 4,390,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari grease trap ke Parit Keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
dari parit los ke parit keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
toilet dan wudhu ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
wastafel ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
meja los ke parit los
- Pengadaan + pemasangan floor drain Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Pekerjaan Plumbing Air Kotoran
Pengadaan + pemasangan pipa air
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
kotoran dari closet ke septictank
Pengadaan + pemasangan pipa udara
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank
Pengadaan + pemasangan pipa peresapan
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank

- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan -
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
- Unit 8.00 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
(APAR)
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509

PPN 10% Err:509 Err:509

GRAND TOTAL Err:509 Err:509

PEMBULATAN Err:509 Err:509

PROGRES RENCANA

PROGRES REALISASI

DEVIASI
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 06
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 14 Oktober 2019 s/d 20 Oktober 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


- Kuda-Kuda 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. PEKERJAAN ATAP, TALANG & LISPLANK
a. Penutup Atap
- Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Atap Sky Light M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Teritisan Keliling M² 1.00 250,000.00 250,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Main Gate M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pasang Insulator Panas M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Bubungan
- Nok Atap Utama M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Nok Atap Main Gate M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Flashing Atap Zincalume M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Pintu Toilet (PT1)


Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Spandrell M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN
- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau Setara Unit 1.52 3,942,850.00 5,993,132.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 240.30 122,823.16 29,514,404.28 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit 16.00 37,210.28 595,364.48 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Door Closer Unit 62.70 82,680.00 5,184,036.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau Setara Unit 206.05 81,260.00 16,743,249.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 206.05 76,125.00 15,685,206.08 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT
a. Plafond Gypsum
- Plafon Ruang Pengelola M² 341.68 26,358.00 9,006,001.44 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Ruang Musholla M² 18.81 46,395.00 872,689.95 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Kios M² 206.05 26,358.00 5,430,944.65 Err:509 - Err:509 - Err:509 - - Err:509 Err:509

b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 60x80 cm)
- COS 160A), 3 phasa Unit 2.00 233,990.00 467,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 60A ,10KA, 3 phasa Unit 12.00 47,047.50 564,570.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 80A ,10KA, 3 phasa Unit 92.00 33,065.00 3,041,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 40A , 3 phasa Unit 2.00 46,030.00 92,060.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 25A , 3 phasa Unit 46.00 46,030.00 2,117,380.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 16A , 3 phasa Unit 46.00 33,047.50 1,520,185.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCB 10A, 6kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 60A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 80A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
MCB 2A, 10kA, 1 phasa (posisi di meja
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
los)
B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY
a. Pekerjaan Kabel Toevoer

- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

b. Pekerjaan Kabel Tray Err:509 Err:509


Pekerjaan Pengadaan + Pasang Kabel
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Tray
Pekerjaan Pengadaan Pipa Galvanis
- Sambungan dari Kabel Tray ke Instalasi M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Los
c. Pekerjaan Kabel Grounding
Pekerjaan Grounding, Nilai Maksimal = 1
- Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Ohm
XIII.2. PEKERJAAN INSTALASI
a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
Pengadaan + Penarikan Instalasi
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Penerangan Down Light, TL
Pengadaan + Penarikan Instalasi Stop
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kontak Normal (1 gang)
- Pengadaan + Penarikan Instalasi Saklar Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Armature
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Downlight
Pengadaan + Pasang Armature Lampu TL
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Emergency TL 2

- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86

- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


XIV. PEKERJAAN PLUMBING
a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air bersih
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay dari PDAM ke profil tank
Pengadaan + pemasangan pipa air bersih
- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke lavatory dan wudlu
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

Pengadaan + pemasangan pipa air bersih


- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay kran ke lavatory dan wudhu

Pengadaan + pemasangan pipa air bersih


- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke kran selasar
Pengadaan + pemasangan pipa air bersih
- supplay dari pipa 1" horisontal ke kran M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
selasar
Pengadaan + pemasangan pipa kuras /
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pembuangan dari profil tank
Pengadaan + pemasangan kran dinding
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1/2"
- Pengadaan + pemasangan washtafel Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengadaan + pemasangan stop kran
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran PVC
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1" posisi pada pompa Out
Pengadaan + pemasangan stop kran PVC
- 1" posisi pada pipa kuras/ pembuangan Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
profil tank
Pengadaan & Pemasangan Profil Tank
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2200 Liter
b. Pekerjaan Plumbing Air Kotor
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari parit los ke grease trap
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 4,390,000.00 4,390,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari grease trap ke Parit Keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
dari parit los ke parit keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
toilet dan wudhu ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
wastafel ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
meja los ke parit los
- Pengadaan + pemasangan floor drain Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Pekerjaan Plumbing Air Kotoran
Pengadaan + pemasangan pipa air
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
kotoran dari closet ke septictank
Pengadaan + pemasangan pipa udara
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank
Pengadaan + pemasangan pipa peresapan
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank

- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
- Unit 8.00 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
(APAR)
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509

PPN 10% Err:509 Err:509

GRAND TOTAL Err:509 Err:509

PEMBULATAN Err:509 Err:509

PROGRES RENCANA

PROGRES REALISASI

DEVIASI
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 07
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 21 Oktober 2019 s/d 27 Oktober 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


- Kuda-Kuda 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. PEKERJAAN ATAP, TALANG & LISPLANK
a. Penutup Atap
- Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Atap Sky Light M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Teritisan Keliling M² 1.00 250,000.00 250,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Main Gate M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pasang Insulator Panas M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Bubungan
- Nok Atap Utama M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Nok Atap Main Gate M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Flashing Atap Zincalume M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding -
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Pintu Toilet (PT1)


Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Spandrell M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN
- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau Setara Unit 1.52 3,942,850.00 5,993,132.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 240.30 122,823.16 29,514,404.28 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit 16.00 37,210.28 595,364.48 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Door Closer Unit 62.70 82,680.00 5,184,036.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau Setara Unit 206.05 81,260.00 16,743,249.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 206.05 76,125.00 15,685,206.08 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT
a. Plafond Gypsum
- Plafon Ruang Pengelola M² 341.68 26,358.00 9,006,001.44 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Ruang Musholla M² 18.81 46,395.00 872,689.95 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Kios M² 206.05 26,358.00 5,430,944.65 Err:509 - Err:509 - Err:509 - - Err:509 Err:509

b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 60x80 cm)
- COS 160A), 3 phasa Unit 2.00 233,990.00 467,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 60A ,10KA, 3 phasa Unit 12.00 47,047.50 564,570.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 80A ,10KA, 3 phasa Unit 92.00 33,065.00 3,041,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 40A , 3 phasa Unit 2.00 46,030.00 92,060.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 25A , 3 phasa Unit 46.00 46,030.00 2,117,380.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 16A , 3 phasa Unit 46.00 33,047.50 1,520,185.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCB 10A, 6kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 60A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 80A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
MCB 2A, 10kA, 1 phasa (posisi di meja
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
los)
B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY
a. Pekerjaan Kabel Toevoer

- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

b. Pekerjaan Kabel Tray Err:509 Err:509 -


Pekerjaan Pengadaan + Pasang Kabel
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Tray
Pekerjaan Pengadaan Pipa Galvanis
- Sambungan dari Kabel Tray ke Instalasi M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Los
c. Pekerjaan Kabel Grounding
Pekerjaan Grounding, Nilai Maksimal = 1
- Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Ohm
XIII.2. PEKERJAAN INSTALASI
a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
Pengadaan + Penarikan Instalasi
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Penerangan Down Light, TL
Pengadaan + Penarikan Instalasi Stop
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kontak Normal (1 gang)
- Pengadaan + Penarikan Instalasi Saklar Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Armature
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Downlight
Pengadaan + Pasang Armature Lampu TL
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Emergency TL 2

- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86

- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


XIV. PEKERJAAN PLUMBING
a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air bersih
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay dari PDAM ke profil tank
Pengadaan + pemasangan pipa air bersih
- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke lavatory dan wudlu
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

Pengadaan + pemasangan pipa air bersih


- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay kran ke lavatory dan wudhu

Pengadaan + pemasangan pipa air bersih


- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke kran selasar
Pengadaan + pemasangan pipa air bersih
- supplay dari pipa 1" horisontal ke kran M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
selasar
Pengadaan + pemasangan pipa kuras /
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pembuangan dari profil tank
Pengadaan + pemasangan kran dinding
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1/2"
- Pengadaan + pemasangan washtafel Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengadaan + pemasangan stop kran
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran PVC
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1" posisi pada pompa Out
Pengadaan + pemasangan stop kran PVC
- 1" posisi pada pipa kuras/ pembuangan Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
profil tank
Pengadaan & Pemasangan Profil Tank
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2200 Liter
b. Pekerjaan Plumbing Air Kotor
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari parit los ke grease trap
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 4,390,000.00 4,390,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari grease trap ke Parit Keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
dari parit los ke parit keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
toilet dan wudhu ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
wastafel ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
meja los ke parit los
- Pengadaan + pemasangan floor drain Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Pekerjaan Plumbing Air Kotoran
Pengadaan + pemasangan pipa air
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
kotoran dari closet ke septictank
Pengadaan + pemasangan pipa udara
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank
Pengadaan + pemasangan pipa peresapan
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank

- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
- Unit 8.00 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
(APAR)
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509

PPN 10% Err:509 Err:509

GRAND TOTAL Err:509 Err:509

PEMBULATAN Err:509 Err:509

PROGRES RENCANA

PROGRES REALISASI

DEVIASI
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 08
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 28 Oktober 2019 s/d 03 November 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


- Kuda-Kuda 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. PEKERJAAN ATAP, TALANG & LISPLANK
a. Penutup Atap
- Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Atap Sky Light M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Teritisan Keliling M² 1.00 250,000.00 250,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Main Gate M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pasang Insulator Panas M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Bubungan
- Nok Atap Utama M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Nok Atap Main Gate M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Flashing Atap Zincalume M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Pintu Toilet (PT1)


Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Spandrell M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN
- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau Setara Unit 1.52 3,942,850.00 5,993,132.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 240.30 122,823.16 29,514,404.28 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit 16.00 37,210.28 595,364.48 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Door Closer Unit 62.70 82,680.00 5,184,036.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau Setara Unit 206.05 81,260.00 16,743,249.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 206.05 76,125.00 15,685,206.08 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT
a. Plafond Gypsum
- Plafon Ruang Pengelola M² 341.68 26,358.00 9,006,001.44 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Ruang Musholla M² 18.81 46,395.00 872,689.95 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Kios M² 206.05 26,358.00 5,430,944.65 Err:509 - Err:509 - Err:509 - - Err:509 Err:509

b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 60x80 cm)
- COS 160A), 3 phasa Unit 2.00 233,990.00 467,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 60A ,10KA, 3 phasa Unit 12.00 47,047.50 564,570.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 80A ,10KA, 3 phasa Unit 92.00 33,065.00 3,041,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 40A , 3 phasa Unit 2.00 46,030.00 92,060.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 25A , 3 phasa Unit 46.00 46,030.00 2,117,380.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 16A , 3 phasa Unit 46.00 33,047.50 1,520,185.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCB 10A, 6kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 60A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 80A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
MCB 2A, 10kA, 1 phasa (posisi di meja
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
los)
B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY
a. Pekerjaan Kabel Toevoer

- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

b. Pekerjaan Kabel Tray Err:509 Err:509


Pekerjaan Pengadaan + Pasang Kabel
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Tray
Pekerjaan Pengadaan Pipa Galvanis
- Sambungan dari Kabel Tray ke Instalasi M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Los
c. Pekerjaan Kabel Grounding
Pekerjaan Grounding, Nilai Maksimal = 1
- Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Ohm
XIII.2. PEKERJAAN INSTALASI
a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
Pengadaan + Penarikan Instalasi
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Penerangan Down Light, TL
Pengadaan + Penarikan Instalasi Stop
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kontak Normal (1 gang)
- Pengadaan + Penarikan Instalasi Saklar Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Armature
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Downlight
Pengadaan + Pasang Armature Lampu TL
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Emergency TL 2

- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86

- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


XIV. PEKERJAAN PLUMBING
a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air bersih
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay dari PDAM ke profil tank
Pengadaan + pemasangan pipa air bersih
- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke lavatory dan wudlu
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

Pengadaan + pemasangan pipa air bersih


- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay kran ke lavatory dan wudhu

Pengadaan + pemasangan pipa air bersih


- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke kran selasar
Pengadaan + pemasangan pipa air bersih
- supplay dari pipa 1" horisontal ke kran M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
selasar
Pengadaan + pemasangan pipa kuras /
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pembuangan dari profil tank
Pengadaan + pemasangan kran dinding
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1/2"
- Pengadaan + pemasangan washtafel Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengadaan + pemasangan stop kran
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran PVC
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1" posisi pada pompa Out
Pengadaan + pemasangan stop kran PVC
- 1" posisi pada pipa kuras/ pembuangan Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
profil tank
Pengadaan & Pemasangan Profil Tank
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2200 Liter
b. Pekerjaan Plumbing Air Kotor
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari parit los ke grease trap
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 4,390,000.00 4,390,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari grease trap ke Parit Keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
dari parit los ke parit keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
toilet dan wudhu ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
wastafel ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
meja los ke parit los
- Pengadaan + pemasangan floor drain Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Pekerjaan Plumbing Air Kotoran
Pengadaan + pemasangan pipa air
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
kotoran dari closet ke septictank
Pengadaan + pemasangan pipa udara
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank
Pengadaan + pemasangan pipa peresapan
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank

- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
(APAR)
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509

PPN 10% Err:509 Err:509

GRAND TOTAL Err:509 Err:509

PEMBULATAN Err:509 Err:509

PROGRES RENCANA

PROGRES REALISASI

DEVIASI
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 09
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 04 November 2019 s/d 10 November 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


- Kuda-Kuda 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. PEKERJAAN ATAP, TALANG & LISPLANK
a. Penutup Atap
- Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Atap Sky Light M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Teritisan Keliling M² 1.00 250,000.00 250,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Main Gate M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pasang Insulator Panas M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Bubungan
- Nok Atap Utama M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Nok Atap Main Gate M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Flashing Atap Zincalume M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Pintu Toilet (PT1)


Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Spandrell M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN
- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau Setara Unit 1.52 3,942,850.00 5,993,132.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 240.30 122,823.16 29,514,404.28 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit 16.00 37,210.28 595,364.48 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Door Closer Unit 62.70 82,680.00 5,184,036.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau Setara Unit 206.05 81,260.00 16,743,249.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 206.05 76,125.00 15,685,206.08 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT
a. Plafond Gypsum
- Plafon Ruang Pengelola M² 341.68 26,358.00 9,006,001.44 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Ruang Musholla M² 18.81 46,395.00 872,689.95 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Kios M² 206.05 26,358.00 5,430,944.65 Err:509 - Err:509 - Err:509 - - Err:509 Err:509

b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 60x80 cm)
- COS 160A), 3 phasa Unit 2.00 233,990.00 467,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 60A ,10KA, 3 phasa Unit 12.00 47,047.50 564,570.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 80A ,10KA, 3 phasa Unit 92.00 33,065.00 3,041,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 40A , 3 phasa Unit 2.00 46,030.00 92,060.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 25A , 3 phasa Unit 46.00 46,030.00 2,117,380.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 16A , 3 phasa Unit 46.00 33,047.50 1,520,185.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCB 10A, 6kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 60A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 80A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
MCB 2A, 10kA, 1 phasa (posisi di meja
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
los)
B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY
a. Pekerjaan Kabel Toevoer

- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

b. Pekerjaan Kabel Tray Err:509 Err:509


Pekerjaan Pengadaan + Pasang Kabel
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Tray
Pekerjaan Pengadaan Pipa Galvanis
- Sambungan dari Kabel Tray ke Instalasi M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Los
c. Pekerjaan Kabel Grounding
Pekerjaan Grounding, Nilai Maksimal = 1
- Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Ohm
XIII.2. PEKERJAAN INSTALASI
a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
Pengadaan + Penarikan Instalasi
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Penerangan Down Light, TL
Pengadaan + Penarikan Instalasi Stop
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kontak Normal (1 gang)
- Pengadaan + Penarikan Instalasi Saklar Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Armature
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Downlight
Pengadaan + Pasang Armature Lampu TL
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Emergency TL 2

- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86

- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


XIV. PEKERJAAN PLUMBING
a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air bersih
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay dari PDAM ke profil tank
Pengadaan + pemasangan pipa air bersih
- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke lavatory dan wudlu
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

Pengadaan + pemasangan pipa air bersih


- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay kran ke lavatory dan wudhu

Pengadaan + pemasangan pipa air bersih


- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke kran selasar
Pengadaan + pemasangan pipa air bersih
- supplay dari pipa 1" horisontal ke kran M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
selasar
Pengadaan + pemasangan pipa kuras /
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pembuangan dari profil tank
Pengadaan + pemasangan kran dinding
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1/2"
- Pengadaan + pemasangan washtafel Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengadaan + pemasangan stop kran
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran PVC
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1" posisi pada pompa Out
Pengadaan + pemasangan stop kran PVC
- 1" posisi pada pipa kuras/ pembuangan Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
profil tank
Pengadaan & Pemasangan Profil Tank
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2200 Liter
b. Pekerjaan Plumbing Air Kotor
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari parit los ke grease trap
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 4,390,000.00 4,390,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari grease trap ke Parit Keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
dari parit los ke parit keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
toilet dan wudhu ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
wastafel ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
meja los ke parit los
- Pengadaan + pemasangan floor drain Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Pekerjaan Plumbing Air Kotoran
Pengadaan + pemasangan pipa air
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
kotoran dari closet ke septictank
Pengadaan + pemasangan pipa udara
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank
Pengadaan + pemasangan pipa peresapan
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank

- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
(APAR)
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509

PPN 10% Err:509 Err:509

GRAND TOTAL Err:509 Err:509

PEMBULATAN Err:509 Err:509

PROGRES RENCANA

PROGRES REALISASI

DEVIASI
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 10
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 11 November 2019 s/d 17 November 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali -
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


- Kuda-Kuda 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. PEKERJAAN ATAP, TALANG & LISPLANK
a. Penutup Atap
- Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Atap Sky Light M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Teritisan Keliling M² 1.00 250,000.00 250,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Main Gate M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pasang Insulator Panas M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Bubungan
- Nok Atap Utama M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Nok Atap Main Gate M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Flashing Atap Zincalume M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Pintu Toilet (PT1)


Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Spandrell M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN
- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau Setara Unit 1.52 3,942,850.00 5,993,132.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 240.30 122,823.16 29,514,404.28 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit 16.00 37,210.28 595,364.48 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Door Closer Unit 62.70 82,680.00 5,184,036.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau Setara Unit 206.05 81,260.00 16,743,249.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 206.05 76,125.00 15,685,206.08 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT
a. Plafond Gypsum
- Plafon Ruang Pengelola M² 341.68 26,358.00 9,006,001.44 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Ruang Musholla M² 18.81 46,395.00 872,689.95 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Kios M² 206.05 26,358.00 5,430,944.65 Err:509 - Err:509 - Err:509 - - Err:509 Err:509

b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 60x80 cm)
- COS 160A), 3 phasa Unit 2.00 233,990.00 467,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 60A ,10KA, 3 phasa Unit 12.00 47,047.50 564,570.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 80A ,10KA, 3 phasa Unit 92.00 33,065.00 3,041,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 40A , 3 phasa Unit 2.00 46,030.00 92,060.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 25A , 3 phasa Unit 46.00 46,030.00 2,117,380.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 16A , 3 phasa Unit 46.00 33,047.50 1,520,185.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCB 10A, 6kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 60A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 80A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
MCB 2A, 10kA, 1 phasa (posisi di meja
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
los)
B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY
a. Pekerjaan Kabel Toevoer

- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

b. Pekerjaan Kabel Tray Err:509 Err:509


Pekerjaan Pengadaan + Pasang Kabel
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Tray
Pekerjaan Pengadaan Pipa Galvanis
- Sambungan dari Kabel Tray ke Instalasi M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Los
c. Pekerjaan Kabel Grounding
Pekerjaan Grounding, Nilai Maksimal = 1
- Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Ohm
XIII.2. PEKERJAAN INSTALASI
a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
Pengadaan + Penarikan Instalasi
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Penerangan Down Light, TL
Pengadaan + Penarikan Instalasi Stop
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kontak Normal (1 gang)
- Pengadaan + Penarikan Instalasi Saklar Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Armature
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Downlight
Pengadaan + Pasang Armature Lampu TL
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Emergency TL 2

- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86

- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


XIV. PEKERJAAN PLUMBING
a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air bersih
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay dari PDAM ke profil tank
Pengadaan + pemasangan pipa air bersih
- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke lavatory dan wudlu
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

Pengadaan + pemasangan pipa air bersih


- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay kran ke lavatory dan wudhu

Pengadaan + pemasangan pipa air bersih


- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke kran selasar
Pengadaan + pemasangan pipa air bersih
- supplay dari pipa 1" horisontal ke kran M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
selasar
Pengadaan + pemasangan pipa kuras /
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pembuangan dari profil tank
Pengadaan + pemasangan kran dinding
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1/2"
- Pengadaan + pemasangan washtafel Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengadaan + pemasangan stop kran
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran PVC
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1" posisi pada pompa Out
Pengadaan + pemasangan stop kran PVC
- 1" posisi pada pipa kuras/ pembuangan Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
profil tank
Pengadaan & Pemasangan Profil Tank
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2200 Liter
b. Pekerjaan Plumbing Air Kotor
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari parit los ke grease trap
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 4,390,000.00 4,390,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari grease trap ke Parit Keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
dari parit los ke parit keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
toilet dan wudhu ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
wastafel ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
meja los ke parit los
- Pengadaan + pemasangan floor drain Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Pekerjaan Plumbing Air Kotoran
Pengadaan + pemasangan pipa air
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
kotoran dari closet ke septictank
Pengadaan + pemasangan pipa udara
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank
Pengadaan + pemasangan pipa peresapan
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank

- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan -
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
(APAR)
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509

PPN 10% Err:509 Err:509

GRAND TOTAL Err:509 Err:509

PEMBULATAN Err:509 Err:509

PROGRES RENCANA

PROGRES REALISASI

DEVIASI
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 11
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 18 November 2019 s/d 24 November 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali -
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


- Kuda-Kuda 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. PEKERJAAN ATAP, TALANG & LISPLANK
a. Penutup Atap
- Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Atap Sky Light M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Teritisan Keliling M² 1.00 250,000.00 250,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Main Gate M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pasang Insulator Panas M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Bubungan
- Nok Atap Utama M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Nok Atap Main Gate M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Flashing Atap Zincalume M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Pintu Toilet (PT1)


Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Spandrell M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN
- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau Setara Unit 1.52 3,942,850.00 5,993,132.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 240.30 122,823.16 29,514,404.28 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit 16.00 37,210.28 595,364.48 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Door Closer Unit 62.70 82,680.00 5,184,036.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau Setara Unit 206.05 81,260.00 16,743,249.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 206.05 76,125.00 15,685,206.08 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT
a. Plafond Gypsum
- Plafon Ruang Pengelola M² 341.68 26,358.00 9,006,001.44 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Ruang Musholla M² 18.81 46,395.00 872,689.95 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Kios M² 206.05 26,358.00 5,430,944.65 Err:509 - Err:509 - Err:509 - - Err:509 Err:509

b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 60x80 cm)
- COS 160A), 3 phasa Unit 2.00 233,990.00 467,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 60A ,10KA, 3 phasa Unit 12.00 47,047.50 564,570.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 80A ,10KA, 3 phasa Unit 92.00 33,065.00 3,041,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 40A , 3 phasa Unit 2.00 46,030.00 92,060.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 25A , 3 phasa Unit 46.00 46,030.00 2,117,380.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 16A , 3 phasa Unit 46.00 33,047.50 1,520,185.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCB 10A, 6kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 60A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 80A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
MCB 2A, 10kA, 1 phasa (posisi di meja
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
los)
B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY
a. Pekerjaan Kabel Toevoer

- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

b. Pekerjaan Kabel Tray Err:509 Err:509


Pekerjaan Pengadaan + Pasang Kabel
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Tray
Pekerjaan Pengadaan Pipa Galvanis
- Sambungan dari Kabel Tray ke Instalasi M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Los
c. Pekerjaan Kabel Grounding
Pekerjaan Grounding, Nilai Maksimal = 1
- Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Ohm
XIII.2. PEKERJAAN INSTALASI
a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
Pengadaan + Penarikan Instalasi
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Penerangan Down Light, TL
Pengadaan + Penarikan Instalasi Stop
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kontak Normal (1 gang)
- Pengadaan + Penarikan Instalasi Saklar Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Armature
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Downlight
Pengadaan + Pasang Armature Lampu TL
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Emergency TL 2

- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86

- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


XIV. PEKERJAAN PLUMBING
a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air bersih
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay dari PDAM ke profil tank
Pengadaan + pemasangan pipa air bersih
- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke lavatory dan wudlu
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

Pengadaan + pemasangan pipa air bersih


- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay kran ke lavatory dan wudhu

Pengadaan + pemasangan pipa air bersih


- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke kran selasar
Pengadaan + pemasangan pipa air bersih
- supplay dari pipa 1" horisontal ke kran M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
selasar
Pengadaan + pemasangan pipa kuras /
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pembuangan dari profil tank
Pengadaan + pemasangan kran dinding
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1/2"
- Pengadaan + pemasangan washtafel Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengadaan + pemasangan stop kran
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran PVC
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1" posisi pada pompa Out
Pengadaan + pemasangan stop kran PVC
- 1" posisi pada pipa kuras/ pembuangan Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
profil tank
Pengadaan & Pemasangan Profil Tank
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2200 Liter
b. Pekerjaan Plumbing Air Kotor
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari parit los ke grease trap
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 4,390,000.00 4,390,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari grease trap ke Parit Keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
dari parit los ke parit keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
toilet dan wudhu ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
wastafel ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
meja los ke parit los
- Pengadaan + pemasangan floor drain Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Pekerjaan Plumbing Air Kotoran
Pengadaan + pemasangan pipa air
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
kotoran dari closet ke septictank
Pengadaan + pemasangan pipa udara
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank
Pengadaan + pemasangan pipa peresapan
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank

- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
(APAR)
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509

PPN 10% Err:509 Err:509

GRAND TOTAL Err:509 Err:509

PEMBULATAN Err:509 Err:509

PROGRES RENCANA

PROGRES REALISASI

DEVIASI
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 12
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 25 November 2019 s/d 01 Desember 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


- Kuda-Kuda 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. PEKERJAAN ATAP, TALANG & LISPLANK
a. Penutup Atap
- Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Atap Sky Light M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Teritisan Keliling M² 1.00 250,000.00 250,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Main Gate M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pasang Insulator Panas M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Bubungan
- Nok Atap Utama M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Nok Atap Main Gate M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Flashing Atap Zincalume M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 628.47 37,200.00 23,379,000.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 96.64 376,900.00 36,423,616.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 102.52 376,900.00 38,639,788.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 56.08 17,830.00 999,906.40 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 36.80 260,850.00 9,599,280.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² 4.80 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Pintu Toilet (PT1)


Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Spandrell M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN
- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau Setara Unit 1.52 3,942,850.00 5,993,132.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 240.30 122,823.16 29,514,404.28 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit 16.00 37,210.28 595,364.48 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Door Closer Unit 62.70 82,680.00 5,184,036.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau Setara Unit 206.05 81,260.00 16,743,249.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 206.05 76,125.00 15,685,206.08 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT
a. Plafond Gypsum
- Plafon Ruang Pengelola M² 341.68 26,358.00 9,006,001.44 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Ruang Musholla M² 18.81 46,395.00 872,689.95 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Kios M² 206.05 26,358.00 5,430,944.65 Err:509 - Err:509 - Err:509 - - Err:509 Err:509

b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 60x80 cm)
- COS 160A), 3 phasa Unit 2.00 233,990.00 467,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 60A ,10KA, 3 phasa Unit 12.00 47,047.50 564,570.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 80A ,10KA, 3 phasa Unit 92.00 33,065.00 3,041,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 40A , 3 phasa Unit 2.00 46,030.00 92,060.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 25A , 3 phasa Unit 46.00 46,030.00 2,117,380.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 16A , 3 phasa Unit 46.00 33,047.50 1,520,185.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCB 10A, 6kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 60A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 80A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
MCB 2A, 10kA, 1 phasa (posisi di meja
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
los)
B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY
a. Pekerjaan Kabel Toevoer

- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

b. Pekerjaan Kabel Tray Err:509 Err:509 -


Pekerjaan Pengadaan + Pasang Kabel
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Tray
Pekerjaan Pengadaan Pipa Galvanis
- Sambungan dari Kabel Tray ke Instalasi M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Los
c. Pekerjaan Kabel Grounding
Pekerjaan Grounding, Nilai Maksimal = 1
- Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Ohm
XIII.2. PEKERJAAN INSTALASI
a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
Pengadaan + Penarikan Instalasi
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Penerangan Down Light, TL
Pengadaan + Penarikan Instalasi Stop
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kontak Normal (1 gang)
- Pengadaan + Penarikan Instalasi Saklar Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Armature
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Downlight
Pengadaan + Pasang Armature Lampu TL
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Emergency TL 2

- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86

- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


XIV. PEKERJAAN PLUMBING
a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air bersih
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay dari PDAM ke profil tank
Pengadaan + pemasangan pipa air bersih
- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke lavatory dan wudlu
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

Pengadaan + pemasangan pipa air bersih


- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay kran ke lavatory dan wudhu

Pengadaan + pemasangan pipa air bersih


- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke kran selasar
Pengadaan + pemasangan pipa air bersih
- supplay dari pipa 1" horisontal ke kran M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
selasar
Pengadaan + pemasangan pipa kuras /
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pembuangan dari profil tank
Pengadaan + pemasangan kran dinding
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1/2"
- Pengadaan + pemasangan washtafel Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengadaan + pemasangan stop kran
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran PVC
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1" posisi pada pompa Out
Pengadaan + pemasangan stop kran PVC
- 1" posisi pada pipa kuras/ pembuangan Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
profil tank
Pengadaan & Pemasangan Profil Tank
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2200 Liter
b. Pekerjaan Plumbing Air Kotor
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari parit los ke grease trap
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 4,390,000.00 4,390,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari grease trap ke Parit Keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
dari parit los ke parit keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
toilet dan wudhu ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
wastafel ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
meja los ke parit los
- Pengadaan + pemasangan floor drain Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Pekerjaan Plumbing Air Kotoran
Pengadaan + pemasangan pipa air
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
kotoran dari closet ke septictank
Pengadaan + pemasangan pipa udara
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank
Pengadaan + pemasangan pipa peresapan
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank

- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan -
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
(APAR)
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509

PPN 10% Err:509 Err:509

GRAND TOTAL Err:509 Err:509

PEMBULATAN Err:509 Err:509

PROGRES RENCANA

PROGRES REALISASI

DEVIASI
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 13
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 02 Desember 2019 s/d 08 Desember 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


- Kuda-Kuda 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. PEKERJAAN ATAP, TALANG & LISPLANK
a. Penutup Atap
- Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Atap Sky Light M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Teritisan Keliling M² 1.00 250,000.00 250,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Main Gate M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pasang Insulator Panas M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Bubungan
- Nok Atap Utama M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Nok Atap Main Gate M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Flashing Atap Zincalume M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Pintu Toilet (PT1)


Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Spandrell M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN
- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau Setara Unit 1.52 3,942,850.00 5,993,132.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 240.30 122,823.16 29,514,404.28 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit 16.00 37,210.28 595,364.48 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Door Closer Unit 62.70 82,680.00 5,184,036.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau Setara Unit 206.05 81,260.00 16,743,249.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 206.05 76,125.00 15,685,206.08 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT
a. Plafond Gypsum
- Plafon Ruang Pengelola M² 341.68 26,358.00 9,006,001.44 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Ruang Musholla M² 18.81 46,395.00 872,689.95 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Kios M² 206.05 26,358.00 5,430,944.65 Err:509 - Err:509 - Err:509 - - Err:509 Err:509

b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 60x80 cm)
- COS 160A), 3 phasa Unit 2.00 233,990.00 467,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 60A ,10KA, 3 phasa Unit 12.00 47,047.50 564,570.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 80A ,10KA, 3 phasa Unit 92.00 33,065.00 3,041,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 40A , 3 phasa Unit 2.00 46,030.00 92,060.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 25A , 3 phasa Unit 46.00 46,030.00 2,117,380.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 16A , 3 phasa Unit 46.00 33,047.50 1,520,185.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCB 10A, 6kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 60A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 80A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
MCB 2A, 10kA, 1 phasa (posisi di meja
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
los)
B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY
a. Pekerjaan Kabel Toevoer

- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

b. Pekerjaan Kabel Tray Err:509 Err:509 -


Pekerjaan Pengadaan + Pasang Kabel
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Tray
Pekerjaan Pengadaan Pipa Galvanis
- Sambungan dari Kabel Tray ke Instalasi M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Los
c. Pekerjaan Kabel Grounding
Pekerjaan Grounding, Nilai Maksimal = 1
- Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Ohm
XIII.2. PEKERJAAN INSTALASI
a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
Pengadaan + Penarikan Instalasi
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Penerangan Down Light, TL
Pengadaan + Penarikan Instalasi Stop
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kontak Normal (1 gang)
- Pengadaan + Penarikan Instalasi Saklar Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Armature
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Downlight
Pengadaan + Pasang Armature Lampu TL
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Emergency TL 2

- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86

- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


XIV. PEKERJAAN PLUMBING
a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air bersih
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay dari PDAM ke profil tank
Pengadaan + pemasangan pipa air bersih
- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke lavatory dan wudlu
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

Pengadaan + pemasangan pipa air bersih


- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay kran ke lavatory dan wudhu

Pengadaan + pemasangan pipa air bersih


- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke kran selasar
Pengadaan + pemasangan pipa air bersih
- supplay dari pipa 1" horisontal ke kran M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
selasar
Pengadaan + pemasangan pipa kuras /
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pembuangan dari profil tank
Pengadaan + pemasangan kran dinding
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1/2"
- Pengadaan + pemasangan washtafel Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengadaan + pemasangan stop kran
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran PVC
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1" posisi pada pompa Out
Pengadaan + pemasangan stop kran PVC
- 1" posisi pada pipa kuras/ pembuangan Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
profil tank
Pengadaan & Pemasangan Profil Tank
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2200 Liter
b. Pekerjaan Plumbing Air Kotor
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari parit los ke grease trap
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 4,390,000.00 4,390,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari grease trap ke Parit Keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
dari parit los ke parit keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
toilet dan wudhu ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
wastafel ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
meja los ke parit los
- Pengadaan + pemasangan floor drain Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Pekerjaan Plumbing Air Kotoran
Pengadaan + pemasangan pipa air
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
kotoran dari closet ke septictank
Pengadaan + pemasangan pipa udara
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank
Pengadaan + pemasangan pipa peresapan
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank

- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan -
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
(APAR)
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509

PPN 10% Err:509 Err:509

GRAND TOTAL Err:509 Err:509

PEMBULATAN Err:509 Err:509

PROGRES RENCANA

PROGRES REALISASI

DEVIASI
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 14
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 09 Desember 2019 s/d 15 Desember 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


- Kuda-Kuda 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. PEKERJAAN ATAP, TALANG & LISPLANK
a. Penutup Atap
- Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Atap Sky Light M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Teritisan Keliling M² 1.00 250,000.00 250,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Main Gate M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pasang Insulator Panas M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Bubungan
- Nok Atap Utama M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Nok Atap Main Gate M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Flashing Atap Zincalume M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1) -
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Pintu Toilet (PT1)


Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Spandrell M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN
- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau Setara Unit 1.52 3,942,850.00 5,993,132.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 240.30 122,823.16 29,514,404.28 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit 16.00 37,210.28 595,364.48 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Door Closer Unit 62.70 82,680.00 5,184,036.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau Setara Unit 206.05 81,260.00 16,743,249.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 206.05 76,125.00 15,685,206.08 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT
a. Plafond Gypsum
- Plafon Ruang Pengelola M² 341.68 26,358.00 9,006,001.44 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Ruang Musholla M² 18.81 46,395.00 872,689.95 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Kios M² 206.05 26,358.00 5,430,944.65 Err:509 - Err:509 - Err:509 - - Err:509 Err:509

b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 60x80 cm)
- COS 160A), 3 phasa Unit 2.00 233,990.00 467,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 60A ,10KA, 3 phasa Unit 12.00 47,047.50 564,570.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 80A ,10KA, 3 phasa Unit 92.00 33,065.00 3,041,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 40A , 3 phasa Unit 2.00 46,030.00 92,060.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 25A , 3 phasa Unit 46.00 46,030.00 2,117,380.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 16A , 3 phasa Unit 46.00 33,047.50 1,520,185.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCB 10A, 6kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 60A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 80A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
MCB 2A, 10kA, 1 phasa (posisi di meja
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
los)
B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY
a. Pekerjaan Kabel Toevoer

- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

b. Pekerjaan Kabel Tray Err:509 Err:509


Pekerjaan Pengadaan + Pasang Kabel
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Tray
Pekerjaan Pengadaan Pipa Galvanis
- Sambungan dari Kabel Tray ke Instalasi M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Los
c. Pekerjaan Kabel Grounding
Pekerjaan Grounding, Nilai Maksimal = 1
- Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Ohm
XIII.2. PEKERJAAN INSTALASI
a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
Pengadaan + Penarikan Instalasi
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Penerangan Down Light, TL
Pengadaan + Penarikan Instalasi Stop
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kontak Normal (1 gang)
- Pengadaan + Penarikan Instalasi Saklar Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Armature
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Downlight
Pengadaan + Pasang Armature Lampu TL
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Emergency TL 2

- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86

- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


XIV. PEKERJAAN PLUMBING
a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air bersih
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay dari PDAM ke profil tank
Pengadaan + pemasangan pipa air bersih
- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke lavatory dan wudlu
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

Pengadaan + pemasangan pipa air bersih


- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay kran ke lavatory dan wudhu

Pengadaan + pemasangan pipa air bersih


- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke kran selasar
Pengadaan + pemasangan pipa air bersih
- supplay dari pipa 1" horisontal ke kran M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
selasar
Pengadaan + pemasangan pipa kuras /
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pembuangan dari profil tank
Pengadaan + pemasangan kran dinding
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1/2"
- Pengadaan + pemasangan washtafel Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengadaan + pemasangan stop kran
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran PVC
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1" posisi pada pompa Out
Pengadaan + pemasangan stop kran PVC
- 1" posisi pada pipa kuras/ pembuangan Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
profil tank
Pengadaan & Pemasangan Profil Tank
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2200 Liter
b. Pekerjaan Plumbing Air Kotor
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari parit los ke grease trap
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 4,390,000.00 4,390,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari grease trap ke Parit Keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
dari parit los ke parit keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
toilet dan wudhu ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
wastafel ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
meja los ke parit los
- Pengadaan + pemasangan floor drain Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Pekerjaan Plumbing Air Kotoran
Pengadaan + pemasangan pipa air
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
kotoran dari closet ke septictank
Pengadaan + pemasangan pipa udara
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank
Pengadaan + pemasangan pipa peresapan
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank

- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
(APAR)
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509

PPN 10% Err:509 Err:509

GRAND TOTAL Err:509 Err:509

PEMBULATAN Err:509 Err:509

PROGRES RENCANA

PROGRES REALISASI

DEVIASI
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 15
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 16 Desember 2019 s/d 22 Desember 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


- Kuda-Kuda 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. PEKERJAAN ATAP, TALANG & LISPLANK
a. Penutup Atap
- Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Atap Sky Light M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Teritisan Keliling M² 1.00 250,000.00 250,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Main Gate M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pasang Insulator Panas M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Bubungan
- Nok Atap Utama M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Nok Atap Main Gate M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Flashing Atap Zincalume M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Pintu Toilet (PT1)


Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Spandrell M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN
- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau Setara Unit 1.52 3,942,850.00 5,993,132.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 240.30 122,823.16 29,514,404.28 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit 16.00 37,210.28 595,364.48 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Door Closer Unit 62.70 82,680.00 5,184,036.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau Setara Unit 206.05 81,260.00 16,743,249.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 206.05 76,125.00 15,685,206.08 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT
a. Plafond Gypsum
- Plafon Ruang Pengelola M² 341.68 26,358.00 9,006,001.44 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Ruang Musholla M² 18.81 46,395.00 872,689.95 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Kios M² 206.05 26,358.00 5,430,944.65 Err:509 - Err:509 - Err:509 - - Err:509 Err:509

b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 60x80 cm)
- COS 160A), 3 phasa Unit 2.00 233,990.00 467,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 60A ,10KA, 3 phasa Unit 12.00 47,047.50 564,570.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 80A ,10KA, 3 phasa Unit 92.00 33,065.00 3,041,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 40A , 3 phasa Unit 2.00 46,030.00 92,060.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 25A , 3 phasa Unit 46.00 46,030.00 2,117,380.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 16A , 3 phasa Unit 46.00 33,047.50 1,520,185.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCB 10A, 6kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 60A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 80A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
MCB 2A, 10kA, 1 phasa (posisi di meja
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
los)
B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY
a. Pekerjaan Kabel Toevoer

- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

b. Pekerjaan Kabel Tray Err:509 Err:509


Pekerjaan Pengadaan + Pasang Kabel
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Tray
Pekerjaan Pengadaan Pipa Galvanis
- Sambungan dari Kabel Tray ke Instalasi M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Los
c. Pekerjaan Kabel Grounding
Pekerjaan Grounding, Nilai Maksimal = 1
- Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Ohm
XIII.2. PEKERJAAN INSTALASI
a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
Pengadaan + Penarikan Instalasi
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Penerangan Down Light, TL
Pengadaan + Penarikan Instalasi Stop
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kontak Normal (1 gang)
- Pengadaan + Penarikan Instalasi Saklar Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Armature
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Downlight
Pengadaan + Pasang Armature Lampu TL
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Emergency TL 2

- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86

- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


XIV. PEKERJAAN PLUMBING
a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air bersih
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay dari PDAM ke profil tank
Pengadaan + pemasangan pipa air bersih
- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke lavatory dan wudlu
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

Pengadaan + pemasangan pipa air bersih


- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay kran ke lavatory dan wudhu

Pengadaan + pemasangan pipa air bersih


- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke kran selasar
Pengadaan + pemasangan pipa air bersih
- supplay dari pipa 1" horisontal ke kran M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
selasar
Pengadaan + pemasangan pipa kuras /
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pembuangan dari profil tank
Pengadaan + pemasangan kran dinding
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1/2"
- Pengadaan + pemasangan washtafel Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengadaan + pemasangan stop kran
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran PVC
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1" posisi pada pompa Out
Pengadaan + pemasangan stop kran PVC
- 1" posisi pada pipa kuras/ pembuangan Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
profil tank
Pengadaan & Pemasangan Profil Tank
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2200 Liter
b. Pekerjaan Plumbing Air Kotor
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari parit los ke grease trap
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 4,390,000.00 4,390,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari grease trap ke Parit Keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
dari parit los ke parit keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
toilet dan wudhu ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
wastafel ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
meja los ke parit los
- Pengadaan + pemasangan floor drain Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Pekerjaan Plumbing Air Kotoran
Pengadaan + pemasangan pipa air
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
kotoran dari closet ke septictank
Pengadaan + pemasangan pipa udara
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank
Pengadaan + pemasangan pipa peresapan
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank

- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
(APAR)
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509

PPN 10% Err:509 Err:509

GRAND TOTAL Err:509 Err:509

PEMBULATAN Err:509 Err:509

PROGRES RENCANA

PROGRES REALISASI

DEVIASI
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 16
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 23 Desember 2019 s/d 29 Desember 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


- Kuda-Kuda 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. PEKERJAAN ATAP, TALANG & LISPLANK
a. Penutup Atap
- Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Atap Sky Light M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Teritisan Keliling M² 1.00 250,000.00 250,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Main Gate M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pasang Insulator Panas M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Bubungan
- Nok Atap Utama M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Nok Atap Main Gate M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Flashing Atap Zincalume M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond -
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Pintu Toilet (PT1)


Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Spandrell M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN
- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau Setara Unit 1.52 3,942,850.00 5,993,132.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 240.30 122,823.16 29,514,404.28 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit 16.00 37,210.28 595,364.48 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Door Closer Unit 62.70 82,680.00 5,184,036.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau Setara Unit 206.05 81,260.00 16,743,249.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 206.05 76,125.00 15,685,206.08 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT
a. Plafond Gypsum
- Plafon Ruang Pengelola M² 341.68 26,358.00 9,006,001.44 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Ruang Musholla M² 18.81 46,395.00 872,689.95 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Kios M² 206.05 26,358.00 5,430,944.65 Err:509 - Err:509 - Err:509 - - Err:509 Err:509

b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 60x80 cm)
- COS 160A), 3 phasa Unit 2.00 233,990.00 467,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 60A ,10KA, 3 phasa Unit 12.00 47,047.50 564,570.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 80A ,10KA, 3 phasa Unit 92.00 33,065.00 3,041,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 40A , 3 phasa Unit 2.00 46,030.00 92,060.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 25A , 3 phasa Unit 46.00 46,030.00 2,117,380.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 16A , 3 phasa Unit 46.00 33,047.50 1,520,185.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCB 10A, 6kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 60A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 80A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
MCB 2A, 10kA, 1 phasa (posisi di meja
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
los)
B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY
a. Pekerjaan Kabel Toevoer

- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

b. Pekerjaan Kabel Tray Err:509 Err:509


Pekerjaan Pengadaan + Pasang Kabel
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Tray
Pekerjaan Pengadaan Pipa Galvanis
- Sambungan dari Kabel Tray ke Instalasi M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Los
c. Pekerjaan Kabel Grounding
Pekerjaan Grounding, Nilai Maksimal = 1
- Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Ohm
XIII.2. PEKERJAAN INSTALASI
a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
Pengadaan + Penarikan Instalasi
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Penerangan Down Light, TL
Pengadaan + Penarikan Instalasi Stop
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kontak Normal (1 gang)
- Pengadaan + Penarikan Instalasi Saklar Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Armature
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Downlight
Pengadaan + Pasang Armature Lampu TL
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Emergency TL 2

- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86

- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


XIV. PEKERJAAN PLUMBING
a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air bersih
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay dari PDAM ke profil tank
Pengadaan + pemasangan pipa air bersih
- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke lavatory dan wudlu
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

Pengadaan + pemasangan pipa air bersih


- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay kran ke lavatory dan wudhu

Pengadaan + pemasangan pipa air bersih


- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke kran selasar
Pengadaan + pemasangan pipa air bersih
- supplay dari pipa 1" horisontal ke kran M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
selasar
Pengadaan + pemasangan pipa kuras /
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pembuangan dari profil tank
Pengadaan + pemasangan kran dinding
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1/2"
- Pengadaan + pemasangan washtafel Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengadaan + pemasangan stop kran
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran PVC
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1" posisi pada pompa Out
Pengadaan + pemasangan stop kran PVC
- 1" posisi pada pipa kuras/ pembuangan Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
profil tank
Pengadaan & Pemasangan Profil Tank
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2200 Liter
b. Pekerjaan Plumbing Air Kotor
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari parit los ke grease trap
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 4,390,000.00 4,390,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari grease trap ke Parit Keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
dari parit los ke parit keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
toilet dan wudhu ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
wastafel ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
meja los ke parit los
- Pengadaan + pemasangan floor drain Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Pekerjaan Plumbing Air Kotoran
Pengadaan + pemasangan pipa air
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
kotoran dari closet ke septictank
Pengadaan + pemasangan pipa udara
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank
Pengadaan + pemasangan pipa peresapan
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank

- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan -
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
(APAR)
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509

PPN 10% Err:509 Err:509

GRAND TOTAL Err:509 Err:509

PEMBULATAN Err:509 Err:509

PROGRES RENCANA

PROGRES REALISASI

DEVIASI
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 17
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 30 Desember 2019 s/d 31 Desember 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. PEKERJAAN PEMBESIAN
a. Kolom -
- Kolom K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


- Kuda-Kuda 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. PEKERJAAN ATAP, TALANG & LISPLANK
a. Penutup Atap
- Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Atap Sky Light M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Teritisan Keliling M² 1.00 250,000.00 250,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Main Gate M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pasang Insulator Panas M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Bubungan
- Nok Atap Utama M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Nok Atap Main Gate M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Flashing Atap Zincalume M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond -
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Pintu Toilet (PT1)


Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Spandrell M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN
- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau Setara Unit 1.52 3,942,850.00 5,993,132.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 240.30 122,823.16 29,514,404.28 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit 16.00 37,210.28 595,364.48 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Door Closer Unit 62.70 82,680.00 5,184,036.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau Setara Unit 206.05 81,260.00 16,743,249.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 206.05 76,125.00 15,685,206.08 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT
a. Plafond Gypsum
- Plafon Ruang Pengelola M² 341.68 26,358.00 9,006,001.44 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Ruang Musholla M² 18.81 46,395.00 872,689.95 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Kios M² 206.05 26,358.00 5,430,944.65 Err:509 - Err:509 - Err:509 - - Err:509 Err:509

b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 60x80 cm)
- COS 160A), 3 phasa Unit 2.00 233,990.00 467,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 60A ,10KA, 3 phasa Unit 12.00 47,047.50 564,570.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 80A ,10KA, 3 phasa Unit 92.00 33,065.00 3,041,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 40A , 3 phasa Unit 2.00 46,030.00 92,060.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 25A , 3 phasa Unit 46.00 46,030.00 2,117,380.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 16A , 3 phasa Unit 46.00 33,047.50 1,520,185.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCB 10A, 6kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 60A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 80A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
MCB 2A, 10kA, 1 phasa (posisi di meja
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
los)
B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY
a. Pekerjaan Kabel Toevoer

- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

b. Pekerjaan Kabel Tray Err:509 Err:509


Pekerjaan Pengadaan + Pasang Kabel
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Tray
Pekerjaan Pengadaan Pipa Galvanis
- Sambungan dari Kabel Tray ke Instalasi M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Los
c. Pekerjaan Kabel Grounding
Pekerjaan Grounding, Nilai Maksimal = 1
- Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Ohm
XIII.2. PEKERJAAN INSTALASI
a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
Pengadaan + Penarikan Instalasi
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Penerangan Down Light, TL
Pengadaan + Penarikan Instalasi Stop
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kontak Normal (1 gang)
- Pengadaan + Penarikan Instalasi Saklar Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Armature
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Downlight
Pengadaan + Pasang Armature Lampu TL
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Emergency TL 2

- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86

- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


XIV. PEKERJAAN PLUMBING
a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air bersih
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay dari PDAM ke profil tank
Pengadaan + pemasangan pipa air bersih
- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke lavatory dan wudlu
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

Pengadaan + pemasangan pipa air bersih


- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay kran ke lavatory dan wudhu

Pengadaan + pemasangan pipa air bersih


- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke kran selasar
Pengadaan + pemasangan pipa air bersih
- supplay dari pipa 1" horisontal ke kran M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
selasar
Pengadaan + pemasangan pipa kuras /
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pembuangan dari profil tank
Pengadaan + pemasangan kran dinding
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1/2"
- Pengadaan + pemasangan washtafel Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengadaan + pemasangan stop kran
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran PVC
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1" posisi pada pompa Out
Pengadaan + pemasangan stop kran PVC
- 1" posisi pada pipa kuras/ pembuangan Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
profil tank
Pengadaan & Pemasangan Profil Tank
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2200 Liter
b. Pekerjaan Plumbing Air Kotor
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari parit los ke grease trap
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 4,390,000.00 4,390,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari grease trap ke Parit Keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
dari parit los ke parit keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
toilet dan wudhu ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
wastafel ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
meja los ke parit los
- Pengadaan + pemasangan floor drain Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Pekerjaan Plumbing Air Kotoran
Pengadaan + pemasangan pipa air
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
kotoran dari closet ke septictank
Pengadaan + pemasangan pipa udara
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank
Pengadaan + pemasangan pipa peresapan
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank

- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
(APAR)
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509

PPN 10% Err:509 Err:509

GRAND TOTAL Err:509 Err:509

PEMBULATAN Err:509 Err:509

PROGRES RENCANA

PROGRES REALISASI

DEVIASI
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 18
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : ……. s/d ……. 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


- Kuda-Kuda 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. PEKERJAAN ATAP, TALANG & LISPLANK
a. Penutup Atap
- Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Atap Sky Light M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Teritisan Keliling M² 1.00 250,000.00 250,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Main Gate M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pasang Insulator Panas M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Bubungan
- Nok Atap Utama M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Nok Atap Main Gate M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Flashing Atap Zincalume M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond -
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Pintu Toilet (PT1)


Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Spandrell M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN
- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau Setara Unit 1.52 3,942,850.00 5,993,132.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 240.30 122,823.16 29,514,404.28 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit 16.00 37,210.28 595,364.48 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Door Closer Unit 62.70 82,680.00 5,184,036.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau Setara Unit 206.05 81,260.00 16,743,249.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 206.05 76,125.00 15,685,206.08 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT
a. Plafond Gypsum
- Plafon Ruang Pengelola M² 341.68 26,358.00 9,006,001.44 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Ruang Musholla M² 18.81 46,395.00 872,689.95 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Kios M² 206.05 26,358.00 5,430,944.65 Err:509 - Err:509 - Err:509 - - Err:509 Err:509

b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 60x80 cm)
- COS 160A), 3 phasa Unit 2.00 233,990.00 467,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 60A ,10KA, 3 phasa Unit 12.00 47,047.50 564,570.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 80A ,10KA, 3 phasa Unit 92.00 33,065.00 3,041,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 40A , 3 phasa Unit 2.00 46,030.00 92,060.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 25A , 3 phasa Unit 46.00 46,030.00 2,117,380.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 16A , 3 phasa Unit 46.00 33,047.50 1,520,185.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCB 10A, 6kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 60A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 80A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
MCB 2A, 10kA, 1 phasa (posisi di meja
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
los)
B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY
a. Pekerjaan Kabel Toevoer

- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

b. Pekerjaan Kabel Tray Err:509 Err:509


Pekerjaan Pengadaan + Pasang Kabel
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Tray
Pekerjaan Pengadaan Pipa Galvanis
- Sambungan dari Kabel Tray ke Instalasi M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Los
c. Pekerjaan Kabel Grounding
Pekerjaan Grounding, Nilai Maksimal = 1
- Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Ohm
XIII.2. PEKERJAAN INSTALASI
a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
Pengadaan + Penarikan Instalasi
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Penerangan Down Light, TL
Pengadaan + Penarikan Instalasi Stop
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kontak Normal (1 gang)
- Pengadaan + Penarikan Instalasi Saklar Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Armature
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Downlight
Pengadaan + Pasang Armature Lampu TL
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Emergency TL 2

- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86

- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


XIV. PEKERJAAN PLUMBING
a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air bersih
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay dari PDAM ke profil tank
Pengadaan + pemasangan pipa air bersih
- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke lavatory dan wudlu
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

Pengadaan + pemasangan pipa air bersih


- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay kran ke lavatory dan wudhu

Pengadaan + pemasangan pipa air bersih


- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke kran selasar
Pengadaan + pemasangan pipa air bersih
- supplay dari pipa 1" horisontal ke kran M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
selasar
Pengadaan + pemasangan pipa kuras /
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pembuangan dari profil tank
Pengadaan + pemasangan kran dinding
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1/2"
- Pengadaan + pemasangan washtafel Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengadaan + pemasangan stop kran
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran PVC
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1" posisi pada pompa Out
Pengadaan + pemasangan stop kran PVC
- 1" posisi pada pipa kuras/ pembuangan Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
profil tank
Pengadaan & Pemasangan Profil Tank
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2200 Liter
b. Pekerjaan Plumbing Air Kotor
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari parit los ke grease trap
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 4,390,000.00 4,390,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari grease trap ke Parit Keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
dari parit los ke parit keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
toilet dan wudhu ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
wastafel ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
meja los ke parit los
- Pengadaan + pemasangan floor drain Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Pekerjaan Plumbing Air Kotoran
Pengadaan + pemasangan pipa air
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
kotoran dari closet ke septictank
Pengadaan + pemasangan pipa udara
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank
Pengadaan + pemasangan pipa peresapan
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank

- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan -
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
(APAR)
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509

PPN 10% Err:509 Err:509

GRAND TOTAL Err:509 Err:509

PEMBULATAN Err:509 Err:509

PROGRES RENCANA

PROGRES REALISASI

DEVIASI
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 04
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 30 September 2019 s/d 06 Oktober 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019

KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Ring Balok
- Balok B1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom K3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom KP M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


- Kuda-Kuda 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. PEKERJAAN ATAP, TALANG & LISPLANK
a. Penutup Atap
- Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Atap Sky Light M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Teritisan Keliling M² 1.00 250,000.00 250,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Atap Main Gate M² 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pasang Insulator Panas M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Bubungan
- Nok Atap Utama M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Nok Atap Main Gate M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Flashing Atap Zincalume M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1) -
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- Pintu Toilet (PT1)


Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Spandrell M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN
- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau Setara Unit 1.52 3,942,850.00 5,993,132.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 240.30 122,823.16 29,514,404.28 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit 16.00 37,210.28 595,364.48 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Door Closer Unit 62.70 82,680.00 5,184,036.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau Setara Unit 206.05 81,260.00 16,743,249.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Engsel Pintu Unit 206.05 76,125.00 15,685,206.08 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Handle Pintu Merk Solid atau Setara Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XI. PEKERJAAN PLAFOND & LANGIT-LANGIT
a. Plafond Gypsum
- Plafon Ruang Pengelola M² 341.68 26,358.00 9,006,001.44 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Ruang Musholla M² 18.81 46,395.00 872,689.95 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Kios M² 206.05 26,358.00 5,430,944.65 Err:509 - Err:509 - Err:509 - - Err:509 Err:509

b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 60x80 cm)
- COS 160A), 3 phasa Unit 2.00 233,990.00 467,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 60A ,10KA, 3 phasa Unit 12.00 47,047.50 564,570.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 80A ,10KA, 3 phasa Unit 92.00 33,065.00 3,041,980.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 40A , 3 phasa Unit 2.00 46,030.00 92,060.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 25A , 3 phasa Unit 46.00 46,030.00 2,117,380.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCCB 16A , 3 phasa Unit 46.00 33,047.50 1,520,185.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- MCB 10A, 6kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios
Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 60A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Box Panel plat 1,5mm fin. Cat warna abu-
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
abu kulit jeruk (uk. 40x60 cm)
- MCCB 80A ,10KA, 3 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 5kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
MCB 2A, 10kA, 1 phasa (posisi di meja
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
los)
B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY
a. Pekerjaan Kabel Toevoer

- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

b. Pekerjaan Kabel Tray Err:509 Err:509


Pekerjaan Pengadaan + Pasang Kabel
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Tray
Pekerjaan Pengadaan Pipa Galvanis
- Sambungan dari Kabel Tray ke Instalasi M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Los
c. Pekerjaan Kabel Grounding -
Pekerjaan Grounding, Nilai Maksimal = 1
- Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Ohm
XIII.2. PEKERJAAN INSTALASI
a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
Pengadaan + Penarikan Instalasi
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Penerangan Down Light, TL
Pengadaan + Penarikan Instalasi Stop
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kontak Normal (1 gang)
- Pengadaan + Penarikan Instalasi Saklar Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pekerjaan Armature
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Downlight
Pengadaan + Pasang Armature Lampu TL
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1
Pengadaan + Pasang Armature Lampu
- Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Emergency TL 2

- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86

- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


XIV. PEKERJAAN PLUMBING
a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air bersih
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay dari PDAM ke profil tank
Pengadaan + pemasangan pipa air bersih
- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke lavatory dan wudlu
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

Pengadaan + pemasangan pipa air bersih


- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
supplay kran ke lavatory dan wudhu

Pengadaan + pemasangan pipa air bersih


- supplay dari pompa ke pipa vertikal turun M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
ke kran selasar
Pengadaan + pemasangan pipa air bersih
- supplay dari pipa 1" horisontal ke kran M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
selasar
Pengadaan + pemasangan pipa kuras /
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pembuangan dari profil tank
Pengadaan + pemasangan kran dinding
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1/2"
- Pengadaan + pemasangan washtafel Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengadaan + pemasangan stop kran
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran PVC
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1" posisi pada pompa Out
Pengadaan + pemasangan stop kran PVC
- 1" posisi pada pipa kuras/ pembuangan Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
profil tank
Pengadaan & Pemasangan Profil Tank
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2200 Liter
b. Pekerjaan Plumbing Air Kotor
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 1,000,000.00 1,000,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari parit los ke grease trap
Pengadaan + pemasangan pipa air kotor
- M¹ 1.00 4,390,000.00 4,390,000.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dari grease trap ke Parit Keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
dari parit los ke parit keliling
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
toilet dan wudhu ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
wastafel ke parit
Pengadaan + pemasangan pipa air kotor
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
meja los ke parit los
- Pengadaan + pemasangan floor drain Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Pekerjaan Plumbing Air Kotoran
Pengadaan + pemasangan pipa air
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
kotoran dari closet ke septictank
Pengadaan + pemasangan pipa udara
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank
Pengadaan + pemasangan pipa peresapan
- M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
pada septictank

- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan -
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire Extinguisher
- Unit 8.00 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
(APAR)
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509

PPN 10% Err:509 Err:509

GRAND TOTAL Err:509 Err:509

PEMBULATAN Err:509 Err:509

PROGRES RENCANA

PROGRES REALISASI

DEVIASI
RENCANA ANGGARAN BIAYA
PASAR RAKYAT MASOHI (TYPE D)

KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN


PEKERJAAN : REVITALISASI PASAR MASOHI
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN : 2019

HRG SAT. HRG SAT. JMLH HARGA JMLH HARGA JUMLAH TOTAL
NO. URAIAN PEKERJAAN SAT. VOL.
MATERIAL TENAGA MATERIAL TENAGA HARGA

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 95.00 67,114.00 24,926.25 6,375,830.00 2,367,993.75 8,743,823.75
2 Pemasangan Papan Nama Proyek Ls 1.00 222,500.00 150,000.00 222,500.00 150,000.00 372,500.00
Sewa Direksi Keet / Kantor Sementara &
3 Ls 1.00 14,400,000.00 5,600,000.00 14,400,000.00 5,600,000.00 20,000,000.00
Gudang Alat dan Bahan
4 Biaya K3 Ls 1.00 23,000,000.00 - 23,000,000.00 - 23,000,000.00
5 Perataan dan Pembersihan Lapangan Ls 1.00 5,000,000.00 10,000,000.00 5,000,000.00 10,000,000.00 15,000,000.00
TOTAL - I 48,998,330.00 18,117,993.75 67,116,323.75

II. PEKERJAAN TANAH DAN STRUKTUR BAWAH


II.1. PONDASI
A. Pondasi Foot Plat
Pekerjaan Mobilisasi & Demobilisasi
- Termasuk biaya pengamanan Ls 1.00 - 10,000,000.00 - 10,000,000.00 10,000,000.00
Peralatan
- Foot Plat P1 Beton K-300, (150 x 100 x 35) M³ 6.30 1,486,588.27 224,077.50 9,365,506.08 1,411,688.25 10,777,194.33
- Foot Plat P2 Beton K-300, (100 x 100 x 30) M³ 1.20 1,486,588.27 224,077.50 1,783,905.92 268,893.00 2,052,798.92
- Foot Plat P3 Beton K-300, (80 x 80 x 20) M³ 0.26 1,486,588.27 224,077.50 380,566.60 57,363.84 437,930.44
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr Pondasi Keliling Bangunan M³ 32.56 1,069,327.50 271,687.50 34,817,303.40 8,846,145.00 43,663,448.40
- Pas. Batu Kali 1 PC : 4 Psr Pondasi Dalam Bangunan M³ 36.33 950,820.00 271,687.50 34,543,290.60 9,870,406.88 44,413,697.48
- Pas. Batu Kali 1 PC : 4 Psr Pondasi Area Los M³ 9.34 950,820.00 271,687.50 8,876,855.52 2,536,474.50 11,413,330.02

II.2. STRUKTUR BAWAH


A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 Kondisi Tanah dengan Kekerasan Standart M³ 77.40 - 101,688.75 - 7,870,709.25 7,870,709.25

- Foot Plat P2 Kondisi Tanah dengan Kekerasan Standart M³ 19.35 - 101,688.75 - 1,967,677.31 1,967,677.31

- Foot Plat P3 Kondisi Tanah dengan Kekerasan Standart M³ 5.58 - 101,688.75 - 567,118.16 567,118.16

- Pas. Batu Kali 1 PC : 3 Psr Kondisi Tanah dengan Kekerasan Standart M³ 53.28 - 82,368.75 - 4,388,607.00 4,388,607.00

- Pas. Batu Kali 1 PC : 4 Psr Kondisi Tanah dengan Kekerasan Standart M³ 54.50 - 82,368.75 - 4,488,685.03 4,488,685.03

- Pas. Batu Kali 1 PC : 4 Psr Kondisi Tanah dengan Kekerasan Standart M³ 11.67 - 82,368.75 - 961,243.31 961,243.31

- Parit Keliling Kondisi Tanah dengan Kekerasan Standart M³ 32.41 - 82,368.75 - 2,669,571.19 2,669,571.19

B. Urug Pasir
a. Foot Plat
- Foot Plat P1 Pasir Urug Tebal 5 cm dipadatkan M³ 1.80 338,100.00 32,947.50 608,580.00 59,305.50 667,885.50
- Foot Plat P2 Pasir Urug Tebal 5 cm dipadatkan M³ 0.40 338,100.00 32,947.50 135,240.00 13,179.00 148,419.00
- Foot Plat P3 Pasir Urug Tebal 5 cm dipadatkan M³ 0.13 338,100.00 32,947.50 43,276.80 4,217.28 47,494.08
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr Pasir Urug Tebal 10 cm dipadatkan M³ 5.92 338,100.00 32,947.50 2,001,552.00 195,049.20 2,196,601.20
- Pas. Batu Kali 1 PC : 4 Psr Pasir Urug Tebal 10 cm dipadatkan M³ 6.06 338,100.00 32,947.50 2,047,195.50 199,497.11 2,246,692.61
- Pas. Batu Kali 1 PC : 4 Psr Pasir Urug Tebal 10 cm dipadatkan M³ 3.89 338,100.00 32,947.50 1,315,209.00 128,165.78 1,443,374.78
HRG SAT. HRG SAT. JMLH HARGA JMLH HARGA JUMLAH TOTAL
NO. URAIAN PEKERJAAN SAT. VOL.
MATERIAL TENAGA MATERIAL TENAGA HARGA

C. Lantai Kerja (Beton K-100)


a. Foot Plat
- Foot Plat P1 Site mix, tebal 5 cm M³ 0.90 1,184,634.78 162,840.00 1,066,171.30 146,556.00 1,212,727.30
- Foot Plat P2 Site mix, tebal 5 cm M³ 0.20 1,184,634.78 162,840.00 236,926.96 32,568.00 269,494.96
- Foot Plat P3 Site mix, tebal 5 cm M³ 0.06 1,184,634.78 162,840.00 75,816.63 10,421.76 86,238.39

D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 Beton K-300, (30 x 40) M³ 2.81 1,486,588.27 224,077.50 4,174,339.85 629,209.62 4,803,549.47
- Kolom Foot Plat P2 Beton K-300, (30 x 30) M³ 0.72 1,486,588.27 224,077.50 1,070,343.55 161,335.80 1,231,679.35
- Kolom Foot Plat P3 Beton K-300, (25 x 25) M³ 0.19 1,486,588.27 224,077.50 278,735.30 42,014.53 320,749.83
b. Sloof
- Sloof S1 Beton K-300, (20 x 30) M³ 4.44 1,486,588.27 224,077.50 6,600,451.91 994,904.10 7,595,356.01
- Sloof S2 Beton K-300, (15 x 20) M³ 2.62 1,486,588.27 224,077.50 3,891,144.79 586,522.86 4,477,667.65
- Sloof S3 Beton K-300, (15 x 15) M³ 3.50 1,486,588.27 224,077.50 5,204,545.52 784,495.33 5,989,040.85

E. Beton K-200 :
- Lantai Parit Keliling Site mix, tebal 10 cm M³ 2.73 1,382,037.45 224,077.50 3,772,962.23 611,731.58 4,384,693.81
- Tutup Parit Keliling Site mix, tebal 12 cm M³ 6.55 1,382,037.45 224,077.50 9,055,109.35 1,468,155.78 10,523,265.13
- Rabat Beton Untuk Lantai Site mix, tebal 5 cm M³ 28.08 1,382,037.45 224,077.50 38,803,465.40 6,291,423.97 45,094,889.37
- Ramp Site mix, tebal 10 cm M³ 2.00 1,382,037.45 224,077.50 2,764,074.89 448,155.00 3,212,229.89

F. Pembesian :
a. Foot Plat
- Foot Plat P1 Tul. D16-150 Kg 1,051.11 27,030.75 1,754.33 28,412,233.25 1,843,984.76 30,256,218.01
- Foot Plat P2 Tul. D16-150 Kg 242.42 27,030.75 1,754.33 6,552,731.27 425,279.37 6,978,010.64
- Foot Plat P3 Tul. D16-150 Kg 31.96 27,030.75 1,754.33 863,885.47 56,067.10 919,952.57
b. Kolom Foot Plat
- Kolom Foot Plat P1 Tul. 10D16 + sengkang Ø10-125 Kg 796.05 27,030.75 1,754.33 21,517,947.26 1,396,538.12 22,914,485.38
- Kolom Foot Plat P2 Tul. 8D12 + sengkang Ø10-125 Kg 136.45 27,030.75 1,754.33 3,688,417.67 239,382.31 3,927,799.98
- Kolom Foot Plat P3 Tul. 4D12 + sengkang Ø10-125 Kg 16.93 27,030.75 1,754.33 457,619.33 29,699.99 487,319.32
c. Sloof
- Sloof S1 Tul. 6D12 + 2Ø10 + sengkang Ø10-150 Kg 870.13 27,030.75 1,754.33 23,520,135.15 1,526,482.29 25,046,617.44
- Sloof S2 Tul. 4D12 + sengkang Ø10-150 Kg 559.97 27,030.75 1,754.33 15,136,393.29 982,368.35 16,118,761.64
- Sloof S3 Tul. 4D8 + sengkang Ø6-200 Kg 340.45 27,030.75 1,754.33 9,202,713.28 597,266.08 9,799,979.36
d. Parit
- Tutup Parit Keliling Tul. Ø8-150 Kg 361.81 27,030.75 1,754.33 9,780,036.74 634,734.99 10,414,771.74

G. Bekisting :
a. Foot Plat
- Foot Plat P1 Papan Kayu + Rangka Kaso M² 21.00 149,385.00 94,185.00 3,137,085.00 1,977,885.00 5,114,970.00
- Foot Plat P2 Papan Kayu + Rangka Kaso M² 4.80 149,385.00 94,185.00 717,048.00 452,088.00 1,169,136.00
- Foot Plat P3 Papan Kayu + Rangka Kaso M² 1.28 149,385.00 94,185.00 191,212.80 120,556.80 311,769.60
b. Kolom Foot Plat
- Kolom Foot Plat P1 Multipleks 9 mm Rangka Kaso M² 32.76 311,707.50 119,542.50 10,211,537.70 3,916,212.30 14,127,750.00
- Kolom Foot Plat P2 Multipleks 9 mm Rangka Kaso M² 9.60 311,707.50 119,542.50 2,992,392.00 1,147,608.00 4,140,000.00
- Kolom Foot Plat P3 Multipleks 9 mm Rangka Kaso M² 3.00 311,707.50 119,542.50 935,122.50 358,627.50 1,293,750.00
c. Sloof
- Sloof S1 Multipleks 9 mm Rangka Kaso M² 44.40 166,778.75 94,185.00 7,404,976.50 4,181,814.00 11,586,790.50
- Sloof S2 Multipleks 9 mm Rangka Kaso M² 34.90 166,778.75 94,185.00 5,820,578.38 3,287,056.50 9,107,634.88
- Sloof S3 Multipleks 9 mm Rangka Kaso M² 46.68 166,778.75 94,185.00 7,785,232.05 4,396,555.80 12,181,787.85
d. Parit
- Tutup Parit Keliling Papan Kayu + Rangka Kaso M² 22.42 149,385.00 94,185.00 3,348,614.16 2,111,250.96 5,459,865.12

H. Tanah Urug
a. Foot Plat
- Foot Plat P1 Menggunakan Tanah Bekas Galian M³ 25.80 - 61,237.50 - 1,579,927.50 1,579,927.50
- Foot Plat P2 Menggunakan Tanah Bekas Galian M³ 6.45 - 61,237.50 - 394,981.88 394,981.88
- Foot Plat P3 Menggunakan Tanah Bekas Galian M³ 1.86 - 61,237.50 - 113,840.51 113,840.51
HRG SAT. HRG SAT. JMLH HARGA JMLH HARGA JUMLAH TOTAL
NO. URAIAN PEKERJAAN SAT. VOL.
MATERIAL TENAGA MATERIAL TENAGA HARGA

b. Pondasi Batu Kali


- Pas. Batu Kali 1 PC : 3 Psr Menggunakan Tanah Bekas Galian M³ 17.76 - 61,237.50 - 1,087,578.00 1,087,578.00
- Pas. Batu Kali 1 PC : 4 Psr Menggunakan Tanah Bekas Galian M³ 18.17 - 61,237.50 - 1,112,379.19 1,112,379.19
- Pas. Batu Kali 1 PC : 4 Psr Menggunakan Tanah Bekas Galian M³ 3.89 - 61,237.50 - 238,213.88 238,213.88
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat Mendatangkan Tanah M³ 105.31 333,960.00 32,947.50 35,168,117.00 3,469,581.79 38,637,698.79
TOTAL - II 369,756,597.90 106,389,451.86 476,146,049.76

III. PEKERJAAN STRUKTUR TENGAH


III.1. PEKERJAAN STRUKTUR BETON
A. PEKERJAAN BETON
a. Kolom
- Kolom K1 Beton K-300, (30 x 40) M³ 1.80 1,486,588.27 224,077.50 2,675,858.88 403,339.50 3,079,198.38
- Kolom K2 Beton K-300, (30 x 30) M³ 1.53 1,486,588.27 224,077.50 2,274,480.05 342,838.58 2,617,318.62
- Kolom K3 Beton K-300, (25 x 25) M³ 0.41 1,486,588.27 224,077.50 603,926.48 91,031.48 694,957.97
- Kolom KP Beton K-250, (13 x 13) M³ 3.41 1,414,348.49 224,077.50 4,816,351.64 763,062.31 5,579,413.95

b. Ring Balok
- Balok B1 Beton K-300, (20 x 30) M³ 1.95 1,486,588.27 224,077.50 2,903,306.89 437,623.36 3,340,930.24
- Balok B2 Beton K-300, (15 x 20) M³ 0.65 1,486,588.27 224,077.50 963,309.20 145,202.22 1,108,511.42
- Ring Balok RB1 Beton K-250, (12 x 20) M³ 2.09 1,414,348.49 224,077.50 2,961,645.74 469,218.29 3,430,864.03
- Balok Letiu Beton K-250, (12 x 20) M³ 0.73 1,414,348.49 224,077.50 1,035,303.10 164,024.73 1,199,327.83

c. Plat Beton
- Plat Beton Lantai 2 Beton K-300, tebal 12 cm M³ 1.08 1,486,588.27 224,077.50 1,605,515.33 242,003.70 1,847,519.03
- Dak Beton Main Gate Beton K-250, tebal 10 cm M³ 0.56 1,414,348.49 224,077.50 795,571.03 126,043.59 921,614.62

d. Plat Beton Meja Los


- Los Model A Beton K-200, tebal 10 cm M³ 3.36 1,382,037.45 224,077.50 4,643,645.82 752,900.40 5,396,546.22
- Los Model B Beton K-200, tebal 10 cm M³ 0.84 1,382,037.45 224,077.50 1,160,911.46 188,225.10 1,349,136.56
- Los Model C Beton K-200, tebal 10 cm M³ 2.40 1,382,037.45 224,077.50 3,316,889.87 537,786.00 3,854,675.87
- Los Model D Beton K-200, tebal 10 cm M³ 0.60 1,382,037.45 224,077.50 829,222.47 134,446.50 963,668.97

e. Kolom Beton Meja Los


- Los Beton K-200, (12 x 12) M³ 1.61 1,382,037.45 224,077.50 2,228,949.99 361,392.19 2,590,342.19

f. Bak Kontrol
- Grease Trap Beton K-200, tebal 10 cm M³ 0.49 1,382,037.45 224,077.50 671,670.20 108,901.67 780,571.86

B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Tul. 10D16 + sengkang Ø10-125 Kg 380.85 27,030.75 1,754.33 10,294,635.19 668,132.99 10,962,768.18
- Kolom K2 Tul. 8D12 + sengkang Ø10-125 Kg 241.51 27,030.75 1,754.33 6,528,201.19 423,687.34 6,951,888.53
- Kolom K3 Tul. 4D12 + sengkang Ø10-125 Kg 42.46 27,030.75 1,754.33 1,147,847.82 74,496.57 1,222,344.39
- Kolom KP Tul. 4D10 + sengkang Ø8-150 Kg 784.93 27,030.75 1,754.33 21,217,293.78 1,377,025.38 22,594,319.17

b. Ring Balok
Tul. 6D12 + 2Ø10 + sengkang Ø10-100
- Balok B1 Kg 414.59 27,030.75 1,754.33 11,206,647.61 727,323.59 11,933,971.20
(tump) & Ø10-150 (lap)
Tul. 4D10 + sengkang Ø10-100 (tump) &
- Balok B2 Kg 94.46 27,030.75 1,754.33 2,553,261.50 165,709.44 2,718,970.94
Ø10-150 (lap)
Tul. 4D10 + sengkang Ø8-100 (tump) &
- Ring Balok RB1 Kg 360.42 27,030.75 1,754.33 9,742,308.41 632,286.39 10,374,594.80
Ø8-150 (lap)
- Balok Letiu Tul. 4D10 + sengkang Ø8-150 Kg 122.70 27,030.75 1,754.33 3,316,733.62 215,259.61 3,531,993.23

c. Plat Beton
- Plat Beton Lantai 2 Tul. D10-150 Kg 173.61 27,030.75 1,754.33 4,692,711.20 304,562.05 4,997,273.24
- Dak Beton Main Gate Tul. D8-150 Kg 66.68 27,030.75 1,754.33 1,802,427.71 116,979.51 1,919,407.22
HRG SAT. HRG SAT. JMLH HARGA JMLH HARGA JUMLAH TOTAL
NO. URAIAN PEKERJAAN SAT. VOL.
MATERIAL TENAGA MATERIAL TENAGA HARGA

d. Plat Beton Meja Los


- Los Model A Tul. Ø8-150 Kg 189.07 27,030.75 1,754.33 5,110,789.10 331,695.76 5,442,484.86
- Los Model B Tul. Ø8-150 Kg 47.27 27,030.75 1,754.33 1,277,697.28 82,923.94 1,360,621.22
- Los Model C Tul. Ø8-150 Kg 135.41 27,030.75 1,754.33 3,660,314.73 237,558.40 3,897,873.13
- Los Model D Tul. Ø8-150 Kg 33.85 27,030.75 1,754.33 915,078.68 59,389.60 974,468.28

e. Kolom Beton Meja Los


- Los Kg 338.40 27,030.75 1,754.33 9,147,320.63 593,671.03 9,740,991.66

f. Bak Kontrol
- Grease Trap Tul. Ø8-150 Kg 40.52 27,030.75 1,754.33 1,095,321.45 71,087.55 1,166,409.01

C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 Multipleks 9 mm Rangka Kaso M² 21.00 311,707.50 119,542.50 6,545,857.50 2,510,392.50 9,056,250.00
- Kolom K2 Multipleks 9 mm Rangka Kaso M² 20.40 311,707.50 119,542.50 6,358,833.00 2,438,667.00 8,797,500.00
- Kolom K3 Multipleks 9 mm Rangka Kaso M² 6.50 311,707.50 119,542.50 2,026,098.75 777,026.25 2,803,125.00
- Kolom KP Multipleks 9 mm Rangka Kaso M² 52.39 311,707.50 119,542.50 16,330,355.93 6,262,831.58 22,593,187.50

b. Ring Balok
- Balok B1 Multipleks 9 mm Rangka Kaso M² 26.04 323,092.50 119,542.50 8,413,328.70 3,112,886.70 11,526,215.40
- Balok B2 Multipleks 9 mm Rangka Kaso M² 11.88 323,092.50 119,542.50 3,838,338.90 1,420,164.90 5,258,503.80
- Ring Balok RB1 Multipleks 9 mm Rangka Kaso M² 34.90 323,092.50 119,542.50 11,275,928.25 4,172,033.25 15,447,961.50
- Balok Letiu Multipleks 9 mm Rangka Kaso M² 15.86 323,092.50 119,542.50 5,124,247.05 1,895,944.05 7,020,191.10

c. Plat Beton
- Plat Beton Lantai 2 Multipleks 9 mm Rangka Kaso M² 9.00 380,707.50 119,542.50 3,426,367.50 1,075,882.50 4,502,250.00
- Dak Beton Main Gate Multipleks 9 mm Rangka Kaso M² 5.63 380,707.50 119,542.50 2,141,479.69 672,426.56 2,813,906.25

d. Plat Beton Meja Los


- Los Model A Multipleks 9 mm Rangka Kaso M² 33.60 380,707.50 119,542.50 12,791,772.00 4,016,628.00 16,808,400.00
- Los Model B Multipleks 9 mm Rangka Kaso M² 8.40 380,707.50 119,542.50 3,197,943.00 1,004,157.00 4,202,100.00
- Los Model C Multipleks 9 mm Rangka Kaso M² 24.00 380,707.50 119,542.50 9,136,980.00 2,869,020.00 12,006,000.00
- Los Model D Multipleks 9 mm Rangka Kaso M² 6.00 380,707.50 119,542.50 2,284,245.00 717,255.00 3,001,500.00

e. Kolom Beton Meja Los


- Los Multipleks 9 mm Rangka Kaso M² 26.88 311,707.50 119,542.50 8,378,697.60 3,213,302.40 11,592,000.00

f. Bak Kontrol
- Grease Trap Multipleks 9 mm Rangka Kaso M² 6.60 363,745.00 119,542.50 2,400,717.00 788,980.50 3,189,697.50

III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL


a. Struktur Utama
- Kolom Struktur K1 Besi WF 250.125.6.9 Kg 1,065.00 31,740.00 14,955.75 33,803,100.00 15,927,873.75 49,730,973.75
- Kuda-Kuda Baja Besi WF 200.100.5,5.8 Kg 2,304.00 31,740.00 14,955.75 73,128,960.00 34,458,048.00 107,587,008.00
- Konsol Teritisan Besi Kopel Canal C 125.50.20.3,2 Kg 148.00 31,740.00 14,955.75 4,697,520.00 2,213,451.00 6,910,971.00
- Ring Balok RB Besi WF 200.100.5,5.8 Kg 1,088.00 31,740.00 14,955.75 34,533,120.00 16,271,856.00 50,804,976.00
- Gording Canal C Besi Canal C 125.50.20.3,2 Kg 4,297.55 31,740.00 14,955.75 136,404,237.00 64,273,083.41 200,677,320.41

b. Aksessoris Struktur Pendukung


- Rip 1 (Plat Buhul) plat besi tebal 10mm Kg 60.76 31,740.00 14,955.75 1,928,370.31 908,639.71 2,837,010.02
- Rip 2 (Plat Buhul) plat besi tebal 8mm Kg 170.44 31,740.00 14,955.75 5,409,851.56 2,549,098.54 7,958,950.10
- Rip 3 (Plat Buhul) potongan Besi WF 200x100 Kg 85.33 31,740.00 14,955.75 2,708,480.00 1,276,224.00 3,984,704.00
- Rip 4 (Plat Buhul) potongan Besi WF 250x150 Kg 307.20 31,740.00 14,955.75 9,750,528.00 4,594,406.40 14,344,934.40
- Endplate 1 Plat Besi tebal 12 mm Kg 70.00 31,740.00 14,955.75 2,221,800.00 1,046,902.50 3,268,702.50
- Endplate 2 plat besi tebal 10mm Kg 200.90 31,740.00 14,955.75 6,376,477.83 3,004,568.63 9,381,046.46
- Angkur Baut baut HTB M22 panjang 750mm Bh 72.00 83,000.00 17,500.00 5,976,000.00 1,260,000.00 7,236,000.00
- Baut HTB 19 baut HTB M19 Bh 600.00 21,000.00 2,800.00 12,600,000.00 1,680,000.00 14,280,000.00
- Baut HTB 16 baut HTB M16 Bh 312.00 20,000.00 2,800.00 6,240,000.00 873,600.00 7,113,600.00
- Trackstang besi Ø10 lengkap dengan ulir Kg 181.99 31,740.00 14,955.75 5,776,387.99 2,721,808.91 8,498,196.90
HRG SAT. HRG SAT. JMLH HARGA JMLH HARGA JUMLAH TOTAL
NO. URAIAN PEKERJAAN SAT. VOL.
MATERIAL TENAGA MATERIAL TENAGA HARGA

- Kait Angin besi Ø16 lengkap dengan ulir Kg 328.27 31,740.00 14,955.75 10,419,414.22 4,909,582.68 15,328,996.90
- Dudukan Gording plat besi tebal 8mm Kg 1,012.92 31,740.00 14,955.75 32,149,975.00 15,148,928.44 47,298,903.44
- Turnbuklce Ø16 lengkap dengan pengunci Bh 20.00 138,000.00 25,000.00 2,760,000.00 500,000.00 3,260,000.00

c. Cat Baja Struktur Utama


- Kolom Struktur K1 Cat Meni Besi M² 36.00 5,796.00 29,799.38 208,656.00 1,072,777.50 1,281,433.50
- Kuda-Kuda Baja Cat Meni Besi M² 43.20 5,796.00 29,799.38 250,387.20 1,287,333.00 1,537,720.20
- Konsol Teritisan Cat Meni Besi M² 6.60 5,796.00 29,799.38 38,253.60 196,675.88 234,929.48
- Ring Balok RB Cat Meni Besi M² 40.80 5,796.00 29,799.38 236,476.80 1,215,814.50 1,452,291.30
- Gording Canal C Cat Meni Besi M² 369.36 5,796.00 29,799.38 2,140,793.17 11,006,607.75 13,147,400.92

d. Cat Baja Aksessoris Struktur Pendukung


- Rip 1 (Plat Buhul) Cat Meni Besi M² 1.50 5,796.00 29,799.38 8,694.00 44,699.06 53,393.06
- Rip 2 (Plat Buhul) Cat Meni Besi M² 5.25 5,796.00 29,799.38 30,429.00 156,446.72 186,875.72
- Rip 3 (Plat Buhul) Cat Meni Besi M² 3.20 5,796.00 29,799.38 18,547.20 95,358.00 113,905.20
- Rip 4 (Plat Buhul) Cat Meni Besi M² 11.52 5,796.00 29,799.38 66,769.92 343,288.80 410,058.72
- Endplate 1 Cat Meni Besi M² 1.44 5,796.00 29,799.38 8,346.24 42,911.10 51,257.34
- Endplate 2 Cat Meni Besi M² 4.96 5,796.00 29,799.38 28,748.16 147,804.90 176,553.06
- Trackstang Cat Meni Besi M² 9.28 5,796.00 29,799.38 53,773.63 276,470.09 330,243.72
- Kait Angin Cat Meni Besi M² 10.46 5,796.00 29,799.38 60,622.85 311,684.43 372,307.28
- Dudukan Gording Cat Meni Besi M² 3.12 5,796.00 29,799.38 18,083.52 92,974.05 111,057.57

III.3. PEKERJAAN STRUKTUR BAJA RINGAN


Baja Ringan Profil C 75 mm termasuk
- Kuda-Kuda 1 M² 20.50 293,537.50 118,110.75 6,017,518.75 2,421,270.38 8,438,789.13
Aksessories Mur dan Pemasangan
TOTAL - III 626,936,659.88 240,627,615.07 867,564,274.94

IV. PEKERJAAN ATAP, TALANG & LISPLANK


a. Penutup Atap
- Atap Utama Atap Zincalume 0,4 atau Setara M² 354.90 121,451.50 119,646.00 43,103,137.35 42,462,365.40 85,565,502.75
- Atap Sky Light Atap Transparan Zincalume atau Setara M² 145.60 128,696.50 119,646.00 18,738,210.40 17,420,457.60 36,158,668.00
- Atap Teritisan Keliling Atap Zincalume 0,4 atau Setara M² 24.60 121,451.50 119,646.00 2,987,706.90 2,943,291.60 5,930,998.50
- Atap Main Gate Atap Zincalume 0,4 atau Setara M² 20.50 121,451.50 119,646.00 2,489,755.75 2,452,743.00 4,942,498.75
Multipleks 6 mm + Aluminium Foil Single
- Pasang Insulator Panas M² 318.50 69,506.00 119,646.00 22,137,661.00 38,107,251.00 60,244,912.00
Side Woven

b. Bubungan
- Nok Atap Utama Nok Zincalume atau Setara M¹ 27.50 125,258.00 156,112.50 3,444,595.00 4,293,093.75 7,737,688.75
- Nok Atap Main Gate Nok Zincalume atau Setara M¹ 2.50 125,258.00 156,112.50 313,145.00 390,281.25 703,426.25
- Flashing Atap Zincalume Flashing Zincalume atau Setara M¹ 12.30 137,505.50 156,112.50 1,691,317.65 1,920,183.75 3,611,501.40

c. Talang
- Rangka Talang Atap Utama Besi Hollow 40x40 termasuk Mesi Besi Kg 752.82 31,740.00 14,955.75 23,894,535.90 11,259,001.42 35,153,537.32
Plat Talang Galvalum lebar 1,2 m tebal 0,5
- Plat Rangka Atap Utama M² 66.00 543,270.00 63,310.00 35,855,820.00 4,178,460.00 40,034,280.00
mm termasuk Aksesoris Mur
- Roof Drain Roof Drain 4" Merk Onda/Setara Bh 12.00 108,100.00 15,611.25 1,297,200.00 187,335.00 1,484,535.00

d. Lisplank
Panel GRC 9 mm termasuk Asesoris Mur
- Lisplank Atap Utama GRC Lebar 50 cm M² 45.70 115,064.40 24,926.25 5,258,443.08 1,139,129.63 6,397,572.71
dan Pemasangan
Panel GRC 9 mm termasuk Asesoris Mur
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ 15.50 46,345.00 38,553.75 718,347.50 597,583.13 1,315,930.63
dan Pemasangan
Panel GRC 9 mm termasuk Asesoris Mur
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ 15.50 33,695.00 38,553.75 522,272.50 597,583.13 1,119,855.63
dan Pemasangan
Lisplank Atap Main Gate GRC Lebar 20 Panel GRC 9 mm termasuk Asesoris Mur
- M¹ 13.20 46,345.00 38,553.75 611,754.00 508,909.50 1,120,663.50
cm dan Pemasangan
Lisplank Atap Main Gate GRC Lebar 15 Panel GRC 9 mm termasuk Asesoris Mur
- M¹ 13.20 33,695.00 38,553.75 444,774.00 508,909.50 953,683.50
cm dan Pemasangan
TOTAL - IV 163,508,676.03 128,966,578.65 292,475,254.67
HRG SAT. HRG SAT. JMLH HARGA JMLH HARGA JUMLAH TOTAL
NO. URAIAN PEKERJAAN SAT. VOL.
MATERIAL TENAGA MATERIAL TENAGA HARGA

V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama Adukan 1 PC : 4 Psr, Bata merah M² 628.47 223,157.50 47,523.75 140,247,291.92 29,867,144.23 170,114,436.15
- Dinding Bata Meja Los Adukan 1 PC : 4 Psr, Bata merah M² 96.64 223,157.50 47,523.75 21,565,940.80 4,592,695.20 26,158,636.00
- Dinding Bata Parit Keliling Adukan 1 PC : 4 Psr, Bata merah M² 102.52 223,157.50 47,523.75 22,878,106.90 4,872,134.85 27,750,241.75
- Dinding Bata Parit Los Adukan 1 PC : 4 Psr, Bata merah M² 56.08 223,157.50 47,523.75 12,514,672.60 2,665,131.90 15,179,804.50
- Dinding Bata Tasram Adukan 1 PC : 3 Psr, Bata merah M² 36.80 227,545.90 47,523.75 8,373,689.12 1,748,874.00 10,122,563.12
- Dinding Roster Roster press 40x20x10 M² 4.80 295,032.50 47,523.75 1,416,156.00 228,114.00 1,644,270.00
TOTAL - V 206,995,857.34 43,974,094.18 250,969,951.52

VI. PEKERJAAN PELAPIS DINDING


a. Plester Aci
- Dinding Bata Bangunan Utama Adukan 1 PC : 4 Psr M² 1,227.06 32,064.30 90,562.50 39,344,675.67 111,125,213.72 150,469,889.39
- Dinding Bata Parit Keliling Adukan 1 PC : 2 Psr M² 111.96 38,241.18 90,562.50 4,281,482.51 10,139,377.50 14,420,860.01
- Dinding Bata Parit Los Adukan 1 PC : 2 Psr M² 112.16 38,241.18 90,562.50 4,289,130.75 10,157,490.00 14,446,620.75
- Dinding Bata Trasram Adukan 1 PC : 3 Psr M² 73.60 34,726.32 90,562.50 2,555,857.15 6,665,400.00 9,221,257.15
- Kolom Teras Termasuk Skoneng Adukan 1 PC : 3 Psr M² 6.50 34,726.32 90,562.50 225,721.08 588,656.25 814,377.33
- Plat Main Gate Adukan 1 PC : 3 Psr M² 12.38 34,726.32 90,562.50 429,738.21 1,120,710.94 1,550,449.15

b. Pekerjaan Keramik Dinding


Keramik 30x60 Warna Abu-Abu Merk Asia
- Keramik Dinding Toilet M² 29.88 381,846.00 163,012.50 11,409,558.48 4,870,813.50 16,280,371.98
Tile atau Setara
Keramik 40x40 Licin Warna Putih Merk Asia
- Keramik Dinding Meja Los M² 95.65 359,628.00 126,787.50 34,398,418.20 12,127,224.38 46,525,642.58
Tile atau Setara
Keramik 30x60 Warna Abu-Abu Merk Asia
- Keramik Dinding Ruang Wudlu M² 6.21 381,846.00 163,012.50 2,371,263.66 1,012,307.63 3,383,571.29
Tile atau Setara
Keramik 10x40 Warna Putih Glossy Merk
- Plint Keramik M¹ 199.95 50,199.80 22,528.50 10,037,450.01 4,504,573.58 14,542,023.59
Asia Tile atau Setara
TOTAL - VI 109,343,295.72 162,311,767.48 271,655,063.20

VII. PEKERJAAN PELAPIS LANTAI


a. Keramik
Keramik 40x40 Anti Selip Warna Putih Merk
- Keramik Selasar Pasar M² 269.27 367,252.50 126,787.50 98,888,244.41 34,139,436.19 133,027,680.60
Asia Tile atau Setara
Keramik 40x40 Licin Warna Putih Merk Asia
- Keramik Meja Los M² 92.00 359,628.00 126,787.50 33,085,776.00 11,664,450.00 44,750,226.00
Tile atau Setara
Keramik 40x40 Anti Selip Warna Abu-Abu
- Keramik Selasar Depan & Tiris2 M² 127.54 367,252.50 126,787.50 46,837,547.59 16,169,843.81 63,007,391.40
Merk Asia Tile atau Setara
Keramik 40x40 Licin Warna Putih Merk Asia
- keramik Ruang Pengelola M² 6.12 359,628.00 126,787.50 2,200,923.36 775,939.50 2,976,862.86
Tile atau Setara
Keramik 40x40 Licin Warna Putih Merk Asia
- keramik Ruang Musholla M² 6.83 359,628.00 126,787.50 2,457,158.31 866,275.59 3,323,433.90
Tile atau Setara
Keramik 30x30 Anti Selip Warna Abu-Abu
- keramik Ruang Wudlu M² 6.74 347,748.50 126,787.50 2,342,086.15 853,913.81 3,195,999.96
Merk Asia Tile atau Setara
Keramik 30x30 Anti Selip Warna Abu-Abu
- keramik Toilet M² 7.53 347,748.50 126,787.50 2,618,546.21 954,709.88 3,573,256.08
Merk Asia Tile atau Setara
Keramik 40x40 Licin Warna Putih Merk Asia
- keramik Kios M² 50.63 359,628.00 126,787.50 18,206,167.50 6,418,617.19 24,624,784.69
Tile atau Setara
TOTAL - VII 206,636,449.52 71,843,185.97 278,479,635.49

VIII. PEKERJAAN PENGECATAN


a. Pengecatan Area Luar
Cat Tembok Warna Putih Weathreshield
- Pengecatan Dinding Bangunan Utama M² 342.80 25,369.00 11,224.58 8,696,594.68 3,847,829.21 12,544,423.88
Merk Vinilex atau Setara
Cat Tembok Warna Putih Weathreshield
- Pengecatan Kolom Selasar M² 6.50 25,369.00 11,224.58 164,898.50 72,959.74 237,858.24
Merk Vinilex atau Setara
Cat Tembok Warna Putih Weathreshield
- Pengecatan Listplank Atap Utama M² 45.70 25,369.00 11,224.58 1,159,363.30 512,963.08 1,672,326.38
Merk Vinilex atau Setara
HRG SAT. HRG SAT. JMLH HARGA JMLH HARGA JUMLAH TOTAL
NO. URAIAN PEKERJAAN SAT. VOL.
MATERIAL TENAGA MATERIAL TENAGA HARGA

Cat Tembok Warna Putih Weathreshield


- Pengecatan Listplank Atap Teritisan M² 5.43 25,369.00 11,224.58 137,626.83 60,893.32 198,520.14
Merk Vinilex atau Setara
Cat Tembok Warna Putih Weathreshield
- Pengecatan Listplank Atap Main Gate M² 4.62 25,369.00 11,224.58 117,204.78 51,857.54 169,062.32
Merk Vinilex atau Setara
Cat Tembok Warna Putih Weathreshield
- Pengecatan Dinding Roster M² 4.80 25,369.00 11,224.58 121,771.20 53,877.96 175,649.16
Merk Vinilex atau Setara

b. Pengecatan Area Dalam


Cat Tembok Warna Putih Merk Vinilex atau
- Pengecatan Dinding Bagian Dalam Pasar M² 420.19 22,080.00 11,224.58 9,277,894.56 4,716,504.68 13,994,399.24
Setara
Cat Tembok Warna Putih Merk Vinilex atau
- Pengecatan Dinding Bagian Dalam Kios M² 353.85 22,080.00 11,224.58 7,813,008.00 3,971,815.86 11,784,823.86
Setara
Pengecatan Dinding Bagian Dalam R. Cat Tembok Warna Putih Merk Vinilex atau
- M² 32.32 22,080.00 11,224.58 713,515.20 362,722.14 1,076,237.34
Pengelola Setara
Pengecatan Dinding Bagian Dalam Cat Tembok Warna Putih Merk Vinilex atau
- M² 33.67 22,080.00 11,224.58 743,323.20 377,875.32 1,121,198.52
Ruang Mushola Setara
Pengecatan Dinding Bagian Dalam Cat Tembok Warna Putih Merk Vinilex atau
- M² 21.03 22,080.00 11,224.58 464,276.16 236,019.14 700,295.30
Ruang Wudlu Setara
Pengecatan Dinding Bagian Dalam Cat Tembok Warna Putih Merk Vinilex atau
- M² 23.20 22,080.00 11,224.58 512,256.00 260,410.14 772,666.14
Ruang Toilet Setara

c. Pengecatan Plafond
Cat Tembok Warna Putih Merk Vinilex atau
- Pengecatan Plafond Kios M² 47.59 22,321.50 11,224.58 1,062,224.38 534,149.46 1,596,373.84
Setara
Cat Tembok Warna Putih Merk Vinilex atau
- Pengecatan Plafond R. Pengelola M² 5.99 22,321.50 11,224.58 133,594.18 67,179.08 200,773.26
Setara
Cat Tembok Warna Putih Merk Vinilex atau
- Pengecatan Plafond Ruang Mushola M² 6.70 22,321.50 11,224.58 149,498.25 75,176.59 224,674.84
Setara
Cat Tembok Warna Putih Merk Vinilex atau
- Pengecatan Plafond Ruang Wudlu M² 3.85 22,321.50 11,224.58 85,881.97 43,186.55 129,068.52
Setara
Cat Tembok Warna Putih Merk Vinilex atau
- Pengecatan Plafond Ruang Toilet M² 7.29 22,321.50 11,224.58 162,723.74 81,827.15 244,550.89
Setara

d. Pengecatan Bidang Besi


Cat Duco Warna Hitam Dof Merk Nipe atau
- Pengecatan Boven Kawat Harmonika M² 32.56 42,642.00 9,832.50 1,388,423.52 320,146.20 1,708,569.72
Setara
- Pengecatan Besi Teralis Atas Kios Cat Meni Besi M² 56.25 42,642.00 9,832.50 2,398,612.50 553,078.13 2,951,690.63
Cat Minyak Kuas Warna Hitam Dof Merk
- Pengecatan Besi Klem Pipa Air Hujan M² 0.90 42,642.00 9,832.50 38,377.80 8,849.25 47,227.05
Nipe atau Setara
Cat Duco Warna Hitam Dof Merk Nipe atau
- Pengecatan Besi Grill Los M² 16.14 42,642.00 9,832.50 688,241.88 158,696.55 846,938.43
Setara
Pengecatan Besi Siku Support Kabel Cat Minyak Kuas Warna Hitam Dof Merk
- Unit 444.00 42,642.00 9,832.50 18,933,048.00 4,365,630.00 23,298,678.00
Tray Nipe atau Setara
Pengecatan Besi Beton Longdrat Cat Minyak Kuas Warna Hitam Dof Merk
- Unit 184.00 42,642.00 9,832.50 7,846,128.00 1,809,180.00 9,655,308.00
Support Kabel Tray Nipe atau Setara
TOTAL - VIII 62,808,486.61 22,542,827.08 85,351,313.70

IX. PEKERJAAN KUSEN


Folding Door Harmonika untuk Pintu Depan
- Lubang Tanpa Daun M² 10.34 2,223,410.00 288,868.50 22,990,059.40 2,986,900.29 25,976,959.69
dan Belakang
Folding Door Harmonika untuk Pintu
- Lubang Tanpa Daun M² 5.94 2,223,410.00 288,868.50 13,207,055.40 1,715,878.89 14,922,934.29
Samping Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m Aluminium tebal 0,8 mm M² 39.60 1,119,352.50 249,262.50 44,326,359.00 9,870,795.00 54,197,154.00
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" Kusen Aluminium Natural 3" M¹ 16.00 274,735.00 10,708.80 4,395,760.00 171,340.80 4,567,100.80
Kaca Naco 5 mm Kaca Naco Polos 5 mm lengkap dg engsel M² 2.10 324,415.00 22,145.55 681,271.50 46,505.66 727,777.16
Kaca Bening 5 mm Kaca Bening 5 mm M² 2.85 233,967.50 22,145.55 667,790.04 63,207.83 730,997.87
Daun Pintu Aluminium Kaca Aluminium Daun Pintu Aluminium M² 3.36 924,082.50 21,407.25 3,104,917.20 71,928.36 3,176,845.56
HRG SAT. HRG SAT. JMLH HARGA JMLH HARGA JUMLAH TOTAL
NO. URAIAN PEKERJAAN SAT. VOL.
MATERIAL TENAGA MATERIAL TENAGA HARGA

Besi Siku 40 x 40 + Kawat Harmonika 25 x


- Boven 1 (BV1) M² 1.60 233,700.00 28,680.00 373,920.00 45,888.00 419,808.00
25
Besi Siku 40 x 40 + Kawat Harmonika 25 x
- Boven 2 (BV2) M² 4.80 233,700.00 28,680.00 1,121,760.00 137,664.00 1,259,424.00
25
- Pintu Toilet (PT1)
Kusen Aluminium Natural 3" Kusen Aluminium Natural 3" M¹ 6.88 274,735.00 10,708.80 1,890,176.80 73,676.54 1,963,853.34
Daun Pintu Aluminium Spandrell Aluminium Natural 3" M² 2.94 2,521,950.00 21,177.83 7,414,533.00 62,262.81 7,476,795.81
TOTAL - IX 100,173,602.34 15,246,048.17 115,419,650.51

X. PEKERJAAN KUNCI, ENGSEL & AKSESSORIES KUSEN


- Pintu Jendela 1 (PJ1)
Kunci Slot Tanam Merk Solid atau
Unit 2.00 379,500.00 70,121.25 759,000.00 140,242.50 899,242.50
Setara
Engsel Pintu Unit 6.00 44,850.00 22,145.55 269,100.00 132,873.30 401,973.30
Handle Pintu Merk Solid atau Setara Unit 2.00 316,250.00 29,514.75 632,500.00 59,029.50 691,529.50
Door Closer Unit 2.00 253,000.00 73,881.75 506,000.00 147,763.50 653,763.50
- Pintu Toilet (PT1)
Kunci Slot Tanam Merk Solid atau
Unit 2.00 379,500.00 70,121.25 759,000.00 140,242.50 899,242.50
Setara
Engsel Pintu Unit 6.00 44,850.00 22,145.55 269,100.00 132,873.30 401,973.30
Handle Pintu Merk Solid atau Setara Unit 2.00 316,250.00 29,514.75 632,500.00 59,029.50 691,529.50
TOTAL - X 3,827,200.00 812,054.10 4,639,254.10

XI. PEKERJAAN PLAFOND & LANGIT-LANGIT


a. Plafond Gypsum
Plafond Gypsum 9 mm Rangka Hollow
- Plafon Ruang Pengelola M² 5.99 212,768.40 105,449.25 1,273,418.87 631,113.76 1,904,532.64
40x40
Plafond Gypsum 9 mm Rangka Hollow
- Plafon Ruang Musholla M² 6.70 212,768.40 105,449.25 1,425,016.36 706,246.35 2,131,262.71
40x40
Plafond Gypsum 9 mm Rangka Hollow
- Plafon Kios M² 47.59 212,768.40 105,449.25 10,125,116.24 5,018,066.18 15,143,182.42
40x40

b. Plafond Kalsiboard
Plafond Kalsi Board 4 mm Rangka Hollow
- Plafon Selasar Depan M² 44.38 189,745.40 105,449.25 8,419,952.13 4,679,310.47 13,099,262.59
40x40
Plafond Kalsi Board 4 mm Rangka Hollow
- Plafon Toilet M² 7.29 189,745.40 105,449.25 1,383,243.97 768,725.03 2,151,969.00
40x40
Plafond Kalsi Board 4 mm Rangka Hollow
- Plafon R. Wudlu M² 3.85 189,745.40 105,449.25 730,045.43 405,715.99 1,135,761.42
40x40
TOTAL - XI 23,356,792.99 12,209,177.79 35,565,970.77

XII. PEKERJAAN LAIN-LAIN


a. Plat Nama Pasar (Signage) Tampak Depan Plat Sainless Steel Press Bh 30.00 400,000.00 25,000.00 12,000,000.00 750,000.00 12,750,000.00
b. Logo Pasar Signage Plat Sainless Steel Press Bh 1.00 800,000.00 350,000.00 800,000.00 350,000.00 1,150,000.00
Besi Siku 40x40 dengan Pengisi Wiremesh
c. Teralis di Atas Plafon Kios M² 56.25 355,867.50 118,399.69 20,017,546.88 6,659,982.42 26,677,529.30
M6
Besi Hollow 20x20 dengan Plat Stainless
d. Papan Nama Kios Bh 15.00 850,000.00 100,000.00 12,750,000.00 1,500,000.00 14,250,000.00
Steel
Besi Strip Plat tebal 1 mm dan Besi Beton
e. Support Gantung untuk Pipa Air Hujan Kg 7.40 31,740.00 14,955.75 234,812.52 110,642.64 345,455.16
10 mm
Klem Menempel Dinding untuk Pipa Air
f. Besi Strip Plat tebal 1 mm Kg 10.89 31,740.00 14,955.75 345,505.77 162,800.82 508,306.59
Hujan
Pipa Galvanis ø2" Lengkap dengan
g. Pipa Display Los M¹ 146.00 313,720.00 22,977.00 45,803,120.00 3,354,642.00 49,157,762.00
Aksessories
Besi Siku 30x30 dengan Pengisi Lubang
h. Gril Besi Los M² 107.60 303,755.25 150,803.81 32,684,064.90 16,226,490.23 48,910,555.13
Plat Strip
TOTAL - XII 124,635,050.07 29,114,558.10 153,749,608.17
HRG SAT. HRG SAT. JMLH HARGA JMLH HARGA JUMLAH TOTAL
NO. URAIAN PEKERJAAN SAT. VOL.
MATERIAL TENAGA MATERIAL TENAGA HARGA

XIII. PEKERJAAN MEKANIKAL ELEKTRIKAL


XIII.1. PEKERJAAN PANEL DISTRIBUSI
A. PEKERJAAN PANEL
a. Pekerjaan Main Panel Distribusi (MDP)
Lengkap dengan Bus-Bar, Ampere/Volt/
Box Panel plat 1,5mm fin. Cat warna
- Frekwensi meter, pilot lamp, sekring, Set 1.00 8,250,000.00 1,000,000.00 8,250,000.00 1,000,000.00 9,250,000.00
abu-abu kulit jeruk (uk. 60x80 cm)
indikator lamp.
- COS 160A), 3 phasa Merk ABB / HAGER / Setara Unit 1.00 3,121,000.00 150,000.00 3,121,000.00 150,000.00 3,271,000.00
- MCCB 60A ,10KA, 3 phasa Merk ABB / HAGER / Setara Unit 1.00 456,700.00 60,000.00 456,700.00 60,000.00 516,700.00
- MCCB 80A ,10KA, 3 phasa Merk ABB / HAGER / Setara Unit 1.00 781,400.00 60,000.00 781,400.00 60,000.00 841,400.00
- MCCB 40A , 3 phasa Merk ABB / HAGER / Setara Unit 1.00 376,000.00 60,000.00 376,000.00 60,000.00 436,000.00
- MCCB 25A , 3 phasa Merk ABB / HAGER / Setara Unit 1.00 271,500.00 20,000.00 271,500.00 20,000.00 291,500.00
- MCCB 16A , 3 phasa Merk ABB / HAGER / Setara Unit 1.00 264,900.00 20,000.00 264,900.00 20,000.00 284,900.00
- MCB 10A, 6kA, 1 phasa Merk ABB / HAGER / Setara Unit 14.00 48,500.00 20,000.00 679,000.00 280,000.00 959,000.00

b. Pekerjaan Sub Panel Distribusi (SDP1) untuk Kios


Lengkap dengan Bus-Bar, Ampere/Volt/
Box Panel plat 1,5mm fin. Cat warna
- Frekwensi meter, pilot lamp, sekring, Set 1.00 5,500,000.00 1,000,000.00 5,500,000.00 1,000,000.00 6,500,000.00
abu-abu kulit jeruk (uk. 40x60 cm)
indikator lamp.
- MCCB 60A ,10KA, 3 phasa Merk ABB / HAGER / Setara Unit 1.00 456,700.00 60,000.00 456,700.00 60,000.00 516,700.00
- MCB 10A, 5kA, 1 phasa Merk ABB / HAGER / Setara Unit 1.00 54,000.00 20,000.00 54,000.00 20,000.00 74,000.00
- MCB 10A, 10kA, 1 phasa Merk ABB / HAGER / Setara Unit 10.00 54,000.00 20,000.00 540,000.00 200,000.00 740,000.00

b. Pekerjaan Sub Panel Distribusi (SDP2) untuk Los


Lengkap dengan Bus-Bar, Ampere/Volt/
Box Panel plat 1,5mm fin. Cat warna
- Frekwensi meter, pilot lamp, sekring, Set 1.00 5,500,000.00 1,000,000.00 5,500,000.00 1,000,000.00 6,500,000.00
abu-abu kulit jeruk (uk. 40x60 cm)
indikator lamp.
- MCCB 80A ,10KA, 3 phasa Merk ABB / HAGER / Setara Unit 1.00 456,700.00 60,000.00 456,700.00 60,000.00 516,700.00
- MCB 10A, 5kA, 1 phasa Merk ABB / HAGER / Setara Unit 24.00 54,000.00 20,000.00 1,296,000.00 480,000.00 1,776,000.00
MCB 2A, 10kA, 1 phasa (posisi di meja
- Merk ABB / HAGER / Setara Unit 60.00 54,000.00 20,000.00 3,240,000.00 1,200,000.00 4,440,000.00
los)

B. PEKERJAAN KABEL TOEVOER + ARDE & KABEL TRAY


a. Pekerjaan Kabel Toevoer
Pekerjaan Kabel Tovoor NYY 4 x 50 (Supreme/Kabelindo/Tranka/ Kabelmetal/
- M¹ 30.00 396,000.00 50,000.00 11,880,000.00 1,500,000.00 13,380,000.00
mm2 setara), dari KWH Meter ke MDP

Pekerjaan Kabel Tovoor NYY 4 x 25 (Supreme/Kabelindo/Tranka/ Kabelmetal/


- M¹ 20.00 237,000.00 45,000.00 4,740,000.00 900,000.00 5,640,000.00
mm2 setara), dari MDP Meter ke SDP1 dan SDP2

b. Pekerjaan Kabel Tray


Pekerjaan Pengadaan + Pasang Kabel Kabel tray uk. 300 x 100 m. Termasuk
- M¹ 103.00 531,300.00 122,440.50 54,723,900.00 12,611,371.50 67,335,271.50
Tray support dan aksesoris (Jalur arus kuat)
Pekerjaan Pengadaan Pipa Galvanis
besi galvanis dia 2" lengkap dengan Lbow
- Sambungan dari Kabel Tray ke Instalasi M¹ 130.80 313,720.00 22,977.00 41,034,576.00 3,005,391.60 44,039,967.60
dan knie drat
Los

c. Pekerjaan Kabel Grounding

Copper Rod Tembaga 1" (dari titik


grounding ke dalam tanah sampai ke dasar
Pekerjaan Grounding, Nilai Maksimal = titik pengeboran), Pentanahan + pipa Gip 1
- Ls 1.00 2,500,000.00 500,000.00 2,500,000.00 500,000.00 3,000,000.00
1 Ohm 1/2", Kabel BC 35 mm
(Supreme/Kabelindo/Tranka/Kabelmetal)
(dari panel sampai lokasi titik grounding)
HRG SAT. HRG SAT. JMLH HARGA JMLH HARGA JUMLAH TOTAL
NO. URAIAN PEKERJAAN SAT. VOL.
MATERIAL TENAGA MATERIAL TENAGA HARGA

XIII.2. PEKERJAAN INSTALASI


a. Pekerjaan Instalasi Kabel Lampu & Stop Kontak
dengan kabel NYM 3x2,5 sqmm
Pengadaan + Penarikan Instalasi (Supreme/Kabelindo/Tranka/ Kabelmetal/
- Titik 90.00 293,480.00 122,440.50 26,413,200.00 11,019,645.00 37,432,845.00
Penerangan Down Light, TL setara) dengan protector PVC Conduit
National/Clipsal/EGA/setara
dengan kabel NYM 3x2,5 sqmm
Pengadaan + Penarikan Instalasi Stop (Supreme/Kabelindo/Tranka/ Kabelmetal/
- Titik 29.00 293,480.00 122,440.50 8,510,920.00 3,550,774.50 12,061,694.50
Kontak Normal (1 gang) setara) dengan protector PVC Conduit
National/Clipsal/EGA/setara
dengan kabel NYM 3x2,5 sqmm
(Supreme/Kabelindo/Tranka/ Kabelmetal/
- Pengadaan + Penarikan Instalasi Saklar Titik 37.00 293,480.00 122,440.50 10,858,760.00 4,530,298.50 15,389,058.50
setara) dengan protector PVC Conduit
National/Clipsal/EGA/setara

b. Pekerjaan Armature
lampu 18 watt (jenis day light) Armature
Pengadaan + Pasang Armature Lampu
- ex. PHILLIPS/PANASONIC/ setara, Titik 31.00 221,950.00 46,833.75 6,880,450.00 1,451,846.25 8,332,296.25
Downlight
Komponen Merk PHILLIPS/OSRAM
TL 2x36w (jenis day light) Komponen
Pengadaan + Pasang Armature Lampu
- lampu TL 36 Watt Merk PHILLIPS/OSRAM, Titik 51.00 316,250.00 46,833.75 16,128,750.00 2,388,521.25 18,517,271.25
TL 1
komplit.
TL 2x36w (jenis day light) Komponen
Pengadaan + Pasang Armature Lampu
- lampu TL 36 Watt Merk PHILLIPS/OSRAM, Titik 8.00 854,450.00 46,833.75 6,835,600.00 374,670.00 7,210,270.00
Emergency TL 2
komplit. include baterai
Pengadaan + Pasang Stop Kontak 1 Stop Kontak Child Protection Merk
- Titik 29.00 46,000.00 46,833.75 1,334,000.00 1,358,178.75 2,692,178.75
Gang Clipsal/Setara
- Pengadaan + Pasang Saklar Tunggal Saklar Merk Clipsal/Setara Titik 22.00 44,850.00 46,833.75 986,700.00 1,030,342.50 2,017,042.50
- Pengadaan + Pasang Saklar Ganda Saklar Merk Clipsal/Setara Titik 15.00 44,850.00 46,833.75 672,750.00 702,506.25 1,375,256.25

XIII.3. PEKERJAAN TATA UDARA


Double Exhaust Fan, Double Bearing :
SKF Full Stainless Steel,Made In Japan.
Pengadaan dan Pemasangan Ventilator 60
- Kapasitas hisap 98,79 M³ / menit, 5 kipas Set 10.00 2,500,000.00 750,000.00 25,000,000.00 7,500,000.00 32,500,000.00
CM = 24’’/100 x 86 x 86
baling dalam bola, Konstruksi rangka dalam
bola dan topi bola di powder coating
Pengadaan dan Pemasangan Exhaust Fan (ceiling) Merk KDK / PANASONIC /
- Unit 2.00 569,250.00 46,833.75 1,138,500.00 93,667.50 1,232,167.50
10" SHARP/setara
TOTAL - XIII 250,882,006.00 58,187,213.60 309,069,219.60

XIV. PEKERJAAN PLUMBING


a. Pekerjaan Plumbing Air Bersih
Pengadaan + pemasangan pipa air pipa galvanis dia 1" lengkap dengan
- M¹ 60.00 167,555.00 22,977.00 10,053,300.00 1,378,620.00 11,431,920.00
bersih supplay dari PDAM ke profil tank asesoris Lbow dan knie
Pengadaan + pemasangan pipa air
pipa PVC AW dia 1" lengkap dengan
- bersih supplay dari pompa ke pipa M¹ 16.00 39,215.00 12,282.00 627,440.00 196,512.00 823,952.00
asesoris Lbow dan knie
vertikal turun ke lavatory dan wudlu
Pengadaan + pemasangan pipa air pipa PVC dia. 1/2" ex.Wavin/Rucika/
- bersih supplay kran ke lavatory dan Vinilon/Paralon AW/setara lengkap dengan M¹ 20.00 28,520.00 12,282.00 570,400.00 245,640.00 816,040.00
wudhu Lbow dan knie
Pengadaan + pemasangan pipa air
pipa PVC AW dia 1" lengkap dengan
- bersih supplay dari pompa ke pipa M¹ 28.00 39,215.00 12,282.00 1,098,020.00 343,896.00 1,441,916.00
asesoris Lbow dan knie
vertikal turun ke kran selasar
Pengadaan + pemasangan pipa air pipa PVC dia. 1/2" ex.Wavin/Rucika/
- bersih supplay dari pipa 1" horisontal ke Vinilon/Paralon AW/setara lengkap dengan M¹ 16.00 28,520.00 12,282.00 456,320.00 196,512.00 652,832.00
kran selasar Lbow dan knie
HRG SAT. HRG SAT. JMLH HARGA JMLH HARGA JUMLAH TOTAL
NO. URAIAN PEKERJAAN SAT. VOL.
MATERIAL TENAGA MATERIAL TENAGA HARGA

Pengadaan + pemasangan pipa kuras / pipa PVC AW dia 1" lengkap dengan
- M¹ 8.00 39,215.00 12,282.00 313,720.00 98,256.00 411,976.00
pembuangan dari profil tank asesoris Lbow dan knie
Pengadaan + pemasangan kran dinding
- merk onda/setara lengkap dengan selotip Unit 10.00 44,907.50 56,493.75 449,075.00 564,937.50 1,014,012.50
1/2"
- Pengadaan + pemasangan washtafel merk INA/setara warna putih Set 2.00 1,269,945.00 333,960.00 2,539,890.00 667,920.00 3,207,810.00
Pengadaan + pemasangan stop kran
- lengkap dengan knie drat dan selotip Set 1.00 82,857.50 56,493.75 82,857.50 56,493.75 139,351.25
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran
- lengkap dengan knie drat dan selotip Set 1.00 50,657.50 56,493.75 50,657.50 56,493.75 107,151.25
PVC 1" posisi pada pompa Out
Pengadaan + pemasangan stop kran
- PVC 1" posisi pada pipa kuras/ lengkap dengan knie drat dan selotip Set 1.00 50,657.50 56,493.75 50,657.50 56,493.75 107,151.25
pembuangan profil tank
Pengadaan & Pemasangan Profil Tank
- Lengkap dengan aksessorisnya Unit 1.00 5,500,000.00 750,000.00 5,500,000.00 750,000.00 6,250,000.00
2200 Liter

b. Pekerjaan Plumbing Air Kotor


pipa PVC dia. 3" ex.Wavin/Rucika/Vinilon/
Pengadaan + pemasangan pipa air kotor
- Paralon AW/setara lengkap dengan Lbow M¹ 2.00 117,645.00 27,539.63 235,290.00 55,079.25 290,369.25
dari parit los ke grease trap
dan knie
pipa PVC dia. 3" ex.Wavin/Rucika/Vinilon/
Pengadaan + pemasangan pipa air kotor
- Paralon AW/setara lengkap dengan Lbow M¹ 6.00 117,645.00 27,539.63 705,870.00 165,237.75 871,107.75
dari grease trap ke Parit Keliling
dan knie
pipa PVC dia. 3" ex.Wavin/Rucika/Vinilon/
Pengadaan + pemasangan pipa air kotor
- Paralon AW/setara lengkap dengan Lbow M¹ 24.00 117,645.00 27,539.63 2,823,480.00 660,951.00 3,484,431.00
dari parit los ke parit keliling
dan knie
pipa PVC dia. 3" ex.Wavin/Rucika/Vinilon/
Pengadaan + pemasangan pipa air kotor
- Paralon AW/setara lengkap dengan Lbow M¹ 12.00 117,645.00 27,539.63 1,411,740.00 330,475.50 1,742,215.50
toilet dan wudhu ke parit
dan knie
pipa PVC dia. 2" ex.Wavin/Rucika/Vinilon/
Pengadaan + pemasangan pipa air kotor
- Paralon AW/setara lengkap dengan Lbow M¹ 6.00 78,430.00 27,539.63 470,580.00 165,237.75 635,817.75
wastafel ke parit
dan knie
pipa PVC dia. 3/4" ex.Wavin/Rucika/
Pengadaan + pemasangan pipa air kotor
- Vinilon/Paralon AW/setara lengkap dengan M¹ 84.00 33,867.50 12,282.00 2,844,870.00 1,031,688.00 3,876,558.00
meja los ke parit los
Lbow dan knie
- Pengadaan + pemasangan floor drain bahan stainless steel 3" merk onda/setara Set 6.00 82,800.00 15,611.25 496,800.00 93,667.50 590,467.50

c. Pekerjaan Plumbing Air Kotoran


pipa PVC dia. 4" ex.Wavin/Rucika/
Pengadaan + pemasangan pipa air
- Vinilon/Paralon AW/setara lengkap dengan M¹ 20.00 206,770.00 27,539.63 4,135,400.00 550,792.50 4,686,192.50
kotoran dari closet ke septictank
Lbow dan knie
pipa PVC dia. 2" ex.Wavin/Rucika/
Pengadaan + pemasangan pipa udara
- Vinilon/Paralon AW/setara lengkap dengan M¹ 2.00 117,645.00 27,539.63 235,290.00 55,079.25 290,369.25
pada septictank
Lbow dan knie
pipa PVC dia. 3" ex.Wavin/Rucika/
Pengadaan + pemasangan pipa
- Vinilon/Paralon AW/setara lengkap dengan M¹ 4.00 117,645.00 27,539.63 470,580.00 110,158.50 580,738.50
peresapan pada septictank
Lbow dan knie
Pengadaan + pemasangan closet
- merk ina/setara Unit 2.00 592,595.00 338,272.50 1,185,190.00 676,545.00 1,861,735.00
jongkok
- Pembuatan Septictank & Resapan Septictank uk 4 x 1,5 x 2 m & Resapan Unit 1.00 11,654,149.87 7,043,807.38 11,654,149.87 7,043,807.38 18,697,957.26

d. Pekerjaan Plumbing Air Hujan


pipa PVC dia. 4" ex.Wavin/Rucika/
Pengadaan + Pemasangan Pipa Air
- Vinilon/Paralon AW/setara lengkap dengan M¹ 104.00 206,770.00 27,539.63 21,504,080.00 2,864,121.00 24,368,201.00
Hujan
Lbow dan knie
dinding bata dengan penutup beton tebal
- Bak Kontrol Parit 40x40 Unit 6.00 550,000.00 250,000.00 3,300,000.00 1,500,000.00 4,800,000.00
80mm
TOTAL - XIV 73,265,657.37 19,914,615.13 93,180,272.51
HRG SAT. HRG SAT. JMLH HARGA JMLH HARGA JUMLAH TOTAL
NO. URAIAN PEKERJAAN SAT. VOL.
MATERIAL TENAGA MATERIAL TENAGA HARGA

XV. PEKERJAAN SISTEM PEMADAM KEBAKARAN


Pengadaan dan Pemasangan Fire APAR 6kg Merk SERVO / CHUBB/setara +
- Unit 8.00 3,250,000.00 100,000.00 26,000,000.00 800,000.00 26,800,000.00
Extinguisher (APAR) braket dinding
TOTAL - XV 26,000,000.00 800,000.00 26,800,000.00
ANALISA HARGA SATUAN PEKERJAAN
PERMEN PU NO. 28/PRT/M/2016

PEKERJAAN PERSIAPAN

1 M¹ Pengukuran dan Pemasangan Bouwplank

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Kayu OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0100 135,000.00 1,350.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Balok Kayu 5 x 7 cm Kelas III M³ 0.0120 3,025,000.00 36,300.00
Paku 5 - 7 cm Kg 0.0200 25,000.00 500.00
Papan Kayu Kelas III M³ 0.0070 3,080,000.00 21,560.00
C PERALATAN

JUMLAH HARGA 80,035.00


OVERHEAD & PROFIT 15 % 12,005.25
HARGA SATUAN PEKERJAAN 92,040.25

1 M² Direksi Keet / Kantor Sementara

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 2.0000 90,000.00 180,000.00
Tukang Kayu OH 2.0000 105,000.00 210,000.00
Tukang Batu OH 1.0000 105,000.00 105,000.00
Kepala Tukang OH 0.3000 135,000.00 40,500.00
Mandor OH 0.0500 165,000.00 8,250.00
B BAHAN
Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg 1.2500 15,000.00 18,750.00
Balok Kayu Kelas II M³ 0.1800 3,300,000.00 594,000.00
Paku 5 - 12 cm Kg 0.0800 25,000.00 2,000.00
Semen Portland (PC) Kg 202.0000 1,800.00 363,600.00
Pasir Pasang M³ 0.2500 450,000.00 112,500.00
Pasir Beton M³ 0.2500 450,000.00 112,500.00
Batu Pecah 2 - 3 cm M³ 0.2500 380,000.00 95,000.00
Bata Merah Bh 0.2500 2,200.00 550.00
Seng Plat BJLS 0,25 mm Lebar 90 cm Lbr 0.2500 83,000.00 20,750.00
Jendela Naco 5 mm Panjang 50 cm Bh 0.1500 22,000.00 3,300.00
Kaca 5 mm M² 0.1500 182,000.00 27,300.00
Kunci Tanam Bh 0.1500 330,000.00 49,500.00
Multipleks 4 mm Lbr 0.0600 72,000.00 4,320.00
C PERALATAN

JUMLAH HARGA 1,947,820.00


OVERHEAD & PROFIT 15 % 292,173.00
HARGA SATUAN PEKERJAAN 2,239,993.00

PEKERJAAN TANAH

1 M³ Galian Tanah Biasa Sedalam 1 M

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.7500 90,000.00 67,500.00
Mandor OH 0.0250 165,000.00 4,125.00
B BAHAN
- - -
C PERALATAN

JUMLAH HARGA 71,625.00


OVERHEAD & PROFIT 15 % 10,743.75
HARGA SATUAN PEKERJAAN 82,368.75

1 M³ Galian Tanah Biasa Sedalam 2 M

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.9000 90,000.00 81,000.00
Mandor OH 0.0450 165,000.00 7,425.00
B BAHAN
- - -
C PERALATAN

JUMLAH HARGA 88,425.00


OVERHEAD & PROFIT 15 % 13,263.75
HARGA SATUAN PEKERJAAN 101,688.75
1 M³ Galian Tanah Biasa Sedalam 3 M

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.0000 90,000.00 90,000.00
Mandor OH 0.0320 165,000.00 5,280.00
B BAHAN
- - -
C PERALATAN

JUMLAH HARGA 95,280.00


OVERHEAD & PROFIT 15 % 14,292.00
HARGA SATUAN PEKERJAAN 109,572.00

1 M³ Galian Tanah Kembali Bekas Galian

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.5000 90,000.00 45,000.00
Mandor OH 0.0500 165,000.00 8,250.00
B BAHAN
- - -
C PERALATAN

JUMLAH HARGA 53,250.00


OVERHEAD & PROFIT 15 % 7,987.50
HARGA SATUAN PEKERJAAN 61,237.50

1 M³ Urugan Pasir

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Mandor OH 0.0100 165,000.00 1,650.00
B BAHAN
Pasir Urug M³ 1.2000 245,000.00 294,000.00
C PERALATAN

JUMLAH HARGA 322,650.00


OVERHEAD & PROFIT 15 % 48,397.50
HARGA SATUAN PEKERJAAN 371,047.50

1 M³ Urugan Tanah

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Mandor OH 0.0100 165,000.00 1,650.00
B BAHAN
Tanah Urug M³ 1.2000 242,000.00 290,400.00
C PERALATAN

JUMLAH HARGA 319,050.00


OVERHEAD & PROFIT 15 % 47,857.50
HARGA SATUAN PEKERJAAN 366,907.50

PEKERJAAN PONDASI

1 M³ Pemasangan Pondasi Batu Kali 1 PC : 3 Psr

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.5000 90,000.00 135,000.00
Tukang Batu OH 0.7500 105,000.00 78,750.00
Kepala Tukang OH 0.0750 135,000.00 10,125.00
Mandor OH 0.0750 165,000.00 12,375.00
B BAHAN
Batu Belah M³ 1.2000 290,000.00 348,000.00
Semen Portland (PC) Kg 202.0000 1,800.00 363,600.00
Pasir Pasang M³ 0.4850 450,000.00 218,250.00
C PERALATAN

JUMLAH HARGA 1,166,100.00


OVERHEAD & PROFIT 15 % 174,915.00
HARGA SATUAN PEKERJAAN 1,341,015.00
1 M³ Pemasangan Pondasi Batu Kali 1 PC : 4 Psr

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.5000 90,000.00 135,000.00
Tukang Batu OH 0.7500 105,000.00 78,750.00
Kepala Tukang OH 0.0750 135,000.00 10,125.00
Mandor OH 0.0750 165,000.00 12,375.00
B BAHAN
Batu Belah M³ 1.2000 290,000.00 348,000.00
Semen Portland (PC) Kg 136.0000 1,800.00 244,800.00
Pasir Pasang M³ 0.5200 450,000.00 234,000.00
C PERALATAN

JUMLAH HARGA 1,063,050.00


OVERHEAD & PROFIT 15 % 159,457.50
HARGA SATUAN PEKERJAAN 1,222,507.50

1 M³ Pemasangan Pondasi Kosong (Anstamping)

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.7800 90,000.00 70,200.00
Tukang Batu OH 0.3900 105,000.00 40,950.00
Kepala Tukang OH 0.0390 135,000.00 5,265.00
Mandor OH 0.0390 165,000.00 6,435.00
B BAHAN
Batu Belah M³ 1.2000 290,000.00 348,000.00
Pasir Urug M³ 0.4320 245,000.00 105,840.00
C PERALATAN

JUMLAH HARGA 576,690.00


OVERHEAD & PROFIT 15 % 86,503.50
HARGA SATUAN PEKERJAAN 663,193.50

PEKERJAAN BETON

1 M³ Beton Mutu f'c = 7,4 MPa (K-100) slum (3-6) cm, w/c = 0,87

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.6500 90,000.00 148,500.00
Tukang Batu OH 0.2750 105,000.00 28,875.00
Kepala Tukang OH 0.0280 135,000.00 3,780.00
Mandor OH 0.0830 165,000.00 13,695.00
B BAHAN
Semen Portland (PC) Kg 247.0000 1,800.00 444,600.00
Pasir Beton M³ 0.6207 450,000.00 279,321.43
Batu Pecah 2 - 3 cm M³ 0.7400 380,000.00 281,200.00
Air Liter 215.0000 200.00 43,000.00
C PERALATAN

JUMLAH HARGA 1,242,971.43


OVERHEAD & PROFIT 15 % 186,445.71
HARGA SATUAN PEKERJAAN 1,429,417.14

1 M³ Lantai Kerja Beton Mutu f'c = 7,4 MPa (K-100) slum (3-6) cm, w/c = 0,87

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.2000 90,000.00 108,000.00
Tukang Batu OH 0.2000 105,000.00 21,000.00
Kepala Tukang OH 0.0200 135,000.00 2,700.00
Mandor OH 0.0600 165,000.00 9,900.00
B BAHAN
Semen Portland (PC) Kg 230.0000 1,800.00 414,000.00
Pasir Beton M³ 0.6379 450,000.00 287,035.71
Batu Pecah 2 - 3 cm M³ 0.7607 380,000.00 289,081.48
Air Liter 200.0000 200.00 40,000.00
C PERALATAN

JUMLAH HARGA 1,171,717.20


OVERHEAD & PROFIT 15 % 175,757.58
HARGA SATUAN PEKERJAAN 1,347,474.78
1 M³ Rabat Beton Mutu f'c = 16,9 MPa (K-200)

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.6500 90,000.00 148,500.00
Tukang Batu OH 0.2750 105,000.00 28,875.00
Kepala Tukang OH 0.0280 135,000.00 3,780.00
Mandor OH 0.0830 165,000.00 13,695.00
B BAHAN
Semen Portland (PC) Kg 352.0000 1,800.00 633,600.00
Pasir Beton M³ 0.5221 450,000.00 234,964.29
Batu Pecah 2 - 3 cm M³ 0.7637 380,000.00 290,207.41
Air Liter 215.0000 200.00 43,000.00
C PERALATAN

JUMLAH HARGA 1,396,621.69


OVERHEAD & PROFIT 15 % 209,493.25
HARGA SATUAN PEKERJAAN 1,606,114.95

1 M³ Beton Mutu f'c = 19,3 MPa (K-250)

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.6500 90,000.00 148,500.00
Tukang Batu OH 0.2750 105,000.00 28,875.00
Kepala Tukang OH 0.0280 135,000.00 3,780.00
Mandor OH 0.0830 165,000.00 13,695.00
B BAHAN
Semen Portland (PC) Kg 371.0000 1,800.00 667,800.00
Pasir Beton M³ 0.4986 450,000.00 224,357.14
Batu Pecah 2 - 3 cm M³ 0.7756 380,000.00 294,711.11
Air Liter 215.0000 200.00 43,000.00
C PERALATAN

JUMLAH HARGA 1,424,718.25


OVERHEAD & PROFIT 15 % 213,707.74
HARGA SATUAN PEKERJAAN 1,638,425.99

1 M³ Beton Mutu f'c = 26,4 MPa (K-300)

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.6500 90,000.00 148,500.00
Tukang Batu OH 0.2750 105,000.00 28,875.00
Kepala Tukang OH 0.0280 135,000.00 3,780.00
Mandor OH 0.0830 165,000.00 13,695.00
B BAHAN
Semen Portland (PC) Kg 413.0000 1,800.00 743,400.00
Pasir Beton M³ 0.4864 450,000.00 218,892.86
Batu Pecah 2 - 3 cm M³ 0.7563 380,000.00 287,392.59
Air Liter 215.0000 200.00 43,000.00
C PERALATAN

JUMLAH HARGA 1,487,535.45


OVERHEAD & PROFIT 15 % 223,130.32
HARGA SATUAN PEKERJAAN 1,710,665.77

1 Kg Pembesian dengan Besi Polos atau Besi Ulir

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0070 90,000.00 630.00
Tukang Besi OH 0.0070 105,000.00 735.00
Kepala Tukang OH 0.0007 135,000.00 94.50
Mandor OH 0.0004 165,000.00 66.00
B BAHAN
Besi Beton Polos / Ulir Kg 1.0500 22,000.00 23,100.00
Kawat Ikat Beton (Bendrat) Kg 0.0150 27,000.00 405.00
C PERALATAN

JUMLAH HARGA 25,030.50


OVERHEAD & PROFIT 15 % 3,754.58
HARGA SATUAN PEKERJAAN 28,785.08
1 M² Bekisting Untuk Pondasi

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.5200 90,000.00 46,800.00
Tukang Kayu OH 0.2600 105,000.00 27,300.00
Kepala Tukang OH 0.0260 135,000.00 3,510.00
Mandor OH 0.0260 165,000.00 4,290.00
B BAHAN
Kayu Kelas III M³ 0.0400 3,025,000.00 121,000.00
Paku 5 - 12 cm Kg 0.3000 25,000.00 7,500.00
Minyak Bekisting Liter 0.1000 14,000.00 1,400.00
C PERALATAN

JUMLAH HARGA 211,800.00


OVERHEAD & PROFIT 15 % 31,770.00
HARGA SATUAN PEKERJAAN 243,570.00

1 M² Bekisting Untuk Sloof

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.5200 90,000.00 46,800.00
Tukang Kayu OH 0.2600 105,000.00 27,300.00
Kepala Tukang OH 0.0260 135,000.00 3,510.00
Mandor OH 0.0260 165,000.00 4,290.00
B BAHAN
Kayu Kelas III M³ 0.0450 3,025,000.00 136,125.00
Paku 5 - 12 cm Kg 0.3000 25,000.00 7,500.00
Minyak Bekisting Liter 0.1000 14,000.00 1,400.00
C PERALATAN

JUMLAH HARGA 226,925.00


OVERHEAD & PROFIT 15 % 34,038.75
HARGA SATUAN PEKERJAAN 260,963.75

1 M² Bekisting Untuk Kolom

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.6600 90,000.00 59,400.00
Tukang Kayu OH 0.3300 105,000.00 34,650.00
Kepala Tukang OH 0.0330 135,000.00 4,455.00
Mandor OH 0.0330 165,000.00 5,445.00
B BAHAN
Kayu Kelas III M³ 0.0400 3,025,000.00 121,000.00
Paku 5 - 12 cm Kg 0.4000 25,000.00 10,000.00
Minyak Bekisting Liter 0.2000 14,000.00 2,800.00
Balok Kayu Kelas II M³ 0.0150 3,300,000.00 49,500.00
Plywood 9 mm Lbr 0.3500 165,000.00 57,750.00
Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg 2.0000 15,000.00 30,000.00
C PERALATAN

JUMLAH HARGA 375,000.00


OVERHEAD & PROFIT 15 % 56,250.00
HARGA SATUAN PEKERJAAN 431,250.00

1 M² Bekisting Untuk Balok

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.6600 90,000.00 59,400.00
Tukang Kayu OH 0.3300 105,000.00 34,650.00
Kepala Tukang OH 0.0330 135,000.00 4,455.00
Mandor OH 0.0330 165,000.00 5,445.00
B BAHAN
Kayu Kelas III M³ 0.0400 3,025,000.00 121,000.00
Paku 5 - 12 cm Kg 0.4000 25,000.00 10,000.00
Minyak Bekisting Liter 0.2000 14,000.00 2,800.00
Balok Kayu Kelas II M³ 0.0180 3,300,000.00 59,400.00
Plywood 9 mm Lbr 0.3500 165,000.00 57,750.00
Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg 2.0000 15,000.00 30,000.00
C PERALATAN

JUMLAH HARGA 384,900.00


OVERHEAD & PROFIT 15 % 57,735.00
HARGA SATUAN PEKERJAAN 442,635.00
1 M² Bekisting Untuk Plat Lantai

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.6600 90,000.00 59,400.00
Tukang Kayu OH 0.3300 105,000.00 34,650.00
Kepala Tukang OH 0.0330 135,000.00 4,455.00
Mandor OH 0.0330 165,000.00 5,445.00
B BAHAN
Kayu Kelas III M³ 0.0400 3,025,000.00 121,000.00
Paku 5 - 12 cm Kg 0.4000 25,000.00 10,000.00
Minyak Bekisting Liter 0.2000 14,000.00 2,800.00
Balok Kayu Kelas II M³ 0.0150 3,300,000.00 49,500.00
Plywood 9 mm Lbr 0.3500 165,000.00 57,750.00
Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg 6.0000 15,000.00 90,000.00
C PERALATAN

JUMLAH HARGA 435,000.00


OVERHEAD & PROFIT 15 % 65,250.00
HARGA SATUAN PEKERJAAN 500,250.00

1 M² Bekisting Untuk Dinding

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.6600 90,000.00 59,400.00
Tukang Kayu OH 0.3300 105,000.00 34,650.00
Kepala Tukang OH 0.0330 135,000.00 4,455.00
Mandor OH 0.0330 165,000.00 5,445.00
B BAHAN
Kayu Kelas III M³ 0.0300 3,025,000.00 90,750.00
Paku 5 - 12 cm Kg 0.4000 25,000.00 10,000.00
Minyak Bekisting Liter 0.2000 14,000.00 2,800.00
Balok Kayu Kelas II M³ 0.0200 3,300,000.00 66,000.00
Plywood 9 mm Lbr 0.3500 165,000.00 57,750.00
Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg 3.0000 15,000.00 45,000.00
Penjaga Jarak Bekisting / Spacer Bh 4.0000 11,000.00 44,000.00
C PERALATAN

JUMLAH HARGA 420,250.00


OVERHEAD & PROFIT 15 % 63,037.50
HARGA SATUAN PEKERJAAN 483,287.50

1 M² Bekisting Untuk Tangga

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.6600 90,000.00 59,400.00
Tukang Kayu OH 0.3300 105,000.00 34,650.00
Kepala Tukang OH 0.0330 135,000.00 4,455.00
Mandor OH 0.0330 165,000.00 5,445.00
B BAHAN
Kayu Kelas III M³ 0.0300 3,025,000.00 90,750.00
Paku 5 - 12 cm Kg 0.4000 25,000.00 10,000.00
Minyak Bekisting Liter 0.1500 14,000.00 2,100.00
Balok Kayu Kelas II M³ 0.0150 3,300,000.00 49,500.00
Plywood 9 mm Lbr 0.3500 165,000.00 57,750.00
Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg 2.0000 15,000.00 30,000.00
C PERALATAN

JUMLAH HARGA 344,050.00


OVERHEAD & PROFIT 15 % 51,607.50
HARGA SATUAN PEKERJAAN 395,657.50
1 M¹ Ring Balok Beton Bertulang (10 x 15) cm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.2970 90,000.00 26,730.00
Tukang Batu OH 0.0330 105,000.00 3,465.00
Tukang Kayu OH 0.0330 105,000.00 3,465.00
Tukang Besi OH 0.0330 105,000.00 3,465.00
Kepala Tukang OH 0.0100 135,000.00 1,350.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Kayu Kelas III M³ 0.0030 3,025,000.00 9,075.00
Paku 5 - 12 cm Kg 0.0200 25,000.00 500.00
Minyak Bekisting Liter 0.0600 14,000.00 840.00
Besi Beton Polos Kg 3.6000 21,000.00 75,600.00
Kawat Ikat Beton (Bendrat) Kg 0.0500 27,000.00 1,350.00
Semen Portland (PC) Kg 5.5000 1,800.00 9,900.00
Pasir Beton M³ 0.0090 450,000.00 4,050.00
Batu Pecah 2 - 3 cm M³ 0.0150 380,000.00 5,700.00
C PERALATAN

JUMLAH HARGA 147,965.00


OVERHEAD & PROFIT 15 % 22,194.75
HARGA SATUAN PEKERJAAN 170,159.75

PEKERJAAN BESI DAN ALUMINIUM

1 Kg Pasang Baja Profil

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0600 90,000.00 5,400.00
Tukang Las OH 0.0600 105,000.00 6,300.00
Kepala Tukang OH 0.0060 135,000.00 810.00
Mandor OH 0.0030 165,000.00 495.00
B BAHAN
Profil Baja Kg 1.1500 24,000.00 27,600.00
C PERALATAN

JUMLAH HARGA 40,605.00


OVERHEAD & PROFIT 15 % 6,090.75
HARGA SATUAN PEKERJAAN 46,695.75

100 Kg Perakitan Baja

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Besi Konstruksi OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0010 135,000.00 135.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Solar Liter 1.0000 13,000.00 13,000.00
Minyak Pelumas Liter 0.1000 50,000.00 5,000.00
C PERALATAN
Sewa Alat Baja Jam 0.8000 275,000.00 220,000.00
JUMLAH HARGA 258,460.00
OVERHEAD & PROFIT 15 % 38,769.00
HARGA SATUAN PEKERJAAN 297,229.00

1 M² Pintu Besi Plat Baja tebal 2 mm rangkap, rangka besi hollow 30 x 30

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.0500 90,000.00 94,500.00
Tukang Las OH 1.0500 105,000.00 110,250.00
Kepala Tukang OH 0.1050 135,000.00 14,175.00
Mandor OH 0.0520 165,000.00 8,580.00
B BAHAN
Besi Hollow 30 x 30 Kg 15.0000 24,000.00 360,000.00
Besi Plat Baja, t = 2 mm Kg 32.8000 24,000.00 787,200.00
Kawat Las Kg 0.0500 165,000.00 8,250.00
C PERALATAN

JUMLAH HARGA 1,382,955.00


OVERHEAD & PROFIT 15 % 207,443.25
HARGA SATUAN PEKERJAAN 1,590,398.25
1 M² Pintu Rolling Door Aluminium

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.0000 90,000.00 90,000.00
Tukang Aluminium OH 1.0000 105,000.00 105,000.00
Kepala Tukang OH 0.1000 135,000.00 13,500.00
Mandor OH 0.0500 165,000.00 8,250.00
B BAHAN
Rolling Door Aluminium M² 1.1000 721,000.00 793,100.00
Aksessories % 25.0000 721,000.00 180,250.00
C PERALATAN

JUMLAH HARGA 1,190,100.00


OVERHEAD & PROFIT 15 % 178,515.00
HARGA SATUAN PEKERJAAN 1,368,615.00

1 M² Pintu Folding Gate

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.2000 90,000.00 108,000.00
Tukang Las OH 1.2000 105,000.00 126,000.00
Kepala Tukang OH 0.1200 135,000.00 16,200.00
Mandor OH 0.0060 165,000.00 990.00
B BAHAN
Folding Gate M² 1.1000 1,381,000.00 1,519,100.00
Aksessories % 30.0000 1,381,000.00 414,300.00
C PERALATAN

JUMLAH HARGA 2,184,590.00


OVERHEAD & PROFIT 15 % 327,688.50
HARGA SATUAN PEKERJAAN 2,512,278.50

1 M¹ Kusen Aluminium

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0430 90,000.00 3,870.00
Tukang Aluminium OH 0.0430 105,000.00 4,515.00
Kepala Tukang OH 0.0043 135,000.00 580.50
Mandor OH 0.0021 165,000.00 346.50
B BAHAN
Profil Aluminium M¹ 1.1000 150,000.00 165,000.00
Sekrup Fischer Bh 2.0000 35,000.00 70,000.00
Sealant Tube 0.0600 65,000.00 3,900.00
C PERALATAN

JUMLAH HARGA 248,212.00


OVERHEAD & PROFIT 15 % 37,231.80
HARGA SATUAN PEKERJAAN 285,443.80

1 M² Pintu Aluminium Spandrel lebar 8 cm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0850 90,000.00 7,650.00
Tukang Aluminium OH 0.0850 105,000.00 8,925.00
Kepala Tukang OH 0.0085 135,000.00 1,147.50
Mandor OH 0.0042 165,000.00 693.00
B BAHAN
Profil Aluminium M¹ 4.4000 150,000.00 660,000.00
Aluminium Strip M¹ 14.6000 105,000.00 1,533,000.00
C PERALATAN

JUMLAH HARGA 2,211,415.50


OVERHEAD & PROFIT 15 % 331,712.33
HARGA SATUAN PEKERJAAN 2,543,127.83
1 M² Pintu Kaca Rangka Aluminium

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0850 90,000.00 7,650.00
Tukang Aluminium OH 0.0850 105,000.00 8,925.00
Kepala Tukang OH 0.0090 135,000.00 1,215.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Profil Aluminium M¹ 4.4000 150,000.00 660,000.00
Profil Kaca M¹ 4.5000 28,000.00 126,000.00
Sealant Tube 0.2700 65,000.00 17,550.00
C PERALATAN

JUMLAH HARGA 822,165.00


OVERHEAD & PROFIT 15 % 123,324.75
HARGA SATUAN PEKERJAAN 945,489.75

1 M² Jendela Kaca Rangka Aluminium

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0850 90,000.00 7,650.00
Tukang Aluminium OH 0.0850 105,000.00 8,925.00
Kepala Tukang OH 0.0090 135,000.00 1,215.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Profil Aluminium 1,2 x 2" M¹ 4.4000 100,000.00 440,000.00
Profil Kaca M¹ 4.5000 28,000.00 126,000.00
Sealant Tube 0.2700 65,000.00 17,550.00
C PERALATAN

JUMLAH HARGA 602,165.00


OVERHEAD & PROFIT 15 % 90,324.75
HARGA SATUAN PEKERJAAN 692,489.75

1 M² Rangka Plafond Hollow 40/40, Modul 60 x 120 cm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3500 90,000.00 31,500.00
Tukang Aluminium OH 0.3500 105,000.00 36,750.00
Kepala Tukang OH 0.0350 135,000.00 4,725.00
Mandor OH 0.0180 165,000.00 2,970.00
B BAHAN
Rangka Hollow Galvalum 40 x 40 mm M¹ 4.0000 25,000.00 100,000.00
Aksessoris (Perkuatan, dll) % 100.0000 25,000.00 25,000.00
C PERALATAN

JUMLAH HARGA 200,945.00


OVERHEAD & PROFIT 15 % 30,141.75
HARGA SATUAN PEKERJAAN 231,086.75

1 M² Pasang Teralis Plafond dengan Besi Siku & Wiremesh M6

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.4750 90,000.00 42,750.00
Tukang Besi OH 0.4750 105,000.00 49,875.00
Kepala Tukang OH 0.0475 135,000.00 6,412.50
Mandor OH 0.02 165,000.00 3,918.75
B BAHAN
Besi Siku L 40.40.4 Kg 7.6125 24,000.00 182,700.00
Wiremesh M6 M² 1.0500 105,000.00 110,250.00
Kawat Las Kg 0.1000 165,000.00 16,500.00
C PERALATAN

JUMLAH HARGA 412,406.25


OVERHEAD & PROFIT 15 % 61,860.94
HARGA SATUAN PEKERJAAN 474,267.19
1 M¹ Pasang Grill Besi Siku 30x30 & Plat Strip 30 mm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.6050 90,000.00 54,450.00
Tukang Besi OH 0.6050 105,000.00 63,525.00
Kepala Tukang OH 0.0605 135,000.00 8,167.50
Mandor OH 0.03 165,000.00 4,991.25
B BAHAN
Besi Siku L 30.30.3 Kg 2.4208 24,000.00 58,098.00
Besi Plat Strip 3x30 mm Kg 7.0380 24,000.00 168,912.00
Kawat Las Kg 0.2250 165,000.00 37,125.00
C PERALATAN

JUMLAH HARGA 395,268.75


OVERHEAD & PROFIT 15 % 59,290.31
HARGA SATUAN PEKERJAAN 454,559.06

PEKERJAAN PASANGAN DINDING

1 M² Pasang Dinding Bata Merah 1/2 Batu Camp. 1 PC : 3 Psr

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Tukang Batu OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0100 135,000.00 1,350.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Bata Merah Bh 70.0000 2,200.00 154,000.00
Semen Portland (PC) Kg 14.3700 1,800.00 25,866.00
Pasir Pasang M³ 0.0400 450,000.00 18,000.00
C PERALATAN

JUMLAH HARGA 239,191.00


OVERHEAD & PROFIT 15 % 35,878.65
HARGA SATUAN PEKERJAAN 275,069.65

1 M² Pasang Dinding Bata Merah 1/2 Batu Camp. 1 PC : 4 Psr

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Tukang Batu OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0100 135,000.00 1,350.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Bata Merah Bh 70.0000 2,200.00 154,000.00
Semen Portland (PC) Kg 11.5000 1,800.00 20,700.00
Pasir Pasang M³ 0.0430 450,000.00 19,350.00
C PERALATAN

JUMLAH HARGA 235,375.00


OVERHEAD & PROFIT 15 % 35,306.25
HARGA SATUAN PEKERJAAN 270,681.25

1 M² Pasang Dinding Roster 40 x 20 x 10 cm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Tukang Batu OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0100 135,000.00 1,350.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Roster uk. 40 x 20 x 10 Bh 13.0000 17,000.00 221,000.00
Semen Portland (PC) Kg 11.0000 1,800.00 19,800.00
Pasir Pasang M³ 0.0350 450,000.00 15,750.00
C PERALATAN

JUMLAH HARGA 297,875.00


OVERHEAD & PROFIT 15 % 44,681.25
HARGA SATUAN PEKERJAAN 342,556.25
PEKERJAAN PLESTERAN

1 M² Plesteran Dinding Camp. 1 PC : 2 Psr

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Tukang Batu OH 0.1500 105,000.00 15,750.00
Kepala Tukang OH 0.0150 135,000.00 2,025.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Semen Portland (PC) Kg 10.2240 1,800.00 18,403.20
Pasir Pasang M³ 0.0200 450,000.00 9,000.00
C PERALATAN

JUMLAH HARGA 74,653.20


OVERHEAD & PROFIT 15 % 11,197.98
HARGA SATUAN PEKERJAAN 85,851.18

1 M² Plesteran Dinding Camp. 1 PC : 3 Psr

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Tukang Batu OH 0.1500 105,000.00 15,750.00
Kepala Tukang OH 0.0150 135,000.00 2,025.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Semen Portland (PC) Kg 7.7760 1,800.00 13,996.80
Pasir Pasang M³ 0.0230 450,000.00 10,350.00
C PERALATAN

JUMLAH HARGA 71,596.80


OVERHEAD & PROFIT 15 % 10,739.52
HARGA SATUAN PEKERJAAN 82,336.32

1 M² Plesteran Dinding Camp. 1 PC : 4 Psr

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Tukang Batu OH 0.1500 105,000.00 15,750.00
Kepala Tukang OH 0.0150 135,000.00 2,025.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Semen Portland (PC) Kg 6.2400 1,800.00 11,232.00
Pasir Pasang M³ 0.0240 450,000.00 10,800.00
C PERALATAN

JUMLAH HARGA 69,282.00


OVERHEAD & PROFIT 15 % 10,392.30
HARGA SATUAN PEKERJAAN 79,674.30

1 M¹ Plesteran Skoneng Camp. 1 PC : 3 Psr Lebar 10 cm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0800 90,000.00 7,200.00
Tukang Batu OH 0.4000 105,000.00 42,000.00
Kepala Tukang OH 0.0400 135,000.00 5,400.00
Mandor OH 0.0040 165,000.00 660.00
B BAHAN
Semen Portland (PC) Kg 0.5000 1,800.00 900.00
Pasir Pasang M³ 0.0130 450,000.00 5,850.00
C PERALATAN

JUMLAH HARGA 62,010.00


OVERHEAD & PROFIT 15 % 9,301.50
HARGA SATUAN PEKERJAAN 71,311.50
1 M² Acian

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.2000 90,000.00 18,000.00
Tukang Batu OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0100 135,000.00 1,350.00
Mandor OH 0.0100 165,000.00 1,650.00
B BAHAN
Semen Portland (PC) Kg 3.2500 1,800.00 5,850.00
C PERALATAN

JUMLAH HARGA 37,350.00


OVERHEAD & PROFIT 15 % 5,602.50
HARGA SATUAN PEKERJAAN 42,952.50

PEKERJAAN PENUTUP LANTAI & PENUTUP DINDING

1 M² Pasang Keramik Lantai uk. 30 x 30 cm, Anti Selip

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.7000 90,000.00 63,000.00
Tukang Batu OH 0.3500 105,000.00 36,750.00
Kepala Tukang OH 0.0350 135,000.00 4,725.00
Mandor OH 0.0350 165,000.00 5,775.00
B BAHAN
Keramik uk. 30 x 30 cm Anti Selip Bh 11.8700 22,000.00 261,140.00
Semen Portland (PC) Kg 10.0000 1,800.00 18,000.00
Semen Warna Kg 0.6000 5,000.00 3,000.00
Pasir Pasang M³ 0.0450 450,000.00 20,250.00
C PERALATAN

JUMLAH HARGA 412,640.00


OVERHEAD & PROFIT 15 % 61,896.00
HARGA SATUAN PEKERJAAN 474,536.00

1 M² Pasang Keramik Lantai uk. 40 x 40 cm, Anti Selip

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.7000 90,000.00 63,000.00
Tukang Batu OH 0.3500 105,000.00 36,750.00
Kepala Tukang OH 0.0350 135,000.00 4,725.00
Mandor OH 0.0350 165,000.00 5,775.00
B BAHAN
Keramik uk. 40 x 40 cm Anti Selip Bh 6.6300 42,000.00 278,460.00
Semen Portland (PC) Kg 9.8000 1,800.00 17,640.00
Semen Warna Kg 0.6000 5,000.00 3,000.00
Pasir Pasang M³ 0.0450 450,000.00 20,250.00
C PERALATAN

JUMLAH HARGA 429,600.00


OVERHEAD & PROFIT 15 % 64,440.00
HARGA SATUAN PEKERJAAN 494,040.00

1 M² Pasang Keramik Lantai uk. 40 x 40 cm, Licin

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.7000 90,000.00 63,000.00
Tukang Batu OH 0.3500 105,000.00 36,750.00
Kepala Tukang OH 0.0350 135,000.00 4,725.00
Mandor OH 0.0350 165,000.00 5,775.00
B BAHAN
Keramik uk. 40 x 40 cm Licin Bh 6.6300 41,000.00 271,830.00
Semen Portland (PC) Kg 9.8000 1,800.00 17,640.00
Semen Warna Kg 0.6000 5,000.00 3,000.00
Pasir Pasang M³ 0.0450 450,000.00 20,250.00
C PERALATAN

JUMLAH HARGA 422,970.00


OVERHEAD & PROFIT 15 % 63,445.50
HARGA SATUAN PEKERJAAN 486,415.50
1 M² Pasang Keramik Dinding uk. 30 x 60 cm, Licin

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.9000 90,000.00 81,000.00
Tukang Batu OH 0.4500 105,000.00 47,250.00
Kepala Tukang OH 0.0450 135,000.00 6,075.00
Mandor OH 0.0450 165,000.00 7,425.00
B BAHAN
Keramik Dinding uk. 30 x 60 cm Bh 5.9500 50,000.00 297,500.00
Semen Portland (PC) Kg 9.3000 1,800.00 16,740.00
Semen Warna Kg 1.9400 5,000.00 9,700.00
Pasir Pasang M³ 0.0180 450,000.00 8,100.00
C PERALATAN

JUMLAH HARGA 473,790.00


OVERHEAD & PROFIT 15 % 71,068.50
HARGA SATUAN PEKERJAAN 544,858.50

1 M¹ Plint Keramik ukuran 10 x 40 cm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0900 90,000.00 8,100.00
Tukang Batu OH 0.0900 105,000.00 9,450.00
Kepala Tukang OH 0.0090 135,000.00 1,215.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Plint Keramik ukuran 10 x 40 cm Bh 2.6500 15,000.00 39,750.00
Semen Portland (PC) Kg 1.1400 1,800.00 2,052.00
Semen Warna Kg 0.1000 5,000.00 500.00
Pasir Pasang M³ 0.0030 450,000.00 1,350.00
C PERALATAN

JUMLAH HARGA 63,242.00


OVERHEAD & PROFIT 15 % 9,486.30
HARGA SATUAN PEKERJAAN 72,728.30

PEKERJAAN PENUTUP LANGIT-LANGIT (PLAFOND)

1 M² Pasang Plafond Gypsum Board tebal 9 mm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Kayu OH 0.0500 105,000.00 5,250.00
Kepala Tukang OH 0.0050 135,000.00 675.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Gypsum Board 9 mm Lbr 0.3640 154,000.00 56,056.00
Paku Sekrup Kg 0.1100 36,000.00 3,960.00
C PERALATAN

JUMLAH HARGA 75,766.00


OVERHEAD & PROFIT 15 % 11,364.90
HARGA SATUAN PEKERJAAN 87,130.90

1 M² Pasang Plafond Kalsi Board tebal 4 mm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Kayu OH 0.0500 105,000.00 5,250.00
Kepala Tukang OH 0.0050 135,000.00 675.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Kalsi Board 4 mm Lbr 0.3640 99,000.00 36,036.00
Paku Sekrup Kg 0.1100 36,000.00 3,960.00
C PERALATAN

JUMLAH HARGA 55,746.00


OVERHEAD & PROFIT 15 % 8,361.90
HARGA SATUAN PEKERJAAN 64,107.90
1 M² Pasang Lisplank GRC tebal 9 mm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Kayu OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0100 135,000.00 1,350.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
GRC 9 mm Lbr 0.3640 264,000.00 96,096.00
Paku Sekrup Kg 0.1100 36,000.00 3,960.00
C PERALATAN

JUMLAH HARGA 121,731.00


OVERHEAD & PROFIT 15 % 18,259.65
HARGA SATUAN PEKERJAAN 139,990.65

1 M¹ List Plafond Gypsum 10 cm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0600 90,000.00 5,400.00
Tukang Kayu OH 0.0600 105,000.00 6,300.00
Kepala Tukang OH 0.0060 135,000.00 810.00
Mandor OH 0.0030 165,000.00 495.00
B BAHAN
List Plafond Gypsum M¹ 1.0500 25,000.00 26,250.00
Tepung Gypsum Kg 0.1500 63,000.00 9,450.00
C PERALATAN

JUMLAH HARGA 48,705.00


OVERHEAD & PROFIT 15 % 7,305.75
HARGA SATUAN PEKERJAAN 56,010.75

PEKERJAAN PENUTUP ATAP

1 M² Pasang Atap Zincalume tebal 0,4 mm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1500 90,000.00 13,500.00
Tukang Kayu OH 0.7500 105,000.00 78,750.00
Kepala Tukang OH 0.0800 135,000.00 10,800.00
Mandor OH 0.0060 165,000.00 990.00
B BAHAN
Atap Zincalume t = 0,4 mm M² 1.0500 99,000.00 103,950.00
Paku Hak Panjang 15 cm Kg 0.0200 83,000.00 1,660.00
C PERALATAN

JUMLAH HARGA 209,650.00


OVERHEAD & PROFIT 15 % 31,447.50
HARGA SATUAN PEKERJAAN 241,097.50

1 M² Pasang Atap Sky Light Zincalume tebal 0,4 mm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1500 90,000.00 13,500.00
Tukang Kayu OH 0.7500 105,000.00 78,750.00
Kepala Tukang OH 0.0800 135,000.00 10,800.00
Mandor OH 0.0060 165,000.00 990.00
B BAHAN
Atap Transparan Zincalume t = 0,4 mm M² 1.0500 105,000.00 110,250.00
Paku Hak Panjang 15 cm Kg 0.0200 83,000.00 1,660.00
C PERALATAN

JUMLAH HARGA 215,950.00


OVERHEAD & PROFIT 15 % 32,392.50
HARGA SATUAN PEKERJAAN 248,342.50
1 M² Pasang Multipleks 6 mm + Aluminium Foil Single Side Woven

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1500 90,000.00 13,500.00
Tukang Kayu OH 0.7500 105,000.00 78,750.00
Kepala Tukang OH 0.0800 135,000.00 10,800.00
Mandor OH 0.0060 165,000.00 990.00
B BAHAN
Multipleks 6 mm Lbr 0.3640 110,000.00 40,040.00
Aluminium Foil Single Side Woven M² 1.2000 17,000.00 20,400.00
C PERALATAN

JUMLAH HARGA 164,480.00


OVERHEAD & PROFIT 15 % 24,672.00
HARGA SATUAN PEKERJAAN 189,152.00

1 M¹ Pasang Nok Atap Zincalume tebal 0,4 mm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Kayu OH 1.0000 105,000.00 105,000.00
Kepala Tukang OH 0.1000 135,000.00 13,500.00
Mandor OH 0.0500 165,000.00 8,250.00
B BAHAN
Nok Atap Zincalume t = 0,4 mm M¹ 1.2000 88,000.00 105,600.00
Paku Hak Panjang 15 cm Kg 0.0400 83,000.00 3,320.00
C PERALATAN

JUMLAH HARGA 244,670.00


OVERHEAD & PROFIT 15 % 36,700.50
HARGA SATUAN PEKERJAAN 281,370.50

1 M¹ Pasang Flashing Zincalume tebal 0,4 mm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Kayu OH 1.0000 105,000.00 105,000.00
Kepala Tukang OH 0.1000 135,000.00 13,500.00
Mandor OH 0.0500 165,000.00 8,250.00
B BAHAN
Wall Flasing Zincalume t = 0,4 mm M¹ 1.2000 83,000.00 99,600.00
Paku Hak Panjang 15 cm Kg 0.0400 83,000.00 3,320.00
Semen Portland (PC) Kg 5.5000 1,800.00 9,900.00
Pasir Pasang M³ 0.0150 450,000.00 6,750.00
C PERALATAN

JUMLAH HARGA 255,320.00


OVERHEAD & PROFIT 15 % 38,298.00
HARGA SATUAN PEKERJAAN 293,618.00

1 M¹ Pasang Lisplank GRC Lebar 20 cm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Kayu OH 0.2000 105,000.00 21,000.00
Kepala Tukang OH 0.0200 135,000.00 2,700.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Lisplank GRC Lebar 20 cm M¹ 1.1000 35,000.00 38,500.00
Paku Sekrup Kg 0.0500 36,000.00 1,800.00
C PERALATAN

JUMLAH HARGA 73,825.00


OVERHEAD & PROFIT 15 % 11,073.75
HARGA SATUAN PEKERJAAN 84,898.75

1 M¹ Pasang Lisplank GRC Lebar 15 cm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Kayu OH 0.2000 105,000.00 21,000.00
Kepala Tukang OH 0.0200 135,000.00 2,700.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Lisplank GRC Lebar 15 cm M¹ 1.1000 25,000.00 27,500.00
Paku Sekrup Kg 0.0500 36,000.00 1,800.00
C PERALATAN

JUMLAH HARGA 62,825.00


OVERHEAD & PROFIT 15 % 9,423.75
HARGA SATUAN PEKERJAAN 72,248.75
1 M² Rangka Atap Baja Ringan

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.2470 90,000.00 22,230.00
Tukang Besi OH 0.1760 105,000.00 18,480.00
Kepala Tukang OH 0.1170 135,000.00 15,795.00
Mandor OH 0.2800 165,000.00 46,200.00
B BAHAN
Main Truss C 80.0,75 M¹ 3.0000 46,000.00 138,000.00
Roof Bottom R 35-0,75 M¹ 2.5000 35,000.00 87,500.00
Self Drilling Screw dia.6x20 mm
Bh 35.0000 800.00 28,000.00
(Trsuss Screw)
Self Drilling Screw dia.4x16 mm (Roof
Bh 1.5000 500.00 750.00
bottom Screw)
Dynabolt dia.10 x 80 mm Bh 1.0000 1,000.00 1,000.00
C PERALATAN

JUMLAH HARGA 357,955.00


OVERHEAD & PROFIT 15 % 53,693.25
HARGA SATUAN PEKERJAAN 411,648.25

PEKERJAAN KUNCI & KACA

1 Bh Pasang Kunci Tanam

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0100 90,000.00 900.00
Tukang Kayu OH 0.5000 105,000.00 52,500.00
Kepala Tukang OH 0.0500 135,000.00 6,750.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Kunci Tanam Bh 1.0000 330,000.00 330,000.00
C PERALATAN

JUMLAH HARGA 390,975.00


OVERHEAD & PROFIT 15 % 58,646.25
HARGA SATUAN PEKERJAAN 449,621.25

1 Bh Pasang Engsel Pintu

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0150 90,000.00 1,350.00
Tukang Kayu OH 0.1500 105,000.00 15,750.00
Kepala Tukang OH 0.0150 135,000.00 2,025.00
Mandor OH 0.0008 165,000.00 132.00
B BAHAN
Engsel Pintu Bh 1.0000 39,000.00 39,000.00
C PERALATAN

JUMLAH HARGA 58,257.00


OVERHEAD & PROFIT 15 % 8,738.55
HARGA SATUAN PEKERJAAN 66,995.55

1 Bh Pasang Door Closer

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0500 90,000.00 4,500.00
Tukang Kayu OH 0.5000 105,000.00 52,500.00
Kepala Tukang OH 0.0500 135,000.00 6,750.00
Mandor OH 0.0030 165,000.00 495.00
B BAHAN
Door Closer Bh 1.0000 220,000.00 220,000.00
C PERALATAN

JUMLAH HARGA 284,245.00


OVERHEAD & PROFIT 15 % 42,636.75
HARGA SATUAN PEKERJAAN 326,881.75
1 Bh Pasang Gerendel Pintu

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0200 90,000.00 1,800.00
Tukang Kayu OH 0.2000 105,000.00 21,000.00
Kepala Tukang OH 0.0200 135,000.00 2,700.00
Mandor OH 0.0010 165,000.00 165.00
B BAHAN
Gerendel Pintu Bh 1.0000 39,000.00 39,000.00
C PERALATAN

JUMLAH HARGA 64,665.00


OVERHEAD & PROFIT 15 % 9,699.75
HARGA SATUAN PEKERJAAN 74,364.75

1 Bh Pasang Handle Pintu

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0200 90,000.00 1,800.00
Tukang Kayu OH 0.2000 105,000.00 21,000.00
Kepala Tukang OH 0.0200 135,000.00 2,700.00
Mandor OH 0.0010 165,000.00 165.00
B BAHAN
Handle Pintu Bh 1.0000 275,000.00 275,000.00
C PERALATAN

JUMLAH HARGA 300,665.00


OVERHEAD & PROFIT 15 % 45,099.75
HARGA SATUAN PEKERJAAN 345,764.75

1 M² Pasang Kaca, tebal 5 mm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0150 90,000.00 1,350.00
Tukang Kayu OH 0.1500 105,000.00 15,750.00
Kepala Tukang OH 0.0150 135,000.00 2,025.00
Mandor OH 0.0008 165,000.00 132.00
B BAHAN
Kaca 5 mm M² 1.1000 182,000.00 200,200.00
Sealant Tube 0.0500 65,000.00 3,250.00
C PERALATAN

JUMLAH HARGA 222,707.00


OVERHEAD & PROFIT 15 % 33,406.05
HARGA SATUAN PEKERJAAN 256,113.05

1 M² Jendela Kaca Naco

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0150 90,000.00 1,350.00
Tukang Aluminium OH 0.1500 105,000.00 15,750.00
Kepala Tukang OH 0.0150 135,000.00 2,025.00
Mandor OH 0.0008 165,000.00 132.00
B BAHAN
Kaca Naco 5 mm M² 1.2000 182,000.00 218,400.00
Perlengkapan % 35.0000 182,000.00 63,700.00
C PERALATAN

JUMLAH HARGA 301,357.00


OVERHEAD & PROFIT 15 % 45,203.55
HARGA SATUAN PEKERJAAN 346,560.55
PEKERJAAN KUNCI & KACA

1 M² Pengecatan Dinding Exterior

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0200 90,000.00 1,800.00
Tukang Cat OH 0.0630 105,000.00 6,615.00
Kepala Tukang OH 0.0063 135,000.00 850.50
Mandor OH 0.0030 165,000.00 495.00
B BAHAN
Plamur Kg 0.1000 22,000.00 2,200.00
Cat Dasar Tembok Exterior Kg 0.1000 40,000.00 4,000.00
Cat Penutup Tembok Exterior Kg 0.2600 61,000.00 15,860.00
C PERALATAN

JUMLAH HARGA 31,820.50


OVERHEAD & PROFIT 15 % 4,773.08
HARGA SATUAN PEKERJAAN 36,593.58

1 M² Pengecatan Dinding Interior

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0200 90,000.00 1,800.00
Tukang Cat OH 0.0630 105,000.00 6,615.00
Kepala Tukang OH 0.0063 135,000.00 850.50
Mandor OH 0.0030 165,000.00 495.00
B BAHAN
Plamur Kg 0.1000 22,000.00 2,200.00
Cat Dasar Tembok Interior Kg 0.1000 40,000.00 4,000.00
Cat Penutup Tembok Interior Kg 0.2600 50,000.00 13,000.00
C PERALATAN

JUMLAH HARGA 28,960.50


OVERHEAD & PROFIT 15 % 4,344.08
HARGA SATUAN PEKERJAAN 33,304.58

1 M² Pengecatan Plafond

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0200 90,000.00 1,800.00
Tukang Cat OH 0.0630 105,000.00 6,615.00
Kepala Tukang OH 0.0063 135,000.00 850.50
Mandor OH 0.0030 165,000.00 495.00
B BAHAN
Plamur Kg 0.1000 22,000.00 2,200.00
Cat Dasar Tembok Interior Kg 0.1000 40,000.00 4,000.00
Cat Penutup Tembok Interior Kg 0.2600 50,000.00 13,000.00
Roll Bh 0.0100 21,000.00 210.00
C PERALATAN

JUMLAH HARGA 29,170.50


OVERHEAD & PROFIT 15 % 4,375.58
HARGA SATUAN PEKERJAAN 33,546.08

1 M² Pengecatan Baja dengan Menie Besi

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0200 90,000.00 1,800.00
Tukang Cat OH 0.2000 105,000.00 21,000.00
Kepala Tukang OH 0.0200 135,000.00 2,700.00
Mandor OH 0.0025 165,000.00 412.50
B BAHAN
Cat Meni Besi Kg 0.1000 49,000.00 4,900.00
Kuas Bh 0.0100 14,000.00 140.00
C PERALATAN

JUMLAH HARGA 30,952.50


OVERHEAD & PROFIT 15 % 4,642.88
HARGA SATUAN PEKERJAAN 35,595.38
1 M² Pengecatan dengan Cat Besi

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0700 90,000.00 6,300.00
Tukang Cat OH 0.0090 105,000.00 945.00
Kepala Tukang OH 0.0060 135,000.00 810.00
Mandor OH 0.0030 165,000.00 495.00
B BAHAN
Cat Meni Besi Kg 0.2000 49,000.00 9,800.00
Pengencer Cat / Thinner Liter 0.0300 37,000.00 1,110.00
Cat Dasar Besi Kg 0.1700 51,000.00 8,670.00
Cat Penutup Besi Kg 0.2600 61,000.00 15,860.00
Kuas Bh 0.0100 14,000.00 140.00
Amplas Lbr 0.2000 7,500.00 1,500.00
C PERALATAN

JUMLAH HARGA 45,630.00


OVERHEAD & PROFIT 15 % 6,844.50
HARGA SATUAN PEKERJAAN 52,474.50

PEKERJAAN SANITASI DALAM GEDUNG

1 Bh Pasang Kloset Jongkok

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.0000 90,000.00 90,000.00
Tukang Batu OH 1.5000 105,000.00 157,500.00
Kepala Tukang OH 0.1500 135,000.00 20,250.00
Mandor OH 0.1600 165,000.00 26,400.00
B BAHAN
Kloset Jongkok Unit 1.0000 500,000.00 500,000.00
Semen Portland (PC) Kg 6.0000 1,800.00 10,800.00
Pasir Pasang M³ 0.0100 450,000.00 4,500.00
C PERALATAN

JUMLAH HARGA 809,450.00


OVERHEAD & PROFIT 15 % 121,417.50
HARGA SATUAN PEKERJAAN 930,867.50

1 Bh Pasang Urinoir

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.0000 90,000.00 90,000.00
Tukang Batu OH 1.0000 105,000.00 105,000.00
Kepala Tukang OH 0.1000 135,000.00 13,500.00
Mandor OH 0.0500 165,000.00 8,250.00
B BAHAN
Urinoir Unit 1.0000 1,265,000.00 1,265,000.00
Semen Portland (PC) Kg 6.0000 1,800.00 10,800.00
Pasir Pasang M³ 0.0100 450,000.00 4,500.00
Perlengkapan % 30.0000 1,265,000.00 379,500.00
C PERALATAN

JUMLAH HARGA 1,876,550.00


OVERHEAD & PROFIT 15 % 281,482.50
HARGA SATUAN PEKERJAAN 2,158,032.50

1 Bh Pasang Wastafel Dinding

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.2000 90,000.00 108,000.00
Tukang Batu OH 1.4500 105,000.00 152,250.00
Kepala Tukang OH 0.1500 135,000.00 20,250.00
Mandor OH 0.0600 165,000.00 9,900.00
B BAHAN
Wastafel Dinding Unit 1.2000 825,000.00 990,000.00
Semen Portland (PC) Kg 6.0000 1,800.00 10,800.00
Pasir Pasang M³ 0.0100 450,000.00 4,500.00
Perlengkapan % 12.0000 825,000.00 99,000.00
C PERALATAN

JUMLAH HARGA 1,394,700.00


OVERHEAD & PROFIT 15 % 209,205.00
HARGA SATUAN PEKERJAAN 1,603,905.00
1 Bh Pasang Floor Drain

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0100 90,000.00 900.00
Tukang Batu OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0100 135,000.00 1,350.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Floor Drain Stainless Unit 1.0000 72,000.00 72,000.00
C PERALATAN

JUMLAH HARGA 85,575.00


OVERHEAD & PROFIT 15 % 12,836.25
HARGA SATUAN PEKERJAAN 98,411.25

1 Bh Pasang Roof Drain

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0100 90,000.00 900.00
Tukang Batu OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0100 135,000.00 1,350.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Roof Drain Stainless Unit 1.0000 94,000.00 94,000.00
C PERALATAN

JUMLAH HARGA 107,575.00


OVERHEAD & PROFIT 15 % 16,136.25
HARGA SATUAN PEKERJAAN 123,711.25

1 Bh Pasang Kran Air dia. 1/2" atau 3/4"

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0100 90,000.00 900.00
Tukang Batu OH 0.4000 105,000.00 42,000.00
Kepala Tukang OH 0.0400 135,000.00 5,400.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Kran Air 3/4" atau 1/2" Unit 1.0000 39,000.00 39,000.00
Sealtape Bh 0.0250 2,000.00 50.00
C PERALATAN

JUMLAH HARGA 88,175.00


OVERHEAD & PROFIT 15 % 13,226.25
HARGA SATUAN PEKERJAAN 101,401.25

1 Bh Pasang Stop Kran PVC 1"

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0100 90,000.00 900.00
Tukang Batu OH 0.4000 105,000.00 42,000.00
Kepala Tukang OH 0.0400 135,000.00 5,400.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Stop Kran PVC 1" Unit 1.0000 44,000.00 44,000.00
Sealtape Bh 0.0250 2,000.00 50.00
C PERALATAN

JUMLAH HARGA 93,175.00


OVERHEAD & PROFIT 15 % 13,976.25
HARGA SATUAN PEKERJAAN 107,151.25

1 Bh Pasang Stop Kran Galvanis 1"

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0100 90,000.00 900.00
Tukang Batu OH 0.4000 105,000.00 42,000.00
Kepala Tukang OH 0.0400 135,000.00 5,400.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Stop Kran Galvanis 1" Unit 1.0000 72,000.00 72,000.00
Sealtape Bh 0.0250 2,000.00 50.00
C PERALATAN

JUMLAH HARGA 121,175.00


OVERHEAD & PROFIT 15 % 18,176.25
HARGA SATUAN PEKERJAAN 139,351.25
1 M¹ Pasang Pipa PVC AW dia. 4"

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0810 90,000.00 7,290.00
Tukang Pipa OH 0.1350 105,000.00 14,175.00
Kepala Tukang OH 0.0135 135,000.00 1,822.50
Mandor OH 0.0040 165,000.00 660.00
B BAHAN
Pipa PVC AW 4" M¹ 1.2000 116,000.00 139,200.00
Perlengkapan % 35.0000 116,000.00 40,600.00
C PERALATAN

JUMLAH HARGA 203,747.50


OVERHEAD & PROFIT 15 % 30,562.13
HARGA SATUAN PEKERJAAN 234,309.63

1 M¹ Pasang Pipa PVC AW dia. 3"

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0810 90,000.00 7,290.00
Tukang Pipa OH 0.1350 105,000.00 14,175.00
Kepala Tukang OH 0.0135 135,000.00 1,822.50
Mandor OH 0.0040 165,000.00 660.00
B BAHAN
Pipa PVC AW 3" M¹ 1.2000 66,000.00 79,200.00
Perlengkapan % 35.0000 66,000.00 23,100.00
C PERALATAN

JUMLAH HARGA 126,247.50


OVERHEAD & PROFIT 15 % 18,937.13
HARGA SATUAN PEKERJAAN 145,184.63

1 M¹ Pasang Pipa PVC AW dia. 2"

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0810 90,000.00 7,290.00
Tukang Pipa OH 0.1350 105,000.00 14,175.00
Kepala Tukang OH 0.0135 135,000.00 1,822.50
Mandor OH 0.0040 165,000.00 660.00
B BAHAN
Pipa PVC AW 2" M¹ 1.2000 44,000.00 52,800.00
Perlengkapan % 35.0000 44,000.00 15,400.00
C PERALATAN

JUMLAH HARGA 92,147.50


OVERHEAD & PROFIT 15 % 13,822.13
HARGA SATUAN PEKERJAAN 105,969.63

1 M¹ Pasang Pipa PVC AW dia. 1"

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0360 90,000.00 3,240.00
Tukang Pipa OH 0.0600 105,000.00 6,300.00
Kepala Tukang OH 0.0060 135,000.00 810.00
Mandor OH 0.0020 165,000.00 330.00
B BAHAN
Pipa PVC AW 1" M¹ 1.2000 22,000.00 26,400.00
Perlengkapan % 35.0000 22,000.00 7,700.00
C PERALATAN

JUMLAH HARGA 44,780.00


OVERHEAD & PROFIT 15 % 6,717.00
HARGA SATUAN PEKERJAAN 51,497.00

1 M¹ Pasang Pipa PVC AW dia. 3/4"

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0360 90,000.00 3,240.00
Tukang Pipa OH 0.0600 105,000.00 6,300.00
Kepala Tukang OH 0.0060 135,000.00 810.00
Mandor OH 0.0020 165,000.00 330.00
B BAHAN
Pipa PVC AW 3/4" M¹ 1.2000 19,000.00 22,800.00
Perlengkapan % 35.0000 19,000.00 6,650.00
C PERALATAN

JUMLAH HARGA 40,130.00


OVERHEAD & PROFIT 15 % 6,019.50
HARGA SATUAN PEKERJAAN 46,149.50
1 M¹ Pasang Pipa PVC AW dia. 1/2"

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0360 90,000.00 3,240.00
Tukang Pipa OH 0.0600 105,000.00 6,300.00
Kepala Tukang OH 0.0060 135,000.00 810.00
Mandor OH 0.0020 165,000.00 330.00
B BAHAN
Pipa PVC AW 1/2" M¹ 1.2000 16,000.00 19,200.00
Perlengkapan % 35.0000 16,000.00 5,600.00
C PERALATAN

JUMLAH HARGA 35,480.00


OVERHEAD & PROFIT 15 % 5,322.00
HARGA SATUAN PEKERJAAN 40,802.00

1 M¹ Pasang Pipa Galvanis dia. 1"

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0540 90,000.00 4,860.00
Tukang Pipa OH 0.0900 105,000.00 9,450.00
Kepala Tukang OH 0.0090 135,000.00 1,215.00
Mandor OH 0.0270 165,000.00 4,455.00
B BAHAN
Pipa Galvanis 1" M¹ 1.2000 94,000.00 112,800.00
Perlengkapan % 35.0000 94,000.00 32,900.00
C PERALATAN

JUMLAH HARGA 165,680.00


OVERHEAD & PROFIT 15 % 24,852.00
HARGA SATUAN PEKERJAAN 190,532.00

1 M¹ Pasang Pipa Galvanis dia. 2"

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0540 90,000.00 4,860.00
Tukang Pipa OH 0.0900 105,000.00 9,450.00
Kepala Tukang OH 0.0090 135,000.00 1,215.00
Mandor OH 0.0270 165,000.00 4,455.00
B BAHAN
Pipa Galvanis 2" M¹ 1.2000 176,000.00 211,200.00
Perlengkapan % 35.0000 176,000.00 61,600.00
C PERALATAN

JUMLAH HARGA 292,780.00


OVERHEAD & PROFIT 15 % 43,917.00
HARGA SATUAN PEKERJAAN 336,697.00

1 M¹ Pasang Pipa Galvanis dia. 1/2"

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0540 90,000.00 4,860.00
Tukang Pipa OH 0.0900 105,000.00 9,450.00
Kepala Tukang OH 0.0090 135,000.00 1,215.00
Mandor OH 0.0270 165,000.00 4,455.00
B BAHAN
Pipa Galvanis 1/2" M¹ 1.2000 52,000.00 62,400.00
Perlengkapan % 35.0000 52,000.00 18,200.00
C PERALATAN

JUMLAH HARGA 100,580.00


OVERHEAD & PROFIT 15 % 15,087.00
HARGA SATUAN PEKERJAAN 115,667.00
1 Unit Septictank uk 4 x 1,5 x 2 m & Resapan

HRG SAT. HRG SAT.


NO. URAIAN PEKERJAAN SAT. KOEF. JUMLAH HARGA
MATERIAL TENAGA
Galian Tanah Biasa Sedalam 2 M M³ 22.32 - 101,688.75 2,269,387.83
Urug Kembali Bekas Galian M³ 7.44 - 61,237.50 455,545.76
Rabat Beton Bawah Lantai Mutu f'c
M³ 0.53 1,205,339.64 224,077.50 760,449.92
=7,4 Mpa (K-100)
Dinding Bata Merah 1 PC : 4 Psr M² 17.35 223,157.50 47,523.75 4,696,319.69
Plesteran 1 PC : 3 Psr, tebal 15 mm M² 34.70 27,998.82 54,337.50 2,857,070.30
Beton mutu f'c = 19,3 Mpa (K-250) M³ 0.52 1,414,348.49 224,077.50 859,354.43
Ring Balok Beton Bertulang (10 x 15)
M¹ 1.80 123,067.25 47,092.50 306,287.55
cm

Pembesian dengan Besi Polos atau Ulir Kg 64.69 27,030.75 1,754.33 1,862,058.53

Kerikil Ls 1.00 369,000.00 50,000.00 419,000.00


Batu Karang Ls 1.00 275,000.00 50,000.00 325,000.00
Lapisan Ijuk Ls 1.00 605,000.00 50,000.00 655,000.00
Pipa PVC Ø 4" M¹ 2.00 206,770.00 27,539.63 468,619.25
Pipa Hawa Ø 2" Ls 1.00 275,000.00 50,000.00 325,000.00
JUMLAH HARGA 16,259,093.27
OVERHEAD & PROFIT 15 % 2,438,863.99
HARGA SATUAN PEKERJAAN 18,697,957.26

PEKERJAAN LISTRIK

1 Titik Pasang Instalasi Lampu Penerangan, Stop Kontak & Saklar

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3600 90,000.00 32,400.00
Tukang Listrik OH 0.6000 105,000.00 63,000.00
Kepala Tukang OH 0.0600 135,000.00 8,100.00
Mandor OH 0.0180 165,000.00 2,970.00
B BAHAN
Kabel NYM 3 x 2.5 mm M¹ 8.0000 20,000.00 160,000.00
Pipa Listrik PVC 3/8'' M¹ 3.0000 25,000.00 75,000.00
Tee Doz Bh 1.0000 7,000.00 7,000.00
Isolasi Listrik Bh 0.2000 6,000.00 1,200.00
Paku Klem Listrik Kg 0.3000 40,000.00 12,000.00
C PERALATAN

JUMLAH HARGA 361,670.00


OVERHEAD & PROFIT 15 % 54,250.50
HARGA SATUAN PEKERJAAN 415,920.50

1 Titik Pasang Lampu Downlight

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0300 90,000.00 2,700.00
Tukang Listrik OH 0.3000 105,000.00 31,500.00
Kepala Tukang OH 0.0300 135,000.00 4,050.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Lampu SL 18 Watt Bh 1.0000 94,000.00 94,000.00
Downlight 10 cm Bh 1.0000 99,000.00 99,000.00
C PERALATAN

JUMLAH HARGA 233,725.00


OVERHEAD & PROFIT 15 % 35,058.75
HARGA SATUAN PEKERJAAN 268,783.75

1 Titik Pasang Lampu TL

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0300 90,000.00 2,700.00
Tukang Listrik OH 0.3000 105,000.00 31,500.00
Kepala Tukang OH 0.0300 135,000.00 4,050.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Lampu TL RM 2 X 36 W Bh 1.0000 275,000.00 275,000.00
C PERALATAN

JUMLAH HARGA 315,725.00


OVERHEAD & PROFIT 15 % 47,358.75
HARGA SATUAN PEKERJAAN 363,083.75
1 Titik Pasang Lampu TL Emergency

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0300 90,000.00 2,700.00
Tukang Listrik OH 0.3000 105,000.00 31,500.00
Kepala Tukang OH 0.0300 135,000.00 4,050.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Lampu TL RM 2 X 36 W + Battery Bh 1.0000 743,000.00 743,000.00
C PERALATAN

JUMLAH HARGA 783,725.00


OVERHEAD & PROFIT 15 % 117,558.75
HARGA SATUAN PEKERJAAN 901,283.75

1 Titik Pasang Stop Kontak

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0300 90,000.00 2,700.00
Tukang Listrik OH 0.3000 105,000.00 31,500.00
Kepala Tukang OH 0.0300 135,000.00 4,050.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Stop Kontak Bh 1.0000 40,000.00 40,000.00
C PERALATAN

JUMLAH HARGA 80,725.00


OVERHEAD & PROFIT 15 % 12,108.75
HARGA SATUAN PEKERJAAN 92,833.75

1 Titik Pasang Saklar Tunggal

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0300 90,000.00 2,700.00
Tukang Listrik OH 0.3000 105,000.00 31,500.00
Kepala Tukang OH 0.0300 135,000.00 4,050.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Saklar Tunggal Bh 1.0000 39,000.00 39,000.00
C PERALATAN

JUMLAH HARGA 79,725.00


OVERHEAD & PROFIT 15 % 11,958.75
HARGA SATUAN PEKERJAAN 91,683.75

1 Titik Pasang Saklar Ganda

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0300 90,000.00 2,700.00
Tukang Listrik OH 0.3000 105,000.00 31,500.00
Kepala Tukang OH 0.0300 135,000.00 4,050.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Saklar Ganda Bh 1.0000 39,000.00 39,000.00
C PERALATAN

JUMLAH HARGA 79,725.00


OVERHEAD & PROFIT 15 % 11,958.75
HARGA SATUAN PEKERJAAN 91,683.75

1 Titik Pasang Exhaust Fan

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0300 90,000.00 2,700.00
Tukang Listrik OH 0.3000 105,000.00 31,500.00
Kepala Tukang OH 0.0300 135,000.00 4,050.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Exhaust Ceiling Fan Bh 1.0000 495,000.00 495,000.00
C PERALATAN

JUMLAH HARGA 535,725.00


OVERHEAD & PROFIT 15 % 80,358.75
HARGA SATUAN PEKERJAAN 616,083.75
1 M¹ Pasang Kabel Tray uk. 300 x 100 mm

HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3600 90,000.00 32,400.00
Tukang Listrik OH 0.6000 105,000.00 63,000.00
Kepala Tukang OH 0.0600 135,000.00 8,100.00
Mandor OH 0.0180 165,000.00 2,970.00
B BAHAN
Kabel Tray 300 x 100 mm M¹ 1.0500 330,000.00 346,500.00
Perlengkapan % 35.0000 330,000.00 115,500.00
C PERALATAN

JUMLAH HARGA 568,470.00


OVERHEAD & PROFIT 15 % 85,270.50
HARGA SATUAN PEKERJAAN 653,740.50
DAFTAR HARGA UPAH DAN BAHAN

No. UPAH / BAHAN SATUAN HARGA SATUAN KET.

HARGA UPAH

1 Mandor OH Rp 165,000.00 On Site


2 Kepala Tukang OH Rp 135,000.00 On Site
3 Tukang Batu OH Rp 105,000.00 On Site
4 Tukang Kayu OH Rp 105,000.00 On Site
5 Tukang Besi OH Rp 105,000.00 On Site
6 Tukang Pipa OH Rp 105,000.00 On Site
7 Tukang Las OH Rp 105,000.00 On Site
8 Tukang Cat OH Rp 105,000.00 On Site
9 Tukang Listrik OH Rp 105,000.00 On Site
10 Tukang Besi Konstruksi OH Rp 105,000.00 On Site
11 Tukang Aluminium OH Rp 105,000.00 On Site
12 Pekerja OH Rp 90,000.00 On Site

HARGA BAHAN

1 Batu Belah M3 Rp 290,000.00 On Site


2 Batu Pecah 2 - 3 cm M3 Rp 380,000.00 On Site
3 Batu Koral M3 Rp 369,000.00 On Site
4 Pasir Pasang M3 Rp 450,000.00 On Site
5 Pasir Beton M3 Rp 450,000.00 On Site
6 Pasir Urug M3 Rp 245,000.00 On Site
7 Tanah Urug M3 Rp 242,000.00 On Site
8 Air Ltr Rp 200.00 On Site
9 Semen Portland @ 50 Kg (PC) Sak Rp 90,000.00 On Site
10 Semen Portland (PC) Kg Rp 1,800.00 On Site
11 Semen Warna Kg Rp 5,000.00 On Site
12 Besi Beton Polos / Ulir Kg Rp 22,000.00 On Site
13 Besi Beton Polos Kg Rp 21,000.00 On Site
14 Kawat Ikat Beton (Bendrat) Kg Rp 27,000.00 On Site
15 Profil Baja Kg Rp 24,000.00 On Site
16 Besi Siku L 100.100.10 Kg Rp 24,000.00 On Site
17 Besi Siku L 70.70.7 Kg Rp 24,000.00 On Site
18 Besi Siku L 50.50.5 Kg Rp 24,000.00 On Site
19 Besi Siku L 40.40.4 Kg Rp 24,000.00 On Site
20 Besi Siku L 30.30.3 Kg Rp 24,000.00 On Site
21 Besi Hollow 30 x 30 Kg Rp 24,000.00 On Site
22 Besi Plat Strip, t = 1,5 mm Kg Rp 24,000.00 On Site
23 Besi Plat Strip 3x30 mm Kg Rp 24,000.00 On Site
24 Besi Plat Baja, t = 2 mm Kg Rp 24,000.00 On Site
25 Wiremesh M6 M² Rp 105,000.00 On Site
26 Kawat Las Kg Rp 165,000.00 On Site
27 Bata Merah Bh Rp 2,200.00 On Site
28 Roster uk. 40 x 20 x 10 Bh Rp 17,000.00 On Site
29 Batako Bh Rp 27,000.00 On Site
30 Batu Alam M2 Rp 331,000.00 On Site
31 Balok Kayu Kelas I M3 Rp 7,260,000.00 On Site
32 Papan Kayu Kelas I M3 Rp 7,315,000.00 On Site
33 Balok Kayu Kelas II M3 Rp 3,300,000.00 On Site
34 Papan Kayu Kelas II M3 Rp 3,355,000.00 On Site
35 Kayu Kelas III M3 Rp 3,025,000.00 On Site
36 Balok Kayu 5 x 7 cm Kelas III M3 Rp 3,025,000.00 On Site
37 Papan Kayu Kelas III M3 Rp 3,080,000.00 On Site
38 Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg Rp 15,000.00 On Site
39 Penjaga Jarak Bekisting / Spacer Bh Rp 11,000.00 On Site
40 Profil Kaca M¹ Rp 28,000.00 On Site
41 Profil Aluminium M¹ Rp 150,000.00 On Site
42 Profil Aluminium 1,2 x 2" M¹ Rp 100,000.00 On Site
43 Aluminium Strip M¹ Rp 105,000.00 On Site
44 Rangka Metal Stud M¹ Rp 46,000.00 On Site
45 Main Truss C 80.0,75 M¹ Rp 46,000.00 On Site
No. UPAH / BAHAN SATUAN HARGA SATUAN KET.

46 Roof Bottom R 35-0,75 M¹ Rp 35,000.00 On Site


47 Rangka Metal Hollow 40 x 40 x 1,2 mm M¹ Rp 39,000.00 On Site
48 Rangka Hollow Galvalum 40 x 40 mm M¹ Rp 25,000.00 On Site
49 Rangka Hollow Galvalum 20 x 40 mm M¹ Rp 15,000.00 On Site
50 Sekrup Fischer Bh Rp 35,000.00 On Site
51 Self Drilling Screw dia.6x20 mm (Trsuss Screw) Bh Rp 800.00 On Site
52 Self Drilling Screw dia.4x16 mm (Roof bottom Screw) Bh Rp 500.00 On Site
53 Dynabolt dia.10 x 80 mm Bh Rp 1,000.00 On Site
54 Paku Sekrup Kg Rp 36,000.00 On Site
55 Anchor and Bolt Kg Rp 84,000.00 On Site
56 Paku 1 - 2,5 cm Kg Rp 28,000.00 On Site
57 Paku 5 - 7 cm Kg Rp 25,000.00 On Site
58 Paku 5 - 10 cm Kg Rp 25,000.00 On Site
59 Paku 5 - 12 cm Kg Rp 25,000.00 On Site
60 Paku 7 - 10 cm Kg Rp 25,000.00 On Site
61 Paku 10 cm Kg Rp 25,000.00 On Site
62 Paku 12 cm Kg Rp 25,000.00 On Site
63 Paku Tripleks Kg Rp 28,000.00 On Site
64 Paku Metal Roof Kg Rp 29,000.00 On Site
65 Paku Hak Panjang 15 cm Kg Rp 83,000.00 On Site
66 Angkur Baut 22 mm, panjang 750 mm Bh Rp 83,000.00 On Site
67 Mur Baut HTB M19 Bh Rp 21,000.00 On Site
68 Mur Baut HTB M16 Bh Rp 20,000.00 On Site
69 Mur HTB M10 Bh Rp 8,000.00 On Site
70 Tumbuckle / Jarum Keras D 16 mm Bh Rp 138,000.00 On Site
71 Keramik uk. 40 x 40 cm Anti Selip Bh Rp 42,000.00 On Site
72 Keramik uk. 40 x 40 cm Licin Bh Rp 41,000.00 On Site
73 Granit Polished uk. 60 x 60 cm Bh Rp 112,000.00 On Site
74 Granit Unpolished uk. 60 x 60 cm Bh Rp 139,000.00 On Site
75 Keramik uk. 30 x 30 cm Anti Selip Bh Rp 22,000.00 On Site
76 Keramik Dinding uk. 30 x 60 cm Bh Rp 50,000.00 On Site
77 Plint Keramik ukuran 10 x 40 cm Bh Rp 15,000.00 On Site
78 Plywood 9 mm Lbr Rp 165,000.00 On Site
79 Kalsi Board 4 mm Lbr Rp 99,000.00 On Site
80 Kalsi Board 6 mm Lbr Rp 165,000.00 On Site
81 GRC 9 mm Lbr Rp 264,000.00 On Site
82 Gypsum Board 9 mm Lbr Rp 154,000.00 On Site
83 Tepung Gypsum Kg Rp 63,000.00 On Site
84 List Plafond Gypsum M Rp 25,000.00 On Site
85 Lisplank GRC Lebar 20 cm M Rp 35,000.00 On Site
86 Lisplank GRC Lebar 15 cm M Rp 25,000.00 On Site
87 Multipleks 4 mm Lbr Rp 72,000.00 On Site
88 Multipleks 6 mm Lbr Rp 110,000.00 On Site
89 Multipleks 9 mm Lbr Rp 138,000.00 On Site
90 Multipleks 12 mm Lbr Rp 220,000.00 On Site
91 Lem Kayu Kg Rp 22,000.00 On Site
92 Sealant Tube Rp 65,000.00 On Site
93 Kaca 5 mm M2 Rp 182,000.00 On Site
94 Kaca 6 mm M2 Rp 204,000.00 On Site
95 Kaca Naco 5 mm M2 Rp 182,000.00 On Site
96 Atap Zincalume t = 0,4 mm M2 Rp 99,000.00 On Site
97 Atap Transparan Zincalume t = 0,4 mm M2 Rp 105,000.00 On Site
98 Nok Atap Zincalume t = 0,4 mm M Rp 88,000.00 On Site
99 Wall Flasing Zincalume t = 0,4 mm M Rp 83,000.00 On Site
100 Aluminium Foil Single Side Woven M2 Rp 17,000.00 On Site
101 Seng Plat BJLS 0,25 mm Lebar 90 cm Lbr Rp 83,000.00 On Site
102 Seng Gelombang BJLS 0,25 mm Lbr Rp 83,000.00 On Site
103 Amplas Lbr Rp 7,500.00 On Site
104 Cat Meni Besi Kg Rp 49,000.00 On Site
105 Cat Dasar Besi Kg Rp 51,000.00 On Site
106 Cat Penutup Besi Kg Rp 61,000.00 On Site
107 Cat Dasar Roof Paint Kg Rp 66,000.00 On Site
108 Cat Penutup Roof Paint Kg Rp 72,000.00 On Site
109 Cat Dasar Tembok Exterior Kg Rp 40,000.00 On Site
No. UPAH / BAHAN SATUAN HARGA SATUAN KET.

110 Cat Penutup Tembok Exterior Kg Rp 61,000.00 On Site


111 Cat Dasar Tembok Interior Kg Rp 40,000.00 On Site
112 Cat Penutup Tembok Interior Kg Rp 50,000.00 On Site
113 Thinner Super Liter Rp 55,000.00 On Site
114 Pengencer Cat / Thinner Kg Rp 37,000.00 On Site
115 Plamur Kg Rp 22,000.00 On Site
116 Roll Kg Rp 21,000.00 On Site
117 Kuas Kg Rp 14,000.00 On Site
118 Alat Bantu Pengecatan Ls Rp 6,000.00 On Site
119 Minyak Bekisting Kg Rp 14,000.00 On Site
120 Jendela Naco 5 mm Panjang 50 cm Bh Rp 22,000.00 On Site
121 Engsel pintu Bh Rp 39,000.00 On Site
122 Engsel Jendela Bh Rp 39,000.00 On Site
123 Hak Angin Bh Rp 28,000.00 On Site
124 Gerendel Pintu Bh Rp 39,000.00 On Site
125 Gerendel Jendela Bh Rp 39,000.00 On Site
126 Kunci Tanam bh Rp 330,000.00 On Site
127 Kunci Tanam Pintu Ganda ex. Solid + Gagang bh Rp 880,000.00 On Site
128 Kunci & Handle Pintu Silinder bh Rp 182,000.00 On Site
129 Handle Pintu bh Rp 275,000.00 On Site
130 Rolling Door Aluminium M2 Rp 721,000.00 On Site
131 Roller Rolling Door Bh Rp 391,000.00 On Site
132 Door Closer Bh Rp 220,000.00 On Site
133 Folding Gate M2 Rp 1,381,000.00 On Site
134 Kloset Duduk Unit Rp 2,750,000.00 On Site
135 Kloset Jongkok Unit Rp 500,000.00 On Site
136 Urinoir Unit Rp 1,265,000.00 On Site
137 Wastafel Dinding Unit Rp 825,000.00 On Site
138 Kran Wastafel Bh Rp 83,000.00 On Site
139 Kran Air 3/4" atau 1/2" bh Rp 39,000.00 On Site
140 Stop Kran PVC 1" bh Rp 44,000.00 On Site
141 Stop Kran Galvanis 1" bh Rp 72,000.00 On Site
142 Floor Drain Stainless bh Rp 72,000.00 On Site
143 Roof Drain Stainless bh Rp 94,000.00 On Site
144 Sealtape M Rp 2,000.00 On Site
145 Pipa PVC AW 4" M Rp 116,000.00 On Site
146 Pipa PVC AW 3" M Rp 66,000.00 On Site
147 Pipa PVC AW 2" M Rp 44,000.00 On Site
148 Pipa PVC AW 1" M Rp 22,000.00 On Site
149 Pipa PVC AW 3/4" M Rp 19,000.00 On Site
150 Pipa PVC AW 1/2" M Rp 16,000.00 On Site
151 Pipa Galvanis 3" M Rp 259,000.00 On Site
152 Pipa Galvanis 2" M Rp 176,000.00 On Site
153 Pipa Galvanis 1" M Rp 94,000.00 On Site
154 Pipa Galvanis 3/4" M Rp 60,000.00 On Site
155 Pipa Galvanis 1/2" M Rp 52,000.00 On Site
156 Batu Karang M³ Rp 275,000.00 On Site
157 Kerikil / Koral M³ Rp 369,000.00 On Site
158 Lapisan Ijuk M³ Rp 605,000.00 On Site
159 Pipa Hawa Galvanis 2" Bh Rp 275,000.00 On Site
160 Lampu TL RM 2 X 36 W Unit Rp 275,000.00 On Site
161 Lampu TL RM 2 X 36 W + Battery Unit Rp 743,000.00 On Site
162 Downlight 10 cm Bh Rp 99,000.00 On Site
163 Lampu SL 18 Watt Bh Rp 94,000.00 On Site
164 Lampu SL 11 Watt Bh Rp 55,000.00 On Site
165 Lampu SL 8 Watt Bh Rp 36,000.00 On Site
166 Exhaust Ceiling Fan Unit Rp 495,000.00 On Site
167 Saklar Tunggal Bh Rp 39,000.00 On Site
168 Saklar Ganda Bh Rp 39,000.00 On Site
169 Stop Kontak Bh Rp 40,000.00 On Site
170 Paku Klem Listrik Kg Rp 40,000.00 On Site
171 Pipa Listrik PVC 3/8'' M Rp 25,000.00 On Site
172 Kabel NYM 3 x 2.5 mm M Rp 20,000.00 On Site
173 Kabel NYFGbY 4 x 50 mm2 M Rp 792,000.00 On Site
174 Kabel Tovoor NYY 4 x 50 mm2 M Rp 396,000.00 On Site
No. UPAH / BAHAN SATUAN HARGA SATUAN KET.

175 Kabel Tovoor NYY 4 x 25 mm3 M Rp 237,000.00 On Site


176 Kabel Tray 300 x 100 mm M Rp 330,000.00 On Site
177 Tee Doz Bh Rp 7,000.00 On Site
178 Isolasi Listrik Bh Rp 6,000.00 On Site
179 Profil Tank Stainless 2200 liter Bh Rp 5,500,000.00 On Site
180 Titik Las Ttk Rp 4,000.00 On Site
181 Alat Pemadam Api Ringan (APAR) 6 Kg Unit Rp 2,750,000.00 On Site
182 Braket Dinding Unit Rp 500,000.00 On Site
183 MDP (Main Distribution Panel) Unit Rp 8,250,000.00 On Site
184 Panel SDP Unit Rp 5,500,000.00 On Site
185 Solar Liter Rp 13,000.00 On Site
186 Minyak Pelumas Liter Rp 50,000.00 On Site
187 Sewa Alat Baja Jam Rp 275,000.00 On Site
188 Ventilator 60 CM = 24’’/100 x 86 x 86 Unit Rp 2,500,000.00 On Site
189 Pengadaan Pompa Hisap 3 pk Unit Rp 3,850,000.00 On Site
190 Pengadaan Pompa Dorong 3 pk Unit Rp 3,575,000.00 On Site