PEKERJAAN :
LOKASI :
KEC. KOTA MASOHI -
KAB. MALUKU TENGAH
TOTAL 339,000,000.00
TOTAL #REF!
PPN 10% #REF!
GRAND TOTAL #REF!
PEMBULATAN #REF!
Terbilang : #REF!
HARGA JUMLAH
NO JENIS PEKERJAAN SAT. VOLUME
SATUAN HARGA (Rp)
1 2 3 4 5 6
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00
Jumlah Sub. A.I 8,110,000.00
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00
Jumlah Sub. A.II 6,000,000.00
GRAND TOTAL 14,110,000.00
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00
Jumlah Sub. B.I 2,250,000.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53
Jumlah Sub. B.II 13,460,471.52
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04
6 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47
7 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00
8 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02
Jumlah Sub. B.III 143,263,113.02
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12
Jumlah Sub. B.IV 33,803,769.12
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 -
Jumlah Sub. B.V -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13
Jumlah Sub. B.VI 20,974,868.58
HARGA JUMLAH
NO JENIS PEKERJAAN SAT. VOLUME
SATUAN HARGA (Rp)
1 2 3 4 5 6
VII PEKERJAAN ATAP DAN PLAFOND
1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 1.260 5,603,580.00 7,058,717.65
2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08
Jumlah Sub. B.VII 83,212,360.89
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49
Jumlah Sub. B.VIII 18,264,960.43
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00
Jumlah Sub. B.IX 3,067,200.00
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00
2 Engsel Pintu bh 12.00 47,047.50 564,570.00
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00
Jumlah Sub. B.X 7,804,155.00
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00
Jumlah Total Sub B.XI 5,390,000.00
GRAND TOTAL 331,490,898.56
XII PEK. MEBELAIR
1 Meja Siswa Tunggal bh 20.00 500,000.00 10,000,000.00
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00
Jumlah Total Sub XII 22,000,000.00
KUANTITAS DAN HARGA
HARGA JUMLAH
NO JENIS PEKERJAAN SAT. VOLUME
SATUAN HARGA (Rp)
1 2 3 4 5 6
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 5,000,000.00 5,000,000.00
2 Survey, Rapat & Transportasi ls 1.00 1,500,000.00 1,500,000.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00
Jumlah Sub. A.I 6,610,000.00
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 2,000,000.00 2,000,000.00
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 700,000.00 700,000.00
Jumlah Sub. A.II 2,700,000.00
GRAND TOTAL 9,310,000.00
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00
Jumlah Sub. B.I 2,250,000.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 23.93 37,200.00 890,289.00
2 Urugan Pasir Bawah Pondasi m3 1.35 376,900.00 508,815.00
3 Urugan Pasir bawah Lantai m3 3.45 376,900.00 1,300,847.74
4 Urugan Tanah kembali Bekas Galian m3 5.98 17,830.00 106,679.12
5 Urugan Tanah Bawah lantai m3 13.07 260,850.00 3,408,015.68
Jumlah Sub. B.II 6,214,646.54
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 2.70 602,030.00 1,625,481.00
2 Pek. Pondasi Batu Karang m3 9.21 1,019,400.00 9,388,674.00
3 Pek. Sloof Beton m3 1.01 5,006,754.00 5,046,808.03
4 Pek. Kolom Beton m3 0.78 5,445,994.00 4,234,804.93
5 Pek. Ring Balk & Kuda - Kuda Beton m3 1.39 5,006,754.00 6,975,409.67
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 3.45 930,415.00 3,211,271.55
7 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 8.00 157,862.00 1,262,896.00
8 Pek. Pasangan Dinding Batako 1 : 4 m2 110.02 157,862.00 17,367,187.93
Jumlah Sub. B.III 49,112,533.12
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 214.39 48,338.00 10,363,183.82
2 Acian Dinding Luar Dalam m2 214.39 21,572.80 4,624,992.59
Jumlah Sub. B.IV 14,988,176.41
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 70.51 241,188.00 17,007,227.11
Jumlah Sub. B.V 17,007,227.11
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 0.54 6,589,000.00 3,526,749.07
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 2.88 669,000.00 1,924,713.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 4.87 275,890.00 1,343,694.66
4 Pek. Kaca Polos 3 mm m2 10.29 248,947.50 2,560,773.56
Jumlah Sub. B.VI 9,355,930.29
HARGA JUMLAH
NO JENIS PEKERJAAN SAT. VOLUME
SATUAN HARGA (Rp)
1 2 3 4 5 6
VII PEKERJAAN ATAP DAN PLAFOND
1 Pek. Kuda - kuda 6/12 & 2x5/10 Kayu Kls 1 m3 0.504 5,603,580.00 2,823,487.06
2 Pek. Gording Ky 5/10 kls 2 m3 0.95 4,217,850.00 4,006,957.50
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 133.50 79,350.93 10,593,349.60
4 Pek, Bubungan Atap Zenk Licin m' 10.00 37,210.28 372,102.80
5 Pek. Lisplang Ky. Kls 1 m' 46.70 82,680.00 3,861,156.00
6 List tripleks standar m' 29.52 25,655.00 757,335.60
7 Pek. Rangka Plafond ky kls 2 m2 117.46 84,260.00 9,897,162.75
8 Pek Penutup Plafond Tripleks 3 mm m2 117.46 43,312.50 5,087,477.59
Jumlah Sub. B.VII 37,399,028.90
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 214.39 26,358.00 5,650,891.62
2 Pek. Cat Lisplank Ky m2 14.01 46,395.00 649,993.95
3 Pek. Cat Plafond m2 117.46 26,358.00 3,096,005.41
4 Pek. Cat Kusen Pintu Jendela m2 16.35 46,395.00 758,780.95
5 Pek. Cat Daun Pintu/Jendela m2 15.49 46,395.00 718,881.25
Jumlah Sub. B.VIII 10,874,553.17
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 4.00 210,600.00 842,400.00
2 Pas. Stop Kontak bh 1.00 80,200.00 80,200.00
3 Pas. Saklar Ganda bh 1.00 80,200.00 80,200.00
4 Pas. Lampu Pijar SL 40 watt bh 2.00 135,200.00 270,400.00
5 Pas. Lampu Pijar SL 15 watt bh 2.00 130,200.00 260,400.00
Jumlah Sub. B.IX 1,533,600.00
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 1.00 233,990.00 233,990.00
2 Engsel Pintu bh 6.00 47,047.50 282,285.00
3 Engsel Jendela & Ventilasi bh 46.00 33,065.00 1,520,990.00
4 Grendel Pintu Tanam bh 1.00 46,030.00 46,030.00
5 Grendel Jendela & Ventilasi bh 23.00 46,030.00 1,058,690.00
6 Kait Angin Jendela & Ventilasi bh 23.00 33,047.50 760,092.50
Jumlah Sub. B.X 3,902,077.50
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00
2 Dokumentasi & Pelaporan ls 1.00 4,103,000.00 4,103,000.00
Jumlah Total Sub B.XI 5,103,000.00
GRAND TOTAL 157,740,773.03
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 15.00 450,000.00 6,750,000.00
2 Meja Kerja/Guru bh 1.00 2,000,000.00 2,000,000.00
3 Kursi Siswa Tunggal bh 15.00 350,000.00 5,250,000.00
4 Kursi Kerja/Guru bh 1.00 1,750,000.00 1,750,000.00
5 Papan Tulis White Board bh 1.00 1,000,000.00 1,000,000.00
Jumlah Total Sub XII 16,750,000.00
LAPORAN KEMAJUAN FISIK PEKERJAAN
KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 - - 1.00 1.103 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 - - 1.00 0.858 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 - - 2.00 0.027 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 - 1.988 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 - - - - - - - -
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 6,000,000.00 1.471 - - - -
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 - - - - - - - -
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
JUMLAH 2,250,000.00 0.552 - - - -
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 - - - - - - - -
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 - - - - - - - -
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 - - - - - - - -
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 - - - -
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 - - - - - - - -
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 - - - - - - - -
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 - - - - - - - -
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 - - - - - - - -
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - - - - - - -
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - - - - -
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 - - 1.00 1.103 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 - - 0.50 0.429 0.50 1,750,000.00 0.429 50.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 - - - - - - - -
JUMLAH 8,110,000.00 1.988 - 1.532 6,250,000.00 1.532
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 - - - - - - - -
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 6,000,000.00 1.471 - - - -
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 - - - - - - - -
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
JUMLAH 2,250,000.00 0.552 - - - -
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 - - - - - - - -
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 - - - - - - - -
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 - - - - - - - -
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 - - - -
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 - - - - - - - -
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 - - - - - - - -
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 - - - - - - - -
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 - - - - - - - -
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - - - - - - -
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - - - - -
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 0.50 0.429 0.50 0.429 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 - - - - - - - -
JUMLAH 8,110,000.00 1.988 1.532 0.429 8,000,000.00 1.961
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 - - - - - - - -
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 6,000,000.00 1.471 - - - -
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 - - - - - - - -
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
JUMLAH 2,250,000.00 0.552 - - - -
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 - - - - - - - -
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 - - - - - - - -
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 - - - - - - - -
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 - - - -
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 - - - - - - - -
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 - - - - - - - -
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 - - - - - - - -
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 - - - - - - - -
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - - - - - - -
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - - - - -
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 - - 1.00 0.013 1.00 55,000.00 0.013 50.00
JUMLAH 8,110,000.00 1.988 1.961 0.013 8,055,000.00 1.975
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 - - - - - - - -
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 6,000,000.00 1.471 - - - -
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 - - - - - - - -
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
JUMLAH 2,250,000.00 0.552 - - - -
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 - - - - - - - -
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 - - - - - - - -
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 - - - - - - - -
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 - - - -
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 - - - - - - - -
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 - - - - - - - -
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 - - - - - - - -
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 - - - - - - - -
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - - - - - - -
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - - - - -
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 1.00 0.013 1.00 0.013 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.975 0.013 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 - - - - - - - -
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 6,000,000.00 1.471 - - - -
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 - - - - - - - -
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
JUMLAH 2,250,000.00 0.552 - - - -
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 - - - - - - - -
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 - - - - - - - -
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 - - - - - - - -
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 - - - -
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 - - - - - - - -
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 - - - - - - - -
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 - - - - - - - -
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 - - - - - - - -
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - - - - - - -
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - - - - -
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 - - 0.31 0.339 0.31 1,384,615.38 0.339 30.77
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 - - 0.31 0.113 0.31 461,538.46 0.113 30.77
JUMLAH 6,000,000.00 1.471 - 0.453 1,846,153.85 0.453
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 - - 1.00 0.245 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 - - 1.00 0.061 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 - - 1.00 0.245 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 - 0.552 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 - - 41.90 0.382 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 - - 2.36 0.218 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 - - 10.48 0.046 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 - 0.646 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 - - 4.71 0.695 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 - - 16.12 7.608 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 - - 1.75 3.190 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 - - 1.29 2.556 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - 2.14 3.892 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - - 17.942 73,179,134.50 17.942
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 - - 0.08 0.085 0.08 346,153.85 0.085 7.69
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 - - 0.08 0.028 0.08 115,384.62 0.028 7.69
JUMLAH 6,000,000.00 1.471 - 0.113 461,538.46 0.113
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 - - 1.00 0.245 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 - - 1.00 0.061 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 - - 1.00 0.245 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 - 0.552 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 - - 41.90 0.382 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 - - 2.36 0.218 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 - - 10.48 0.046 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 - 0.646 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 - - 4.71 0.695 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 - - 16.12 7.608 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 - - - - - - - -
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 - - - - - - - -
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - - - - - - -
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - - 8.303 33,867,894.50 8.303
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.08 0.085 0.08 0.085 0.15 692,307.69 0.170 15.38
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.08 0.028 0.08 0.028 0.15 230,769.23 0.057 15.38
JUMLAH 6,000,000.00 1.471 0.113 0.113 923,076.92 0.226
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 - - 1.75 3.190 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 - - 1.29 2.556 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - - - - - - -
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - 8.303 5.746 57,306,077.43 14.050
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.15 0.170 0.08 0.085 0.23 1,038,461.54 0.255 23.08
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.15 0.057 0.08 0.028 0.23 346,153.85 0.085 23.08
JUMLAH 6,000,000.00 1.471 0.226 0.113 1,384,615.38 0.339
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - - - - - - -
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - 14.050 - 57,306,077.43 14.050
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.23 0.255 0.08 0.085 0.31 1,384,615.38 0.339 30.77
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.23 0.085 0.08 0.028 0.31 461,538.46 0.113 30.77
JUMLAH 6,000,000.00 1.471 0.339 0.113 1,846,153.85 0.453
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - 2.14 3.892 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - 14.050 3.892 73,179,134.50 17.942
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.31 0.339 0.31 0.339 0.62 2,769,230.77 0.679 61.54
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.31 0.113 0.31 0.113 0.62 923,076.92 0.226 61.54
JUMLAH 6,000,000.00 1.471 0.453 0.453 3,692,307.69 0.905
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - 6.91 3.604 6.91 14,698,225.04 3.604 100.00
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - 2.51 1.309 2.51 5,337,921.47 1.309 100.00
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - 14.00 0.903 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - 176.13 11.367 176.13 46,362,696.02 11.367 100.00
JUMLAH 143,263,113.02 35.124 - 17.942 17.183 143,263,113.02 35.124
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - 341.68 6.471 341.68 26,394,780.00 6.471 100.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - 6.471 26,394,780.00 6.471
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - 1.07 1.729 1.07 7,053,498.14 1.729 100.00
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - 5.75 0.944 5.75 3,849,426.00 0.944 100.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - 9.74 0.659 9.74 2,687,389.31 0.659 100.00
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - 20.57 1.810 20.57 7,384,555.13 1.810 100.00
JUMLAH 20,974,868.58 5.142 - 5.142 20,974,868.58 5.142
KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
2 Pek. Gor m3 1.52 3,942,850.00 5,993,132.00 1.469 - - 1.52 1.469 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 - - 240.30 7.236 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - 16.00 0.146 16.00 595,364.48 0.146 100.00
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - 62.70 1.271 62.70 5,184,036.00 1.271 100.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Ran m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 - 10.122 41,286,936.76 10.122
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 252,134,465.71 60.951
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.31 0.339 0.08 0.085 0.38 1,730,769.23 0.424 38.46
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.31 0.113 0.08 0.028 0.38 576,923.08 0.141 38.46
JUMLAH 6,000,000.00 1.471 0.453 0.113 2,307,692.31 0.566
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - - - - - - -
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - - - - - - -
JUMLAH 143,263,113.02 35.124 - 17.942 - 73,179,134.50 17.942
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 - - 1.52 1.469 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 - - 240.30 7.236 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - - - - - - -
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - - - - - - -
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 - 8.705 35,507,536.28 8.705
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 127,516,822.74 30.398
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.38 0.424 0.08 0.085 0.46 2,076,923.08 0.509 46.15
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.38 0.141 0.08 0.028 0.46 692,307.69 0.170 46.15
JUMLAH 6,000,000.00 1.471 0.566 0.113 2,769,230.77 0.679
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - 14.00 0.903 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - 134.00 8.648 134.00 35,272,016.00 8.648 76.08
JUMLAH 143,263,113.02 35.124 - 17.942 9.551 112,136,286.50 27.493
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - - - - - - -
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - - - -
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - - - - - - -
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - - - - - - -
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - - - - - - -
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - - - -
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 1.52 1.469 - - 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 240.30 7.236 - - 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - - - - - - -
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - - - - - - -
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 8.705 - 35,507,536.28 8.705
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 166,935,513.20 40.063
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.46 0.509 0.08 0.085 0.54 2,423,076.92 0.594 53.85
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.46 0.170 0.08 0.028 0.54 807,692.31 0.198 53.85
JUMLAH 6,000,000.00 1.471 0.679 0.113 3,230,769.23 0.792
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - - - - - - -
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - - - - - - -
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 14.00 0.903 - - 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 134.00 8.648 42.13 2.719 176.13 46,362,696.02 11.367 100.00
JUMLAH 143,263,113.02 35.124 - 27.493 2.719 123,226,966.52 30.212
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - 170.84 3.236 170.84 13,197,390.00 3.236 50.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 - 3.236 13,197,390.00 3.236
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - 1.07 1.729 1.07 7,053,498.14 1.729 100.00
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - 5.75 0.944 5.75 3,849,426.00 0.944 100.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - 9.74 0.659 9.74 2,687,389.31 0.659 100.00
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - - - - - - -
JUMLAH 20,974,868.58 5.142 - 3.332 13,590,313.46 3.332
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 1.52 1.469 - - 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 240.30 7.236 - - 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - 16.00 0.146 16.00 595,364.48 0.146 100.00
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - 62.70 1.271 62.70 5,184,036.00 1.271 100.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Ran m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 8.705 1.417 41,286,936.76 10.122
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 211,054,835.61 50.880
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.54 0.594 0.08 0.085 0.62 2,769,230.77 0.679 61.54
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.54 0.198 0.08 0.028 0.62 923,076.92 0.226 61.54
JUMLAH 6,000,000.00 1.471 0.792 0.113 3,692,307.69 0.905
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - 6.91 3.604 6.91 14,698,225.04 3.604 100.00
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - 2.51 1.309 2.51 5,337,921.47 1.309 100.00
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 14.00 0.903 - - 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 176.13 11.367 - - 176.13 46,362,696.02 11.367 100.00
JUMLAH 143,263,113.02 35.124 - 30.212 4.912 143,263,113.02 35.124
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 170.84 3.236 170.84 3.236 341.68 26,394,780.00 6.471 100.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - - - - - - -
JUMLAH 33,803,769.12 8.288 3.236 3.236 26,394,780.00 6.471
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 1.07 1.729 - - 1.07 7,053,498.14 1.729 100.00
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 5.75 0.944 - - 5.75 3,849,426.00 0.944 100.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 9.74 0.659 - - 9.74 2,687,389.31 0.659 100.00
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - 20.57 1.810 20.57 7,384,555.13 1.810 100.00
JUMLAH 20,974,868.58 5.142 3.332 1.810 20,974,868.58 5.142
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
2 Pek. Gor m3 1.52 3,942,850.00 5,993,132.00 1.469 1.52 1.469 - - 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 240.30 7.236 - - 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 16.00 0.146 - - 16.00 595,364.48 0.146 100.00
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 62.70 1.271 - - 62.70 5,184,036.00 1.271 100.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Ran m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 10.122 - 41,286,936.76 10.122
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - - - - - - -
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - - - - - - -
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - - - - - - -
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - - - - - - -
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - - - - - - -
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - - - - - - -
JUMLAH 7,804,155.00 1.913 - - - -
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 252,134,465.71 60.951
KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 - - - - - - - -
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 - - - - - - - -
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 - - - - - - - -
JUMLAH 8,110,000.00 1.988 - - - -
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.38 0.424 0.31 0.339 0.69 3,115,384.62 0.764 69.23
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.38 0.141 0.31 0.113 0.69 1,038,461.54 0.255 69.23
JUMLAH 6,000,000.00 1.471 0.566 0.453 4,153,846.15 1.018
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 - - - - - - - -
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
JUMLAH 2,250,000.00 0.552 - - - -
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 - - - - - - - -
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 - - - - - - - -
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 10.62 0.981 - - 10.62 4,002,512.16 0.981 100.00
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 - - - - - - - -
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 26.16 1.673 - - 26.16 6,824,858.53 1.673 100.00
JUMLAH 13,460,471.52 3.300 2.655 - 10,827,370.70 2.655
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 - - - - - - - -
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 - - - - - - - -
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 - - - - - - - -
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 - - - - - - - -
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 - - - - - - - -
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 - - 6.91 3.604 6.91 14,698,225.04 3.604 100.00
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 - - 2.51 1.309 2.51 5,337,921.47 1.309 100.00
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 - - 14.00 0.903 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 - - 176.13 11.367 176.13 46,362,696.02 11.367 100.00
JUMLAH 143,263,113.02 35.124 - - 17.183 70,083,978.52 17.183
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 - - 341.68 6.471 341.68 26,394,780.00 6.471 100.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 341.68 1.816 - - 341.68 7,408,989.12 1.816 100.00
JUMLAH 33,803,769.12 8.288 1.816 6.471 33,803,769.12 8.288
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 140.73 9.874 - - 140.73 40,274,893.81 9.874 100.00
JUMLAH 40,274,893.81 9.874 9.874 - 40,274,893.81 9.874
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 - - 1.07 1.729 1.07 7,053,498.14 1.729 100.00
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 - - 5.75 0.944 5.75 3,849,426.00 0.944 100.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 - - 9.74 0.659 9.74 2,687,389.31 0.659 100.00
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 - - 20.57 1.810 20.57 7,384,555.13 1.810 100.00
JUMLAH 20,974,868.58 5.142 - 5.142 20,974,868.58 5.142
KEMAJUAN PEKERJAAN
HARGA SATUAN BULAN LALU BULAN INI S/D BULAN INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
2 Pek. Gor m3 1.52 3,942,850.00 5,993,132.00 1.469 - - 1.52 1.469 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 - - 240.30 7.236 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 - - 16.00 0.146 16.00 595,364.48 0.146 100.00
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 - - 62.70 1.271 62.70 5,184,036.00 1.271 100.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 95.04 0.598 - - 95.04 2,438,251.20 0.598 100.00
7 Pek. Ran m2 206.05 81,260.00 16,743,249.20 4.105 206.05 4.105 - - 206.05 16,743,249.20 4.105 100.00
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 206.05 3.846 - - 206.05 15,685,206.08 3.846 100.00
JUMLAH 83,212,360.89 20.401 8.548 10.122 76,153,643.24 18.671
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 341.68 2.208 - - 341.68 9,006,001.44 2.208 100.00
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 18.81 0.214 - - 18.81 872,689.95 0.214 100.00
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 206.05 1.332 - - 206.05 5,430,944.65 1.332 100.00
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 32.71 0.372 - - 32.71 1,517,561.89 0.372 100.00
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 30.99 0.353 - - 30.99 1,437,762.49 0.353 100.00
JUMLAH 18,264,960.43 4.478 4.478 - 18,264,960.43 4.478
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 8.00 0.413 - - 8.00 1,684,800.00 0.413 100.00
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 2.00 0.039 - - 2.00 160,400.00 0.039 100.00
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 2.00 0.039 - - 2.00 160,400.00 0.039 100.00
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 4.00 0.133 - - 4.00 540,800.00 0.133 100.00
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 4.00 0.128 - - 4.00 520,800.00 0.128 100.00
JUMLAH 3,067,200.00 0.752 0.752 - 3,067,200.00 0.752 100.00
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 2.00 0.115 - - 2.00 467,980.00 0.115 100.00
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 12.00 0.138 - - 12.00 564,570.00 0.138 100.00
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 92.00 0.746 - - 92.00 3,041,980.00 0.746 100.00
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 2.00 0.023 - - 2.00 92,060.00 0.023 100.00
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 46.00 0.519 - - 46.00 2,117,380.00 0.519 100.00
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 46.00 0.373 - - 46.00 1,520,185.00 0.373 100.00
JUMLAH 7,804,155.00 1.913 1.913 - 7,804,155.00 1.913
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 1.00 1.076 - - 1.00 4,390,000.00 1.076 100.00
JUMLAH 5,390,000.00 1.321 1.321 - 5,390,000.00 1.321
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 20.00 2.452 - - 20.00 10,000,000.00 2.452 100.00
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 2.00 0.490 - - 2.00 2,000,000.00 0.490 100.00
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 20.00 1.716 - - 20.00 7,000,000.00 1.716 100.00
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 2.00 0.368 - - 2.00 1,500,000.00 0.368 100.00
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 2.00 0.368 - - 2.00 1,500,000.00 0.368 100.00
JUMLAH 22,000,000.00 5.394 5.394 - 22,000,000.00 5.394
TOTAL 407,875,792.38 100.000 316,328,044.38 76.690
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.62 0.679 0.08 0.085 0.69 3,115,384.62 0.764 69.23
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.62 0.226 0.08 0.028 0.69 1,038,461.54 0.255 69.23
JUMLAH 6,000,000.00 1.471 0.905 0.113 4,153,846.15 1.018
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 6.91 3.604 - - 6.91 14,698,225.04 3.604 100.00
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 2.51 1.309 - - 2.51 5,337,921.47 1.309 100.00
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 14.00 0.903 - - 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 176.13 11.367 - - 176.13 46,362,696.02 11.367 100.00
JUMLAH 143,263,113.02 35.124 - 35.124 - 143,263,113.02 35.124
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 341.68 6.471 - - 341.68 26,394,780.00 6.471 100.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 - - 341.68 1.816 341.68 7,408,989.12 1.816 100.00
JUMLAH 33,803,769.12 8.288 6.471 1.816 33,803,769.12 8.288
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 1.07 1.729 - - 1.07 7,053,498.14 1.729 100.00
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 5.75 0.944 - - 5.75 3,849,426.00 0.944 100.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 9.74 0.659 - - 9.74 2,687,389.31 0.659 100.00
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 20.57 1.810 - - 20.57 7,384,555.13 1.810 100.00
JUMLAH 20,974,868.58 5.142 5.142 - 20,974,868.58 5.142
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 1.52 1.469 - - 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 240.30 7.236 - - 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 16.00 0.146 - - 16.00 595,364.48 0.146 100.00
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 62.70 1.271 - - 62.70 5,184,036.00 1.271 100.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 - - - - - - - -
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 10.122 - 41,286,936.76 10.122
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 - - 2.00 0.115 2.00 467,980.00 0.115 100.00
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 - - 12.00 0.138 12.00 564,570.00 0.138 100.00
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 - - 92.00 0.746 92.00 3,041,980.00 0.746 100.00
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 - - 2.00 0.023 2.00 92,060.00 0.023 100.00
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 - - 46.00 0.519 46.00 2,117,380.00 0.519 100.00
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 - - 46.00 0.373 46.00 1,520,185.00 0.373 100.00
JUMLAH 7,804,155.00 1.913 - 1.913 7,804,155.00 1.913
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 267,809,148.29 64.794
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.69 0.764 0.08 0.085 0.77 3,461,538.46 0.849 76.92
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.69 0.255 0.08 0.028 0.77 1,153,846.15 0.283 76.92
JUMLAH 6,000,000.00 1.471 1.018 0.113 4,615,384.62 1.132
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 6.91 3.604 - - 6.91 14,698,225.04 3.604 100.00
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 2.51 1.309 - - 2.51 5,337,921.47 1.309 100.00
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 14.00 0.903 - - 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 176.13 11.367 - - 176.13 46,362,696.02 11.367 100.00
JUMLAH 143,263,113.02 35.124 - 35.124 - 143,263,113.02 35.124
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 341.68 6.471 - - 341.68 26,394,780.00 6.471 100.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 341.68 1.816 - - 341.68 7,408,989.12 1.816 100.00
JUMLAH 33,803,769.12 8.288 8.288 - 33,803,769.12 8.288
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 1.07 1.729 - - 1.07 7,053,498.14 1.729 100.00
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 5.75 0.944 - - 5.75 3,849,426.00 0.944 100.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 9.74 0.659 - - 9.74 2,687,389.31 0.659 100.00
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 20.57 1.810 - - 20.57 7,384,555.13 1.810 100.00
JUMLAH 20,974,868.58 5.142 5.142 - 20,974,868.58 5.142
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 1.52 1.469 - - 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 240.30 7.236 - - 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 16.00 0.146 - - 16.00 595,364.48 0.146 100.00
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 62.70 1.271 - - 62.70 5,184,036.00 1.271 100.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 - - 206.05 4.105 206.05 16,743,249.20 4.105 100.00
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 10.122 4.105 58,030,185.96 14.227
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - - - - - - -
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - - - - - - -
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - - - - -
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 2.00 0.115 - - 2.00 467,980.00 0.115 100.00
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 12.00 0.138 - - 12.00 564,570.00 0.138 100.00
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 92.00 0.746 - - 92.00 3,041,980.00 0.746 100.00
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 2.00 0.023 - - 2.00 92,060.00 0.023 100.00
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 46.00 0.519 - - 46.00 2,117,380.00 0.519 100.00
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 46.00 0.373 - - 46.00 1,520,185.00 0.373 100.00
JUMLAH 7,804,155.00 1.913 1.913 - 7,804,155.00 1.913
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 285,013,935.95 69.012
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.77 0.849 0.08 0.085 0.85 3,807,692.31 0.934 84.62
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.77 0.283 0.08 0.028 0.85 1,269,230.77 0.311 84.62
JUMLAH 6,000,000.00 1.471 1.132 0.113 5,076,923.08 1.245
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - - - - - - -
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - - - - - - -
JUMLAH 13,460,471.52 3.300 0.646 - 2,633,100.82 0.646
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 6.91 3.604 - - 6.91 14,698,225.04 3.604 100.00
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 2.51 1.309 - - 2.51 5,337,921.47 1.309 100.00
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 14.00 0.903 - - 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 176.13 11.367 - - 176.13 46,362,696.02 11.367 100.00
JUMLAH 143,263,113.02 35.124 - 35.124 - 143,263,113.02 35.124
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 341.68 6.471 - - 341.68 26,394,780.00 6.471 100.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 341.68 1.816 - - 341.68 7,408,989.12 1.816 100.00
JUMLAH 33,803,769.12 8.288 8.288 - 33,803,769.12 8.288
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - - - - - - -
JUMLAH 40,274,893.81 9.874 - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 1.07 1.729 - - 1.07 7,053,498.14 1.729 100.00
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 5.75 0.944 - - 5.75 3,849,426.00 0.944 100.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 9.74 0.659 - - 9.74 2,687,389.31 0.659 100.00
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 20.57 1.810 - - 20.57 7,384,555.13 1.810 100.00
JUMLAH 20,974,868.58 5.142 5.142 - 20,974,868.58 5.142
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 1.52 1.469 - - 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 240.30 7.236 - - 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 16.00 0.146 - - 16.00 595,364.48 0.146 100.00
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 62.70 1.271 - - 62.70 5,184,036.00 1.271 100.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - - - - - - -
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 206.05 4.105 - - 206.05 16,743,249.20 4.105 100.00
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - - - - - - -
JUMLAH 83,212,360.89 20.401 15.958 - 58,030,185.96 15.958
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 - - 8.00 0.413 8.00 1,684,800.00 0.413 100.00
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 - - 2.00 0.039 2.00 160,400.00 0.039 100.00
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 - - 2.00 0.039 2.00 160,400.00 0.039 100.00
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - - - - - - -
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - - - - - - -
JUMLAH 3,067,200.00 0.752 - 0.492 2,005,600.00 0.492 65.39
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 2.00 0.115 - - 2.00 467,980.00 0.115 100.00
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 12.00 0.138 - - 12.00 564,570.00 0.138 100.00
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 92.00 0.746 - - 92.00 3,041,980.00 0.746 100.00
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 2.00 0.023 - - 2.00 92,060.00 0.023 100.00
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 46.00 0.519 - - 46.00 2,117,380.00 0.519 100.00
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 46.00 0.373 - - 46.00 1,520,185.00 0.373 100.00
JUMLAH 7,804,155.00 1.913 1.913 - 7,804,155.00 1.913
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 287,481,074.42 71.348
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.85 0.934 0.08 0.085 0.92 4,153,846.15 1.018 92.31
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.85 0.311 0.08 0.028 0.92 1,384,615.38 0.339 92.31
JUMLAH 6,000,000.00 1.471 1.245 0.113 5,538,461.54 1.358
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 - - 10.62 0.981 10.62 4,002,512.16 0.981 100.00
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 - - 26.16 1.673 26.16 6,824,858.53 1.673 100.00
JUMLAH 13,460,471.52 3.300 0.646 2.655 13,460,471.52 3.300
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 6.91 3.604 - - 6.91 14,698,225.04 3.604 100.00
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 2.51 1.309 - - 2.51 5,337,921.47 1.309 100.00
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 14.00 0.903 - - 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 176.13 11.367 - - 176.13 46,362,696.02 11.367 100.00
JUMLAH 143,263,113.02 35.124 - 35.124 - 143,263,113.02 35.124
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 341.68 6.471 - - 341.68 26,394,780.00 6.471 100.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 341.68 1.816 - - 341.68 7,408,989.12 1.816 100.00
JUMLAH 33,803,769.12 8.288 8.288 - 33,803,769.12 8.288
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 - - 140.73 9.874 140.73 40,274,893.81 9.874 100.00
JUMLAH 40,274,893.81 9.874 - 9.874 40,274,893.81 9.874
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 1.07 1.729 - - 1.07 7,053,498.14 1.729 100.00
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 5.75 0.944 - - 5.75 3,849,426.00 0.944 100.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 9.74 0.659 - - 9.74 2,687,389.31 0.659 100.00
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 20.57 1.810 - - 20.57 7,384,555.13 1.810 100.00
JUMLAH 20,974,868.58 5.142 5.142 - 20,974,868.58 5.142
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 1.52 1.469 - - 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 240.30 7.236 - - 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 16.00 0.146 - - 16.00 595,364.48 0.146 100.00
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 62.70 1.271 - - 62.70 5,184,036.00 1.271 100.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 - - 95.04 0.598 95.04 2,438,251.20 0.598 100.00
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 206.05 4.105 - - 206.05 16,743,249.20 4.105 100.00
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 - - 206.05 3.846 206.05 15,685,206.08 3.846 100.00
JUMLAH 83,212,360.89 20.401 15.958 4.443 76,153,643.24 20.401
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - - - - - - -
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - - - - - - -
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - - - - - - -
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - - - - - - -
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - - - - - - -
JUMLAH 18,264,960.43 4.478 - - - -
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 8.00 0.413 - - 8.00 1,684,800.00 0.413 100.00
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 2.00 0.039 - - 2.00 160,400.00 0.039 100.00
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 2.00 0.039 - - 2.00 160,400.00 0.039 100.00
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 - - 4.00 0.133 4.00 540,800.00 0.133 100.00
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 - - 4.00 0.128 4.00 520,800.00 0.128 100.00
JUMLAH 3,067,200.00 0.752 0.492 0.260 3,067,200.00 0.752 100.00
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 2.00 0.115 - - 2.00 467,980.00 0.115 100.00
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 12.00 0.138 - - 12.00 564,570.00 0.138 100.00
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 92.00 0.746 - - 92.00 3,041,980.00 0.746 100.00
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 2.00 0.023 - - 2.00 92,060.00 0.023 100.00
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 46.00 0.519 - - 46.00 2,117,380.00 0.519 100.00
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 46.00 0.373 - - 46.00 1,520,185.00 0.373 100.00
JUMLAH 7,804,155.00 1.913 1.913 - 7,804,155.00 1.913
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - - - - - - -
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - - - - - - -
JUMLAH 5,390,000.00 1.321 - - - -
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - - - - - - -
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - - - - - - -
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - - - - - - -
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - - - - - - -
JUMLAH 22,000,000.00 5.394 - - - -
TOTAL 407,875,792.38 100.000 358,229,934.66 88.693
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA
(Rp) VOLUME VOLUME VOLUME BOBOT (%) PENYELES
(%) (%) (Rp)
AIAN
A BIAYA PERSIAPAN
I PERENCANAAN
1 Tenaga Arsitek Bulan 1.00 4,500,000.00 4,500,000.00 1.103 1.00 1.103 - - 1.00 4,500,000.00 1.103 100.00
2 Survey, Rapat & Transportasi ls 1.00 3,500,000.00 3,500,000.00 0.858 1.00 0.858 - - 1.00 3,500,000.00 0.858 100.00
3 Dokumen Gambar, RAB & Spesifikasi Teknik Buku 2.00 55,000.00 110,000.00 0.027 2.00 0.027 - - 2.00 110,000.00 0.027 100.00
JUMLAH 8,110,000.00 1.988 1.988 - 8,110,000.00 1.988
II PENGAWASAN
1 Tenaga Pengawas ls 1.00 4,500,000.00 4,500,000.00 1.103 0.92 1.018 0.08 0.085 1.00 4,500,000.00 1.103 100.00
2 Dokumentasi+Dok. Laporan Kemajuan Buku 1.00 1,500,000.00 1,500,000.00 0.368 0.92 0.339 0.08 0.028 1.00 1,500,000.00 0.368 100.00
JUMLAH 6,000,000.00 1.471 1.358 0.113 6,000,000.00 1.471
B BIAYA KONSTRUKSI
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
2 Papan nama Proyek ls 1.00 250,000.00 250,000.00 0.061 1.00 0.061 - - 1.00 250,000.00 0.061 100.00
3 Bouwplank ls 1.00 1,000,000.00 1,000,000.00 0.245 1.00 0.245 - - 1.00 1,000,000.00 0.245 100.00
JUMLAH 2,250,000.00 0.552 0.552 - 2,250,000.00 0.552
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 41.90 37,200.00 1,558,726.50 0.382 41.90 0.382 - - 41.90 1,558,726.50 0.382 100.00
2 Urugan Pasir Bawah Pondasi m3 2.36 376,900.00 887,599.50 0.218 2.36 0.218 - - 2.36 887,599.50 0.218 100.00
3 Urugan Pasir bawah Lantai m3 10.62 376,900.00 4,002,512.16 0.981 10.62 0.981 - - 10.62 4,002,512.16 0.981 100.00
4 Urugan Tanah kembali Bekas Galian m3 10.48 17,830.00 186,774.82 0.046 10.48 0.046 - - 10.48 186,774.82 0.046 100.00
5 Urugan Tanah Bawah lantai m3 26.16 260,850.00 6,824,858.53 1.673 26.16 1.673 - - 26.16 6,824,858.53 1.673 100.00
JUMLAH 13,460,471.52 3.300 3.300 - 13,460,471.52 3.300
III PEKERJAAN PASANGAN BATU & BETON
1 Pek. Batu Kosong/Anstamping m3 4.71 602,030.00 2,835,561.30 0.695 4.71 0.695 - - 4.71 2,835,561.30 0.695 100.00
2 Pek. Pondasi Batu Karang m3 16.12 1,925,680.00 31,032,333.20 7.608 16.12 7.608 - - 16.12 31,032,333.20 7.608 100.00
3 Pek. Sloof Beton m3 1.75 7,427,034.00 13,012,163.57 3.190 1.75 3.190 - - 1.75 13,012,163.57 3.190 100.00
4 Pek. Kolom Beton m3 1.29 8,085,194.00 10,426,019.37 2.556 1.29 2.556 - - 1.29 10,426,019.37 2.556 100.00
5 Pek. Ring Balk & Kuda - Kuda Beton m3 2.14 7,427,034.00 15,873,057.06 3.892 2.14 3.892 - - 2.14 15,873,057.06 3.892 100.00
6 Pek. Lantai Kerja Mutu Beton 1 : 2 : 5 m3 6.91 2,125,815.00 14,698,225.04 3.604 6.91 3.604 - - 6.91 14,698,225.04 3.604 100.00
7 Pek. Rabat Beton keliling Bangunan m3 2.51 2,125,815.00 5,337,921.47 1.309 2.51 1.309 - - 2.51 5,337,921.47 1.309 100.00
8 Pek. Pasangan Penebalan Kaki Kolom 1 : 4 m2 14.00 263,224.00 3,685,136.00 0.903 14.00 0.903 - - 14.00 3,685,136.00 0.903 100.00
9 Pek. Pasangan Dinding Batako 1 : 4 m2 176.13 263,224.00 46,362,696.02 11.367 176.13 11.367 - - 176.13 46,362,696.02 11.367 100.00
JUMLAH 143,263,113.02 35.124 - 35.124 - 143,263,113.02 35.124
IV PEKERJAAN PLESTERAN DAN ACIAN DINDING
1 Pek. Plesteran Dinding Luar Dalam m2 341.68 77,250.00 26,394,780.00 6.471 341.68 6.471 - - 341.68 26,394,780.00 6.471 100.00
2 Acian Dinding Luar Dalam m2 341.68 21,684.00 7,408,989.12 1.816 341.68 1.816 - - 341.68 7,408,989.12 1.816 100.00
JUMLAH 33,803,769.12 8.288 8.288 - 33,803,769.12 8.288
V PEKERJAAN KERAMIK
1 Pek. Lantai Keramik 40 X 40 m2 140.73 286,188.00 40,274,893.81 9.874 140.73 9.874 - - 140.73 40,274,893.81 9.874 100.00
JUMLAH 40,274,893.81 9.874 9.874 - 40,274,893.81 9.874
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA KACA
1 Pek. Kusen Pintu Dan Jendela ky. 6/12 Kls 1 m3 1.07 6,589,000.00 7,053,498.14 1.729 1.07 1.729 - - 1.07 7,053,498.14 1.729 100.00
2 Pek. Daun Pintu Panil Ky 3/30 Kls 1 m2 5.75 669,000.00 3,849,426.00 0.944 5.75 0.944 - - 5.75 3,849,426.00 0.944 100.00
3 Pek. Bingkai Daun Jendela ky kls 1 m2 9.74 275,890.00 2,687,389.31 0.659 9.74 0.659 - - 9.74 2,687,389.31 0.659 100.00
4 Pek. Kaca Polos 3 mm m2 20.57 358,947.50 7,384,555.13 1.810 20.57 1.810 - - 20.57 7,384,555.13 1.810 100.00
JUMLAH 20,974,868.58 5.142 5.142 - 20,974,868.58 5.142
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA
(Rp) VOLUME VOLUME VOLUME BOBOT (%) PENYELES
(%) (%) (Rp)
AIAN
2 Pek. Gording Ky 5/10 kls 2 m3 1.52 3,942,850.00 5,993,132.00 1.469 1.52 1.469 - - 1.52 5,993,132.00 1.469 100.00
3 Pek. Penutup Atap Zenk Gelombng 0.20 mm m2 240.30 122,823.16 29,514,404.28 7.236 240.30 7.236 - - 240.30 29,514,404.28 7.236 100.00
4 Pek, Bubungan Atap Zenk Licin m' 16.00 37,210.28 595,364.48 0.146 16.00 0.146 - - 16.00 595,364.48 0.146 100.00
5 Pek. Lisplang Ky. Kls 1 m' 62.70 82,680.00 5,184,036.00 1.271 62.70 1.271 - - 62.70 5,184,036.00 1.271 100.00
6 List tripleks standar m' 95.04 25,655.00 2,438,251.20 0.598 95.04 0.598 - - 95.04 2,438,251.20 0.598 100.00
7 Pek. Rangka Plafond ky kls 2 m2 206.05 81,260.00 16,743,249.20 4.105 206.05 4.105 - - 206.05 16,743,249.20 4.105 100.00
8 Pek Penutup Plafond Tripleks 3 mm m2 206.05 76,125.00 15,685,206.08 3.846 206.05 3.846 - - 206.05 15,685,206.08 3.846 100.00
JUMLAH 83,212,360.89 20.401 20.401 - 76,153,643.24 20.401
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Luar Dalam m2 341.68 26,358.00 9,006,001.44 2.208 - - 341.68 2.208 341.68 9,006,001.44 2.208 100.00
2 Pek. Cat Lisplank Ky m2 18.81 46,395.00 872,689.95 0.214 - - 18.81 0.214 18.81 872,689.95 0.214 100.00
3 Pek. Cat Plafond m2 206.05 26,358.00 5,430,944.65 1.332 - - 206.05 1.332 206.05 5,430,944.65 1.332 100.00
4 Pek. Cat Kusen Pintu Jendela m2 32.71 46,395.00 1,517,561.89 0.372 - - 32.71 0.372 32.71 1,517,561.89 0.372 100.00
5 Pek. Cat Daun Pintu/Jendela m2 30.99 46,395.00 1,437,762.49 0.353 - - 30.99 0.353 30.99 1,437,762.49 0.353 100.00
JUMLAH 18,264,960.43 4.478 - 4.478 18,264,960.43 4.478
IX PEKERJAAN LISTRIK
1 Pek. Titik Listrik ttk 8.00 210,600.00 1,684,800.00 0.413 8.00 0.413 - - 8.00 1,684,800.00 0.413 100.00
2 Pas. Stop Kontak bh 2.00 80,200.00 160,400.00 0.039 2.00 0.039 - - 2.00 160,400.00 0.039 100.00
3 Pas. Saklar Ganda bh 2.00 80,200.00 160,400.00 0.039 2.00 0.039 - - 2.00 160,400.00 0.039 100.00
4 Pas. Lampu Pijar SL 40 watt bh 4.00 135,200.00 540,800.00 0.133 4.00 0.133 - - 4.00 540,800.00 0.133 100.00
5 Pas. Lampu Pijar SL 15 watt bh 4.00 130,200.00 520,800.00 0.128 4.00 0.128 - - 4.00 520,800.00 0.128 100.00
JUMLAH 3,067,200.00 0.752 0.752 - 3,067,200.00 0.752 100.00
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam bh 2.00 233,990.00 467,980.00 0.115 2.00 0.115 - - 2.00 467,980.00 0.115 100.00
2 Engsel Pintu bh 12.00 47,047.50 564,570.00 0.138 12.00 0.138 - - 12.00 564,570.00 0.138 100.00
3 Engsel Jendela & Ventilasi bh 92.00 33,065.00 3,041,980.00 0.746 92.00 0.746 - - 92.00 3,041,980.00 0.746 100.00
4 Grendel Pintu Tanam bh 2.00 46,030.00 92,060.00 0.023 2.00 0.023 - - 2.00 92,060.00 0.023 100.00
5 Grendel Jendela & Ventilasi bh 46.00 46,030.00 2,117,380.00 0.519 46.00 0.519 - - 46.00 2,117,380.00 0.519 100.00
6 Kait Angin Jendela & Ventilasi bh 46.00 33,047.50 1,520,185.00 0.373 46.00 0.373 - - 46.00 1,520,185.00 0.373 100.00
JUMLAH 7,804,155.00 1.913 1.913 - 7,804,155.00 1.913
XI PEKERJAAN LAIN-LAIN
1 Pembersihan akhir ls 1.00 1,000,000.00 1,000,000.00 0.245 - - 1.00 0.245 1.00 1,000,000.00 0.245 100.00
2 Dokumentasi & Pelaporan ls 1.00 4,390,000.00 4,390,000.00 1.076 - - 1.00 1.076 1.00 4,390,000.00 1.076 100.00
JUMLAH 5,390,000.00 1.321 - 1.321 5,390,000.00 1.321
XII PEK. MEBELAIR
1 Meja Siswa Ganda bh 20.00 500,000.00 10,000,000.00 2.452 - - 20.00 2.452 20.00 10,000,000.00 2.452 100.00
2 Meja Kerja/Guru bh 2.00 1,000,000.00 2,000,000.00 0.490 - - 2.00 0.490 2.00 2,000,000.00 0.490 100.00
3 Kursi Siswa Tunggal bh 20.00 350,000.00 7,000,000.00 1.716 - - 20.00 1.716 20.00 7,000,000.00 1.716 100.00
4 Kursi Kerja/Guru bh 2.00 750,000.00 1,500,000.00 0.368 - - 2.00 0.368 2.00 1,500,000.00 0.368 100.00
5 Papan Tulis White Board bh 2.00 750,000.00 1,500,000.00 0.368 - - 2.00 0.368 2.00 1,500,000.00 0.368 100.00
JUMLAH 22,000,000.00 5.394 - 5.394 22,000,000.00 5.394
TOTAL 407,875,792.38 100.000 404,346,433.55 100.000
KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 02
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 16 September 2019 s/d 22 September 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 1.00 Err:509 1.00 Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 1.00 Err:509 1.00 Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 2.00 Err:509 2.00 Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 0.06 Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 - Err:509 0.50 Err:509 0.50 2,250,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 - Err:509 0.50 Err:509 0.50 750,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86
- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan Err:509
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
PROGRES RENCANA
PROGRES REALISASI
DEVIASI
LAPORAN KEMAJUAN PEKERJAAN
KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 03
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 23 September 2019 s/d 29 September 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.50 Err:509 0.25 Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 0.50 Err:509 0.50 Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali -
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof -
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting : -
a. Foot Plat -
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug -
a. Foot Plat -
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 - Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1) -
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 -
- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 -
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 -
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86
- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan -
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
PROGRES RENCANA
PROGRES REALISASI
DEVIASI
LAPORAN KEMAJUAN PEKERJAAN
KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 04
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 30 September 2019 s/d 06 Oktober 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1) -
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86
- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan -
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
PROGRES RENCANA
PROGRES REALISASI
DEVIASI
LAPORAN KEMAJUAN PEKERJAAN
KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 05
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 07 Oktober 2019 s/d 13 Oktober 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi -
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86
- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan -
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
PROGRES RENCANA
PROGRES REALISASI
DEVIASI
LAPORAN KEMAJUAN PEKERJAAN
KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 06
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 14 Oktober 2019 s/d 20 Oktober 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86
- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
PROGRES RENCANA
PROGRES REALISASI
DEVIASI
LAPORAN KEMAJUAN PEKERJAAN
KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 07
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 21 Oktober 2019 s/d 27 Oktober 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding -
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86
- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
PROGRES RENCANA
PROGRES REALISASI
DEVIASI
LAPORAN KEMAJUAN PEKERJAAN
KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 08
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 28 Oktober 2019 s/d 03 November 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86
- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
PROGRES RENCANA
PROGRES REALISASI
DEVIASI
LAPORAN KEMAJUAN PEKERJAAN
KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 09
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 04 November 2019 s/d 10 November 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86
- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
PROGRES RENCANA
PROGRES REALISASI
DEVIASI
LAPORAN KEMAJUAN PEKERJAAN
KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 10
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 11 November 2019 s/d 17 November 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali -
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86
- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan -
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
PROGRES RENCANA
PROGRES REALISASI
DEVIASI
LAPORAN KEMAJUAN PEKERJAAN
KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 11
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 18 November 2019 s/d 24 November 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali -
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86
- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
PROGRES RENCANA
PROGRES REALISASI
DEVIASI
LAPORAN KEMAJUAN PEKERJAAN
KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 12
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 25 November 2019 s/d 01 Desember 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 628.47 37,200.00 23,379,000.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 96.64 376,900.00 36,423,616.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 102.52 376,900.00 38,639,788.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 56.08 17,830.00 999,906.40 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 36.80 260,850.00 9,599,280.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² 4.80 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86
- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan -
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
PROGRES RENCANA
PROGRES REALISASI
DEVIASI
LAPORAN KEMAJUAN PEKERJAAN
KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 13
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 02 Desember 2019 s/d 08 Desember 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86
- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan -
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
PROGRES RENCANA
PROGRES REALISASI
DEVIASI
LAPORAN KEMAJUAN PEKERJAAN
KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 14
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 09 Desember 2019 s/d 15 Desember 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1) -
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86
- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
PROGRES RENCANA
PROGRES REALISASI
DEVIASI
LAPORAN KEMAJUAN PEKERJAAN
KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 15
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 16 Desember 2019 s/d 22 Desember 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86
- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
PROGRES RENCANA
PROGRES REALISASI
DEVIASI
LAPORAN KEMAJUAN PEKERJAAN
KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 16
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 23 Desember 2019 s/d 29 Desember 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond -
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86
- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan -
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
PROGRES RENCANA
PROGRES REALISASI
DEVIASI
LAPORAN KEMAJUAN PEKERJAAN
KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 17
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 30 Desember 2019 s/d 31 Desember 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond -
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86
- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
PROGRES RENCANA
PROGRES REALISASI
DEVIASI
LAPORAN KEMAJUAN PEKERJAAN
KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 18
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : ……. s/d ……. 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond -
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1)
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86
- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan -
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
PROGRES RENCANA
PROGRES REALISASI
DEVIASI
LAPORAN KEMAJUAN PEKERJAAN
KEGIATAN : PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN DAN KAPASITAS LOGISTIK PERDAGANGAN MINGGU : 04
PEKERJAAN : REVITALISASI PASAR MASOHI PERIODE : 30 September 2019 s/d 06 Oktober 2019
LOKASI : KEC. KOTA MASOHI - KAB. MALUKU TENGAH
TAHUN ANGGARAN: 2019
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 1.00 4,500,000.00 4,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 9,000,000.00 Err:509 Err:509
2 Pemasangan Papan Nama Proyek Ls 1.00 3,500,000.00 3,500,000.00 Err:509 2.00 Err:509 - Err:509 2.00 7,000,000.00 Err:509 Err:509
Sewa Direksi Keet / Kantor Sementara & Gudang
3 Ls 2.00 55,000.00 110,000.00 Err:509 4.00 Err:509 - Err:509 4.00 220,000.00 Err:509 Err:509
Alat dan Bahan
4 Biaya K3 Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Perataan dan Pembersihan Lapangan Ls Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1. PONDASI
A. Pondasi Foot Plat
- Pekerjaan Mobilisasi & Demobilisasi Peralatan Ls 1.00 4,500,000.00 4,500,000.00 Err:509 0.75 Err:509 - Err:509 0.75 3,375,000.00 Err:509 Err:509
- Foot Plat P1 M³ 1.00 1,500,000.00 1,500,000.00 Err:509 1.00 Err:509 - Err:509 1.00 1,500,000.00 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II.2. STRUKTUR BAWAH
A. Pekerjaan Galian Tanah Manual
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Lantai Kerja (Beton K-100)
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Sloof
- Sloof S1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
E. Beton K-200 :
- Lantai Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Tutup Parit Keliling M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rabat Beton Untuk Lantai M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ramp M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
G. Bekisting :
a. Foot Plat
- Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Kolom Foot Plat
- Kolom Foot Plat P1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kolom Foot Plat P3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Sloof
- Sloof S1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Sloof S3 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Parit
- Tutup Parit Keliling M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P2 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Foot Plat P3 M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pas. Batu Kali 1 PC : 4 Psr M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Peninggian Elevasi
- Tanah Urug Bawah Rabat M³ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Ring Balok
- Balok B1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok B2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Balok Letiu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Plat Beton
- Plat Beton Lantai 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dak Beton Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Plat Beton Meja Los
- Los Model A M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model B M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Los Model D M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
e. Kolom Beton Meja Los
- Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
f. Bak Kontrol
- Grease Trap M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
III.2. PEKERJAAN STRUKTUR BAJA KONVENSIONAL
a. Struktur Utama
- Kolom Struktur K1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Angkur Baut Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 19 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Baut HTB 16 Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Turnbuklce Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
c. Cat Baja Struktur Utama
- Kolom Struktur K1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kuda-Kuda Baja M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Konsol Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Ring Balok RB M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Gording Canal C M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Cat Baja Aksessoris Struktur Pendukung
- Rip 1 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 2 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 3 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Rip 4 (Plat Buhul) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 1 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Endplate 2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Trackstang M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Kait Angin M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Dudukan Gording M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
c. Talang
- Rangka Talang Atap Utama Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plat Rangka Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Roof Drain Bh Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Lisplank
- Lisplank Atap Utama GRC Lebar 50 cm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 20 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Lisplank Atap Main Gate GRC Lebar 15 cm M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama M² 41.90 37,200.00 1,558,726.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Meja Los M² 2.36 376,900.00 887,599.50 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 10.62 376,900.00 4,002,512.16 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 10.48 17,830.00 186,774.82 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Tasram M² 26.16 260,850.00 6,824,858.53 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN PELAPIS DINDING
a. Plester Aci
- Dinding Bata Bangunan Utama M² 4.71 602,030.00 2,835,561.30 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Keliling M² 16.12 1,925,680.00 31,032,333.20 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Parit Los M² 1.75 7,427,034.00 13,012,163.57 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Dinding Bata Trasram M² 1.29 8,085,194.00 10,426,019.37 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Kolom Teras Termasuk Skoneng M² 2.14 7,427,034.00 15,873,057.06 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plat Main Gate M² 6.91 2,125,815.00 14,698,225.04 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Pekerjaan Keramik Dinding
- Keramik Dinding Toilet M² 14.00 263,224.00 3,685,136.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Meja Los M² 176.13 263,224.00 46,362,696.02 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Dinding Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Plint Keramik M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 - Err:509 0 Err:509 Err:509 Err:509
VII. PEKERJAAN PELAPIS LANTAI
a. Keramik
- Keramik Selasar Pasar M² 341.68 77,250.00 26,394,780.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Keramik Meja Los M² 341.68 21,684.00 7,408,989.12 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Keramik Selasar Depan & Tiris2 M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- keramik Ruang Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Musholla M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- keramik Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VIII. PEKERJAAN PENGECATAN
a. Pengecatan Area Luar
- Pengecatan Dinding Bangunan Utama M² 140.73 286,188.00 40,274,893.81 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pengecatan Kolom Selasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Utama M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Teritisan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Listplank Atap Main Gate M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Roster M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
b. Pengecatan Area Dalam
- Pengecatan Dinding Bagian Dalam Pasar M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Dinding Bagian Dalam Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Dinding Bagian Dalam R.
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengelola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Mushola
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Wudlu
Pengecatan Dinding Bagian Dalam Ruang
- M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Toilet
c. Pengecatan Plafond
- Pengecatan Plafond Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond R. Pengelola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Mushola M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Plafond Ruang Toilet M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pengecatan Bidang Besi
- Pengecatan Boven Kawat Harmonika M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Teralis Atas Kios M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Klem Pipa Air Hujan M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Grill Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengecatan Besi Siku Support Kabel Tray Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Pengecatan Besi Beton Longdrat Support
- Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kabel Tray
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX. PEKERJAAN KUSEN
Folding Door Harmonika untuk Pintu Depan
- M² 1.07 6,589,000.00 7,053,498.14 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
dan Belakang
Folding Door Harmonika untuk Pintu Samping
- M² 5.75 669,000.00 3,849,426.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
Kiri dan Kanan
- Rolling Door Kios Lebar 1,60 m M² 9.74 275,890.00 2,687,389.31 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Pintu Jendela 1 (PJ1) -
Kusen Aluminium Natural 3" M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Naco 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Kaca Bening 5 mm M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Daun Pintu Aluminium Kaca Aluminium M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 1 (BV1) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Boven 2 (BV2) M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
b. Plafond Kalsiboard
- Plafon Selasar Depan M² 32.71 46,395.00 1,517,561.89 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon Toilet M² 30.99 46,395.00 1,437,762.49 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
- Plafon R. Wudlu M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
XII. PEKERJAAN LAIN-LAIN
a. Plat Nama Pasar (Signage) Tampak Depan Bh 8.00 210,600.00 1,684,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
b. Logo Pasar Signage Bh 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
c. Teralis di Atas Plafon Kios M² 2.00 80,200.00 160,400.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
d. Papan Nama Kios Bh 4.00 135,200.00 540,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
e. Support Gantung untuk Pipa Air Hujan Kg 4.00 130,200.00 520,800.00 Err:509 - Err:509 - Err:509 - - Err:509 Err:509
f. Klem Menempel Dinding untuk Pipa Air Hujan Kg Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
g. Pipa Display Los M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
h. Gril Besi Los M² Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- MCB 10A, 10kA, 1 phasa Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
- Pekerjaan Kabel Tovoor NYY 4 x 50 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pekerjaan Kabel Tovoor NYY 4 x 25 mm2 M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Stop Kontak 1 Gang Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Tunggal Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + Pasang Saklar Ganda Titik Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
XIII.3. PEKERJAAN TATA UDARA
Pengadaan dan Pemasangan Ventilator 60 CM
- Set Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
= 24’’/100 x 86 x 86
- Pengadaan dan Pemasangan Exhaust Fan 10" Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pengadaan + pemasangan closet jongkok Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Pembuatan Septictank & Resapan Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
d. Pekerjaan Plumbing Air Hujan -
- Pengadaan + Pemasangan Pipa Air Hujan M¹ Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
- Bak Kontrol Parit 40x40 Unit Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KEMAJUAN PEKERJAAN
HARGA SATUAN MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN SAT. VOL. JUMLAH HARGA % THDP
(%) BOBOT BOBOT JUMLAH HARGA BOBOT
(Rp) VOLUME VOLUME VOLUME PENYELES
(%) (%) (Rp) (%)
AIAN
PROGRES RENCANA
PROGRES REALISASI
DEVIASI
RENCANA ANGGARAN BIAYA
PASAR RAKYAT MASOHI (TYPE D)
HRG SAT. HRG SAT. JMLH HARGA JMLH HARGA JUMLAH TOTAL
NO. URAIAN PEKERJAAN SAT. VOL.
MATERIAL TENAGA MATERIAL TENAGA HARGA
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank M¹ 95.00 67,114.00 24,926.25 6,375,830.00 2,367,993.75 8,743,823.75
2 Pemasangan Papan Nama Proyek Ls 1.00 222,500.00 150,000.00 222,500.00 150,000.00 372,500.00
Sewa Direksi Keet / Kantor Sementara &
3 Ls 1.00 14,400,000.00 5,600,000.00 14,400,000.00 5,600,000.00 20,000,000.00
Gudang Alat dan Bahan
4 Biaya K3 Ls 1.00 23,000,000.00 - 23,000,000.00 - 23,000,000.00
5 Perataan dan Pembersihan Lapangan Ls 1.00 5,000,000.00 10,000,000.00 5,000,000.00 10,000,000.00 15,000,000.00
TOTAL - I 48,998,330.00 18,117,993.75 67,116,323.75
- Foot Plat P2 Kondisi Tanah dengan Kekerasan Standart M³ 19.35 - 101,688.75 - 1,967,677.31 1,967,677.31
- Foot Plat P3 Kondisi Tanah dengan Kekerasan Standart M³ 5.58 - 101,688.75 - 567,118.16 567,118.16
- Pas. Batu Kali 1 PC : 3 Psr Kondisi Tanah dengan Kekerasan Standart M³ 53.28 - 82,368.75 - 4,388,607.00 4,388,607.00
- Pas. Batu Kali 1 PC : 4 Psr Kondisi Tanah dengan Kekerasan Standart M³ 54.50 - 82,368.75 - 4,488,685.03 4,488,685.03
- Pas. Batu Kali 1 PC : 4 Psr Kondisi Tanah dengan Kekerasan Standart M³ 11.67 - 82,368.75 - 961,243.31 961,243.31
- Parit Keliling Kondisi Tanah dengan Kekerasan Standart M³ 32.41 - 82,368.75 - 2,669,571.19 2,669,571.19
B. Urug Pasir
a. Foot Plat
- Foot Plat P1 Pasir Urug Tebal 5 cm dipadatkan M³ 1.80 338,100.00 32,947.50 608,580.00 59,305.50 667,885.50
- Foot Plat P2 Pasir Urug Tebal 5 cm dipadatkan M³ 0.40 338,100.00 32,947.50 135,240.00 13,179.00 148,419.00
- Foot Plat P3 Pasir Urug Tebal 5 cm dipadatkan M³ 0.13 338,100.00 32,947.50 43,276.80 4,217.28 47,494.08
b. Pondasi Batu Kali
- Pas. Batu Kali 1 PC : 3 Psr Pasir Urug Tebal 10 cm dipadatkan M³ 5.92 338,100.00 32,947.50 2,001,552.00 195,049.20 2,196,601.20
- Pas. Batu Kali 1 PC : 4 Psr Pasir Urug Tebal 10 cm dipadatkan M³ 6.06 338,100.00 32,947.50 2,047,195.50 199,497.11 2,246,692.61
- Pas. Batu Kali 1 PC : 4 Psr Pasir Urug Tebal 10 cm dipadatkan M³ 3.89 338,100.00 32,947.50 1,315,209.00 128,165.78 1,443,374.78
HRG SAT. HRG SAT. JMLH HARGA JMLH HARGA JUMLAH TOTAL
NO. URAIAN PEKERJAAN SAT. VOL.
MATERIAL TENAGA MATERIAL TENAGA HARGA
D. Beton K-300 :
a. Kolom Foot Plat
- Kolom Foot Plat P1 Beton K-300, (30 x 40) M³ 2.81 1,486,588.27 224,077.50 4,174,339.85 629,209.62 4,803,549.47
- Kolom Foot Plat P2 Beton K-300, (30 x 30) M³ 0.72 1,486,588.27 224,077.50 1,070,343.55 161,335.80 1,231,679.35
- Kolom Foot Plat P3 Beton K-300, (25 x 25) M³ 0.19 1,486,588.27 224,077.50 278,735.30 42,014.53 320,749.83
b. Sloof
- Sloof S1 Beton K-300, (20 x 30) M³ 4.44 1,486,588.27 224,077.50 6,600,451.91 994,904.10 7,595,356.01
- Sloof S2 Beton K-300, (15 x 20) M³ 2.62 1,486,588.27 224,077.50 3,891,144.79 586,522.86 4,477,667.65
- Sloof S3 Beton K-300, (15 x 15) M³ 3.50 1,486,588.27 224,077.50 5,204,545.52 784,495.33 5,989,040.85
E. Beton K-200 :
- Lantai Parit Keliling Site mix, tebal 10 cm M³ 2.73 1,382,037.45 224,077.50 3,772,962.23 611,731.58 4,384,693.81
- Tutup Parit Keliling Site mix, tebal 12 cm M³ 6.55 1,382,037.45 224,077.50 9,055,109.35 1,468,155.78 10,523,265.13
- Rabat Beton Untuk Lantai Site mix, tebal 5 cm M³ 28.08 1,382,037.45 224,077.50 38,803,465.40 6,291,423.97 45,094,889.37
- Ramp Site mix, tebal 10 cm M³ 2.00 1,382,037.45 224,077.50 2,764,074.89 448,155.00 3,212,229.89
F. Pembesian :
a. Foot Plat
- Foot Plat P1 Tul. D16-150 Kg 1,051.11 27,030.75 1,754.33 28,412,233.25 1,843,984.76 30,256,218.01
- Foot Plat P2 Tul. D16-150 Kg 242.42 27,030.75 1,754.33 6,552,731.27 425,279.37 6,978,010.64
- Foot Plat P3 Tul. D16-150 Kg 31.96 27,030.75 1,754.33 863,885.47 56,067.10 919,952.57
b. Kolom Foot Plat
- Kolom Foot Plat P1 Tul. 10D16 + sengkang Ø10-125 Kg 796.05 27,030.75 1,754.33 21,517,947.26 1,396,538.12 22,914,485.38
- Kolom Foot Plat P2 Tul. 8D12 + sengkang Ø10-125 Kg 136.45 27,030.75 1,754.33 3,688,417.67 239,382.31 3,927,799.98
- Kolom Foot Plat P3 Tul. 4D12 + sengkang Ø10-125 Kg 16.93 27,030.75 1,754.33 457,619.33 29,699.99 487,319.32
c. Sloof
- Sloof S1 Tul. 6D12 + 2Ø10 + sengkang Ø10-150 Kg 870.13 27,030.75 1,754.33 23,520,135.15 1,526,482.29 25,046,617.44
- Sloof S2 Tul. 4D12 + sengkang Ø10-150 Kg 559.97 27,030.75 1,754.33 15,136,393.29 982,368.35 16,118,761.64
- Sloof S3 Tul. 4D8 + sengkang Ø6-200 Kg 340.45 27,030.75 1,754.33 9,202,713.28 597,266.08 9,799,979.36
d. Parit
- Tutup Parit Keliling Tul. Ø8-150 Kg 361.81 27,030.75 1,754.33 9,780,036.74 634,734.99 10,414,771.74
G. Bekisting :
a. Foot Plat
- Foot Plat P1 Papan Kayu + Rangka Kaso M² 21.00 149,385.00 94,185.00 3,137,085.00 1,977,885.00 5,114,970.00
- Foot Plat P2 Papan Kayu + Rangka Kaso M² 4.80 149,385.00 94,185.00 717,048.00 452,088.00 1,169,136.00
- Foot Plat P3 Papan Kayu + Rangka Kaso M² 1.28 149,385.00 94,185.00 191,212.80 120,556.80 311,769.60
b. Kolom Foot Plat
- Kolom Foot Plat P1 Multipleks 9 mm Rangka Kaso M² 32.76 311,707.50 119,542.50 10,211,537.70 3,916,212.30 14,127,750.00
- Kolom Foot Plat P2 Multipleks 9 mm Rangka Kaso M² 9.60 311,707.50 119,542.50 2,992,392.00 1,147,608.00 4,140,000.00
- Kolom Foot Plat P3 Multipleks 9 mm Rangka Kaso M² 3.00 311,707.50 119,542.50 935,122.50 358,627.50 1,293,750.00
c. Sloof
- Sloof S1 Multipleks 9 mm Rangka Kaso M² 44.40 166,778.75 94,185.00 7,404,976.50 4,181,814.00 11,586,790.50
- Sloof S2 Multipleks 9 mm Rangka Kaso M² 34.90 166,778.75 94,185.00 5,820,578.38 3,287,056.50 9,107,634.88
- Sloof S3 Multipleks 9 mm Rangka Kaso M² 46.68 166,778.75 94,185.00 7,785,232.05 4,396,555.80 12,181,787.85
d. Parit
- Tutup Parit Keliling Papan Kayu + Rangka Kaso M² 22.42 149,385.00 94,185.00 3,348,614.16 2,111,250.96 5,459,865.12
H. Tanah Urug
a. Foot Plat
- Foot Plat P1 Menggunakan Tanah Bekas Galian M³ 25.80 - 61,237.50 - 1,579,927.50 1,579,927.50
- Foot Plat P2 Menggunakan Tanah Bekas Galian M³ 6.45 - 61,237.50 - 394,981.88 394,981.88
- Foot Plat P3 Menggunakan Tanah Bekas Galian M³ 1.86 - 61,237.50 - 113,840.51 113,840.51
HRG SAT. HRG SAT. JMLH HARGA JMLH HARGA JUMLAH TOTAL
NO. URAIAN PEKERJAAN SAT. VOL.
MATERIAL TENAGA MATERIAL TENAGA HARGA
b. Ring Balok
- Balok B1 Beton K-300, (20 x 30) M³ 1.95 1,486,588.27 224,077.50 2,903,306.89 437,623.36 3,340,930.24
- Balok B2 Beton K-300, (15 x 20) M³ 0.65 1,486,588.27 224,077.50 963,309.20 145,202.22 1,108,511.42
- Ring Balok RB1 Beton K-250, (12 x 20) M³ 2.09 1,414,348.49 224,077.50 2,961,645.74 469,218.29 3,430,864.03
- Balok Letiu Beton K-250, (12 x 20) M³ 0.73 1,414,348.49 224,077.50 1,035,303.10 164,024.73 1,199,327.83
c. Plat Beton
- Plat Beton Lantai 2 Beton K-300, tebal 12 cm M³ 1.08 1,486,588.27 224,077.50 1,605,515.33 242,003.70 1,847,519.03
- Dak Beton Main Gate Beton K-250, tebal 10 cm M³ 0.56 1,414,348.49 224,077.50 795,571.03 126,043.59 921,614.62
f. Bak Kontrol
- Grease Trap Beton K-200, tebal 10 cm M³ 0.49 1,382,037.45 224,077.50 671,670.20 108,901.67 780,571.86
B. PEKERJAAN PEMBESIAN
a. Kolom
- Kolom K1 Tul. 10D16 + sengkang Ø10-125 Kg 380.85 27,030.75 1,754.33 10,294,635.19 668,132.99 10,962,768.18
- Kolom K2 Tul. 8D12 + sengkang Ø10-125 Kg 241.51 27,030.75 1,754.33 6,528,201.19 423,687.34 6,951,888.53
- Kolom K3 Tul. 4D12 + sengkang Ø10-125 Kg 42.46 27,030.75 1,754.33 1,147,847.82 74,496.57 1,222,344.39
- Kolom KP Tul. 4D10 + sengkang Ø8-150 Kg 784.93 27,030.75 1,754.33 21,217,293.78 1,377,025.38 22,594,319.17
b. Ring Balok
Tul. 6D12 + 2Ø10 + sengkang Ø10-100
- Balok B1 Kg 414.59 27,030.75 1,754.33 11,206,647.61 727,323.59 11,933,971.20
(tump) & Ø10-150 (lap)
Tul. 4D10 + sengkang Ø10-100 (tump) &
- Balok B2 Kg 94.46 27,030.75 1,754.33 2,553,261.50 165,709.44 2,718,970.94
Ø10-150 (lap)
Tul. 4D10 + sengkang Ø8-100 (tump) &
- Ring Balok RB1 Kg 360.42 27,030.75 1,754.33 9,742,308.41 632,286.39 10,374,594.80
Ø8-150 (lap)
- Balok Letiu Tul. 4D10 + sengkang Ø8-150 Kg 122.70 27,030.75 1,754.33 3,316,733.62 215,259.61 3,531,993.23
c. Plat Beton
- Plat Beton Lantai 2 Tul. D10-150 Kg 173.61 27,030.75 1,754.33 4,692,711.20 304,562.05 4,997,273.24
- Dak Beton Main Gate Tul. D8-150 Kg 66.68 27,030.75 1,754.33 1,802,427.71 116,979.51 1,919,407.22
HRG SAT. HRG SAT. JMLH HARGA JMLH HARGA JUMLAH TOTAL
NO. URAIAN PEKERJAAN SAT. VOL.
MATERIAL TENAGA MATERIAL TENAGA HARGA
f. Bak Kontrol
- Grease Trap Tul. Ø8-150 Kg 40.52 27,030.75 1,754.33 1,095,321.45 71,087.55 1,166,409.01
C. PEKERJAAN BEKISTING
a. Kolom
- Kolom K1 Multipleks 9 mm Rangka Kaso M² 21.00 311,707.50 119,542.50 6,545,857.50 2,510,392.50 9,056,250.00
- Kolom K2 Multipleks 9 mm Rangka Kaso M² 20.40 311,707.50 119,542.50 6,358,833.00 2,438,667.00 8,797,500.00
- Kolom K3 Multipleks 9 mm Rangka Kaso M² 6.50 311,707.50 119,542.50 2,026,098.75 777,026.25 2,803,125.00
- Kolom KP Multipleks 9 mm Rangka Kaso M² 52.39 311,707.50 119,542.50 16,330,355.93 6,262,831.58 22,593,187.50
b. Ring Balok
- Balok B1 Multipleks 9 mm Rangka Kaso M² 26.04 323,092.50 119,542.50 8,413,328.70 3,112,886.70 11,526,215.40
- Balok B2 Multipleks 9 mm Rangka Kaso M² 11.88 323,092.50 119,542.50 3,838,338.90 1,420,164.90 5,258,503.80
- Ring Balok RB1 Multipleks 9 mm Rangka Kaso M² 34.90 323,092.50 119,542.50 11,275,928.25 4,172,033.25 15,447,961.50
- Balok Letiu Multipleks 9 mm Rangka Kaso M² 15.86 323,092.50 119,542.50 5,124,247.05 1,895,944.05 7,020,191.10
c. Plat Beton
- Plat Beton Lantai 2 Multipleks 9 mm Rangka Kaso M² 9.00 380,707.50 119,542.50 3,426,367.50 1,075,882.50 4,502,250.00
- Dak Beton Main Gate Multipleks 9 mm Rangka Kaso M² 5.63 380,707.50 119,542.50 2,141,479.69 672,426.56 2,813,906.25
f. Bak Kontrol
- Grease Trap Multipleks 9 mm Rangka Kaso M² 6.60 363,745.00 119,542.50 2,400,717.00 788,980.50 3,189,697.50
- Kait Angin besi Ø16 lengkap dengan ulir Kg 328.27 31,740.00 14,955.75 10,419,414.22 4,909,582.68 15,328,996.90
- Dudukan Gording plat besi tebal 8mm Kg 1,012.92 31,740.00 14,955.75 32,149,975.00 15,148,928.44 47,298,903.44
- Turnbuklce Ø16 lengkap dengan pengunci Bh 20.00 138,000.00 25,000.00 2,760,000.00 500,000.00 3,260,000.00
b. Bubungan
- Nok Atap Utama Nok Zincalume atau Setara M¹ 27.50 125,258.00 156,112.50 3,444,595.00 4,293,093.75 7,737,688.75
- Nok Atap Main Gate Nok Zincalume atau Setara M¹ 2.50 125,258.00 156,112.50 313,145.00 390,281.25 703,426.25
- Flashing Atap Zincalume Flashing Zincalume atau Setara M¹ 12.30 137,505.50 156,112.50 1,691,317.65 1,920,183.75 3,611,501.40
c. Talang
- Rangka Talang Atap Utama Besi Hollow 40x40 termasuk Mesi Besi Kg 752.82 31,740.00 14,955.75 23,894,535.90 11,259,001.42 35,153,537.32
Plat Talang Galvalum lebar 1,2 m tebal 0,5
- Plat Rangka Atap Utama M² 66.00 543,270.00 63,310.00 35,855,820.00 4,178,460.00 40,034,280.00
mm termasuk Aksesoris Mur
- Roof Drain Roof Drain 4" Merk Onda/Setara Bh 12.00 108,100.00 15,611.25 1,297,200.00 187,335.00 1,484,535.00
d. Lisplank
Panel GRC 9 mm termasuk Asesoris Mur
- Lisplank Atap Utama GRC Lebar 50 cm M² 45.70 115,064.40 24,926.25 5,258,443.08 1,139,129.63 6,397,572.71
dan Pemasangan
Panel GRC 9 mm termasuk Asesoris Mur
- Lisplank Atap Teritisan GRC Lebar 20 cm M¹ 15.50 46,345.00 38,553.75 718,347.50 597,583.13 1,315,930.63
dan Pemasangan
Panel GRC 9 mm termasuk Asesoris Mur
- Lisplank Atap Teritisan GRC Lebar 15 cm M¹ 15.50 33,695.00 38,553.75 522,272.50 597,583.13 1,119,855.63
dan Pemasangan
Lisplank Atap Main Gate GRC Lebar 20 Panel GRC 9 mm termasuk Asesoris Mur
- M¹ 13.20 46,345.00 38,553.75 611,754.00 508,909.50 1,120,663.50
cm dan Pemasangan
Lisplank Atap Main Gate GRC Lebar 15 Panel GRC 9 mm termasuk Asesoris Mur
- M¹ 13.20 33,695.00 38,553.75 444,774.00 508,909.50 953,683.50
cm dan Pemasangan
TOTAL - IV 163,508,676.03 128,966,578.65 292,475,254.67
HRG SAT. HRG SAT. JMLH HARGA JMLH HARGA JUMLAH TOTAL
NO. URAIAN PEKERJAAN SAT. VOL.
MATERIAL TENAGA MATERIAL TENAGA HARGA
V. PEKERJAAN DINDING
Pekerjaan Dinding Bata
- Dinding Bata Bangunan Utama Adukan 1 PC : 4 Psr, Bata merah M² 628.47 223,157.50 47,523.75 140,247,291.92 29,867,144.23 170,114,436.15
- Dinding Bata Meja Los Adukan 1 PC : 4 Psr, Bata merah M² 96.64 223,157.50 47,523.75 21,565,940.80 4,592,695.20 26,158,636.00
- Dinding Bata Parit Keliling Adukan 1 PC : 4 Psr, Bata merah M² 102.52 223,157.50 47,523.75 22,878,106.90 4,872,134.85 27,750,241.75
- Dinding Bata Parit Los Adukan 1 PC : 4 Psr, Bata merah M² 56.08 223,157.50 47,523.75 12,514,672.60 2,665,131.90 15,179,804.50
- Dinding Bata Tasram Adukan 1 PC : 3 Psr, Bata merah M² 36.80 227,545.90 47,523.75 8,373,689.12 1,748,874.00 10,122,563.12
- Dinding Roster Roster press 40x20x10 M² 4.80 295,032.50 47,523.75 1,416,156.00 228,114.00 1,644,270.00
TOTAL - V 206,995,857.34 43,974,094.18 250,969,951.52
c. Pengecatan Plafond
Cat Tembok Warna Putih Merk Vinilex atau
- Pengecatan Plafond Kios M² 47.59 22,321.50 11,224.58 1,062,224.38 534,149.46 1,596,373.84
Setara
Cat Tembok Warna Putih Merk Vinilex atau
- Pengecatan Plafond R. Pengelola M² 5.99 22,321.50 11,224.58 133,594.18 67,179.08 200,773.26
Setara
Cat Tembok Warna Putih Merk Vinilex atau
- Pengecatan Plafond Ruang Mushola M² 6.70 22,321.50 11,224.58 149,498.25 75,176.59 224,674.84
Setara
Cat Tembok Warna Putih Merk Vinilex atau
- Pengecatan Plafond Ruang Wudlu M² 3.85 22,321.50 11,224.58 85,881.97 43,186.55 129,068.52
Setara
Cat Tembok Warna Putih Merk Vinilex atau
- Pengecatan Plafond Ruang Toilet M² 7.29 22,321.50 11,224.58 162,723.74 81,827.15 244,550.89
Setara
b. Plafond Kalsiboard
Plafond Kalsi Board 4 mm Rangka Hollow
- Plafon Selasar Depan M² 44.38 189,745.40 105,449.25 8,419,952.13 4,679,310.47 13,099,262.59
40x40
Plafond Kalsi Board 4 mm Rangka Hollow
- Plafon Toilet M² 7.29 189,745.40 105,449.25 1,383,243.97 768,725.03 2,151,969.00
40x40
Plafond Kalsi Board 4 mm Rangka Hollow
- Plafon R. Wudlu M² 3.85 189,745.40 105,449.25 730,045.43 405,715.99 1,135,761.42
40x40
TOTAL - XI 23,356,792.99 12,209,177.79 35,565,970.77
b. Pekerjaan Armature
lampu 18 watt (jenis day light) Armature
Pengadaan + Pasang Armature Lampu
- ex. PHILLIPS/PANASONIC/ setara, Titik 31.00 221,950.00 46,833.75 6,880,450.00 1,451,846.25 8,332,296.25
Downlight
Komponen Merk PHILLIPS/OSRAM
TL 2x36w (jenis day light) Komponen
Pengadaan + Pasang Armature Lampu
- lampu TL 36 Watt Merk PHILLIPS/OSRAM, Titik 51.00 316,250.00 46,833.75 16,128,750.00 2,388,521.25 18,517,271.25
TL 1
komplit.
TL 2x36w (jenis day light) Komponen
Pengadaan + Pasang Armature Lampu
- lampu TL 36 Watt Merk PHILLIPS/OSRAM, Titik 8.00 854,450.00 46,833.75 6,835,600.00 374,670.00 7,210,270.00
Emergency TL 2
komplit. include baterai
Pengadaan + Pasang Stop Kontak 1 Stop Kontak Child Protection Merk
- Titik 29.00 46,000.00 46,833.75 1,334,000.00 1,358,178.75 2,692,178.75
Gang Clipsal/Setara
- Pengadaan + Pasang Saklar Tunggal Saklar Merk Clipsal/Setara Titik 22.00 44,850.00 46,833.75 986,700.00 1,030,342.50 2,017,042.50
- Pengadaan + Pasang Saklar Ganda Saklar Merk Clipsal/Setara Titik 15.00 44,850.00 46,833.75 672,750.00 702,506.25 1,375,256.25
Pengadaan + pemasangan pipa kuras / pipa PVC AW dia 1" lengkap dengan
- M¹ 8.00 39,215.00 12,282.00 313,720.00 98,256.00 411,976.00
pembuangan dari profil tank asesoris Lbow dan knie
Pengadaan + pemasangan kran dinding
- merk onda/setara lengkap dengan selotip Unit 10.00 44,907.50 56,493.75 449,075.00 564,937.50 1,014,012.50
1/2"
- Pengadaan + pemasangan washtafel merk INA/setara warna putih Set 2.00 1,269,945.00 333,960.00 2,539,890.00 667,920.00 3,207,810.00
Pengadaan + pemasangan stop kran
- lengkap dengan knie drat dan selotip Set 1.00 82,857.50 56,493.75 82,857.50 56,493.75 139,351.25
Galvanis 1" posisi pada pompa in
Pengadaan + pemasangan stop kran
- lengkap dengan knie drat dan selotip Set 1.00 50,657.50 56,493.75 50,657.50 56,493.75 107,151.25
PVC 1" posisi pada pompa Out
Pengadaan + pemasangan stop kran
- PVC 1" posisi pada pipa kuras/ lengkap dengan knie drat dan selotip Set 1.00 50,657.50 56,493.75 50,657.50 56,493.75 107,151.25
pembuangan profil tank
Pengadaan & Pemasangan Profil Tank
- Lengkap dengan aksessorisnya Unit 1.00 5,500,000.00 750,000.00 5,500,000.00 750,000.00 6,250,000.00
2200 Liter
PEKERJAAN PERSIAPAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Kayu OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0100 135,000.00 1,350.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Balok Kayu 5 x 7 cm Kelas III M³ 0.0120 3,025,000.00 36,300.00
Paku 5 - 7 cm Kg 0.0200 25,000.00 500.00
Papan Kayu Kelas III M³ 0.0070 3,080,000.00 21,560.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 2.0000 90,000.00 180,000.00
Tukang Kayu OH 2.0000 105,000.00 210,000.00
Tukang Batu OH 1.0000 105,000.00 105,000.00
Kepala Tukang OH 0.3000 135,000.00 40,500.00
Mandor OH 0.0500 165,000.00 8,250.00
B BAHAN
Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg 1.2500 15,000.00 18,750.00
Balok Kayu Kelas II M³ 0.1800 3,300,000.00 594,000.00
Paku 5 - 12 cm Kg 0.0800 25,000.00 2,000.00
Semen Portland (PC) Kg 202.0000 1,800.00 363,600.00
Pasir Pasang M³ 0.2500 450,000.00 112,500.00
Pasir Beton M³ 0.2500 450,000.00 112,500.00
Batu Pecah 2 - 3 cm M³ 0.2500 380,000.00 95,000.00
Bata Merah Bh 0.2500 2,200.00 550.00
Seng Plat BJLS 0,25 mm Lebar 90 cm Lbr 0.2500 83,000.00 20,750.00
Jendela Naco 5 mm Panjang 50 cm Bh 0.1500 22,000.00 3,300.00
Kaca 5 mm M² 0.1500 182,000.00 27,300.00
Kunci Tanam Bh 0.1500 330,000.00 49,500.00
Multipleks 4 mm Lbr 0.0600 72,000.00 4,320.00
C PERALATAN
PEKERJAAN TANAH
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.7500 90,000.00 67,500.00
Mandor OH 0.0250 165,000.00 4,125.00
B BAHAN
- - -
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.9000 90,000.00 81,000.00
Mandor OH 0.0450 165,000.00 7,425.00
B BAHAN
- - -
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.0000 90,000.00 90,000.00
Mandor OH 0.0320 165,000.00 5,280.00
B BAHAN
- - -
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.5000 90,000.00 45,000.00
Mandor OH 0.0500 165,000.00 8,250.00
B BAHAN
- - -
C PERALATAN
1 M³ Urugan Pasir
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Mandor OH 0.0100 165,000.00 1,650.00
B BAHAN
Pasir Urug M³ 1.2000 245,000.00 294,000.00
C PERALATAN
1 M³ Urugan Tanah
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Mandor OH 0.0100 165,000.00 1,650.00
B BAHAN
Tanah Urug M³ 1.2000 242,000.00 290,400.00
C PERALATAN
PEKERJAAN PONDASI
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.5000 90,000.00 135,000.00
Tukang Batu OH 0.7500 105,000.00 78,750.00
Kepala Tukang OH 0.0750 135,000.00 10,125.00
Mandor OH 0.0750 165,000.00 12,375.00
B BAHAN
Batu Belah M³ 1.2000 290,000.00 348,000.00
Semen Portland (PC) Kg 202.0000 1,800.00 363,600.00
Pasir Pasang M³ 0.4850 450,000.00 218,250.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.5000 90,000.00 135,000.00
Tukang Batu OH 0.7500 105,000.00 78,750.00
Kepala Tukang OH 0.0750 135,000.00 10,125.00
Mandor OH 0.0750 165,000.00 12,375.00
B BAHAN
Batu Belah M³ 1.2000 290,000.00 348,000.00
Semen Portland (PC) Kg 136.0000 1,800.00 244,800.00
Pasir Pasang M³ 0.5200 450,000.00 234,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.7800 90,000.00 70,200.00
Tukang Batu OH 0.3900 105,000.00 40,950.00
Kepala Tukang OH 0.0390 135,000.00 5,265.00
Mandor OH 0.0390 165,000.00 6,435.00
B BAHAN
Batu Belah M³ 1.2000 290,000.00 348,000.00
Pasir Urug M³ 0.4320 245,000.00 105,840.00
C PERALATAN
PEKERJAAN BETON
1 M³ Beton Mutu f'c = 7,4 MPa (K-100) slum (3-6) cm, w/c = 0,87
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.6500 90,000.00 148,500.00
Tukang Batu OH 0.2750 105,000.00 28,875.00
Kepala Tukang OH 0.0280 135,000.00 3,780.00
Mandor OH 0.0830 165,000.00 13,695.00
B BAHAN
Semen Portland (PC) Kg 247.0000 1,800.00 444,600.00
Pasir Beton M³ 0.6207 450,000.00 279,321.43
Batu Pecah 2 - 3 cm M³ 0.7400 380,000.00 281,200.00
Air Liter 215.0000 200.00 43,000.00
C PERALATAN
1 M³ Lantai Kerja Beton Mutu f'c = 7,4 MPa (K-100) slum (3-6) cm, w/c = 0,87
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.2000 90,000.00 108,000.00
Tukang Batu OH 0.2000 105,000.00 21,000.00
Kepala Tukang OH 0.0200 135,000.00 2,700.00
Mandor OH 0.0600 165,000.00 9,900.00
B BAHAN
Semen Portland (PC) Kg 230.0000 1,800.00 414,000.00
Pasir Beton M³ 0.6379 450,000.00 287,035.71
Batu Pecah 2 - 3 cm M³ 0.7607 380,000.00 289,081.48
Air Liter 200.0000 200.00 40,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.6500 90,000.00 148,500.00
Tukang Batu OH 0.2750 105,000.00 28,875.00
Kepala Tukang OH 0.0280 135,000.00 3,780.00
Mandor OH 0.0830 165,000.00 13,695.00
B BAHAN
Semen Portland (PC) Kg 352.0000 1,800.00 633,600.00
Pasir Beton M³ 0.5221 450,000.00 234,964.29
Batu Pecah 2 - 3 cm M³ 0.7637 380,000.00 290,207.41
Air Liter 215.0000 200.00 43,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.6500 90,000.00 148,500.00
Tukang Batu OH 0.2750 105,000.00 28,875.00
Kepala Tukang OH 0.0280 135,000.00 3,780.00
Mandor OH 0.0830 165,000.00 13,695.00
B BAHAN
Semen Portland (PC) Kg 371.0000 1,800.00 667,800.00
Pasir Beton M³ 0.4986 450,000.00 224,357.14
Batu Pecah 2 - 3 cm M³ 0.7756 380,000.00 294,711.11
Air Liter 215.0000 200.00 43,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.6500 90,000.00 148,500.00
Tukang Batu OH 0.2750 105,000.00 28,875.00
Kepala Tukang OH 0.0280 135,000.00 3,780.00
Mandor OH 0.0830 165,000.00 13,695.00
B BAHAN
Semen Portland (PC) Kg 413.0000 1,800.00 743,400.00
Pasir Beton M³ 0.4864 450,000.00 218,892.86
Batu Pecah 2 - 3 cm M³ 0.7563 380,000.00 287,392.59
Air Liter 215.0000 200.00 43,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0070 90,000.00 630.00
Tukang Besi OH 0.0070 105,000.00 735.00
Kepala Tukang OH 0.0007 135,000.00 94.50
Mandor OH 0.0004 165,000.00 66.00
B BAHAN
Besi Beton Polos / Ulir Kg 1.0500 22,000.00 23,100.00
Kawat Ikat Beton (Bendrat) Kg 0.0150 27,000.00 405.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.5200 90,000.00 46,800.00
Tukang Kayu OH 0.2600 105,000.00 27,300.00
Kepala Tukang OH 0.0260 135,000.00 3,510.00
Mandor OH 0.0260 165,000.00 4,290.00
B BAHAN
Kayu Kelas III M³ 0.0400 3,025,000.00 121,000.00
Paku 5 - 12 cm Kg 0.3000 25,000.00 7,500.00
Minyak Bekisting Liter 0.1000 14,000.00 1,400.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.5200 90,000.00 46,800.00
Tukang Kayu OH 0.2600 105,000.00 27,300.00
Kepala Tukang OH 0.0260 135,000.00 3,510.00
Mandor OH 0.0260 165,000.00 4,290.00
B BAHAN
Kayu Kelas III M³ 0.0450 3,025,000.00 136,125.00
Paku 5 - 12 cm Kg 0.3000 25,000.00 7,500.00
Minyak Bekisting Liter 0.1000 14,000.00 1,400.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.6600 90,000.00 59,400.00
Tukang Kayu OH 0.3300 105,000.00 34,650.00
Kepala Tukang OH 0.0330 135,000.00 4,455.00
Mandor OH 0.0330 165,000.00 5,445.00
B BAHAN
Kayu Kelas III M³ 0.0400 3,025,000.00 121,000.00
Paku 5 - 12 cm Kg 0.4000 25,000.00 10,000.00
Minyak Bekisting Liter 0.2000 14,000.00 2,800.00
Balok Kayu Kelas II M³ 0.0150 3,300,000.00 49,500.00
Plywood 9 mm Lbr 0.3500 165,000.00 57,750.00
Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg 2.0000 15,000.00 30,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.6600 90,000.00 59,400.00
Tukang Kayu OH 0.3300 105,000.00 34,650.00
Kepala Tukang OH 0.0330 135,000.00 4,455.00
Mandor OH 0.0330 165,000.00 5,445.00
B BAHAN
Kayu Kelas III M³ 0.0400 3,025,000.00 121,000.00
Paku 5 - 12 cm Kg 0.4000 25,000.00 10,000.00
Minyak Bekisting Liter 0.2000 14,000.00 2,800.00
Balok Kayu Kelas II M³ 0.0180 3,300,000.00 59,400.00
Plywood 9 mm Lbr 0.3500 165,000.00 57,750.00
Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg 2.0000 15,000.00 30,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.6600 90,000.00 59,400.00
Tukang Kayu OH 0.3300 105,000.00 34,650.00
Kepala Tukang OH 0.0330 135,000.00 4,455.00
Mandor OH 0.0330 165,000.00 5,445.00
B BAHAN
Kayu Kelas III M³ 0.0400 3,025,000.00 121,000.00
Paku 5 - 12 cm Kg 0.4000 25,000.00 10,000.00
Minyak Bekisting Liter 0.2000 14,000.00 2,800.00
Balok Kayu Kelas II M³ 0.0150 3,300,000.00 49,500.00
Plywood 9 mm Lbr 0.3500 165,000.00 57,750.00
Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg 6.0000 15,000.00 90,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.6600 90,000.00 59,400.00
Tukang Kayu OH 0.3300 105,000.00 34,650.00
Kepala Tukang OH 0.0330 135,000.00 4,455.00
Mandor OH 0.0330 165,000.00 5,445.00
B BAHAN
Kayu Kelas III M³ 0.0300 3,025,000.00 90,750.00
Paku 5 - 12 cm Kg 0.4000 25,000.00 10,000.00
Minyak Bekisting Liter 0.2000 14,000.00 2,800.00
Balok Kayu Kelas II M³ 0.0200 3,300,000.00 66,000.00
Plywood 9 mm Lbr 0.3500 165,000.00 57,750.00
Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg 3.0000 15,000.00 45,000.00
Penjaga Jarak Bekisting / Spacer Bh 4.0000 11,000.00 44,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.6600 90,000.00 59,400.00
Tukang Kayu OH 0.3300 105,000.00 34,650.00
Kepala Tukang OH 0.0330 135,000.00 4,455.00
Mandor OH 0.0330 165,000.00 5,445.00
B BAHAN
Kayu Kelas III M³ 0.0300 3,025,000.00 90,750.00
Paku 5 - 12 cm Kg 0.4000 25,000.00 10,000.00
Minyak Bekisting Liter 0.1500 14,000.00 2,100.00
Balok Kayu Kelas II M³ 0.0150 3,300,000.00 49,500.00
Plywood 9 mm Lbr 0.3500 165,000.00 57,750.00
Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg 2.0000 15,000.00 30,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.2970 90,000.00 26,730.00
Tukang Batu OH 0.0330 105,000.00 3,465.00
Tukang Kayu OH 0.0330 105,000.00 3,465.00
Tukang Besi OH 0.0330 105,000.00 3,465.00
Kepala Tukang OH 0.0100 135,000.00 1,350.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Kayu Kelas III M³ 0.0030 3,025,000.00 9,075.00
Paku 5 - 12 cm Kg 0.0200 25,000.00 500.00
Minyak Bekisting Liter 0.0600 14,000.00 840.00
Besi Beton Polos Kg 3.6000 21,000.00 75,600.00
Kawat Ikat Beton (Bendrat) Kg 0.0500 27,000.00 1,350.00
Semen Portland (PC) Kg 5.5000 1,800.00 9,900.00
Pasir Beton M³ 0.0090 450,000.00 4,050.00
Batu Pecah 2 - 3 cm M³ 0.0150 380,000.00 5,700.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0600 90,000.00 5,400.00
Tukang Las OH 0.0600 105,000.00 6,300.00
Kepala Tukang OH 0.0060 135,000.00 810.00
Mandor OH 0.0030 165,000.00 495.00
B BAHAN
Profil Baja Kg 1.1500 24,000.00 27,600.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Besi Konstruksi OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0010 135,000.00 135.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Solar Liter 1.0000 13,000.00 13,000.00
Minyak Pelumas Liter 0.1000 50,000.00 5,000.00
C PERALATAN
Sewa Alat Baja Jam 0.8000 275,000.00 220,000.00
JUMLAH HARGA 258,460.00
OVERHEAD & PROFIT 15 % 38,769.00
HARGA SATUAN PEKERJAAN 297,229.00
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.0500 90,000.00 94,500.00
Tukang Las OH 1.0500 105,000.00 110,250.00
Kepala Tukang OH 0.1050 135,000.00 14,175.00
Mandor OH 0.0520 165,000.00 8,580.00
B BAHAN
Besi Hollow 30 x 30 Kg 15.0000 24,000.00 360,000.00
Besi Plat Baja, t = 2 mm Kg 32.8000 24,000.00 787,200.00
Kawat Las Kg 0.0500 165,000.00 8,250.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.0000 90,000.00 90,000.00
Tukang Aluminium OH 1.0000 105,000.00 105,000.00
Kepala Tukang OH 0.1000 135,000.00 13,500.00
Mandor OH 0.0500 165,000.00 8,250.00
B BAHAN
Rolling Door Aluminium M² 1.1000 721,000.00 793,100.00
Aksessories % 25.0000 721,000.00 180,250.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.2000 90,000.00 108,000.00
Tukang Las OH 1.2000 105,000.00 126,000.00
Kepala Tukang OH 0.1200 135,000.00 16,200.00
Mandor OH 0.0060 165,000.00 990.00
B BAHAN
Folding Gate M² 1.1000 1,381,000.00 1,519,100.00
Aksessories % 30.0000 1,381,000.00 414,300.00
C PERALATAN
1 M¹ Kusen Aluminium
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0430 90,000.00 3,870.00
Tukang Aluminium OH 0.0430 105,000.00 4,515.00
Kepala Tukang OH 0.0043 135,000.00 580.50
Mandor OH 0.0021 165,000.00 346.50
B BAHAN
Profil Aluminium M¹ 1.1000 150,000.00 165,000.00
Sekrup Fischer Bh 2.0000 35,000.00 70,000.00
Sealant Tube 0.0600 65,000.00 3,900.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0850 90,000.00 7,650.00
Tukang Aluminium OH 0.0850 105,000.00 8,925.00
Kepala Tukang OH 0.0085 135,000.00 1,147.50
Mandor OH 0.0042 165,000.00 693.00
B BAHAN
Profil Aluminium M¹ 4.4000 150,000.00 660,000.00
Aluminium Strip M¹ 14.6000 105,000.00 1,533,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0850 90,000.00 7,650.00
Tukang Aluminium OH 0.0850 105,000.00 8,925.00
Kepala Tukang OH 0.0090 135,000.00 1,215.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Profil Aluminium M¹ 4.4000 150,000.00 660,000.00
Profil Kaca M¹ 4.5000 28,000.00 126,000.00
Sealant Tube 0.2700 65,000.00 17,550.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0850 90,000.00 7,650.00
Tukang Aluminium OH 0.0850 105,000.00 8,925.00
Kepala Tukang OH 0.0090 135,000.00 1,215.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Profil Aluminium 1,2 x 2" M¹ 4.4000 100,000.00 440,000.00
Profil Kaca M¹ 4.5000 28,000.00 126,000.00
Sealant Tube 0.2700 65,000.00 17,550.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3500 90,000.00 31,500.00
Tukang Aluminium OH 0.3500 105,000.00 36,750.00
Kepala Tukang OH 0.0350 135,000.00 4,725.00
Mandor OH 0.0180 165,000.00 2,970.00
B BAHAN
Rangka Hollow Galvalum 40 x 40 mm M¹ 4.0000 25,000.00 100,000.00
Aksessoris (Perkuatan, dll) % 100.0000 25,000.00 25,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.4750 90,000.00 42,750.00
Tukang Besi OH 0.4750 105,000.00 49,875.00
Kepala Tukang OH 0.0475 135,000.00 6,412.50
Mandor OH 0.02 165,000.00 3,918.75
B BAHAN
Besi Siku L 40.40.4 Kg 7.6125 24,000.00 182,700.00
Wiremesh M6 M² 1.0500 105,000.00 110,250.00
Kawat Las Kg 0.1000 165,000.00 16,500.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.6050 90,000.00 54,450.00
Tukang Besi OH 0.6050 105,000.00 63,525.00
Kepala Tukang OH 0.0605 135,000.00 8,167.50
Mandor OH 0.03 165,000.00 4,991.25
B BAHAN
Besi Siku L 30.30.3 Kg 2.4208 24,000.00 58,098.00
Besi Plat Strip 3x30 mm Kg 7.0380 24,000.00 168,912.00
Kawat Las Kg 0.2250 165,000.00 37,125.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Tukang Batu OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0100 135,000.00 1,350.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Bata Merah Bh 70.0000 2,200.00 154,000.00
Semen Portland (PC) Kg 14.3700 1,800.00 25,866.00
Pasir Pasang M³ 0.0400 450,000.00 18,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Tukang Batu OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0100 135,000.00 1,350.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Bata Merah Bh 70.0000 2,200.00 154,000.00
Semen Portland (PC) Kg 11.5000 1,800.00 20,700.00
Pasir Pasang M³ 0.0430 450,000.00 19,350.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Tukang Batu OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0100 135,000.00 1,350.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Roster uk. 40 x 20 x 10 Bh 13.0000 17,000.00 221,000.00
Semen Portland (PC) Kg 11.0000 1,800.00 19,800.00
Pasir Pasang M³ 0.0350 450,000.00 15,750.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Tukang Batu OH 0.1500 105,000.00 15,750.00
Kepala Tukang OH 0.0150 135,000.00 2,025.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Semen Portland (PC) Kg 10.2240 1,800.00 18,403.20
Pasir Pasang M³ 0.0200 450,000.00 9,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Tukang Batu OH 0.1500 105,000.00 15,750.00
Kepala Tukang OH 0.0150 135,000.00 2,025.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Semen Portland (PC) Kg 7.7760 1,800.00 13,996.80
Pasir Pasang M³ 0.0230 450,000.00 10,350.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Tukang Batu OH 0.1500 105,000.00 15,750.00
Kepala Tukang OH 0.0150 135,000.00 2,025.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Semen Portland (PC) Kg 6.2400 1,800.00 11,232.00
Pasir Pasang M³ 0.0240 450,000.00 10,800.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0800 90,000.00 7,200.00
Tukang Batu OH 0.4000 105,000.00 42,000.00
Kepala Tukang OH 0.0400 135,000.00 5,400.00
Mandor OH 0.0040 165,000.00 660.00
B BAHAN
Semen Portland (PC) Kg 0.5000 1,800.00 900.00
Pasir Pasang M³ 0.0130 450,000.00 5,850.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.2000 90,000.00 18,000.00
Tukang Batu OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0100 135,000.00 1,350.00
Mandor OH 0.0100 165,000.00 1,650.00
B BAHAN
Semen Portland (PC) Kg 3.2500 1,800.00 5,850.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.7000 90,000.00 63,000.00
Tukang Batu OH 0.3500 105,000.00 36,750.00
Kepala Tukang OH 0.0350 135,000.00 4,725.00
Mandor OH 0.0350 165,000.00 5,775.00
B BAHAN
Keramik uk. 30 x 30 cm Anti Selip Bh 11.8700 22,000.00 261,140.00
Semen Portland (PC) Kg 10.0000 1,800.00 18,000.00
Semen Warna Kg 0.6000 5,000.00 3,000.00
Pasir Pasang M³ 0.0450 450,000.00 20,250.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.7000 90,000.00 63,000.00
Tukang Batu OH 0.3500 105,000.00 36,750.00
Kepala Tukang OH 0.0350 135,000.00 4,725.00
Mandor OH 0.0350 165,000.00 5,775.00
B BAHAN
Keramik uk. 40 x 40 cm Anti Selip Bh 6.6300 42,000.00 278,460.00
Semen Portland (PC) Kg 9.8000 1,800.00 17,640.00
Semen Warna Kg 0.6000 5,000.00 3,000.00
Pasir Pasang M³ 0.0450 450,000.00 20,250.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.7000 90,000.00 63,000.00
Tukang Batu OH 0.3500 105,000.00 36,750.00
Kepala Tukang OH 0.0350 135,000.00 4,725.00
Mandor OH 0.0350 165,000.00 5,775.00
B BAHAN
Keramik uk. 40 x 40 cm Licin Bh 6.6300 41,000.00 271,830.00
Semen Portland (PC) Kg 9.8000 1,800.00 17,640.00
Semen Warna Kg 0.6000 5,000.00 3,000.00
Pasir Pasang M³ 0.0450 450,000.00 20,250.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.9000 90,000.00 81,000.00
Tukang Batu OH 0.4500 105,000.00 47,250.00
Kepala Tukang OH 0.0450 135,000.00 6,075.00
Mandor OH 0.0450 165,000.00 7,425.00
B BAHAN
Keramik Dinding uk. 30 x 60 cm Bh 5.9500 50,000.00 297,500.00
Semen Portland (PC) Kg 9.3000 1,800.00 16,740.00
Semen Warna Kg 1.9400 5,000.00 9,700.00
Pasir Pasang M³ 0.0180 450,000.00 8,100.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0900 90,000.00 8,100.00
Tukang Batu OH 0.0900 105,000.00 9,450.00
Kepala Tukang OH 0.0090 135,000.00 1,215.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Plint Keramik ukuran 10 x 40 cm Bh 2.6500 15,000.00 39,750.00
Semen Portland (PC) Kg 1.1400 1,800.00 2,052.00
Semen Warna Kg 0.1000 5,000.00 500.00
Pasir Pasang M³ 0.0030 450,000.00 1,350.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Kayu OH 0.0500 105,000.00 5,250.00
Kepala Tukang OH 0.0050 135,000.00 675.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Gypsum Board 9 mm Lbr 0.3640 154,000.00 56,056.00
Paku Sekrup Kg 0.1100 36,000.00 3,960.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Kayu OH 0.0500 105,000.00 5,250.00
Kepala Tukang OH 0.0050 135,000.00 675.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Kalsi Board 4 mm Lbr 0.3640 99,000.00 36,036.00
Paku Sekrup Kg 0.1100 36,000.00 3,960.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Kayu OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0100 135,000.00 1,350.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
GRC 9 mm Lbr 0.3640 264,000.00 96,096.00
Paku Sekrup Kg 0.1100 36,000.00 3,960.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0600 90,000.00 5,400.00
Tukang Kayu OH 0.0600 105,000.00 6,300.00
Kepala Tukang OH 0.0060 135,000.00 810.00
Mandor OH 0.0030 165,000.00 495.00
B BAHAN
List Plafond Gypsum M¹ 1.0500 25,000.00 26,250.00
Tepung Gypsum Kg 0.1500 63,000.00 9,450.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1500 90,000.00 13,500.00
Tukang Kayu OH 0.7500 105,000.00 78,750.00
Kepala Tukang OH 0.0800 135,000.00 10,800.00
Mandor OH 0.0060 165,000.00 990.00
B BAHAN
Atap Zincalume t = 0,4 mm M² 1.0500 99,000.00 103,950.00
Paku Hak Panjang 15 cm Kg 0.0200 83,000.00 1,660.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1500 90,000.00 13,500.00
Tukang Kayu OH 0.7500 105,000.00 78,750.00
Kepala Tukang OH 0.0800 135,000.00 10,800.00
Mandor OH 0.0060 165,000.00 990.00
B BAHAN
Atap Transparan Zincalume t = 0,4 mm M² 1.0500 105,000.00 110,250.00
Paku Hak Panjang 15 cm Kg 0.0200 83,000.00 1,660.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1500 90,000.00 13,500.00
Tukang Kayu OH 0.7500 105,000.00 78,750.00
Kepala Tukang OH 0.0800 135,000.00 10,800.00
Mandor OH 0.0060 165,000.00 990.00
B BAHAN
Multipleks 6 mm Lbr 0.3640 110,000.00 40,040.00
Aluminium Foil Single Side Woven M² 1.2000 17,000.00 20,400.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Kayu OH 1.0000 105,000.00 105,000.00
Kepala Tukang OH 0.1000 135,000.00 13,500.00
Mandor OH 0.0500 165,000.00 8,250.00
B BAHAN
Nok Atap Zincalume t = 0,4 mm M¹ 1.2000 88,000.00 105,600.00
Paku Hak Panjang 15 cm Kg 0.0400 83,000.00 3,320.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Kayu OH 1.0000 105,000.00 105,000.00
Kepala Tukang OH 0.1000 135,000.00 13,500.00
Mandor OH 0.0500 165,000.00 8,250.00
B BAHAN
Wall Flasing Zincalume t = 0,4 mm M¹ 1.2000 83,000.00 99,600.00
Paku Hak Panjang 15 cm Kg 0.0400 83,000.00 3,320.00
Semen Portland (PC) Kg 5.5000 1,800.00 9,900.00
Pasir Pasang M³ 0.0150 450,000.00 6,750.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Kayu OH 0.2000 105,000.00 21,000.00
Kepala Tukang OH 0.0200 135,000.00 2,700.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Lisplank GRC Lebar 20 cm M¹ 1.1000 35,000.00 38,500.00
Paku Sekrup Kg 0.0500 36,000.00 1,800.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Kayu OH 0.2000 105,000.00 21,000.00
Kepala Tukang OH 0.0200 135,000.00 2,700.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Lisplank GRC Lebar 15 cm M¹ 1.1000 25,000.00 27,500.00
Paku Sekrup Kg 0.0500 36,000.00 1,800.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.2470 90,000.00 22,230.00
Tukang Besi OH 0.1760 105,000.00 18,480.00
Kepala Tukang OH 0.1170 135,000.00 15,795.00
Mandor OH 0.2800 165,000.00 46,200.00
B BAHAN
Main Truss C 80.0,75 M¹ 3.0000 46,000.00 138,000.00
Roof Bottom R 35-0,75 M¹ 2.5000 35,000.00 87,500.00
Self Drilling Screw dia.6x20 mm
Bh 35.0000 800.00 28,000.00
(Trsuss Screw)
Self Drilling Screw dia.4x16 mm (Roof
Bh 1.5000 500.00 750.00
bottom Screw)
Dynabolt dia.10 x 80 mm Bh 1.0000 1,000.00 1,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0100 90,000.00 900.00
Tukang Kayu OH 0.5000 105,000.00 52,500.00
Kepala Tukang OH 0.0500 135,000.00 6,750.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Kunci Tanam Bh 1.0000 330,000.00 330,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0150 90,000.00 1,350.00
Tukang Kayu OH 0.1500 105,000.00 15,750.00
Kepala Tukang OH 0.0150 135,000.00 2,025.00
Mandor OH 0.0008 165,000.00 132.00
B BAHAN
Engsel Pintu Bh 1.0000 39,000.00 39,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0500 90,000.00 4,500.00
Tukang Kayu OH 0.5000 105,000.00 52,500.00
Kepala Tukang OH 0.0500 135,000.00 6,750.00
Mandor OH 0.0030 165,000.00 495.00
B BAHAN
Door Closer Bh 1.0000 220,000.00 220,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0200 90,000.00 1,800.00
Tukang Kayu OH 0.2000 105,000.00 21,000.00
Kepala Tukang OH 0.0200 135,000.00 2,700.00
Mandor OH 0.0010 165,000.00 165.00
B BAHAN
Gerendel Pintu Bh 1.0000 39,000.00 39,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0200 90,000.00 1,800.00
Tukang Kayu OH 0.2000 105,000.00 21,000.00
Kepala Tukang OH 0.0200 135,000.00 2,700.00
Mandor OH 0.0010 165,000.00 165.00
B BAHAN
Handle Pintu Bh 1.0000 275,000.00 275,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0150 90,000.00 1,350.00
Tukang Kayu OH 0.1500 105,000.00 15,750.00
Kepala Tukang OH 0.0150 135,000.00 2,025.00
Mandor OH 0.0008 165,000.00 132.00
B BAHAN
Kaca 5 mm M² 1.1000 182,000.00 200,200.00
Sealant Tube 0.0500 65,000.00 3,250.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0150 90,000.00 1,350.00
Tukang Aluminium OH 0.1500 105,000.00 15,750.00
Kepala Tukang OH 0.0150 135,000.00 2,025.00
Mandor OH 0.0008 165,000.00 132.00
B BAHAN
Kaca Naco 5 mm M² 1.2000 182,000.00 218,400.00
Perlengkapan % 35.0000 182,000.00 63,700.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0200 90,000.00 1,800.00
Tukang Cat OH 0.0630 105,000.00 6,615.00
Kepala Tukang OH 0.0063 135,000.00 850.50
Mandor OH 0.0030 165,000.00 495.00
B BAHAN
Plamur Kg 0.1000 22,000.00 2,200.00
Cat Dasar Tembok Exterior Kg 0.1000 40,000.00 4,000.00
Cat Penutup Tembok Exterior Kg 0.2600 61,000.00 15,860.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0200 90,000.00 1,800.00
Tukang Cat OH 0.0630 105,000.00 6,615.00
Kepala Tukang OH 0.0063 135,000.00 850.50
Mandor OH 0.0030 165,000.00 495.00
B BAHAN
Plamur Kg 0.1000 22,000.00 2,200.00
Cat Dasar Tembok Interior Kg 0.1000 40,000.00 4,000.00
Cat Penutup Tembok Interior Kg 0.2600 50,000.00 13,000.00
C PERALATAN
1 M² Pengecatan Plafond
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0200 90,000.00 1,800.00
Tukang Cat OH 0.0630 105,000.00 6,615.00
Kepala Tukang OH 0.0063 135,000.00 850.50
Mandor OH 0.0030 165,000.00 495.00
B BAHAN
Plamur Kg 0.1000 22,000.00 2,200.00
Cat Dasar Tembok Interior Kg 0.1000 40,000.00 4,000.00
Cat Penutup Tembok Interior Kg 0.2600 50,000.00 13,000.00
Roll Bh 0.0100 21,000.00 210.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0200 90,000.00 1,800.00
Tukang Cat OH 0.2000 105,000.00 21,000.00
Kepala Tukang OH 0.0200 135,000.00 2,700.00
Mandor OH 0.0025 165,000.00 412.50
B BAHAN
Cat Meni Besi Kg 0.1000 49,000.00 4,900.00
Kuas Bh 0.0100 14,000.00 140.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0700 90,000.00 6,300.00
Tukang Cat OH 0.0090 105,000.00 945.00
Kepala Tukang OH 0.0060 135,000.00 810.00
Mandor OH 0.0030 165,000.00 495.00
B BAHAN
Cat Meni Besi Kg 0.2000 49,000.00 9,800.00
Pengencer Cat / Thinner Liter 0.0300 37,000.00 1,110.00
Cat Dasar Besi Kg 0.1700 51,000.00 8,670.00
Cat Penutup Besi Kg 0.2600 61,000.00 15,860.00
Kuas Bh 0.0100 14,000.00 140.00
Amplas Lbr 0.2000 7,500.00 1,500.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.0000 90,000.00 90,000.00
Tukang Batu OH 1.5000 105,000.00 157,500.00
Kepala Tukang OH 0.1500 135,000.00 20,250.00
Mandor OH 0.1600 165,000.00 26,400.00
B BAHAN
Kloset Jongkok Unit 1.0000 500,000.00 500,000.00
Semen Portland (PC) Kg 6.0000 1,800.00 10,800.00
Pasir Pasang M³ 0.0100 450,000.00 4,500.00
C PERALATAN
1 Bh Pasang Urinoir
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.0000 90,000.00 90,000.00
Tukang Batu OH 1.0000 105,000.00 105,000.00
Kepala Tukang OH 0.1000 135,000.00 13,500.00
Mandor OH 0.0500 165,000.00 8,250.00
B BAHAN
Urinoir Unit 1.0000 1,265,000.00 1,265,000.00
Semen Portland (PC) Kg 6.0000 1,800.00 10,800.00
Pasir Pasang M³ 0.0100 450,000.00 4,500.00
Perlengkapan % 30.0000 1,265,000.00 379,500.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 1.2000 90,000.00 108,000.00
Tukang Batu OH 1.4500 105,000.00 152,250.00
Kepala Tukang OH 0.1500 135,000.00 20,250.00
Mandor OH 0.0600 165,000.00 9,900.00
B BAHAN
Wastafel Dinding Unit 1.2000 825,000.00 990,000.00
Semen Portland (PC) Kg 6.0000 1,800.00 10,800.00
Pasir Pasang M³ 0.0100 450,000.00 4,500.00
Perlengkapan % 12.0000 825,000.00 99,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0100 90,000.00 900.00
Tukang Batu OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0100 135,000.00 1,350.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Floor Drain Stainless Unit 1.0000 72,000.00 72,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0100 90,000.00 900.00
Tukang Batu OH 0.1000 105,000.00 10,500.00
Kepala Tukang OH 0.0100 135,000.00 1,350.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Roof Drain Stainless Unit 1.0000 94,000.00 94,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0100 90,000.00 900.00
Tukang Batu OH 0.4000 105,000.00 42,000.00
Kepala Tukang OH 0.0400 135,000.00 5,400.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Kran Air 3/4" atau 1/2" Unit 1.0000 39,000.00 39,000.00
Sealtape Bh 0.0250 2,000.00 50.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0100 90,000.00 900.00
Tukang Batu OH 0.4000 105,000.00 42,000.00
Kepala Tukang OH 0.0400 135,000.00 5,400.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Stop Kran PVC 1" Unit 1.0000 44,000.00 44,000.00
Sealtape Bh 0.0250 2,000.00 50.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0100 90,000.00 900.00
Tukang Batu OH 0.4000 105,000.00 42,000.00
Kepala Tukang OH 0.0400 135,000.00 5,400.00
Mandor OH 0.0050 165,000.00 825.00
B BAHAN
Stop Kran Galvanis 1" Unit 1.0000 72,000.00 72,000.00
Sealtape Bh 0.0250 2,000.00 50.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0810 90,000.00 7,290.00
Tukang Pipa OH 0.1350 105,000.00 14,175.00
Kepala Tukang OH 0.0135 135,000.00 1,822.50
Mandor OH 0.0040 165,000.00 660.00
B BAHAN
Pipa PVC AW 4" M¹ 1.2000 116,000.00 139,200.00
Perlengkapan % 35.0000 116,000.00 40,600.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0810 90,000.00 7,290.00
Tukang Pipa OH 0.1350 105,000.00 14,175.00
Kepala Tukang OH 0.0135 135,000.00 1,822.50
Mandor OH 0.0040 165,000.00 660.00
B BAHAN
Pipa PVC AW 3" M¹ 1.2000 66,000.00 79,200.00
Perlengkapan % 35.0000 66,000.00 23,100.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0810 90,000.00 7,290.00
Tukang Pipa OH 0.1350 105,000.00 14,175.00
Kepala Tukang OH 0.0135 135,000.00 1,822.50
Mandor OH 0.0040 165,000.00 660.00
B BAHAN
Pipa PVC AW 2" M¹ 1.2000 44,000.00 52,800.00
Perlengkapan % 35.0000 44,000.00 15,400.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0360 90,000.00 3,240.00
Tukang Pipa OH 0.0600 105,000.00 6,300.00
Kepala Tukang OH 0.0060 135,000.00 810.00
Mandor OH 0.0020 165,000.00 330.00
B BAHAN
Pipa PVC AW 1" M¹ 1.2000 22,000.00 26,400.00
Perlengkapan % 35.0000 22,000.00 7,700.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0360 90,000.00 3,240.00
Tukang Pipa OH 0.0600 105,000.00 6,300.00
Kepala Tukang OH 0.0060 135,000.00 810.00
Mandor OH 0.0020 165,000.00 330.00
B BAHAN
Pipa PVC AW 3/4" M¹ 1.2000 19,000.00 22,800.00
Perlengkapan % 35.0000 19,000.00 6,650.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0360 90,000.00 3,240.00
Tukang Pipa OH 0.0600 105,000.00 6,300.00
Kepala Tukang OH 0.0060 135,000.00 810.00
Mandor OH 0.0020 165,000.00 330.00
B BAHAN
Pipa PVC AW 1/2" M¹ 1.2000 16,000.00 19,200.00
Perlengkapan % 35.0000 16,000.00 5,600.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0540 90,000.00 4,860.00
Tukang Pipa OH 0.0900 105,000.00 9,450.00
Kepala Tukang OH 0.0090 135,000.00 1,215.00
Mandor OH 0.0270 165,000.00 4,455.00
B BAHAN
Pipa Galvanis 1" M¹ 1.2000 94,000.00 112,800.00
Perlengkapan % 35.0000 94,000.00 32,900.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0540 90,000.00 4,860.00
Tukang Pipa OH 0.0900 105,000.00 9,450.00
Kepala Tukang OH 0.0090 135,000.00 1,215.00
Mandor OH 0.0270 165,000.00 4,455.00
B BAHAN
Pipa Galvanis 2" M¹ 1.2000 176,000.00 211,200.00
Perlengkapan % 35.0000 176,000.00 61,600.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0540 90,000.00 4,860.00
Tukang Pipa OH 0.0900 105,000.00 9,450.00
Kepala Tukang OH 0.0090 135,000.00 1,215.00
Mandor OH 0.0270 165,000.00 4,455.00
B BAHAN
Pipa Galvanis 1/2" M¹ 1.2000 52,000.00 62,400.00
Perlengkapan % 35.0000 52,000.00 18,200.00
C PERALATAN
Pembesian dengan Besi Polos atau Ulir Kg 64.69 27,030.75 1,754.33 1,862,058.53
PEKERJAAN LISTRIK
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3600 90,000.00 32,400.00
Tukang Listrik OH 0.6000 105,000.00 63,000.00
Kepala Tukang OH 0.0600 135,000.00 8,100.00
Mandor OH 0.0180 165,000.00 2,970.00
B BAHAN
Kabel NYM 3 x 2.5 mm M¹ 8.0000 20,000.00 160,000.00
Pipa Listrik PVC 3/8'' M¹ 3.0000 25,000.00 75,000.00
Tee Doz Bh 1.0000 7,000.00 7,000.00
Isolasi Listrik Bh 0.2000 6,000.00 1,200.00
Paku Klem Listrik Kg 0.3000 40,000.00 12,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0300 90,000.00 2,700.00
Tukang Listrik OH 0.3000 105,000.00 31,500.00
Kepala Tukang OH 0.0300 135,000.00 4,050.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Lampu SL 18 Watt Bh 1.0000 94,000.00 94,000.00
Downlight 10 cm Bh 1.0000 99,000.00 99,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0300 90,000.00 2,700.00
Tukang Listrik OH 0.3000 105,000.00 31,500.00
Kepala Tukang OH 0.0300 135,000.00 4,050.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Lampu TL RM 2 X 36 W Bh 1.0000 275,000.00 275,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0300 90,000.00 2,700.00
Tukang Listrik OH 0.3000 105,000.00 31,500.00
Kepala Tukang OH 0.0300 135,000.00 4,050.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Lampu TL RM 2 X 36 W + Battery Bh 1.0000 743,000.00 743,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0300 90,000.00 2,700.00
Tukang Listrik OH 0.3000 105,000.00 31,500.00
Kepala Tukang OH 0.0300 135,000.00 4,050.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Stop Kontak Bh 1.0000 40,000.00 40,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0300 90,000.00 2,700.00
Tukang Listrik OH 0.3000 105,000.00 31,500.00
Kepala Tukang OH 0.0300 135,000.00 4,050.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Saklar Tunggal Bh 1.0000 39,000.00 39,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0300 90,000.00 2,700.00
Tukang Listrik OH 0.3000 105,000.00 31,500.00
Kepala Tukang OH 0.0300 135,000.00 4,050.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Saklar Ganda Bh 1.0000 39,000.00 39,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.0300 90,000.00 2,700.00
Tukang Listrik OH 0.3000 105,000.00 31,500.00
Kepala Tukang OH 0.0300 135,000.00 4,050.00
Mandor OH 0.0150 165,000.00 2,475.00
B BAHAN
Exhaust Ceiling Fan Bh 1.0000 495,000.00 495,000.00
C PERALATAN
HARGA
NO. URAIAN PEKERJAAN KODE SAT. KOEF. JUMLAH HARGA
SATUAN
A TENAGA
Pekerja OH 0.3600 90,000.00 32,400.00
Tukang Listrik OH 0.6000 105,000.00 63,000.00
Kepala Tukang OH 0.0600 135,000.00 8,100.00
Mandor OH 0.0180 165,000.00 2,970.00
B BAHAN
Kabel Tray 300 x 100 mm M¹ 1.0500 330,000.00 346,500.00
Perlengkapan % 35.0000 330,000.00 115,500.00
C PERALATAN
HARGA UPAH