FORM LOADING TEST &

KONDISI ANGIN

Lokasi Erection Girer : …………….. Kecepatan Angin : ……………………

Bentang Girder : …………….. Load Beban : …………………..

Crane Typpe/ Kapasitas : …………………………………

Holding Time : …………….. Minute WIND


60/4=
15Mph

No Holding Type of Lift Heigh Before Lift Heigh After Down Turn Result
. Time Load

Note: 1. Cek penuruna Hidrolis Crane 3. Cek posisi drum wire sling
2. Cek Landasan Crane / ada taping tidak 4. Pastikan operator tidak memainkan boom

Comment : ___________________________________________________________________
___________________________________________________________________
___________________________________________________________________
Date: …………………………………..

Approved By: Check By:

(HSE Konsultan) (HSE Officer)