INSTALASI PENERANGAN Asrama Perawat, Asrama Pegawai Dan Mess Dokter R1-ASRAMA PERAWAT B
INSTALASI PENERANGAN Asrama Perawat, Asrama Pegawai Dan Mess Dokter R1-ASRAMA PERAWAT B
KETERANGAN:
Teras
-0.15
E
K. Mandi K. Mandi K. Mandi K. Mandi K. Mandi K. Mandi K. Mandi K. Mandi K. Mandi K. Mandi
+0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15
D
R. Cuci
-0.02
Unit Kamar Unit Kamar Unit Kamar Unit Kamar R. Bersama Unit Kamar Unit Kamar Unit Kamar Unit Kamar Unit Kamar Unit Kamar
1 2 3 4 ±0.00 5 6 7 8 9 10 KEMENTRIAN
Teras Teras
±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 PEKERJAAN UMUM DAN
-0.15 -0.15 PERUMAHAN RAKYAT
PROYEK
Dapur
PROYEK PEMBANGUNAN
±0.00 RUMAH SAKIT CORONA
DI PULAU GALANG
B
DISETUJUI OLEH :
Koridor
Koridor Koridor Koridor -0.05 Koridor Koridor Koridor KEMENTRIAN
-0.02 -0.02 -0.02 -0.02 -0.02 -0.02 PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT
A
Teras PEJABAT PEMBUAT KOMITMEN
PEMBANGUNAN RUMAH SAKIT CORONA
-0.15
NAMA TANGGAL TANDA TANGAN
NAMA
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Jl. Hangtuah Raya No.26, Kebayoran baru-Jakarta Selatan
DIBUAT OLEH :
KONTRAKTOR
DIPERIKSA OLEH
DIGAMBAR OLEH
ANTO' 18/03/2020
JUDUL GAMBAR
INSTALASI PENERANGAN
ASRAMA PERAWAT B
1 : 125 A3 0
TANGGAL NOMOR GAMBAR LEMBAR
18/03/2020 MEP-EL-RENOV-202 1