How to get the Firm Planned orders from PS into ASCP without passing it directly
to ERP server? How
to stop them at PDS Level ?
--------------------------------------------------------------------------------
---------
How does one create works orders in ERP from manually created Works Orders in Pr
oduct Scheduling
(PS)
Solution
At present this is not supported functionality. It is not possible to create Wor
ks Orders (and
OPM Batches) in the ERP instance from manually created Works Orders in PS
--------------------------------------------------------------------------------
------------------
How does one create works orders in ERP from manually created Works Orders in Pr
oduct Scheduling
(PS)
Solution
At present this is not supported functionality. It is not possible to create Wor
ks Orders (and
OPM Batches) in the ERP instance from manually created Works Orders in PS
To see these firmed planned orders, you will have to attach the PS Plan created
to the ASCP Plan
in the ASCP Plan options in the Org tab. The Horizon of 30 days same as PS plan
needs to be given.
Rerun of ASCP Plan is necessary to see these Firm Planned orders.
--------------------------------------------------------------------------------
------------
--------------------------------------------------------------------------------
----
Production Scheduling (PS) February 2011 Business Scenarios and Answers [ID 1290
503.1]
Oracle Production Scheduling Release Notes, Release 12.1.3 [ID 1081458.1]
Discrete and Process Manufacturing Product Resource Guide [ID 1081971.1]
**Demo Test Case Of Production Scheduler (PS) Integration With ASCP - Functional