Anda di halaman 1dari 2

Bond Trading Est.

Data Date: 24-Oct-09


PROJECT :PENTOMINIUM TOWER
ELECTRICAL WORKS
Status of Area Handover vs Baseline Current Progress
AREA HANDOVER / CLEARANCES BTE CURRENT PROGRESS STATUS

EMBEDDMENTSERVICES First Fix - Conduits, Trays & Trunkings Second Fix - Wiring/Cable laying & DB Installation Final Fix - Installation of Field Devices & Panels
Civil Clearance for

Removal of thermocol and

/BMS/Security Systems &


Civil Clearance for Block Wall Electrical- Shaft

MCC/EMCC Installation
DBS/SMDB Installation

Cable glanding to LLDB


Termination and Cable
Final Fix Ceiling

BUS BARS Installation


Marking and Fixing of

Wiring For Lighting &


Insatllation GI Conduits

Lightning Protection
Emergency Lighting

Emergency Lihgting
1st Fix Clearance Area Handover Columns/Walls/Co BEAMS AND TOP

Connection to DBS

Fire Alarm devices


Clearance

Cable trays /Trunking


LEVEL

AREA re Walls SLAB

Cabling For FA
REMARKS

installation
DESCRIPTION

supports
cleaning

Power
Installaiton
Planned Planned Planned Planned Planned Planned
vs vs vs vs vs vs
Actual Actual Actual Actual Actual Actual

Planned 15-Apr-10 - - - 8-Dec-09 10-Jan-10 18-Apr-01 21-Apr-10 - - - - - - - - - - - -


Area-1 Parking and Drive way
- - - 22-Jan-10 10-Feb-10 23-May-10 - - - - - - - - - - - - -
Actual
Planned 15-May-10 - - - - - - - - - - - - - - - - -
Area-2(Electrical Room)
- - - - - - - - - - - - - - - -
Actual
BASEMENT - 6

Planned 15-Apr-10 - - - 2-Jun-10 5-Jun-10 - - - - - - - - - - - -


Area-3 Lift Lobby and Corridor Area
- - - - - - - - - - - - - - - -
Actual
Planned 15-Apr-10 - - - - - - - - - - - - - - - -
Area-4 Mechanical Plant Room
- - - - - - - - - - - - - - - -
Actual
Planned 15-Apr-10 - - - - - - - - - - - - - - - -
Area-5 Stair Case
- - - - - - - - - - - - - - -
Actual
Planned 8-Mar-10 15-Jan-10 15-Feb-10
Area-1 Parking and Drive way
6-Feb-10 12-Feb-10
Actual
Planned 7-Apr-10
Area-2(Electrical Room)
Actual
Planned 8-Mar-10
BASEMENT - 5

Area-3 Lift Lobby and Corridor Area


PENTOMINIUM TOWER

Actual
Planned 8-Mar-10
Area-4Stair Case
Actual

Actual

Planned 6-Apr-10 22-Feb-10 14-Mar-10


Area-1 Parking and Drive way
5-Mar-10
Actual

Planned 6-May-10
Area-2(Electrical Room)
Actual
6-Apr-10
BASEMENT - 4

Planned
Area-3 Lift Lobby and Corridor Area
Actual

Planned 6-Apr-10
Area-4Stair Case
Actual

Planned 2-May-10 22-Mar-10 8-Apr-10


Area-1 Parking and Drive way
25-Mar-10
Actual
Planned 1-Jun-10
Area-2(Electrical Room)
Actual
Planned 2-May-10
BASEMENT - 3

Area-3 Lift Lobby and Corridor Area


Actual
Planned 2-May-10
Area-4Stair Case
Actual

Planned 29-May-10 17-Apr-10 5-May-10


Area-1 Parking and Drive way
Actual
Planned 28-Jun-10
Area-2(Electrical Room)
Actual
Planned 29-May-10
BASEMENT - 2

Area-3 Lift Lobby and Corridor Area


Actual
Planned 29-May-10
Area-4Stair Case
Actual
Carpark - C 2

Planned 1-Jul-10 16-May-10 6-Jun-10


Area-1 Parking and Drive way
Actual
Planned 31-Jul-10
Area-2(Electrical Room)
Actual
Planned 1-Jul-10
Area-3 Lift Lobby and Corridor Area
BASEMENT - 1

Actual
Planned 1-Jul-10
Area-4Stair Case
Actual

Planned 2-Aug-10
Area-1 Parking and Drive way
Actual
Planned 1-Sep-10
Area-2(Electrical Room)
Actual
Planned 2-Aug-10
Area-3 Lift Lobby and Corridor Area
Actual
Planned
Area-4 LV Room /Substation
Grund Floor

Actual
Planned 2-Aug-10
Area-5 Transformer Room
Actual
Planned 2-Aug-10
Area-6 Dewa/RMU & Meter control Room
Actual
Planned 2-Aug-10
Area-7 BMS/Security & Fire Command Centre
Actual
Planned 2-Aug-10
Area-8 Stair Case Area
Actual

Summary - Planned vs Actual

Total 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0

Cumulative Planned till date

Cumulative Actual till date 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Variance

002060Page 1 of 2
Bond Trading Est. Data Date: 24-Oct-09
Areas of Concerns:
1)
2)
3) LEGEND

4)
WORK COMPLETE complete
5)
6)

Total count of cells 0 3 8 9 9 9 9 9 9 9 9 9 9 9 9


Count of cells with "-" 0 1 7 9 9 9 9 9 9 9 9 9 9 9 9
Count of cells for existing title
Count of cells with "complete"
Count of cells with dates <= Data Date
(Date to be updated each time)