EMBEDDMENTSERVICES First Fix - Conduits, Trays & Trunkings Second Fix - Wiring/Cable laying & DB Installation Final Fix - Installation of Field Devices & Panels
Civil Clearance for
MCC/EMCC Installation
DBS/SMDB Installation
Lightning Protection
Emergency Lighting
Emergency Lihgting
1st Fix Clearance Area Handover Columns/Walls/Co BEAMS AND TOP
Connection to DBS
Cabling For FA
REMARKS
installation
DESCRIPTION
supports
cleaning
Power
Installaiton
Planned Planned Planned Planned Planned Planned
vs vs vs vs vs vs
Actual Actual Actual Actual Actual Actual
Actual
Planned 8-Mar-10
Area-4Stair Case
Actual
Actual
Planned 6-May-10
Area-2(Electrical Room)
Actual
6-Apr-10
BASEMENT - 4
Planned
Area-3 Lift Lobby and Corridor Area
Actual
Planned 6-Apr-10
Area-4Stair Case
Actual
Actual
Planned 1-Jul-10
Area-4Stair Case
Actual
Planned 2-Aug-10
Area-1 Parking and Drive way
Actual
Planned 1-Sep-10
Area-2(Electrical Room)
Actual
Planned 2-Aug-10
Area-3 Lift Lobby and Corridor Area
Actual
Planned
Area-4 LV Room /Substation
Grund Floor
Actual
Planned 2-Aug-10
Area-5 Transformer Room
Actual
Planned 2-Aug-10
Area-6 Dewa/RMU & Meter control Room
Actual
Planned 2-Aug-10
Area-7 BMS/Security & Fire Command Centre
Actual
Planned 2-Aug-10
Area-8 Stair Case Area
Actual
Total 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0
Variance
002060Page 1 of 2
Bond Trading Est. Data Date: 24-Oct-09
Areas of Concerns:
1)
2)
3) LEGEND
4)
WORK COMPLETE complete
5)
6)
002060Page 2 of 2