Anda di halaman 1dari 3

English Español 中文 Français Português Русский Norsk

Search NOV

You are here: NOV.com > Solutions > Drilling > Drill Bits > Advanced Drilling Solutions

SOLUTION CATEGORIES DRILL BIT ECONOMICS


Advanced Drilling Solutions Drill Bit Economics

More Ways to Browse


By Brand

Contact Us
By Brand
By Solution
By Location
General Inquiry
After Hours On-Call List
Description
Careers/Human Resources

myNOV Drill Bit Economics


Sign In

Drill bit economics consists of drilling curves, cost-per-interval and breakeven


analysis; all of w hich possess significant differences.

There are tw o types of drilling curves:


1. Depth vs. Time
2. Depth vs. Costs

Drilling costs are comprised of three different components:

Time
Rotating Time
Drilling / on bottom time
Non-drilling
Reaming / back reaming
Non-Rotating Time
Connections
Tripping
Circulating
Running Casing
Logging
Maintenance / Repair
Fishing

Bit Cost
Dow nhole Tool / BHA Costs
Standby Charges
In-Hole Costs
Up-Front Charges

Indirect Costs
Borehole Quality
Trajectory
Shape
Open-Hole Risk
Borehole Integrity
Formation Damage
Pressure Risk
W ireline and Cement Unit Rentals

converted by Web2PDFConvert.com
Basic Cost-Per-Interval

CI = RR x (HR + TT) + (DT x HR) + BC

INT

CI = Cost-Per-Interval (Currency)

RR = Rig Rate (Hourly)

HR = Drilling Time (Hours)

TT = Trip Time (Hours)

BC = Bit Cost (Currency)

INT = Interval Drilled (feet or meters)

Historical Versus Projected Cost-Per-Interval

Historical
Uses information from an actual w ell or w ells
Cost-Per-Interval is actual
Projected
Used for selection and comparison
Calculated based on planned or target w ell
Calculated based on projected hours and interval drilled

Breakeven Analysis

Breakeven analysis demonstrates rate of penetration or interval required to


meet or exceed offset cost-per-interval.

Assumed Footage

ROP BE = RR / CL O – [((R(TT)) + BC) / INT]

Assumed Penetration Rate

INTBE = [RR (TT) + BC] / [CL O – (RR / ROP)

ROP BE = Breakeven Penetration Rate

INTBE = Breakeven Interval

CL O = Offset Cost-Per-Interval (Currency)

RR = Rig Rate (Hours)

TT = Trip Time (Hours)

BC = Bit Cost (Currency)

ROP = Assumed Rate of Penetration

INT = Assumed Interval Drilled

C orporate Overview
Downhole Production
ABOUT Brands TECHNOLOGY CONTACT C ontact Us
NOV SOLUTIONS Drilling Supply C hain NOV
Investor Relations Facility Locator
Engineering & Project Tubular & C orrosion
Training 24 HR On-C all List
Management C ontrol
insideNOV: News Investor Relations
Industrial Well Service &
C areers C areers
Lifting & Handling C ompletion

converted by Web2PDFConvert.com
Lifting & Handling C ompletion
Featured Technology
Your Privacy Rights | Acceptable Use Policy and Visitor Agreem ent | Copyright Notices | Contact Us | ©2011 National O ilwell Varco All rights reserved.

converted by Web2PDFConvert.com

Anda mungkin juga menyukai