Penawaran YILADIA 2021
Penawaran YILADIA 2021
KULMAN ULOLI
Direktur
JADWAL PELAKSANAAN (KURVA "S")
BULAN KE-
I
NO URAIAN PEKERAJAAN BOBOT KET
MINGGU KE-
1 2 3 4
90
80
70
C REHABILITASI BANGUNAN AULA 12.34 12.34
60
50
D REHABILITASI CARPORT 2.38 2.38
40
30
E REHABILITASI GARASI 2 MOBIL 4.91 4.91
20
10
F PEKERJAAN PENGECATAN LAIN-LAIN 11.52 11.52
0
JUMLAH 100.00 KET
PROGRES REALISASI
Dibuat Oleh
KULMAN ULOLI
Direktur
0
1 satu
2 dua
3 tiga
4 empat
5 lima
6 enam
7 tujuh
8 delapan
9 sembilan
10 sepuluh
11 sebelas
12 dua belas
13 tiga belas
14 empat belas
15 lima belas
16 enam belas
17 tujuh belas
18 delapan belas
19 sembilan belas
BY : TAUFIQ ABDULKADIR
Rp 149,712,000.00
BY : TAUFIQ ABDULKADIR
Rp 12.00
BY : TAUFIQ ABDULKADIR
#REF!
149,712,000.00
Seratus Empat Puluh Sembilan Juta Tujuh Ratus Dua Belas Ribu Rupiah
12.00
#REF!
#REF!
- - - - - - 1.00
0 0 0 0 0 0 1
0 0 0 0 0 0 1
satu
ratus
seratus
- - - - - - -
0 0 0 0 0 0 0
0 0 0 0 0 0 0
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
14.00 149.00 1,497.00 14,971.00 149,712.00 1,497,120.00 ###
4 9 7 1 2 0 0
4 9 7 12 0 0
empat sembilan tujuh dua belas
puluh juta ratus ribu
empat puluh sembilan juta tujuh ratus dua belas ribu
- - - - - - 1.00
0 0 0 0 0 0 1
0 0 0 0 0 0 12
dua belas
dua belas
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
149,712,000.00
0
0
12.00
2
#REF!
#REF!
#REF!
#REF!
Thn. Angg :2 0 2 1
Overhead : 10%
Mengetahui/Menyetujui
(K P A)
Menyetujui
Dibuat Oleh
Besi 12 : 0.0117
Besi 10 : 0.009
Besi 8 : 0.0075
Pemakaian Bekisting : 5
Kegiatan : Penyelenggaraan Bangunan Gedung di Wilayah Daerah Kabupaten/Kota, Pemberian Izin Mendirikan Bangunan (IMB) dan Sertifikat Laik Fungsi Bangunan Gedung
Pekerjaan : Rehabilitasi Yiladia
Lantai 1
= 63.37 M
= 428.33 M2
68.58
= 8.93 M2
Daun Pintu = 3.78 x 7.00 = 26.46
= 41.27 M2
= 5.81 M2
Kusen jendela 4 mata Krapyak = 7.14 x 1.00 bh
= 7.14 M2
Krapyak = 9.86 x 3.00 bh
= 29.58 M2
Kusen jendela 3 mata = 5.81 x 1.00 bh
= 5.81 M2
9.91 M2
Total = 67.57 M2
= 108.84 M2
= 2.00 x 1.05
= 2.10 M2
= 1.20 x 1.20
= 1.44 M2
= 16.00 Bh
= 15.00 Bh
= 25.00 M
298.70
Pek. Pemasangan Kunci Tanam 2 Slaag
= 7.00 bh
Pek. Pas. Anak Kunci
= 7.00 bh
NO URAIAN/PERHITUNGAN PEKERJAAN VOL SAT
Pek. Wastafel
= 1.00 Unit
= 1.00 Unit
Pek. Gantungan
= 1.00 Bh
= 2.00 Bh
= 1.00 Unit
LANTAI 2
= 1.70 M2
= 7.00 bh
= 41.86 M
PV = 10.00 + 4.00 + 2.00 + 4.00 + 1.00 + 1.75 + 3.00 + 11.00
= 36.75 M
Total = 41.86 + 36.75 x 2.95 = 231.90
35.61
= 374.99 M2
NO URAIAN/PERHITUNGAN PEKERJAAN VOL SAT
144.60 M2
75.56 M2
63.10
75.56 M2
sama dengan
= volume Plesteran Plat Dak = 75.56 M2
Kusen
12.16 M2
Pengecatan Pagar
Luasan B 100.06
Luasan C 90.74
Total = + 100.06 + 90.74
= 190.80 M2
DAFTAR KUANTITAS DAN HARGA
Kegiatan : Penyelenggaraan Bangunan Gedung di Wilayah Daerah Kabupaten/Kota, Pemberian Izin Mendirikan
Bangunan (IMB) dan Sertifikat Laik Fungsi Bangunan Gedung
Pekerjaan : Rehabilitasi Yiladia
Lokasi : Kecamatan Suwawa Kabupaten Bone Bolango
Thn. Angg :2 0 2 1
LANTAI 2
1 Pek. Daun Pintu Kayu Kls II M² 2.97 654,830.00 1,943,535.44
2 Pek. Daun Jendela Kaca, Kayu Kls II M² 1.70 654,830.00 1,113,211.00
3 Pek. Pemasangan Lampu 20 Watt Bh 7.00 57,755.50 404,288.50
4 Pek. Pemasangan Lampu 5 Watt Bh 5.00 13,755.50 68,777.50
5 Pek. Pengecatan Dinding Lama M² 374.99 26,396.70 9,898,472.14
6 Pek. Pengecatan Plafond M² 144.60 23,096.70 3,339,782.82
7 Pek. Pengecatan Plat Dak M² 75.56 25,129.50 1,898,722.20
8 Pengecatan Bidang Kayu M² 63.10 58,125.10 3,667,828.38
9 Pek. Plesteran Plat Dak Sp. 1 : 3 M² 75.56 73,184.54 5,529,640.88
10 Pek. Acian Semen M² 75.56 43,450.00 3,282,973.38
11 Kunci Tanam 2 Slaag Bh 6.00 215,396.50 1,292,379.00
12 Pek. Pemasangan Lampu 20 Watt Bh 6.00 57,755.50 346,533.00
13 Pek. Pemasangan Lampu 5 Watt Bh 5.00 22,790.90 113,954.50
D REHABILITASI CARPORT
1 Pek. Pengecatan Dinding Lama M² 42.75 26,396.70 1,128,458.93
2 Pek. Pengecatan Plafond Lama M² 12.78 23,096.70 295,175.83
3 Pek. Plesteran Plat Dak Sp. 1 : 3 M² 12.78 73,184.54 935,298.42
4 Pek. Acian Semen M² 12.78 43,450.00 555,291.00
5 Pek. Pengecatan Plat Dak M² 12.78 25,129.50 321,155.01
KULMAN ULOLI
Direktur
REKAPITULASI DAFTAR KUANTITAS DAN HARGA
IV DIBULATKAN 149,707,000.00
Terbilang : Seratus Empat Puluh Sembilan Juta Tujuh Ratus Dua Belas Ribu Rupiah
KULMAN ULOLI
Direktur
DAFTAR KUANTITAS DAN HARGA
Kegiatan : Penyelenggaraan Bangunan Gedung di Wilayah Daerah Kabupaten/Kota, Pemberian Izin Mendirikan
Bangunan (IMB) dan Sertifikat Laik Fungsi Bangunan Gedung
Pekerjaan : Rehabilitasi Yiladia
Lokasi : Kecamatan Suwawa Kabupaten Bone Bolango
Thn. Angg :2 0 2 1
LANTAI 2
1 Pek. Daun Pintu Kayu Kls II M² 2.97 654,830.00 1,944,845.10
2 Pek. Daun Jendela Kaca, Kayu Kls II M² 1.70 654,830.00 1,113,211.00
3 Pek. Pemasangan Lampu 20 Watt Bh 7.00 57,755.50 404,288.50
4 Pek. Pemasangan Lampu 5 Watt Bh 5.00 13,755.50 68,777.50
5 Pek. Pengecatan Dinding Lama M² 374.99 26,396.70 9,898,498.53
6 Pek. Pengecatan Plafond M² 144.60 23,096.70 3,339,782.82
7 Pek. Pengecatan Plat Dak M² 75.56 25,129.50 1,898,785.02
8 Pengecatan Bidang Kayu M² 63.10 58,125.10 3,667,828.38
9 Pek. Plesteran Plat Dak Sp. 1 : 3 M² 75.56 73,184.54 5,529,823.84
10 Pek. Acian Semen M² 75.56 43,450.00 3,283,082.00
11 Kunci Tanam 2 Slaag Bh 6.00 215,396.50 1,292,379.00
12 Pek. Pemasangan Lampu 20 Watt Bh 6.00 57,755.50 346,533.00
13 Pek. Pemasangan Lampu 5 Watt Bh 5.00 22,790.90 113,954.50
D REHABILITASI CARPORT
1 Pek. Pengecatan Dinding Lama M² 42.75 26,396.70 1,128,458.93
2 Pek. Pengecatan Plafond Lama M² 12.78 23,096.70 295,175.83
3 Pek. Plesteran Plat Dak Sp. 1 : 3 M² 12.78 73,184.54 935,298.42
4 Pek. Acian Semen M² 12.78 43,450.00 555,291.00
5 Pek. Pengecatan Plat Dak M² 12.78 25,129.50 321,155.01
KULMAN ULOLI
Direktur
REKAPITULASI DAFTAR KUANTITAS DAN HARGA
IV DIBULATKAN 149,712,000.00
Terbilang : Seratus Empat Puluh Sembilan Juta Tujuh Ratus Dua Belas Ribu Rupiah
KULMAN ULOLI
Direktur
Kegiatan : Penyelenggaraan Bangunan Gedung di Wilayah Daerah Kabupaten/Kota, Pemberian Izin Mendirikan Bangunan
(IMB) dan Sertifikat Laik Fungsi Bangunan Gedung
A UPAH
B BAHAN
B.1.2 B A T U
B.1.3 K A Y U
5. Lem Wallpapper Kg -
6. Lem Kayu Kg 25,000.00 25,000.00
22. Karpet M² -
3. Ounduline Lmbr -
4. Genteng Glazuur Bh -
5. Sirap Bh -
6. Mopana Bh -
5. Cermin Bayang Bh -
9. Cat Tembok -
10. Metrolite Kg 35,000.00 5,000.00 40,000.00
KULMAN ULOLI
Direktur
ANALISA HARGA SATUAN
I UPAH 77,125.00
II BAHAN -
1. -
2. -
3. -
4. -
5. -
I UPAH 94,275.00
II BAHAN -
1. -
2. -
3. -
4. -
5. -
I UPAH 111,655.00
II BAHAN -
1. -
2. -
3. -
4. -
5. -
I UPAH 102,680.00
II BAHAN -
1. -
2. -
3. -
4. -
5. -
I UPAH 155,400.00
II BAHAN -
1. -
2. -
3. -
4. -
5. -
I UPAH 123,975.00
II BAHAN -
1. -
2. -
3. -
4. -
5. -
I UPAH 5,525.00
II BAHAN -
1. -
2. -
3. -
4. -
5. -
I UPAH 25,708.33
II BAHAN -
1. -
2. -
3. -
4. -
5. -
I UPAH 30,850.00
II BAHAN 156,000.00
3. -
4. -
5. -
I UPAH 27,625.00
II BAHAN 168,000.00
2. -
3. -
4. -
5. -
I UPAH 16,575.00
II BAHAN 15,000.00
3. -
4. -
5. -
I UPAH 27,625.00
II BAHAN -
2. -
3. -
4. -
5. -
I UPAH 136,305.00
II BAHAN 254,160.00
3. -
4. -
5. -
I UPAH 136,305.00
II BAHAN 180,000.00
2. -
3. -
4. -
5. -
I UPAH 262,125.00
II BAHAN 548,700.00
4. -
5. -
I UPAH 262,125.00
II BAHAN 499,000.00
4. -
5. -
I UPAH 262,125.00
II BAHAN 464,560.00
4. -
5. -
I UPAH 262,125.00
II BAHAN 440,340.00
4. -
5. -
I UPAH 262,125.00
II BAHAN 407,160.00
4. -
5. -
Jenis Pekerjaan : 1 M3 Pekerjaan Pondasi Siclop, 60% Beton Camp. 1 : 2 : 3 & 40% Batu Belah
I UPAH 475,150.00
II BAHAN 469,360.00
5. -
I UPAH 211,470.00
II BAHAN 597,325.00
5. -
Jenis Pekerjaan : 1 M3 Pekerjaan Lantai Kerja Beton Mutu K 100 = 7,4 Mpa, Slump 3-6 Cm
I UPAH 153,700.00
II BAHAN 576,018.52
5. -
I UPAH 211,470.00
II BAHAN 635,365.74
5. -
I UPAH 211,470.00
II BAHAN 665,258.33
5. -
I UPAH 211,470.00
II BAHAN 700,580.56
5. -
I UPAH 211,470.00
II BAHAN 734,317.59
5. -
I UPAH 211,470.00
II BAHAN 759,513.89
5. -
I UPAH 211,470.00
II BAHAN 776,165.74
5. -
I UPAH 211,470.00
II BAHAN 804,980.56
5. -
I UPAH 211,470.00
II BAHAN 813,532.41
5. -
I UPAH 268,975.00
II BAHAN 847,054.63
5. -
I UPAH 268,975.00
II BAHAN 858,643.52
5. -
I UPAH 90,870.00
II BAHAN 140,250.00
3. -
4. -
5. -
I UPAH 115,335.00
II BAHAN 201,750.00
5. -
I UPAH 115,335.00
II BAHAN 260,750.00
I UPAH 115,335.00
II BAHAN 351,750.00
I UPAH 115,335.00
II BAHAN 261,750.00
I UPAH 115,335.00
II BAHAN 171,750.00
I UPAH 90,870.00
II BAHAN 125,250.00
3. -
4. -
5. -
I UPAH 90,850.00
II BAHAN 184,100.00
4. -
5. -
I UPAH 90,850.00
II BAHAN 170,870.00
4. -
5. -
I UPAH 90,850.00
II BAHAN 162,190.00
5. -
I UPAH 90,850.00
II BAHAN 157,360.00
4. -
5. -
I UPAH 45,425.00
II BAHAN 81,718.00
4. -
5. -
I UPAH 45,425.00
II BAHAN 78,120.00
4. -
5. -
I UPAH 45,425.00
II BAHAN 75,852.00
4.
5.
I UPAH 45,425.00
II BAHAN 74,508.00
4. -
5. -
I UPAH 52,425.00
II BAHAN 14,106.40
3. -
4. -
5. -
I UPAH 52,425.00
II BAHAN 12,096.00
4. -
5. -
I UPAH 52,425.00
II BAHAN 10,897.60
3. -
4. -
5. -
I UPAH 52,425.00
II BAHAN 9,962.40
4. -
5. -
I UPAH 70,130.00
II BAHAN 18,855.20
3. -
4. -
5. -
I UPAH 70,130.00
II BAHAN 16,128.00
4. -
5. -
I UPAH 70,130.00
II BAHAN 14,576.80
3. -
4. -
5. -
I UPAH 70,130.00
II BAHAN 13,283.20
4. -
5. -
I UPAH 64,380.00
II BAHAN 2,520.00
3. -
4. -
5. -
I UPAH 45,425.00
II BAHAN 6,888.00
4. -
5. -
I UPAH 34,950.00
II BAHAN 4,550.00
3. -
4. -
5. -
I UPAH 122,325.00
II BAHAN 27,516.00
5. -
I UPAH 227,175.00
II BAHAN 30,666.00
5. -
I UPAH 41,940.00
II BAHAN 170,115.00
5. -
I UPAH 41,940.00
II BAHAN 150,740.00
5. -
I UPAH 41,940.00
II BAHAN 158,490.00
5. -
I UPAH 45,435.00
II BAHAN 153,911.11
5. -
I UPAH 42,349.50
II BAHAN 138,970.00
5. -
I UPAH 45,435.00
II BAHAN 73,662.00
5. -
I UPAH 45,435.00
II BAHAN 74,849.00
5. -
I UPAH 122,325.00
II BAHAN 148,510.00
5. -
I UPAH 122,325.00
II BAHAN 148,510.00
5. -
I UPAH 157,275.00
II BAHAN 146,040.00
5. -
I UPAH 29,370.00
II BAHAN #N/A
1. Underlayer M² 1.0500 - -
2. Lem Khusus #N/A 0.3500 #N/A #N/A
3. -
4. -
5. -
I UPAH 41,665.00
II BAHAN #N/A
1. Karpet M² 1.0500 - -
4. -
5. -
I UPAH 122,325.00
II BAHAN #N/A
3. -
4. -
5. -
I UPAH 36,770.00
II BAHAN #N/A
4. -
5. -
I UPAH 22,085.00
II BAHAN 17,116.00
5. -
I UPAH 22,085.00
II BAHAN 17,116.00
5. -
I UPAH 22,085.00
II BAHAN 3,516.00
5. -
I UPAH 22,085.00
II BAHAN 3,516.00
5. -
I UPAH 22,085.00
II BAHAN 2,391.00
5. -
I UPAH 29,370.00
II BAHAN 21,875.00
4. -
5. -
Kegiatan : Penyelenggaraan Bangunan Gedung di Wilayah Daerah Kabupaten/Kota, Pemberian Izin Mendirik
I UPAH #N/A
II BAHAN #N/A
4. -
5. -
I UPAH #N/A
II BAHAN #N/A
3. -
4. -
5. -
Kegiatan : Penyelenggaraan Bangunan Gedung di Wilayah Daerah Kabupaten/Kota, Pemberian Izin Mendirik
I UPAH 69,465.00
II BAHAN 144,000.00
2. -
3. -
4. -
5. -
I UPAH 122,325.00
II BAHAN 171,350.00
4. -
5. -
I UPAH 24,475.00
II BAHAN 27,300.00
3. -
4. -
5. -
I UPAH 24,475.00
II BAHAN 27,300.00
4. -
5. -
I UPAH 17,475.00
II BAHAN 27,774.00
3. -
4. -
5. -
I UPAH 195,800.00
II BAHAN 105,350.00
4. -
5. -
I UPAH 12,295.00
II BAHAN 5,950.00
3. -
4. -
5. -
I UPAH 14,685.00
II BAHAN 11,362.50
4. -
5. -
I UPAH 14,685.00
II BAHAN 13,725.00
3. -
4. -
5. -
I UPAH 14,685.00
II BAHAN 9,000.00
4. -
5. -
I UPAH 20,970.00
II BAHAN 37,600.00
3. -
4. -
5. -
I UPAH 25,340.00
II BAHAN 15,700.00
4. -
5. -
I UPAH 33,915.00
II BAHAN 40,220.00
3. -
4. -
5. -
I UPAH 47,245.00
II BAHAN 43,775.00
4. -
5. -
I UPAH 24,465.00
II BAHAN 2,100.00
3. -
4. -
5. -
I UPAH 14,685.00
II BAHAN 2,625.00
4. -
5. -
I UPAH 47,915.00
II BAHAN 109,762.50
4. -
5. -
I UPAH 3,673,250.00
II BAHAN 7,746,875.00
4. -
5. -
I UPAH 3,148,500.00
II BAHAN 7,746,875.00
4. -
5. -
I UPAH 524,750.00
II BAHAN 292,500.00
3. -
4. -
5. -
Jenis Pekerjaan : 1 M2 Daun Pintu & Jendela Jalusi (Krepyek), Kayu Kls I/Kls II
I UPAH 524,750.00
II BAHAN 460,500.00
4. -
5. -
Jenis Pekerjaan : 1 M2 Daun Pintu & Daun Jendela Kaca, Kayu Kls I
I UPAH 419,800.00
II BAHAN 175,500.00
3. -
4. -
5. -
I UPAH 384,855.00
II BAHAN 423,750.00
4. -
5. -
I UPAH 2,099,000.00
II BAHAN #N/A
4. -
5. -
I UPAH 3,515,825.00
II BAHAN #N/A
4. -
5. -
I UPAH 3,515,825.00
II BAHAN 7,752,500.00
3. -
4. -
5. -
I UPAH 37,975.00
II BAHAN 102,375.00
4. -
5. -
I UPAH 65,475.00
II BAHAN 111,300.00
3. -
4. -
5. -
I UPAH 62,950.00
II BAHAN 118,475.00
4. -
5. -
I UPAH 38,475.00
II BAHAN 77,350.00
3. -
4. -
5. -
I UPAH 38,475.00
II BAHAN 77,875.00
4. -
5. -
I UPAH 78,770.00
II BAHAN 198,625.00
3. -
4. -
5. -
I UPAH 314,850.00
II BAHAN 50,900.00
4. -
5. -
I UPAH 70,815.00
II BAHAN 135,000.00
3. -
4. -
5. -
I UPAH 70,815.00
II BAHAN 125,000.00
2. -
3. -
4. -
5. -
I UPAH 22,352.00
II BAHAN 25,000.00
3. -
4. -
5. -
I UPAH 14,897.50
II BAHAN 20,000.00
2. -
3. -
4. -
5. -
I UPAH 23,180.00
II BAHAN 40,000.00
3. -
4. -
5. -
I UPAH 28,747.50
II BAHAN 35,000.00
2. -
3. -
4. -
5. -
I UPAH 23,180.00
II BAHAN 50,000.00
3. -
4. -
5. -
I UPAH 75,295.00
II BAHAN 250,000.00
2. -
3. -
4. -
5. -
I UPAH 22,577.00
II BAHAN 108,300.00
3. -
4. -
5. -
I UPAH 22,577.00
II BAHAN 130,300.00
4. -
5. -
I UPAH 12,194.00
II BAHAN 8,525.00
3. -
4. -
5. -
I UPAH 12,194.00
II BAHAN 10,850.00
4. -
5. -
I UPAH 12,194.00
II BAHAN 15,500.00
3. -
4. -
5. -
I UPAH 27,379.00
II BAHAN 82,925.00
4. -
5. -
I UPAH 21,051.00
II BAHAN 46,500.00
1. Pipa Galvanis Med. B Dia. 1/2 " M' 1.2000 30,000.00 36,000.00
2. Perlengkapan Ls 1.0000 10,500.00 10,500.00
3. -
4. -
5. -
I UPAH 123,975.00
II BAHAN 62,000.00
1. Pipa Galvanis Med. B Dia. 3/4 " M' 1.2000 40,000.00 48,000.00
4. -
5. -
I UPAH 21,051.00
II BAHAN 94,550.00
3. -
4. -
5. -
I UPAH 36,467.00
II BAHAN 131,750.00
4. -
5. -
I UPAH 36,467.00
II BAHAN 178,250.00
3. -
4. -
5. -
I UPAH 45,745.00
II BAHAN -
2. Perlengkapan Ls 1.0000 - -
3. -
4. -
5. -
I UPAH 9,300.00
II BAHAN 43,541.00
I UPAH 38,585.00
II BAHAN 12,325.00
4. -
Jenis Pekerjaan : 1 M2 Pengecatan Dinding Baru & Plafond (1x Plamur,1x Cat Dasar,2x Cat Penutup)
I UPAH 10,125.00
II BAHAN 17,900.00
4. -
5. -
Jenis Pekerjaan : 1 M2 Pengecatan Dinding & PLafond Lama (1x Cat Dasar,2x Cat Penutup)
I UPAH 8,997.00
II BAHAN 15,000.00
4. -
5. -
I UPAH 15,195.00
II BAHAN 7,650.00
3. -
4. -
5. -
I UPAH 8,997.00
II BAHAN 6,750.00
2. -
3. -
4. -
5. -
I UPAH 8,997.00
II BAHAN 12,000.00
3. -
4. -
5. -
I UPAH 10,454.00
II BAHAN 79,600.00
4. -
5. -
I UPAH 10,454.00
II BAHAN 76,850.00
4. -
5. -
Jenis Pekerjaan : 1 M2 Pekerjaan Daun Pintu, Jendela, & Ventilasi Rangka Aluminium
I UPAH 20,830.00
II BAHAN 365,950.00
4. -
5. -
I UPAH 85,195.00
II BAHAN #N/A
2. -
3. -
4. -
5. -
I UPAH 243,250.00
II BAHAN #N/A
3. -
4. -
5. -
I UPAH 20,670.50
II BAHAN 550,000.00
2. -
3. -
4. -
5. -
I UPAH 6,990.00
II BAHAN #N/A
5. -
Jenis Pekerjaan : 1 M2 Pekerjaan Pemasangan Teralis Besi Strip Pengaman (Jendela & Pintu)
I UPAH 408,675.00
II BAHAN 19,124.00
4. -
5. -
I UPAH 85,195.00
II BAHAN 31,250.00
3. -
4. -
5. -
Jenis Pekerjaan : 1 M2 Rangka Plafond Dinding Aluminium Hollow (Baja Ringan) 60 x 120 Cm
I UPAH 60,870.00
II BAHAN 28,125.00
4. -
5. -
I UPAH -
1. Pekerja Oh 99,000.00 -
4. Mandor Oh 115,000.00 -
II BAHAN 155,000.00
3. -
4. -
5. -
I UPAH 1,719.00
II BAHAN 13,087.50
4. -
5. -
I UPAH 85,195.00
II BAHAN 550,000.00
3. -
4. -
5. -
I UPAH 60,870.00
II BAHAN 28,125.00
4. -
5. -
Jenis Pekerjaan : 1 Titik Instalasi Listrik (Lampu, MCB, Saklar, Stop Kontak)
I UPAH 33,600.00
4. Mandor Oh 115,000.00 -
II BAHAN 240,975.00
1. Kabel NYM (Putih) Eterna Uk. 3 x 2,5 M' 12.0000 16,000.00 192,000.00
2. Pipa Clipsal Uk. 20 mm Ujg 2.5000 15,000.00 37,500.00
4. -
5. -
I UPAH 33,600.00
4. Mandor Oh 115,000.00 -
II BAHAN 73,500.00
4. -
5. -
I UPAH 2,505.00
II BAHAN 50,000.00
4. -
5. -
I UPAH 2,505.00
II BAHAN 10,000.00
4. -
5. -
I UPAH 9,760.00
II BAHAN 31,500.00
3. -
4. -
5. -
I UPAH 9,760.00
II BAHAN 105,000.00
4. -
5. -
I UPAH 9,760.00
II BAHAN 33,600.00
3. -
4. -
5. -
I UPAH 9,760.00
II BAHAN 42,000.00
4. -
5. -
I UPAH 9,760.00
II BAHAN 21,000.00
3. -
4. -
5. -
I UPAH 9,760.00
II BAHAN 3,150,000.00
4. -
5. -
I UPAH 484,100.00
II BAHAN 2,120,000.00
3. -
4. -
5. -
I UPAH 94,275.00
II BAHAN 712,260.00
4. -
5. -
I UPAH 57,565.00
II BAHAN 35,000.00
3. -
4. -
5. -
I UPAH 15,565.00
II BAHAN 15,000.00
2. -
3. -
4. -
5. -
I UPAH 244,750.00
II BAHAN 204,800.00
5. -
I UPAH 244,750.00
II BAHAN 2,091,400.00
5. -
I UPAH 244,750.00
II BAHAN 2,072,000.00
3. -
4. -
5. -
I UPAH 46,695.00
II BAHAN 550,000.00
2.
3. -
4. -
5. -