Anda di halaman 1dari 3

II PEKERJAAN PASANGAN DINDING

1 M2 PASANGAN DINDING BATAKO/HOLLOWBLOCK (HB. 10), campuran spesi 1 pc: 5 ps


12.5 Buah Batako Lubang
15.16 kg Semen Portland
0.036 m3 Pasir Pasang
0.28 Besi Beton 8 mm
0.3 Pekerja
0.1 Tukang Batu
0.01 Kepala Tukang
0.015 Mandor

0.425

300 705.882352941
117.647058824

4.00 380,000.00
2.00 230,000.00
6.00 610,000.00
1,220,000.00
HARGA SATUAN UPAH MATERIAL TOTAL

2,000 25,000
1,450 21,982
400,000 14,400
9,000 2,520
95,000 28,500
100,000 10,000
115,000 1,150
130,000 1,950
Total : 41,600 63,902 105,502
12,480,000

10.2295081967213 29.33
RAB PEKERJAAN PAGAR
RAB PEKERJAAN PAGAR GUDANG MAKASSAR
GUDANG MAKASSAR
no uraian vol sat harga satuan total
no uraian vol sat harga satuan total bouplank 1 bouwplank 486.88 m1 77,913 37,934,057
1 bouwplank 486.88 m1 77,913 37,934,057 0.65 btg Kayu Usuk Meranti 5/7 316.4714 v 2 galian 116.85 m3 61,588 7,196,558
2 galian 116.85 m3 61,588 7,196,558 0.02 kg Paku Biasa 2"-5" 2.337019 v 3 urugan pasir 24.34 m3 224,635 5,468,503
3 urugan pasir 24.34 m3 224,635 5,468,503 pasir 4 pasang batu kali 155.80 m3 609,293 94,928,551
4 pasang batu kali 155.80 m3 609,293 94,928,551 1 m3 pasir urug 24.34395 v 5 sloof 18.26 m3 4,593,989 83,876,883
5 sloof 18.26 m3 4,593,989 83,876,883 pondasi 6 pasang batako 1460.64 m2 77,782 113,611,753
6 pasang batako 1460.64 m2 77,782 113,611,753 1.200 m3 Batu Belah 15 cm/ 20cm 186.9615 v 7 kolom praktis 5.48 m3 6,941,985 38,023,953
7 kolom praktis 5.48 m3 6,941,985 38,023,953 91.000 kg Semen Portland 14177.92 v 8 balok praktis 10.95 m3 4,883,895 53,501,985
8 balok praktis 10.95 m3 4,883,895 53,501,985 0.584 m3 Pasir Pasang 90.98795 v TOTAL 434,542,244
total 434,542,244 bekisting sloof
0.045 m3 Kayu Kelas III 5.751258 v
0.3 kg Paku Biasa 5'-10' 38.34172 v KEBUTUHAN MATERIAL
0.1 ltr Minyak Bekesting 12.78057 v PEKERJAAN PAGAR GUDANG MAKASSAR
0.35 lbr Multiplek 8 mm 44.73201 v
besi sloof no uraian jumlah sat harga total
semua 434,542,244 70.76564 kg Besi Beton 1292.036 v 1 usuk 316.47 m3 50,000 15,823,568
material 289,250,889 0.25 kg kawat 323.0091 v 2 paku 113.71 kg 15,000 1,705,659
upah 145,291,355 beton sloof 3 pasir urug 24.34 m3 200,000 4,868,790
247.000 kg Semen Portland 4509.717 v 4 batu belah 186.96 m3 200,000 37,392,307
1 mandor 150,000.00 150,000.00 0.6207 m3 Pasir Beton 11.33272 v 5 batako 18257.96 bh 2,000 36,515,925
6 pekerja 120,000.00 720,000.00 0.7400 m3 Koral Beton 13.51089 v 6 semen 806.01 sak 50,000 40,300,648
4 tukang 100,000.00 400,000.00 pasang batako 7 pasir pasang 144.16 m3 200,000 28,831,027
1,270,000.00 12.500 Batako Lubang 18257.96 v 8 pasir cor 21.53 m3 175,000 3,768,129
114.40 6.500 Semen Portland 9494.141 v 9 kayu kelas 3 14.51508 m3 3,900,000 56,608,813
0.036 Pasir Pasang 53.17 v 10 oli 41.99331 l 36,000 1,511,759
0.280 Besi Beton 8 mm 408.9784 v 11 triplek 121.4155 lbr 108,000 13,112,869
bekisting balok 12 koral 25.6707 m3 210,000 5,390,846
0.040 m3 Kayu Kelas III 5.842548 v 13 besi 2863.847 kg 11,000 31,502,321
0.300 kg Paku Biasa 5'-12' 43.81911 v 14 kawat 518.1839 kg 23,000 11,918,229
0.100 ltr Minyak Bekesting 14.60637 v TOTAL 289,250,889
0.350 lbr Multiplek 8 mm 51.1223 v
besi balok
70.76564 kg besi 775.2218 v
0.250 kg kawat 193.8054 v 578,501,778.78
beton balok
247.000 kg Semen Portland 2705.83 v 50000
0.6207 m3 Pasir Beton 6.79963 v
0.7400 m3 Koral Beton 8.106535 v
bekisting kolom
0.040 m3 Kayu Kelas III 2.921274 v
0.400 kg Paku Biasa 5'-12' 29.21274 v
0.200 ltr Minyak Bekesting 14.60637 v
0.350 lbr Multiplek 8 mm 25.56115 v
besi kolom
70.76564 kg besi 387.6109 v
0.250 kg kawat 1.369347 v
beton kolom
247.000 kg Semen Portland 1352.915 v
0.6207 m3 Pasir Beton 3.399815 v
0.7400 m3 Koral Beton 4.053268 v