Anda di halaman 1dari 1

DAFTAR PUSTAKA

Alhadi, G. P., et al. (2021). "PENENTUAN INTERVAL WAKTU


MAINTENANCE FORKLIFT TERHADAP KOMPONEN KRITIS
BERDASARKAN DATA KERUSAKAN MESIN MENGGUNAKAN METODE
PREVENTIVE AGE REPLACEMENT (Studi kasus: PT. XXX)." JITEKH (Jurnal
Ilmiah Teknologi Harapan) 9(1): 1-7.
Kurniawan, F. (2013). "Manajemen perawatan industri." Yogyakarta: Graha Ilmu.
Rinawati, D. I. and N. C. Dewi (2014). "Analisis Penerapan Total Productive
Maintenance (TPM) Menggunakan Overall Equipment Efectiveness (Oee) Dan Six
Big Losses Pada Mesin Cavitec Di PT. Essentra Surabaya." Prosiding SNATIF: 21-
26.
Suprianto, E. (2011). "PENENTUAN INTERVAL WAKTU PERAWATAN
FORKLIFT SCAGLIA BERDASARKAN DATA LAJU KERUSAKAN MESIN
DI PT.” X”." Jurnal Industri Elektro dan Penerbangan 1(3).
Syahroni, I. (2018). USULAN PERENCANAAN PERAWATAN MESIN
FORKLIFT DENGAN METODE RELIABILITY CENTERED MAINTENANCE
DI PT. INDOSPRING TBK, UNIVERSITAS MUHAMMADIYAH GRESIK.
Tanurahardja, O. W., et al. (2017). "Penjadwalan preventive maintenance di PT.
Wahana Lentera Raya." Widya Teknik 8(1): 86-96.
Wibowo, D. and N. Kurniati (2020). "Penentuan Strategi Pemeliharaan Forklift
Menggunakan Metode RCM II." Jurnal Teknik ITS 8(2): E26-E31.

38

Anda mungkin juga menyukai