Alhadi, G. P., et al. (2021). "PENENTUAN INTERVAL WAKTU
MAINTENANCE FORKLIFT TERHADAP KOMPONEN KRITIS BERDASARKAN DATA KERUSAKAN MESIN MENGGUNAKAN METODE PREVENTIVE AGE REPLACEMENT (Studi kasus: PT. XXX)." JITEKH (Jurnal Ilmiah Teknologi Harapan) 9(1): 1-7. Kurniawan, F. (2013). "Manajemen perawatan industri." Yogyakarta: Graha Ilmu. Rinawati, D. I. and N. C. Dewi (2014). "Analisis Penerapan Total Productive Maintenance (TPM) Menggunakan Overall Equipment Efectiveness (Oee) Dan Six Big Losses Pada Mesin Cavitec Di PT. Essentra Surabaya." Prosiding SNATIF: 21- 26. Suprianto, E. (2011). "PENENTUAN INTERVAL WAKTU PERAWATAN FORKLIFT SCAGLIA BERDASARKAN DATA LAJU KERUSAKAN MESIN DI PT.” X”." Jurnal Industri Elektro dan Penerbangan 1(3). Syahroni, I. (2018). USULAN PERENCANAAN PERAWATAN MESIN FORKLIFT DENGAN METODE RELIABILITY CENTERED MAINTENANCE DI PT. INDOSPRING TBK, UNIVERSITAS MUHAMMADIYAH GRESIK. Tanurahardja, O. W., et al. (2017). "Penjadwalan preventive maintenance di PT. Wahana Lentera Raya." Widya Teknik 8(1): 86-96. Wibowo, D. and N. Kurniati (2020). "Penentuan Strategi Pemeliharaan Forklift Menggunakan Metode RCM II." Jurnal Teknik ITS 8(2): E26-E31.