RENCANA ANGGARAN BIAYA (RAB) PEKERJAAN PEMBUATAN BAK DAN

PEMASANGAN MAGNETIC FLOW METER Ø 600 MM X 7 TEMPAT

No Uraian Pekerjaan Volume Satuan Analisa Harga Satuan (Rp) Jlh Harga (Rp)

I. MATERIAL
1 Pipa steel Ø 600 mm 1.40 m tabel 3,223,200.00 4,512,480.00
2 Collar Ø 600x625 mm 2.00 bh tabel 12,521,982.00 25,043,964.00
3 Flange steel Ø 600 mm 2.00 bh tabel 2,718,196.00 5,436,392.00
4 Magnetic Flow Meter Ø 600 mm merk Siemens 1.00 unit hitung 124,300,000.00 124,300,000.00
5 Rubber Paking 3 mm 2.00 m2 tabel 132,000.00 264,000.00
6 Bolt & nut 5/8x3" 48.00 bh tabel 3,400.00 163,200.00
Total I 159,720,036.00
II. PELAKSANAAN
1 Pekerjaan Pembuatan Bak
1. Galian tanah biasa
-Kedalaman 1 meter uk. 2,9x4,4x1 m 14.04 m3 PT 6.1 84,608.75 1,187,568.42
-Kedalaman 2 meter uk. 2,9x4,4x1 m 14.04 m3 PT 6.2 103,479.75 1,452,441.77
2. Beton bertulang
-Lantai Bak uk. 1,9x3,4x0,20 m 1.29 m3 PB 6.30C 5,805,146.18 7,500,248.86
-Dinding Bak uk. 9,8x2x0,20 m 3.92 m3 PB 6.27B 6,086,535.95 23,859,220.92
3. Tangga besi Ø 18 mm 10.00 kg tabel 11,865.00 118,650.00
4. Tutup Bak
-Beton bertulang uk. (0,3x1,65x0,15 m) x 7 bh 0.91 m3 PB 6.30C 5,805,146.18 5,294,293.32
5. Pemasangan Besi siku tutup & ujung dinding atas Bak
-Besi siku uk. 50 . 50 mm = 70 m 294.98 kg tabel 11,865.00 3,499,985.16
-Pemotongan besi siku ( 64 titik ) 6.40 m tabel 67,093.75 429,400.00
-Pengelasan besi siku (64 titik) 6.40 m tabel 417,252.50 2,670,416.00
-Handle besi Ø 10 mm 3.50 kg tabel 11,865.00 41,527.50
6. Dewatering 1.00 unit hitung 272,250.00 272,250.00

2 Pekerjaan Perpipaan
1. Pemotongan Pipa Stee Ø 600 mm (MH) 3.77 m tabel 100,640.63 379,213.88
2. Pengelasan u/ Flange steel Ø 600 mm (2x las) 7.54 m tabel 417,252.50 3,144,414.84
3. Pemasangan Collar Ø 600 mm (MH) 2.00 bh tabel 1,100,895.00 2,201,790.00
3. Pemasangan Magnetic Flow Meter Ø 600 mm (MH) 1.00 unit tabel 2,224,913.75 2,224,913.75
5. Pengeboran Flange u/ Lubang Baut 48.00 lubang tabel 12,706.61 609,917.28
6. Sewa Katrol 2.00 bh tabel 84,750.00 169,500.00
7. Sewa genset u/ penerangan 12.00 jam tabel 50,850.00 610,200.00
8. Dokumentasi - - ls - 50,000.00
Jumlah 55,715,951.69
Ppn 10 % 5,571,595.17
Total II 61,287,546.86

Toatal I + II Toatal I + II 221,007,582.86


Dibulatkan Dibulatkan 221,007,000.00
Terbilang : Satu Miliar Limaratus Empat Puluh Tujuh Juta Empat Puluh Sembilan Ribu
Rupiah . Total Pemasangan x 7 Lokasi 1,547,049,000.00
RENCANA ANGGARAN BIAYA (RAB) PEKERJAAN PEMBUATAN BAK DAN
PEMASANGAN MAGNETIC FLOW METER Ø 500 MM X 3 TEMPAT

No Uraian Pekerjaan Volume Satuan Analisa Harga Satuan (Rp) Jlh Harga (Rp)

I. MATERIAL
1 Pipa steel Ø 500 mm 1.40 m tabel 3,023,123.00 4,232,372.20
2 Collar Ø 500x520 mm 2.00 bh tabel 9,546,240.00 19,092,480.00
3 Flange steel Ø 500 mm 2.00 bh tabel 2,718,196.00 5,436,392.00
4 Magnetic Flow Meter Ø 500 mm merk Siemens 1.00 unit hitung 106,100,000.00 106,100,000.00
5 Rubber Paking 3 mm 2.00 m2 tabel 132,000.00 264,000.00
6 Bolt & nut 5/8x3" 48.00 bh tabel 3,400.00 163,200.00
Total I 135,288,444.20
II. PELAKSANAAN
1 Pekerjaan Pembuatan Bak
1. Galian tanah biasa
-Kedalaman 1 meter uk. 2,9x4,4x1 m 14.04 m3 PT 6.1 84,608.75 1,187,568.42
-Kedalaman 2 meter uk. 2,9x4,4x1 m 14.04 m3 PT 6.2 103,479.75 1,452,441.77
2. Beton bertulang
-Lantai Bak uk. 1,9x3,4x0,20 m 1.29 m3 PB 6.30C 5,805,146.18 7,500,248.86
-Dinding Bak uk. 9,8x2x0,20 m 3.92 m3 PB 6.27B 6,086,535.95 23,859,220.92
3. Tangga besi Ø 18 mm 10.00 kg tabel 11,865.00 118,650.00
4. Tutup Bak
-Beton bertulang uk. (0,3x1,65x0,15 m) x 7 bh 0.91 m3 PB 6.30C 5,805,146.18 5,294,293.32
5. Pemasangan Besi siku tutup & ujung dinding atas Bak
-Besi siku uk. 50 . 50 mm = 70 m 294.98 kg tabel 11,865.00 3,499,985.16
-Pemotongan besi siku ( 64 titik ) 6.40 m tabel 67,093.75 429,400.00
-Pengelasan besi siku (64 titik) 6.40 m tabel 417,252.50 2,670,416.00
-Handle besi Ø 10 mm 3.50 kg tabel 11,865.00 41,527.50
6. Dewatering 1.00 unit hitung 272,250.00 272,250.00

2 Pekerjaan Perpipaan
1. Pemotongan Pipa Stee Ø 500 mm (MH) 3.14 m tabel 100,640.63 316,011.56
2. Pengelasan u/ Flange steel Ø 500 mm (2x las) 6.28 m tabel 417,252.50 2,620,345.70
3. Pemasangan Collar Ø 500 mm (MH) 2.00 bh tabel 788,933.25 1,577,866.50
3. Pemasangan Magnetic Flow Meter Ø 500 mm (MH) 1.00 unit tabel 1,456,540.01 1,456,540.01
5. Pengeboran Flange u/ Lubang Baut 48.00 lubang tabel 12,706.61 609,917.28
6. Sewa Katrol 2.00 bh tabel 84,750.00 169,500.00
7. Sewa genset u/ penerangan 12.00 jam tabel 50,850.00 610,200.00
8. Dokumentasi - - ls - 50,000.00
Jumlah 53,736,383.00
Ppn 10 % 5,373,638.30
Total II 59,110,021.30

Toatal I + II Toatal I + II 194,398,465.50


Dibulatkan Dibulatkan 194,398,000.00
Terbilang : Lima Ratus Delapan Puluh Tiga Juta Seratus Sembilan Puluh Empat Ribu
Rupiah . Total Pemasangan x 3 Lokasi 583,194,000.00
RENCANA ANGGARAN BIAYA (RAB) PEKERJAAN PEMBUATAN BAK DAN
PEMASANGAN MAGNETIC FLOW METER Ø 400 MM X 2 TEMPAT

No Uraian Pekerjaan Volume Satuan Analisa Harga Satuan (Rp) Jlh Harga (Rp)

I. MATERIAL
1 Pipa steel Ø 400 mm 1.40 m tabel 1,015,000.00 1,421,000.00
2 Collar Ø 400x420 mm 2.00 bh tabel 4,606,558.00 9,213,116.00
3 Flange steel Ø 400 mm 2.00 bh tabel 665,500.00 1,331,000.00
4 Magnetic Flow Meter Ø 400 mm merk Siemens 1.00 unit hitung 87,900,000.00 87,900,000.00
5 Rubber Paking 3 mm 2.00 m2 tabel 132,000.00 264,000.00
6 Bolt & nut 5/8x3" 48.00 bh tabel 3,400.00 163,200.00
Total I 100,292,316.00
II. PELAKSANAAN
1 Pekerjaan Pembuatan Bak
1. Galian tanah biasa
-Kedalaman 1 meter uk. 2,9x4,4x1 m 14.04 m3 PT 6.1 84,608.75 1,187,568.42
-Kedalaman 2 meter uk. 2,9x4,4x1 m 14.04 m3 PT 6.2 103,479.75 1,452,441.77
2. Beton bertulang
-Lantai Bak uk. 1,9x3,4x0,20 m 1.29 m3 PB 6.30C 5,805,146.18 7,500,248.86
-Dinding Bak uk. 9,8x2x0,20 m 3.92 m3 PB 6.27B 6,086,535.95 23,859,220.92
3. Tangga besi Ø 18 mm 10.00 kg tabel 11,865.00 118,650.00
4. Tutup Bak
-Beton bertulang uk. (0,3x1,65x0,15 m) x 7 bh 0.91 m3 PB 6.30C 5,805,146.18 5,294,293.32
5. Pemasangan Besi siku tutup & ujung dinding atas Bak
-Besi siku uk. 50 . 50 mm = 70 m 294.98 kg tabel 11,865.00 3,499,985.16
-Pemotongan besi siku ( 64 titik ) 6.40 m tabel 67,093.75 429,400.00
-Pengelasan besi siku (64 titik) 6.40 m tabel 417,252.50 2,670,416.00
-Handle besi Ø 10 mm 3.50 kg tabel 11,865.00 41,527.50
6. Dewatering 1.00 unit hitung 272,250.00 272,250.00

2 Pekerjaan Perpipaan
1. Pemotongan Pipa Stee Ø 400 mm (MH) 2.51 m tabel 100,640.63 252,809.25
2. Pengelasan u/ Flange steel Ø 400 mm (2x las) 5.02 m tabel 417,252.50 2,096,276.56
3. Pemasangan Collar Ø 400 mm (MH) 2.00 bh tabel 788,933.25 1,577,866.50
3. Pemasangan Magnetic Flow Meter Ø 400 mm (MH) 1.00 unit tabel 1,456,540.01 1,456,540.01
5. Pengeboran Flange u/ Lubang Baut 48.00 lubang tabel 12,706.61 609,917.28
6. Sewa Katrol 2.00 bh tabel 84,750.00 169,500.00
7. Sewa genset u/ penerangan 12.00 jam tabel 50,850.00 610,200.00
8. Dokumentasi - - ls - 50,000.00
Jumlah 53,149,111.55
Ppn 10 % 5,314,911.15
Total II 58,464,022.70

Toatal I + II Toatal I + II 158,756,338.70


Dibulatkan Dibulatkan 158,756,000.00
Terbilang : Lima Ratus Delapan Puluh Tiga Juta Seratus Sembilan Puluh Empat Ribu
Rupiah . Total Pemasangan x 2 Lokasi 317,512,000.00
RENCANA ANGGARAN BIAYA (RAB) PEKERJAAN PEMBUATAN BAK DAN
PEMASANGAN MAGNETIC FLOW METER Ø 300 MM X 5 TEMPAT

No Uraian Pekerjaan Volume Satuan Analisa Harga Satuan (Rp) Jlh Harga (Rp)

I. MATERIAL
1 Pipa steel Ø 300 mm 1.40 m tabel 613,833.33 859,366.66
2 Collar Ø 300x325 mm 2.00 bh tabel 2,324,410.00 4,648,820.00
3 Flange steel Ø 300 mm 2.00 bh tabel 338,800.00 677,600.00
4 Magnetic Flow Meter Ø 300 mm merk Siemens 1.00 unit hitung 69,300,000.00 69,300,000.00
5 Rubber Paking 3 mm 2.00 m2 tabel 132,000.00 264,000.00
6 Bolt & nut 5/8x3" 48.00 bh tabel 3,400.00 163,200.00
Total I 75,912,986.66
II. PELAKSANAAN
1 Pekerjaan Pembuatan Bak
1. Galian tanah biasa
-Kedalaman 1 meter uk. 2,9x4,4x1 m 14.04 m3 PT 6.1 84,608.75 1,187,568.42
-Kedalaman 2 meter uk. 2,9x4,4x1 m 14.04 m3 PT 6.2 103,479.75 1,452,441.77
2. Beton bertulang
-Lantai Bak uk. 1,9x3,4x0,20 m 1.29 m3 PB 6.30C 5,805,146.18 7,500,248.86
-Dinding Bak uk. 9,8x2x0,20 m 3.92 m3 PB 6.27B 6,086,535.95 23,859,220.92
3. Tangga besi Ø 18 mm 10.00 kg tabel 11,865.00 118,650.00
4. Tutup Bak
-Beton bertulang uk. (0,3x1,65x0,15 m) x 7 bh 0.91 m3 PB 6.30C 5,805,146.18 5,294,293.32
5. Pemasangan Besi siku tutup & ujung dinding atas Bak
-Besi siku uk. 50 . 50 mm = 70 m 294.98 kg tabel 11,865.00 3,499,985.16
-Pemotongan besi siku ( 64 titik ) 6.40 m tabel 67,093.75 429,400.00
-Pengelasan besi siku (64 titik) 6.40 m tabel 417,252.50 2,670,416.00
-Handle besi Ø 10 mm 3.50 kg tabel 11,865.00 41,527.50
6. Dewatering 1.00 unit hitung 272,250.00 272,250.00

2 Pekerjaan Perpipaan
1. Pemotongan Pipa Stee Ø 300 mm (MH) 1.88 m tabel 100,640.63 189,606.94
2. Pengelasan u/ Flange steel Ø 300 mm (2x las) 3.77 m tabel 417,252.50 1,572,207.42
3. Pemasangan Collar Ø 300 (MH) 2.00 bh tabel 788,933.25 1,577,866.50
3. Pemasangan Magnetic Flow Meter Ø 300 mm (MH) 1.00 unit tabel 1,456,540.01 1,456,540.01
5. Pengeboran Flange u/ Lubang Baut 48.00 lubang tabel 12,706.61 609,917.28
6. Sewa Katrol 2.00 bh tabel 84,750.00 169,500.00
7. Sewa genset u/ penerangan 12.00 jam tabel 50,850.00 610,200.00
8. Dokumentasi - - ls - 50,000.00
Jumlah 52,561,840.09
Ppn 10 % 5,256,184.01
Total II 57,818,024.10

Toatal I + II Toatal I + II 133,731,010.76


Dibulatkan Dibulatkan 133,731,000.00
Terbilang : Enam Ratus Enam Puluh Delapan Juta Enam Ratus Lima Puluh Lima Ribu
Rupiah . Total Pemasangan x 5 Lokasi 668,655,000.00
RENCANA ANGGARAN BIAYA (RAB) PEKERJAAN PEMBUATAN BAK DAN
PEMASANGAN MAGNETIC FLOW METER Ø 200 MM X 3 TEMPAT

No Uraian Pekerjaan Volume Satuan Analisa Harga Satuan (Rp) Jlh Harga (Rp)

I. MATERIAL
1 Pipa steel Ø 200 mm 1.40 m tabel 389,333.33 545,066.66
2 Collar Ø 200x225 mm 2.00 bh tabel 1,686,751.00 3,373,502.00
3 Flange steel Ø 200 mm 2.00 bh tabel 254,100.00 508,200.00
4 Magnetic Flow Meter Ø 200 mm merk Siemens 1.00 unit hitung 41,700,000.00 41,700,000.00
5 Rubber Paking 3 mm 2.00 m2 tabel 132,000.00 264,000.00
6 Bolt & nut 5/8x3" 48.00 bh tabel 3,400.00 163,200.00
Total I 46,553,968.66
II. PELAKSANAAN
1 Pekerjaan Pembuatan Bak
1. Galian tanah biasa
-Kedalaman 1 meter uk. 2,9x4,4x1 m 14.04 m3 PT 6.1 84,608.75 1,187,568.42
-Kedalaman 2 meter uk. 2,9x4,4x1 m 14.04 m3 PT 6.2 103,479.75 1,452,441.77
2. Beton bertulang
-Lantai Bak uk. 1,9x3,4x0,20 m 1.29 m3 PB 6.30C 5,805,146.18 7,500,248.86
-Dinding Bak uk. 9,8x2x0,20 m 3.92 m3 PB 6.27B 6,086,535.95 23,859,220.92
3. Tangga besi Ø 18 mm 10.00 kg tabel 11,865.00 118,650.00
4. Tutup Bak
-Beton bertulang uk. (0,3x1,65x0,15 m) x 7 bh 0.91 m3 PB 6.30C 5,805,146.18 5,294,293.32
5. Pemasangan Besi siku tutup & ujung dinding atas Bak
-Besi siku uk. 50 . 50 mm = 70 m 294.98 kg tabel 11,865.00 3,499,985.16
-Pemotongan besi siku ( 64 titik ) 6.40 m tabel 67,093.75 429,400.00
-Pengelasan besi siku (64 titik) 6.40 m tabel 417,252.50 2,670,416.00
-Handle besi Ø 10 mm 3.50 kg tabel 11,865.00 41,527.50
6. Dewatering 1.00 unit hitung 272,250.00 272,250.00

2 Pekerjaan Perpipaan
1. Pemotongan Pipa Stee Ø 200 mm (MH) 1.26 m tabel 100,640.63 126,404.63
2. Pengelasan u/ Flange steel Ø 200 mm (2x las) 2.51 m tabel 417,252.50 1,048,138.28
3. Pemasangan Collar Ø 200 (MH) 2.00 bh tabel 788,933.25 1,577,866.50
3. Pemasangan Magnetic Flow Meter Ø 200 mm (MH) 1.00 unit tabel 1,456,540.01 1,456,540.01
5. Pengeboran Flange u/ Lubang Baut 48.00 lubang tabel 12,706.61 609,917.28
6. Sewa Katrol 2.00 bh tabel 84,750.00 169,500.00
7. Sewa genset u/ penerangan 12.00 jam tabel 50,850.00 610,200.00
8. Dokumentasi - - ls - 50,000.00
Jumlah 51,974,568.64
Ppn 10 % 5,197,456.86
Total II 57,172,025.50

Toatal I + II Toatal I + II 103,725,994.17


Dibulatkan Dibulatkan 103,726,000.00
Terbilang : Tiga Ratus Sebelas Juta Seratus Tujuh Puluh Delapan Ribu Rupiah.
Total Pemasangan x 3 Lokasi 311,178,000.00