Gorong2 DSN Krajan 2 Rt. 06
Gorong2 DSN Krajan 2 Rt. 06
Lebar atas
Desa KaDes SekDes
Dringu Bukhari, SH
Kalirejo Gatot Mulyono
Kalisalam Sukur Susiono Subagyo
Kedungdalem Sumartono Trisno Guntoro
Mranggonlawang Eko Wahyudi
Ngepoh Drs. Salehudin
Pabean Bambang Susilo, ST Rachmad
Randuputih H. Sukandar Usman Dedis S
Sekarkare Senadi Basri Adi S S.Sos
Sumberagung Elmidi Muhammad Asmadi
Sumbersuko Hasan Siadi
Tamansari Misnawi Tohar
Tegalrejo Suharul Halim
Watuwungkuk Saihan
BendDes TPK Desa Tim Teknis Desa
Edi Sutaji Nadi
Ngajuri
Mahmudi
Misnali Triyadi Pramono
Sari'ah Wagiman Diding
Buanam Sum Mohlis
Dyah Retno H, S.Pd Paiman Witanto
Satimin Undariyati
Shodiq
Achmad Khusairi S. Purwanto
Syahrul Romadhoni Busar Sa'id
Dra. Deka Yuliati Zainul Abidin
Ngatro Tosat Wajib Isnaini Hamzah
Adi Santuso Sanitram Asku
DAFTAR HARGA SATUAN UNTUK PERENCANAAN
PEKERJAAN TALUD/TPT FR
No Jenis Satuan Harga Tinggi
A Bahan
1 Batu kali/belah m3 204,000 Rendah
2 Semen / PC (40 kg) zak 74,000 Sedang
3 Pasir pasang m3 297,000 Tinggi
4 Pasir Lumajang m3 373,000
5 Batu pecah 2 - 3 cm (lokal) m3 356,000
6 Besi ø 12 ljr 124,000
7 Besi ø 10 ljr 100,000
8 Besi ø 8 ljr 64,000
9 Bendrat kg 37,000
10 Bata merah bj 1,000
11 Triplek lbr 177,000
12 Paku kg 23,000
13 Kayu lokal balok m3 3,660,000
14 Tulisan kg 200,000
15 Plywood lbr 193,000
16 Minyak begisting ltr 10,000
B Alat
1 Cangkul bh 70,000
2 Ganco bh 90,000
3 Sekop bh 70,000
4 Timba cor bh 14,500
5 Benang bh 5,000
6 Gerobak Sorong bh 550,000
C Upah
1 Mandor OH 80,000
2 Tukang kayu OH 94,500
3 Tukang batu OH 94,500
4 Tukang besi OH 94,500
5 Tukang cat OH 94,500
6 Pekerja OH 75,500
ANALISA PERHITUNGAN TALUD
Kabupaten : Probolinggo Desa : Ngadas
Kecamatan : Sukapura Lokasi : Dsn. Krajan 2 RT. 06
T1
T2
D PERENCANAAN DIMENSI :
Total
Tipe I Tipe II Tipe III Tipe IV Tipe V Tipe VI Tipe VII
Volume
B : Lebar Atas = 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
T1 : Tinggi Talud = 0.70 0.60 4.00 1.70 0.60 0.50 3.00 0.50 4.00 1.73 = tinggi rata-rata
P : Panjang Talud = 7.00 3.00 3.00 2.50 3.00 2.50 3.50 2.00 3.00 29.50 = panjang total
T2 : Kedalaman Pondasi = 0.30 0.30 0.70 0.50 0.30 0.30 0.70 0.30 0.70
= 0.30 0.30 0.70 0.50 0.30 0.30 0.70 0.30 0.70 3.10 : Kedalaman Pondasi rata-rata
D : Lebar Pondasi = 0.30 0.35 0.80 0.50 0.35 0.35 0.70 0.35 0.80
= 0.30 0.35 0.80 0.50 0.35 0.35 0.70 0.35 0.80 3.35 : Lebar Pondasi rata-rata
Luas Talud atas =
= 0.21 0.20 2.20 0.68 0.20 0.16 1.50 0.16 2.20 5.15 Luas Talud atas rata-rata
Luas Pondasi =
= 0.09 0.11 0.56 0.25 0.11 0.11 0.49 0.11 0.56 1.72 Luas Pondasi rata-rata
Volume Talud =
= 4.69 2.04 8.28 2.33 2.04 1.50 6.97 1.20 8.28 37.32
Galian Pondasi = ( 7 x 0,3 x 0,3 x 2 )
= 1.26 0.66 1.68 0.63 0.66 0.55 1.72 0.44 1.68 9.27
Volume Plesteran = ( 0,3 + 0,1 ) x 2 x 7
= 3.33 2.81 3.86 3.33 13.32
Volume Siar / Setrik = ( 0,7 - 0,15 ) x 2 x 7
= 7.70 2.70 11.55 3.88 2.70 1.75 9.98 1.40 11.55 53.20
RENCANA ANGGARAN BIAYA (RAB)
Desa : Ngadas No. RAB : 1
Kecamatan : Sukapura Kegiatan : Gorong-gorong
Kabupaten : Probolinggo Lokasi : Dsn. Krajan 2 RT. 06
Sumber Dana : Dana Desa Ukuran/Dimensi : 29,5 m
Harga Satuan Jumlah Total
URAIAN Volume Satuan
( Rp ) ( Rp )
a b c d e=bxd
1. B A H A N
1.1 Batu kali/belah 44.78 m3 204,000.00 9,135,100
1.2 Semen / PC (40 kg) 156.00 zak 74,000.00 11,544,000
1.3 Pasir pasang 22.00 m3 297,000.00 6,534,000
1.4 Pasir Lumajang 1.41 m3 373,000.00 525,900
1.5 Batu pecah 2 - 3 cm (lokal) 1.86 m3 356,000.00 662,200
1.6 Besi ø 12 0.00 ljr 124,000.00 -
1.7 Besi ø 10 53.00 ljr 100,000.00 5,300,000
1.8 Besi ø 8 0.00 ljr 64,000.00 -
1.9 Bendrat 6.00 kg 37,000.00 222,000
1.10 Bata merah 504.00 bj 1,000.00 504,000
1.11 Triplek 0.21 lbr 177,000.00 37,200
1.12 Paku 4.36 kg 23,000.00 100,300
1.13 Kayu lokal balok 0.35 m3 3,660,000.00 1,281,000
1.14 Plywood 6.00 lbr 193,000.00 1,158,000
1.15 Minyak begisting 3.00 ltr 10,000.00 30,000
1.15 Tulisan 1.00 bh 200,000.00 200,000
-
Sub Total 1) 37,233,700
2. A L A T
2.1 Cangkul 2.00 bh 70,000 140,000
2.2 Ganco 0.00 bh 90,000 -
2.3 Sekop 2.00 bh 70,000 140,000
2.4 Timba cor 15.00 bh 14,500 217,500
2.5 Benang 2.00 bh 5,000 10,000
2.6 Gerobak Sorong 1.00 bh 550,000 550,000
-
-
-
Sub Total 2) 1,057,500
3. U P A H
3.1 Pekerja 126.00 OH 75,500.00 9,513,000
3.2 Langsir batu kali /m3 44.78 m3 150,000.00 6,717,000
3.3 Langsir pasir /m3 1.86 m3 100,000.00 186,000
3.4 Tukang besi 3.00 OH 94,500.00 283,500
3.5 Tukang batu 39.00 OH 94,500.00 3,685,500
3.6 Tukang kayu 9.00 OH 94,500.00 850,500
Sub Total 3) 21,235,500
TOTAL Rp 59,526,700
DIBULATKAN Rp 59,526,700
Dengan Huruf : Lima puluh sembilan juta lima ratus dua puluh enam ribu tujuh ratus rupiah
Menyetujui,
TPK Desa Ngadas Dibuat oleh :
Tim Teknis
0.70 Mengetahui,
Kepala Desa Ngadas
Diperiksa/Disetujui,
Pendamping Profesional/Instansi
0.30
Sutono, ST
0.30
Dibuat oleh :
Tim Teknis
0
Talud/TPT Tipe I Panjang = 7.00 m
0.30 0.50
Pemerintah Desa Ngadas
Kecamatan Sukapura
KABUPATEN PROBOLINGGO
0.70 KEGIATAN
Gorong-gorong
Lokasi : Dsn. Krajan 2 RT. 06
Mengetahui,
Kepala Desa Ngadas
Talud/TPT Tipe II Panjang = 3.00 m
0.30
0.30 0.50
0.30 0
Menyetujui,
Pendamping Profesional/Instansi
0.60
Sutono, ST
Dibuat oleh :
0.30 Tim Teknis
0.35
Gorong-gorong
Lokasi : Dsn. Krajan 2 RT. 06
0.30 0.30
Mengetahui,
0.30 0.35 Kepala Desa Ngadas
0
Talud/TPT Tipe III Panjang = 3.00 m Talud/TPT Tipe IV Panjang = 3.50 m
4.00 3.00
Sutono, ST
Dibuat oleh :
Tim Teknis
0.70 0.70
0.80 0.70
0
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
KABUPATEN PROBOLINGGO TA. 2016
Desa : Ngadas No. RAB : 1
Kecamatan : Sukapura Kegiatan : Gorong-gorong
Kabupaten : Probolinggo Lokasi : Dsn. Krajan 2 RT. 06
Sumber Dana: Dana Desa Ukuran/Dimens
: 29,5 m
Ngadas,
Menyetujui, Mengetahui,
TPK Desa Ngadas Kepala Desa Ngadas
0 0
Dibuat oleh :
Tim Teknis
0
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
1. PEK. PERSIAPAN
KODE JENIS PEKERJAAN INDEKS SAT. HARGA SAT. JUMLAH HARGA SATUAN
HSP (Rp.) (Rp.) PEKERJAAN
AHSP.DPU/2012/L.04-T
1.3.1 1 bh - Papan nama proyek, 60x90 cm
a. Bahan : - Triplek 0.208 lbr 94,200.00 19,625.00
- Paku 0.250 kg 20,200.00 5,050.00
- Kayu hutan balok 0.025 m3 5,043,000.00 123,553.50
- Tulisan 1.000 bh 200,000.00 200,000.00 Rp 348,228.50
2. PEK. TANAH
AHSP.DPU/2012/T.07.a)
2.1.1 1 m3 - Galian TANAH BIASA, kedalaman < 1 meter
a. Tenaga : - Pekerja 0.563 OH 60,000.00 33,780.00
- Mandor 0.019 OH 80,000.00 1,520.00
m3 - Galian TANAH BIASA, kedalaman < HSP Rp 35,300.00
AHSP.DPU/2012/T.14.c)
2.8.2 1 m3 - Urugan PASIR
a. Bahan : - Pasir urug 1.200 m3 155,000.00 186,000.00 Rp 186,000.00
AHSP.DPU/2012/P.03.c)
3.7.2 1 m2 - Plesteran, 1 PC : 4 PP
a. Bahan : - Semen / PC (40 kg) 0.111 zak 72,300.00 8,025.30
- Pasir pasang 0.018 m3 236,000.00 4,248.00 Rp 12,273.30
AHSP.DPU/2012/P.02.a)
3.10.1 1 m2 - Siar / Setrik, 1 PC : 2 PP (luar)
a. Bahan : - Semen / PC (40 kg) 0.159 zak 72,300.00 11,495.70
- Pasir pasang 0.012 m3 236,000.00 2,832.00 Rp 14,327.70
AHSP.DPU/2012/B.21
4.3.1 1 m2 - Bekisting beton PLAT LANTAI (tanpa perancah)
a. Bahan : - Kayu lokal balok 0.020 m3 3,660,000.00 73,200.00
- Paku 0.250 kg 23,000.00 5,750.00
- Plywood 0.350 lbr 193,000.00 67,550.00
- Minyak begisting 0.200 #N/A 10,000.00 2,000.00 148,500.00