Bangunan Air
Bangunan Air
B Alat
1 Cangkul bh 70,000
C Upah
1 Tukang kayu OH Rp 94,500
2 Pekerja OH Rp 75,500
3 Tukang besi OH Rp 94,500
4 Tukang batu OH Rp 94,500
5 Tukang cat OH Rp 94,500
6 Tukang pipa OH Rp 94,500
7 Mandor OH
124,023,100 Panjang Lebar Tinggi Unit
Dimensi 2 3 2
Galian tanah 0.85 0.85 10 1
Urugan tanah 0.6 0.6 10 0.333333 1.2
Urugan pasir 0.85 10 0.1 1 0.85
3.7 0.1 0
Anstampeng 0.85 10 0.15 1
Balok plat
Volume beton
1.7 2 0.15 2 1.02
1.7 1 0.15 1 0.255
2.7 2 0.15 2 1.62
2 3 0.15 1 0.9
0.5 0.5 0.12 5 0.15
Pembesian
Besi Ø12 48.70833
15 7 2 17.5
24 6 2 24
15 2.3 1 2.875
9 2 2 3
8 2 1 1.333333
Begisting balok
2 3 4 24
2 2 5 20
Plat
Volume beton 2 3 0.1
Pembesian
Besi Ø10 6.583333
20 2 3.333333
13 3 3.25
Begisting Plat 2 3
Paving lantai 0 3.7
Jumlah
Galian tanah 7.225 m3
Urugan tanah 1.2 m3
7.225 Urugan pasir 0 m3
1.2 Anstampeng 1.275 m3
0 Volume beton 5.025 m3
Pembesian 667.2996 m3
1.275 Besi Ø10 7 ljr
Besi Ø12 63 ljr
3 Besi Ø8 7 ljr
Begisting sloof 0 m2
0.2295 Begisting plat 6 m2
Begisting kolom 0 m2
0.18 Begisting balok 44 m2
Trasram 0 m2
7 74.57184 Pasangan batu kali 3 m2
Plesteran 0 m2 110
3 14.20416 Paving lantai 0 m2
Pasang keramik 0 m2
Kusen pintu jendel 0 m2
0.3 Pintu panel 0 m2
Jendela 0 m2
Kaca 0 m2
72.20448
5 53.2656
4 18.93888
3.945
543.30912
51 543.3091
44
0.6
51.786
7 51.786
6
0
RENCANA ANGGARAN BIAYA (RAB)
Desa : Ngadas No. RAB : 1
Kecamatan : Sukapura Kegiatan : Bangunan air
Kabupaten : Probolinggo Lokasi : Dsn. II Rt. 06
Sumber Dana : Dana Desa Ukuran/Dimensi :2x3m
Harga Satuan Jumlah Total
URAIAN Volume Satuan
( Rp ) ( Rp )
a b c d e=bxd
1. B A H A N
1.1 Batu kali/belah 5.13 M3 204,000.00 1,046,500
1.2 Batu pecah 2 - 3 cm (lokal) 3.84 M3 356,000.00 1,367,000
1.3 Bendrat 10.01 Kg 37,000.00 370,400
1.4 Besi ø 10 7.00 Batang 100,000.00 700,000
1.5 Besi ø 12 63.00 Batang 124,000.00 7,812,000
1.6 Besi ø 8 7.00 Batang 64,000.00 448,000
1.7 Cat waterproof 6.00 Kg 161,000.00 966,000
1.8 Kayu lokal balok 2.37 M3 3,660,000.00 8,674,200
1.9 Minyak begisting 10.00 Liter 10,000.00 100,000
1.10 Paku 21.29 Kg 23,000.00 489,700
1.11 Pasir lumajang 2.62 M3 373,000.00 977,300
1.12 Pasir pasang 1.63 M3 297,000.00 484,100
1.13 Pasir urug 0.55 M3 194,000.00 106,700
1.14 Pipa PVC diameter 3/4" 600.00 Lonjor 77,000.00 46,200,000
1.15 Plywood 11.00 Lembar 193,000.00 2,123,000
1.16 Semen / PC (40 kg) 56.00 Sak 74,000.00 4,144,000
1.17 Triplek 0.21 Lembar 177,000.00 37,200
1.18 Tulisan 1.00 bh 200,000.00 200,000
1.19 Pompa air jenis tanam (02.04.02.11.6) 1.00 unit 19,000,000.00 19,000,000
1.20 WASSER PC-500EA Spec : Jetpump 500W,
daya hisap 50 m 1.00 unit 2,800,000.00 2,800,000
1.21 Air 1,180.00 ltr 150.00 177,000
-
Sub Total 1) 98,223,100
2. A L A T
2.1 Cangkul 2.00 bh 70,000 140,000
2.2 Sekop 3.00 bh 70,000 210,000
2.3 Timba cor 20.00 bh 14,500 290,000
2.4 Benang 1.00 bh 5,000 5,000
2.5 Mobilisasi beton mixer 1.00 ls 400,000 400,000
2.6 Beton Mixer 1.00 hr 200,000 200,000
-
Sub Total 2) 1,245,000
3. U P A H
3.1 Pekerja 46.00 OH 75,500.00 3,473,000
3.2 Tukang batu 6.00 OH 94,500.00 567,000
3.3 Tukang kayu 41.00 OH 94,500.00 3,874,500
3.4 Tukang besi 5.00 OH 94,500.00 472,500
3.5 Tukang cat 1.00 OH 94,500.00 94,500
3.6 Upah langsir pipa 3/4" 2.00 rit 200,000.00 400,000
3.7 Upah langsir galian c 13.77 rit 150,000.00 2,065,500
3.8 Tukang pipa 144.00 OH 94,500.00 13,608,000
Sub Total 3) 24,555,000
TOTAL Rp 124,023,100
DIBULATKAN Rp 124,023,100
Dengan Huruf :
Menyetujui,
TPK Desa Ngadas Dibuat oleh :
Tim Teknis
Mengetahui,
Kepala Desa Ngadas
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
1. PEK. PERSIAPAN
KODE JENIS PEKERJAAN INDEKS SAT. HARGA SAT. JUMLAH HARGA SATUAN
HSP (Rp.) (Rp.) PEKERJAAN
AHSP.DPU/2012/L.04-T
1.3.1 1 bh - Papan nama proyek, 60x90 cm
a. Bahan : - Triplek 0.208 Lembar 177,000.00 36,875.00
- Paku 0.250 Kg 23,000.00 5,750.00
- Kayu lokal balok 0.025 M3 3,660,000.00 89,670.00
- Tulisan 1.000 bh 200,000.00 200,000.00 Rp 332,295.00