ANALISA KEBUTUHAN TENAGA PER HARI BERDASAR SISA, JENIS DAN PROPORSI BIAYA TENAGA

EST SISA PEK


PROGRES ESTIMASI UNIT TERPASANG
No URAIAN PEKERJAAN BOBOT SD M8 PROGRES BESAR (% SD M11 (%
SD M11 BOBO)
BOBOT)

I. PEKERJAAN PERSIAPAN UMUM


I. Pekerjaan Persiapan Umum
1.2 Pasengger Hoist
2.20 0.229 0.403 1.25 0.544
II. PEKERJAAN STRUKTUR
2.1 PEK. PERUBAHAN DI BANGUNAN HOTEL
2.2 PEKERJAAN RUANG BILAS DAN HOTEL 5.36 1.011 1.785 3.578

III. PEKERJAAN ARSITEKTUR


3.1 PEKERJAAN ARSITEKTUR LANTAI - 1
3.2 PEKERJAAN ARSITEKTUR LANTAI - 2
3.3 PEKERJAAN ARSITEKTUR LANTAI - 3
3.4 PEKERJAAN ARSITEKTUR LANTAI - 4
3.5 PEKERJAAN ARSITEKTUR LANTAI - 5
3.6 PEKERJAAN ARSITEKTUR LANTAI - 6
3.7 PEKERJAAN PERUBAHAN AREA KITCHEN & R. STORAGE
3.8 PEKERJAAN ARSITEKTUR LANTAI DAK 38.17 2.451 4.325 33.843

IV PEKERJAAN ELECTRICAL
4.1 DISTRIBUTION BOARD PANEL & POWER CABEL 1.5
4.2 ARMATURE, CABELING, LIGHTENING PROTECTION 4
4.3 INSTALATION INTEGRATION SYSTEM ( DATA/TELP) 1.5
4.4 INSTALATION FIRE ALARM SYSTEM
4.5 PUBLIC ADDRESS GEN- ANNOUNCEMENT/ SOUND SYS 12.21 1.094 1.931 7 3.280

V PEKERJAAN MEKANIKAL
5.1 CLEAN WATER SUPPLY INSTALATION
5.3 SEWAGE WATER INSTALATION SYSTEM (STP)
5.5 WASTE WATER & VENT INSTALLATION SYSTEM
5.6 HYDRANT & SPRINKLER ( fire fighing instalation)
5.7 AIR CONDITIONING & FAN 10
5.9 ELEVATOR (LIFT) 380V 3PHs 50HZ (gearlessPM) 6
5.10 GENERATOR SET INSTALATION 42.06 12.340 21.777 16 4.284

JUMLAH 100.00 17.125 30.220 45.530

PROGRES SD M11 30% (MASIH DIBAWAHNYA)


CATATAN DAN ASUMSI KOMPOSISI TENAGA DIBANDING
PENGADAAN BESAR SUDAH DIPIS
DASAR PERHITUNGAN ADALAH NILAI SISA PEKERJAAN (TIDAK TERMASUK PENGADA
ONGKOS TUKANG DISAMAKAN TENAGA, 150 RB TANPA LEMBUR
SISA WAKTU 65 HARI
NILAI 295 ORANG PERHARI ADALAH TENAGA RATA RATA PER HARI TANPA LEMBUR
PERHITUNGAN YANG SEBENARNAY ADALAH BERDASAR PADA RENCANA KERJA, KEB
SATUAN WAKTU
AN PROPORSI BIAYA TENAGA DAN BAHAN
KEBUTUHAN
EST SISA PEK KEBUTUHAN ORANG PER
KOMPONEN TENAGA
TERPASANG SD M11 (20 SD 30%) TENAGA (HARI HARI (SISA 65
(RP) ORANG
HARI)

132,263,362 26,452,672 176.3511 2.7131

869,558,174 217,389,543 1,449.2636 22.2964

8,223,943,583 2,055,985,896 13,706.5726 210.8703

796,968,031 199,242,008 1,328.2801 20.4351

1,040,990,489 260,247,622 1,734.9841 26.6921

11,063,723,639.540 2,759,317,741.771 18,395.452 283.007

1
ERJAAN (TIDAK TERMASUK PENGADAAN BEASR)
RB TANPA LEMBUR

ATA RATA PER HARI TANPA LEMBUR


ERDASAR PADA RENCANA KERJA, KEBUTUHAN TENAGA PER PEKERJAAN PER
NO URAIAN OKTOBER
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

I. LANTAI DASAR
1 STRUKTUR DAN ARSITEKTUR 8 10 4 10 7 4 4 7 7 7 6 6 4 3 6 6 15 6 6 8 11
2 MEKANIKAL ELEKTRIKAL 2 2
###
II. LANTAI 3 ###
1 STRUKTUR DAN ARSITEKTUR 20 19 18 19 19 17 17 20 20 21 27 24 24 14 16 23 23 9 15 15 16 16
2 MEKANIKAL ELEKTRIKAL 6 6 7 6 6 6 5 5 8 5 3 5 4 4 4 4 4 6
###
III. LANTAI 5 ###
1 STRUKTUR DAN ARSITEKTUR 8 8 11 8 13 10 10 9 9 9 4 6 5 5 3 13 16 12 13 14 15
2 MEKANIKAL ELEKTRIKAL 6 6 2 6 6 6 6 6 6 10 6 6 5 5 6 8 8 6
###
IV LANTAI 6 ###
1 STRUKTUR DAN ARSITEKTUR 4 3 7 3 4 4 4 7 2 3 3 3 2 3
2 MEKANIKAL ELEKTRIKAL 4 4 6 4 4 2 2 2 4 ###

V LANGSIRAN 14 14 17 14 12 14 14 14 20 9 8 6 6 4 6 5 9 8
JUMLAH - - - - 70 70 72 70 45 49 59 65 65 57 46 48 45 29 35 39 58 63 48 56 21 67 67
CATATAN
TIDAK ADA LEMBUR
ADA LEMBUR
NO URAIAN NOVEMBER
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

I. LANTAI DASAR
1 STRUKTUR DAN ARSITEKTUR 5 7 5 6
2 MEKANIKAL ELEKTRIKAL

II. LANTAI 3
1 STRUKTUR DAN ARSITEKTUR 15 20 18 18
2 MEKANIKAL ELEKTRIKAL 4 9 8

III. LANTAI 5
1 STRUKTUR DAN ARSITEKTUR 13 16 14 12
2 MEKANIKAL ELEKTRIKAL 2 6

IV LANTAI 6
1 STRUKTUR DAN ARSITEKTUR 3 4 4 4
2 MEKANIKAL ELEKTRIKAL 3 2

V LANGSIRAN 9 9 9
JUMLAH 36 60 64 65
CATATAN
TIDAK ADA LEMBUR
ADA LEMBUR