NAMA PROYEK : NO.

PAKET PENGGANTIAN JEMBATAN REVIEW BY : DIGAMBAR OLEH : DIPERIKSA OLEH : DISETUJUI OLEH :
NAMA JEMBATAN JEMBATAN TAKONG 3

SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II NAMA PAKET / LINK RUAS JALAN ANJUNGAN-SELUAS-BTS. SERAWAK
CORE TEAM APBN 2020 DENAH DAN POTONGAN MEMANJANG
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL
PROVINSI KALIMANTAN BARAT PROV. KALIMANTAN BARAT HARDY HARYAPRAJA GUSTI PRIADI, ST ENGKUS KUSWANDI BE. ST
PROVINSI KALIMANTAN BARAT Jl. Surya, Gg. Surya Nila No. 4A. Pontianak CAD OPERATOR Ahli Jembatan Team Leader

A.1 A.2

KE PONTIANAK KE. BENGKAYANG


Tangga Insfeksi
Tangga Insfeksi

C
L SAMBUNGAN
BH1 MAB=ELV.37.100 BH2

MAB=ELV.35.100

SUMURAN Ø 3.00 M SUMURAN Ø 3.00 M


6000 6000
H= 6.00 M H= 6.00 M

3000 3000

DATUM = 70.000

0.47
0.30
0.77
0.98

0.41
JARAK 14.53 1.45 1.30 1.51 1.64 1.18 1.47 1.40 0.83 1.44 11.30

39.100
ELEVASI RENCANA
37.107

37.099

37.100
37.100
36.200

35.917

35.366

34.656

34.503

34.245

34.408

34.515

34.639

35.928
37.150

37.155

37.193
ELEVASI EKSISTING

STA 0+275 0+300 0+325

15000
300 300

1000

1600

3500 1600

KE PONTIANAK 7000 1600 KE. BENGKAYANG

3500 1600

1600

1000
5000 5000 5000

12000 C
3000
L SAMBUNGAN