SEDIMENTASI

Kotak, horizontal-flow rectangular sedimentation basins,

Diketahui:
Q 165 lps
0.165 m3/s 14256 m3/day
Kekeruhan 55 NTU
Overflow rate 45 m3/day
Asumsi jumlah tank 2 buah
PERHITUNGAN

1. Menghitung luas area settler


As = Q/Overflow
316.8 m2

2. Menghitung luasan tank


A tank = As/jlh tank
158.4 m

3. Menentukan width W 3m
4. Menentukan Length L 52.8 m
17.6 m
Rasio L :W 17.6 : 1

4. Kedalaman permukaan (zona lumpur)


Freeboard (ketentuan) 0.6 m
sludge depth (h lumpur) kriteria 0.6 -1 m 0.7 m
h laju pelimpah 2m
SWD (h lumpur+h laju) 2.7 m
TOTAL DEPTH (swd + freeboard) 3.3 m
L/D 16 m
rasio L/D 16:1 , acceptable krn min 15:1

5. Menentukan kecepatan Vf
Q 0.165 m3/s
A (jlh tank x depth h laju x width) 12 m2
Vf 0.01375 m/s ketentuan 0,005-0,018

6. Menentukan jari-jari basah Rh


Ax (luas basah) = h laju (depth) x width 6 m2
Pw (2H + w) 7m
Rh = Ax/Pw 0.8571428571 m

7. Bilangan Reynold
R = (vf x Rh)/viskositas 9017.3789485 atau 9000
Acceptable krn kurang dr 20.000

8. Menentukan bil Froud Fr


Fr = Vf^2/(g x Rh) 2.24845E-05
acceptable krna lebih besar dr 10^-5

9. Mendesain launder/pencuci
Tersedia launder 1/3 dari panjang basin 17.6 m
jlh laundernya 3 buah

10. Periksa weir loading rate


WL = Q m3/day /(jlh tank x jlh launder x L launder x 2 67.5 m3/day.m atau 68
Diterima karna dibawah 250 m3/day.m

JADI
P atau Length 52.8 m
L atau Width 3m
T atau total depth 3.3 m
n 0,005-0,018
FILTRASI

Single media sand only


Q m3/day 14256 m3/day
q atau filtration rate utk sand 5-12 m/ 6 m/h 0.0016666667 m/s 144
faktor bentuk (f) 0.7-0.95) 0.8
Porositas (3) 0.42
Depth of medium (D) 0.7 m

1. Tinggi jagaan 35 cm 0.35 m


2. Luas permukaan A
a= Q m3/day / (N jlh layer x q m/day) 99 m2

3. Va / filtration rate
Va = Q/A 144 m/day
0.0016666667 m/s

4. Headloss
hL= (1.067) x (q)^2 x (D)/ psi x 9.81 x ε^4
8.495791E-06
x 75025 x sigma ke 0.6373966943
hL= 0.6373966943 m
63.739669433 cm

5. Tinggi expansi (Backwash)


De = (1-ε) ( D) sigma f/(1-εe) 1.02718 1m

6. Deep through 30cm 0.3 m

7. Dimensi bak
jika luas 99 m2
jika p=l maka p 9.9498743711 m
atau 10 m

Jika p=10 m maka l=A/p jadi l 9.9 m

P 10 m
L 9.9 m
H = deep through + D medium + De +t 2.95 m

8. jlh bak
n = 12Q^0.5 1432.7819094
m/day

h = 2.95 m

l=9.9 m

p = 10 m
FLOTASI
Conventional rate
Q 0.015 M3/S 54 m3/jam

recycle rate, kriteria 6-12% 11 0.8


footprint area (asumsi berapa persen) 90 0.7
V nom hl, kriteria 5-15 m/jam 10 m/jam
Vsz hl, kriteria 6-12 V nom hl *(recycle rate/footprint area)

Vsz hl 11.42857 m/jam


memenuhi kriteria separation loading rate 6-18 m/jam

dari rumus Vsz didapatkan rumus Asz


Asz = (Q+Qr)/Vsz
Vsz (m/hari) 274.2857 m/hari
Q 1296 m3/hari
Qr = 8% dari Q 1036.8 m3/hari
sehingga Asz 8.505 m2

jika memilih rasio 1,2 :1 maka 10.206


1.2x dikali x = 44,55 m2 3.194683
1,2 x^2 = 44,55 m2 6.389366
x^2 = 37,125
x = 6,1 m

L = 2x = 2 x 6,1 = 12,2 m
W = x = 6,1 m
L/W = 2, memenuhi L/W rasio 1-2

Depth nya lihat di kriteria desain hal 9-66 edwalz, conventional 2-3,5 m