TABULASI PENGUKURAN

PAKET PEMBANGUNAN JALAN TOL


JAKARTA CIKAMPEK 2 SELATAN
KM 34+100 - 60+180

No REFERENSI JENIS PEKERJAAN

1 PEKERJAAN TANAH
Galian Biasa
Galian Batu
Galian Struktur
Borrow Material
Urugan Material Berbutir (Granular Backfill)
Urugan Rembesan (Permeable Backfill)
Vertikal Sand Drain
Horozontal Sand Drain
Fabricated Vertical Drain, PVD
Geotextile

2 Drainase
Box Culvert
RCP

3 Persiapan Tanah Dasar

4 Lapis Pondasi Aggregat


Lapis Pondasi Aggregat
CTB

5 Perkerasan
Prime Coat
Tack Coat
Seal Coat
Aspal Beton
Rigid Pavement
Lean Concrete
Drainase Layer

6 Struktur Beton
Balok Beton Precast
Tiang Pancang Beton
Tiang pPancang Baja
Tiang Bor Beton Cast In Place