ANALISIS TINGKAT KERUSAKAN RUANG KELAS (RK3)

Tingkat
Bobot (%) Kerusakan
N Komponen
Sub Komponen Bangunan Terhada Bobo Nilai
o Bangunan Kerusakan
p t (%)
Ruang Maksimum (%) (4x6)
(1) (2) (3) (4) (5) (6) (7)
1 Atap a. Penutup Atap 10,56% 100% 35 3,70%
    b. Rangka Atap 11,62% 100% 40 4,65%
    c. Lis Plang & Talang 2,06% 100% 100 2,06%
             
2 Plafon a. Rangka Plafon 4,67% 100% 50 2,34%
    b. Penutup & Lis Plafon 5,06% 100% 25 1,27%
    c. Cat 1,41% 100% 40 0,56%
             
3 Dinding a. Kolom & Balok Ring 9,66% 100% 25 2,42%
    b. Bata / Dinding Pengisi 13,68% 100% 25 3,42%
    c. Cat 1,65% 100% 80 1,32%
             
4 Pintu & Jendela a. Kusen 2,70% 100% 35 0,95%
    b. Daun Pintu 2,47% 100% 50 1,24%
    c. Daun Jendela 5,15% 100% 50 2,58%
             
5 Lantai a. Struktur Bawah 2,89% 100% 20 0,58%
    b. Penutup Lantai 8,96% 100% 35 3,14%
             
6 Pondasi a. Pondasi 11,15% 100% 30 3,35%
    b. Sloof 3,30% 100% 35 1,16%
             
7 Utilitas a. Listrik 1,79% 100% 30 0,54%
    b. Instalansi Air Hujan & 100 1,22%
    pasang rabat beton 1,22% 100% 0 0,00%
    keliling bangunan 0  
             
JUMLAH 100,00%   0 36,45%
NILAI TINGKAT KERUSAKAN KELAS 3       36,45%