LIST PEMBAYARAN / PEMASUKAN

PROYEK : PEMBANGUNAN RUMAH PAK SOFYANDI


LOKASI : TANAH KAVLING KSB
PERIODE : JUNI 2021
NILAI KONTRAK : 105.500.000;
A. PEMASUKAN
NOMINAL JUMLAH SISA
NO TANGGAL KETERANGAN
(Rp) (Rp) (Rp)
1 14/06/2021 30.000.000 30.000.000 75.500.000 transfer, termasuk bayar bata merah 9000 pcs
2 15/07/2021 10.000.000 40.000.000 65.500.000 transfer
3 19/07/2021 10.000.000 50.000.000 55.500.000 transfer
4 22/07/2021 10.000.000 60.000.000 45.500.000 transfer
5 05/09/2021 10.000.000 70.000.000 35.500.000 transfer
6 06/09/2021 10.000.000 80.000.000 25.500.000 transfer
7 16/09/2021 20.000.000 100.000.000 5.500.000 cash

B. LIST PEKERJAAN TAMBAH


VOL HARGA SAT. JUMLAH
NO TANGGAL KETERANGAN
(LS) (Rp) (Rp)
1 12/09/2021 1 1.400.000 1.400.000 pindah kwh berikut kabel 90m dan jasa
2 26/09/2021 1 1.250.000 1.250.000 perubahan pintu slide berikut pindah saklar & jasa
3 16/09/2021 1 300.000 300.000 pas. Exuast fan toilet berikut kabel & jasa
4 19/09/2021 1 350.000 350.000 pas. Instalasi air dari sumur ke torn berikut pipa & jasa
5 26/09/2021 1 13.000.000 13.000.000 pas. Pagar keliling dengan hable, plester aci bagian dalam
6 27/09/2021 1 300.000 300.000 pas. Otomatis pompa berikut kabel & jasa
7 16/09/2021 1 3.500.000 3.500.000 pemasangan atap dapur berikut plapon material dan jasa
TOTAL 20.100.000