Anda di halaman 1dari 1

PROGRAM STUDI TEKNIK PETAMBANGAN

443,000 mE

444,000 mE

445,000 mE

446,000 mE

447,000 mE

448,000 mE

449,000 mE

450,000 mE

451,000 mE

452,000 mE
FAKULTAS TEKNIK
S.
UNIVERSITAS KUTAI KARTANEGARA
Ke
d an
gl u
an
g

S. N
9,956,000 mN

gas
inan
PETA GEOLOGI REGIONAL

S. Kehan
PT. BUMI JAYA PRIMA ETAM
Skala 1 : 25000
0 250 500 1,000
9,955,000 mN
metres

S.
9,954,000 mN iu N
Oleh ng :

Nama : Muhammad Untung


Npm : 14.11.108.701602000817

Keterangan :

IUP Operasi Produksi

9,953,000 mN

Struktur geologi sinklin


li
Sa
S.

Struktur GeologiSesar Naik

Alur/Sungai

9,952,000 mN
Qa Quarter aluvial

ta
i Tmpb Formasi Pulaubalang
ehe
N
s.
Tomp Formasi Pamaluan
e
en

Sumber Peta Rupa Bumi Indonesia 1990


ng

dan Geologi Lembar Samarinda Oleh S.Supriatna dkk 1995


da

9,951,000 mN
Ke

Geologi Lembar Samarinda


Lokasi IUP BJPE Lembar Pengesahan
S.

Digambar :

Diperiksa :
0 50

kilometres
Scale: 1:10,860,000

Disetujui :

0 500

kilometres
Scale: 1:37,970,000

Proyeksi : Universal Transverse Mercator (UTM)


Sistem Grid : Grid Geografi dan UTM Zona 50 S
9,950,000 mN
S. Nokang

Anda mungkin juga menyukai