Anda di halaman 1dari 204

OPNAME PEKERJAAN

PENGENDALIAN BANJIR TUKAD UNDA

MANDOR : Putu Sukanegara


SPK NOMOR :
PERIODE : 31 Oktober 2020 sd 21 November 2020
KETENTUAN :
1 SPK TIDAK BERLAKU UNTUK MENGUANGKAN TAGIHAN JIKA SPK TERISI TIDAK LENGKAP / TIDAK ABSAH TERMASUK LEMBAR SEBALIKNYA
2 PENGISIAN VOLUME OPNAME DIMUNGKINKAN DIBUAT DALAM JUMLAH BULAT MENDEKATI : 5, 10, 15 DST
3 JIKA BERKAS LAMPIRAN PERHITUNGAN OPNAME MANDOR / SUBKON TIDAK ADA / TIDAK JELAS, OPNAME TIDAK DAPAT DIBAYAR

PERIODE LALU PERIODE INI KUMULATIF s/d SAAT INI


NO URAIAN PEKERJAAN SAT. HARGA SATUAN
VOLUME JUMLAH HARGA VOLUME JUMLAH HARGA VOLUME JUMLAH HARGA

Upah Pasang Batu Kali m3 Rp 150,000.00 Rp - 845.00 Rp 126,750,000.00 845.00 Rp 126,750,000.00


Upah Siaran m2 Rp 18,000.00 Rp - - Rp - Rp -
Upah Plesteran m2 Rp 22,500.00 Rp - - Rp - Rp -

TOTAL Rp - Rp 126,750,000.00 Rp 126,750,000.00


PEMBAYARAN DITAHAN AKIBAT RETENSI 5% Rp - Rp - Rp -
PEMOTONGAN AKIBAT KASBON
TOTAL BIAYA PENGURANG
BIAYA YANG DIBAYARKAN Rp - Rp 126,750,000.00 Rp 126,750,000.00

Disetujui, Diperiksa, Dibuat oleh,

I Made Sujana Muhammad Ihsan I Wayan Darmada Putu Sukanegara


Project Manager Site Engineer Manager Site Operasion Manager Mandor
065 100221 AJB 02 01/04 a
Rit 1 113 180221 AJB 02 01/02 b
117 190221 AJB 03 03/05 a
067 100221 AJB 04 03/04 a
Rit 2 072 110221 AJB 04 04/05 a
076 120221 AJB 01 03/05 a
23 March 2021
066 100221 AJB 03 02/04 a
Rit 3 079 120221 AJB 03 01/04 b
080 120221 AJB 02 02/04 b
068 100221 AJB 01 04/04 a
Rit 4 078 120221 AJB 05 05/05 a
082 120221 AJB 04 04/04 b
038 040221 AJB 01 03/04 a
Rit 1 059 090221 AJB 04 03/04 a 24 March 2021
132 210221 AJB 04 02/06 a
115 190221 AJB 04 01/05 a
Rit 1 127 200221 AJB 05 05/05 a
136 210221 AJB 05 06/06 a
131 210221 AJB 03 01/06 a
Rit 2 133 210221 AJB 02 03/06 a
137 210221 AJB 04 01/02 b
25 March 2021
138 210221 AJB 01 02/02 b
Rit 3 116 190221 AJB 01 02/05 a
118 190221 AJB 05 04/05 a
125 200221 AJB 03 03/05 a
Rit 4 114 180221 AJB 03 02/02 b
128 200221 AJB 03 01/03 b
108 180221 AJB 02 01/05 a
Rit 1 109 180221 AJB 03 02/05 a
122 190221 AJB 04 03/03 b
083 140221 AJB 01 01/05 a
Rit 2 110 180221 AJB 04 03/05 a
135 210221 AJB 06 05/06 a
26 March 2021
121 190221 AJB 01 02/03 b
Rit 3 123 200221 AJB 01 01/05 a
124 200221 AJB 04 02/05 a
112 180221 AJB 05 05/05 a
Rit 4 102 170221 AJB 03 03/05 a
103 170221 AJB 04 04/05 a
DIMENSI
TINGGI LEBAR
NO KODE PRODUKSI

1.00 003 170321 AJB 01 01/01 b


2.00 004 190321 AJB 01 01/02 a
3.00 005 190321 AJB 02 02/02 a
4.00 006 190321 AJB 01 01/02 b
5.00 007 190321 AJB 02 02/02 b
6.00 013 210321 AJB 02 02/02 b
7.00 020 240321 AJB 01 01/02 a
8.00 016 230321 AJB 01 01/02 a
9.00 014 220321 AJB 01 01/02 a
10.00 017 230321 AJB 02 02/02 a
11.00 022 290321 AJB 01 01/02 a

12.00 002 170321 AJB 02 02/02 a


13.00 012 210321 AJB 01 01/02 b
14.00 001 170321 AJB 01 01/02 a
15.00 027 300321 AJB 04 04/04 a
Rit 1
16.00 010 210321 AJB 01 01/02 a
17.00 021 240321 AJB 02 02/02 a
18.00 051 030421 AJB 04 04/04 b
19.00 029 300321 AJB 02 02/04 b
20.00 024 300321 AJB 01 01/04 a
21.00 026 300321 AJB 03 03/04 a
22.00 025 300321 AJB 02 02/04 a
23.00 008 200321 AJB 01 01/02 a
24.00 Rit 2 011 210321 AJB 02 02/02 a
25.00 023 290321 AJB 02 02/02 a
26.00 018 230321 AJB 01 01/02 b
27.00 019 230321 AJB 02 02/02 b
28.00 028 300321 AJB 01 01/04 b
29.00 146 150421 AJB 02 02/07 a
30.00 145 150421 AJB 01 01/07 a
31.00 134 140421 AJB 04 04/07 a
32.00 147 150421 AJB 03 03/07 a
33.00 Rit 1 151 150421 AJB 07 07/07 a
34.00 152 150421 AJB 01 01/07 b
35.00 148 150421 AJB 04 04/07 a
36.00 150 150421 AJB 06 06/07 a
37.00 156 150421 AJB 05 05/07 b
38.00 157 150421 AJB 06 06/07 b
39.00 149 150421 AJB 05 05/07 a
40.00 153 150421 AJB 02 02/07 b
Rit 2
41.00 135 140421 AJB 05 05/07 a
42.00 136 140421 AJB 06 06/07 a
43.00 158 150421 AJB 07 07/07 b
44.00 143 140421 AJB 06 06/07 b
45.00 142 140421 AJB 05 05/07 b
46.00 131 140421 AJB 01 01/07 a
47.00 144 140421 AJB 07 07/07 b
48.00 Rit 1 133 140421 AJB 03 03/07 a
49.00 120 130421 AJB 04 04/07 a
50.00 119 130421 AJB 03 03/07 a
51.00 122 130421 AJB 06 06/07 a
52.00 123 130421 AJB 07 07/07 a
53.00 141 140421 AJB 04 04/07 b
54.00 139 140421 AJB 02 02/07 b
55.00 132 140421 AJB 02 02/07 a
Rit 2
56.00 137 140421 AJB 07 07/07 a
57.00 154 150421 AJB 03 03/07 b
58.00 138 140421 AJB 01 01/07 b
59.00 127 130421 AJB 04 04/07 b
60.00 140 140421 AJB 03 03/07 b
61.00 117 130421 AJB 01 01/07 a
62.00 118 130421 AJB 02 02/07 a
63.00 Rit 1 121 130421 AJB 05 05/07 a
64.00 124 130421 AJB 01 01/07 b
65.00 106 120421 AJB 03 03/07 a
66.00 113 120421 AJB 03 03/06 b
67.00 112 120421 AJB 02 02/06 b
68.00 126 130421 AJB 03 03/07 b
69.00 125 130421 AJB 02 02/07 b
70.00 110 120421 AJB 07 07/07 a
Rit 2
71.00 108 120421 AJB 05 05/07 a
Rit 2

72.00 114 120421 AJB 04 04/06 b


73.00 155 150421 AJB 04 04/07 b
74.00 104 120421 AJB 01 01/07 a
75.00 130 130421 AJB 07 07/07 b
76.00 205 190421 AJB 05 05/07 b
77.00 129 130421 AJB 06 06/07 b
78.00 Rit 1 116 120421 AJB 06 06/06 b
79.00 111 120421 AJB 01 01/06 b
80.00 105 120421 AJB 02 02/07 a
81.00 107 120421 AJB 04 04/07 a
82.00 115 120421 AJB 05 05/06 b
83.00 101 110421 AJB 03 03/05 a
84.00 100 110421 AJB 02 02/05 a
85.00 099 110421 AJB 01 01/05 a
Rit 2
86.00 109 120421 AJB 06 06/07 a
87.00 103 110421 AJB 05 05/05 a
88.00 102 110421 AJB 04 04/05 a
89.00 095 100421 AJB 02 02/05 a
90.00 096 100421 AJB 03 03/05 a
91.00 097 100421 AJB 04 04/05 a
92.00 094 100421 AJB 01 01/05 a
93.00 Rit 3 089 090421 AJB 01 01/05 b
94.00 088 090421 AJB 05 05/05 a
95.00 084 090421 AJB 01 01/05 a
96.00 087 090421 AJB 04 04/05 a
97.00 223 200421 AJB 07 07/09 b
98.00 093 090421 AJB 05 05/05 b
99.00 098 100421 AJB 05 05/05 a
100.00 085 090421 AJB 02 02/05 a
Rit 4
101.00 092 090421 AJB 04 04/05 b
102.00 090 090421 AJB 02 02/05 b
103.00 086 090421 AJB 03 03/05 a
104.00 033 310321 AJB 02 02/04 a
105.00 075 070421 AJB 04 04/04 b
106.00 072 070421 AJB 01 01/04 b
107.00 079 080421 AJB 04 04/04 a
108.00 Rit 1 044 030421 AJB 01 01/04 a
109.00 082 080421 AJB 03 03/04 b
110.00 049 030421 AJB 02 02/04 b
111.00 195 190421 AJB 02 02/07 a
112.00 039 010421 AJB 04 04/04 a
113.00 060 060421 AJB 01 01/04 a
114.00 074 070421 AJB 03 03/04 b
115.00 041 020421 AJB 02 02/04 a
Rit 2
116.00 073 070421 AJB 02 02/04 b
Rit 2

117.00 061 060421 AJB 02 02/04 a


118.00 206 190421 AJB 06 06/07 b
119.00 194 190421 AJB 01 01/07 a
120.00 091 090421 AJB 03 03/05 b
121.00 182 '170421 AJB 03 03/07 b
122.00 183 '170421 AJB 04 04/07 b
123.00 Rit 3 179 '170421 AJB 07 07/07 a
124.00 181 '170421 AJB 02 02/07 b
125.00 169 160421 AJB 04 04/07 b
126.00 162 160421 AJB 04 04/07 a
127.00 178 '170421 AJB 06 06/07 a
128.00 180 '170421 AJB 01 01/07 b
129.00 184 '170421 AJB 05 05/07 b
130.00 177 '170421 AJB 05 05/07 a
Rit 4
131.00 166 160421 AJB 01 01/07 b
132.00 187 180421 AJB 01 01/07 a
133.00 159 160421 AJB 01 01/07 a

134.00 036 010421 AJB 01 01/04 a


135.00 071 070421 AJB 04 04/04 a
136.00 069 070421 AJB 02 02/04 a
137.00 189 '180421 AJB 03 03/07 a
138.00 Rit 1 080 080421 AJB 01 01/04 b
139.00 176 '170421 AJB 04 04/07 a
140.00 186 '170421 AJB 07 07/07 b
141.00 078 080421 AJB 03 03/04 a
142.00 163 160421 AJB 05 05/07 a
143.00 160 160421 AJB 02 02/07 a
144.00 161 160421 AJB 03 03/07 a
145.00 167 160421 AJB 02 02/07 b
146.00 164 160421 AJB 06 06/07 a
147.00 Rit 1 188 '180421 AJB 02 02/07 a
148.00 171 160421 AJB 06 06/07 b
149.00 165 160421 AJB 07 07/07 a
150.00 190 '180421 AJB 04 04/07 a
151.00 192 '180421 AJB 06 06/07 a
152.00 168 160421 AJB 03 03/07 b
153.00 175 '170421 AJB 03 03/07 a
154.00 191 '180421 AJB 05 05/07 a
155.00 215 200421 AJB 08 08/09 a
156.00 269 230421 AJB 08 08/09 b
157.00 170 160421 AJB 05 05/07 b
158.00 216 200421 AJB 09 09/09 a
159.00 196 190421 AJB 03 03/07 a
160.00 214 200421 AJB 07 07/09 a
Rit 2
Rit 2
161.00 083 080421 AJB 04 04/04 b
162.00 174 '170421 AJB 02 02/07 a
163.00 172 160421 AJB 07 07/07 b
164.00 035 310321 AJB 04 04/04 a
165.00 249 220421 AJB 06 06/09 b
166.00 070 070421 AJB 03 03/04 a
167.00 076 080421 AJB 01 01/04 a
168.00 045 030421 AJB 02 02/04 a
169.00 257 230421 AJB 05 05/09 a
170.00 056 050421 AJB 01 01/04 b
171.00 173 170421 AJB 01 01/07 a
172.00 050 030421 AJB 03 03/04 b
173.00 220 200421 AJB 04 04/09 b
174.00 Rit 3 231 210421 AJB 06 06/09 a
175.00 226 210421 AJB 01 01/09 a
176.00 248 220421 AJB 05 05/09 b
177.00 251 220421 AJB 08 08/09 b
178.00 009 200321 AJB 02 02/02 a
179.00 247 220421 AJB 04 04/09 b
180.00 275 240421 AJB 05 05/09 a
181.00 222 200421 AJB 06 06/09 b
182.00 227 210421 AJB 02 02/09 a
183.00 Rit 1 240 220421 AJB 06 06/09 a
184.00 246 220421 AJB 03 03/09 b
185.00 232 210421 AJB 07 07/09 a
186.00 221 200421 AJB 05 05/09 b
187.00 273 240421 AJB 03 03/09 a
188.00 260 230421 AJB 08 08/09 a
189.00 296 260421 AJB 08 08/09 b
190.00 261 230421 AJB 09 09/09 a
191.00 276 240421 AJB 06 06/09 a
192.00 Rit 1 262 230421 AJB 01 01/09 b
193.00 264 230421 AJB 03 03/09 b
194.00 277 240421 AJB 07 07/09 a
195.00 263 230421 AJB 02 02/09 b
196.00 278 240421 AJB 08 08/09 a
197.00 245 220421 AJB 02 02/09 b
198.00 279 240421 AJB 09 09/09 a
199.00 250 220421 AJB 07 07/09 b
200.00 267 230421 AJB 06 06/09 b
201.00 Rit 2 265 230421 AJB 04 04/09 b
202.00 241 220421 AJB 07 07/09 a
203.00 235 220421 AJB 01 01/09 a
204.00 239 220421 AJB 05 05/09 a
205.00 238 220421 AJB 04 04/09 a
206.00 229 210421 AJB 04 04/09 a
207.00 228 210421 AJB 03 03/09 a
208.00 237 220421 AJB 03 03/09 a
Rit 3
209.00 081 080421 AJB 02 02/04 b
210.00 233 210421 AJB 08 08/09 a
211.00 062 060421 AJB 03 03/04 a
212.00 185 '170421 AJB 06 06/07 b
213.00 193 '180421 AJB 07 07/07 a
214.00 032 310321 AJB 01 01/04 a
215.00 052 050421 AJB 01 01/04 a
216.00 Rit 1 063 060421 AJB 04 04/04 a
217.00 077 080421 AJB 02 02/04 a
218.00 057 050421 AJB 02 02/04 b
219.00 047 030421 AJB 04 04/04 a
220.00 015 220321 AJB 02 02/02 a
221.00 207 190421 AJB 07 07/07 b
222.00 030 300321 AJB 03 03/04 b
223.00 203 190421 AJB 03 03/07 b
Rit 2
224.00 031 300321 AJB 04 04/04 b
225.00 201 190421 AJB 01 01/07 b
226.00 202 190421 AJB 02 02/07 b
227.00 068 070421 AJB 01 01/04 a
228.00 212 200421 AJB 05 05/09 a
229.00 213 200421 AJB 06 06/09 a
Rit 3
230.00 034 310321 AJB 03 03/04 a
231.00 046 030421 AJB 03 03/04 a
232.00 040 020421 AJB 01 01/04 a
233.00 256 230421 AJB 04 04/09 a
234.00 211 200421 AJB 04 04/09 a
235.00 297 260421 AJB 09 09/09 b
236.00 287 260421 AJB 08 08/09 a
237.00 Rit 1 286 260421 AJB 07 07/09 a
238.00 295 260421 AJB 07 07/09 b
239.00 283 260421 AJB 04 04/09 a
240.00 259 230421 AJB 07 07/09 a
241.00 255 230421 AJB 03 03/09 a
242.00 284 260421 AJB 05 05/09 a
243.00 258 230421 AJB 06 06/09 a
244.00 318 280421 AJB 03 03/09 a
Rit 2
245.00 244 220421 AJB 01 01/09 b
246.00 303 270421 AJB 06 06/09 a
247.00 304 270421 AJB 07 07/09 a
TIDAK ADA PENGIRIMAN
248.00 290 260421 AJB 02 02/09 b
249.00 300 270421 AJB 03 03/09 a

Rit 1
250.00 301 270421 AJB 04 04/09 a
251.00 236 220421 AJB 02 02/09 a
252.00 Rit 1 298 270421 AJB 01 01/09 a
253.00 282 260421 AJB 03 03/09 a
254.00 254 230421 AJB 02 02/09 a
255.00 242 220421 AJB 08 08/09 a
256.00 243 220421 AJB 09 09/09 a
257.00 058 050421 AJB 03 03/04 b
258.00 294 260421 AJB 06 06/09 b
259.00 288 260421 AJB 09 09/09 a
Rit 2
260.00 271 240421 AJB 01 01/09 a
261.00 253 230421 AJB 01 01/09 a
262.00 210 200421 AJB 03 03/09 a
263.00 309 270421 AJB 03 03/09 b
264.00 272 240421 AJB 02 02/09 a
265.00 270 230421 AJB 09 09/09 b
266.00 209 200421 AJB 02 02/09 a
267.00 Rit 1 219 200421 AJB 03 03/09 b
268.00 218 200421 AJB 02 02/09 b
269.00 208 200421 AJB 01 01/09 a
270.00 266 230421 AJB 05 05/09 b
271.00 204 190421 AJB 04 04/07 b
272.00 281 260421 AJB 02 02/09 a
273.00 274 240421 AJB 04 04/09 a
274.00 217 200421 AJB 01 01/09 b
Rit 2
275.00 197 190421 AJB 04 04/07 a
276.00 038 010421 AJB 03 03/04 a
277.00 280 260421 AJB 01 01/09 a

278.00 230 210421 AJB 05 05/09 a


279.00 028 300321 AJB 01 01/04 b
280.00 198 190421 AJB 05 05/07 a
281.00 199 190421 AJB 06 06/07 a
282.00 Rit 1 200 190421 AJB 07 07/07 a
283.00 037 010421 AJB 02 02/04 a
284.00 042 020421 AJB 03 03/04 a
285.00 043 020421 AJB 04 04/04 a
286.00 054 050421 AJB 03 03/04 a
287.00 302 270421 AJB 05 05/09 a
288.00 321 280421 AJB 06 06/09 a

Rit 1
289.00 322 280421 AJB 07 07/09 a
290.00 319 280421 AJB 04 04/09 a
291.00 Rit 1 128 130421 AJB 05 05/07 b
292.00 320 280421 AJB 05 05/09 a
293.00 324 280421 AJB 09 09/09 a
294.00 048 030421 AJB 01 01/04 b
295.00 323 280421 AJB 08 08/09 a
296.00 081 080421 AJB 02 02/04 b
297.00 238 220421 AJB 04 04/09 a
298.00 225 200421 AJB 09 09/09 b
Rit 2
299.00 224 200421 AJB 08 08/09 b
300.00 293 260421 AJB 05 05/09 b
301.00 292 260421 AJB 04 04/09 b
302.00 252 220421 AJB 09 09/09 b
303.00 299 270421 AJB 02 02/09 a
304.00 268 230421 AJB 07 07/09 b
Rit 1
305.00 289 260421 AJB 01 01/09 b
306.00 291 260421 AJB 03 03/09 b
307.00 234 210421 AJB 09 09/09 a
308.00 430 050521 AJB 01 01/06 b
309.00 431 050521 AJB 02 02/06 b
310.00 432 050521 AJB 03 03/06 b
Rit 1
311.00 433 050521 AJB 04 04/06 b
312.00 421 050521 AJB 01 01/09 a
313.00 422 050521 AJB 02 02/09 a
314.00 423 050521 AJB 03 03/09 a
315.00 055 050421 AJB 04 04/04 a
316.00 434 050521 AJB 05 05/06 b
Rit 2
317.00 435 050521 AJB 06 06/06 b
318.00 285 260421 AJB 06 06/09 a
319.00 424 050521 AJB 04 04/09 a
320.00 391 020521 AJB 07 07/09 a
321.00 400 030521 AJB 07 07/09 a
322.00 412 040521 AJB 01 01/09 a
323.00 413 040521 AJB 02 02/09 a
324.00 Rit 3 426 050521 AJB 06 06/09 a
325.00 399 030521 AJB 06 06/09 a
326.00 390 020521 AJB 06 06/09 a
327.00 414 040521 AJB 03 03/09 a
328.00 425 050521 AJB 05 05/09 a
329.00 405 030521 AJB 03 03/09 b
330.00 410 030521 AJB 08 08/09 b
331.00 411 030521 AJB 09 09/09 b
332.00 415 040521 AJB 04 04/09 a
333.00 Rit 1 416 040521 AJB 05 05/09 a
Rit 1
334.00 417 040521 AJB 06 06/09 a
335.00 418 040521 AJB 07 07/09 a
336.00 419 040521 AJB 08 08/09 a
337.00 420 040521 AJB 09 09/09 a
338.00 403 030521 AJB 01 01/09 b
339.00 404 030521 AJB 02 02/09 b
340.00 394 030521 AJB 01 01/09 a
Rit 2
341.00 374 010521 AJB 08 08/09 a
342.00 409 030521 AJB 07 07/09 b
343.00 398 030521 AJB 05 05/09 a
344.00 392 020521 AJB 08 08/09 a
345.00 407 030521 AJB 05 05/09 b
346.00 408 030521 AJB 06 06/09 b
347.00 393 020521 AJB 09 09/09 a
348.00 Rit 3 397 030521 AJB 04 04/09 a
349.00 385 020521 AJB 01 01/09 a
350.00 396 030521 AJB 03 03/09 a
351.00 395 030521 AJB 02 02/09 a
352.00 387 020521 AJB 03 03/09 a
353.00 386 020521 AJB 02 02/09 a
354.00 389 020521 AJB 05 05/09 a
355.00 388 020521 AJB 04 04/09 a
Rit 4
356.00 382 010521 AJB 07 07/09 b
357.00 383 010521 AJB 08 08/09 b
358.00 375 010521 AJB 09 09/09 a
359.00 363 300421 AJB 06 06/09 b
360.00 364 300421 AJB 07 07/09 b
361.00 365 300421 AJB 08 08/09 b
Rit 1
362.00 366 300421 AJB 09 09/09 b
363.00 367 010521 AJB 01 01/09 a
364.00 368 010521 AJB 02 02/09 a
365.00 377 010521 AJB 02 02/09 b
366.00 373 010521 AJB 07 07/09 a
367.00 362 300421 AJB 05 05/09 b
Rit 2
368.00 361 300421 AJB 04 04/09 b
369.00 359 300421 AJB 02 02/09 b
370.00 360 300421 AJB 03 03/09 b
371.00 352 300421 AJB 04 04/09 a
372.00 349 300421 AJB 01 01/09 a
373.00 351 300421 AJB 03 03/09 a
374.00 347 290421 AJB 05 05/06 b
375.00 Rit 1 335 290421 AJB 02 02/09 a
376.00 336 290421 AJB 03 03/09 a
377.00 358 300421 AJB 01 01/09 b
378.00 345 290421 AJB 03 03/06 b
Rit 1

379.00 348 290421 AJB 06 06/06 b


380.00 357 300421 AJB 09 09/09 a
381.00 356 300421 AJB 08 08/09 a
382.00 342 290421 AJB 09 09/09 a
383.00 355 300421 AJB 07 07/09 a
384.00 Rit 2 343 290421 AJB 01 01/06 b
385.00 354 300421 AJB 06 06/09 a
386.00 344 290421 AJB 02 02/06 b
387.00 353 300421 AJB 05 05/09 a
388.00 346 290421 AJB 04 04/06 b
389.00 339 290421 AJB 06 06/09 a
390.00 338 290421 AJB 05 05/09 a
391.00 350 300421 AJB 02 02/09 a
392.00 337 290421 AJB 04 04/09 a
393.00 Rit 1 334 290421 AJB 01 01/09 a
394.00 341 290421 AJB 08 08/09 a
395.00 333 280421 AJB 09 09/09 b
396.00 331 280421 AJB 07 07/09 b
397.00 329 280421 AJB 05 05/09 b
398.00 327 280421 AJB 03 03/09 b
399.00 328 280421 AJB 04 04/09 b
400.00 340 290421 AJB 07 07/09 a
401.00 332 280421 AJB 08 08/09 b
402.00 Rit 2 330 280421 AJB 06 06/09 b
403.00 325 280421 AJB 01 01/09 b
404.00 326 280421 AJB 02 02/09 b
405.00 316 280421 AJB 01 01/09 a
406.00 317 280421 AJB 02 02/09 a
407.00 307 270421 AJB 01 01/09 b
408.00 428 050521 AJB 08 08/09 a
409.00 473 160521 AJB 09 09/09 a
410.00 305 270421 AJB 08 08/09 a
411.00 Rit 1 381 010521 AJB 06 06/09 b
412.00 308 270421 AJB 02 02/09 b
413.00 402 030521 AJB 09 09/09 a
414.00 446 070521 AJB 02 02/02 a
415.00 482 170521 AJB 09 09/09 a
416.00 314 270421 AJB 08 08/09 b
417.00 313 270421 AJB 07 07/09 b
418.00 306 270421 AJB 09 09/09 a
Rit 2
419.00 310 270421 AJB 04 04/09 b
420.00 312 270421 AJB 06 06/09 b
421.00 311 270421 AJB 05 05/09 b
422.00 502 200521 AJB 02 02/09 a
423.00 Rit 1 503 200521 AJB 03 03/09 a
424.00 508 200521 AJB 08 08/09 a
425.00 456 150521 AJB 01 01/09 a
426.00 447 110521 AJB 01 01/09 a
427.00 448 110521 AJB 02 02/09 a
428.00 053 050421 AJB 02 02/04 a
Rit 2
429.00 444 060521 AJB 09 09/09 a
430.00 438 060521 AJB 03 03/09 a
431.00 504 200521 AJB 04 04/09 a
432.00 497 190521 AJB 06 06/09 a
433.00 495 190521 AJB 04 04/09 a
434.00 507 200521 AJB 07 07/09 a
435.00 501 200521 AJB 01 01/09 a
436.00 506 200521 AJB 06 06/09 a
437.00 Rit 3 496 190521 AJB 05 05/09 a
438.00 493 190521 AJB 02 02/09 a
439.00 505 200521 AJB 05 05/09 a
440.00 498 190521 AJB 07 07/09 a
441.00 494 190521 AJB 03 03/09 a
442.00 492 190521 AJB 01 01/09 a
443.00 500 190521 AJB 09 09/09 a
444.00 484 180521 AJB 02 02/09 a
Rit 4
445.00 481 170521 AJB 08 08/09 a
446.00 483 180521 AJB 01 01/09 a
447.00 499 190521 AJB 08 08/09 a
448.00 490 180521 AJB 08 08/09 a
449.00 491 180521 AJB 09 09/09 a
450.00 478 170521 AJB 05 05/09 a
Rit 1
451.00 479 170521 AJB 06 06/09 a
452.00 480 170521 AJB 07 07/09 a
453.00 489 180521 AJB 07 07/09 a
454.00 466 160521 AJB 02 02/09 a
455.00 468 160521 AJB 04 04/09 a
456.00 469 160521 AJB 05 05/09 a
Rit 2
457.00 470 160521 AJB 06 06/09 a
458.00 471 160521 AJB 07 07/09 a
459.00 472 160521 AJB 08 08/09 a
460.00 488 180521 AJB 06 06/09 a
461.00 477 170521 AJB 04 04/09 a
462.00 487 180521 AJB 05 05/09 a
463.00 485 180521 AJB 03 03/09 a
464.00 Rit 3 476 170521 AJB 03 03/09 a
465.00 486 180521 AJB 04 04/09 a
466.00 475 170521 AJB 02 02/09 a
Rit 3

467.00 474 170521 AJB 01 01/09 a


468.00 427 050521 AJB 07 07/09 a
469.00 465 160521 AJB 01 01/09 a
470.00 464 150521 AJB 09 09/09 a
471.00 458 150521 AJB 03 03/09 a
472.00 461 150521 AJB 06 06/09 a
473.00 Rit 1 449 110521 AJB 03 03/09 a
474.00 459 150521 AJB 04 04/09 a
475.00 460 150521 AJB 05 05/09 a
476.00 450 110521 AJB 04 04/09 a
477.00 462 150521 AJB 07 07/09 a
478.00 451 110521 AJB 05 05/09 a
479.00 445 070521 AJB 01 01/02 a
480.00 429 050521 AJB 09 09/09 a
Rit 2
481.00 401 030521 AJB 08 08/09 a
482.00 452 110521 AJB 06 06/09 a
483.00 463 150521 AJB 08 08/09 a
484.00 467 160521 AJB 03 03/09 a
485.00 457 150521 AJB 02 02/09 a
486.00 453 110521 AJB 07 07/09 a
487.00 454 110521 AJB 08 08/09 a
488.00 Rit 3 455 110521 AJB 09 09/09 a
489.00 315 270421 AJB 09 09/09 b
490.00 436 060521 AJB 01 01/09 a
491.00 441 060521 AJB 06 06/09 a
492.00 442 060521 AJB 07 07/09 a
493.00 439 060521 AJB 04 04/09 a
494.00 440 060521 AJB 05 05/09 a
495.00 437 060521 AJB 02 02/09 a
Rit 4
496.00 384 010521 AJB 09 09/09 b
497.00 376 010521 AJB 01 01/09 b
498.00 378 010521 AJB 03 03/09 b

499.00 562 270521 AJB 03 03/09 a


500.00 551 260521 AJB 01 01/09 b
501.00 557 260521 AJB 07 07/09 b
502.00 563 270521 AJB 04 04/09 a
Rit 1
503.00 Rit 1 594 280521 AJB 08 08/09 b
504.00 602 300521 AJB 07 07/09 a
505.00 593 280521 AJB 07 07/09 b
506.00 544 260521 AJB 03 03/09 a
507.00 592 280521 AJB 06 06/09 b

508.00 613 310521 AJB 09 09/09 a


509.00 601 300521 AJB 06 06/09 a
510.00 614 010621 AJB 01 01/09 a
511.00 580 280521 AJB 03 03/09 a
512.00 Rit 1 582 280521 AJB 05 05/09 a
513.00 560 270521 AJB 01 01/09 a
514.00 584 280521 AJB 07 07/09 a
515.00 581 280521 AJB 04 04/09 a
516.00 542 260521 AJB 01 01/09 a
517.00 612 310521 AJB 08 08/09 a
518.00 600 300521 AJB 05 05/09 a
519.00 583 280521 AJB 06 06/09 a
520.00 599 300521 AJB 04 04/09 a
521.00 610 310521 AJB 06 06/09 a
522.00 554 260521 AJB 04 04/09 b
523.00 598 300521 AJB 03 03/09 a
524.00 Rit 2 520 220521 AJB 02 02/09 a
525.00 609 310521 AJB 05 05/09 a
526.00 597 300521 AJB 02 02/09 a
527.00 510 210521 AJB 01 01/09 a
528.00 608 310521 AJB 04 04/09 a
529.00 596 300521 AJB 01 01/09 a
530.00 538 240521 AJB 06 06/09 a
531.00 607 310521 AJB 03 03/09 a

532.00 590 280521 AJB 04 04/09 b


533.00 591 280521 AJB 05 05/09 b
534.00 587 280521 AJB 01 01/09 b
535.00 578 280521 AJB 01 01/09 a
536.00 Rit 1 574 270521 AJB 06 06/09 b
537.00 576 270521 AJB 08 08/09 b
538.00 571 270521 AJB 03 03/09 b
539.00 564 270521 AJB 05 05/09 a
540.00 621 010621 AJB 08 08/09 a
541.00 577 270521 AJB 09 09/09 b
542.00 648 030621 AJB 01 01/06 a
543.00 379 010521 AJB 04 04/09 b
544.00 623 010621 AJB 01 01/07 b
545.00 624 010621 AJB 02 02/07 b

Rit 2
546.00 625 010621 AJB 03 03/07 b
547.00 661 040621 AJB 08 08/09 a
548.00 Rit 2 649 030621 AJB 02 02/06 a
549.00 662 040621 AJB 09 09/09 a
550.00 627 010621 AJB 05 05/07 b
551.00 611 310521 AJB 07 07/09 a
552.00 650 030621 AJB 03 03/06 a
553.00 616 010621 AJB 03 03/09 a
554.00 618 010621 AJB 05 05/09 a
555.00 629 010621 AJB 07 07/07 b
556.00 605 310521 AJB 01 01/09 a
557.00 620 010621 AJB 07 07/09 a
558.00 619 010621 AJB 06 06/09 a
559.00 651 030621 AJB 04 04/06 a
560.00 Rit 1 626 010621 AJB 04 04/07 b
561.00 595 280521 AJB 09 09/09 b
562.00 617 010621 AJB 04 04/09 a
563.00 589 280521 AJB 03 03/09 b
564.00 615 010621 AJB 02 02/09 a

565.00 663 050621 AJB 01 01/09 a


566.00 664 050621 AJB 02 02/09 a
567.00 665 050621 AJB 03 03/09 a
568.00 666 050621 AJB 04 04/09 a
569.00 Rit 1 667 050621 AJB 05 05/09 a
570.00 668 050621 AJB 06 06/09 a
571.00 669 050621 AJB 07 07/09 a
572.00 670 050621 AJB 08 08/09 a
573.00 654 040621 AJB 01 01/09 a
574.00 630 020621 AJB 01 01/09 a
575.00 631 020621 AJB 02 02/09 a
576.00 632 020621 AJB 03 03/09 a
577.00 633 020621 AJB 04 04/09 a
578.00 Rit 1 634 020621 AJB 05 05/09 a
Rit 1
579.00 642 020621 AJB 04 04/09 b
580.00 643 020621 AJB 05 05/09 b
581.00 644 020621 AJB 06 06/09 b
582.00 645 020621 AJB 07 07/09 b
583.00 655 040621 AJB 02 02/09 a
584.00 622 010621 AJB 09 09/09 a
585.00 656 040621 AJB 03 03/09 a
586.00 641 020621 AJB 03 03/09 b
587.00 638 020621 AJB 09 09/09 a
588.00 652 030621 AJB 05 05/06 a
589.00 657 040621 AJB 04 04/09 a
590.00 637 020621 AJB 08 08/09 a
Rit 2
591.00 636 020621 AJB 07 07/09 a
592.00 653 030621 AJB 06 06/06 a
593.00 658 040621 AJB 05 05/09 a
594.00 639 020621 AJB 01 01/09 b
595.00 659 040621 AJB 06 06/09 a
596.00 640 020621 AJB 02 02/09 b
597.00 660 040621 AJB 07 07/09 a
598.00 635 020621 AJB 06 06/09 a
599.00 masih bongkar stock bt 4m
600.00 570 270521 AJB 02 02/09 b
601.00 573 270521 AJB 05 05/09 b
602.00 588 280521 AJB 02 02/09 b
603.00 575 270521 AJB 07 07/09 b
604.00 Rit 1 547 260521 AJB 06 06/09 a
605.00 565 270521 AJB 06 06/09 a
606.00 572 270521 AJB 04 04/09 b
607.00 569 270521 AJB 01 01/09 b
608.00 553 260521 AJB 03 03/09 b
609.00 566 270521 AJB 07 07/09 a
610.00 561 270521 AJB 02 02/09 a
611.00 558 260521 AJB 08 08/09 b
612.00 567 270521 AJB 08 08/09 a
613.00 Rit 2 552 260521 AJB 02 02/09 b
614.00 555 260521 AJB 05 05/09 b
615.00 543 260521 AJB 02 02/09 a
616.00 559 260521 AJB 09 09/09 b
617.00 556 260521 AJB 06 06/09 b
618.00 509 200521 AJB 09 09/09 a
619.00 550 260521 AJB 09 09/09 a
620.00 536 240521 AJB 04 04/09 a
621.00 548 260521 AJB 07 07/09 a
622.00 549 260521 AJB 08 08/09 a
623.00 537 240521 AJB 05 05/09 a

Rit 3
624.00 535 240521 AJB 03 03/09 a
625.00 540 240521 AJB 08 08/09 a
626.00 545 260521 AJB 04 04/09 a
Rit 3
627.00 531 230521 AJB 04 04/05 a
628.00 532 230521 AJB 05 05/05 a
629.00 539 240521 AJB 07 07/09 a
630.00 530 230521 AJB 03 03/05 a
631.00 527 220521 AJB 09 09/09 a
632.00 541 240521 AJB 09 09/09 a
633.00 523 220521 AJB 05 05/09 a
634.00 534 240521 AJB 02 02/09 a
635.00 533 240521 AJB 01 01/09 a
636.00 522 220521 AJB 04 04/09 a
637.00 511 210521 AJB 02 02/09 a
638.00 528 230521 AJB 01 01/05 a
639.00 524 220521 AJB 06 06/09 a
640.00 Rit 1 525 220521 AJB 07 07/09 a
641.00 526 220521 AJB 08 08/09 a
642.00 521 220521 AJB 03 03/09 a
643.00 513 210521 AJB 04 04/09 a
644.00 518 210521 AJB 09 09/09 a
645.00 064 060421 AJB 01 01/04 b
646.00 512 210521 AJB 03 03/09 a
647.00 514 210521 AJB 05 05/09 a
648.00 515 210521 AJB 06 06/09 a
649.00 516 210521 AJB 07 07/09 a
650.00 517 210521 AJB 08 08/09 a
651.00 519 220521 AJB 01 01/09 a
652.00 546 260521 AJB 05 05/09 a
653.00 568 270521 AJB 09 09/09 a
Rit 1
654.00 579 280521 AJB 02 02/09 a
655.00 059 050421 AJB 04 04/04 b
656.00 680 100621 AJB 04 04/09 a
657.00 681 100621 AJB 05 05/09 a
658.00 406 030521 AJB 04 04/09 b
659.00 603 300521 AJB 08 08/09 a
660.00 604 300521 AJB 09 09/09 a
661.00 065 060421 AJB 02 02/04 b
662.00 676 070621 AJB 05 05/05 a
663.00 674 070621 AJB 03 03/05 a
664.00 675 070621 AJB 04 04/05 a
665.00 673 070621 AJB 02 02/05 a
666.00 586 280521 AJB 09 09/09 a
667.00 Rit 2 672 070621 AJB 01 01/05 a
668.00 066 060421 AJB 03 03/04 b
Rit 2

669.00 585 280521 AJB 08 08/09 a


670.00 709 140621 AJB 06 06/09 a
671.00 606 310521 AJB 02 02/09 a

672.00 764 180621 AJB 01 01/06 b


673.00 371 010521 AJB 05 05/09 a
674.00 769 180621 AJB 06 06/06 b
675.00 710 150621 AJB 01 01/09 a
676.00 724 160621 AJB 06 06/09 a
677.00 716 150621 AJB 07 07/09 a
678.00 717 150621 AJB 08 08/09 a
679.00 707 140621 AJB 04 04/09 a
680.00 736 160621 AJB 09 09/09 b
Rit 1
681.00 723 160621 AJB 05 05/09 a
682.00 728 160621 AJB 01 01/09 b
683.00 718 150621 AJB 09 09/09 a
684.00 722 160621 AJB 04 04/09 a
685.00 705 140621 AJB 02 02/09 a
686.00 719 160621 AJB 01 01/09 a
687.00 727 160621 AJB 09 09/09 a
688.00 729 160621 AJB 02 02/09 b
689.00 721 160621 AJB 03 03/09 a
690.00 708 140621 AJB 05 05/09 a
691.00 714 150621 AJB 05 05/09 a
692.00 777 190621 AJB 08 08/09 a
693.00 730 160621 AJB 03 03/09 b
694.00 720 160621 AJB 02 02/09 a
Rit 1
695.00 711 150621 AJB 02 02/09 a
696.00 712 150621 AJB 03 03/09 a
697.00 713 150621 AJB 04 04/09 a
698.00 704 140621 AJB 01 01/09 a
699.00 067 060421 AJB 04 04/04 b
700.00 725 160621 AJB 07 07/09 a
701.00 696 130621 AJB 02 02/09 b
702.00 697 130621 AJB 03 03/09 b
703.00 698 130621 AJB 04 04/09 b
704.00 Rit 2 699 130621 AJB 05 05/09 b
705.00 700 130621 AJB 06 06/09 b
706.00 701 130621 AJB 07 07/09 b
707.00 702 130621 AJB 08 08/09 b
708.00 703 130621 AJB 09 09/09 b
709.00 686 130621 AJB 01 01/09 a
710.00 687 130621 AJB 02 02/09 a
711.00 688 130621 AJB 03 03/09 a
712.00 689 130621 AJB 04 04/09 a

Rit 3
713.00 695 130621 AJB 01 01/09 b
Rit 3
714.00 692 130621 AJB 07 07/09 a
715.00 682 100621 AJB 06 06/09 a
716.00 690 130621 AJB 05 05/09 a
717.00 678 100621 AJB 02 02/09 a
718.00 679 100621 AJB 03 03/09 a
719.00 693 130621 AJB 08 08/09 a
720.00 372 010521 AJB 06 06/09 a
721.00 529 230521 AJB 02 02/05 a
722.00 380 010521 AJB 05 05/09 b
723.00 683 100621 AJB 07 07/09 a
Rit 1
724.00 677 100621 AJB 01 01/09 a
725.00 369 010521 AJB 03 03/09 a
726.00 370 010521 AJB 04 04/09 a
727.00 765 180621 AJB 02 02/06 b
728.00 766 180621 AJB 03 03/06 b
729.00 758 180621 AJB 04 04/09 a
730.00 734 160621 AJB 07 07/09 b
731.00 739 170621 AJB 03 03/09 a
732.00 742 170621 AJB 06 06/09 a
733.00 753 170621 AJB 08 08/09 b
Rit 2
734.00 737 170621 AJB 01 01/09 a
735.00 752 170621 AJB 07 07/09 b
736.00 745 170621 AJB 09 09/09 a
737.00 744 170621 AJB 08 08/09 a
738.00 751 170621 AJB 06 06/09 b

739.00 746 170621 AJB 01 01/09 b


740.00 762 180621 AJB 08 08/09 a
741.00 756 180621 AJB 02 02/09 a
742.00 757 180621 AJB 03 03/09 a
743.00 763 180621 AJB 09 09/09 a
Rit 1
744.00 761 180621 AJB 07 07/09 a
745.00 747 170621 AJB 02 02/09 b
746.00 750 170621 AJB 05 05/09 b
747.00 798 210621 AJB 02 02/09 b
748.00 691 130621 AJB 06 06/09 a
749.00 799 210621 AJB 03 03/09 b
750.00 694 130621 AJB 09 09/09 a
751.00 782 200621 AJB 04 04/09 a
752.00 780 200621 AJB 02 02/09 a
753.00 779 200621 AJB 01 01/09 a
Rit 2
754.00 786 200621 AJB 08 08/09 a
755.00 755 180621 AJB 01 01/09 a
756.00 784 200621 AJB 06 06/09 a
Rit 2

757.00 781 200621 AJB 03 03/09 a


758.00 443 060521 AJB 08 08/09 a
759.00 770 190621 AJB 01 01/09 a
760.00 771 190621 AJB 02 02/09 a
761.00 772 190621 AJB 03 03/09 a
762.00 759 180621 AJB 05 05/09 a
763.00 749 170621 AJB 04 04/09 b
Rit 3
764.00 774 190621 AJB 05 05/09 a
765.00 775 190621 AJB 06 06/09 a
766.00 776 190621 AJB 07 07/09 a
767.00 787 200621 AJB 09 09/09 a
768.00 748 170621 AJB 03 03/09 b
769.00 800 210621 AJB 04 04/09 b
770.00 773 190621 AJB 04 04/09 a
771.00 785 200621 AJB 07 07/09 a
772.00 801 210621 AJB 05 05/09 b
773.00 807 220621 AJB 02 02/09 a
Rit 1
774.00 805 210621 AJB 09 09/09 b
775.00 795 210621 AJB 08 08/09 a
776.00 793 210621 AJB 06 06/09 a
777.00 783 200621 AJB 05 05/09 a
778.00 803 210621 AJB 07 07/09 b
779.00 791 210621 AJB 04 04/09 a
780.00 792 210621 AJB 05 05/09 a
781.00 804 210621 AJB 08 08/09 b
782.00 806 220621 AJB 01 01/09 a
783.00 838 240621 AJB 03 03/07 b
Rit 2
784.00 808 220621 AJB 03 03/09 a
785.00 809 220621 AJB 04 04/09 a
786.00 810 220621 AJB 05 05/09 a
787.00 811 220621 AJB 06 06/09 a
788.00 812 220621 AJB 07 07/09 a
789.00 789 210621 AJB 02 02/09 a
790.00 790 210621 AJB 03 03/09 a
791.00 813 220621 AJB 08 08/09 a
792.00 814 220621 AJB 09 09/09 a
793.00 794 210621 AJB 07 07/09 a
Rit 3
794.00 731 160621 AJB 04 04/09 b
795.00 828 230621 AJB 07 07/07 b
796.00 827 230621 AJB 06 06/07 b
797.00 840 240621 AJB 05 05/07 b
798.00 841 240621 AJB 06 06/07 b
799.00 796 210621 AJB 09 09/09 a
800.00 820 230621 AJB 06 06/07 a
801.00 821 230621 AJB 07 07/07 a

Rit 4
802.00 822 230621 AJB 01 01/07 b
803.00 823 230621 AJB 02 02/07 b
Rit 4
804.00 824 230621 AJB 03 03/07 b
805.00 819 230621 AJB 05 05/07 a
806.00 839 240621 AJB 04 04/07 b
807.00 836 240621 AJB 01 01/07 b
808.00 837 240621 AJB 02 02/07 b
809.00 830 240621 AJB 02 02/07 a
810.00 831 240621 AJB 03 03/07 a
811.00 832 240621 AJB 04 04/07 a
812.00 833 240621 AJB 05 05/07 a
813.00 825 230621 AJB 04 04/07 b
Rit 1
814.00 815 230621 AJB 01 01/07 a
815.00 816 230621 AJB 02 02/07 a
816.00 817 230621 AJB 03 03/07 a
817.00 818 230621 AJB 04 04/07 a
818.00 842 240621 AJB 07 07/07 b
819.00 880 280621 AJB 03 03/07 b
820.00 851 260621 AJB 02 02/07 a
821.00 829 240621 AJB 01 01/07 a
822.00 852 260621 AJB 03 03/07 a
823.00 853 260621 AJB 04 04/07 a
Rit 1
824.00 854 260621 AJB 05 05/07 a
825.00 855 260621 AJB 06 06/07 a
826.00 856 260621 AJB 07 07/07 a
827.00 857 260621 AJB 01 01/07 b
828.00 858 260621 AJB 02 02/07 b
829.00 860 260621 AJB 04 04/07 b
830.00 861 260621 AJB 05 05/07 b
831.00 628 010621 AJB 06 06/07 b
832.00 788 210621 AJB 01 01/09 a
833.00 646 020621 AJB 08 08/09 b
Rit 1
834.00 863 260621 AJB 07 07/07 b
835.00 834 240621 AJB 06 06/07 a
836.00 797 210621 AJB 01 01/09 b
837.00 826 230621 AJB 05 05/07 b
838.00 844 250621 AJB 02 02/07 a
839.00 881 280621 AJB 04 04/07 b
840.00 882 280621 AJB 05 05/07 b
841.00 866 270621 AJB 03 03/07 a
842.00 874 280621 AJB 04 04/07 a
843.00 872 280621 AJB 02 02/07 a
Rit 2
844.00 864 270621 AJB 01 01/07 a
845.00 865 270621 AJB 02 02/07 a
846.00 867 270621 AJB 04 04/07 a
Rit 2

847.00 862 260621 AJB 06 06/07 b


848.00 859 260621 AJB 03 03/07 b
849.00 876 280621 AJB 06 06/07 a
850.00 871 280621 AJB 01 01/07 a
851.00 869 270621 AJB 06 06/07 a
852.00 868 270621 AJB 05 05/07 a
853.00 870 270621 AJB 07 07/07 a
Rit 1
854.00 875 280621 AJB 05 05/07 a
855.00 883 280621 AJB 06 06/07 b
856.00 847 250621 AJB 05 05/07 a
857.00 878 280621 AJB 01 01/07 b
858.00 877 280621 AJB 07 07/07 a
859.00 741 170621 AJB 05 05/09 a
860.00 735 160621 AJB 08 08/09 b
861.00 732 160621 AJB 05 05/09 b
862.00 738 170621 AJB 02 02/09 a
863.00 733 160621 AJB 06 06/09 b
Rit 1
864.00 740 170621 AJB 04 04/09 a
865.00 743 170621 AJB 07 07/09 a
866.00 754 170621 AJB 09 09/09 b
867.00 760 180621 AJB 06 06/09 a
868.00 684 100621 AJB 08 08/09 a
869.00 647 020621 AJB 09 09/09 b
870.00 671 050621 AJB 09 09/09 a
871.00 685 100621 AJB 09 09/09 a
872.00 767 180621 AJB 04 04/06 b
873.00 Rit 1 768 180621 AJB 05 05/06 b
874.00 778 190621 AJB 09 09/09 a
875.00 845 250621 AJB 03 03/07 a
876.00 846 250621 AJB 04 04/07 a
877.00 848 250621 AJB 06 06/07 a
878.00 897 290621 AJB 06 06/07 b
879.00 898 290621 AJB 07 07/07 b
880.00 895 290621 AJB 04 04/07 b
881.00 885 290621 AJB 01 01/07 a
882.00 893 290621 AJB 02 02/07 b
Rit 2
883.00 896 290621 AJB 05 05/07 b
884.00 911 010721 AJB 06 06/07 a
885.00 906 010721 AJB 01 01/07 a
886.00 907 010721 AJB 02 02/07 a
887.00 908 010721 AJB 03 03/07 a
888.00 706 140621 AJB 03 03/09 a
889.00 891 290621 AJB 07 07/07 a
890.00 894 290621 AJB 03 03/07 b
891.00 715 150621 AJB 06 06/09 a
Rit 1
892.00 909 010721 AJB 04 04/07 a
Rit 1
893.00 910 010721 AJB 05 05/07 a
894.00 726 160621 AJB 08 08/09 a
895.00 890 290621 AJB 06 06/07 a
896.00 892 290621 AJB 01 01/07 b
897.00 889 290621 AJB 05 05/07 a

898.00 923 020721 AJB 02 02/07 b


899.00 913 020721 AJB 01 01/09 a
900.00 914 020721 AJB 02 02/09 a
901.00 912 010721 AJB 07 07/07 a
902.00 900 300621 AJB 02 02/07 a
903.00 915 020721 AJB 03 03/09 a
904.00 901 300621 AJB 03 03/07 a
905.00 924 020721 AJB 03 03/07 b
906.00 916 020721 AJB 04 04/09 a
Rit 1
907.00 904 300621 AJB 06 06/07 a
908.00 925 020721 AJB 04 04/07 b
909.00 917 020721 AJB 05 05/09 a
910.00 899 300621 AJB 01 01/07 a
911.00 903 300621 AJB 05 05/07 a
912.00 886 290621 AJB 02 02/07 a
913.00 888 290621 AJB 04 04/07 a
914.00 887 290621 AJB 03 03/07 a
915.00 920 020721 AJB 08 08/09 a
916.00 802 210621 AJB 06 06/09 b
917.00 987 080721 AJB 09 09/09 a
918.00 970 070721 AJB 06 06/09 a
919.00 986 080721 AJB 08 08/09 a
920.00 971 070721 AJB 07 07/09 a
921.00 972 070721 AJB 08 08/09 a
922.00 985 080721 AJB 07 07/09 a
923.00 973 070721 AJB 09 09/09 a
924.00 969 070721 AJB 05 05/09 a
925.00 976 070721 AJB 03 03/05 b
Rit 1
926.00 835 240621 AJB 07 07/07 a
927.00 975 070721 AJB 02 02/05 b
928.00 953 050721 AJB 07 07/09 a
929.00 921 020721 AJB 09 09/09 a
930.00 947 050721 AJB 01 01/09 a
931.00 984 080721 AJB 06 06/09 a
932.00 981 080721 AJB 03 03/09 a
933.00 982 080721 AJB 04 04/09 a
934.00 974 070721 AJB 01 01/05 b
935.00 939 040721 AJB 02 02/09 a
936.00 992 090721 AJB 05 05/09 a
937.00 993 090721 AJB 06 06/09 a
938.00 994 090721 AJB 07 07/09 a
939.00 980 080721 AJB 02 02/09 a
940.00 979 080721 AJB 01 01/09 a
941.00 978 070721 AJB 05 05/05 b
942.00 983 080721 AJB 05 05/09 a
943.00 954 050721 AJB 08 08/09 a
944.00 949 050721 AJB 03 03/09 a
945.00 950 050721 AJB 04 04/09 a
Rit 1
946.00 951 050721 AJB 05 05/09 a
947.00 952 050721 AJB 06 06/09 a
948.00 955 050721 AJB 09 09/09 a
949.00 948 050721 AJB 02 02/09 a
950.00 958 060721 AJB 03 03/09 a
951.00 959 060721 AJB 04 04/09 a
952.00 960 060721 AJB 05 05/09 a
953.00 961 060721 AJB 06 06/09 a
954.00 956 060721 AJB 01 01/09 a
955.00 849 250621 AJB 07 07/07 a
LIBUR HARI RAYA
tidak ada pengiriman
956.00 957 060721 AJB 02 02/09 a
957.00 963 060721 AJB 08 08/09 a
958.00 964 060721 AJB 09 09/09 a
959.00 944 040721 AJB 07 07/09 a
960.00 945 040721 AJB 08 08/09 a
Rit 1
961.00 940 040721 AJB 03 03/09 a
962.00 941 040721 AJB 04 04/09 a
963.00 942 040721 AJB 05 05/09 a
964.00 943 040721 AJB 06 06/09 a
965.00 938 040721 AJB 01 01/09 a
966.00 934 030721 AJB 06 06/09 a
967.00 935 030721 AJB 07 07/09 a
968.00 1098 190721 AJB 01 01/09 a
969.00 946 040721 AJB 09 09/09 a
970.00 930 030721 AJB 02 02/09 a
Rit 2
971.00 931 030721 AJB 03 03/09 a
972.00 932 030721 AJB 04 04/09 a
973.00 933 030721 AJB 05 05/09 a
974.00 936 030721 AJB 08 08/09 a
975.00 937 030721 AJB 09 09/09 a
976.00 927 020721 AJB 06 06/07 b
977.00 928 020721 AJB 07 07/07 b

Rit 1
978.00 929 030721 AJB 01 01/09 a
979.00 989 090721 AJB 02 02/09 a
980.00 990 090721 AJB 03 03/09 a
Rit 1
981.00 991 090721 AJB 04 04/09 a
982.00 996 090721 AJB 09 09/09 a
983.00 997 090721 AJB 01 01/09 b
984.00 843 250621 AJB 01 01/07 a
985.00 1000 090721 AJB 04 04/09 b
986.00 1034 120721 AJB 02 02/09 a
987.00 995 090721 AJB 08 08/09 a
988.00 999 090721 AJB 03 03/09 b
989.00 1037 120721 AJB 05 05/09 a
990.00 1070 150721 AJB 09 09/09 b
Rit 2
991.00 1036 120721 AJB 04 04/09 a
992.00 1027 110721 AJB 04 04/09 b
993.00 1029 110721 AJB 06 06/09 b
994.00 1026 110721 AJB 03 03/09 b
995.00 1001 090721 AJB 05 05/09 b
TIDAK ADA PENGIRIMAN
996.00 1075 160721 AJB 05 05/09 a
997.00 1071 160721 AJB 01 01/09 a
998.00 1072 160721 AJB 02 02/09 a
999.00 1073 160721 AJB 03 03/09 a
1,000.00 1054 150721 AJB 02 02/09 a
Rit 1
1,001.00 1055 150721 AJB 03 03/09 a
1,002.00 1057 150721 AJB 05 05/09 a
1,003.00 1058 150721 AJB 06 06/09 a
1,004.00 1062 150721 AJB 01 01/09 b
1,005.00 1063 150721 AJB 02 02/09 b

1,006.00 1076 160721 AJB 06 06/09 a


1,007.00 1064 150721 AJB 03 03/09 b
1,008.00 1074 160721 AJB 04 04/09 a
1,009.00 1077 160721 AJB 07 07/09 a
1,010.00 1069 150721 AJB 08 08/09 b
Rit 1
1,011.00 1078 160721 AJB 08 08/09 a
1,012.00 1068 150721 AJB 07 07/09 b
1,013.00 1103 190721 AJB 06 06/09 a
1,014.00 1104 190721 AJB 07 07/09 a
1,015.00 998 090721 AJB 02 02/09 b
1,016.00 1089 180721 AJB 01 01/09 a
1,017.00 1090 180721 AJB 02 02/09 a
1,018.00 1091 180721 AJB 03 03/09 a
1,019.00 1092 180721 AJB 04 04/09 a
1,020.00 1093 180721 AJB 05 05/09 a
Rit 1
Rit 1
1,021.00 1094 180721 AJB 06 06/09 a
1,022.00 1095 180721 AJB 07 07/09 a
1,023.00 1025 110721 AJB 02 02/09 b
1,024.00 1080 170721 AJB 01 01/09 a
1,025.00 1081 170721 AJB 02 02/09 a
1,026.00 1083 170721 AJB 04 04/09 a
1,027.00 1084 170721 AJB 05 05/09 a
1,028.00 1085 170721 AJB 06 06/09 a
1,029.00 1086 170721 AJB 07 07/09 a
1,030.00 1087 170721 AJB 08 08/09 a
Rit 1
1,031.00 1088 170721 AJB 09 09/09 a
1,032.00 1056 150721 AJB 04 04/09 a
1,033.00 1066 150721 AJB 05 05/09 b
1,034.00 1067 150721 AJB 06 06/09 b
1,035.00 1079 160721 AJB 09 09/09 a
1,036.00 1059 150721 AJB 07 07/09 a
1,037.00 1060 150721 AJB 08 08/09 a
1,038.00 1061 150721 AJB 09 09/09 a
1,039.00 1065 150721 AJB 04 04/09 b
1,040.00 1053 150721 AJB 01 01/09 a
Rit 2
1,041.00 1045 140721 AJB 02 02/09 a
1,042.00 1046 140721 AJB 03 03/09 a
1,043.00 1047 140721 AJB 04 04/09 a
1,044.00 1048 140721 AJB 05 05/09 a
1,045.00 1049 140721 AJB 06 06/09 a
1,046.00 1044 140721 AJB 01 01/09 a
1,047.00 1050 140721 AJB 07 07/09 a
1,048.00 1051 140721 AJB 08 08/09 a
1,049.00 1052 140721 AJB 09 09/09 a
1,050.00 1040 120721 AJB 08 08/09 a
Rit 3
1,051.00 1039 120721 AJB 07 07/09 a
1,052.00 1035 120721 AJB 03 03/09 a
1,053.00 1041 120721 AJB 09 09/09 a
1,054.00 1042 120721 AJB 01 01/02 b
1,055.00 1043 120721 AJB 02 02/02 b
1,056.00 1019 110721 AJB 05 05/09 a
1,057.00 1020 110721 AJB 06 06/09 a
1,058.00 1021 110721 AJB 07 07/09 a
1,059.00 1022 110721 AJB 08 08/09 a
1,060.00 1023 110721 AJB 09 09/09 a
Rit 1
1,061.00 1024 110721 AJB 01 01/09 b
1,062.00 968 070721 AJB 04 04/09 a
1,063.00 1003 090721 AJB 07 07/09 b
1,064.00 922 020721 AJB 01 01/07 b
1,065.00 1130 220721 AJB 06 06/09 b
1,066.00 1133 220721 AJB 09 09/09 b
1,067.00 1015 110721 AJB 01 01/09 a
1,068.00 1016 110721 AJB 02 02/09 a
1,069.00 1017 110721 AJB 03 03/09 a
1,070.00 1018 110721 AJB 04 04/09 a
Rit 1
1,071.00 1007 100721 AJB 02 02/09 a
1,072.00 1008 100721 AJB 03 03/09 a
1,073.00 1031 110721 AJB 08 08/09 b
1,074.00 1032 110721 AJB 09 09/09 b
1,075.00 926 020721 AJB 05 05/07 b
1,076.00 1002 090721 AJB 06 06/09 b
1,077.00 1005 090721 AJB 09 09/09 b
1,078.00 1006 100721 AJB 01 01/09 a
1,079.00 1010 100721 AJB 05 05/09 a
1,080.00 1011 100721 AJB 06 06/09 a
Rit 1
1,081.00 1012 100721 AJB 07 07/09 a
1,082.00 1013 100721 AJB 08 08/09 a
1,083.00 1014 100721 AJB 09 09/09 a
1,084.00 850 260621 AJB 01 01/07 a
1,085.00 873 280621 AJB 03 03/07 a
1,086.00 1100 190721 AJB 03 03/09 a
1,087.00 1101 190721 AJB 04 04/09 a
1,088.00 1151 240721 AJB 02 02/08 b
1,089.00 1152 240721 AJB 03 03/08 b
1,090.00 1153 240721 AJB 04 04/08 b
Rit 2
1,091.00 1154 240721 AJB 05 05/08 b
1,092.00 1158 250721 AJB 01 01/08 a
1,093.00 1159 250721 AJB 02 02/08 a
1,094.00 1106 190721 AJB 09 09/09 a
1,095.00 1107 210721 AJB 01 01/09 a
1,096.00 1165 250721 AJB 08 08/08 a
1,097.00 1157 240721 AJB 08 08/08 b
1,098.00 1136 230721 AJB 03 03/08 a
1,099.00 1142 240721 AJB 01 01/08 a
1,100.00 1164 250721 AJB 07 07/08 a
Rit 1
1,101.00 1143 240721 AJB 02 02/08 a
1,102.00 1146 240721 AJB 05 05/08 a
1,103.00 1147 240721 AJB 06 06/08 a
1,104.00 1148 240721 AJB 07 07/08 a
1,105.00 1134 230721 AJB 01 01/08 a

1,106.00 1099 190721 AJB 02 02/09 a


1,107.00 1135 230721 AJB 02 02/08 a
1,108.00 1128 220721 AJB 04 04/09 b
1,109.00 1137 230721 AJB 04 04/08 a
Rit 1
1,110.00 1138 230721 AJB 05 05/08 a
Rit 1
1,111.00 1124 220721 AJB 09 09/09 a
1,112.00 1132 220721 AJB 08 08/09 b
1,113.00 1139 230721 AJB 06 06/08 a
1,114.00 1123 220721 AJB 08 08/09 a
1,115.00 1141 230721 AJB 08 08/08 a
1,116.00 1131 220721 AJB 07 07/09 b
1,117.00 1129 220721 AJB 05 05/09 b
1,118.00 1150 240721 AJB 01 01/08 b
1,119.00 1082 170721 AJB 03 03/09 a
1,120.00 1122 220721 AJB 07 07/09 a
Rit 2
1,121.00 1097 180721 AJB 09 09/09 a
1,122.00 1125 220721 AJB 01 01/09 b
1,123.00 1115 210721 AJB 09 09/09 a
1,124.00 1110 210721 AJB 04 04/09 a
1,125.00 1096 180721 AJB 08 08/09 a
1,126.00 1127 220721 AJB 03 03/09 b
1,127.00 1109 210721 AJB 03 03/09 a
1,128.00 1112 210721 AJB 06 06/09 a
1,129.00 1111 210721 AJB 05 05/09 a
1,130.00 1126 220721 AJB 02 02/09 b
Rit 3
1,131.00 1108 210721 AJB 02 02/09 a
1,132.00 1160 250721 AJB 03 03/08 a
1,133.00 1116 220721 AJB 01 01/09 a
1,134.00 1161 250721 AJB 04 04/08 a
1,135.00 1105 190721 AJB 08 08/09 a
1,136.00 1120 220721 AJB 05 05/09 a
1,137.00 1114 210721 AJB 08 08/09 a
1,138.00 1163 250721 AJB 06 06/08 a
1,139.00 1144 240721 AJB 03 03/08 a
1,140.00 1121 220721 AJB 06 06/09 a
Rit 1
1,141.00 1119 220721 AJB 04 04/09 a
1,142.00 1117 220721 AJB 02 02/09 a
1,143.00 1113 210721 AJB 07 07/09 a
1,144.00 1118 220721 AJB 03 03/09 a
1,145.00 1162 250721 AJB 05 05/08 a
TIDAK ADA PENGIRIMAN
1,146.00 879 280621 AJB 02 02/07 b
1,147.00 884 280621 AJB 07 07/07 b
1,148.00 902 300621 AJB 04 04/07 a
1,149.00 905 300621 AJB 07 07/07 a
1,150.00 918 020721 AJB 06 06/09 a
Rit 1
1,151.00 919 020721 AJB 07 07/09 a
1,152.00 962 060721 AJB 07 07/09 a
1,153.00 965 070721 AJB 01 01/09 a
Rit 1

1,154.00 966 070721 AJB 02 02/09 a


1,155.00 967 070721 AJB 03 03/09 a
1,156.00 977 070721 AJB 04 04/05 b
1,157.00 988 090721 AJB 01 01/09 a
1,158.00 1004 090721 AJB 08 08/09 b
1,159.00 1009 100721 AJB 04 04/09 a
1,160.00 1028 110721 AJB 05 05/09 b
Rit 2
1,161.00 1030 110721 AJB 07 07/09 b
1,162.00 1033 120721 AJB 01 01/09 a
1,163.00 1038 120721 AJB 06 06/09 a
1,164.00 1102 190721 AJB 05 05/09 a
1,165.00 1140 230721 AJB 07 07/08 a

1,166.00 1183 040821 AJB 01 01/08 a


1,167.00 1184 040821 AJB 02 02/08 a
1,168.00 1187 040821 AJB 05 05/08 a
1,169.00 1191 040821 AJB 01 01/08 b
1,170.00 1192 040821 AJB 02 02/08 b
Rit 1
1,171.00 1195 040821 AJB 05 05/08 b
1,172.00 1196 040821 AJB 06 06/08 b
1,173.00 1218 060821 AJB 04 04/08 a
1,174.00 1219 060821 AJB 05 05/08 a
1,175.00 1220 060821 AJB 06 06/08 a

1,176.00 1216 060821 AJB 02 02/08 a


1,177.00 1217 060821 AJB 03 03/08 a
1,178.00 1205 050821 AJB 07 07/08 a
1,179.00 1206 050821 AJB 08 08/08 a
1,180.00 1243 070821 AJB 05 05/06 b
Rit 1
1,181.00 1234 070821 AJB 04 04/08 a
1,182.00 1235 070821 AJB 05 05/08 a
1,183.00 1236 070821 AJB 06 06/08 a
1,184.00 1237 070821 AJB 07 07/08 a
1,185.00 1232 070821 AJB 02 02/08 a

Rit 1
Rit 1

Rit 2

Rit 3

Rit 1

Rit 2

Rit 3
Rit 3

Rit 1

Rit 2

Rit 3

Rit 1
Rit 1

Rit 2

Rit 3
Note : Moulding nmr 02, 03, 05, 08 (Pak Sri)
Moulding nmr 01, 06, 07 (Nanang)
Moulding nmr 09, 10, 11, 12, 13 & 04 (Pak Dar)
NMR KENDARAAN DAN WAKTU P
RIT 1
TANGGAL
WAKTU
NMR KENDARAAN
BERANGKAT

16 April 2021

17 April 2021

18 April 2021
19 April 2021

20 April 2021

21 April 2021
22 April 2021
23 April 2021
24 April 2021
25 April 2021
26 April 2021

27 April 2021

28 April 2021

29 April 2021
30 April 2021

01 May 2021
01 May 2021

02 May 2021

03 May 2021

04 May 2021
04 May 2021

05 May 2021

06 May 2021
07 May 2021

08 May 2021

09 May 2021
10 May 2021

11 May 2021

12 May 2021
13 May 2021
14 May 2021
15 May 2021
16 May 2021

17 May 2021
18 May 2021

19 May 2021

20 May 2021
21 May 2021

22 May 2021

23 May 2021
23 May 2021

24 May 2021

25 May 2021

26 May 2021
27 May 2021
28 May 2021

29 May 2021
30 May 2021

31 May 2021
01 June 2021
02 June 2021
03 June 2021
04 June 2021
05 June 2021
06 June 2021
07 June 2021

08 June 2021
08 June 2021

09 June 2021

10 June 2021

11 June 2021

12 June 2021
12 June 2021

13 June 2021

14 June 2021
15 June 2021
16 June 2021
17 June 2021
18 June 2021
19 June 2021
20 June 2021
21 June 2021
22 June 2021
23 June 2021
24 June 2021

25 June 2021
26 June 2021

27 June 2021 masih bongkar stock bt 4m yg tertimbu

28 June 2021
29 June 2021

30 June 2021
01 July 2021

02 July 2021

03 July 2021
04 July 2021

05 July 2021

06 July 2021
06 July 2021

07 July 2021
08 July 2021

09 July 2021

10 July 2021
11 July 2021

12 July 2021

13 July 2021

14 July 2021
14 July 2021

15 July 2021

16 July 2021

17 July 2021
18 July 2021

19 July 2021

20 July 2021
21 July 2021

22 July 2021
23 July 2021

24 July 2021

25 July 2021

26 July 2021

27 July 2021

28 July 2021
28 July 2021

29 July 2021

30 July 2021
31 July 2021

01 August 2021

02 August 2021

03 August 2021
04 August 2021

05 August 2021

06 August 2021

07 August 2021
07 August 2021

08 August 2021
09 August 2021
10 August 2021

11 August 2021

12 August 2021

13 August 2021
14 August 2021

15 August 2021
16 August 2021
17 August 2021
NMR KENDARAAN DAN WAKTU PENGIRIMAN
RIT 2
WAKTU WAKTU Molding
NMR KENDARAAN
SAMPAI BERANGKAT SAMPAI Yes
masih bongkar stock bt 4m yg tertimbun produksi baru
Beton Besi Molding Beton
Molding
Tidak Yes Tidak (kg) (m2) (m3)
KETERANGAN
0.346 x 5.1

0.346 x 5.1
= 1.76 m3

= 1.76 m3
NO KODE PRODUKSI

1.00 058 190221 AJB 01 03/03 b


2.00 047 170221 AJB 02 02/03 b
3.00 012 070221 AJB 03 02/03 a
4.00 057 190221 AJB 03 02/03 b
5.00 011 070221 AJB 02 01/03 a
6.00 050 180221 AJB 03 02/03 a
7.00 052 190221 AJB 02 01/04 a
Rit 1
8.00 066 210221 AJB 04 04/04 a
9.00 062 200221 AJB 04 04/04 a
10.00 070 220221 AJB 04 04/04 a
11.00 051 180221 AJB 01 03/03 a
12.00 055 190221 AJB 04 04/04 a
13.00 064 210221 AJB 03 02/04 a
14.00 063 210221 AJB 02 01/04 a
15.00 067 220221 AJB 02 01/04 a
Rit 2
16.00 068 220221 AJB 03 02/04 a
17.00 074 230221 AJB 03 04/04 a
Rit 3
18.00 075 230221 AJB 02 01/04 b
TIDAK ADA PENGIRIMAN
TIDAK ADA PENGIRIMAN
19.00 069 220221 AJB 01 03/04 a
20.00 072 230221 AJB 04 02/04 a
21.00 101 280221 AJB 03 03/04 a
22.00 073 230221 AJB 02 03/04 a
23.00 119 030321 AJB 02 02/03 a
24.00 079 240221 AJB 02 01/04 a
25.00 103 280221 AJB 01 01/03 b
Rit 1
26.00 065 210221 AJB 01 03/04 a
27.00 114 020321 AJB 04 01/04 a
28.00 077 230221 AJB 01 03/04 b
29.00 076 230221 AJB 03 02/04 b
30.00 071 230221 AJB 01 01/04 a
31.00 016 080221 AJB 03 03/03 a
32.00 099 280221 AJB 01 01/04 a
33.00 060 200221 AJB 03 02/04 a
34.00 081 240221 AJB 01 03/04 a
35.00 078 230221 AJB 04 04/04 b
36.00 1

Rit 1
37.00 110 010321 AJB 02 01/04 b
38.00 100 280221 AJB 02 02/04 a
39.00 Rit 1 108 010321 AJB 01 03/04 a
40.00 080 240221 AJB 03 02/04 a
41.00 109 010321 AJB 04 04/04 a
42.00 111 010321 AJB 03 02/04 b
43.00 106 010321 AJB 02 01/04 a
44.00 107 010321 AJB 03 02/04 a
45.00 104 280221 AJB 02 02/03 b

Rit 2
TANGGAL

10 August 2021

11 August 2021
12 August 2021

13 August 2021
14 August 2021
NMR KENDARAAN DAN WAKTU PENGIRIMAN
RIT 1 RIT 2
NO KODE PRODUKSI TANGGAL
WAKTU
NMR KENDARAAN NMR KENDARAAN
BERANGKAT SAMPAI

008 080221 AJB 02 02/02 a


016 110221 AJB 02 02/02 a
009 090221 AJB 01 01/02 a
16 March 2021
014 100221 AJB 02 02/02 a
007 080221 AJB 01 01/02 a
005 070221 AJB 01 01/02 a
006 070221 AJB 02 02/02 a
015 110221 AJB 01 01/02 a
017 120221 AJB 01 01/02 a
018 120221 AJB 02 02/02 a
038 190221 AJB 04 02/04 a
039 190221 AJB 01 03/04 a
21 March 2021
040 190221 AJB 02 04/04 a
041 200221 AJB 01 01/04 a
042 200221 AJB 02 02/04 a
044 200221 AJB 04 04/04 a
034 180221 AJB 04 02/04 a
036 180221 AJB 02 04/04 a
010 090221 AJB 02 02/02 a
011 090221 AJB 01 01/02 b
012 090221 AJB 02 02/02 b
019 120221 AJB 01 01/02 b
020 120221 AJB 02 02/02 b
021 140221 AJB 01 01/02 a
22 March 2021
022 140221 AJB 02 02/02 a
031 170221 AJB 01 01/02 b
033 180221 AJB 03 01/04 a
035 180221 AJB 01 03/04 a
037 190221 AJB 03 01/04 a
046 210221 AJB 02 02/04 a
030 170221 AJB 04 04/04 a
024 150221 AJB 02 02/02 a
023 150221 AJB 01 01/02 a
027 170221 AJB 01 01/04 a
028 170221 AJB 02 02/04 a
029 170221 AJB 03 03/04 a
23 March 2021
043 200221 AJB 03 03/04 a
045 210221 AJB 01 01/04 a
032 170221 AJB 02 02/02 b
049 220221 AJB 01 01/04 a
050 220221 AJB 02 02/04 a
013 100221 AJB 01 01/02 a
001 050221 AJB 01 01/02 a
002 050221 AJB 02 02/02 a
003 060221 AJB 01 01/02 a
004 060221 AJB 02 02/02 a
025 160221 AJB 01 01/02 a
026 160221 AJB 02 02/02 a
24 March 2021
047 210221 AJB 03 03/04 a
048 210221 AJB 04 04/04 a
052 220221 AJB 04 04/04 a
054 230221 AJB 02 02/04 a
057 240221 AJB 01 01/04 a
059 240221 AJB 03 03/04 a
051 220221 AJB 03 03/04 a
053 230221 AJB 01 01/04 a
056 230221 AJB 04 04/04 a
058 240221 AJB 02 02/04 a
060 240221 AJB 04 04/04 a 25 March 2021
061 250221 AJB 01 01/04 a
062 250221 AJB 02 02/04 a
063 250221 AJB 03 03/04 a
064 250221 AJB 04 04/04 a
26 March 2021
27 March 2021
28 March 2021
055 230221 AJB 03 03/04 a
065 260221 AJB 01 01/04 a
066 260221 AJB 02 02/04 a
067 260221 AJB 03 03/04 a
068 260221 AJB 04 04/04 a
073 280221 AJB 03 01/04 a
29 March 2021
074 280221 AJB 04 02/04 a
075 280221 AJB 01 03/04 a
077 280221 AJB 03 01/04 b
078 280221 AJB 04 02/04 b
079 280221 AJB 01 03/04 b
29 March 2021

080 280221 AJB 02 04/04 b


096 020321 AJB 02 04/04 b
091 020321 AJB 03 03/04 a
092 020321 AJB 04 04/04 a
095 020321 AJB 01 03/04 b
081 010321 AJB 03 01/04 a 30 March 2021
082 010321 AJB 04 02/04 a
083 010321 AJB 01 03/04 a
070 270221 AJB 02 02/04 a
072 270221 AJB 04 04/04 a
31 March 2021
076 280221 AJB 02 04/04 a
097 030321 AJB 01 01/04 a
098 030321 AJB 02 02/04 a
099 030321 AJB 03 03/04 a
100 030321 AJB 04 04/04 a
101 030321 AJB 01 01/04 b
01 April 2021
104 030321 AJB 04 04/04 b
105 040321 AJB 01 01/04 a
107 04321 AJB 03 03/04 a
108 040321 AJB 04 04/04 a
109 040321 AJB 01 01/04 b
112 040321 AJB 04 04/04 b
123 050321 AJB 03 03/04 b
124 050321 AJB 04 04/04 b
110 040321 AJB 02 02/04 b
119 050321 AJB 07 07/08 a
093 020321 AJB 03 01/04 b
094 020321 AJB 04 02/04 b
02 April 2021
121 050321 AJB 01 01/04 b
117 050321 AJB 05 05/08 a
103 030321 AJB 03 03/04 b
120 050321 AJB 08 08/08 a
111 040321 AJB 03 03/04 b
122 050321 AJB 02 02/04 b
03 April 2021
144 070321 AJB 02 02/10 a
089 020321 AJB 01 01/04 a
090 020321 AJB 02 02/04 a
128 060321 AJB 04 04/10 a
088 010321 AJB 02 04/04 b
087 010321 AJB 01 03/04 b
04 April 2021
143 070321 AJB 01 01/10 a
127 060321 AJB 03 03/10 a
142 060321 AJB 08 08/08 b
125 060321 AJB 01 01/10 a
130 060321 AJB 06 06/10 a
131 060321 AJB 07 07/10 a
146 070321 AJB 04 04/10 a
126 060321 AJB 02 02/10 a
161 080321 AJB 09 09/12 a
132 060321 AJB 08 08/10 a
171 080321 AJB 07 07/10 b
152 070321 AJB 10 10/10 a
05 April 2021
149 070321 AJB 07 07/10 a
102 030321 AJB 02 02/04 b
150 070321 AJB 08 08/10 a
169 080321 AJB 05 05/10 b
141 060321 AJB 07 07/08 b
114 050321 AJB 02 02/08 a
145 070321 AJB 03 03/10 a
179 090321 AJB 05 05/12 a
180 090321 AJB 06 06/12 a
187 090321 AJB 01 01/12 b
188 090321 AJB 02 02/12 b
189 090321 AJB 03 03/12 b
06 April 2021
190 090321 AJB 04 04/12 b
191 090321 AJB 05 05/12 b
192 090321 AJB 06 06/12 b
164 080321 AJB 12 12/12 a
194 090321 AJB 08 08/12 b
196 090321 AJB 10 10/12 b
201 100321 AJB 03 03/12 b
221 110321 AJB 11 11/12 a
213 110321 AJB 03 03/12 a
228 110321 AJB 10 06/06 b
203 100321 AJB 05 05/12 b
156 080321 AJB 04 04/12 a
202 100321 AJB 04 04/12 b
195 090321 AJB 09 09/12 b
160 080321 AJB 08 08/12 a
207 100321 AJB 09 09/12 b
205 100321 AJB 07 07/12 b
157 080321 AJB 05 05/12 a
Rit Ke 1
223 110321 AJB 01 01/06 b
158 080321 AJB 06 06/12 a

07 April 2021
Rit Ke 1

159 080321 AJB 07 07/12 a


226 110321 AJB 04 04/06 b
204 100321 AJB 06 06/12 b
222 110321 AJB 12 12/12 a
07 April 2021
139 060321 AJB 05 05/08 b
163 080321 AJB 11 11/12 a
220 110321 AJB 10 10/12 a
162 080321 AJB 10 10/12 a
224 110321 AJB 02 02/06 b
227 110321 AJB 05 05/06 b
212 110321 AJB 02 02/12 a
182 090321 AJB 08 08/12 a
181 090321 AJB 07 07/12 a
184 090321 AJB 10 10/12 a
170 080321 AJB 06 06/10 b
185 090321 AJB 11 11/12 a
Rit Ke 2
183 090321 AJB 09 09/12 a
172 080321 AJB 08 08/10 b
173 080321 AJB 09 09/10 b
186 090321 AJB 12 12/12 a
197 090321 AJB 11 11/12 b
198 090321 AJB 12 12/12 b
08 April 2021
252 120321 AJB 12 12/12 b
248 120321 AJB 08 08/12 b
229 120321 AJB 01 01/12 a
249 120321 AJB 09 09/12 b
148 070321 AJB 06 06/10 a
250 120321 AJB 10 10/12 b
251 120321 AJB 11 11/12 b
230 120321 AJB 02 02/12 a
231 120321 AJB 03 03/12 a
247 120321 AJB 07 07/12 b
232 120321 AJB 04 04/12 a
246 120321 AJB 06 06/12 b
Rit Ke 1 09 April 2021
217 110321 AJB 07 07/12 a
200 100321 AJB 02 02/12 b
215 110321 AJB 05 05/12 a
218 110321 AJB 08 08/12 a
216 110321 AJB 06 06/12 a
199 100321 AJB 01 01/12 b
206 100321 AJB 08 08/12 b
147 070321 AJB 05 05/10 a
153 080321 AJB 01 01/12 a
154 080321 AJB 02 02/12 a
155 080321 AJB 03 03/12 a
214 110321 AJB 04 04/12 a
071 270221 AJB 03 03/04 a
225 110321 AJB 03 03/06 b
259 130321 AJB 07 07/10 a
208 100321 AJB 10 10/12 b Surat Jalan Bunyi 203 padahal 203 udah pernah dikirim tanggal 07 April 2021
177 090321 AJB 03 03/12 a
219 110321 AJB 09 09/12 a
10 April 2021
178 090321 AJB 04 04/12 a
176 090321 AJB 02 02/12 a
129 060321 AJB 05 05/10 a
175 090321 AJB 01 01/12 a
256 130321 AJB 04 04/10 a
253 130321 AJB 01 01/10 a
151 070321 AJB 09 09/10 a
174 080321 AJB 10 10/10 b
118 050321 AJB 06 06/08 a
165 080321 AJB 01 01/10 b
113 050321 AJB 01 01/08 a
193 090321 AJB 07 07/12 b
11 April 2021
138 060321 AJB 04 04/08 b
140 060321 AJB 06 06/08 b
233 120321 AJB 05 05/12 a
168 080321 AJB 04 04/10 b
167 080321 AJB 03 03/10 b
135 060321 AJB 01 01/08 b
12 April 2021
115 050321 AJB 03 03/08 a
116 050321 AJB 04 04/08 a
084 010321 AJB 02 04/04 a
211 110321 AJB 01 01/12 a
235 120321 AJB 07 07/12 a
266 160321 AJB 04 04/12 a
13 April 2021
234 120321 AJB 06 06/12 a
261 130321 AJB 09 09/10 a
236 120321 AJB 08 08/12 a
210 100321 AJB 12 12/12 b
209 100321 AJB 11 11/12 b
166 080321 AJB 02 02/10 b
14 April 2021
133 060321 AJB 09 09/10 a

15 April 2021
134 060321 AJB 10 10/10 a
136 060321 AJB 02 02/08 b
137 060321 AJB 03 03/08 b
260 130321 AJB 08 08/10 a
255 130321 AJB 03 03/10 a
15 April 2021
258 130321 AJB 06 06/10 a
453 010421 AJB 03 03/04 a
293 200321 AJB 03 03/08 a
262 130321 AJB 10 10/10 a
267 160321 AJB 05 05/12 a
284 190321 AJB 02 02/08 b
16 April 2021
285 190321 AJB 03 03/08 b
085 010321 AJB 03 01/04 b
277 190321 AJB 03 03/08 a
281 190321 AJB 07 07/08 a
279 190321 AJB 05 05/08 a
275 190321 AJB 01 01/08 a
17 April 2021
286 190321 AJB 04 04/08 b
320 220321 AJB 02 02/08 b
282 190321 AJB 08 08/08 a
319 220321 AJB 01 01/08 b
325 220321 AJB 07 07/08 b
283 190321 AJB 01 01/08 b
409 270321 AJB 03 03/12 b
406 270321 AJB 12 12/12 a
278 190321 AJB 04 04/08 a
086 010321 AJB 04 02/04 b
287 190321 AJB 05 05/08 b
288 190321 AJB 06 06/08 b
18 April 2021
289 190321 AJB 07 07/08 b
349 240321 AJB 07 07/08 a
402 270321 AJB 08 08/12 a
388 260321 AJB 06 06/12 b
345 240321 AJB 03 03/08 a
387 260321 AJB 05 05/12 b
350 240321 AJB 08 08/08 a
331 230321 AJB 05 05/08 a
404 270321 AJB 10 10/12 a
386 260321 AJB 04 04/12 b
301 210321 AJB 03 03/08 a
389 260321 AJB 07 07/12 b
19 April 2021
390 260321 AJB 08 08/12 b
416 270321 AJB 10 10/12 b
405 270321 AJB 11 11/12 a
343 240321 AJB 01 01/08 a
327 230321 AJB 01 01/08 a
303 210321 AJB 05 05/08 a
392 260321 AJB 10 10/12 b
391 260321 AJB 09 09/12 b
326 220321 AJB 08 08/08 b
292 200321 AJB 02 02/08 a
441 300321 AJB 03 03/04 a
442 300321 AJB 04 04/04 a
20 April 2021
291 200321 AJB 01 01/08 a
321 220321 AJB 03 03/08 b
439 300321 AJB 01 01/04 a
415 270321 AJB 09 09/12 b
323 220321 AJB 05 05/08 b
440 300321 AJB 02 02/04 a
298 200321 AJB 08 08/08 a
370 250321 AJB 10 10/10 a
351 240321 AJB 01 01/10 b
385 260321 AJB 03 03/12 b
419 290321 AJB 01 01/12 a
297 200321 AJB 07 07/08 a
Rit 1
384 260321 AJB 02 02/12 b
418 270321 AJB 12 12/12 b
357 240321 AJB 05 07/10 b
379 260321 AJB 09 09/12 a
421 290321 AJB 03 03/12 a
353 240321 AJB 03 03/10 b
21 April 2021
300 210321 AJB 02 02/08 a
352 240321 AJB 02 02/10 b
354 240321 AJB 03 04/10 b
356 240321 AJB 04 06/10 b
383 260321 AJB 01 01/12 b
358 240321 AJB 06 08/10 b
Rit 2
424 290321 AJB 06 06/12 a
382 260321 AJB 12 12/12 a
380 260321 AJB 10 10/12 a
333 230321 AJB 07 07/08 a
306 210321 AJB 08 08/08 a
381 260321 AJB 11 11/12 a
432 290321 AJB 02 02/08 b
346 240321 AJB 04 04/08 a

Rit 1
431 290321 AJB 01 01/08 b
360 240321 AJB 08 10/10 b
355 240321 AJB 03 05/10 b
369 250321 AJB 09 09/10 a
Rit 1
310 210321 AJB 04 04/04 b
330 230321 AJB 04 04/08 a
403 270321 AJB 09 09/12 a
332 230321 AJB 06 06/08 a
410 270321 AJB 04 04/12 b
365 250321 AJB 05 05/10 a
22 April 2021
244 120321 AJB 04 04/12 b
254 130321 AJB 02 02/10 a
272 160321 AJB 10 10/12 a
245 120321 AJB 05 05/12 b
430 290321 AJB 12 12/12 a
269 160321 AJB 07 07/12 a
Rit 2
274 160321 AJB 12 12/12 a
420 290321 AJB 02 02/12 a
273 160321 AJB 11 11/12 a
271 160321 AJB 09 09/12 a
257 130321 AJB 05 05/10 a
265 160321 AJB 03 03/12 a
425 290321 AJB 07 07/12 a
427 290321 AJB 09 09/12 a
412 270321 AJB 06 06/12 b
344 240321 AJB 02 02/08 a
328 230321 AJB 02 02/08 a
302 210321 AJB 04 04/08 a
Rit 1
429 290321 AJB 11 11/12 a
428 290321 AJB 10 10/12 a
408 270321 AJB 02 02/12 b
363 250321 AJB 03 03/10 a
361 250321 AJB 01 01/10 a
446 300321 AJB 04 04/04 b
23 April 2021
359 240321 AJB 07 09/10 b
307 210321 AJB 01 01/04 b
433 290321 AJB 03 03/08 b
299 210321 AJB 01 01/08 a
364 250321 AJB 04 04/10 a
445 300321 AJB 03 03/04 b
Rit 2
304 210321 AJB 06 06/08 a
368 250321 AJB 08 08/10 a
444 300321 AJB 02 02/04 b
443 300321 AJB 01 01/04 b
309 210321 AJB 03 03/04 b
434 290321 AJB 04 04/08 b
24 April 2021
25 April 2021
312 220321 AJB 02 02/08 a
348 240321 AJB 06 06/08 a
338 230321 AJB 04 04/08 b
315 220321 AJB 05 05/08 a
336 230321 AJB 02 02/08 b
337 230321 AJB 03 03/08 b
Rit 1
334 230321 AJB 08 08/08 a
308 210321 AJB 02 02/04 b
401 270321 AJB 07 07/12 a
435 290321 AJB 05 05/08 b
436 290321 AJB 06 06/08 b
411 270321 AJB 05 05/12 b
26 April 2021
318 220321 AJB 08 08/08 a
329 230321 AJB 03 03/08 a
422 290321 AJB 04 04/12 a
316 220321 AJB 06 06/08 a
413 270321 AJB 07 07/12 b
407 270321 AJB 01 01/12 b
Rit 2
314 220321 AJB 04 04/08 a
423 290321 AJB 05 05/12 a
366 250321 AJB 06 06/10 a
317 220321 AJB 07 07/08 a
417 270321 AJB 11 11/12 b
362 250321 AJB 02 02/10 a
27 April 2021
28 April 2021
29 April 2021
30 April 2021
01 May 2021
02 May 2021
03 May 2021
04 May 2021
05 May 2021
06 May 2021
07 May 2021
08 May 2021
09 May 2021
10 May 2021
11 May 2021
12 May 2021
13 May 2021
14 May 2021
15 May 2021
16 May 2021
17 May 2021
18 May 2021
508 120421 AJB 02 02/02 a
456 020421 AJB 02 02/04 a
457 020421 AJB 03 03/04 a
454 010421 AJB 04 04/04 a
452 010421 AJB 02 02/04 a
509 120421 AJB 01 01/03 b
Rit 1 19 May 2021
507 120421 AJB 01 01/02 a
510 120421 AJB 02 02/03 b
322 220321 AJB 04 04/08 b
500 090421 AJB 02 02/02 a
503 100421 AJB 01 01/02 a
458 020421 AJB 04 04/04 a
20 May 2021
21 May 2021
22 May 2021
23 May 2021
24 May 2021
25 May 2021
448 310321 AJB 02 02/04 a
504 100421 AJB 02 02/02 a
449 310321 AJB 03 03/04 a
414 270321 AJB 08 08/12 b
437 290321 AJB 07 07/08 b
502 090421 AJB 02 02/02 b
Rit 1
501 090421 AJB 01 01/02 b
492 080421 AJB 02 02/04 a
483 070421 AJB 01 01/04 a
484 070421 AJB 02 02/04 a
481 060421 AJB 03 03/04 b
467 050421 AJB 01 01/04 a
438 290321 AJB 08 08/08 b
296 200321 AJB 06 06/08 a
455 020421 AJB 01 01/04 a
450 310321 AJB 04 04/04 a
451 010421 AJB 01 01/04 a
069 270221 AJB 01 01/04 a
Rit 2
494 080421 AJB 04 04/04 a
499 090421 AJB 01 01/02 a
493 080421 AJB 03 03/04 a
495 080421 AJB 01 01/04 b
466 030421 AJB 04 04/04 b
496 080421 AJB 02 02/04 b
26 May 2021
313 220321 AJB 03 03/08 a
311 220321 AJB 01 01/08 a
270 160321 AJB 08 08/12 a
395 270321 AJB 01 01/12 a
371 260321 AJB 01 01/12 a
378 260321 AJB 08 08/12 a
Rit 3
396 270321 AJB 02 02/12 a
237 120321 AJB 09 09/12 a
264 160321 AJB 02 02/12 a
426 290321 AJB 08 08/12 a
400 270321 AJB 06 06/12 a
263 160321 AJB 01 01/12 a
399 270321 AJB 05 05/12 a
376 260321 AJB 06 06/12 a
268 160321 AJB 06 06/12 a
243 120321 AJB 03 03/12 b
398 270321 AJB 04 04/12 a
375 260321 AJB 05 05/12 a
Rit 4
397 270321 AJB 03 03/12 a
374 260321 AJB 04 04/12 a
373 260321 AJB 03 03/12 a
372 260321 AJB 02 02/12 a
242 120321 AJB 02 02/12 b
238 120321 AJB 10 10/12 a
497 080421 AJB 03 03/04 b
505 110421 AJB 01 01/02 a
488 070421 AJB 02 02/04 b
485 070421 AJB 03 03/04 a
486 070421 AJB 04 04/04 a
487 070421 AJB 01 01/04 b
Rit 1
477 060421 AJB 03 03/04 a
475 060421 AJB 01 01/04 a
476 060421 AJB 02 02/04 a
480 060421 AJB 02 02/04 b
Rit 1

479 060421 AJB 01 01/04 b


478 060421 AJB 04 04/04 a
324 220321 AJB 06 06/08 b
447 310321 AJB 01 01/04 a
491 080421 AJB 01 01/04 a
340 230321 AJB 06 06/08 b
294 200321 AJB 04 04/08 a
341 230321 AJB 07 07/08 b
Rit 2
335 230321 AJB 01 01/08 b
295 200321 AJB 05 05/08 a
498 080421 AJB 04 04/04 b
506 110421 AJB 02 02/02 a
474 050421 AJB 04 04/04 b
490 070421 AJB 04 04/04 b
27 May 2021
489 070421 AJB 03 03/04 b
470 050421 AJB 04 04/04 a
469 050421 AJB 03 03/04 a
471 050421 AJB 01 01/04 b
473 050421 AJB 03 03/04 b
461 030421 AJB 03 03/04 a
Rit 3
482 060421 AJB 04 04/04 b
468 050421 AJB 02 02/04 a
472 050421 AJB 02 02/04 b
465 030421 AJB 03 03/04 b
462 030421 AJB 04 04/04 a
464 030421 AJB 02 02/04 b
460 030421 AJB 02 02/04 a
463 030421 AJB 01 01/04 b
459 030421 AJB 01 01/04 a
339 230321 AJB 05 05/08 b
394 260321 AJB 12 12/12 b
241 120321 AJB 01 01/12 b
Rit 4
393 260321 AJB 11 11/12 b
511 120421 AJB 03 03/03 b
276 190321 AJB 02 02/08 a
240 120321 AJB 12 12/12 a
239 120321 AJB 11 11/12 a
305 210321 AJB 07 07/08 a
106 040321 AJB 02 02/04 a
280 190321 AJB 06 06/08 a
347 240321 AJB 05 05/08 a
Rit 1 377 260321 AJB 07 07/12 a 28 May 2021
342 230321 AJB 08 08/08 b
367 250321 AJB 07 07/10 a
290 190321 AJB 08 08/08 b
AKTU PENGIRIMAN
RIT 2 Beton Besi Molding Beton
WAKTU Molding
BERANGKAT SAMPAI Yes Tidak Yes Tidak (kg) (m2) (m3)
KETERANGAN
Rit 1 Muat Malam Rit 1 Muat
Berangkat 07:00:00 Berangkat
Sampai Poyek 09:00:00 Sampai Poyek
Selesai Bongkar 09:30:00 Selesai Bongkar
Sampai Ke Plan 11:00:00 Sampai Ke Plan

Rit 2 Muat 13:00:00 Rit 2 Muat


Berangkat 13:45:00 Berangkat
Truk 1 Sampai Poyek 15:45:00 Truk 2 Sampai Poyek
Selesai Bongkar 16:15:00 Selesai Bongkar
Sampai Ke Plan 17:45:00 Sampai Ke Plan

Rit 3 Muat 19:00:00 Rit 3 Muat


Berangkat 19:45:00 Berangkat
Sampai Poyek 21:45:00 Sampai Poyek
Selesai Bongkar 22:15:00 Selesai Bongkar
Sampai Ke Plan 23:45:00 Sampai Ke Plan

Rit 1 Muat Malam Rit 2 Muat


Berangkat 07:00:00 Berangkat
Sampai Poyek 09:00:00 Sampai Poyek
Selesai Bongkar 09:30:00 Selesai Bongkar
Sampai Ke Plan 11:00:00 Sampai Ke Plan

Rit 5 Muat 13:00:00 Rit 6 Muat


Berangkat 13:45:00 Berangkat
Truk 1 Sampai Poyek 15:45:00 Truk 2 Sampai Poyek
Selesai Bongkar 16:15:00 Selesai Bongkar
Sampai Ke Plan 17:45:00 Sampai Ke Plan

Rit 3 Muat Malam Rit 4 Muat


Berangkat 07:00:00 Berangkat
Sampai Poyek 09:00:00 Sampai Poyek
Selesai Bongkar 10:30:00 Selesai Bongkar
Sampai Ke Plan 12:00:00 Sampai Ke Plan
Rit 1 10:45:00 Rit 5
Loading + cuci 11:05:00 Loading + cuci
Sampai Proyek 12:50:00 Sampai Proyek
Tuang Ke CP 13:15:00 Tuang Ke CP
Sampai Ke Plan 14:45:00 Sampai Ke Plan

Rit 2 11:05:00 Rit 6


Loading + cuci 11:25:00 Loading + cuci
Sampai Proyek 13:10:00 Sampai Proyek
Tuang Ke CP 13:35:00 Tuang Ke CP
Sampai Ke Plan 15:05:00 Sampai Ke Plan

Rit 3 11:25:00 Rit 7


Loading + cuci 11:45:00 Loading + cuci
Sampai Proyek 13:30:00 Sampai Proyek
Tuang Ke CP 13:55:00 Tuang Ke CP
Sampai Ke Plan 15:25:00 Sampai Ke Plan

Rit 4 11:45:00 Rit 8


Loading + cuci 12:05:00 Loading + cuci
Sampai Proyek 13:50:00 Sampai Proyek
Tuang Ke CP 14:15:00 Tuang Ke CP
Sampai Ke Plan 15:45:00 Sampai Ke Plan
Malam Rit 1 Muat Malam
07:00:00 Berangkat 07:00:00
09:00:00 Sampai Poyek 09:00:00
10:00:00 Selesai Bongkar 10:30:00
11:30:00 Sampai Ke Plan 12:00:00

13:45:00 Rit 2 Muat 14:30:00


14:30:00 Berangkat 15:15:00
16:30:00 Truk 3 Sampai Poyek 17:15:00 Truk 4
17:00:00 Selesai Bongkar 17:45:00
18:30:00 Sampai Ke Plan 19:15:00

19:45:00 Rit 3 Muat 20:30:00


20:30:00 Berangkat 21:15:00
22:30:00 Sampai Poyek 23:15:00
23:00:00 Selesai Bongkar 23:45:00
00:30:00 Sampai Ke Plan 01:15:00

Malam Rit 3 Muat Malam


07:00:00 Berangkat 07:00:00
09:00:00 Sampai Poyek 09:00:00
10:00:00 Selesai Bongkar 10:30:00
11:30:00 Sampai Ke Plan 12:00:00

13:45:00 Rit 1 Muat Malam


14:30:00 Berangkat 07:00:00
16:30:00 Truk 3 Sampai Poyek 09:00:00 Truk 4
17:00:00 Selesai Bongkar 09:30:00
18:30:00 Sampai Ke Plan 11:00:00

Malam Rit 5 Muat 13:00:00


07:00:00 Berangkat 13:45:00
09:00:00 Sampai Poyek 15:45:00
11:00:00 Selesai Bongkar 16:15:00
12:30:00 Sampai Ke Plan 17:45:00
12:05:00 Rit 9 13:25:00
12:25:00 Loading + cuci 13:45:00
14:10:00 Sampai Proyek 15:30:00
14:35:00 Tuang Ke CP 15:55:00
16:05:00 Sampai Ke Plan 17:25:00

12:25:00 Rit 10 13:45:00


12:45:00 Loading + cuci 14:05:00
14:30:00 Sampai Proyek 15:50:00
14:55:00 Tuang Ke CP 16:15:00
16:25:00 Sampai Ke Plan 17:45:00

12:45:00 Rit 11 14:05:00


13:05:00 Loading + cuci 14:25:00
14:50:00 Sampai Proyek 16:10:00
15:15:00 Tuang Ke CP 16:35:00
16:45:00 Sampai Ke Plan 18:05:00

13:05:00 Rit 12 14:25:00


13:25:00 Loading + cuci 14:45:00
15:10:00 Sampai Proyek 16:30:00
15:35:00 Tuang Ke CP 16:55:00
17:05:00 Sampai Ke Plan 18:25:00
Rit 1 Muat Malam
Berangkat 07:00:00
Sampai Poyek 09:00:00
Selesai Bongkar 11:00:00
Sampai Ke Plan 12:30:00

Rit 2 Muat 15:15:00


Berangkat 16:00:00
Sampai Poyek 18:00:00
Selesai Bongkar 18:30:00
Sampai Ke Plan 20:00:00

Rit 3 Muat 21:15:00


Berangkat 22:00:00
Sampai Poyek 00:00:00
Selesai Bongkar 00:30:00
Sampai Ke Plan 02:00:00

Rit 4 Muat Malam


Berangkat 07:00:00
Sampai Poyek 09:00:00
Selesai Bongkar 11:00:00
Sampai Ke Plan 12:30:00

Rit 2 Muat Malam


Berangkat 07:00:00
Sampai Poyek 09:00:00
Selesai Bongkar 10:00:00
Sampai Ke Plan 11:30:00

Rit 6 Muat 13:45:00


Berangkat 14:30:00
Sampai Poyek 16:30:00
Selesai Bongkar 17:00:00
Sampai Ke Plan 18:30:00