Anda di halaman 1dari 6

30- -

Rabuna Super Dek Kuda-Kuda C trusSS


(60-80 mm)Rangka trusss
t U. B mm
(BO-80 mm )
5.9
ambak Layar

20/20
-+4.10
PLAF OND PYC 1 MM
J. 80
Ratung 7 incalum
Gording R135-40
5,95 htap Zinclun 0, 3mm

Ring Balok C-75-78


12/20
5-78
RIngBalok
4.0 2/20J
AS solank 6RC 2/20
RIng12/20Balok 4 123-
TminimTTimi iiimmIiininmunmIIIiImininL||
ISLaof 20/20 +0, 00CMT) LPLafond 3.80
PVC I 7H Plafond PYC T. 7an
SLoot20:2 3.00 Plafond VC
Balok
0. Latei
250 -300- 250
3.20 12/15
-800-

POTONGAN II-1 Kol om Selasar


20/20 cm

SKALA 1: 100 ERAS


y+0, 25
uf

0, 00(M)
\Sloof
20/203 Stoof 20/ 20\

-350- -350

-700-

POTONGAN 1
SKALA 1:100

PEMILIK: PROGRAM
NAMA GAMBAR: PEKERJAAN DIKETAHUI OLEH:
DISETUJUI OLEH: DI GAMBAR OLEH:
KEPALA DINAS PENDDIKAN
KABID PEMBINAAN SD DAN SMP
KABUPATEN TAPANULI UTARA
PEMULIHAN EKONOMI Pembangunan Pembangunan DINAS PENDIDIKAN DRAFTER
Kantor Gunn KABUPATEN TAPANULI UTARA
NASIONAL Kantor Gu
(PEN)
KEGIATAN KETERANGAN
MERINTAH KABUPATENTAPANULI UTARA NO
DINAS PENDIDIKAN Lenbu Jomlah Lenbar
Pembangunan Kantor Guru BONTOR ARIFIN HUTASOIT, S.IP M.SP FERDINAN SITTNJAK, S.T,M.T HALOMOAN NAINGGOLAN, ST|
NIP.197310031993031003 NIP.197s03252002 121009
412
- 15

20-

- 15
Koloa Seleser 20/20

Pas. Bata 1:4


-Kolom Teres 20/20 -Pes.Bate 1:4
-Rollag Bate Teres -Pas. Beta 1:2 CTresran) t=20cm 2 412 Lantel keremlk 40x40ca
Sloof 20/20
Hantet Keranlk 60x60 cn
Lantal koranik 40x40 cm
SAR RUANG KELAS Rabet Beton t=5 ca
Vt U,20 Pasir Uru
ton t=5 cm
32 Pasir Urg -Staof 15/20

-Stoof 20/20
LTanah Uru
-Pondasl Beton Cor 1:3:5
-lansh Urug
Pondast Teras
Beton Cor 1:3:5 -Pas. Betu Kosong
-Pondest Batu Kall l:4
Paslr Urug
*

Pas. Batu Kosong


Pasit Urug

DETAIL 2
SKALA 1: 25

DETAIL PONDASI SETEMPAT SELASAR


SKALA 1: 25

PEMILIK: PROGRAM PEKERJAAN


NAMAGAMBAR: DIKETAHUI OLEH:
DISETUJUI OLEH DI GAMBAR OLEH:
KEPALA DINAS PENDIDIKAN KABID PEMBINAAN SD DAN SMP
KABUPATEN TAPANULI UTARA DINAS PENDIDIKAN DRAFTER:
PEMULIHAN EKONOMI Pembangunan Pembangunan KABUPATEN TAPANULI UTARA
NASIONAL Kantor Guu Kantor Guru
(PEN)
KEGIATAN KETERANGAN:
MERINTAH KABUPATEN TAPANUL UTARA|
DINAS PENDIDKAN Lombar Jualab Leuber1 HALOMOAN NAINGGOLAN, ST
Pembangunan Kantor Guru BONTOR ARIFIN HUTASOrr, s.P,M.SP FERDINAN sITINJAK, S.T,M.T
NIP.197310031993031003 NIP.197S03252002 121009
KAGA KACA1
/3ENI BEN

KACA KACA BENIN KACA


BENIN CKACA ATD BENING
5 N

L P

DETAIL J-1 (2 UNIT)

DETAIL P-1(1 UNIT DETAIL PJ-11 UNID


SKALA 1:25

PROGRAM
PEMILIK: NAMA KEGIATAN: PEKERJAAN DIKETAHUI OLEH: DISETUJUI OLEH: DI GAMBAR OLEH :
KEPALA DINAS PENDIwIKAN KABID SARANA DAN PRASARANA DRAFTER:
KABUPATEN TAPANULI UTARA DINAS PENDIDIKAN
PEMULIHAN EKONOM Pembangunan
KABUPATEN TAPANULI UTARA
NASIONAL Kantor Guru
(PEN)

LOKASIKEGIATAN KETERANGAN
EMERINTAH KABUPATEN TAPANUL UTARA NO
DINAS PENDDKAW Lebar Jumlab Lember BONTOR ARIPIN HUTASOIT, S.IP,M.SP FBRDINAN SITINJAK, S.T.M.T HALOMOAN NAINGGOLAN, ST
Ro H TM
NIP.197s03252002121009
Sunre U T / F s ) 217
NIP.19731003199303 1003
daftar kuantitas dan harga
KEGIATAN
PEKERJAAN Rehabilitasi/Pembangunan Sarana dan Prasarana Pendidikan
Pembangunan Kantor Guru SD
LOKASI KECAMATAN ADIANKOTING KABUPATEN TAPANULI UTARA
T.A 2020
NO
URAIAN PEKERJAAN ANALISA vOL SATUAN HARGA SATUAN JUMLAH HARGA
ABIAYA PENYELENGGARAAN SMK3
1
Penyusunan Rencana Keselamatan Kerja
2 Alat Pelindung 1,00 Ls 200.000,0 200.000,0
3 Asuransi Pekerja 1,00 LS 500.000,0 500.000,0
Fasilitas Prasana Kesehatan 1,00 Ls 200.000,0 200.000,0
1,00 Ls 300.000,0 300.000,0
LB PEKERJAAN PENDAHULUAN JUMLAHA 1.200.000,0
1 Pek. Pematokan &
Pemasangan Bowplank 1,0000 1.800.000,00
2 Pas. Papan Nama Infomasi 1.800.000,00 |
3 Pekejaan Direksi Keet 1,0000 250.000,00 250.000,00
12,0000 M2 120.000,00 1.440.000,00
JUMLAH B
CPEKERJAAN KONSTRUKSI .490.000,00
IPekerjaan Tanah &Pasir
1 Galian tanah
A.2.3.1.1 9,1300 MP
2 Uugan Tanah Kembali 68.266,00 623.268,58
A.2.3.1.9 3,0433 M
I Pekerjaan Batu Dan Plesteran 51.084,00o 155.465,64
1 Pasangan Pondasi dan Batu Kali 1:4 A.3.2.1.1
2 Pasangan Batu Bata 1:4 13,6800 M 1.075.354,85 14.710.854,38
3 Plesteran 1:4 A.4.4.1.7 80,7217 M2 175.355,96 14.155.031,54
A.4.4.2.4 161,4434 M?
Pekerjaan Struktur 71.401,20 11.527.252,88
Pasangan Sloof 20/25
Begisting A.4.1.1.21
Pembesian 4,0000 M2 296.693,85
A.4.1.1.177 1.186.775,39
Cor Beton fc= 16,9 132,1653 Kg 18.659,45
Mpa (K200) A.4.1.1.7 2.466.131,19
2 Pasangan Tiang Kolom 20/20 1,5000 M 1.362.793,75 2.044.190,62
Begisting A.4.1.1.22 9,7600 ME
Pembesian A.4.1.1.17 433.760,89 8.571.115,15
Cor 291,5114 Kg
3
Beton fc= 16,9 Mpa (K200)) A.4.1.1.7 1,7784 M
18.659,45 5.439.441,83
Pasangan Ring Balök15/25 1.362.793,75 2.423.592,40
Begisting A.4.1.1.23 7,5000 M
Pembesian A.4.1.1.17 446.561,98 3.349.214,88
Cor Beton fc= 16,9
Mpa (K200) 122,1780 Kg 18.659,45
A.4.1.1.7 0,9000 2.279.773,67
IV Pekerjaan Kosen Dan
Pintu M 1.362.793,75 1.226.514,37
1 Pek. Kozen Pintu &
Jendela PJ1
2 Pek. Kosen Pintu P1 A.4.6.1.1 0,1102 M3 10.515.887,80
3 Pek. Kosen Pintu J1 A.4.6.1.1 0,1890 M3
1.159.271,47
A.4.6.1.1 10.515.887,80 1.987.713,11
4 Pek. Kosen Pintu J2 0,0780 M3 10.515.887,80
5 Pasangan Daun Pintu A.4.6.1.1 0,2340 M3
1.159.271,47
A.4.6.1.5 10.515.887,80 1.987.713,11
6 Pasangan Daun
Jendela Kaca 2,9400 M 859.011,56
Pas Kaca Benig T 5mm
A.4.6.1.6 12,7440 Ma 2.525.493,99
A.4.6.2.17.b 638.955,42 8.142.847,82
Pasangan Kunci Tanam 2,4000 MP
A.4.6.2.2 420.189,98 1.008.455,95
9 Pasangan. Engsel Pintu 2,0000 Set
198.308,88
10 Pasangan. Engsel Jendela A.4.6.2.5 3,0000 Set 396.617,76
A.4.6.2.6 49.040,20 147.120,60
11 Pasangan Grendel 12,0000 Set
32.922,56
12 Pasangan Winhak 2,0000 Set 395.070,72
15.840,00 190.080,0o
V Pekerjaan Atap 12,0000 Set
19.840,00 238.080,00
Pekerjaan kuda - kuda baja ringan C 75
2 Pekerjaan Gordig C35 Dihitung 55,1667 Bh
Pekerjaan Atap Spandek Zincalum wama Dihitung 230,0000 M'
155.000,00| 8.550.833,33
10.000,00 2.300.000,00
Merah maron # 0,3mm A.4.5.2.41 110,6000 M2
Pekerjaan Rabung atap Zincalum Wama 151.988,32 16.809.908,19
Merah #0,3mm A.4.5.2.42 0,0000 M 156.456,08
5 Pekerjaan List Plang GRC (Lebar 20
1.564.560,80
=
cm) Dihitung 42,1200 M
65.000,00 2.737.800,00

M TBTETTAKETT7
URAIAN PEKERJAAN
VI Pekerjaan Plafon
1
RangkaFuring t.0,5 mm +Plafond ANALISA vOL SATUAN HARGA SATUAN JUMLAH HARGA
VII
Pekerjaan Lantai PVc8 mm
Pek Lantai Keramikdan Lapis dinding Dihitung 74,0000 M2 175.000,00 12.950.000,00
Untuk Interior Jenis Garanit
60 x cm
Pek. 60
Keramik Kasar Corak
cm untuk A.4.4.3.35.b 56,0000 M2 249.289,10
Lantai Selasar
Batu Alam 40
13.960.189,63
80 cm dan Kaki A.4.4.3.35.b 27,0000 M2 283.389,10
Vl Pekerjaan Pengecatan
Tiang Selasar setinggi 7.651.505,71
1 Pengecatan Dinding
2
IX Pengecetan Bidang Kayu
Pekerjaan Elektrikal A.4.7.1.10 161,4434 M2 29.176,38 4.710.334,37
1 A.4.7.1.4 23,6793 M
2
Pasangan Instlasi Listrik 47.814,36 1.132.210,57
3
Pasangan Pipa Listrik Dihitung 6,0000 Titik 134.000,00o
4
Pasangan Kabel Listrik NYA Dihitung 30,0000 M' 4.500,00
804.000,00

5
Pasangan Lampu Downlight 2,5mm
SL 18 Dihitung 60,0000 M 10.000,00
135.000,00
600.000,00
Pasangan Saklar Tripel Watt Dihitung 5,0000 Bh
6
Pasangan Stop Kontak Dihitung 1,0000 Bh
54.000,00| 270.000,00
30.000,00 30.000,00
Dihitung 2,0000 Bh 30.000,00
DPEKERJAAN LAIN-LAIN JUMLAHC 60.000,00
1
Pelaporan dan As Buil Drawing 163.762.701,15
2 Foto Dokumentasi
1,0000| Ls 3.000.000,000 3.000.000,00
3 Pek. Pembersihan Akhir 1,0000
500.000,00 | 500.000,00
1,0000 s 536.117.27| 536.117,27
JUMLAH D
REKAPITULASI 4.036.117,27
A
BIAYA PENYELENGGARAAN
B PEKERJAAN PENDAHULUAN SMK3
1.200.000,00
C PEKERJAAN KONSTRUKSI
3.490.000,00
D PEKERJAAN LAIN-LAIN 163.762.701,15
JUMLAH
4.036.117,27
PPn (10 %)
172.488.818,42
JUMLAH KESELURUHAN
17.248.881,84
189.737.700,27
DIBULATKAN 189.737.700,00
Terbilang9 Seratus Delapan Puluh Sembilan Juta
Delapan Ratus Delapan Puluh Ribu Rupiah

Dibuat Oleh

Anda mungkin juga menyukai