DRAFT --- North Slope Pipelines

August 14, 2006


Pipeline ROW Diameter Length Agency Last Repairs SPCO Pipeline Operating Production
Lease Date of Corrosion Volume State Date
Pig Run Monitoring

Badami Sales BP Trans (AK) 12” 25 miles to SPCO 2003 – mag Line is 2006 - Found 1,200 bbls 1998 MAOP August 24,
Oil Endicott US DOT flux and piggable – Satisfactory 1415 psig. 1998
US EPA geo pig smart pigs Transported Currently
ADEC 2006. used. Internal 152,711 bbls operating
corrosion- in 2005 after between
related line restarted about 50 and
anomalies, no in September 200 psi
sleeves. 3 2005 after
dents suspending
operations in
2003
Endicott Endicott 16” 26 miles to SPCO 2005 mag Mostly ext. 2006 - Sat 6,000 bbls 1987 MAOP October 3,
Pipeline Co. PS 1 US DOT flux pig run corrosion- 1440 psig at 1987
US EPA related Transported 180°F
ADEC anomalies. 5 almost 7.5
dents, no million
sleeves bbls/oil to PS
1 in 2005
Milne Pt. Milne Pt. 14” 10 miles tie SPCO 2005 mag Inter/ext 2006 - Sat Designed to 1984/5 November
Sales Oil Pipeline LLC into Kuparuk US DOT flux pig corrosion- carry 65,000 MAOP 1350 1985
at Module 68 US EPA run. related bbls/day psig up to
ADEC anomalies. 8 200°F
sleeves placed Transported
over 16
million bbls in
2005
Northstar BP Trans (AK) 10” 17 miles to SPCO 2003, 7 of top 10 2006 - Sat Designed to 2000/01 November 1,
Sales Oil PS 1 US DOT geometry defects were carry 85,000 MAOP 1480 2001
US EPA and mag external bbls/day psig at 100°F
ADEC flux. Metal w/peak depths
loss & of 13% or Transported
geometry less. Does not more than 22
ILI in 2006. use corrosion million bbls in
inhibitor. 2005

Alpine Oil ConocoPhillips 14” 34.2 to SPCO 2005 geo 2005 – Sat 100,000 – 1998 MAOP November 15,
Co. Kuparuk Ext. US DOT pig & mag 140,000 2064 psig 2000
US EPA flux ILI.
ADEC Mo. pig transported
Cleaning 43,819.365
bbls in 2005
Kuparuk Oil Kuparuk Trans 24” 28 miles SPCO 2003 last Ext. corrosion Kuparuk line is Combined 1980 MAOP January 1982
Co., from KPL US DOT smart pig has been id’d piggable, SPCO Kuparuk and 1415 psig
ConocoPhillips Ext and BP US EPA run. as problem at will be doing Kuparuk Ext.
DRAFT --- North Slope Pipelines
August 14, 2006
Pipeline ROW Diameter Length Agency Last Repairs SPCO Pipeline Operating Production
Lease Date of Corrosion Volume State Date
Pig Run Monitoring

Milne Pt ADEC Piggable weld packs field surveillance 330,000 bbls.


eastward to line. where water August 23-25,
PS 1 Cleaned can seep into 2006 to observe Transported
monthly. insulation. smart pigging more than 125
2005 - 6 of operations on the million bbls in
12 planned Kuparuk 2005
cleaning Pipeline. Conoco
pigs were also uses
run. Smart corrosion
pigs for coupons to detect
corrosion corrosive
detection conditions in the
every 3 pipe, and uses
years 2006 ultrasonic,
next radiography, and
scheduled other techniques
run. in portions of the
line that are not
piggable. The
system does
include a pig
launcher and
receiver, though
these are not
located within the
AS 38.35 ROW.
Kuparuk Ext. Kuparuk Trans Comb. 12 and 9 miles SPCO Not Exterior 2005 Combined 1983 MAOP October 1984
Co., 18” connecting US DOT piggable. corrosion has Kuparuk and 1415 psig
ConocoPhillips Kuparuk US EPA Tangential been id’d as Kuparuk Ext.
CPF-2 into ADEC radiography problem at 330,000 bbls.
CPF-1 used to weld packs
detect ext. where water Transported
corrosion & can seep into 77.1 million
ultrasonic insulation. bbls in 2005
& other
inspection
techniques.
Oliktok Oliktok 16” 28 miles, SPCO Not Ext corr has 2005 Transported 1981
Natural Gas Pipeline Co. from Prudhoe US DOT piggable. been id’d as 6.2 million
Liquids Bay Skid 50 US EPA Tangential problem at barrels of
to Kuparuk ADEC radiography weld packs natural gas
CPF-1 used to where water liquids in
detect ext. can seep into 2005
corrosion. insulation.
DRAFT --- North Slope Pipelines
August 14, 2006
Pipeline ROW Diameter Length Agency Last Repairs SPCO Pipeline Operating Production
Lease Date of Corrosion Volume State Date
Pig Run Monitoring

Lisburne BP 16” 7 miles – 1 US DOT 2006 Pipeline ILI in 18,000 Between 80


Segment US EPA June 2006 – bbls/day and 120 psi,
ADEC BJ evaluating less than
DNR, Div of 20% syns
O&G
East BP 30” & 34” 8 miles – 2 US DOT 2006 Two 190,000 Between 80
Operating segments US EPA segments. ILI bbls/day and 120 psi,
Area ADEC in July 2006 less than
DNR, Div of on 30” eastern 20% syns
O&G most segment.
34” yet to be
pigged. 16
anomalies id’d
at 12
locations. 16
of 22 miles of
pipeline to be
replaced
West BP 34” 8 miles – 3 US DOT 2006 3 Segments in 190,000 Between 80
Operating segments. US EPA this line. bbls/day and 120 psi,
Area ADEC GC2-GC1 less than
DNR, Div of Shut down 20% syns
O&G since March
2nd.
Remaining
two segments
may be shut
down 8/11

Jerry/10 NS Pipelines 8-6-06


Jurisdictional agencies for the listed North Slope Pipelines:
US Department of Transportation
US Environmental Protection Agency
State of Alaska Department of Environmental Conservation
State Pipeline Coordinator’s Office

 Alpine Oil Pipeline  Kuparuk Pipeline Extension


 Alpine Diesel Pipeline  Milne Point Oil Pipeline
 Alpine Utility Pipeline  Milne Point Products Pipeline
 Badami Sales Oil Pipeline  Northstar Oil Pipeline
 Badami Utility Pipeline  Northstar Gas Pipeline
 Endicott Oil Pipeline  Oliktok Pipeline
 Kuparuk Oil Pipeline  Trans-Alaska Pipeline System

BLM Administered pipelines on the North Slope – Trans-Alaska Pipeline System (TAPS)