Perhitungan RAB Kolom

Uraian Beton (m3)

Baja (kg) Bekisting (m2) Perancah (m2)

Uraian Beton (m3) Baja (kg) Bekisting (m2) Perancah (m2)

Uraian

Beton (m3) Baja (kg)

Bekisting (m2) Perancah (m2)

Uraian

Beton (m3) Baja (kg)

Bekisting (m2) Perancah (m2)

Kebutuhuan Basement 2 (Kolom) Jumlah Harga Satuan 58.7895445 900000

12766.5374 11000 383.853973 16500 38.3853973 7500

Total Kebutuhuan Basement 1 (Kolom)

Jumlah Harga 52910590.07 140431911.6 6333590.548 287890.4794

Rp199,963,983

Jumlah Harga 49563715.07 132920332 6137240.548 278965.4794 Rp188,900,253

Jumlah 55.07079452 12083.66654 371.9539726 37.19539726

Harga Satuan 900000 11000 16500 7500 Total

Kebutuhuan Lower Ground (Kolom)

Jumlah

59.02805088 13630.41038

411.4902544 41.14902544

Harga Satuan

900000 11000

16500

7500 Total

Jumlah Harga

53125245.79 149934514.2

6789589.197 308617.6908
Rp210,157,967

Jumlah Harga

41625000 130962941.5

5973000

271500 Rp178,832,441

Kebutuhuan Ground Floor (Kolom)

Jumlah

46.25 11905.72195

362 36.2

Harga Satuan

900000 11000