NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN JUMLAH BOBOT REALISASI PEKERJAAN
1 2 3 4 5.00 6=4x5 % Minggu Lalu
Vol REALISASI BOBOT
PEMELIHARAAN ASRAMA PUTRA 1 DAN 2 - - -
A. PEKERJAAN PERSIAPAN DAN TANAH - - -
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - - -
1 Persiapan & Pembersihan Lokasi Pekerjaan Ls 1.00 300,000.00 Rp 300,000.00 0.06% - - -
2 Pembongkaran Dinding Bak Toilet Ls 1.00 500,000.00 Rp 500,000.00 0.10% - - -
3 Pembongkaran Keramik Ls 1.00 300,000.00 Rp 300,000.00 0.06% - - -
4 Pembongkaran Kusen m² 17.09 138,000.00 Rp 2,358,420.00 0.48% - - -
5 Pembongkaran Plafond + Rangka Plafond m² 19.23 15,060.00 Rp 289,603.80 0.06% - - -
JUMLAH PEKERJAAN PERSIAPAN Rp 3,748,023.80 - - -
B. PEKERJAAN STRUKTUR ATAP - - -
1 Tambal Sulam Genteng 10% m² 16.47 77,535.00 Rp 1,277,001.45 0.26% - - -
- - -
JUMLAH PEKERJAAN STRUKTUR ATAP Rp 1,277,001.45 - - -
C. PEKERJAAN ARSITEKTUR - - -
I. PEKERJAAN PASANGAN DAN PLESTERAN - - -
1 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps m² 5.40 116,037.50 Rp 626,602.50 0.13% - - -
- - -
SUB JUMLAH Rp 626,602.50 - - -
II. PEKERJAAN PELAPIS LANTAI DAN DINDING - - -
1 Pasang Keramik Lantai ukuran 40x40 cm m² 22.46 154,438.75 Rp 3,468,694.33 0.70% - - -
2 Pasang Keramik Dinding 25x40 cm m² 89.20 191,653.75 Rp 17,095,514.50 3.44% - - -
SUB JUMLAH Rp 20,564,208.83 - - -
III. PEKERJAAN KUSEN PINTU DAN ASSESORIES - - -
1 Pekerjaan Pintu Toilet UPVC unit 10.00 1,690,000.00 Rp 16,900,000.00 3.40% - - -
2 Pasang Kloset Duduk unit 6.00 2,427,520.00 Rp 14,565,120.00 2.93% - - -
3 Pasang Kloset Jongkok unit 2.00 454,650.00 Rp 909,300.00 0.18% - - -
4 Kran Ø 3/4 stainles Steel + Knop Penutup unit 4.00 82,631.00 Rp 330,524.00 0.07% - - -
5 Pasang Floor drain StainlessSteel unit 8.00 89,455.00 Rp 715,640.00 0.14% - - -
6 Pasang Grab Bar StainlessSteel (Terpasang) unit 8.00 250,000.00 Rp 2,000,000.00 0.40% - - -
SUB JUMLAH Rp 35,420,584.00 - - -
IV. PEKERJAAN PLAFOND - - -
1 Pasang rangka plafond besi hollow 1 x 40.40.0,3 mm, modul 60 x 60 cm m² 13.77 126,250.00 Rp 1,738,462.50 0.35% - - -
2 Pemasangan Gypsumboard 9mm m² 13.77 41,765.00 Rp 575,104.05 0.12% - - -
3 List Plafond Gypsum Lebar 9 cm m¹ 36.52 27,080.25 Rp 988,970.73 0.20% - - -
4 Pengecatan Plafon m² 13.77 24,173.50 Rp 332,869.10 0.07% - - -
SUB JUMLAH Rp 3,635,406.38 - - -
V. PEKERJAAN PENGECATAN - - -
1 Pengecatan tembok lama dalam ( 1 lapis cat dasar, 2 lapis cat penutup ) m² 1,122.19 18,110.50 Rp 20,323,422.00 4.09% - - -
2 Pengecatan tembok lama luar( 1 lapis cat dasar, 2 lapis cat penutup ) m² 436.02 20,531.50 Rp 8,952,144.63 1.80% - - -
- - -
SUB JUMLAH Rp 29,275,566.63 - - -
JUMLAH PEKERJAAN ARSITEKTUR Rp 89,522,368.33 - - -
D. PEKERJAAN MEP - - -
I. PEKERJAAN ELEKTRIKAL - - -
ARMATURE, STOP KONTAK DAN INSTAL - - -
- Titik Penerangan Ttk 8.00 126,500.00 Rp 1,012,000.00 0.20% - - -
- Saklar Tunggal Ttk 4.00 61,100.00 Rp 244,400.00 0.05% - - -
- Lampu LED Downlight 7,5 watt bh 8.00 67,300.00 Rp 538,400.00 0.11% - - -
Rp 96,342,193.58 19.41%
Minggu Ke :I
Periode : 27 Sept s/d 03 Okt 2021
Bobot Rencana : 1.07%
Bobot Realisasi : 1.14%
Deviasi : 0.06% (CEPAT)

REALISASI PEKERJAAN
Minggu Ini S/D Minggu Ini
Vol REALISASI BOBOT Vol REALISASI BOBOT
- - - - - -
- - - - - -
- - - - - -
1.00 100.00% 0.06% 1.00 100.00% 0.06%
- 0.00% 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
56.11 5.00% 0.20% 56.11 5.00% 0.20%
21.80 5.00% 0.09% 21.80 5.00% 0.09%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
- - 0.00% - 0.00% 0.00%
0.36% 0.36%
BILL OF QUANTITY ( BQ )

KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI


PEKERJAAN : PEMELIHARAAN GEDUNG ASRAMA PUTRA 3
LOKASI : Jl. R A Kartini No. 292 Bangil - Pasuruan
TAHUN : 2021

NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN JUMLAH BOBOT


1 2 3 4 5 6=4x5 %

PEMELIHARAAN ASRAMA PUTRA 3


I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN
1 Pekerjaan Pembersihan Lokasi Ls 1.00 300,000.00 Rp 300,000.00 0.06%
2 Pekerjaan Pembongkaran Plafond Ls 1.00 1,000,000.00 Rp 1,000,000.00 0.20%
3 Pekerjaan Pembongkaran Kusen Lama Ls 1.00 750,000.00 Rp 750,000.00 0.15%
4 Pekerjaan Pembongkaran Keramik Lama Ls 1.00 300,000.00 Rp 300,000.00 0.06%
5 Pekerjaan Pembongkaran Kuda-Kuda, Balok & Nok Lama Ls 1.00 500,000.00 Rp 500,000.00 0.10%
6 Pembongkaran Rangka & penutup Atap Lama Ls 1.00 1,000,000.00 Rp 1,000,000.00 0.20%

SUB JUMLAH Rp 3,850,000.00


II. PEKERJAAN STRUKTUR
1 Beton Ring Balk RB (11x15) TOC.+3,80
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.36 938,359.60 Rp 337,809.46 0.07%
- Pasang bekesting Praktis 3x Pakai m² 6.59 165,660.38 Rp 1,091,701.87 0.22%
- Pembesian Polos Tul. Pokok 4 -Ø12 Kg 54.13 13,520.00 Rp 731,837.60 0.15%
- Pembesian Polos Beg. Ø8-150 Kg 13.61 13,520.00 Rp 184,007.20 0.04%

SUB JUMLAH Rp 2,345,356.13


III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 18.63 127,075.00 Rp 2,367,407.25 0.48%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 18.63 77,535.00 Rp 1,444,477.05 0.29%
3 Woodplank L: 30 cm + Pengecatan m 50.80 75,575.00 Rp 3,839,210.00 0.77%

SUB JUMLAH Rp 7,651,094.30


IV. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 75.30 110,185.00 Rp 8,296,930.50 1.67%
2 Plesteran Cam. 1 Pc : 6 Psr tebal 15 mm + Acian m² 150.59 65,475.00 Rp 9,859,880.25 1.99%
3 Benangan m² 48.16 10,356.00 Rp 498,744.96 0.10%

SUB JUMLAH Rp 18,655,555.71


V. PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pasang Keramik Lantai KM Uk. 40x40 cm Motif unpolished m² 6.83 179,755.06 Rp 1,227,727.08 0.25%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 23.92 191,653.75 Rp 4,584,357.70 0.92%

SUB JUMLAH Rp 5,812,084.78


VI. PEKERJAAN PLAFOND
1 Pasang Rangka plafon besi hollow 1 x 40.40.0,3 mm m² 146.78 126,250.00 Rp 18,530,975.00 3.73%
2 Pasang Plafond gypsum board, tebal 9 mm m² 94.61 41,765.00 Rp 3,951,386.65 0.80%
3 Pasang Plafond Kalsi board, tebal 4 mm m² 52.17 43,415.00 Rp 2,264,960.55 0.46%
4 List Plafond Gypsum Profil m 161.50 27,080.25 Rp 4,373,460.38 0.88%

SUB JUMLAH Rp 29,120,782.58


VII. PEKERJAAN KUSEN PINTU
1 Pekerjaan Pintu PJ1 Unit 1.00 5,934,000.00 Rp 5,934,000.00 1.20%
2 Pekerjaan Pintu PJ2 Unit 1.00 5,673,000.00 Rp 5,673,000.00 1.14%
3 Pekerjaan Pintu P1 Unit 6.00 3,704,000.00 Rp 22,224,000.00 4.48%
4 Pekerjaan Pintu P2 Unit 2.00 2,836,000.00 Rp 5,672,000.00 1.14%
5 Pekerjaan Jendela J1 Unit 1.00 3,066,000.00 Rp 3,066,000.00 0.62%
6 Pekerjaan Jendela J2 Unit 5.00 2,480,000.00 Rp 12,400,000.00 2.50%
7 Pekerjaan Bouvenlis BV Unit 2.00 1,073,000.00 Rp 2,146,000.00 0.43%
8 Pekerjaan Bouvenlis BV2 Unit 1.00 755,000.00 Rp 755,000.00 0.15%

SUB JUMLAH Rp 57,870,000.00


NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN JUMLAH BOBOT
1 2 3 4 5 6=4x5 %
VIII. PEKERJAAN PENGECATAN
1 Pengecatan Plafon baru 3x m² 146.78 24,173.50 Rp 3,548,186.33 0.71%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup )
2 Pengecatan tembok baru dalam m² 150.59 24,173.50 Rp 3,640,287.37 0.73%
( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
3 Pengecatan tembok lama dalam m² 266.75 18,110.50 Rp 4,830,975.88 0.97%
( 1 lapis cat dasar, 2 lapis cat penutup )
4 Penjahitan Dinding Pecah Ls 1.00 250,000.00 Rp 250,000.00 0.05%

SUB JUMLAH Rp 12,269,449.57


IX. PEKERJAAN MEKANIKAL
- Floordrain StainlessSteel Bh 2.00 89,455.00 Rp 178,910.00 0.04%
- Kran Ø stainless Steel + Knop Penutup m1 2.00 82,631.00 Rp 165,262.00 0.03%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 2.00 250,000.00 Rp 500,000.00 0.10%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 0.88 110,185.00 Rp 96,962.80 0.02%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.04 938,359.60 Rp 37,534.38 0.01%
- Urugan Pasir Tb:30 cm m³ 0.15 173,150.00 Rp 25,972.50 0.01%

SUB JUMLAH Rp 1,004,641.68


X. PEKERJAAN ELEKTRIKAL
1 Pasang Instalasi Listrik Indoor + Fitting Kabel NGA 1 x 2,5 mm Ttk 13.00 126,500.00 Rp 1,644,500.00 0.33%
2 Pasang Instalasi Stop Kontak Kabel NYA 1 x 2,5 mm Ttk 4.00 126,500.00 Rp 506,000.00 0.10%
3 Pasang Instalasi Listrik Lama Ls 1.00 1,200,000.00 Rp 1,200,000.00 0.24%
4 Pasang Stop Kontak bh 4.00 131,866.00 Rp 527,464.00 0.11%
5 Pasang Saklar Tunggal bh 4.00 61,100.00 Rp 244,400.00 0.05%
6 Pasang Lampu LED 14 Watt bh 9.00 100,395.00 Rp 903,555.00 0.18%
7 Pasang Lampu LED 7,5 Watt bh 4.00 67,300.00 Rp 269,200.00 0.05%

SUB JUMLAH Rp 5,295,119.00


TOTAL PEMELIHARAAN GEDUNG ELEKTRO DAN PERCETAKAN Rp 143,874,083.74 28.98%
BILL OF QUANTITY ( BQ )

KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI


SUB PEKERJAAN : PEMELIHARAAN ASRAMA PUTRI 1 & 2
LOKASI : Jl. R A Kartini No. 292 Bangil - Pasuruan
TAHUN : 2021

NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN JUMLAH


1 2 3 4 5 6=4x5 BOBOT%

PEMELIHARAAN ASRAMA PUTRI 1 & 2


A ASRAMA PUTRI 1
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN
1 Pekerjaan Pembersihan Lokasi, Pembongkaran Plafond Teras Ls 1.00 1,000,000.00 Rp 1,000,000.00 0.20%

SUB JUMLAH Rp 1,000,000.00


II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 36.19 127,075.00 Rp 4,598,844.25 0.93%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 36.19 77,535.00 Rp 2,805,991.65 0.57%
3 Tambal Sulam Bubungan lokal model Karangpilang ( Kodok ) m 33.48 114,480.00 Rp 3,832,790.40 0.77%
4 Woodplank L: 30 cm + Pengecatan m 76.50 75,575.00 Rp 5,781,487.50 1.16%

SUB JUMLAH Rp 17,019,113.80


III. PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 12.16 179,755.06 Rp 2,185,821.56 0.44%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 54.40 191,653.75 Rp 10,425,964.00 2.10%

SUB JUMLAH Rp 12,611,785.56


IV. PEKERJAAN PLAFOND
1 Pek. Plafond Kalsiboard t: 4 mm Teras m² 92.69 43,415.00 Rp 4,024,136.35 0.81%
2 Tambal Sulam rangka langit-langit Teras (1.00 x 1.00) m m² 46.35 64,375.00 Rp 2,983,781.25 0.60%
kayu Meranti 50%
3 Pasang list langit - langit kayu profil m 71.70 17,775.00 Rp 1,274,467.50 0.26%

SUB JUMLAH Rp 8,282,385.10


V. PEKERJAAN PENGECATAN
1 Pengecatan tembok lama dalam m² 478.58 18,110.50 Rp 8,667,323.09 1.75%
( 1 lapis cat dasar, 2 lapis cat penutup )
2 Pengecatan tembok lama luar m² 154.77 20,531.50 Rp 3,177,660.26 0.64%
( 1 lapis cat dasar, 2 lapis cat penutup )
3 Pengecatan Plafon baru 3x m² 92.69 24,173.50 Rp 2,240,641.72 0.45%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup )
SUB JUMLAH Rp 14,085,625.06
VI. PEKERJAAN MEKANIKAL
PEKERJAAN MEKANIKAL
- Kran Ø 3/4 "Onda stailles teel + Knop Penutup Bh 4.00 82,631.00 Rp 330,524.00 0.07%
- Pasang Kloset Duduk Ex..Toto Unit 4.00 2,427,520.00 Rp 9,710,080.00 1.96%
- Floordrain StainlessSteel Bh 4.00 89,455.00 Rp 357,820.00 0.07%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) Unit 4.00 250,000.00 Rp 1,000,000.00 0.20%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.76 110,185.00 Rp 193,925.60 0.04%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.09 938,359.60 Rp 84,452.36 0.02%
- Urugan Pasir Tb:30 cm m³ 0.290 173,150.00 Rp 50,213.50 0.01%
SUB JUMLAH Rp 11,727,015.46
VII. PEKERJAAN ELEKTRIKAL
1 Pasang Instalasi Listrik Lama Ttk 1.00 126,500.00 Rp 126,500.00 0.03%

SUB JUMLAH Rp 126,500.00


TOTAL PEMELIHARAAN GEDUNG ASRAMA PUTRI 1 Rp 64,852,424.98 13.06%
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN JUMLAH
1 2 3 4 5 6=4x5 BOBOT%

PEMELIHARAAN ASRAMA PUTRI 1 & 2


B GEDUNG ASRAMA PUTRI 2
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN
1 Pekerjaan Pembongkaran Kusen & Keramik KM Ls 1.00 750,000.00 Rp 750,000.00 0.15%

SUB JUMLAH Rp 750,000.00


II. PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 7.47 179,755.06 Rp 1,342,770.32 0.27%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 32.88 191,653.75 Rp 6,301,575.30 1.27%

SUB JUMLAH Rp 7,644,345.62


III. PEKERJAAN KUSEN PINTU
1 Pekerjaan Pintu P2 m² 1.00 5,024,000.00 Rp 5,024,000.00 1.01%

SUB JUMLAH Rp 5,024,000.00


IV. PEKERJAAN PENGECATAN
1 Pengecatan tembok lama dalam m² 496.32 18,110.50 Rp 8,988,603.36 1.81%
( 1 lapis cat dasar, 2 lapis cat penutup )
2 Pengecatan tembok lama luar m² 178.47 20,531.50 Rp 3,664,256.81 0.74%
( 1 lapis cat dasar, 2 lapis cat penutup )
3 Pengecatan Plafon lama 2x m² 236.70 18,110.50 Rp 4,286,755.35 0.86%
( 1 lapis plamir, 1 lapis cat penutup )
4 Pengecatan Kalsiplank Lama m² 27.97 37,547.50 Rp 1,050,203.58 0.21%

SUB JUMLAH Rp 17,989,819.09


V. PEKERJAAN MEKANIKAL
- Kran Ø 3/4" Stainless Steel + Knop Penutup Bh 6.00 82,631.00 Rp 495,786.00 0.10%
- Pasang Kloset Duduk Monoblok Unit 3.00 2,427,520.00 Rp 7,282,560.00 1.47%
- Floordrain StainlessSteel Bh 3.00 89,455.00 Rp 268,365.00 0.05%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 3.00 250,000.00 Rp 750,000.00 0.15%
Tempat Duduk t: 80x 40 x 40 cm 3 Unit
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.32 110,185.00 Rp 145,444.20 0.03%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.07 938,359.60 Rp 65,685.17 0.01%
- Urugan Pasir Tb:30 cm m³ 0.22 173,150.00 Rp 38,093.00 0.01%

SUB JUMLAH Rp 9,045,933.37


TOTAL PEMELIHARAAN GEDUNG ASRAMA PUTRI 2 Rp 40,454,098.08 8.15%
LAPORAN PENGAWASAN

KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI


SUB PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL
LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN
TAHUN : 2021

NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN JUMLAH REALISASI PEK
1 2 3 4 5.00 8=6+7 BOBOT% Minggu Lalu Minggu In
PEMELIHARAAN AKSESIBILITAS/SELASAR Vol REALISASI BOBOT Vol
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - - -
1 Persiapan & Pembersihan Lokasi Pekerjaan m² 63.60 17,550.00 Rp 1,116,180.00 0.22% - - 63.60
2 Pengukuran dan Pasang Bouwplank m1 52.00 61,225.00 Rp 3,183,700.00 0.64% - - 4.33
3 Galian Tanah Pondasi m³ 22.36 87,875.00 Rp 1,964,885.00 0.40% - - 20.50
4 Urugan Pasir t:5cm m³ 0.97 173,150.00 Rp 167,955.50 0.03% - - -
5 Lantai kerja t:5cm Camp.1:3:5 m³ 0.97 777,448.68 Rp 754,125.22 0.15% - - -
JUMLAH PEKERJAAN PERSIAPAN Rp 7,186,845.72 - - -
B. PEKERJAAN STRUKTUR - - -
1 Beton Pondasi Footplat 80x80x20 cm - - -
Pengecoran beton mutu K.175 m³ 3.07 938,359.60 Rp 2,880,763.98 0.58% - - -
Pekerjaan Bekisting 2x Pakai m² 15.36 159,830.00 Rp 2,454,988.80 0.49% - - -
Pekerjaan Pembesian kg 434.65 13,520.00 Rp 5,876,468.00 1.18% - - 36.22
- Tul. Pokok. Ø12-150 - - -
2 Beton Kolom Pedestal 20/20cm - - -
Pengecoran beton mutu K.175 m³ 0.53 938,359.60 Rp 497,330.59 0.10% - - -
Pekerjaan Bekisting 2x Pakai m² 10.56 165,660.38 Rp 1,749,373.56 0.35% - - -
Pekerjaan Pembesian - - -
- Tul. Pokok. 4Ø12 kg 89.49 13,520.00 Rp 1,209,904.80 0.24% - - 11.19
- Beg. Ø8-150 kg 30.93 13,520.00 Rp 418,173.60 0.08% - - 3.87
3 Beton Sloof 15/20cm - - -
Pengecoran beton mutu K.175 m³ 2.46 938,359.60 Rp 2,308,364.62 0.47% - - -
Pekerjaan Bekisting 2x Pakai m² 32.76 83,665.00 Rp 2,740,865.40 0.55% - - -
Pekerjaan Pembesian - - -
- Tul. Pokok. 4Ø12 kg 303.97 13,520.00 Rp 4,109,674.40 0.83% - - -
- Beg. Ø8-100-150 kg 162.59 13,520.00 Rp 2,198,216.80 0.44% - - -
4 Beton Kolom Praktis - - -
Pengecoran beton mutu K.175 m³ 0.75 938,359.60 Rp 703,769.70 0.14% - - -
Pekerjaan Bekisting 2x Pakai m² 19.87 165,660.38 Rp 3,291,671.65 0.66% - - -
Pekerjaan Pembesian - - -
- Tul. Pokok. 4Ø12 kg 160.22 13,520.00 Rp 2,166,174.40 0.44% - - -
- Beg. Ø8-150 kg 48.29 13,520.00 Rp 652,880.80 0.13% - - -
5 Rabatan t:15cm m³ 24.39 777,448.68 Rp 18,961,973.24 3.82% - - -
6 Tiang Besi Hollow 50X50X2.3 mm + Pengecatan m1 33.60 80,000.00 Rp 2,688,000.00 0.54% - - -
7 Plat Besi 10mm kg 42.39 50,825.40 Rp 2,154,488.71 0.43% - - -
Anchor M14 X 200 mm
8 bh 96.00 50,000.00 Rp 4,800,000.00 0.97% - - -
Rangka Atap Besi Hollow, uk. 40X40X1.6 mm
9 m² 83.94 563,852.60 Rp 47,329,787.34 9.53% - - -
;20X40X1.6 mm+Pengecatan (terpasang)
10 Penutup Atap Zincalume tebal 0,35mm m² 83.94 145,000.00 Rp 12,171,300.00 2.45% - - -
11 Pasang atap nok seng plat m1 34.40 45,172.00 Rp 1,553,916.80 0.31% - - -
12 Woodplank 30cm + Pengecatan m1 68.80 75,575.00 Rp 5,199,560.00 1.05% - - -
- - -
JUMLAH PEKERJAAN STRUKTUR Rp 128,117,647.19 - - -
C. PEKERJAAN ARSITEKTUR - - -
I. PEKERJAAN PASANGAN DAN PLESTERAN - - -
1 Ban-banan Kolom m' 19.20 10,356.00 Rp 198,835.20 0.04% - - -
2 Plesteran beton m² 31.87 65,475.00 Rp 2,086,688.25 0.42% - - -
- - -
SUB JUMLAH Rp 2,285,523.45 - - -
II. PEKERJAAN PENGECATAN - - -
1 Pengecatan kolom m² 31.87 24,173.50 Rp 770,409.45 0.16% - - -
- - -
SUB JUMLAH Rp 770,409.45 - - -
JUMLAH PEKERJAAN ARSITEKTUR Rp 3,055,932.90 - - -
D. PEKERJAAN MEP - - -
I. PEKERJAAN ELEKTRIKAL - - -
ARMATURE, STOP KONTAK DAN INSTAL - - -
- Titik Penerangan Ttk 27.00 126,500.00 Rp 3,415,500.00 0.69% - - -
- Lampu LED Downlight bulat 12 watt Outbow bh 27.00 125,000.00 Rp 3,375,000.00 0.68% - - -
SUB JUMLAH Rp 6,790,500.00 - - -
Rp 145,150,925.80 29.24% 0.00%
Minggu Ke :I
Periode : 27 Sept s/d 03 Okt 2021
Bobot Rencana : 1.07%
Bobot Realisasi : 1.14%
Deviasi : 0.06% (CEPAT)

REALISASI PEKERJAAN
Minggu Ini S/D Minggu Ini
REALISASI BOBOT Vol REALISASI BOBOT

- - -
100.00% 0.22% 63.60 100.00% 0.22%
8.33% 0.05% 4.33 8.33% 0.05%
91.67% 0.36% 20.50 91.67% 0.36%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
8.33% 0.10% 36.22 8.33% 0.10%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
12.50% 0.03% 11.19 12.50% 0.03%
12.50% 0.01% 3.87 12.50% 0.01%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00%
0.78% 0.78%
BILL OF QUANTITY (BQ) SMK3
BOBOT KEMAJUAN FISIK PEKERJAAN
Harga Satuan Jumlah Harga % Minggu Lalu Minggu Ini S/D Minggu Ini
No. URAIAN PEKERJAAN Volume Satuan
Rp Rp Vol % Vol % Vol %

1) Penyiapan RKK Terdiri Atas:


a. Pembuatan prosedur dan instruksi kerja 1.00 200,000.00 200,000.00 0.04%

2) Sosialisasi, Promosi dan Pelatihan terdiri atas


a.Spanduk / Baner 1 bh 1.00 100,000.00 100,000.00 0.02%

3) Alat Pelindung Kerja Terdiri Atas:


a. Pagar Pengaman Sementara; 1.00 ls 250,000.00 250,000.00 0.05%
b. Pembatas Area (Restricted Area). 1.00 ls 200,000.00 200,000.00 0.04%

4) Alat Pelindung Diri Terdiri Atas:


a. Topi Pelindung (Safety Helmet); 15.00 bh 40,000.00 600,000.00 0.12%
b. Pelindung Pernafasan Dan Mulut (Masker); 149.00 bh 2,000.00 298,000.00 0.06%
c. Sarung Tangan (Safety Gloves); 150.00 psng 5,000.00 750,000.00 0.15%
d. Sepatu Keselamatan (Safety Shoes); 15.00 psng 50,000.00 750,000.00 0.15%
e. Rompi Keselamatan (Safety Vest); 15.00 bh 30,000.00 450,000.00 0.09%

5) Asuransi dan Perijinan terdiri atas :


a. BPJS ketenagakerjaan 1.00 ls 1,000,000.00 1,000,000.00 0.20%

6) Fasilitas sarana kesehatan;


a. Peralatan P3K ( 2 Kotak P3K, Obat Luka, Perban, dll) 1.00 unit 150,000.00 150,000.00 0.03%
b. Wastafel Portabel +lengkap (terpasang) 1.00 unit 500,000.00 500,000.00 0.10%

7) Kegiatan Dan peralatan terkait dengan pengendalian resiko Keselamatan Konstruksi :


a.Alat Pemadam Api ringan (APAR) 3 Kg 1 bh, KIP 1.00 ls 300,000.00 300,000.00 0.06%

8) Rambu - Rambu Terdiri Atas :


a. Tongkat Pengatur Lalu Lintas (Warning Lights Stick); 1.00 bh 100,000.00 100,000.00 0.02%
b. Lampu Putar (Rotary Lamp); 1.00 bh 75,000.00 75,000.00 0.02%

JUMLAH 5,723,000.00
PPN 10% 572,300.00 0.12%
JUMLAH TOTAL 6,295,300.00 1.27%
TIME SCHEDULE

JANGKA WAKTU PELAKSANAAN 75 HARI KALENDER


NO. URAIAN PEKERJAAN HARGA (Rp.) BOBOT (%) Minggu Ke-1 Minggu Ke-2 Minggu Ke-3 Minggu Ke-4 Minggu Ke-5 Minggu Ke-6 Minggu Ke-7 Minggu Ke-8 Minggu Ke-9 Minggu Ke-10 Minggu Ke-11 KETERANGAN
Hari 1-7 Hari 8-14 Hari 15-21 Hari 22-28 Hari 29-35 Hari 36-42 Hari 43-49 Hari 50-56 Hari 57-63 Hari 64-70 Hari 71-75

PEMELIHARAAN ASRAMA PUTRA 1 DAN 2


A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN Rp 3,748,023.80 0.755% 0.189% 0.189% 0.189% 0.189%
B. PEKERJAAN STRUKTUR ATAP Rp 1,277,001.45 0.257% 0.129% 0.129%
C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN PASANGAN DAN PLESTERAN Rp 626,602.50 0.126% 0.032% 0.032% 0.032% 0.032%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING Rp 20,564,208.83 4.143% 0.690% 0.690% 0.690% 0.690% 0.690% 0.690%
III. PEKERJAAN KUSEN PINTU DAN JENDELA Rp 35,420,584.00 7.136% 1.189% 1.189% 1.189% 1.189% 1.189% 1.189%
IV. PEKERJAAN PLAFOND Rp 3,635,406.38 0.732% 0.183% 0.183% 0.183% 0.183%
V. PEKERJAAN PENGECATAN Rp 29,275,566.63 5.898% 0.737% 0.737% 0.737% 0.737% 0.737% 0.737% 0.737% 0.737%
D. PEKERJAAN MEP
I. PEKERJAAN ELEKTRIKAL Rp 1,794,800.00 0.362% 0.121% 0.121% 0.121%

PEMELIHARAAN ASRAMA PUTRA 3


I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN Rp 3,850,000.00 0.776% 0.388% 0.388%
II. PEKERJAAN STRUKTUR Rp 2,345,356.13 0.472% 0.236% 0.236%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP Rp 7,651,094.30 1.541% 0.514% 0.514% 0.514%
IV. PEKERJAAN PASANGAN DAN PLESTERAN Rp 18,655,555.71 3.758% 0.752% 0.752% 0.752% 0.752% 0.752%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING Rp 5,812,084.78 1.171% 0.293% 0.293% 0.293% 0.293%
VI. PEKERJAAN PLAFOND Rp 29,120,782.58 5.866% 1.173% 1.173% 1.173% 1.173% 1.173%
VII. PEKERJAAN KUSEN PINTU Rp 57,870,000.00 11.658% 1.943% 1.943% 1.943% 1.943% 1.943% 1.943%
VIII. PEKERJAAN PENGECATAN Rp 12,269,449.57 2.472% 0.618% 0.618% 0.618% 0.618%
IX. PEKERJAAN MEKANIKAL Rp 1,004,641.68 0.202% 0.067% 0.067% 0.067%
X. PEKERJAAN ELEKTRIKAL Rp 5,295,119.00 1.067% 0.356% 0.356% 0.356%

PEMELIHARAAN ASRAMA PUTRI 1 & 2


A GEDUNG ASRAMA PUTRI 1
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN Rp 1,000,000.00 0.201% 0.101% 0.101%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP Rp 17,019,113.80 3.429% 0.857% 0.857% 0.857% 0.857%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING Rp 12,611,785.56 2.541% 0.635% 0.635% 0.635% 0.635%
IV. PEKERJAAN PLAFOND Rp 8,282,385.10 1.669% 0.417% 0.417% 0.417% 0.417%
V. PEKERJAAN PENGECATAN Rp 14,085,625.06 2.838% 0.946% 0.946% 0.946%
VI. PEKERJAAN MEKANIKAL Rp 11,727,015.46 2.362% 0.787% 0.787% 0.787%
VII. PEKERJAAN ELEKTRIKAL Rp 126,500.00 0.025% 0.008% 0.008% 0.008%
B GEDUNG ASRAMA PUTRI 2
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN Rp 750,000.00 0.151% 0.151%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING Rp 7,644,345.62 1.540% 0.513% 0.513% 0.513%
III. PEKERJAAN KUSEN PINTU Rp 5,024,000.00 1.012% 0.506% 0.506%
IV. PEKERJAAN PENGECATAN Rp 17,989,819.09 3.624% 0.906% 0.906% 0.906% 0.906%
V. PEKERJAAN MEKANIKAL Rp 9,045,933.37 1.822% 0.607% 0.607% 0.607%

PEMELIHARAAN AKSESIBILITAS/SELASAR
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN Rp 7,186,845.72 1.448% 0.290% 0.290% 0.290% 0.290% 0.290%
B. PEKERJAAN STRUKTUR Rp 128,117,647.19 25.810% 2.868% 2.868% 2.868% 2.868% 2.868% 2.868% 2.868% 2.868% 2.868%
C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN PASANGAN DAN PLESTERAN Rp 2,285,523.45 0.460% 0.230% 0.230%
III. PEKERJAAN PENGECATAN Rp 770,409.45 0.155% 0.155%
D. PEKERJAAN MEP
I. PEKERJAAN ELEKTRIKAL Rp 6,790,500.00 1.368% 0.456% 0.456% 0.456%

SMK3
I. SMK3 Rp 5,723,000.00 1.153% 0.105% 0.105% 0.105% 0.105% 0.105% 0.105% 0.105% 0.105% 0.105% 0.105% 0.105%

JUMLAH TOTAL Rp 496,396,726.19 100.000%


RENCANA KEMAJUAN MINGGUAN 0.000% 1.072% 1.200% 5.888% 7.619% 13.335% 14.135% 12.063% 12.494% 13.149% 12.573% 6.472%
RENCANA KEMAJUAN MINGGUAN KOMULATIF 0.000% 1.072% 2.272% 8.160% 15.779% 29.114% 43.249% 55.312% 67.806% 80.955% 93.528% 100.000%
TIME SCHEDULE

JANGKA WAKTU PELAKSANAAN 75 HARI KALENDER


NO. URAIAN PEKERJAAN HARGA (Rp.) BOBOT (%) Minggu Ke-1 Minggu Ke-2 Minggu Ke-3 Minggu Ke-4 Minggu Ke-5 Minggu Ke-6 Minggu Ke-7 Minggu Ke-8 Minggu Ke-9 Minggu Ke-10Minggu Ke-11 KETERANGAN
Hari 1-7 Hari 8-14 Hari 15-21 Hari 22-28 Hari 29-35 Hari 36-42 Hari 43-49 Hari 50-56 Hari 57-63 Hari 64-70 Hari 71-75

PEMELIHARAAN ASRAMA PUTRA 1 DAN 2


A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN Rp 3,748,023.80 0.755% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.106% 0.000% 0.000% 0.000% 0.000%
B. PEKERJAAN STRUKTUR ATAP Rp 1,277,001.45 0.257% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN PASANGAN DAN PLESTERAN Rp 626,602.50 0.126% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING Rp 20,564,208.83 4.143% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
III. PEKERJAAN KUSEN PINTU DAN JENDELA Rp 35,420,584.00 7.136% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
IV. PEKERJAAN PLAFOND Rp 3,635,406.38 0.732% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
V. PEKERJAAN PENGECATAN Rp 29,275,566.63 5.898% 0.295% 0.295% 0.000% 0.000% 0.000% 0.295% 0.500% 0.000% 0.000% 0.000% 0.000%
D. PEKERJAAN MEP
I. PEKERJAAN ELEKTRIKAL Rp 1,794,800.00 0.362% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

PEMELIHARAAN ASRAMA PUTRA 3


I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN Rp 3,850,000.00 0.776% 0.000% 0.403% 0.000% 0.000% 0.126% 0.126% 0.060% 0.000% 0.000% 0.000% 0.000%
II. PEKERJAAN STRUKTUR Rp 2,345,356.13 0.472% 0.000% 0.000% 0.000% 0.000% 0.472% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP Rp 7,651,094.30 1.541% 0.000% 0.000% 0.000% 0.000% 0.000% 0.238% 0.000% 0.000% 0.000% 0.000% 0.000%
IV. PEKERJAAN PASANGAN DAN PLESTERAN Rp 18,655,555.71 3.758% 0.000% 0.000% 0.000% 2.743% 0.914% 0.100% 0.000% 0.000% 0.000% 0.000% 0.000%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING Rp 5,812,084.78 1.171% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.693% 0.000% 0.000% 0.000% 0.000%
VI. PEKERJAAN PLAFOND Rp 29,120,782.58 5.866% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
VII. PEKERJAAN KUSEN PINTU Rp 57,870,000.00 11.658% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
VIII. PEKERJAAN PENGECATAN Rp 12,269,449.57 2.472% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
IX. PEKERJAAN MEKANIKAL Rp 1,004,641.68 0.202% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
X. PEKERJAAN ELEKTRIKAL Rp 5,295,119.00 1.067% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

PEMELIHARAAN ASRAMA PUTRI 1 & 2


A GEDUNG ASRAMA PUTRI 1
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN Rp 1,000,000.00 0.201% 0.000% 0.101% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP Rp 17,019,113.80 3.429% 0.000% 0.000% 0.000% 0.896% 1.470% 0.291% 0.000% 0.000% 0.000% 0.000% 0.000%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING Rp 12,611,785.56 2.541% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 1.575% 0.000% 0.000% 0.000% 0.000%
IV. PEKERJAAN PLAFOND Rp 8,282,385.10 1.669% 0.000% 0.141% 0.000% 0.301% 0.970% 0.000% 0.128% 0.000% 0.000% 0.000% 0.000%
V. PEKERJAAN PENGECATAN Rp 14,085,625.06 2.838% 0.000% 0.000% 0.000% 0.000% 0.000% 0.151% 0.000% 0.000% 0.000% 0.000% 0.000%
VI. PEKERJAAN MEKANIKAL Rp 11,727,015.46 2.362% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
VII. PEKERJAAN ELEKTRIKAL Rp 126,500.00 0.025% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
B GEDUNG ASRAMA PUTRI 2
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN Rp 750,000.00 0.151% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING Rp 7,644,345.62 1.540% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
III. PEKERJAAN KUSEN PINTU Rp 5,024,000.00 1.012% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
IV. PEKERJAAN PENGECATAN Rp 17,989,819.09 3.624% 0.000% 0.000% 0.000% 0.000% 0.000% 0.037% 0.000% 0.000% 0.000% 0.000% 0.000%
V. PEKERJAAN MEKANIKAL Rp 9,045,933.37 1.822% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

PEMELIHARAAN AKSESIBILITAS/SELASAR
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN Rp 7,186,845.72 1.448% 0.419% 0.491% 0.321% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
B. PEKERJAAN STRUKTUR Rp 128,117,647.19 25.810% 0.378% 1.008% 6.713% 0.000% 0.000% 0.000% 0.504% 0.000% 0.000% 0.000% 0.000%
C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN PASANGAN DAN PLESTERAN Rp 2,285,523.45 0.460% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
III. PEKERJAAN PENGECATAN Rp 770,409.45 0.155% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
D. PEKERJAAN MEP
I. PEKERJAAN ELEKTRIKAL Rp 6,790,500.00 1.368% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

SMK3
I. SMK3 Rp 5,723,000.00 1.153% 0.206% 0.000% 0.000% 0.000% 0.000% 0.398% 0.166% 0.000% 0.000% 0.000% 0.000%

JUMLAH TOTAL Rp 496,396,726.19 100.000%


RENCANA KEMAJUAN MINGGUAN 0.000% 1.298% 2.439% 7.034% 3.940% 3.952% 1.637% 3.732% 0.000% 0.000% 0.000% 0.000%
AKUMULASI KEMAJUAN MINGGUAN 0.000% 1.298% 3.737% 10.771% 14.711% 18.663% 20.300% 24.032% 24.032% 24.032% 24.032% 24.032%
SCHEDULE PROGRES KEMAJUAN
KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI Minggu Ke :
SUB PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL Periode :
LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN Konsultan Pengawas : PT. MERBABU ARDICON
TAHUN : 2021 Kontraktor Pelaksana : CV. SINAR PUTRA MULYA

BOBOT JANGKA WAKTU PELAKSANAAN 75 HARI KALENDER


NO. URAIAN PEKERJAAN SAT. VOL % M-01 M-02 M-03 M-04 M-05 M-06 M-07 M-08 M-09 M-10 M-11 KET
H 1-7 H 8-14 H 15-21 H 22-28 H 29-35 H 36-42 H 43-49 H 50-56 H 57-63 H 64-70 H 71-75
PEMELIHARAAN ASRAMA PUTRA 1 DAN 2
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.19% 0.19% 0.00% 0.00% 0.00% 0.19% 0.19% 0.00% 0.00% 0.00% 0.00%
1 Persiapan & Pembersihan Lokasi Pekerjaan Ls 1.00 0.06% 0.00% 0.02%
2 Pembongkaran Dinding Bak Toilet Ls 1.00 0.10% 0.08%
3 Pembongkaran Keramik Ls 1.00 0.06% 0.02%
4 Pembongkaran Kusen m² 17.09 0.48% 0.00%
5 Pembongkaran Plafond + Rangka Plafond m² 19.23 0.06% 0.00%
0.76% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.11% 0.00% 0.00% 0.00% 0.00%
B. PEKERJAAN STRUKTUR ATAP 0.00% 0.13% 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Tambal Sulam Genteng 10% m² 16.47 0.26%

C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.03% 0.03% 0.00% 0.03% 0.03% 0.00% 0.00% 0.00% 0.00%
1 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps m² 5.40 0.13%

II. PEKERJAAN PELAPIS LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.69% 0.69% 0.69% 0.00% 0.69% 0.69% 0.69% 0.00%
1 Pasang Keramik Lantai ukuran 40x40 cm m² 22.46 0.70%
2 Pasang Keramik Dinding 25x40 cm m² 89.20 3.44%
4.14%
III. PEKERJAAN KUSEN PINTU DAN ASSESORIES 0.00% 0.00% 0.00% 0.00% 1.19% 1.19% 1.19% 1.19% 1.19% 1.19% 0.00%
1 Pekerjaan Pintu Toilet UPVC unit 10.00 3.40%
2 Pasang Kloset Duduk unit 6.00 2.93%
3 Pasang Kloset Jongkok unit 2.00 0.18%
4 Kran Ø 3/4 stainles Steel + Knop Penutup unit 4.00 0.07%
5 Pasang Floor drain StainlessSteel unit 8.00 0.14%
6 Pasang Grab Bar StainlessSteel (Terpasang) unit 8.00 0.40%
7.14%
IV. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.00% 0.18% 0.00% 0.18% 0.18% 0.18% 0.00% 0.00%
1 Pasang rangka plafond besi hollow 1 x 40.40.0,3 mm, modul 60 x 60 cm m² 13.77 0.35%
2 Pemasangan Gypsumboard 9mm m² 13.77 0.12%
3 List Plafond Gypsum Lebar 9 cm m¹ 36.52 0.20%
4 Pengecatan Plafon m² 13.77 0.07%
0.73%
V. PEKERJAAN PENGECATAN 0.00% 0.00% 0.74% 0.74% 0.74% 0.74% 0.00% 0.74% 0.74% 0.74% 0.74%
1 Pengecatan tembok lama dalam ( 1 lapis cat dasar, 2 lapis cat penutup ) m² 1,122.19 4.09% 0.20% 0.20% 0.20% 0.41%
2 Pengecatan tembok lama luar( 1 lapis cat dasar, 2 lapis cat penutup ) m² 436.02 1.80% 0.09% 0.09% 0.09% 0.09%
5.90% 0.29% 0.29% 0.00% 0.00% 0.00% 0.29% 0.50% 0.00% 0.00% 0.00% 0.00%
D. PEKERJAAN MEP
I. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.12% 0.00% 0.00% 0.00% 0.00% 0.12% 0.12%
ARMATURE, STOP KONTAK DAN INSTAL
- Titik Penerangan Ttk 8.00 0.20%
- Saklar Tunggal Ttk 4.00 0.05%
- Lampu LED Downlight 7,5 watt bh 8.00 0.11%
0.36%
PEMELIHARAAN ASRAMA PUTRA 3
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.39% 0.39% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi Ls 1.00 0.06% 0.00% 0.00% 0.00% 0.00%
2 Pekerjaan Pembongkaran Plafond Ls 1.00 0.20% 0.20% 0.00% 0.00% 0.00%
3 Pekerjaan Pembongkaran Kusen Lama Ls 1.00 0.15% 0.00% 0.08% 0.08% 0.06%
4 Pekerjaan Pembongkaran Keramik Lama Ls 1.00 0.06% 0.00% 0.00% 0.00% 0.00%
5 Pekerjaan Pembongkaran Kuda-Kuda, Balok & Nok Lama Ls 1.00 0.10% 0.00% 0.05% 0.05% 0.00%
6 Pembongkaran Rangka & penutup Atap Lama Ls 1.00 0.20% 0.20% 0.00% 0.00% 0.00%
0.78% 0.00% 0.40% 0.00% 0.00% 0.13% 0.13% 0.06% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN STRUKTUR 0.00% 0.00% 0.24% 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Beton Ring Balk RB (11x15) TOC.+3,80
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.36 0.07% 0.07%
- Pasang bekesting Praktis 3x Pakai m² 6.59 0.22% 0.22%
- Pembesian Polos Tul. Pokok 4 -Ø12 Kg 54.13 0.15% 0.15%
- Pembesian Polos Beg. Ø8-150 Kg 13.61 0.04% 0.04%
0.47% 0.00% 0.00% 0.00% 0.00% 0.47% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.51% 0.00% 0.00% 0.00% 0.00%
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 18.63 0.48% 0.24%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 18.63 0.29%
3 Woodplank L: 30 cm + Pengecatan m 50.80 0.77%
1.54% 0.00% 0.00% 0.00% 0.00% 0.00% 0.24% 0.00% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.00% 0.75% 0.75% 0.75% 0.75% 0.75% 0.00% 0.00% 0.00%
1 Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 75.30 1.67% 1.25% 0.42% 0.00%
2 Plesteran Cam. 1 Pc : 6 Psr tebal 15 mm + Acian m² 150.59 1.99% 1.49% 0.50% 0.00%
3 Benangan m² 48.16 0.10% 0.00% 0.00% 0.10%
3.76% 2.74% 0.91% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.00% 0.29% 0.29% 0.29% 0.29% 0.00% 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk. 40x40 cm Motif unpolished m² 6.83 0.25% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 23.92 0.92% 0.69%
1.17% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.69% 0.00% 0.00% 0.00% 0.00%
VI. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.00% 0.00% 1.17% 1.17% 1.17% 1.17% 1.17% 0.00%
1 Pasang Rangka plafon besi hollow 1 x 40.40.0,3 mm m² 146.78 3.73%
2 Pasang Plafond gypsum board, tebal 9 mm m² 94.61 0.80%
3 Pasang Plafond Kalsi board, tebal 4 mm m² 52.17 0.46%
4 List Plafond Gypsum Profil m 161.50 0.88%
5.87%
VII.PEKERJAAN KUSEN PINTU 0.00% 0.00% 0.00% 0.00% 1.94% 1.94% 1.94% 1.94% 1.94% 1.94% 0.00%
1 Pekerjaan Pintu PJ1 Unit 1.00 1.20%
2 Pekerjaan Pintu PJ2 Unit 1.00 1.14%
3 Pekerjaan Pintu P1 Unit 6.00 4.48%
4 Pekerjaan Pintu P2 Unit 2.00 1.14%
5 Pekerjaan Jendela J1 Unit 1.00 0.62%
6 Pekerjaan Jendela J2 Unit 5.00 2.50%
7 Pekerjaan Bouvenlis BV Unit 2.00 0.43%
8 Pekerjaan Bouvenlis BV2 Unit 1.00 0.15%
11.66%
VIII.PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.62% 0.62% 0.62% 0.62%
1 Pengecatan Plafon baru 3x m² 146.78 0.71%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup )
2 Pengecatan tembok baru dalam m² 150.59 0.73%
( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
3 Pengecatan tembok lama dalam m² 266.75 0.97%
( 1 lapis cat dasar, 2 lapis cat penutup )
4 Penjahitan Dinding Pecah Ls 1.00 0.05%
2.47%
IX. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.07% 0.07% 0.07% 0.00%
- Floordrain StainlessSteel Bh 2.00 0.04%
- Kran Ø stainless Steel + Knop Penutup m1 2.00 0.03%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 2.00 0.10%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 0.88 0.02%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.04 0.01%
- Urugan Pasir Tb:30 cm m³ 0.15 0.01%
0.20%
X. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.36% 0.36% 0.36%
1 Pasang Instalasi Listrik Indoor + Fitting Kabel NGA 1 x 2,5 mm Ttk 13.00 0.33%
2 Pasang Instalasi Stop Kontak Kabel NYA 1 x 2,5 mm Ttk 4.00 0.10%
3 Pasang Instalasi Listrik Lama Ls 1.00 0.24%
4 Pasang Stop Kontak bh 4.00 0.11%
5 Pasang Saklar Tunggal bh 4.00 0.05%
6 Pasang Lampu LED 14 Watt bh 9.00 0.18%
7 Pasang Lampu LED 7,5 Watt bh 4.00 0.05%
1.07%
PEMELIHARAAN ASRAMA PUTRI 1 & 2
A ASRAMA PUTRI 1
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.10% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi, Pembongkaran Plafond Teras Ls 1.00 0.20% 0.10%

II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00% 0.00% 0.86% 0.86% 0.86% 0.86% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 36.19 0.93% 0.46% 0.46% 0.00%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 36.19 0.57% 0.14% 0.42% 0.00%
3 Tambal Sulam Bubungan lokal model Karangpilang ( Kodok ) m 33.48 0.77% 0.00% 0.00% 0.00%
4 Woodplank L: 30 cm + Pengecatan m 76.50 1.16% 0.29% 0.58% 0.29%
3.43% 0.90% 1.47% 0.29% 0.00% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.64% 0.64% 0.64% 0.64% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 12.16 0.44% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 54.40 2.10% 1.58%
2.54% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.58% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.42% 0.42% 0.42% 0.42% 0.00% 0.00% 0.00% 0.00%
1 Pek. Plafond Kalsiboard t: 4 mm Teras m² 92.69 0.81% 0.08% 0.00% 0.73% 0.00%
2 Tambal Sulam rangka langit-langit Teras (1.00 x 1.00) m m² 46.35 0.60% 0.06% 0.30% 0.24% 0.00%
kayu Meranti 50% 0.00% 0.00% 0.00% 0.00%
3 Pasang list langit - langit kayu profil m 71.70 0.26% 0.00% 0.00% 0.00% 0.13%
1.67% 0.14% 0.30% 0.97% 0.00% 0.13% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.95% 0.95% 0.95% 0.00% 0.00% 0.00% 0.00%
1 Pengecatan tembok lama dalam m² 478.58 1.75% 0.09%
( 1 lapis cat dasar, 2 lapis cat penutup ) 0.00%
2 Pengecatan tembok lama luar m² 154.77 0.64% 0.06%
( 1 lapis cat dasar, 2 lapis cat penutup ) 0.00%
3 Pengecatan Plafon baru 3x m² 92.69 0.45% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup )
2.84% 0.00% 0.00% 0.00% 0.00% 0.00% 0.15% 0.00% 0.00% 0.00% 0.00% 0.00%
VI. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.79% 0.79% 0.79% 0.00% 0.00% 0.00% 0.00%
- Kran Ø 3/4 "Onda stailles teel + Knop Penutup Bh 4.00 0.07%
- Pasang Kloset Duduk Ex..Toto Unit 4.00 1.96%
- Floordrain StainlessSteel Bh 4.00 0.07%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) Unit 4.00 0.20%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.76 0.04%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.09 0.02%
- Urugan Pasir Tb:30 cm m³ 0.290 0.01%
2.36%
VII.PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.01% 0.01% 0.01% 0.00% 0.00% 0.00% 0.00%
1 Pasang Instalasi Listrik Lama Ttk 1.00 0.03%

PEMELIHARAAN ASRAMA PUTRI 1 & 2


B GEDUNG ASRAMA PUTRI 2
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.15% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembongkaran Kusen & Keramik KM Ls 1.00 0.15%

II. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.51% 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 7.47 0.27%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 32.88 1.27%
1.54%
III. PEKERJAAN KUSEN PINTU 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.00%
1 Pekerjaan Pintu P2 m² 1.00 1.01%

IV. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.91% 0.91% 0.91% 0.91%
1 Pengecatan tembok lama dalam m² 496.32 1.81% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) 0.00%
2 Pengecatan tembok lama luar m² 178.47 0.74% 0.04%
( 1 lapis cat dasar, 2 lapis cat penutup ) 0.00%
3 Pengecatan Plafon lama 2x m² 236.70 0.86% 0.00%
( 1 lapis plamir, 1 lapis cat penutup ) 0.00%
4 Pengecatan Kalsiplank Lama m² 27.97 0.21% 0.00%
3.62% 0.00% 0.00% 0.00% 0.00% 0.00% 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.61% 0.61% 0.61%
- Kran Ø 3/4" Stainless Steel + Knop Penutup Bh 6.00 0.10%
- Pasang Kloset Duduk Monoblok Unit 3.00 1.47%
- Floordrain StainlessSteel Bh 3.00 0.05%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 3.00 0.15%
Tempat Duduk t: 80x 40 x 40 cm 3 Unit
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.32 0.03%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.07 0.01%
- Urugan Pasir Tb:30 cm m³ 0.22 0.01%
1.82%
PEMELIHARAAN AKSESIBILITAS/SELASAR
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.29% 0.29% 0.29% 0.29% 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Persiapan & Pembersihan Lokasi Pekerjaan m² 63.60 0.22% 0.06% 0.00%
2 Pengukuran dan Pasang Bouwplank m1 52.00 0.64% 0.00% 0.32% 0.32%
3 Galian Tanah Pondasi m³ 22.36 0.40% 0.36% 0.00%
4 Urugan Pasir t:5cm m³ 0.97 0.03% 0.00% 0.03%
5 Lantai kerja t:5cm Camp.1:3:5 m³ 0.97 0.15% 0.00% 0.14%
1.45% 0.42% 0.49% 0.32%
B. PEKERJAAN STRUKTUR 0.00% 0.00% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87%
1 Beton Pondasi Footplat 80x80x20 cm
Pengecoran beton mutu K.175 m³ 3.07 0.58% 0.00% 0.53% 0.00%
Pekerjaan Bekisting 2x Pakai m² 15.36 0.49% 0.00% 0.45% 0.00%
Pekerjaan Pembesian kg 434.65 1.18% 0.30% 0.79% 0.00% 0.00%
- Tul. Pokok. Ø12-150 0.00% 0.00% 0.00% 0.00%
2 Beton Kolom Pedestal 20/20cm 0.00% 0.00% 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 0.53 0.10% 0.00% 0.00% 0.09% 0.00%
Pekerjaan Bekisting 2x Pakai m² 10.56 0.35% 0.00% 0.00% 0.32% 0.00%
Pekerjaan Pembesian 0.00% 0.00% 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 89.49 0.24% 0.06% 0.16% 0.00% 0.00%
- Beg. Ø8-150 kg 30.93 0.08% 0.02% 0.06% 0.00% 0.00%
3 Beton Sloof 15/20cm 0.00% 0.00% 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 2.46 0.47% 0.00% 0.00% 0.44% 0.00%
Pekerjaan Bekisting 2x Pakai m² 32.76 0.55% 0.00% 0.00% 0.52% 0.00%
Pekerjaan Pembesian 0.00% 0.00% 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 303.97 0.83% 0.00% 0.00% 0.78% 0.00%
- Beg. Ø8-100-150 kg 162.59 0.44% 0.00% 0.00% 0.42% 0.00%
4 Beton Kolom Praktis 0.00% 0.00% 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 0.75 0.14% 0.00% 0.00% 0.13% 0.00%
Pekerjaan Bekisting 2x Pakai m² 19.87 0.66% 0.00% 0.00% 0.61% 0.00%
Pekerjaan Pembesian 0.00% 0.00% 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 160.22 0.44% 0.00% 0.00% 0.40% 0.00%
- Beg. Ø8-150 kg 48.29 0.13% 0.00% 0.00% 0.12% 0.00%
5 Rabatan t:15cm m³ 24.39 3.82% 0.00% 0.00% 1.91% 0.00%
6 Tiang Besi Hollow 50X50X2.3 mm + Pengecatan m1 33.60 0.54% 0.00% 0.00% 0.00% 0.03%
7 Plat Besi 10mm kg 42.39 0.43% 0.00% 0.00% 0.00% 0.00%
Anchor M14 X 200 mm
8 bh 96.00 0.97% 0.00% 0.00% 0.00% 0.00%
Rangka Atap Besi Hollow, uk. 40X40X1.6 mm
9 m² 83.94 9.53% 0.00% 0.00% 0.00% 0.48%
;20X40X1.6 mm+Pengecatan (terpasang)
10 Penutup Atap Zincalume tebal 0,35mm m² 83.94 2.45% 0.00% 0.00% 0.00% 0.00%
11 Pasang atap nok seng plat m1 34.40 0.31% 0.00% 0.00% 0.00% 0.00%
12 Woodplank 30cm + Pengecatan m1 68.80 1.05% 0.00% 0.00% 0.00% 0.00%
25.81% 0.38% 1.01% 6.71% 0.00% 0.00% 0.00% 0.50% 0.00% 0.00% 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.23% 0.23% 0.00%
1 Ban-banan Kolom m' 19.20 0.04%
2 Plesteran beton m² 31.87 0.42%
0.46%
II. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.16%
1 Pengecatan kolom m² 31.87 0.16%

D. PEKERJAAN MEP
I. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.46% 0.46% 0.46% 0.00%
ARMATURE, STOP KONTAK DAN INSTAL
- Titik Penerangan Ttk 27.000 0.69%
- Lampu LED Downlight bulat 12 watt Outbow bh 27.000 0.68%
1.37%
SIMK3 0.00% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10%
1) Penyiapan RKK Terdiri Atas:
a. Pembuatan prosedur dan instruksi kerja 1.00 0.04% 0.04% 0.00% 0.00%
0.00% 0.00% 0.00%
2) Sosialisasi, Promosi dan Pelatihan terdiri atas 0.00% 0.00% 0.00%
a.Spanduk / Baner 1 bh 1.00 0.02% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
3) Alat Pelindung Kerja Terdiri Atas: 0.00% 0.00% 0.00%
a. Pagar Pengaman Sementara; ls 1.00 0.05% 0.00% 0.00% 0.00%
b. Pembatas Area (Restricted Area). ls 1.00 0.04% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
4) Alat Pelindung Diri Terdiri Atas: 0.00% 0.00% 0.00%
a. Topi Pelindung (Safety Helmet); bh 15.00 0.12% 0.00% 0.06% 0.06%
b. Pelindung Pernafasan Dan Mulut (Masker); bh 149.00 0.06% 0.00% 0.03% 0.03%
c. Sarung Tangan (Safety Gloves); psng 150.00 0.15% 0.08% 0.00% 0.00%
d. Sepatu Keselamatan (Safety Shoes); psng 15.00 0.15% 0.00% 0.08% 0.08%
e. Rompi Keselamatan (Safety Vest); bh 15.00 0.09% 0.09% 0.00% 0.00%
0.00% 0.00% 0.00%
5) Asuransi dan Perijinan terdiri atas : 0.00% 0.00% 0.00%
a. BPJS ketenagakerjaan ls 1.00 0.20% 0.00% 0.20% 0.00%
0.00% 0.00% 0.00%
6) Fasilitas sarana kesehatan; 0.00% 0.00% 0.00%
a. Peralatan P3K ( 2 Kotak P3K, Obat Luka, Perban, dll) unit 1.00 0.03% 0.00% 0.03% 0.00%
b. Wastafel Portabel +lengkap (terpasang) unit 1.00 0.10% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
7) Kegiatan Dan peralatan terkait dengan pengendalian resiko Keselamatan Konstruksi : 0.00% 0.00% 0.00%
a.Alat Pemadam Api ringan (APAR) 3 Kg 1 bh, KIP ls 1.00 0.06% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
8) Rambu - Rambu Terdiri Atas : 0.00% 0.00% 0.00%
a. Tongkat Pengatur Lalu Lintas (Warning Lights Stick); bh 1.00 0.02% 0.00% 0.00% 0.00%
b. Lampu Putar (Rotary Lamp); bh 1.00 0.02% 0.00% 0.00% 0.00%
1.15% 0.21% 0.00% 0.00% 0.00% 0.00% 0.40% 0.17% 0.00% 0.00% 0.00% 0.00%
100.00%
RENCANA KEMAJUAN MINGGUAN 1.07% 1.20% 5.89% 7.62% 13.33% 14.14% 12.06% 12.49% 13.15% 12.57% 6.47%
REALISASI MINGGUAN 1.30% 2.44% 7.03% 3.94% 3.95% 1.64% 3.73%
RENCANA KEMAJUAN MINGGUAN KOMULATIF 1.07% 2.27% 8.16% 15.78% 29.11% 43.25% 55.31% 67.81% 80.95% 93.53% 100.00%
REALISASI MINGGUAN KOMULATIF 1.30% 3.74% 10.77% 14.71% 18.66% 20.30% 24.03% 24.03% 24.03% 24.03% 24.03%
KEMAJUAN PEKERJAAN 0.23% 1.46% 2.61% -1.07% -10.45% -22.95% -31.28% -43.77% -56.92% -69.50% -75.97%
LAPORAN PENGAWASAN
KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI Minggu Ke : 1
PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL Periode : 28 Sept s/d 04 Okt 2021
LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN Konsultan Pengawas : PT. MERBABU ARDICON
TAHUN : 2021 Kontraktor Pelaksana : CV. SINAR PUTRA MULYA

BOBOT REALISASI PEKERJAAN


NO. URAIAN PEKERJAAN SAT. VOL % Minggu Lalu Minggu Ini S/D Minggu Ini
Vol REALISASI BOBOT Vol REALISASI BOBOT Vol REALISASI BOBOT
PEMELIHARAAN ASRAMA PUTRA 1 DAN 2
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN
1 Persiapan & Pembersihan Lokasi Pekerjaan Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pembongkaran Dinding Bak Toilet Ls 1.00 0.10% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
3 Pembongkaran Keramik Ls 1.00 0.06% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
4 Pembongkaran Kusen m² 17.09 0.48% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
5 Pembongkaran Plafond + Rangka Plafond m² 19.23 0.06% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%

B. PEKERJAAN STRUKTUR ATAP - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%


1 Tambal Sulam Genteng 10% m² 16.47 0.26% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps m² 5.40 0.13% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai ukuran 40x40 cm m² 22.46 0.70% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm m² 89.20 3.44% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%

III. PEKERJAAN KUSEN PINTU DAN ASSESORIES - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu Toilet UPVC unit 10.00 3.40% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pasang Kloset Duduk unit 6.00 2.93% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
3 Pasang Kloset Jongkok unit 2.00 0.18% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
4 Kran Ø 3/4 stainles Steel + Knop Penutup unit 4.00 0.07% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
5 Pasang Floor drain StainlessSteel unit 8.00 0.14% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
6 Pasang Grab Bar StainlessSteel (Terpasang) unit 8.00 0.40% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%

IV. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%


1 Pasang rangka plafond besi hollow 1 x 40.40.0,3 mm, modul 60 x 60 cm m² 13.77 0.35% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pemasangan Gypsumboard 9mm m² 13.77 0.12% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
3 List Plafond Gypsum Lebar 9 cm m¹ 36.52 0.20% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
4 Pengecatan Plafon m² 13.77 0.07% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%

V. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%


1 Pengecatan tembok lama dalam ( 1 lapis cat dasar, 2 lapis cat penutup ) m² 1,122.19 4.09% - 0.00% 0.00% 56.11 5.00% 0.20% 56.11 5.00% 0.20%
2 Pengecatan tembok lama luar( 1 lapis cat dasar, 2 lapis cat penutup ) m² 436.02 1.80% - 0.00% 0.00% 21.80 5.00% 0.09% 21.80 5.00% 0.09%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
D. PEKERJAAN MEP - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
ARMATURE, STOP KONTAK DAN INSTAL - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Titik Penerangan Ttk 8.00 0.20% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Saklar Tunggal Ttk 4.00 0.05% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Lampu LED Downlight 7,5 watt bh 8.00 0.11% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%

PEMELIHARAAN ASRAMA PUTRA 3 - 0.00% 0.00% - 0.00% - 0.00% 0.00%


I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pekerjaan Pembongkaran Plafond Ls 1.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pekerjaan Pembongkaran Kusen Lama Ls 1.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pekerjaan Pembongkaran Keramik Lama Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pekerjaan Pembongkaran Kuda-Kuda, Balok & Nok Lama Ls 1.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pembongkaran Rangka & penutup Atap Lama Ls 1.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN STRUKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Beton Ring Balk RB (11x15) TOC.+3,80 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.36 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pasang bekesting Praktis 3x Pakai m² 6.59 0.22% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pembesian Polos Tul. Pokok 4 -Ø12 Kg 54.13 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pembesian Polos Beg. Ø8-150 Kg 13.61 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 18.63 0.48% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 18.63 0.29% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Woodplank L: 30 cm + Pengecatan m 50.80 0.77% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 75.30 1.67% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Plesteran Cam. 1 Pc : 6 Psr tebal 15 mm + Acian m² 150.59 1.99% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Benangan m² 48.16 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk. 40x40 cm Motif unpolished m² 6.83 0.25% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 23.92 0.92% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VI. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Rangka plafon besi hollow 1 x 40.40.0,3 mm m² 146.78 3.73% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Plafond gypsum board, tebal 9 mm m² 94.61 0.80% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Plafond Kalsi board, tebal 4 mm m² 52.17 0.46% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 List Plafond Gypsum Profil m 161.50 0.88% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VII. PEKERJAAN KUSEN PINTU - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu PJ1 Unit 1.00 1.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pekerjaan Pintu PJ2 Unit 1.00 1.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pekerjaan Pintu P1 Unit 6.00 4.48% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pekerjaan Pintu P2 Unit 2.00 1.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pekerjaan Jendela J1 Unit 1.00 0.62% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pekerjaan Jendela J2 Unit 5.00 2.50% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Pekerjaan Bouvenlis BV Unit 2.00 0.43% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
8 Pekerjaan Bouvenlis BV2 Unit 1.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VIII. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan Plafon baru 3x m² 146.78 0.71% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok baru dalam m² 150.59 0.73% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan tembok lama dalam m² 266.75 0.97% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Penjahitan Dinding Pecah Ls 1.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IX. PEKERJAAN MEKANIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 2.00 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø stainless Steel + Knop Penutup m1 2.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 2.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 0.88 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.04 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.15 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
X. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Instalasi Listrik Indoor + Fitting Kabel NGA 1 x 2,5 mm Ttk 13.00 0.33% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Instalasi Stop Kontak Kabel NYA 1 x 2,5 mm Ttk 4.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Instalasi Listrik Lama Ls 1.00 0.24% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pasang Stop Kontak bh 4.00 0.11% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pasang Saklar Tunggal bh 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pasang Lampu LED 14 Watt bh 9.00 0.18% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Pasang Lampu LED 7,5 Watt bh 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
A ASRAMA PUTRI 1 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi, Pembongkaran Plafond Teras Ls 1.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 36.19 0.93% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 36.19 0.57% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Tambal Sulam Bubungan lokal model Karangpilang ( Kodok ) m 33.48 0.77% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Woodplank L: 30 cm + Pengecatan m 76.50 1.16% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 12.16 0.44% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 54.40 2.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pek. Plafond Kalsiboard t: 4 mm Teras m² 92.69 0.81% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Tambal Sulam rangka langit-langit Teras (1.00 x 1.00) m m² 46.35 0.60% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
kayu Meranti 50% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang list langit - langit kayu profil m 71.70 0.26% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam m² 478.58 1.75% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok lama luar m² 154.77 0.64% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan Plafon baru 3x m² 92.69 0.45% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%

VI. PEKERJAAN MEKANIKAL 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%


- Kran Ø 3/4 "Onda stailles teel + Knop Penutup Bh 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pasang Kloset Duduk Ex..Toto Unit 4.00 1.96% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) Unit 4.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.76 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.09 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.290 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%

VII. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%


1 Pasang Instalasi Listrik Lama Ttk 1.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
B GEDUNG ASRAMA PUTRI 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembongkaran Kusen & Keramik KM Ls 1.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 7.47 0.27% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 32.88 1.27% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu P2 m² 1.00 1.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam m² 496.32 1.81% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok lama luar m² 178.47 0.74% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan Plafon lama 2x m² 236.70 0.86% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pengecatan Kalsiplank Lama m² 27.97 0.21% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN MEKANIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø 3/4" Stainless Steel + Knop Penutup Bh 6.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pasang Kloset Duduk Monoblok Unit 3.00 1.47% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 3.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 3.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 3 Unit - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.32 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.07 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.22 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN AKSESIBILITAS/SELASAR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
A. PEKERJAAN PERSIAPAN DAN TANAH - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Persiapan & Pembersihan Lokasi Pekerjaan m² 63.60 0.22% - 0.00% 0.00% 15.90 25.00% 0.06% 15.90 25.00% 0.06%
2 Pengukuran dan Pasang Bouwplank m1 52.00 0.64% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Galian Tanah Pondasi m³ 22.36 0.40% - 0.00% 0.00% 20.50 91.67% 0.36% 20.50 91.67% 0.36%
4 Urugan Pasir t:5cm m³ 0.97 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Lantai kerja t:5cm Camp.1:3:5 m³ 0.97 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%

B. PEKERJAAN STRUKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%


1 Beton Pondasi Footplat 80x80x20 cm - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 3.07 0.58% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pekerjaan Bekisting 2x Pakai m² 15.36 0.49% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pekerjaan Pembesian kg 434.65 1.18% - 0.00% 0.00% 108.66 25.00% 0.30% 108.66 25.00% 0.30%
- Tul. Pokok. Ø12-150 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Beton Kolom Pedestal 20/20cm - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 0.53 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pekerjaan Bekisting 2x Pakai m² 10.56 0.35% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 89.49 0.24% - 0.00% 0.00% 22.37 25.00% 0.06% 22.37 25.00% 0.06%
- Beg. Ø8-150 kg 30.93 0.08% - 0.00% 0.00% 7.73 25.00% 0.02% 7.73 25.00% 0.02%
3 Beton Sloof 15/20cm - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 2.46 0.47% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pekerjaan Bekisting 2x Pakai m² 32.76 0.55% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 303.97 0.83% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Beg. Ø8-100-150 kg 162.59 0.44% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Beton Kolom Praktis - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 0.75 0.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pekerjaan Bekisting 2x Pakai m² 19.87 0.66% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 160.22 0.44% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Beg. Ø8-150 kg 48.29 0.13% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Rabatan t:15cm m³ 24.39 3.82% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Tiang Besi Hollow 50X50X2.3 mm + Pengecatan m1 33.60 0.54% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Plat Besi 10mm kg 42.39 0.43% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Anchor M14 X 200 mm
8 bh 96.00 0.97% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Rangka Atap Besi Hollow, uk. 40X40X1.6 mm
9 m² 83.94 9.53% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
;20X40X1.6 mm+Pengecatan (terpasang)
10 Penutup Atap Zincalume tebal 0,35mm m² 83.94 2.45% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
11 Pasang atap nok seng plat m1 34.40 0.31% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
12 Woodplank 30cm + Pengecatan m1 68.80 1.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Ban-banan Kolom m' 19.20 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Plesteran beton m² 31.87 0.42% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan kolom m² 31.87 0.16% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
D. PEKERJAAN MEP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
ARMATURE, STOP KONTAK DAN INSTAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Titik Penerangan Ttk 27.00 0.69% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Lampu LED Downlight bulat 12 watt Outbow bh 27.00 0.68% - 0.00% 0.00% - 0.00% - 0.00% 0.00%

SIMK3 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%


1) Penyiapan RKK Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Pembuatan prosedur dan instruksi kerja 1.00 0.04% - 0.00% 0.00% 1.00 100.00% 0.04% 1.00 100.00% 0.04%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
2) Sosialisasi, Promosi dan Pelatihan terdiri atas - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a.Spanduk / Baner 1 bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
3) Alat Pelindung Kerja Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Pagar Pengaman Sementara; ls 1.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Pembatas Area (Restricted Area). ls 1.00 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
4) Alat Pelindung Diri Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Topi Pelindung (Safety Helmet); bh 15.00 0.12% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Pelindung Pernafasan Dan Mulut (Masker); bh 149.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
c. Sarung Tangan (Safety Gloves); psng 150.00 0.15% - 0.00% 0.00% 75.00 50.00% 0.08% 75.00 50.00% 0.08%
d. Sepatu Keselamatan (Safety Shoes); psng 15.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
e. Rompi Keselamatan (Safety Vest); bh 15.00 0.09% - 0.00% 0.00% 15.00 100.00% 0.09% 15.00 100.00% 0.09%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
5) Asuransi dan Perijinan terdiri atas : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. BPJS ketenagakerjaan ls 1.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
6) Fasilitas sarana kesehatan; - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Peralatan P3K ( 2 Kotak P3K, Obat Luka, Perban, dll) unit 1.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Wastafel Portabel +lengkap (terpasang) unit 1.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
7) Kegiatan Dan peralatan terkait dengan pengendalian resiko Keselamatan Konstruksi : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a.Alat Pemadam Api ringan (APAR) 3 Kg 1 bh, KIP ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
8) Rambu - Rambu Terdiri Atas : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Tongkat Pengatur Lalu Lintas (Warning Lights Stick); bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Lampu Putar (Rotary Lamp); bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
100.00% 1.30% 1.30%

Mengetahui : Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Pejabat Pembuat Komitmen (PPK) Konsultan Pengawas Konsultan Pengawas Konsultan Pengawas
Dinas Sosial PT. MERBABU ARDICON PT. MERBABU ARDICON PT. MERBABU ARDICON
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan

YUSMANU, S.ST. RONI PRAYITNO, ST. FAISOL ABDULLAH ABDUL ROSYID, ST.
NIP. 19680831 199201 1 001 TEAM LEADER PENGAWAS LAPANGAN TENAGA AHLI
LAPORAN PENGAWASAN
KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI Minggu Ke : 2
PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL Periode : 05 Okt s/d 11 Oktober 2021
LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN Konsultan Pengawas : PT. MERBABU ARDICON
TAHUN : 2021 Kontraktor Pelaksana : CV. SINAR PUTRA MULYA

BOBOT REALISASI PEKERJAAN


NO. URAIAN PEKERJAAN SAT. VOL % Minggu Lalu Minggu Ini S/D Minggu Ini
Vol REALISASI BOBOT Vol REALISASI BOBOT Vol REALISASI BOBOT
PEMELIHARAAN ASRAMA PUTRA 1 DAN 2
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN
1 Persiapan & Pembersihan Lokasi Pekerjaan Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pembongkaran Dinding Bak Toilet Ls 1.00 0.10% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
3 Pembongkaran Keramik Ls 1.00 0.06% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
4 Pembongkaran Kusen m² 17.09 0.48% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
5 Pembongkaran Plafond + Rangka Plafond m² 19.23 0.06% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
0.00%
B. PEKERJAAN STRUKTUR ATAP - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Tambal Sulam Genteng 10% m² 16.47 0.26% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps m² 5.40 0.13% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai ukuran 40x40 cm m² 22.46 0.70% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm m² 89.20 3.44% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
0.00%
III. PEKERJAAN KUSEN PINTU DAN ASSESORIES - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu Toilet UPVC unit 10.00 3.40% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pasang Kloset Duduk unit 6.00 2.93% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
3 Pasang Kloset Jongkok unit 2.00 0.18% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
4 Kran Ø 3/4 stainles Steel + Knop Penutup unit 4.00 0.07% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
5 Pasang Floor drain StainlessSteel unit 8.00 0.14% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
6 Pasang Grab Bar StainlessSteel (Terpasang) unit 8.00 0.40% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
0.00%
IV. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pasang rangka plafond besi hollow 1 x 40.40.0,3 mm, modul 60 x 60 cm m² 13.77 0.35% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pemasangan Gypsumboard 9mm m² 13.77 0.12% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
3 List Plafond Gypsum Lebar 9 cm m¹ 36.52 0.20% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
4 Pengecatan Plafon m² 13.77 0.07% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
0.00%
V. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam ( 1 lapis cat dasar, 2 lapis cat penutup ) m² 1,122.19 4.09% 56.11 5.00% 0.20% 56.11 5.00% 0.20% 112.22 10.00% 0.41%
2 Pengecatan tembok lama luar( 1 lapis cat dasar, 2 lapis cat penutup ) m² 436.02 1.80% 21.80 5.00% 0.090% 21.80 5.00% 0.09% 43.60 10.00% 0.18%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
D. PEKERJAAN MEP - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
ARMATURE, STOP KONTAK DAN INSTAL - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Titik Penerangan Ttk 8.00 0.20% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Saklar Tunggal Ttk 4.00 0.05% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Lampu LED Downlight 7,5 watt bh 8.00 0.11% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
0.00%
PEMELIHARAAN ASRAMA PUTRA 3 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pekerjaan Pembongkaran Plafond Ls 1.00 0.20% - 0.00% 0.00% 1.00 100.00% 0.20% 1.00 100.00% 0.20%
3 Pekerjaan Pembongkaran Kusen Lama Ls 1.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pekerjaan Pembongkaran Keramik Lama Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pekerjaan Pembongkaran Kuda-Kuda, Balok & Nok Lama Ls 1.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pembongkaran Rangka & penutup Atap Lama Ls 1.00 0.20% - 0.00% 0.00% 1.00 100.00% 0.20% 1.00 100.00% 0.20%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN STRUKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Beton Ring Balk RB (11x15) TOC.+3,80 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.36 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pasang bekesting Praktis 3x Pakai m² 6.59 0.22% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pembesian Polos Tul. Pokok 4 -Ø12 Kg 54.13 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pembesian Polos Beg. Ø8-150 Kg 13.61 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 18.63 0.48% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 18.63 0.29% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Woodplank L: 30 cm + Pengecatan m 50.80 0.77% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 75.30 1.67% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Plesteran Cam. 1 Pc : 6 Psr tebal 15 mm + Acian m² 150.59 1.99% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Benangan m² 48.16 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk. 40x40 cm Motif unpolished m² 6.83 0.25% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 23.92 0.92% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VI. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Rangka plafon besi hollow 1 x 40.40.0,3 mm m² 146.78 3.73% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Plafond gypsum board, tebal 9 mm m² 94.61 0.80% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Plafond Kalsi board, tebal 4 mm m² 52.17 0.46% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 List Plafond Gypsum Profil m 161.50 0.88% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VII. PEKERJAAN KUSEN PINTU - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu PJ1 Unit 1.00 1.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pekerjaan Pintu PJ2 Unit 1.00 1.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pekerjaan Pintu P1 Unit 6.00 4.48% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pekerjaan Pintu P2 Unit 2.00 1.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pekerjaan Jendela J1 Unit 1.00 0.62% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pekerjaan Jendela J2 Unit 5.00 2.50% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Pekerjaan Bouvenlis BV Unit 2.00 0.43% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
8 Pekerjaan Bouvenlis BV2 Unit 1.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VIII. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan Plafon baru 3x m² 146.78 0.71% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok baru dalam m² 150.59 0.73% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan tembok lama dalam m² 266.75 0.97% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Penjahitan Dinding Pecah Ls 1.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IX. PEKERJAAN MEKANIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 2.00 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø stainless Steel + Knop Penutup m1 2.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 2.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 0.88 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.04 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.15 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
X. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Instalasi Listrik Indoor + Fitting Kabel NGA 1 x 2,5 mm Ttk 13.00 0.33% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Instalasi Stop Kontak Kabel NYA 1 x 2,5 mm Ttk 4.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Instalasi Listrik Lama Ls 1.00 0.24% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pasang Stop Kontak bh 4.00 0.11% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pasang Saklar Tunggal bh 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pasang Lampu LED 14 Watt bh 9.00 0.18% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Pasang Lampu LED 7,5 Watt bh 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
A ASRAMA PUTRI 1 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi, Pembongkaran Plafond Teras Ls 1.00 0.20% - 0.00% 0.00% 0.50 50.00% 0.10% 0.50 50.00% 0.10%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 36.19 0.93% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 36.19 0.57% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Tambal Sulam Bubungan lokal model Karangpilang ( Kodok ) m 33.48 0.77% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Woodplank L: 30 cm + Pengecatan m 76.50 1.16% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 12.16 0.44% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 54.40 2.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pek. Plafond Kalsiboard t: 4 mm Teras m² 92.69 0.81% - 0.00% 0.00% 9.27 10.00% 0.08% 9.27 10.00% 0.08%
2 Tambal Sulam rangka langit-langit Teras (1.00 x 1.00) m m² 46.35 0.60% - 0.00% 0.00% 4.64 10.00% 0.06% 4.64 10.00% 0.06%
kayu Meranti 50% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang list langit - langit kayu profil m 71.70 0.26% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam m² 478.58 1.75% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok lama luar m² 154.77 0.64% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan Plafon baru 3x m² 92.69 0.45% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
VI. PEKERJAAN MEKANIKAL 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø 3/4 "Onda stailles teel + Knop Penutup Bh 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pasang Kloset Duduk Ex..Toto Unit 4.00 1.96% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) Unit 4.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.76 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.09 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.290 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
VII. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Instalasi Listrik Lama Ttk 1.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
B GEDUNG ASRAMA PUTRI 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembongkaran Kusen & Keramik KM Ls 1.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 7.47 0.27% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 32.88 1.27% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu P2 m² 1.00 1.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam m² 496.32 1.81% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok lama luar m² 178.47 0.74% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan Plafon lama 2x m² 236.70 0.86% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pengecatan Kalsiplank Lama m² 27.97 0.21% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN MEKANIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø 3/4" Stainless Steel + Knop Penutup Bh 6.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pasang Kloset Duduk Monoblok Unit 3.00 1.47% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 3.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 3.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 3 Unit - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.32 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.07 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.22 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN AKSESIBILITAS/SELASAR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
A. PEKERJAAN PERSIAPAN DAN TANAH - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Persiapan & Pembersihan Lokasi Pekerjaan m² 63.60 0.22% 15.90 25.00% 0.06% - 0.00% 15.90 25.00% 0.06%
2 Pengukuran dan Pasang Bouwplank m1 52.00 0.64% - 0.00% 0.00% 26.00 50.00% 0.32% 26.00 50.00% 0.32%
3 Galian Tanah Pondasi m³ 22.36 0.40% 20.50 91.67% 0.36% - 0.00% 20.50 91.67% 0.36%
4 Urugan Pasir t:5cm m³ 0.97 0.03% - 0.00% 0.00% 0.89 91.67% 0.03% 0.89 91.67% 0.03%
5 Lantai kerja t:5cm Camp.1:3:5 m³ 0.97 0.15% - 0.00% 0.00% 0.89 91.67% 0.14% 0.89 91.67% 0.14%
0.00%
B. PEKERJAAN STRUKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Beton Pondasi Footplat 80x80x20 cm - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 3.07 0.58% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pekerjaan Bekisting 2x Pakai m² 15.36 0.49% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pekerjaan Pembesian kg 434.65 1.18% 108.66 25.00% 0.30% 289.77 66.67% 0.79% 398.43 91.67% 1.09%
- Tul. Pokok. Ø12-150 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Beton Kolom Pedestal 20/20cm - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 0.53 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pekerjaan Bekisting 2x Pakai m² 10.56 0.35% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 89.49 0.24% 22.37 25.00% 0.06% 59.66 66.67% 0.16% 82.03 91.67% 0.22%
- Beg. Ø8-150 kg 30.93 0.08% 7.73 25.00% 0.02% 20.62 66.67% 0.06% 28.35 91.67% 0.08%
3 Beton Sloof 15/20cm - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 2.46 0.47% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pekerjaan Bekisting 2x Pakai m² 32.76 0.55% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 303.97 0.83% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Beg. Ø8-100-150 kg 162.59 0.44% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Beton Kolom Praktis - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 0.75 0.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pekerjaan Bekisting 2x Pakai m² 19.87 0.66% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 160.22 0.44% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Beg. Ø8-150 kg 48.29 0.13% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Rabatan t:15cm m³ 24.39 3.82% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Tiang Besi Hollow 50X50X2.3 mm + Pengecatan m1 33.60 0.54% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Plat Besi 10mm kg 42.39 0.43% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Anchor M14 X 200 mm
8 bh 96.00 0.97% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Rangka Atap Besi Hollow, uk. 40X40X1.6 mm
9 m² 83.94 9.53% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
;20X40X1.6 mm+Pengecatan (terpasang)
10 Penutup Atap Zincalume tebal 0,35mm m² 83.94 2.45% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
11 Pasang atap nok seng plat m1 34.40 0.31% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
12 Woodplank 30cm + Pengecatan m1 68.80 1.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Ban-banan Kolom m' 19.20 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Plesteran beton m² 31.87 0.42% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan kolom m² 31.87 0.16% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
D. PEKERJAAN MEP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
ARMATURE, STOP KONTAK DAN INSTAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Titik Penerangan Ttk 27.000 0.69% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Lampu LED Downlight bulat 12 watt Outbow bh 27.000 0.68% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
SIMK3 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1) Penyiapan RKK Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Pembuatan prosedur dan instruksi kerja 1.00 0.04% 1.00 100.00% 0.04% - 0.00% 1.00 100.00% 0.04%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
2) Sosialisasi, Promosi dan Pelatihan terdiri atas - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a.Spanduk / Baner 1 bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
3) Alat Pelindung Kerja Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Pagar Pengaman Sementara; ls 1.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Pembatas Area (Restricted Area). ls 1.00 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
4) Alat Pelindung Diri Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Topi Pelindung (Safety Helmet); bh 15.00 0.12% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Pelindung Pernafasan Dan Mulut (Masker); bh 149.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
c. Sarung Tangan (Safety Gloves); psng 150.00 0.15% 75.00 50.00% 0.08% - 0.00% 75.00 50.00% 0.08%
d. Sepatu Keselamatan (Safety Shoes); psng 15.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
e. Rompi Keselamatan (Safety Vest); bh 15.00 0.09% 15.00 100.00% 0.09% - 0.00% 15.00 100.00% 0.09%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
5) Asuransi dan Perijinan terdiri atas : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. BPJS ketenagakerjaan ls 1.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
6) Fasilitas sarana kesehatan; - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Peralatan P3K ( 2 Kotak P3K, Obat Luka, Perban, dll) unit 1.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Wastafel Portabel +lengkap (terpasang) unit 1.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
7) Kegiatan Dan peralatan terkait dengan pengendalian resiko Keselamatan Konstruksi : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a.Alat Pemadam Api ringan (APAR) 3 Kg 1 bh, KIP ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
8) Rambu - Rambu Terdiri Atas : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Tongkat Pengatur Lalu Lintas (Warning Lights Stick); bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Lampu Putar (Rotary Lamp); bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
100.00% 1.30% 2.44% 3.74%

Mengetahui : Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Pejabat Pembuat Komitmen (PPK) Konsultan Pengawas Konsultan Pengawas Konsultan Pengawas
Dinas Sosial PT. MERBABU ARDICON PT. MERBABU ARDICON PT. MERBABU ARDICON
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
YUSMANU, S.ST. RONI PRAYITNO, ST. FAISOL ABDULLAH ABDUL ROSYID, ST.
NIP. 19680831 199201 1 001 TEAM LEADER PENGAWAS LAPANGAN TENAGA AHLI
LAPORAN PENGAWASAN
KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI Minggu Ke : 3
PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL Periode : 12 Okt s/d 18 Oktober 2021
LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN Konsultan Pengawas : PT. MERBABU ARDICON
TAHUN : 2021 Kontraktor Pelaksana : CV. SINAR PUTRA MULYA

BOBOT REALISASI PEKERJAAN


NO. URAIAN PEKERJAAN SAT. VOL % Minggu Lalu Minggu Ini S/D Minggu Ini
Vol REALISASI BOBOT Vol REALISASI BOBOT Vol REALISASI BOBOT
PEMELIHARAAN ASRAMA PUTRA 1 DAN 2
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN
1 Persiapan & Pembersihan Lokasi Pekerjaan Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pembongkaran Dinding Bak Toilet Ls 1.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pembongkaran Keramik Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pembongkaran Kusen m² 17.09 0.48% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pembongkaran Plafond + Rangka Plafond m² 19.23 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
B. PEKERJAAN STRUKTUR ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam Genteng 10% m² 16.47 0.26% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps m² 5.40 0.13% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai ukuran 40x40 cm m² 22.46 0.70% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm m² 89.20 3.44% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
III. PEKERJAAN KUSEN PINTU DAN ASSESORIES - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu Toilet UPVC unit 10.00 3.40% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Kloset Duduk unit 6.00 2.93% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Kloset Jongkok unit 2.00 0.18% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Kran Ø 3/4 stainles Steel + Knop Penutup unit 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pasang Floor drain StainlessSteel unit 8.00 0.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pasang Grab Bar StainlessSteel (Terpasang) unit 8.00 0.40% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
IV. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang rangka plafond besi hollow 1 x 40.40.0,3 mm, modul 60 x 60 cm m² 13.77 0.35% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pemasangan Gypsumboard 9mm m² 13.77 0.12% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 List Plafond Gypsum Lebar 9 cm m¹ 36.52 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pengecatan Plafon m² 13.77 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
V. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam ( 1 lapis cat dasar, 2 lapis cat penutup ) m² 1,122.19 4.09% 112.22 10.00% 0.41% - 0.00% 112.22 10.00% 0.41%
2 Pengecatan tembok lama luar( 1 lapis cat dasar, 2 lapis cat penutup ) m² 436.02 1.80% 43.60 10.00% 0.180% - 0.00% 43.60 10.00% 0.18%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
D. PEKERJAAN MEP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
ARMATURE, STOP KONTAK DAN INSTAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Titik Penerangan Ttk 8.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Saklar Tunggal Ttk 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Lampu LED Downlight 7,5 watt bh 8.00 0.11% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
PEMELIHARAAN ASRAMA PUTRA 3 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pekerjaan Pembongkaran Plafond Ls 1.00 0.20% 1.00 100.00% 0.20% - 0.00% 1.00 100.00% 0.20%
3 Pekerjaan Pembongkaran Kusen Lama Ls 1.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pekerjaan Pembongkaran Keramik Lama Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pekerjaan Pembongkaran Kuda-Kuda, Balok & Nok Lama Ls 1.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pembongkaran Rangka & penutup Atap Lama Ls 1.00 0.20% 1.00 100.00% 0.20% - 0.00% 1.00 100.00% 0.20%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN STRUKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Beton Ring Balk RB (11x15) TOC.+3,80 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.36 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pasang bekesting Praktis 3x Pakai m² 6.59 0.22% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pembesian Polos Tul. Pokok 4 -Ø12 Kg 54.13 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pembesian Polos Beg. Ø8-150 Kg 13.61 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 18.63 0.48% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 18.63 0.29% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Woodplank L: 30 cm + Pengecatan m 50.80 0.77% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 75.30 1.67% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Plesteran Cam. 1 Pc : 6 Psr tebal 15 mm + Acian m² 150.59 1.99% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Benangan m² 48.16 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk. 40x40 cm Motif unpolished m² 6.83 0.25% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 23.92 0.92% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VI. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Rangka plafon besi hollow 1 x 40.40.0,3 mm m² 146.78 3.73% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Plafond gypsum board, tebal 9 mm m² 94.61 0.80% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Plafond Kalsi board, tebal 4 mm m² 52.17 0.46% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 List Plafond Gypsum Profil m 161.50 0.88% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VII. PEKERJAAN KUSEN PINTU - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu PJ1 Unit 1.00 1.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pekerjaan Pintu PJ2 Unit 1.00 1.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pekerjaan Pintu P1 Unit 6.00 4.48% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pekerjaan Pintu P2 Unit 2.00 1.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pekerjaan Jendela J1 Unit 1.00 0.62% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pekerjaan Jendela J2 Unit 5.00 2.50% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Pekerjaan Bouvenlis BV Unit 2.00 0.43% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
8 Pekerjaan Bouvenlis BV2 Unit 1.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VIII. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan Plafon baru 3x m² 146.78 0.71% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok baru dalam m² 150.59 0.73% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan tembok lama dalam m² 266.75 0.97% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Penjahitan Dinding Pecah Ls 1.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IX. PEKERJAAN MEKANIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 2.00 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø stainless Steel + Knop Penutup m1 2.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 2.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 0.88 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.04 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.15 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
X. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Instalasi Listrik Indoor + Fitting Kabel NGA 1 x 2,5 mm Ttk 13.00 0.33% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Instalasi Stop Kontak Kabel NYA 1 x 2,5 mm Ttk 4.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Instalasi Listrik Lama Ls 1.00 0.24% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pasang Stop Kontak bh 4.00 0.11% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pasang Saklar Tunggal bh 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pasang Lampu LED 14 Watt bh 9.00 0.18% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Pasang Lampu LED 7,5 Watt bh 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
A ASRAMA PUTRI 1 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi, Pembongkaran Plafond Teras Ls 1.00 0.20% 0.50 50.00% 0.10% - 0.00% 0.50 50.00% 0.10%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 36.19 0.93% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 36.19 0.57% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Tambal Sulam Bubungan lokal model Karangpilang ( Kodok ) m 33.48 0.77% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Woodplank L: 30 cm + Pengecatan m 76.50 1.16% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 12.16 0.44% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 54.40 2.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pek. Plafond Kalsiboard t: 4 mm Teras m² 92.69 0.81% 9.27 10.00% 0.08% - 0.00% 9.27 10.00% 0.08%
2 Tambal Sulam rangka langit-langit Teras (1.00 x 1.00) m m² 46.35 0.60% 4.64 10.00% 0.06% - 0.00% 4.64 10.00% 0.06%
kayu Meranti 50% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang list langit - langit kayu profil m 71.70 0.26% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam m² 478.58 1.75% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok lama luar m² 154.77 0.64% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan Plafon baru 3x m² 92.69 0.45% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
VI. PEKERJAAN MEKANIKAL 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø 3/4 "Onda stailles teel + Knop Penutup Bh 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pasang Kloset Duduk Ex..Toto Unit 4.00 1.96% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) Unit 4.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.76 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.09 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.290 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
VII. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Instalasi Listrik Lama Ttk 1.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
B GEDUNG ASRAMA PUTRI 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembongkaran Kusen & Keramik KM Ls 1.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 7.47 0.27% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 32.88 1.27% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu P2 m² 1.00 1.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam m² 496.32 1.81% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok lama luar m² 178.47 0.74% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan Plafon lama 2x m² 236.70 0.86% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pengecatan Kalsiplank Lama m² 27.97 0.21% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN MEKANIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø 3/4" Stainless Steel + Knop Penutup Bh 6.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pasang Kloset Duduk Monoblok Unit 3.00 1.47% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 3.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 3.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 3 Unit - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.32 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.07 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.22 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN AKSESIBILITAS/SELASAR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
A. PEKERJAAN PERSIAPAN DAN TANAH - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Persiapan & Pembersihan Lokasi Pekerjaan m² 63.60 0.22% 15.90 25.00% 0.06% - 0.00% 15.90 25.00% 0.06%
2 Pengukuran dan Pasang Bouwplank m1 52.00 0.64% 26.00 50.00% 0.32% 26.00 50.00% 0.32% 52.00 100.00% 0.64%
3 Galian Tanah Pondasi m³ 22.36 0.40% 20.50 91.67% 0.36% - 0.00% 20.50 91.67% 0.36%
4 Urugan Pasir t:5cm m³ 0.97 0.03% 0.89 91.67% 0.03% - 0.00% 0.89 91.67% 0.03%
5 Lantai kerja t:5cm Camp.1:3:5 m³ 0.97 0.15% 0.89 91.67% 0.14% - 0.00% 0.89 91.67% 0.14%
0.00%
B. PEKERJAAN STRUKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Beton Pondasi Footplat 80x80x20 cm - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 3.07 0.58% - 0.00% 0.00% 2.81 91.67% 0.53% 2.81 91.67% 0.53%
Pekerjaan Bekisting 2x Pakai m² 15.36 0.49% - 0.00% 0.00% 14.08 91.67% 0.45% 14.08 91.67% 0.45%
Pekerjaan Pembesian kg 434.65 1.18% 398.43 91.67% 1.09% - 0.00% 398.43 91.67% 1.09%
- Tul. Pokok. Ø12-150 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Beton Kolom Pedestal 20/20cm - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 0.53 0.10% - 0.00% 0.00% 0.49 91.67% 0.09% 0.49 91.67% 0.09%
Pekerjaan Bekisting 2x Pakai m² 10.56 0.35% - 0.00% 0.00% 9.68 91.67% 0.32% 9.68 91.67% 0.32%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 89.49 0.24% 82.03 91.67% 0.22% - 0.00% 82.03 91.67% 0.22%
- Beg. Ø8-150 kg 30.93 0.08% 28.35 91.67% 0.08% - 0.00% 28.35 91.67% 0.08%
3 Beton Sloof 15/20cm - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 2.46 0.47% - 0.00% 0.00% 2.31 93.75% 0.44% 2.31 93.75% 0.44%
Pekerjaan Bekisting 2x Pakai m² 32.76 0.55% - 0.00% 0.00% 30.71 93.75% 0.52% 30.71 93.75% 0.52%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 303.97 0.83% - 0.00% 0.00% 284.97 93.75% 0.78% 284.97 93.75% 0.78%
- Beg. Ø8-100-150 kg 162.59 0.44% - 0.00% 0.00% 152.43 93.75% 0.42% 152.43 93.75% 0.42%
4 Beton Kolom Praktis - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 0.75 0.14% - 0.00% 0.00% 0.69 91.67% 0.13% 0.69 91.67% 0.13%
Pekerjaan Bekisting 2x Pakai m² 19.87 0.66% - 0.00% 0.00% 18.21 91.67% 0.61% 18.21 91.67% 0.61%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 160.22 0.44% - 0.00% 0.00% 146.87 91.67% 0.40% 146.87 91.67% 0.40%
- Beg. Ø8-150 kg 48.29 0.13% - 0.00% 0.00% 44.27 91.67% 0.12% 44.27 91.67% 0.12%
5 Rabatan t:15cm m³ 24.39 3.82% - 0.00% 0.00% 12.20 50.00% 1.91% 12.20 50.00% 1.91%
6 Tiang Besi Hollow 50X50X2.3 mm + Pengecatan m1 33.60 0.54% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Plat Besi 10mm kg 42.39 0.43% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Anchor M14 X 200 mm
8 bh 96.00 0.97% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Rangka Atap Besi Hollow, uk. 40X40X1.6 mm
9 m² 83.94 9.53% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
;20X40X1.6 mm+Pengecatan (terpasang)
10 Penutup Atap Zincalume tebal 0,35mm m² 83.94 2.45% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
11 Pasang atap nok seng plat m1 34.40 0.31% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
12 Woodplank 30cm + Pengecatan m1 68.80 1.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Ban-banan Kolom m' 19.20 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Plesteran beton m² 31.87 0.42% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan kolom m² 31.87 0.16% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
D. PEKERJAAN MEP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
ARMATURE, STOP KONTAK DAN INSTAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Titik Penerangan Ttk 27.00 0.69% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Lampu LED Downlight bulat 12 watt Outbow bh 27.00 0.68% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
SIMK3 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1) Penyiapan RKK Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Pembuatan prosedur dan instruksi kerja 1.00 0.04% 1.00 100.00% 0.04% - 0.00% 1.00 100.00% 0.04%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
2) Sosialisasi, Promosi dan Pelatihan terdiri atas - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a.Spanduk / Baner 1 bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
3) Alat Pelindung Kerja Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Pagar Pengaman Sementara; ls 1.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Pembatas Area (Restricted Area). ls 1.00 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
4) Alat Pelindung Diri Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Topi Pelindung (Safety Helmet); bh 15.00 0.12% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Pelindung Pernafasan Dan Mulut (Masker); bh 149.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
c. Sarung Tangan (Safety Gloves); psng 150.00 0.15% 75.00 50.00% 0.08% - 0.00% 75.00 50.00% 0.08%
d. Sepatu Keselamatan (Safety Shoes); psng 15.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
e. Rompi Keselamatan (Safety Vest); bh 15.00 0.09% 15.00 100.00% 0.09% - 0.00% 15.00 100.00% 0.09%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
5) Asuransi dan Perijinan terdiri atas : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. BPJS ketenagakerjaan ls 1.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
6) Fasilitas sarana kesehatan; - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Peralatan P3K ( 2 Kotak P3K, Obat Luka, Perban, dll) unit 1.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Wastafel Portabel +lengkap (terpasang) unit 1.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
7) Kegiatan Dan peralatan terkait dengan pengendalian resiko Keselamatan Konstruksi : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a.Alat Pemadam Api ringan (APAR) 3 Kg 1 bh, KIP ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
8) Rambu - Rambu Terdiri Atas : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Tongkat Pengatur Lalu Lintas (Warning Lights Stick); bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Lampu Putar (Rotary Lamp); bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
100.00% 3.74% 7.03% 10.77%

Mengetahui : Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Pejabat Pembuat Komitmen (PPK) Konsultan Pengawas Konsultan Pengawas Konsultan Pengawas
Dinas Sosial PT. MERBABU ARDICON PT. MERBABU ARDICON PT. MERBABU ARDICON
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
YUSMANU, S.ST. RONI PRAYITNO, ST. FAISOL ABDULLAH ABDUL ROSYID, ST.
NIP. 19680831 199201 1 001 TEAM LEADER PENGAWAS LAPANGAN TENAGA AHLI
LAPORAN PENGAWASAN
KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI Minggu Ke : 4
PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL Periode : 19 Okt s/d 25 Oktober 2021
LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN Konsultan Pengawas : PT. MERBABU ARDICON
TAHUN : 2021 Kontraktor Pelaksana : CV. SINAR PUTRA MULYA

BOBOT REALISASI PEKERJAAN


NO. URAIAN PEKERJAAN SAT. VOL % Minggu Lalu Minggu Ini S/D Minggu Ini
Vol REALISASI BOBOT Vol REALISASI BOBOT Vol REALISASI BOBOT
PEMELIHARAAN ASRAMA PUTRA 1 DAN 2
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN
1 Persiapan & Pembersihan Lokasi Pekerjaan Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pembongkaran Dinding Bak Toilet Ls 1.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pembongkaran Keramik Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pembongkaran Kusen m² 17.09 0.48% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pembongkaran Plafond + Rangka Plafond m² 19.23 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
B. PEKERJAAN STRUKTUR ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam Genteng 10% m² 16.47 0.26% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps m² 5.40 0.13% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai ukuran 40x40 cm m² 22.46 0.70% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm m² 89.20 3.44% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
III. PEKERJAAN KUSEN PINTU DAN ASSESORIES - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu Toilet UPVC unit 10.00 3.40% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Kloset Duduk unit 6.00 2.93% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Kloset Jongkok unit 2.00 0.18% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Kran Ø 3/4 stainles Steel + Knop Penutup unit 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pasang Floor drain StainlessSteel unit 8.00 0.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pasang Grab Bar StainlessSteel (Terpasang) unit 8.00 0.40% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
IV. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang rangka plafond besi hollow 1 x 40.40.0,3 mm, modul 60 x 60 cm m² 13.77 0.35% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pemasangan Gypsumboard 9mm m² 13.77 0.12% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 List Plafond Gypsum Lebar 9 cm m¹ 36.52 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pengecatan Plafon m² 13.77 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
V. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam ( 1 lapis cat dasar, 2 lapis cat penutup ) m² 1,122.19 4.09% 112.22 10.00% 0.41% - 0.00% 112.22 10.00% 0.41%
2 Pengecatan tembok lama luar( 1 lapis cat dasar, 2 lapis cat penutup ) m² 436.02 1.80% 43.60 10.00% 0.180% - 0.00% 43.60 10.00% 0.18%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
D. PEKERJAAN MEP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
ARMATURE, STOP KONTAK DAN INSTAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Titik Penerangan Ttk 8.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Saklar Tunggal Ttk 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Lampu LED Downlight 7,5 watt bh 8.00 0.11% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
PEMELIHARAAN ASRAMA PUTRA 3 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pekerjaan Pembongkaran Plafond Ls 1.00 0.20% 1.00 100.00% 0.20% - 0.00% 1.00 100.00% 0.20%
3 Pekerjaan Pembongkaran Kusen Lama Ls 1.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pekerjaan Pembongkaran Keramik Lama Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pekerjaan Pembongkaran Kuda-Kuda, Balok & Nok Lama Ls 1.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pembongkaran Rangka & penutup Atap Lama Ls 1.00 0.20% 1.00 100.00% 0.20% - 0.00% 1.00 100.00% 0.20%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN STRUKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Beton Ring Balk RB (11x15) TOC.+3,80 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.36 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pasang bekesting Praktis 3x Pakai m² 6.59 0.22% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pembesian Polos Tul. Pokok 4 -Ø12 Kg 54.13 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pembesian Polos Beg. Ø8-150 Kg 13.61 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 18.63 0.48% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 18.63 0.29% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Woodplank L: 30 cm + Pengecatan m 50.80 0.77% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 75.30 1.67% - 0.00% 0.00% 56.48 75.00% 1.25% 56.48 75.00% 1.25%
2 Plesteran Cam. 1 Pc : 6 Psr tebal 15 mm + Acian m² 150.59 1.99% - 0.00% 0.00% 112.94 75.00% 1.49% 112.94 75.00% 1.49%
3 Benangan m² 48.16 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk. 40x40 cm Motif unpolished m² 6.83 0.25% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 23.92 0.92% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VI. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Rangka plafon besi hollow 1 x 40.40.0,3 mm m² 146.78 3.73% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Plafond gypsum board, tebal 9 mm m² 94.61 0.80% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Plafond Kalsi board, tebal 4 mm m² 52.17 0.46% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 List Plafond Gypsum Profil m 161.50 0.88% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VII. PEKERJAAN KUSEN PINTU - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu PJ1 Unit 1.00 1.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pekerjaan Pintu PJ2 Unit 1.00 1.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pekerjaan Pintu P1 Unit 6.00 4.48% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pekerjaan Pintu P2 Unit 2.00 1.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pekerjaan Jendela J1 Unit 1.00 0.62% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pekerjaan Jendela J2 Unit 5.00 2.50% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Pekerjaan Bouvenlis BV Unit 2.00 0.43% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
8 Pekerjaan Bouvenlis BV2 Unit 1.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VIII. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan Plafon baru 3x m² 146.78 0.71% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok baru dalam m² 150.59 0.73% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan tembok lama dalam m² 266.75 0.97% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Penjahitan Dinding Pecah Ls 1.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IX. PEKERJAAN MEKANIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 2.00 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø stainless Steel + Knop Penutup m1 2.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 2.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 0.88 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.04 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.15 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
X. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Instalasi Listrik Indoor + Fitting Kabel NGA 1 x 2,5 mm Ttk 13.00 0.33% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Instalasi Stop Kontak Kabel NYA 1 x 2,5 mm Ttk 4.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Instalasi Listrik Lama Ls 1.00 0.24% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pasang Stop Kontak bh 4.00 0.11% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pasang Saklar Tunggal bh 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pasang Lampu LED 14 Watt bh 9.00 0.18% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Pasang Lampu LED 7,5 Watt bh 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
A ASRAMA PUTRI 1 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi, Pembongkaran Plafond Teras Ls 1.00 0.20% 0.50 50.00% 0.10% - 0.00% 0.50 50.00% 0.10%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 36.19 0.93% - 0.00% 0.00% 18.10 50.00% 0.46% 18.10 50.00% 0.46%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 36.19 0.57% - 0.00% 0.00% 9.05 25.00% 0.14% 9.05 25.00% 0.14%
3 Tambal Sulam Bubungan lokal model Karangpilang ( Kodok ) m 33.48 0.77% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Woodplank L: 30 cm + Pengecatan m 76.50 1.16% - 0.00% 0.00% 19.13 25.00% 0.29% 19.13 25.00% 0.29%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 12.16 0.44% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 54.40 2.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pek. Plafond Kalsiboard t: 4 mm Teras m² 92.69 0.81% 9.27 10.00% 0.08% - 0.00% 9.27 10.00% 0.08%
2 Tambal Sulam rangka langit-langit Teras (1.00 x 1.00) m m² 46.35 0.60% 4.64 10.00% 0.06% 23.18 50.00% 0.30% 27.81 60.00% 0.36%
kayu Meranti 50% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang list langit - langit kayu profil m 71.70 0.26% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam m² 478.58 1.75% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok lama luar m² 154.77 0.64% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan Plafon baru 3x m² 92.69 0.45% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
VI. PEKERJAAN MEKANIKAL 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø 3/4 "Onda stailles teel + Knop Penutup Bh 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pasang Kloset Duduk Ex..Toto Unit 4.00 1.96% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) Unit 4.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.76 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.09 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.290 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
VII. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Instalasi Listrik Lama Ttk 1.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
B GEDUNG ASRAMA PUTRI 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembongkaran Kusen & Keramik KM Ls 1.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 7.47 0.27% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 32.88 1.27% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu P2 m² 1.00 1.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam m² 496.32 1.81% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok lama luar m² 178.47 0.74% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan Plafon lama 2x m² 236.70 0.86% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pengecatan Kalsiplank Lama m² 27.97 0.21% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN MEKANIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø 3/4" Stainless Steel + Knop Penutup Bh 6.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pasang Kloset Duduk Monoblok Unit 3.00 1.47% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 3.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 3.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 3 Unit - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.32 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.07 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.22 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN AKSESIBILITAS/SELASAR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
A. PEKERJAAN PERSIAPAN DAN TANAH - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Persiapan & Pembersihan Lokasi Pekerjaan m² 63.60 0.22% 15.90 25.00% 0.06% - 0.00% 15.90 25.00% 0.06%
2 Pengukuran dan Pasang Bouwplank m1 52.00 0.64% 52.00 100.00% 0.64% - 0.00% 52.00 100.00% 0.64%
3 Galian Tanah Pondasi m³ 22.36 0.40% 20.50 91.67% 0.36% - 0.00% 20.50 91.67% 0.36%
4 Urugan Pasir t:5cm m³ 0.97 0.03% 0.89 91.67% 0.03% - 0.00% 0.89 91.67% 0.03%
5 Lantai kerja t:5cm Camp.1:3:5 m³ 0.97 0.15% 0.89 91.67% 0.14% - 0.00% 0.89 91.67% 0.14%
0.00%
B. PEKERJAAN STRUKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Beton Pondasi Footplat 80x80x20 cm 0 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 3.07 0.58% 2.81 91.67% 0.53% - 0.00% 2.81 91.67% 0.53%
Pekerjaan Bekisting 2x Pakai m² 15.36 0.49% 14.08 91.67% 0.45% - 0.00% 14.08 91.67% 0.45%
Pekerjaan Pembesian kg 434.65 1.18% 398.43 91.67% 1.09% - 0.00% 398.43 91.67% 1.09%
- Tul. Pokok. Ø12-150 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Beton Kolom Pedestal 20/20cm - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 0.53 0.10% 0.49 91.67% 0.09% - 0.00% 0.49 91.67% 0.09%
Pekerjaan Bekisting 2x Pakai m² 10.56 0.35% 9.68 91.67% 0.32% - 0.00% 9.68 91.67% 0.32%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 89.49 0.24% 82.03 91.67% 0.22% - 0.00% 82.03 91.67% 0.22%
- Beg. Ø8-150 kg 30.93 0.08% 28.35 91.67% 0.08% - 0.00% 28.35 91.67% 0.08%
3 Beton Sloof 15/20cm - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 2.46 0.47% 2.31 93.75% 0.44% - 0.00% 2.31 93.75% 0.44%
Pekerjaan Bekisting 2x Pakai m² 32.76 0.55% 30.71 93.75% 0.52% - 0.00% 30.71 93.75% 0.52%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 303.97 0.83% 284.97 93.75% 0.78% - 0.00% 284.97 93.75% 0.78%
- Beg. Ø8-100-150 kg 162.59 0.44% 152.43 93.75% 0.42% - 0.00% 152.43 93.75% 0.42%
4 Beton Kolom Praktis - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 0.75 0.14% 0.69 91.67% 0.13% - 0.00% 0.69 91.67% 0.13%
Pekerjaan Bekisting 2x Pakai m² 19.87 0.66% 18.21 91.67% 0.61% - 0.00% 18.21 91.67% 0.61%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 160.22 0.44% 146.87 91.67% 0.40% - 0.00% 146.87 91.67% 0.40%
- Beg. Ø8-150 kg 48.29 0.13% 44.27 91.67% 0.12% - 0.00% 44.27 91.67% 0.12%
5 Rabatan t:15cm m³ 24.39 3.82% 12.20 50.00% 1.91% - 0.00% 12.20 50.00% 1.91%
6 Tiang Besi Hollow 50X50X2.3 mm + Pengecatan m1 33.60 0.54% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Plat Besi 10mm kg 42.39 0.43% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Anchor M14 X 200 mm
8 bh 96.00 0.97% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Rangka Atap Besi Hollow, uk. 40X40X1.6 mm
9 m² 83.94 9.53% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
;20X40X1.6 mm+Pengecatan (terpasang)
10 Penutup Atap Zincalume tebal 0,35mm m² 83.94 2.45% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
11 Pasang atap nok seng plat m1 34.40 0.31% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
12 Woodplank 30cm + Pengecatan m1 68.80 1.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Ban-banan Kolom m' 19.20 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Plesteran beton m² 31.87 0.42% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan kolom m² 31.87 0.16% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
D. PEKERJAAN MEP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
ARMATURE, STOP KONTAK DAN INSTAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Titik Penerangan Ttk 27.000 0.69% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Lampu LED Downlight bulat 12 watt Outbow bh 27.000 0.68% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
SIMK3 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1) Penyiapan RKK Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Pembuatan prosedur dan instruksi kerja 1.00 0.04% 1.00 100.00% 0.04% - 0.00% 1.00 100.00% 0.04%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
2) Sosialisasi, Promosi dan Pelatihan terdiri atas - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a.Spanduk / Baner 1 bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
3) Alat Pelindung Kerja Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Pagar Pengaman Sementara; ls 1.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Pembatas Area (Restricted Area). ls 1.00 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
4) Alat Pelindung Diri Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Topi Pelindung (Safety Helmet); bh 15.00 0.12% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Pelindung Pernafasan Dan Mulut (Masker); bh 149.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
c. Sarung Tangan (Safety Gloves); psng 150.00 0.15% 75.00 50.00% 0.08% - 0.00% 75.00 50.00% 0.08%
d. Sepatu Keselamatan (Safety Shoes); psng 15.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
e. Rompi Keselamatan (Safety Vest); bh 15.00 0.09% 15.00 100.00% 0.09% - 0.00% 15.00 100.00% 0.09%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
5) Asuransi dan Perijinan terdiri atas : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. BPJS ketenagakerjaan ls 1.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
6) Fasilitas sarana kesehatan; - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Peralatan P3K ( 2 Kotak P3K, Obat Luka, Perban, dll) unit 1.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Wastafel Portabel +lengkap (terpasang) unit 1.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
7) Kegiatan Dan peralatan terkait dengan pengendalian resiko Keselamatan Konstruksi : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a.Alat Pemadam Api ringan (APAR) 3 Kg 1 bh, KIP ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
8) Rambu - Rambu Terdiri Atas : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Tongkat Pengatur Lalu Lintas (Warning Lights Stick); bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Lampu Putar (Rotary Lamp); bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
100.00% 10.77% 3.94% 14.71%

Mengetahui : Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Pejabat Pembuat Komitmen (PPK) Konsultan Pengawas Konsultan Pengawas Konsultan Pengawas
Dinas Sosial PT. MERBABU ARDICON PT. MERBABU ARDICON PT. MERBABU ARDICON
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
YUSMANU, S.ST. RONI PRAYITNO, ST. FAISOL ABDULLAH ABDUL ROSYID, ST.
NIP. 19680831 199201 1 001 TEAM LEADER PENGAWAS LAPANGAN TENAGA AHLI
LAPORAN PENGAWASAN
KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI Minggu Ke : 5
PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL Periode : 26 Okt - 01 November
LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN Konsultan Pengawas : PT. MERBABU ARDICON
TAHUN : 2021 Kontraktor Pelaksana : CV. SINAR PUTRA MULYA

BOBOT REALISASI PEKERJAAN


NO. URAIAN PEKERJAAN SAT. VOL % Minggu Lalu Minggu Ini S/D Minggu Ini
Vol REALISASI BOBOT Vol REALISASI BOBOT Vol REALISASI BOBOT
PEMELIHARAAN ASRAMA PUTRA 1 DAN 2
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN
1 Persiapan & Pembersihan Lokasi Pekerjaan Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pembongkaran Dinding Bak Toilet Ls 1.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pembongkaran Keramik Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pembongkaran Kusen m² 17.09 0.48% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pembongkaran Plafond + Rangka Plafond m² 19.23 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
B. PEKERJAAN STRUKTUR ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam Genteng 10% m² 16.47 0.26% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps m² 5.40 0.13% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai ukuran 40x40 cm m² 22.46 0.70% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm m² 89.20 3.44% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
III. PEKERJAAN KUSEN PINTU DAN ASSESORIES - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu Toilet UPVC unit 10.00 3.40% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Kloset Duduk unit 6.00 2.93% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Kloset Jongkok unit 2.00 0.18% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Kran Ø 3/4 stainles Steel + Knop Penutup unit 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pasang Floor drain StainlessSteel unit 8.00 0.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pasang Grab Bar StainlessSteel (Terpasang) unit 8.00 0.40% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
IV. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang rangka plafond besi hollow 1 x 40.40.0,3 mm, modul 60 x 60 cm m² 13.77 0.35% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pemasangan Gypsumboard 9mm m² 13.77 0.12% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 List Plafond Gypsum Lebar 9 cm m¹ 36.52 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pengecatan Plafon m² 13.77 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
V. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam ( 1 lapis cat dasar, 2 lapis cat penutup ) m² 1,122.19 4.09% 112.22 10.00% 0.41% - 0.00% 112.22 10.00% 0.41%
2 Pengecatan tembok lama luar( 1 lapis cat dasar, 2 lapis cat penutup ) m² 436.02 1.80% 43.60 10.00% 0.180% - 0.00% 43.60 10.00% 0.18%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
D. PEKERJAAN MEP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
ARMATURE, STOP KONTAK DAN INSTAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Titik Penerangan Ttk 8.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Saklar Tunggal Ttk 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Lampu LED Downlight 7,5 watt bh 8.00 0.11% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
PEMELIHARAAN ASRAMA PUTRA 3 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pekerjaan Pembongkaran Plafond Ls 1.00 0.20% 1.00 100.00% 0.20% - 0.00% 1.00 100.00% 0.20%
3 Pekerjaan Pembongkaran Kusen Lama Ls 1.00 0.15% - 0.00% 0.00% 0.50 50.00% 0.08% 0.50 50.00% 0.08%
4 Pekerjaan Pembongkaran Keramik Lama Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pekerjaan Pembongkaran Kuda-Kuda, Balok & Nok Lama Ls 1.00 0.10% - 0.00% 0.00% 0.50 50.00% 0.05% 0.50 50.00% 0.05%
6 Pembongkaran Rangka & penutup Atap Lama Ls 1.00 0.20% 1.00 100.00% 0.20% - 0.00% 1.00 100.00% 0.20%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN STRUKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Beton Ring Balk RB (11x15) TOC.+3,80 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.36 0.07% - 0.00% 0.00% 0.36 100.00% 0.07% 0.36 100.00% 0.07%
- Pasang bekesting Praktis 3x Pakai m² 6.59 0.22% - 0.00% 0.00% 6.59 100.00% 0.22% 6.59 100.00% 0.22%
- Pembesian Polos Tul. Pokok 4 -Ø12 Kg 54.13 0.15% - 0.00% 0.00% 54.13 100.00% 0.15% 54.13 100.00% 0.15%
- Pembesian Polos Beg. Ø8-150 Kg 13.61 0.04% - 0.00% 0.00% 13.61 100.00% 0.04% 13.61 100.00% 0.04%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 18.63 0.48% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 18.63 0.29% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Woodplank L: 30 cm + Pengecatan m 50.80 0.77% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 75.30 1.67% 56.48 75.00% 1.25% 18.83 25.00% 0.42% 75.30 100.00% 1.67%
2 Plesteran Cam. 1 Pc : 6 Psr tebal 15 mm + Acian m² 150.59 1.99% 112.94 75.00% 1.49% 37.65 25.00% 0.50% 150.59 100.00% 1.99%
3 Benangan m² 48.16 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk. 40x40 cm Motif unpolished m² 6.83 0.25% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 23.92 0.92% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VI. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Rangka plafon besi hollow 1 x 40.40.0,3 mm m² 146.78 3.73% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Plafond gypsum board, tebal 9 mm m² 94.61 0.80% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Plafond Kalsi board, tebal 4 mm m² 52.17 0.46% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 List Plafond Gypsum Profil m 161.50 0.88% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VII. PEKERJAAN KUSEN PINTU - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu PJ1 Unit 1.00 1.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pekerjaan Pintu PJ2 Unit 1.00 1.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pekerjaan Pintu P1 Unit 6.00 4.48% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pekerjaan Pintu P2 Unit 2.00 1.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pekerjaan Jendela J1 Unit 1.00 0.62% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pekerjaan Jendela J2 Unit 5.00 2.50% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Pekerjaan Bouvenlis BV Unit 2.00 0.43% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
8 Pekerjaan Bouvenlis BV2 Unit 1.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VIII. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan Plafon baru 3x m² 146.78 0.71% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok baru dalam m² 150.59 0.73% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan tembok lama dalam m² 266.75 0.97% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Penjahitan Dinding Pecah Ls 1.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IX. PEKERJAAN MEKANIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 2.00 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø stainless Steel + Knop Penutup m1 2.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 2.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 0.88 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.04 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.15 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
X. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Instalasi Listrik Indoor + Fitting Kabel NGA 1 x 2,5 mm Ttk 13.00 0.33% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Instalasi Stop Kontak Kabel NYA 1 x 2,5 mm Ttk 4.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Instalasi Listrik Lama Ls 1.00 0.24% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pasang Stop Kontak bh 4.00 0.11% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pasang Saklar Tunggal bh 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pasang Lampu LED 14 Watt bh 9.00 0.18% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Pasang Lampu LED 7,5 Watt bh 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
A ASRAMA PUTRI 1 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi, Pembongkaran Plafond Teras Ls 1.00 0.20% 0.50 50.00% 0.10% - 0.00% 0.50 50.00% 0.10%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 36.19 0.93% 18.10 50.00% 0.46% 18.10 50.00% 0.46% 36.19 100.00% 0.93%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 36.19 0.57% 9.05 25.00% 0.14% 27.14 75.00% 0.42% 36.19 100.00% 0.57%
3 Tambal Sulam Bubungan lokal model Karangpilang ( Kodok ) m 33.48 0.77% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Woodplank L: 30 cm + Pengecatan m 76.50 1.16% 19.13 25.00% 0.29% 38.25 50.00% 0.58% 57.38 75.00% 0.87%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 12.16 0.44% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 54.40 2.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pek. Plafond Kalsiboard t: 4 mm Teras m² 92.69 0.81% 9.27 10.00% 0.08% 83.42 90.00% 0.73% 92.69 100.00% 0.81%
2 Tambal Sulam rangka langit-langit Teras (1.00 x 1.00) m m² 46.35 0.60% 27.81 60.00% 0.36% 18.54 40.00% 0.24% 46.35 100.00% 0.60%
kayu Meranti 50% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang list langit - langit kayu profil m 71.70 0.26% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam m² 478.58 1.75% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok lama luar m² 154.77 0.64% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan Plafon baru 3x m² 92.69 0.45% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
VI. PEKERJAAN MEKANIKAL 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø 3/4 "Onda stailles teel + Knop Penutup Bh 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pasang Kloset Duduk Ex..Toto Unit 4.00 1.96% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) Unit 4.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.76 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.09 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.290 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
VII. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Instalasi Listrik Lama Ttk 1.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
B GEDUNG ASRAMA PUTRI 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembongkaran Kusen & Keramik KM Ls 1.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 7.47 0.27% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 32.88 1.27% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu P2 m² 1.00 1.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam m² 496.32 1.81% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok lama luar m² 178.47 0.74% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan Plafon lama 2x m² 236.70 0.86% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pengecatan Kalsiplank Lama m² 27.97 0.21% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN MEKANIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø 3/4" Stainless Steel + Knop Penutup Bh 6.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pasang Kloset Duduk Monoblok Unit 3.00 1.47% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 3.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 3.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 3 Unit - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.32 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.07 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.22 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN AKSESIBILITAS/SELASAR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
A. PEKERJAAN PERSIAPAN DAN TANAH - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Persiapan & Pembersihan Lokasi Pekerjaan m² 63.60 0.22% 15.90 25.00% 0.06% - 0.00% 15.90 25.00% 0.06%
2 Pengukuran dan Pasang Bouwplank m1 52.00 0.64% 52.00 100.00% 0.64% - 0.00% 52.00 100.00% 0.64%
3 Galian Tanah Pondasi m³ 22.36 0.40% 20.50 91.67% 0.36% - 0.00% 20.50 91.67% 0.36%
4 Urugan Pasir t:5cm m³ 0.97 0.03% 0.89 91.67% 0.03% - 0.00% 0.89 91.67% 0.03%
5 Lantai kerja t:5cm Camp.1:3:5 m³ 0.97 0.15% 0.89 91.67% 0.14% - 0.00% 0.89 91.67% 0.14%
0.00%
B. PEKERJAAN STRUKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Beton Pondasi Footplat 80x80x20 cm 0 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 3.07 0.58% 2.81 91.67% 0.53% - 0.00% 2.81 91.67% 0.53%
Pekerjaan Bekisting 2x Pakai m² 15.36 0.49% 14.08 91.67% 0.45% - 0.00% 14.08 91.67% 0.45%
Pekerjaan Pembesian kg 434.65 1.18% 398.43 91.67% 1.09% - 0.00% 398.43 91.67% 1.09%
- Tul. Pokok. Ø12-150 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Beton Kolom Pedestal 20/20cm - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 0.53 0.10% 0.49 91.67% 0.09% - 0.00% 0.49 91.67% 0.09%
Pekerjaan Bekisting 2x Pakai m² 10.56 0.35% 9.68 91.67% 0.32% - 0.00% 9.68 91.67% 0.32%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 89.49 0.24% 82.03 91.67% 0.22% - 0.00% 82.03 91.67% 0.22%
- Beg. Ø8-150 kg 30.93 0.08% 28.35 91.67% 0.08% - 0.00% 28.35 91.67% 0.08%
3 Beton Sloof 15/20cm - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 2.46 0.47% 2.31 93.75% 0.44% - 0.00% 2.31 93.75% 0.44%
Pekerjaan Bekisting 2x Pakai m² 32.76 0.55% 30.71 93.75% 0.52% - 0.00% 30.71 93.75% 0.52%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 303.97 0.83% 284.97 93.75% 0.78% - 0.00% 284.97 93.75% 0.78%
- Beg. Ø8-100-150 kg 162.59 0.44% 152.43 93.75% 0.42% - 0.00% 152.43 93.75% 0.42%
4 Beton Kolom Praktis - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 0.75 0.14% 0.69 91.67% 0.13% - 0.00% 0.69 91.67% 0.13%
Pekerjaan Bekisting 2x Pakai m² 19.87 0.66% 18.21 91.67% 0.61% - 0.00% 18.21 91.67% 0.61%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 160.22 0.44% 146.87 91.67% 0.40% - 0.00% 146.87 91.67% 0.40%
- Beg. Ø8-150 kg 48.29 0.13% 44.27 91.67% 0.12% - 0.00% 44.27 91.67% 0.12%
5 Rabatan t:15cm m³ 24.39 3.82% 12.20 50.00% 1.91% - 0.00% 12.20 50.00% 1.91%
6 Tiang Besi Hollow 50X50X2.3 mm + Pengecatan m1 33.60 0.54% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Plat Besi 10mm kg 42.39 0.43% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Anchor M14 X 200 mm
8 bh 96.00 0.97% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Rangka Atap Besi Hollow, uk. 40X40X1.6 mm
9 m² 83.94 9.53% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
;20X40X1.6 mm+Pengecatan (terpasang)
10 Penutup Atap Zincalume tebal 0,35mm m² 83.94 2.45% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
11 Pasang atap nok seng plat m1 34.40 0.31% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
12 Woodplank 30cm + Pengecatan m1 68.80 1.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Ban-banan Kolom m' 19.20 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Plesteran beton m² 31.87 0.42% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan kolom m² 31.87 0.16% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
D. PEKERJAAN MEP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
ARMATURE, STOP KONTAK DAN INSTAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Titik Penerangan Ttk 27.000 0.69% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Lampu LED Downlight bulat 12 watt Outbow bh 27.000 0.68% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
SIMK3 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1) Penyiapan RKK Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Pembuatan prosedur dan instruksi kerja 1.00 0.04% 1.00 100.00% 0.04% - 0.00% 1.00 100.00% 0.04%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
2) Sosialisasi, Promosi dan Pelatihan terdiri atas - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a.Spanduk / Baner 1 bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
3) Alat Pelindung Kerja Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Pagar Pengaman Sementara; ls 1.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Pembatas Area (Restricted Area). ls 1.00 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
4) Alat Pelindung Diri Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Topi Pelindung (Safety Helmet); bh 15.00 0.12% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Pelindung Pernafasan Dan Mulut (Masker); bh 149.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
c. Sarung Tangan (Safety Gloves); psng 150.00 0.15% 75.00 50.00% 0.08% - 0.00% 75.00 50.00% 0.08%
d. Sepatu Keselamatan (Safety Shoes); psng 15.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
e. Rompi Keselamatan (Safety Vest); bh 15.00 0.09% 15.00 100.00% 0.09% - 0.00% 15.00 100.00% 0.09%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
5) Asuransi dan Perijinan terdiri atas : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. BPJS ketenagakerjaan ls 1.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
6) Fasilitas sarana kesehatan; - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Peralatan P3K ( 2 Kotak P3K, Obat Luka, Perban, dll) unit 1.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Wastafel Portabel +lengkap (terpasang) unit 1.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
7) Kegiatan Dan peralatan terkait dengan pengendalian resiko Keselamatan Konstruksi : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a.Alat Pemadam Api ringan (APAR) 3 Kg 1 bh, KIP ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
8) Rambu - Rambu Terdiri Atas : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Tongkat Pengatur Lalu Lintas (Warning Lights Stick); bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Lampu Putar (Rotary Lamp); bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
100.00% 14.71% 3.95% 18.66%

Mengetahui : Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Pejabat Pembuat Komitmen (PPK) Konsultan Pengawas Konsultan Pengawas Konsultan Pengawas
Dinas Sosial PT. MERBABU ARDICON PT. MERBABU ARDICON PT. MERBABU ARDICON
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
YUSMANU, S.ST. RONI PRAYITNO, ST. FAISOL ABDULLAH ABDUL ROSYID, ST.
NIP. 19680831 199201 1 001 TEAM LEADER PENGAWAS LAPANGAN TENAGA AHLI
LAPORAN PENGAWASAN
KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI Minggu Ke : 6
PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL Periode : 02 Nov - 08 November 2021
LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN Konsultan Pengawas : PT. MERBABU ARDICON
TAHUN : 2021 Kontraktor Pelaksana : CV. SINAR PUTRA MULYA

BOBOT REALISASI PEKERJAAN


NO. URAIAN PEKERJAAN SAT. VOL % Minggu Lalu Minggu Ini S/D Minggu Ini
Vol REALISASI BOBOT Vol REALISASI BOBOT Vol REALISASI BOBOT
PEMELIHARAAN ASRAMA PUTRA 1 DAN 2
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN
1 Persiapan & Pembersihan Lokasi Pekerjaan Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pembongkaran Dinding Bak Toilet Ls 1.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pembongkaran Keramik Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pembongkaran Kusen m² 17.09 0.48% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pembongkaran Plafond + Rangka Plafond m² 19.23 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
B. PEKERJAAN STRUKTUR ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam Genteng 10% m² 16.47 0.26% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps m² 5.40 0.13% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai ukuran 40x40 cm m² 22.46 0.70% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm m² 89.20 3.44% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
III. PEKERJAAN KUSEN PINTU DAN ASSESORIES - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu Toilet UPVC unit 10.00 3.40% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Kloset Duduk unit 6.00 2.93% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Kloset Jongkok unit 2.00 0.18% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Kran Ø 3/4 stainles Steel + Knop Penutup unit 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pasang Floor drain StainlessSteel unit 8.00 0.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pasang Grab Bar StainlessSteel (Terpasang) unit 8.00 0.40% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
IV. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang rangka plafond besi hollow 1 x 40.40.0,3 mm, modul 60 x 60 cm m² 13.77 0.35% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pemasangan Gypsumboard 9mm m² 13.77 0.12% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 List Plafond Gypsum Lebar 9 cm m¹ 36.52 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pengecatan Plafon m² 13.77 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
V. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam ( 1 lapis cat dasar, 2 lapis cat penutup ) m² 1,122.19 4.09% 112.22 10.00% 0.41% 56.11 5.00% 0.20% 168.33 15.00% 0.61%
2 Pengecatan tembok lama luar( 1 lapis cat dasar, 2 lapis cat penutup ) m² 436.02 1.80% 43.60 10.00% 0.180% 21.80 5.00% 0.09% 65.40 15.00% 0.27%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
D. PEKERJAAN MEP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
ARMATURE, STOP KONTAK DAN INSTAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Titik Penerangan Ttk 8.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Saklar Tunggal Ttk 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Lampu LED Downlight 7,5 watt bh 8.00 0.11% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
PEMELIHARAAN ASRAMA PUTRA 3 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pekerjaan Pembongkaran Plafond Ls 1.00 0.20% 1.00 100.00% 0.20% - 0.00% 1.00 100.00% 0.20%
3 Pekerjaan Pembongkaran Kusen Lama Ls 1.00 0.15% 0.50 50.00% 0.08% 0.50 50.00% 0.08% 1.00 100.00% 0.15%
4 Pekerjaan Pembongkaran Keramik Lama Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pekerjaan Pembongkaran Kuda-Kuda, Balok & Nok Lama Ls 1.00 0.10% 0.50 50.00% 0.05% 0.50 50.00% 0.05% 1.00 100.00% 0.10%
6 Pembongkaran Rangka & penutup Atap Lama Ls 1.00 0.20% 1.00 100.00% 0.20% - 0.00% 1.00 100.00% 0.20%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN STRUKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Beton Ring Balk RB (11x15) TOC.+3,80 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.36 0.07% 0.36 100.00% 0.07% - 0.00% 0.36 100.00% 0.07%
- Pasang bekesting Praktis 3x Pakai m² 6.59 0.22% 6.59 100.00% 0.22% - 0.00% 6.59 100.00% 0.22%
- Pembesian Polos Tul. Pokok 4 -Ø12 Kg 54.13 0.15% 54.13 100.00% 0.15% - 0.00% 54.13 100.00% 0.15%
- Pembesian Polos Beg. Ø8-150 Kg 13.61 0.04% 13.61 100.00% 0.04% - 0.00% 13.61 100.00% 0.04%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 18.63 0.48% - 0.00% 0.00% 9.32 50.00% 0.24% 9.32 50.00% 0.24%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 18.63 0.29% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Woodplank L: 30 cm + Pengecatan m 50.80 0.77% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 75.30 1.67% 75.30 100.00% 1.67% - 0.00% 75.30 100.00% 1.67%
2 Plesteran Cam. 1 Pc : 6 Psr tebal 15 mm + Acian m² 150.59 1.99% 150.59 100.00% 1.99% - 0.00% 150.59 100.00% 1.99%
3 Benangan m² 48.16 0.10% - 0.00% 0.00% 48.16 100.00% 0.10% 48.16 100.00% 0.10%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk. 40x40 cm Motif unpolished m² 6.83 0.25% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 23.92 0.92% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VI. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Rangka plafon besi hollow 1 x 40.40.0,3 mm m² 146.78 3.73% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Plafond gypsum board, tebal 9 mm m² 94.61 0.80% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Plafond Kalsi board, tebal 4 mm m² 52.17 0.46% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 List Plafond Gypsum Profil m 161.50 0.88% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VII. PEKERJAAN KUSEN PINTU - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu PJ1 Unit 1.00 1.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pekerjaan Pintu PJ2 Unit 1.00 1.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pekerjaan Pintu P1 Unit 6.00 4.48% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pekerjaan Pintu P2 Unit 2.00 1.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pekerjaan Jendela J1 Unit 1.00 0.62% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pekerjaan Jendela J2 Unit 5.00 2.50% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Pekerjaan Bouvenlis BV Unit 2.00 0.43% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
8 Pekerjaan Bouvenlis BV2 Unit 1.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VIII. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan Plafon baru 3x m² 146.78 0.71% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok baru dalam m² 150.59 0.73% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan tembok lama dalam m² 266.75 0.97% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Penjahitan Dinding Pecah Ls 1.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IX. PEKERJAAN MEKANIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 2.00 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø stainless Steel + Knop Penutup m1 2.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 2.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 0.88 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.04 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.15 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
X. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Instalasi Listrik Indoor + Fitting Kabel NGA 1 x 2,5 mm Ttk 13.00 0.33% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Instalasi Stop Kontak Kabel NYA 1 x 2,5 mm Ttk 4.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Instalasi Listrik Lama Ls 1.00 0.24% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pasang Stop Kontak bh 4.00 0.11% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pasang Saklar Tunggal bh 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pasang Lampu LED 14 Watt bh 9.00 0.18% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Pasang Lampu LED 7,5 Watt bh 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
A ASRAMA PUTRI 1 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi, Pembongkaran Plafond Teras Ls 1.00 0.20% 0.50 50.00% 0.10% - 0.00% 0.50 50.00% 0.10%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 36.19 0.93% 36.19 100.00% 0.93% - 0.00% 36.19 100.00% 0.93%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 36.19 0.57% 36.19 100.00% 0.57% - 0.00% 36.19 100.00% 0.57%
3 Tambal Sulam Bubungan lokal model Karangpilang ( Kodok ) m 33.48 0.77% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Woodplank L: 30 cm + Pengecatan m 76.50 1.16% 57.38 75.00% 0.87% 19.13 25.00% 0.29% 76.50 100.00% 1.16%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 12.16 0.44% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 54.40 2.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pek. Plafond Kalsiboard t: 4 mm Teras m² 92.69 0.81% 92.69 100.00% 0.81% - 0.00% 92.69 100.00% 0.81%
2 Tambal Sulam rangka langit-langit Teras (1.00 x 1.00) m m² 46.35 0.60% 46.35 100.00% 0.60% - 0.00% 46.35 100.00% 0.60%
kayu Meranti 50% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang list langit - langit kayu profil m 71.70 0.26% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam m² 478.58 1.75% - 0.00% 0.00% 23.93 5.00% 0.09% 23.93 5.00% 0.09%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok lama luar m² 154.77 0.64% - 0.00% 0.00% 15.48 10.00% 0.06% 15.48 10.00% 0.06%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan Plafon baru 3x m² 92.69 0.45% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
VI. PEKERJAAN MEKANIKAL 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø 3/4 "Onda stailles teel + Knop Penutup Bh 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pasang Kloset Duduk Ex..Toto Unit 4.00 1.96% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) Unit 4.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.76 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.09 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.290 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
VII. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Instalasi Listrik Lama Ttk 1.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
B GEDUNG ASRAMA PUTRI 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembongkaran Kusen & Keramik KM Ls 1.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 7.47 0.27% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 32.88 1.27% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu P2 m² 1.00 1.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam m² 496.32 1.81% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok lama luar m² 178.47 0.74% - 0.00% 0.00% 8.92 5.00% 0.04% 8.92 5.00% 0.04%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan Plafon lama 2x m² 236.70 0.86% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pengecatan Kalsiplank Lama m² 27.97 0.21% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN MEKANIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø 3/4" Stainless Steel + Knop Penutup Bh 6.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pasang Kloset Duduk Monoblok Unit 3.00 1.47% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 3.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 3.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 3 Unit - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.32 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.07 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.22 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN AKSESIBILITAS/SELASAR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
A. PEKERJAAN PERSIAPAN DAN TANAH - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Persiapan & Pembersihan Lokasi Pekerjaan m² 63.60 0.22% 15.90 25.00% 0.06% - 0.00% 15.90 25.00% 0.06%
2 Pengukuran dan Pasang Bouwplank m1 52.00 0.64% 52.00 100.00% 0.64% - 0.00% 52.00 100.00% 0.64%
3 Galian Tanah Pondasi m³ 22.36 0.40% 20.50 91.67% 0.36% - 0.00% 20.50 91.67% 0.36%
4 Urugan Pasir t:5cm m³ 0.97 0.03% 0.89 91.67% 0.03% - 0.00% 0.89 91.67% 0.03%
5 Lantai kerja t:5cm Camp.1:3:5 m³ 0.97 0.15% 0.89 91.67% 0.14% - 0.00% 0.89 91.67% 0.14%
0.00%
B. PEKERJAAN STRUKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Beton Pondasi Footplat 80x80x20 cm 0 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 3.07 0.58% 2.81 91.67% 0.53% - 0.00% 2.81 91.67% 0.53%
Pekerjaan Bekisting 2x Pakai m² 15.36 0.49% 14.08 91.67% 0.45% - 0.00% 14.08 91.67% 0.45%
Pekerjaan Pembesian kg 434.65 1.18% 398.43 91.67% 1.09% - 0.00% 398.43 91.67% 1.09%
- Tul. Pokok. Ø12-150 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Beton Kolom Pedestal 20/20cm - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 0.53 0.10% 0.49 91.67% 0.09% - 0.00% 0.49 91.67% 0.09%
Pekerjaan Bekisting 2x Pakai m² 10.56 0.35% 9.68 91.67% 0.32% - 0.00% 9.68 91.67% 0.32%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 89.49 0.24% 82.03 91.67% 0.22% - 0.00% 82.03 91.67% 0.22%
- Beg. Ø8-150 kg 30.93 0.08% 28.35 91.67% 0.08% - 0.00% 28.35 91.67% 0.08%
3 Beton Sloof 15/20cm - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 2.46 0.47% 2.31 93.75% 0.44% - 0.00% 2.31 93.75% 0.44%
Pekerjaan Bekisting 2x Pakai m² 32.76 0.55% 30.71 93.75% 0.52% - 0.00% 30.71 93.75% 0.52%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 303.97 0.83% 284.97 93.75% 0.78% - 0.00% 284.97 93.75% 0.78%
- Beg. Ø8-100-150 kg 162.59 0.44% 152.43 93.75% 0.42% - 0.00% 152.43 93.75% 0.42%
4 Beton Kolom Praktis - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 0.75 0.14% 0.69 91.67% 0.13% - 0.00% 0.69 91.67% 0.13%
Pekerjaan Bekisting 2x Pakai m² 19.87 0.66% 18.21 91.67% 0.61% - 0.00% 18.21 91.67% 0.61%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 160.22 0.44% 146.87 91.67% 0.40% - 0.00% 146.87 91.67% 0.40%
- Beg. Ø8-150 kg 48.29 0.13% 44.27 91.67% 0.12% - 0.00% 44.27 91.67% 0.12%
5 Rabatan t:15cm m³ 24.39 3.82% 12.20 50.00% 1.91% - 0.00% 12.20 50.00% 1.91%
6 Tiang Besi Hollow 50X50X2.3 mm + Pengecatan m1 33.60 0.54% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Plat Besi 10mm kg 42.39 0.43% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Anchor M14 X 200 mm
8 bh 96.00 0.97% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Rangka Atap Besi Hollow, uk. 40X40X1.6 mm
9 m² 83.94 9.53% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
;20X40X1.6 mm+Pengecatan (terpasang)
10 Penutup Atap Zincalume tebal 0,35mm m² 83.94 2.45% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
11 Pasang atap nok seng plat m1 34.40 0.31% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
12 Woodplank 30cm + Pengecatan m1 68.80 1.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Ban-banan Kolom m' 19.20 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Plesteran beton m² 31.87 0.42% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan kolom m² 31.87 0.16% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
D. PEKERJAAN MEP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
ARMATURE, STOP KONTAK DAN INSTAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Titik Penerangan Ttk 27.000 0.69% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Lampu LED Downlight bulat 12 watt Outbow bh 27.000 0.68% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
SIMK3 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1) Penyiapan RKK Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Pembuatan prosedur dan instruksi kerja 1.00 0.04% 1.00 100.00% 0.04% - 0.00% 1.00 100.00% 0.04%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
2) Sosialisasi, Promosi dan Pelatihan terdiri atas - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a.Spanduk / Baner 1 bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
3) Alat Pelindung Kerja Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Pagar Pengaman Sementara; ls 1.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Pembatas Area (Restricted Area). ls 1.00 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
4) Alat Pelindung Diri Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Topi Pelindung (Safety Helmet); bh 15.00 0.12% - 0.00% 0.00% 7.50 50.00% 0.06% 7.50 50.00% 0.06%
b. Pelindung Pernafasan Dan Mulut (Masker); bh 149.00 0.06% - 0.00% 0.00% 74.50 50.00% 0.03% 74.50 50.00% 0.03%
c. Sarung Tangan (Safety Gloves); psng 150.00 0.15% 75.00 50.00% 0.08% - 0.00% 75.00 50.00% 0.08%
d. Sepatu Keselamatan (Safety Shoes); psng 15.00 0.15% - 0.00% 0.00% 7.50 50.00% 0.08% 7.50 50.00% 0.08%
e. Rompi Keselamatan (Safety Vest); bh 15.00 0.09% 15.00 100.00% 0.09% - 0.00% 15.00 100.00% 0.09%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
5) Asuransi dan Perijinan terdiri atas : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. BPJS ketenagakerjaan ls 1.00 0.20% - 0.00% 0.00% 1.00 100.00% 0.20% 1.00 100.00% 0.20%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
6) Fasilitas sarana kesehatan; - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Peralatan P3K ( 2 Kotak P3K, Obat Luka, Perban, dll) unit 1.00 0.03% - 0.00% 0.00% 1.00 100.00% 0.03% 1.00 100.00% 0.03%
b. Wastafel Portabel +lengkap (terpasang) unit 1.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
7) Kegiatan Dan peralatan terkait dengan pengendalian resiko Keselamatan Konstruksi : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a.Alat Pemadam Api ringan (APAR) 3 Kg 1 bh, KIP ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
8) Rambu - Rambu Terdiri Atas : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Tongkat Pengatur Lalu Lintas (Warning Lights Stick); bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Lampu Putar (Rotary Lamp); bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
100.00% 18.66% 1.64% 20.30%

Mengetahui : Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Pejabat Pembuat Komitmen (PPK) Konsultan Pengawas Konsultan Pengawas Konsultan Pengawas
Dinas Sosial PT. MERBABU ARDICON PT. MERBABU ARDICON PT. MERBABU ARDICON
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
YUSMANU, S.ST. RONI PRAYITNO, ST. FAISOL ABDULLAH ABDUL ROSYID, ST.
NIP. 19680831 199201 1 001 TEAM LEADER PENGAWAS LAPANGAN TENAGA AHLI
LAPORAN PENGAWASAN
KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI Minggu Ke : 7
PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL Periode : 09 Nov - 15 November 2021
LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN Konsultan Pengawas : PT. MERBABU ARDICON
TAHUN : 2021 Kontraktor Pelaksana : CV. SINAR PUTRA MULYA

BOBOT REALISASI PEKERJAAN


NO. URAIAN PEKERJAAN SAT. VOL % Minggu Lalu Minggu Ini S/D Minggu Ini
Vol REALISASI BOBOT Vol REALISASI BOBOT Vol REALISASI BOBOT
PEMELIHARAAN ASRAMA PUTRA 1 DAN 2
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN
1 Persiapan & Pembersihan Lokasi Pekerjaan Ls 1.00 0.06% - 0.00% 0.00% 0.25 25.00% 0.02% 0.25 25.00% 0.02%
2 Pembongkaran Dinding Bak Toilet Ls 1.00 0.10% - 0.00% 0.00% 0.75 75.00% 0.08% 0.75 75.00% 0.08%
3 Pembongkaran Keramik Ls 1.00 0.06% - 0.00% 0.00% 0.25 25.00% 0.02% 0.25 25.00% 0.02%
4 Pembongkaran Kusen m² 17.09 0.48% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pembongkaran Plafond + Rangka Plafond m² 19.23 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
B. PEKERJAAN STRUKTUR ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam Genteng 10% m² 16.47 0.26% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps m² 5.40 0.13% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai ukuran 40x40 cm m² 22.46 0.70% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm m² 89.20 3.44% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
III. PEKERJAAN KUSEN PINTU DAN ASSESORIES - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu Toilet UPVC unit 10.00 3.40% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Kloset Duduk unit 6.00 2.93% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Kloset Jongkok unit 2.00 0.18% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Kran Ø 3/4 stainles Steel + Knop Penutup unit 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pasang Floor drain StainlessSteel unit 8.00 0.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pasang Grab Bar StainlessSteel (Terpasang) unit 8.00 0.40% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
IV. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang rangka plafond besi hollow 1 x 40.40.0,3 mm, modul 60 x 60 cm m² 13.77 0.35% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pemasangan Gypsumboard 9mm m² 13.77 0.12% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 List Plafond Gypsum Lebar 9 cm m¹ 36.52 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pengecatan Plafon m² 13.77 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
V. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam ( 1 lapis cat dasar, 2 lapis cat penutup ) m² 1,122.19 4.09% 168.33 15.00% 0.61% 112.22 10.00% 0.41% 280.55 25.00% 1.02%
2 Pengecatan tembok lama luar( 1 lapis cat dasar, 2 lapis cat penutup ) m² 436.02 1.80% 65.40 15.00% 0.271% 21.80 5.00% 0.09% 87.20 20.00% 0.36%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
D. PEKERJAAN MEP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
ARMATURE, STOP KONTAK DAN INSTAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Titik Penerangan Ttk 8.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Saklar Tunggal Ttk 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Lampu LED Downlight 7,5 watt bh 8.00 0.11% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
PEMELIHARAAN ASRAMA PUTRA 3 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi Ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pekerjaan Pembongkaran Plafond Ls 1.00 0.20% 1.00 100.00% 0.20% - 0.00% 1.00 100.00% 0.20%
3 Pekerjaan Pembongkaran Kusen Lama Ls 1.00 0.15% 1.00 100.00% 0.15% - 0.00% 1.00 100.00% 0.15%
4 Pekerjaan Pembongkaran Keramik Lama Ls 1.00 0.06% - 0.00% 0.00% 1.00 100.00% 0.06% 1.00 100.00% 0.06%
5 Pekerjaan Pembongkaran Kuda-Kuda, Balok & Nok Lama Ls 1.00 0.10% 1.00 100.00% 0.10% - 0.00% 1.00 100.00% 0.10%
6 Pembongkaran Rangka & penutup Atap Lama Ls 1.00 0.20% 1.00 100.00% 0.20% - 0.00% 1.00 100.00% 0.20%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN STRUKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Beton Ring Balk RB (11x15) TOC.+3,80 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.36 0.07% 0.36 100.00% 0.07% - 0.00% 0.36 100.00% 0.07%
- Pasang bekesting Praktis 3x Pakai m² 6.59 0.22% 6.59 100.00% 0.22% - 0.00% 6.59 100.00% 0.22%
- Pembesian Polos Tul. Pokok 4 -Ø12 Kg 54.13 0.15% 54.13 100.00% 0.15% - 0.00% 54.13 100.00% 0.15%
- Pembesian Polos Beg. Ø8-150 Kg 13.61 0.04% 13.61 100.00% 0.04% - 0.00% 13.61 100.00% 0.04%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 18.63 0.48% 9.32 50.00% 0.24% - 0.00% 9.32 50.00% 0.24%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 18.63 0.29% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Woodplank L: 30 cm + Pengecatan m 50.80 0.77% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 75.30 1.67% 75.30 100.00% 1.67% - 0.00% 75.30 100.00% 1.67%
2 Plesteran Cam. 1 Pc : 6 Psr tebal 15 mm + Acian m² 150.59 1.99% 150.59 100.00% 1.99% - 0.00% 150.59 100.00% 1.99%
3 Benangan m² 48.16 0.10% 48.16 100.00% 0.10% - 0.00% 48.16 100.00% 0.10%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk. 40x40 cm Motif unpolished m² 6.83 0.25% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 23.92 0.92% - 0.00% 0.00% 17.94 75.00% 0.69% 17.94 75.00% 0.69%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VI. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Rangka plafon besi hollow 1 x 40.40.0,3 mm m² 146.78 3.73% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Plafond gypsum board, tebal 9 mm m² 94.61 0.80% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Plafond Kalsi board, tebal 4 mm m² 52.17 0.46% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 List Plafond Gypsum Profil m 161.50 0.88% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VII. PEKERJAAN KUSEN PINTU - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu PJ1 Unit 1.00 1.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pekerjaan Pintu PJ2 Unit 1.00 1.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pekerjaan Pintu P1 Unit 6.00 4.48% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pekerjaan Pintu P2 Unit 2.00 1.14% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pekerjaan Jendela J1 Unit 1.00 0.62% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pekerjaan Jendela J2 Unit 5.00 2.50% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Pekerjaan Bouvenlis BV Unit 2.00 0.43% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
8 Pekerjaan Bouvenlis BV2 Unit 1.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
VIII. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan Plafon baru 3x m² 146.78 0.71% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok baru dalam m² 150.59 0.73% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan tembok lama dalam m² 266.75 0.97% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Penjahitan Dinding Pecah Ls 1.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IX. PEKERJAAN MEKANIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 2.00 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø stainless Steel + Knop Penutup m1 2.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 2.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 0.88 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.04 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.15 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
X. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Instalasi Listrik Indoor + Fitting Kabel NGA 1 x 2,5 mm Ttk 13.00 0.33% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Instalasi Stop Kontak Kabel NYA 1 x 2,5 mm Ttk 4.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang Instalasi Listrik Lama Ls 1.00 0.24% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pasang Stop Kontak bh 4.00 0.11% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
5 Pasang Saklar Tunggal bh 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
6 Pasang Lampu LED 14 Watt bh 9.00 0.18% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
7 Pasang Lampu LED 7,5 Watt bh 4.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
A ASRAMA PUTRI 1 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi, Pembongkaran Plafond Teras Ls 1.00 0.20% 0.50 50.00% 0.10% - 0.00% 0.50 50.00% 0.10%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 36.19 0.93% 36.19 100.00% 0.93% - 0.00% 36.19 100.00% 0.93%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 36.19 0.57% 36.19 100.00% 0.57% - 0.00% 36.19 100.00% 0.57%
3 Tambal Sulam Bubungan lokal model Karangpilang ( Kodok ) m 33.48 0.77% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Woodplank L: 30 cm + Pengecatan m 76.50 1.16% 76.50 100.00% 1.16% - 0.00% 76.50 100.00% 1.16%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 12.16 0.44% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 54.40 2.10% - 0.00% 0.00% 40.80 75.00% 1.58% 40.80 75.00% 1.58%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pek. Plafond Kalsiboard t: 4 mm Teras m² 92.69 0.81% 92.69 100.00% 0.81% - 0.00% 92.69 100.00% 0.81%
2 Tambal Sulam rangka langit-langit Teras (1.00 x 1.00) m m² 46.35 0.60% 46.35 100.00% 0.60% - 0.00% 46.35 100.00% 0.60%
kayu Meranti 50% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pasang list langit - langit kayu profil m 71.70 0.26% - 0.00% 0.00% 35.85 50.00% 0.13% 35.85 50.00% 0.13%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam m² 478.58 1.75% 23.93 5.00% 0.09% - 0.00% 23.93 5.00% 0.09%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok lama luar m² 154.77 0.64% 15.48 10.00% 0.06% - 0.00% 15.48 10.00% 0.06%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan Plafon baru 3x m² 92.69 0.45% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
VI. PEKERJAAN MEKANIKAL 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø 3/4 "Onda stailles teel + Knop Penutup Bh 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pasang Kloset Duduk Ex..Toto Unit 4.00 1.96% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 4.00 0.07% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) Unit 4.00 0.20% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.76 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.09 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.290 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
VII. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Instalasi Listrik Lama Ttk 1.00 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
B GEDUNG ASRAMA PUTRI 2 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pembongkaran Kusen & Keramik KM Ls 1.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 7.47 0.27% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 32.88 1.27% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu P2 m² 1.00 1.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
IV. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam m² 496.32 1.81% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Pengecatan tembok lama luar m² 178.47 0.74% 8.92 5.00% 0.04% - 0.00% 8.92 5.00% 0.04%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
3 Pengecatan Plafon lama 2x m² 236.70 0.86% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% - 0.00% 0.00%
4 Pengecatan Kalsiplank Lama m² 27.97 0.21% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
V. PEKERJAAN MEKANIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Kran Ø 3/4" Stainless Steel + Knop Penutup Bh 6.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pasang Kloset Duduk Monoblok Unit 3.00 1.47% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 3.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 3.00 0.15% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 3 Unit - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.32 0.03% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.07 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.22 0.01% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
PEMELIHARAAN AKSESIBILITAS/SELASAR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
A. PEKERJAAN PERSIAPAN DAN TANAH - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Persiapan & Pembersihan Lokasi Pekerjaan m² 63.60 0.22% 15.90 25.00% 0.06% - 0.00% 15.90 25.00% 0.06%
2 Pengukuran dan Pasang Bouwplank m1 52.00 0.64% 52.00 100.00% 0.64% - 0.00% 52.00 100.00% 0.64%
3 Galian Tanah Pondasi m³ 22.36 0.40% 20.50 91.67% 0.36% - 0.00% 20.50 91.67% 0.36%
4 Urugan Pasir t:5cm m³ 0.97 0.03% 0.89 91.67% 0.03% - 0.00% 0.89 91.67% 0.03%
5 Lantai kerja t:5cm Camp.1:3:5 m³ 0.97 0.15% 0.89 91.67% 0.14% - 0.00% 0.89 91.67% 0.14%
0.00%
B. PEKERJAAN STRUKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Beton Pondasi Footplat 80x80x20 cm 0 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 3.07 0.58% 2.81 91.67% 0.53% - 0.00% 2.81 91.67% 0.53%
Pekerjaan Bekisting 2x Pakai m² 15.36 0.49% 14.08 91.67% 0.45% - 0.00% 14.08 91.67% 0.45%
Pekerjaan Pembesian kg 434.65 1.18% 398.43 91.67% 1.09% - 0.00% 398.43 91.67% 1.09%
- Tul. Pokok. Ø12-150 - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Beton Kolom Pedestal 20/20cm - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 0.53 0.10% 0.49 91.67% 0.09% - 0.00% 0.49 91.67% 0.09%
Pekerjaan Bekisting 2x Pakai m² 10.56 0.35% 9.68 91.67% 0.32% - 0.00% 9.68 91.67% 0.32%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 89.49 0.24% 82.03 91.67% 0.22% - 0.00% 82.03 91.67% 0.22%
- Beg. Ø8-150 kg 30.93 0.08% 28.35 91.67% 0.08% - 0.00% 28.35 91.67% 0.08%
3 Beton Sloof 15/20cm - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 2.46 0.47% 2.31 93.75% 0.44% - 0.00% 2.31 93.75% 0.44%
Pekerjaan Bekisting 2x Pakai m² 32.76 0.55% 30.71 93.75% 0.52% - 0.00% 30.71 93.75% 0.52%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 303.97 0.83% 284.97 93.75% 0.78% - 0.00% 284.97 93.75% 0.78%
- Beg. Ø8-100-150 kg 162.59 0.44% 152.43 93.75% 0.42% - 0.00% 152.43 93.75% 0.42%
4 Beton Kolom Praktis - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 0.75 0.14% 0.69 91.67% 0.13% - 0.00% 0.69 91.67% 0.13%
Pekerjaan Bekisting 2x Pakai m² 19.87 0.66% 18.21 91.67% 0.61% - 0.00% 18.21 91.67% 0.61%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 160.22 0.44% 146.87 91.67% 0.40% - 0.00% 146.87 91.67% 0.40%
- Beg. Ø8-150 kg 48.29 0.13% 44.27 91.67% 0.12% - 0.00% 44.27 91.67% 0.12%
5 Rabatan t:15cm m³ 24.39 3.82% 12.20 50.00% 1.91% - 0.00% 12.20 50.00% 1.91%
6 Tiang Besi Hollow 50X50X2.3 mm + Pengecatan m1 33.60 0.54% - 0.00% 0.00% 1.68 5.00% 0.03% 1.68 5.00% 0.03%
7 Plat Besi 10mm kg 42.39 0.43% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Anchor M14 X 200 mm
8 bh 96.00 0.97% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
Rangka Atap Besi Hollow, uk. 40X40X1.6 mm
9 m² 83.94 9.53% - 0.00% 0.00% 4.20 5.00% 0.48% 4.20 5.00% 0.48%
;20X40X1.6 mm+Pengecatan (terpasang)
10 Penutup Atap Zincalume tebal 0,35mm m² 83.94 2.45% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
11 Pasang atap nok seng plat m1 34.40 0.31% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
12 Woodplank 30cm + Pengecatan m1 68.80 1.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Ban-banan Kolom m' 19.20 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
2 Plesteran beton m² 31.87 0.42% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
II. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1 Pengecatan kolom m² 31.87 0.16% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
D. PEKERJAAN MEP - 0.00% 0.00% - 0.00% - 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
ARMATURE, STOP KONTAK DAN INSTAL - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Titik Penerangan Ttk 27.000 0.69% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- Lampu LED Downlight bulat 12 watt Outbow bh 27.000 0.68% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00%
SIMK3 0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
1) Penyiapan RKK Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Pembuatan prosedur dan instruksi kerja 1.00 0.04% 1.00 100.00% 0.04% - 0.00% 1.00 100.00% 0.04%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
2) Sosialisasi, Promosi dan Pelatihan terdiri atas - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a.Spanduk / Baner 1 bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
3) Alat Pelindung Kerja Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Pagar Pengaman Sementara; ls 1.00 0.05% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Pembatas Area (Restricted Area). ls 1.00 0.04% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
4) Alat Pelindung Diri Terdiri Atas: - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Topi Pelindung (Safety Helmet); bh 15.00 0.12% 7.50 50.00% 0.06% 7.50 50.00% 0.06% 15.00 100.00% 0.12%
b. Pelindung Pernafasan Dan Mulut (Masker); bh 149.00 0.06% 74.50 50.00% 0.03% 74.50 50.00% 0.03% 149.00 100.00% 0.06%
c. Sarung Tangan (Safety Gloves); psng 150.00 0.15% 75.00 50.00% 0.08% - 0.00% 75.00 50.00% 0.08%
d. Sepatu Keselamatan (Safety Shoes); psng 15.00 0.15% 7.50 50.00% 0.08% 7.50 50.00% 0.08% 15.00 100.00% 0.15%
e. Rompi Keselamatan (Safety Vest); bh 15.00 0.09% 15.00 100.00% 0.09% - 0.00% 15.00 100.00% 0.09%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
5) Asuransi dan Perijinan terdiri atas : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. BPJS ketenagakerjaan ls 1.00 0.20% 1.00 100.00% 0.20% - 0.00% 1.00 100.00% 0.20%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
6) Fasilitas sarana kesehatan; - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Peralatan P3K ( 2 Kotak P3K, Obat Luka, Perban, dll) unit 1.00 0.03% 1.00 100.00% 0.03% - 0.00% 1.00 100.00% 0.03%
b. Wastafel Portabel +lengkap (terpasang) unit 1.00 0.10% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
7) Kegiatan Dan peralatan terkait dengan pengendalian resiko Keselamatan Konstruksi : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a.Alat Pemadam Api ringan (APAR) 3 Kg 1 bh, KIP ls 1.00 0.06% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% - 0.00% 0.00%
8) Rambu - Rambu Terdiri Atas : - 0.00% 0.00% - 0.00% - 0.00% 0.00%
a. Tongkat Pengatur Lalu Lintas (Warning Lights Stick); bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
b. Lampu Putar (Rotary Lamp); bh 1.00 0.02% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
100.00% 20.30% 3.73% 24.03%

Mengetahui : Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Pejabat Pembuat Komitmen (PPK) Konsultan Pengawas Konsultan Pengawas Konsultan Pengawas
Dinas Sosial PT. MERBABU ARDICON PT. MERBABU ARDICON PT. MERBABU ARDICON
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
YUSMANU, S.ST. RONI PRAYITNO, ST. FAISOL ABDULLAH ABDUL ROSYID, ST.
NIP. 19680831 199201 1 001 TEAM LEADER PENGAWAS LAPANGAN TENAGA AHLI
REKAPITULASI LAPORAN UMUM

MINGGU KE : I (SATU)
PEMELIHARAAN KANTOR REHABILITASI SOSIAL
PERIODE : 28 September - 04 Oktober 2021

KONSULTAN PENGAWAS : PT. MERBABU ARDICON


NOMOR SURAT PERINTAH KERJA (SPK) : 027/ 1788 / 107.6.27 / 2021
NILAI KONTRAK : Rp 546,036,398.80
TANGGAL MULAI PEKERJAAN : 28 September 2021
TANGGAL SELESAI PEKERJAAN : 10 Desember 2021
PRESTASI BOBOT PRESTASI PEKERJAAN
NO. URAIAN PEKERJAAN BOBOT (%) S/D MENURUT CEPAT LAMBAT
MINGGU INI SCHEDULE (%) (%)

PEMELIHARAAN ASRAMA PUTRA 1 DAN 2


A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.76% 0.00% 0.19% 0.00% 0.19%
B. PEKERJAAN STRUKTUR ATAP 0.26% 0.00% 0.00% 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.13% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING 4.14% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU DAN JENDELA 7.14% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PLAFOND 0.73% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENGECATAN 5.90% 0.29% 0.00% 0.29% 0.00%
D. PEKERJAAN MEP 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL 0.36% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRA 3 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.78% 0.00% 0.39% 0.00% 0.39%
II. PEKERJAAN STRUKTUR 0.47% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 1.54% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN 3.76% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING 1.17% 0.00% 0.00% 0.00% 0.00%
VI. PEKERJAAN PLAFOND 5.87% 0.00% 0.00% 0.00% 0.00%
VII. PEKERJAAN KUSEN PINTU 11.66% 0.00% 0.00% 0.00% 0.00%
VIII. PEKERJAAN PENGECATAN 2.47% 0.00% 0.00% 0.00% 0.00%
IX. PEKERJAAN MEKANIKAL 0.20% 0.00% 0.00% 0.00% 0.00%
X. PEKERJAAN ELEKTRIKAL 1.07% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 0.00% 0.00% 0.00% 0.00%
A GEDUNG ASRAMA PUTRI 1 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.20% 0.00% 0.10% 0.00% 0.10%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 3.43% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING 2.54% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PLAFOND 1.67% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENGECATAN 2.84% 0.00% 0.00% 0.00% 0.00%
VI. PEKERJAAN MEKANIKAL 2.36% 0.00% 0.00% 0.00% 0.00%
VII. PEKERJAAN ELEKTRIKAL 0.03% 0.00% 0.00% 0.00% 0.00%
B GEDUNG ASRAMA PUTRI 2 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.15% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING 1.54% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU 1.01% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PENGECATAN 3.62% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN MEKANIKAL 1.82% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN AKSESIBILITAS/SELASAR 0.00% 0.00% 0.00% 0.00%
A. PEKERJAAN PERSIAPAN DAN TANAH 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 1.45% 0.42% 0.29% 0.13% 0.00%
B. PEKERJAAN STRUKTUR 25.81% 0.38% 0.00% 0.38% 0.00%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.46% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN PENGECATAN 0.16% 0.00% 0.00% 0.00% 0.00%
D. PEKERJAAN MEP 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL 1.37% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
SMK3 0.00% 0.00% 0.00% 0.00%
I. SMK3 1.15% 0.21% 0.10% 0.10% 0.00%
0.00% 0.00% 0.00% 0.00%
JUMLAH TOTAL 100.00% 1.30% 1.07% 0.90% 0.68%
KEMAJUAN PEKERJAAN SEBESAR

RENCANA PRESTASI 1.07% %


PRESTASI NYATA S/D MINGGU INI 1.30% %
TINGKAT KEMAJUAN PEKERJAAN 0.23% % (CEPAT)

Mengetahui, Dibuat Oleh :


Kontraktor Pelaksana Konsultan Pengawas
CV. SINAR PUTRA MULYA PT. MERBABU ARDICON

ARDYO KUSTRIYONO ABDUL ROSYID, ST.


PELAKSANA TENAGA AHLI

Mengetahui :
Pejabat Pembuat Komitmen (PPK)
Dinas Sosial
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan

YUSMANU, S.ST.
NIP. 19680831 199201 1 001
REKAPITULASI LAPORAN UMUM

MINGGU KE : 2 (DUA)
PEMELIHARAAN KANTOR REHABILITASI SOSIAL
PERIODE : 05 Oktober 2021 - 11 Oktober 2021

KONSULTAN PENGAWAS : PT. MERBABU ARDICON


NOMOR SURAT PERINTAH KERJA (SPK) : 027/ 1788 / 107.6.27 / 2021
NILAI KONTRAK : Rp 546,036,398.80
TANGGAL MULAI PEKERJAAN : 28 September 2021
TANGGAL SELESAI PEKERJAAN : 10 Desember 2021
PRESTASI BOBOT PRESTASI PEKERJAAN
NO. URAIAN PEKERJAAN BOBOT (%) S/D MENURUT CEPAT LAMBAT
MINGGU INI SCHEDULE (%) (%)

PEMELIHARAAN ASRAMA PUTRA 1 DAN 2


A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.76% 0.00% 0.19% 0.00% 0.19%
B. PEKERJAAN STRUKTUR ATAP 0.26% 0.00% 0.13% 0.00% 0.13%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.13% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING 4.14% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU DAN JENDELA 7.14% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PLAFOND 0.73% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENGECATAN 5.90% 0.29% 0.00% 0.29% 0.00%
D. PEKERJAAN MEP 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL 0.36% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRA 3 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.78% 0.40% 0.39% 0.02% 0.00%
II. PEKERJAAN STRUKTUR 0.47% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 1.54% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN 3.76% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING 1.17% 0.00% 0.00% 0.00% 0.00%
VI. PEKERJAAN PLAFOND 5.87% 0.00% 0.00% 0.00% 0.00%
VII. PEKERJAAN KUSEN PINTU 11.66% 0.00% 0.00% 0.00% 0.00%
VIII. PEKERJAAN PENGECATAN 2.47% 0.00% 0.00% 0.00% 0.00%
IX. PEKERJAAN MEKANIKAL 0.20% 0.00% 0.00% 0.00% 0.00%
X. PEKERJAAN ELEKTRIKAL 1.07% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 0.00% 0.00% 0.00% 0.00%
A GEDUNG ASRAMA PUTRI 1 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.20% 0.10% 0.10% 0.00% 0.00%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 3.43% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING 2.54% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PLAFOND 1.67% 0.14% 0.00% 0.14% 0.00%
V. PEKERJAAN PENGECATAN 2.84% 0.00% 0.00% 0.00% 0.00%
VI. PEKERJAAN MEKANIKAL 2.36% 0.00% 0.00% 0.00% 0.00%
VII. PEKERJAAN ELEKTRIKAL 0.03% 0.00% 0.00% 0.00% 0.00%
B GEDUNG ASRAMA PUTRI 2 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.15% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING 1.54% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU 1.01% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PENGECATAN 3.62% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN MEKANIKAL 1.82% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN AKSESIBILITAS/SELASAR 0.00% 0.00% 0.00% 0.00%
A. PEKERJAAN PERSIAPAN DAN TANAH 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 1.45% 0.49% 0.29% 0.20% 0.00%
B. PEKERJAAN STRUKTUR 25.81% 1.01% 0.00% 1.01% 0.00%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.46% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN PENGECATAN 0.16% 0.00% 0.00% 0.00% 0.00%
D. PEKERJAAN MEP 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL 1.37% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
SMK3 0.00% 0.00% 0.00% 0.00%
I. SMK3 1.15% 0.00% 0.10% 0.00% 0.10%
0.00% 0.00% 0.00% 0.00%
JUMLAH TOTAL 100.00% 2.44% 1.20% 1.66% 0.42%
KEMAJUAN PEKERJAAN SEBESAR

RENCANA PRESTASI 1.20% %


PRESTASI NYATA S/D MINGGU INI 2.44% %
TINGKAT KEMAJUAN PEKERJAAN 1.24% % (CEPAT)

Mengetahui, Dibuat Oleh :


Kontraktor Pelaksana Konsultan Pengawas
CV. SINAR PUTRA MULYA PT. MERBABU ARDICON

ARDYO KUSTRIYONO ABDUL ROSYID, ST.


PELAKSANA TENAGA AHLI

Mengetahui :
Pejabat Pembuat Komitmen (PPK)
Dinas Sosial
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan

YUSMANU, S.ST.
NIP. 19680831 199201 1 001
REKAPITULASI LAPORAN UMUM

MINGGU KE : 3 (TIGA)
PEMELIHARAAN KANTOR REHABILITASI SOSIAL
PERIODE : 12 Oktober 2021 - 18 Oktober 2021

KONSULTAN PENGAWAS : PT. MERBABU ARDICON


NOMOR SURAT PERINTAH KERJA (SPK) : 027/ 1788 / 107.6.27 / 2021
NILAI KONTRAK : Rp 546,036,398.80
TANGGAL MULAI PEKERJAAN : 28 September 2021
TANGGAL SELESAI PEKERJAAN : 10 Desember 2021
PRESTASI BOBOT PRESTASI PEKERJAAN
NO. URAIAN PEKERJAAN BOBOT (%) S/D MENURUT CEPAT LAMBAT
MINGGU INI SCHEDULE (%) (%)

PEMELIHARAAN ASRAMA PUTRA 1 DAN 2


A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.76% 0.00% 0.00% 0.00% 0.00%
B. PEKERJAAN STRUKTUR ATAP 0.26% 0.00% 0.13% 0.00% 0.13%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.13% 0.00% 0.03% 0.00% 0.03%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING 4.14% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU DAN JENDELA 7.14% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PLAFOND 0.73% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENGECATAN 5.90% 0.00% 0.74% 0.00% 0.74%
D. PEKERJAAN MEP 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL 0.36% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRA 3 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.78% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN STRUKTUR 0.47% 0.00% 0.24% 0.00% 0.24%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 1.54% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN 3.76% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING 1.17% 0.00% 0.00% 0.00% 0.00%
VI. PEKERJAAN PLAFOND 5.87% 0.00% 0.00% 0.00% 0.00%
VII. PEKERJAAN KUSEN PINTU 11.66% 0.00% 0.00% 0.00% 0.00%
VIII. PEKERJAAN PENGECATAN 2.47% 0.00% 0.00% 0.00% 0.00%
IX. PEKERJAAN MEKANIKAL 0.20% 0.00% 0.00% 0.00% 0.00%
X. PEKERJAAN ELEKTRIKAL 1.07% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 0.00% 0.00% 0.00% 0.00%
A GEDUNG ASRAMA PUTRI 1 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.20% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 3.43% 0.00% 0.86% 0.00% 0.86%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING 2.54% 0.00% 0.64% 0.00% 0.64%
IV. PEKERJAAN PLAFOND 1.67% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENGECATAN 2.84% 0.00% 0.00% 0.00% 0.00%
VI. PEKERJAAN MEKANIKAL 2.36% 0.00% 0.00% 0.00% 0.00%
VII. PEKERJAAN ELEKTRIKAL 0.03% 0.00% 0.00% 0.00% 0.00%
B GEDUNG ASRAMA PUTRI 2 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.15% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING 1.54% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU 1.01% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PENGECATAN 3.62% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN MEKANIKAL 1.82% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN AKSESIBILITAS/SELASAR 0.00% 0.00% 0.00% 0.00%
A. PEKERJAAN PERSIAPAN DAN TANAH 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 1.45% 0.32% 0.29% 0.03% 0.00%
B. PEKERJAAN STRUKTUR 25.81% 6.71% 2.87% 3.85% 0.00%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.46% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN PENGECATAN 0.16% 0.00% 0.00% 0.00% 0.00%
D. PEKERJAAN MEP 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL 1.37% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
SMK3 0.00% 0.00% 0.00% 0.00%
I. SMK3 1.15% 0.00% 0.10% 0.00% 0.10%
0.00% 0.00% 0.00% 0.00%
JUMLAH TOTAL 100.00% 7.03% 5.89% 3.88% 2.73%
KEMAJUAN PEKERJAAN SEBESAR

RENCANA PRESTASI 5.89% %


PRESTASI NYATA S/D MINGGU INI 7.03% %
TINGKAT KEMAJUAN PEKERJAAN 1.15% % (CEPAT)

Mengetahui, Dibuat Oleh :


Kontraktor Pelaksana Konsultan Pengawas
CV. SINAR PUTRA MULYA PT. MERBABU ARDICON

ARDYO KUSTRIYONO ABDUL ROSYID, ST.


PELAKSANA TENAGA AHLI

Mengetahui :
Pejabat Pembuat Komitmen (PPK)
Dinas Sosial
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan

YUSMANU, S.ST.
NIP. 19680831 199201 1 001
REKAPITULASI LAPORAN UMUM

MINGGU KE : 4 (EMPAT)
PEMELIHARAAN KANTOR REHABILITASI SOSIAL
PERIODE : 19 Oktober 2021 - 25 Oktober 2021

KONSULTAN PENGAWAS : PT. MERBABU ARDICON


NOMOR SURAT PERINTAH KERJA (SPK) : 027/ 1788 / 107.6.27 / 2021
NILAI KONTRAK : Rp 546,036,398.80
TANGGAL MULAI PEKERJAAN : 28 September 2021
TANGGAL SELESAI PEKERJAAN : 10 Desember 2021
PRESTASI BOBOT PRESTASI PEKERJAAN
NO. URAIAN PEKERJAAN BOBOT (%) S/D MENURUT CEPAT LAMBAT
MINGGU INI SCHEDULE (%) (%)

PEMELIHARAAN ASRAMA PUTRA 1 DAN 2


A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.76% 0.00% 0.00% 0.00% 0.00%
B. PEKERJAAN STRUKTUR ATAP 0.26% 0.00% 0.00% 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.13% 0.00% 0.03% 0.00% 0.03%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING 4.14% 0.00% 0.69% 0.00% 0.69%
III. PEKERJAAN KUSEN PINTU DAN JENDELA 7.14% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PLAFOND 0.73% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENGECATAN 5.90% 0.00% 0.74% 0.00% 0.74%
D. PEKERJAAN MEP 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL 0.36% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRA 3 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.78% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN STRUKTUR 0.47% 0.00% 0.24% 0.00% 0.24%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 1.54% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN 3.76% 2.74% 0.75% 1.99% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING 1.17% 0.00% 0.00% 0.00% 0.00%
VI. PEKERJAAN PLAFOND 5.87% 0.00% 0.00% 0.00% 0.00%
VII. PEKERJAAN KUSEN PINTU 11.66% 0.00% 0.00% 0.00% 0.00%
VIII. PEKERJAAN PENGECATAN 2.47% 0.00% 0.00% 0.00% 0.00%
IX. PEKERJAAN MEKANIKAL 0.20% 0.00% 0.00% 0.00% 0.00%
X. PEKERJAAN ELEKTRIKAL 1.07% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 0.00% 0.00% 0.00% 0.00%
A GEDUNG ASRAMA PUTRI 1 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.20% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 3.43% 0.90% 0.86% 0.04% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING 2.54% 0.00% 0.64% 0.00% 0.64%
IV. PEKERJAAN PLAFOND 1.67% 0.30% 0.42% 0.00% 0.12%
V. PEKERJAAN PENGECATAN 2.84% 0.00% 0.00% 0.00% 0.00%
VI. PEKERJAAN MEKANIKAL 2.36% 0.00% 0.00% 0.00% 0.00%
VII. PEKERJAAN ELEKTRIKAL 0.03% 0.00% 0.00% 0.00% 0.00%
B GEDUNG ASRAMA PUTRI 2 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.15% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING 1.54% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU 1.01% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PENGECATAN 3.62% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN MEKANIKAL 1.82% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN AKSESIBILITAS/SELASAR 0.00% 0.00% 0.00% 0.00%
A. PEKERJAAN PERSIAPAN DAN TANAH 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 1.45% 0.00% 0.29% 0.00% 0.29%
B. PEKERJAAN STRUKTUR 25.81% 0.00% 2.87% 0.00% 2.87%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.46% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN PENGECATAN 0.16% 0.00% 0.00% 0.00% 0.00%
D. PEKERJAAN MEP 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL 1.37% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
SMK3 0.00% 0.00% 0.00% 0.00%
I. SMK3 1.15% 0.00% 0.10% 0.00% 0.10%
0.00% 0.00% 0.00% 0.00%
JUMLAH TOTAL 100.00% 3.94% 7.62% 2.03% 5.71%
KEMAJUAN PEKERJAAN SEBESAR

RENCANA PRESTASI 7.62% %


PRESTASI NYATA S/D MINGGU INI 3.94% %
TINGKAT KEMAJUAN PEKERJAAN -3.68% % (LAMBAT)

Mengetahui, Dibuat Oleh :


Kontraktor Pelaksana Konsultan Pengawas
CV. SINAR PUTRA MULYA PT. MERBABU ARDICON

ARDYO KUSTRIYONO ABDUL ROSYID, ST.


PELAKSANA TENAGA AHLI

Mengetahui :
Pejabat Pembuat Komitmen (PPK)
Dinas Sosial
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan

YUSMANU, S.ST.
NIP. 19680831 199201 1 001
REKAPITULASI LAPORAN UMUM

MINGGU KE : 5 (LIMA)
PEMELIHARAAN KANTOR REHABILITASI SOSIAL
PERIODE : 26 Okt 2021 - 02 November 2021

KONSULTAN PENGAWAS : PT. MERBABU ARDICON


NOMOR SURAT PERINTAH KERJA (SPK) : 027/ 1788 / 107.6.27 / 2021
NILAI KONTRAK : Rp 546,036,398.80
TANGGAL MULAI PEKERJAAN : 28 September 2021
TANGGAL SELESAI PEKERJAAN : 10 Desember 2021
PRESTASI BOBOT PRESTASI PEKERJAAN
NO. URAIAN PEKERJAAN BOBOT (%) S/D MENURUT CEPAT LAMBAT
MINGGU INI SCHEDULE (%) (%)

PEMELIHARAAN ASRAMA PUTRA 1 DAN 2


A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.76% 0.00% 0.00% 0.00% 0.00%
B. PEKERJAAN STRUKTUR ATAP 0.26% 0.00% 0.00% 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.13% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING 4.14% 0.00% 0.69% 0.00% 0.69%
III. PEKERJAAN KUSEN PINTU DAN JENDELA 7.14% 0.00% 1.19% 0.00% 1.19%
IV. PEKERJAAN PLAFOND 0.73% 0.00% 0.18% 0.00% 0.18%
V. PEKERJAAN PENGECATAN 5.90% 0.00% 0.74% 0.00% 0.74%
D. PEKERJAAN MEP 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL 0.36% 0.00% 0.12% 0.00% 0.12%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRA 3 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.78% 0.13% 0.00% 0.13% 0.00%
II. PEKERJAAN STRUKTUR 0.47% 0.47% 0.00% 0.47% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 1.54% 0.00% 0.51% 0.00% 0.51%
IV. PEKERJAAN PASANGAN DAN PLESTERAN 3.76% 0.91% 0.75% 0.16% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING 1.17% 0.00% 0.29% 0.00% 0.29%
VI. PEKERJAAN PLAFOND 5.87% 0.00% 0.00% 0.00% 0.00%
VII. PEKERJAAN KUSEN PINTU 11.66% 0.00% 1.94% 0.00% 1.94%
VIII. PEKERJAAN PENGECATAN 2.47% 0.00% 0.00% 0.00% 0.00%
IX. PEKERJAAN MEKANIKAL 0.20% 0.00% 0.00% 0.00% 0.00%
X. PEKERJAAN ELEKTRIKAL 1.07% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 0.00% 0.00% 0.00% 0.00%
A GEDUNG ASRAMA PUTRI 1 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.20% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 3.43% 1.47% 0.86% 0.61% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING 2.54% 0.00% 0.64% 0.00% 0.64%
IV. PEKERJAAN PLAFOND 1.67% 0.97% 0.42% 0.55% 0.00%
V. PEKERJAAN PENGECATAN 2.84% 0.00% 0.95% 0.00% 0.95%
VI. PEKERJAAN MEKANIKAL 2.36% 0.00% 0.79% 0.00% 0.79%
VII. PEKERJAAN ELEKTRIKAL 0.03% 0.00% 0.01% 0.00% 0.01%
B GEDUNG ASRAMA PUTRI 2 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.15% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING 1.54% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU 1.01% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PENGECATAN 3.62% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN MEKANIKAL 1.82% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN AKSESIBILITAS/SELASAR 0.00% 0.00% 0.00% 0.00%
A. PEKERJAAN PERSIAPAN DAN TANAH 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 1.45% 0.00% 0.29% 0.00% 0.29%
B. PEKERJAAN STRUKTUR 25.81% 0.00% 2.87% 0.00% 2.87%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.46% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN PENGECATAN 0.16% 0.00% 0.00% 0.00% 0.00%
D. PEKERJAAN MEP 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL 1.37% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
SMK3 0.00% 0.00% 0.00% 0.00%
I. SMK3 1.15% 0.00% 0.10% 0.00% 0.10%
0.00% 0.00% 0.00% 0.00%
JUMLAH TOTAL 100.00% 3.95% 13.33% 1.93% 11.31%
KEMAJUAN PEKERJAAN SEBESAR

RENCANA PRESTASI 13.33% %


PRESTASI NYATA S/D MINGGU INI 3.95% %
TINGKAT KEMAJUAN PEKERJAAN -9.38% % (LAMBAT)

Mengetahui, Dibuat Oleh :


Kontraktor Pelaksana Konsultan Pengawas
CV. SINAR PUTRA MULYA PT. MERBABU ARDICON

ARDYO KUSTRIYONO ABDUL ROSYID, ST.


PELAKSANA TENAGA AHLI

Mengetahui :
Pejabat Pembuat Komitmen (PPK)
Dinas Sosial
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan

YUSMANU, S.ST.
NIP. 19680831 199201 1 001
REKAPITULASI LAPORAN UMUM

MINGGU KE : 6 (ENAM)
PEMELIHARAAN KANTOR REHABILITASI SOSIAL
PERIODE : 02 Nov 2021 - 08 November 2021

KONSULTAN PENGAWAS : PT. MERBABU ARDICON


NOMOR SURAT PERINTAH KERJA (SPK) : 027/ 1788 / 107.6.27 / 2021
NILAI KONTRAK : Rp 546,036,398.80
TANGGAL MULAI PEKERJAAN : 28 September 2021
TANGGAL SELESAI PEKERJAAN : 10 Desember 2021
PRESTASI BOBOT PRESTASI PEKERJAAN
NO. URAIAN PEKERJAAN BOBOT (%) S/D MENURUT CEPAT LAMBAT
MINGGU INI SCHEDULE (%) (%)

PEMELIHARAAN ASRAMA PUTRA 1 DAN 2


A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.76% 0.00% 0.19% 0.00% 0.19%
B. PEKERJAAN STRUKTUR ATAP 0.26% 0.00% 0.00% 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.13% 0.00% 0.03% 0.00% 0.03%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING 4.14% 0.00% 0.69% 0.00% 0.69%
III. PEKERJAAN KUSEN PINTU DAN JENDELA 7.14% 0.00% 1.19% 0.00% 1.19%
IV. PEKERJAAN PLAFOND 0.73% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENGECATAN 5.90% 0.29% 0.74% 0.00% 0.44%
D. PEKERJAAN MEP 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL 0.36% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRA 3 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.78% 0.13% 0.00% 0.13% 0.00%
II. PEKERJAAN STRUKTUR 0.47% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 1.54% 0.24% 0.51% 0.00% 0.28%
IV. PEKERJAAN PASANGAN DAN PLESTERAN 3.76% 0.10% 0.75% 0.00% 0.65%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING 1.17% 0.00% 0.29% 0.00% 0.29%
VI. PEKERJAAN PLAFOND 5.87% 0.00% 1.17% 0.00% 1.17%
VII. PEKERJAAN KUSEN PINTU 11.66% 0.00% 1.94% 0.00% 1.94%
VIII. PEKERJAAN PENGECATAN 2.47% 0.00% 0.00% 0.00% 0.00%
IX. PEKERJAAN MEKANIKAL 0.20% 0.00% 0.00% 0.00% 0.00%
X. PEKERJAAN ELEKTRIKAL 1.07% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 0.00% 0.00% 0.00% 0.00%
A GEDUNG ASRAMA PUTRI 1 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.20% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 3.43% 0.29% 0.86% 0.00% 0.57%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING 2.54% 0.00% 0.64% 0.00% 0.64%
IV. PEKERJAAN PLAFOND 1.67% 0.00% 0.42% 0.00% 0.42%
V. PEKERJAAN PENGECATAN 2.84% 0.15% 0.95% 0.00% 0.79%
VI. PEKERJAAN MEKANIKAL 2.36% 0.00% 0.79% 0.00% 0.79%
VII. PEKERJAAN ELEKTRIKAL 0.03% 0.00% 0.01% 0.00% 0.01%
B GEDUNG ASRAMA PUTRI 2 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.15% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING 1.54% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU 1.01% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PENGECATAN 3.62% 0.04% 0.00% 0.04% 0.00%
V. PEKERJAAN MEKANIKAL 1.82% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN AKSESIBILITAS/SELASAR 0.00% 0.00% 0.00% 0.00%
A. PEKERJAAN PERSIAPAN DAN TANAH 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 1.45% 0.00% 0.00% 0.00% 0.00%
B. PEKERJAAN STRUKTUR 25.81% 0.00% 2.87% 0.00% 2.87%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.46% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN PENGECATAN 0.16% 0.00% 0.00% 0.00% 0.00%
D. PEKERJAAN MEP 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL 1.37% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
SMK3 0.00% 0.00% 0.00% 0.00%
I. SMK3 1.15% 0.40% 0.10% 0.29% 0.00%
0.00% 0.00% 0.00% 0.00%
JUMLAH TOTAL 100.00% 1.64% 14.14% 0.46% 12.95%
KEMAJUAN PEKERJAAN SEBESAR

RENCANA PRESTASI 14.14% %


PRESTASI NYATA S/D MINGGU INI 1.64% %
TINGKAT KEMAJUAN PEKERJAAN -12.50% % (LAMBAT)

Dibuat Oleh : Dibuat Oleh :


Konsultan Pengawas Konsultan Pengawas
CV. SINAR PUTRA MULYA PT. MERBABU ARDICON

ARDYO KUSTRIYONO ABDUL ROSYID, ST.


PELAKSANA TENAGA AHLI

Mengetahui :
Pejabat Pembuat Komitmen (PPK)
Dinas Sosial
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan

0.00%
YUSMANU, S.ST.
NIP. 19680831 199201 1 001
REKAPITULASI LAPORAN UMUM

MINGGU KE : 7 (TUJUH)
PEMELIHARAAN KANTOR REHABILITASI SOSIAL
PERIODE : 09 Nov 2021 - 15 November 2021

KONSULTAN PENGAWAS : PT. MERBABU ARDICON


NOMOR SURAT PERINTAH KERJA (SPK) : 027/ 1788 / 107.6.27 / 2021
NILAI KONTRAK : Rp 546,036,398.80
TANGGAL MULAI PEKERJAAN : 28 September 2021
TANGGAL SELESAI PEKERJAAN : 10 Desember 2021
PRESTASI BOBOT PRESTASI PEKERJAAN
NO. URAIAN PEKERJAAN BOBOT (%) S/D MENURUT CEPAT LAMBAT
MINGGU INI SCHEDULE (%) (%)

PEMELIHARAAN ASRAMA PUTRA 1 DAN 2


A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.76% 0.11% 0.19% 0.00% 0.08%
B. PEKERJAAN STRUKTUR ATAP 0.26% 0.00% 0.00% 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.13% 0.00% 0.03% 0.00% 0.03%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING 4.14% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU DAN JENDELA 7.14% 0.00% 1.19% 0.00% 1.19%
IV. PEKERJAAN PLAFOND 0.73% 0.00% 0.18% 0.00% 0.18%
V. PEKERJAAN PENGECATAN 5.90% 0.50% 0.00% 0.50% 0.00%
D. PEKERJAAN MEP 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL 0.36% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRA 3 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.78% 0.06% 0.00% 0.06% 0.00%
II. PEKERJAAN STRUKTUR 0.47% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 1.54% 0.00% 0.51% 0.00% 0.51%
IV. PEKERJAAN PASANGAN DAN PLESTERAN 3.76% 0.00% 0.75% 0.00% 0.75%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING 1.17% 0.69% 0.29% 0.40% 0.00%
VI. PEKERJAAN PLAFOND 5.87% 0.00% 1.17% 0.00% 1.17%
VII. PEKERJAAN KUSEN PINTU 11.66% 0.00% 1.94% 0.00% 1.94%
VIII. PEKERJAAN PENGECATAN 2.47% 0.00% 0.00% 0.00% 0.00%
IX. PEKERJAAN MEKANIKAL 0.20% 0.00% 0.00% 0.00% 0.00%
X. PEKERJAAN ELEKTRIKAL 1.07% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 0.00% 0.00% 0.00% 0.00%
A GEDUNG ASRAMA PUTRI 1 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.20% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 3.43% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING 2.54% 1.58% 0.00% 1.58% 0.00%
IV. PEKERJAAN PLAFOND 1.67% 0.13% 0.42% 0.00% 0.29%
V. PEKERJAAN PENGECATAN 2.84% 0.00% 0.95% 0.00% 0.95%
VI. PEKERJAAN MEKANIKAL 2.36% 0.00% 0.79% 0.00% 0.79%
VII. PEKERJAAN ELEKTRIKAL 0.03% 0.00% 0.01% 0.00% 0.01%
B GEDUNG ASRAMA PUTRI 2 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.15% 0.00% 0.15% 0.00% 0.15%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING 1.54% 0.00% 0.51% 0.00% 0.51%
III. PEKERJAAN KUSEN PINTU 1.01% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PENGECATAN 3.62% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN MEKANIKAL 1.82% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN AKSESIBILITAS/SELASAR 0.00% 0.00% 0.00% 0.00%
A. PEKERJAAN PERSIAPAN DAN TANAH 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 1.45% 0.00% 0.00% 0.00% 0.00%
B. PEKERJAAN STRUKTUR 25.81% 0.50% 2.87% 0.00% 2.36%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.46% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN PENGECATAN 0.16% 0.00% 0.00% 0.00% 0.00%
D. PEKERJAAN MEP 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL 1.37% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
SMK3 0.00% 0.00% 0.00% 0.00%
I. SMK3 1.15% 0.17% 0.10% 0.06% 0.00%
0.00% 0.00% 0.00% 0.00%
JUMLAH TOTAL 100.00% 3.73% 12.06% 2.60% 10.93%
KEMAJUAN PEKERJAAN SEBESAR

RENCANA PRESTASI 12.06% %


PRESTASI NYATA S/D MINGGU INI 3.73% %
TINGKAT KEMAJUAN PEKERJAAN -8.33% % (LAMBAT)

Dibuat Oleh : Dibuat Oleh :


Konsultan Pengawas Konsultan Pengawas
0.00% 0.00%

ARDYO KUSTRIYONO ABDUL ROSYID, ST.


PELAKSANA TENAGA AHLI
0.00% 0.00%

Mengetahui :
Pejabat Pembuat Komitmen (PPK)
Dinas Sosial
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan

0.00%
YUSMANU, S.ST.
NIP. 19680831 199201 1 001
REKAPITULASI PROGRES KEMAJUAN MINGGUAN
PROGRES DEVIASI
NO MINGGU KE - PERIODE KOMULATIF KOMULATIF PROGRES
RENCANA REALISASI
1 I (Satu) 28-Sep-21 s/d 4-Oct-21 1.07% 1.30% 0.23%
2 II (Dua) 5-Oct-21 s/d 11-Oct-21 1.20% 2.44% 1.24%
3 III (Tiga) 12-Oct-21 s/d 18-Oct-21 5.89% 7.03% 1.15%
4 IV (Empat) 19-Oct-21 s/d 25-Oct-21 7.62% 3.94% -3.68%
5 V (Lima) 26-Oct-21 s/d 1-Nov-21 13.33% 3.95% -9.38%
6 VI (Enam) 2-Nov-21 s/d 8-Nov-21 14.14% 1.64% -12.50%
7 VII (Tujuh) 9-Nov-21 s/d 15-Nov-21 12.06% 3.73% -8.33%
8 VIII (Delapan) s/d
9 IX (Sembilan) s/d 0.00%
10 X (Sepuluh) s/d 0.00%
11 XI (Sebelas) s/d 0.00%
12 XII (Dua belas) s/d 0.00%
13 XIII (Tiga belas) s/d 0.00%
PEMERINTAH PROVINSI JAWA TIMUR
DINAS SOSIAL
UPT REHABILITASI SOSIAL BINA DAKSA PASURUAN
JL RA.KARTINI NO. 292, Telp / Fax. (0343) 741135
BANGIL - PASURUAN

PEKERJAAN : PENGAWASAN PEMELIHARAAN ASRAMA 1 & 2,


ASRAMA PUTRA 3, ASRAMA PUTRI 1 & 2, dan
AKSESBILITAS (SELASAR) UPT. RSBD PASURUAN

LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN

TAHUN ANGGARAN : 2021

KONSULTAN PENGAWAS : PT. MERBABU ARDICON


Alamat : Jl. Rawan 18 Mangunsuman - Ponorogo

No. SPK : 027/ 1788 / 107.6.27 / 2021


Tanggal : 27 September 2021

KONTRAKTOR PELAKSANA : CV. SINAR PUTRA MULYA


Alamat : PERUM. SIDOKARE ASRI AH-09, SIDOARJO

No. SPK : 027/ 1776 / 107.6.27 / 2021


Tanggal : 27 September 2021

KEMAJUAN FISIK PEKERJAAN

Waktu Pelaksanaan : 75 Hari Kalender


Waktu Yang Sudah Berjalan : 7 Hari
Sisa Waktu : 68 Hari

Rencana Prestasi Pekerjaan : 1.07%


Prestasi Nyata s/d Minggu ini : 1.30%
Tingkat Kemajuan Pekerjaan : 0.23% % (CEPAT)
PEMERINTAH PROVINSI JAWA TIMUR
DINAS SOSIAL
UPT REHABILITASI SOSIAL BINA DAKSA PASURUAN
JL RA.KARTINI NO. 292, Telp / Fax. (0343) 741135
BANGIL - PASURUAN

PEKERJAAN : PENGAWASAN PEMELIHARAAN ASRAMA 1 & 2,


ASRAMA PUTRA 3, ASRAMA PUTRI 1 & 2, dan
AKSESBILITAS (SELASAR) UPT. RSBD PASURUAN

LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN

TAHUN ANGGARAN : 2021

KONSULTAN PENGAWAS : PT. MERBABU ARDICON


Alamat : Jl. Rawan 18 Mangunsuman - Ponorogo

No. SPK : 027/ 1788 / 107.6.27 / 2021


Tanggal : 27 September 2021

KONTRAKTOR PELAKSANA : CV. SINAR PUTRA MULYA


Alamat : PERUM. SIDOKARE ASRI AH-09, SIDOARJO

No. SPK : 027/ 1776 / 107.6.27 / 2021


Tanggal : 27 September 2021

KEMAJUAN FISIK PEKERJAAN

Waktu Pelaksanaan : 75 Hari Kalender


Waktu Yang Sudah Berjalan : 14 Hari
Sisa Waktu : 61 Hari

Rencana Prestasi Pekerjaan : 1.20%


Prestasi Nyata s/d Minggu ini : 2.44%
Tingkat Kemajuan Pekerjaan : 1.24% % (CEPAT)
PEMERINTAH PROVINSI JAWA TIMUR
DINAS SOSIAL
UPT REHABILITASI SOSIAL BINA DAKSA PASURUAN
JL RA.KARTINI NO. 292, Telp / Fax. (0343) 741135
BANGIL - PASURUAN

PEKERJAAN : PENGAWASAN PEMELIHARAAN ASRAMA 1 & 2,


ASRAMA PUTRA 3, ASRAMA PUTRI 1 & 2, dan
AKSESBILITAS (SELASAR) UPT. RSBD PASURUAN

LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN

TAHUN ANGGARAN : 2021

KONSULTAN PENGAWAS : PT. MERBABU ARDICON


Alamat : Jl. Rawan 18 Mangunsuman - Ponorogo

No. SPK : 027/ 1788 / 107.6.27 / 2021


Tanggal : 27 September 2021

KONTRAKTOR PELAKSANA : CV. SINAR PUTRA MULYA


Alamat : PERUM. SIDOKARE ASRI AH-09, SIDOARJO

No. SPK : 027/ 1776 / 107.6.27 / 2021


Tanggal : 27 September 2021

KEMAJUAN FISIK PEKERJAAN

Waktu Pelaksanaan : 75 Hari Kalender


Waktu Yang Sudah Berjalan : 21 Hari
Sisa Waktu : 54 Hari

Rencana Prestasi Pekerjaan : 5.89%


Prestasi Nyata s/d Minggu ini : 7.03%
Tingkat Kemajuan Pekerjaan : 1.15% % (CEPAT)
PEMERINTAH PROVINSI JAWA TIMUR
DINAS SOSIAL
UPT REHABILITASI SOSIAL BINA DAKSA PASURUAN
JL RA.KARTINI NO. 292, Telp / Fax. (0343) 741135
BANGIL - PASURUAN

PEKERJAAN : PENGAWASAN PEMELIHARAAN ASRAMA 1 & 2,


ASRAMA PUTRA 3, ASRAMA PUTRI 1 & 2, dan
AKSESBILITAS (SELASAR) UPT. RSBD PASURUAN

LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN

TAHUN ANGGARAN : 2021

KONSULTAN PENGAWAS : PT. MERBABU ARDICON


Alamat : Jl. Rawan 18 Mangunsuman - Ponorogo

No. SPK : 027/ 1788 / 107.6.27 / 2021


Tanggal : 27 September 2021

KONTRAKTOR PELAKSANA : CV. SINAR PUTRA MULYA


Alamat : PERUM. SIDOKARE ASRI AH-09, SIDOARJO

No. SPK : 027/ 1776 / 107.6.27 / 2021


Tanggal : 27 September 2021

KEMAJUAN FISIK PEKERJAAN

Waktu Pelaksanaan : 75 Hari Kalender


Waktu Yang Sudah Berjalan : 28 Hari
Sisa Waktu : 47 Hari

Rencana Prestasi Pekerjaan : 7.62%


Prestasi Nyata s/d Minggu ini : 3.94%
Tingkat Kemajuan Pekerjaan : -3.68% % (LAMBAT)
JADWAL PELAKSANA KEGIATAN

KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI Konsultan Pengawas : PT. MERBABU ARDICON
PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL Konsultan Pelaksana : CV. SINAR PUTRA MULYA
LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN Periode Bulan : 1 28 Sept - 25 Okt 2021
TAHUN : 2021

BOBOT JANGKA WAKTU PELAKSANAAN 75 HARI KALENDER


NO. URAIAN PEKERJAAN % M-01 M-02 M-03 M-04 M-05 M-06 M-07 M-08 M-09 M-10 M-11 KET
Hari 1-7 Hari 8-14 Hari 15-21 Hari 22-28 Hari 29-35 Hari 36-42 Hari 43-49 Hari 50-56 Hari 57-63 Hari 64-70 Hari 71-75
PEMELIHARAAN ASRAMA PUTRA 1 DAN 2
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.19% 0.19% 0.00% 0.00% 0.00% 0.19% 0.19% 0.00% 0.00% 0.00% 0.00%
0.76%
B. PEKERJAAN STRUKTUR ATAP 0.00% 0.13% 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Tambal Sulam Genteng 10% 0.26%

C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.03% 0.03% 0.00% 0.03% 0.03% 0.00% 0.00% 0.00% 0.00%
1 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps 0.13%

II. PEKERJAAN PELAPIS LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.69% 0.69% 0.69% 0.00% 0.69% 0.69% 0.69% 0.00%
4.14%
III. PEKERJAAN KUSEN PINTU DAN ASSESORIES 0.00% 0.00% 0.00% 0.00% 1.19% 1.19% 1.19% 1.19% 1.19% 1.19% 0.00%
7.14%
IV. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.00% 0.18% 0.00% 0.18% 0.18% 0.18% 0.00% 0.00%
0.73%
V. PEKERJAAN PENGECATAN 0.00% 0.00% 0.74% 0.74% 0.74% 0.74% 0.00% 0.74% 0.74% 0.74% 0.74%
5.90% 0.29% 0.29%
D. PEKERJAAN MEP
I. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.12% 0.00% 0.00% 0.00% 0.00% 0.12% 0.12%
0.36%
PEMELIHARAAN ASRAMA PUTRA 3
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.39% 0.39% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.78% 0.40%
II. PEKERJAAN STRUKTUR 0.00% 0.00% 0.24% 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.47%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.51% 0.00% 0.00% 0.00% 0.00%
1.54%
IV. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.00% 0.75% 0.75% 0.75% 0.75% 0.75% 0.00% 0.00% 0.00%
3.76% 2.74%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.00% 0.29% 0.29% 0.29% 0.29% 0.00% 0.00% 0.00%
1.17%
VI. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.00% 0.00% 1.17% 1.17% 1.17% 1.17% 1.17% 0.00%
5.87%
VII.PEKERJAAN KUSEN PINTU 0.00% 0.00% 0.00% 0.00% 1.94% 1.94% 1.94% 1.94% 1.94% 1.94% 0.00%
11.66%
VIII.PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.62% 0.62% 0.62% 0.62%
2.47%
IX. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.07% 0.07% 0.07% 0.00%
0.20%
X. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.36% 0.36% 0.36%
1.07%
PEMELIHARAAN ASRAMA PUTRI 1 & 2
A ASRAMA PUTRI 1
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.10% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi, Pembongkaran Plafond Teras 0.20% 0.10%

II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00% 0.00% 0.86% 0.86% 0.86% 0.86% 0.00% 0.00% 0.00% 0.00% 0.00%
3.43% 0.90%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.64% 0.64% 0.64% 0.64% 0.00% 0.00% 0.00% 0.00% 0.00%
2.54%
IV. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.42% 0.42% 0.42% 0.42% 0.00% 0.00% 0.00% 0.00%
1.67% 0.14% 0.30%
V. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.95% 0.95% 0.95% 0.00% 0.00% 0.00% 0.00%
2.84%
VI. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.79% 0.79% 0.79% 0.00% 0.00% 0.00% 0.00%
2.36%
VII.PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.01% 0.01% 0.01% 0.00% 0.00% 0.00% 0.00%
1 Pasang Instalasi Listrik Lama 0.03%

PEMELIHARAAN ASRAMA PUTRI 1 & 2


B GEDUNG ASRAMA PUTRI 2
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.15% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembongkaran Kusen & Keramik KM 0.15%

II. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.51% 0.00% 0.00%
1.54%
III. PEKERJAAN KUSEN PINTU 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.00%
1 Pekerjaan Pintu P2 1.01%

IV. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.91% 0.91% 0.91% 0.91%
4 Pengecatan Kalsiplank Lama 0.21%
3.62%
V. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.61% 0.61% 0.61%
1.82%
PEMELIHARAAN AKSESIBILITAS/SELASAR
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.29% 0.29% 0.29% 0.29% 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.45% 0.42% 0.49% 0.32%
B. PEKERJAAN STRUKTUR 0.00% 0.00% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87%
25.81% 0.38% 1.01% 6.71%
C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.23% 0.23% 0.00%
0.46%
II. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.16%
1 Pengecatan kolom 0.16%

D. PEKERJAAN MEP
I. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.46% 0.46% 0.46% 0.00%
1.37%
I. SIMK3 0.00% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10%
1.15% 0.21%
100.00%
RENCANA KEMAJUAN BULANAN 1.07% 1.20% 5.89% 7.62% 13.33% 14.14% 12.06% 12.49% 13.15% 12.57% 6.47%
REALISASI BULANAN 1.30% 2.44% 7.03% 3.94%
RENCANA KEMAJUAN BULANAN KOMULATIF 1.07% 2.27% 8.16% 15.78% 29.11% 43.25% 55.31% 67.81% 80.95% 93.53% 100.00%
REALISASI BULAN KOMULATIF 1.30% 3.74% 10.77% 14.71% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
KEMAJUAN PEKERJAAN 0.23% 1.46% 2.61% -1.07%

Pasuruan, 26 Oktober 2021


Mengetahui : Mengetahui, Diperiksa Oleh : Dibuat Oleh :
Pejabat Pembuat Komitmen (PPK) Kontraktor Pelaksana Konsultan Pengawas Konsultan Pengawas
Dinas Sosial CV. SINAR PUTRA MULYA CV. ROUDHOH TEHNIK CV. ROUDHOH TEHNIK
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan

YUSMANU, SST. ARDIANSYAH BRENDA NURUL HIDAYATI, ST. CHANDRA YUDHA, ST.
NIP. 19680831 199201 1 001 Pelaksana Lapangan Direktur Pengawas Lapangan
LAPORAN PENGAWASAN
KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI Bulan Ke : 1
PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL Periode : 28 Sept s/d 26 Okt 2021
LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN Konsultan Pengawas : PT. MERBABU ARDICON
TAHUN : 2021 Kontraktor Pelaksana : CV. SINAR PUTRA MULYA

BOBOT REALISASI PEKERJAAN


NO. URAIAN PEKERJAAN SAT. VOLUME % Bulan Lalu Bulan ini S/D Bulan Ini
Vol REALISASI BOBOT Vol REALISASI BOBOT Vol REALISASI BOBOT
PEMELIHARAAN ASRAMA PUTRA 1 DAN 2
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN
1 Persiapan & Pembersihan Lokasi Pekerjaan Ls 1.00 0.06% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pembongkaran Dinding Bak Toilet Ls 1.00 0.10% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
3 Pembongkaran Keramik Ls 1.00 0.06% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
4 Pembongkaran Kusen m² 17.09 0.48% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
5 Pembongkaran Plafond + Rangka Plafond m² 19.23 0.06% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
0.00%
B. PEKERJAAN STRUKTUR ATAP - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Tambal Sulam Genteng 10% m² 16.47 0.26% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps m² 5.40 0.13% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai ukuran 40x40 cm m² 22.46 0.70% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm m² 89.20 3.44% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
0.00%
III. PEKERJAAN KUSEN PINTU DAN ASSESORIES - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu Toilet UPVC unit 10.00 3.40% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pasang Kloset Duduk unit 6.00 2.93% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
3 Pasang Kloset Jongkok unit 2.00 0.18% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
4 Kran Ø 3/4 stainles Steel + Knop Penutup unit 4.00 0.07% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
5 Pasang Floor drain StainlessSteel unit 8.00 0.14% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
6 Pasang Grab Bar StainlessSteel (Terpasang) unit 8.00 0.40% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
0.00%
IV. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pasang rangka plafond besi hollow 1 x 40.40.0,3 mm, modul 60 x 60 cm m² 13.77 0.35% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pemasangan Gypsumboard 9mm m² 13.77 0.12% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
3 List Plafond Gypsum Lebar 9 cm m¹ 36.52 0.20% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
4 Pengecatan Plafon m² 13.77 0.07% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
0.00%
V. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam ( 1 lapis cat dasar, 2 lapis cat penutup ) m² 1,122.19 4.09% - 0.00% 0.00% 112.22 10.00% 0.41% 112.22 10.00% 0.41%
2 Pengecatan tembok lama luar( 1 lapis cat dasar, 2 lapis cat penutup ) m² 436.02 1.80% - 0.00% 0.00% 43.60 10.00% 0.18% 43.60 10.00% 0.18%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
D. PEKERJAAN MEP - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
ARMATURE, STOP KONTAK DAN INSTAL - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Titik Penerangan Ttk 8.00 0.20% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Saklar Tunggal Ttk 4.00 0.05% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Lampu LED Downlight 7,5 watt bh 8.00 0.11% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
0.00%
PEMELIHARAAN ASRAMA PUTRA 3 - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi Ls 1.00 0.06% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pekerjaan Pembongkaran Plafond Ls 1.00 0.20% - 0.00% 0.00% 1.00 100.00% 0.20% 1.00 100.00% 0.20%
3 Pekerjaan Pembongkaran Kusen Lama Ls 1.00 0.15% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
4 Pekerjaan Pembongkaran Keramik Lama Ls 1.00 0.06% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
5 Pekerjaan Pembongkaran Kuda-Kuda, Balok & Nok Lama Ls 1.00 0.10% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
6 Pembongkaran Rangka & penutup Atap Lama Ls 1.00 0.20% - 0.00% 0.00% 1.00 100.00% 0.20% 1.00 100.00% 0.20%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
II. PEKERJAAN STRUKTUR - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Beton Ring Balk RB (11x15) TOC.+3,80 - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.36 0.07% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Pasang bekesting Praktis 3x Pakai m² 6.59 0.22% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Pembesian Polos Tul. Pokok 4 -Ø12 Kg 54.13 0.15% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Pembesian Polos Beg. Ø8-150 Kg 13.61 0.04% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 18.63 0.48% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 18.63 0.29% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
3 Woodplank L: 30 cm + Pengecatan m 50.80 0.77% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 75.30 1.67% - 0.00% 0.00% 56.48 75.00% 1.25% 56.48 75.00% 1.25%
2 Plesteran Cam. 1 Pc : 6 Psr tebal 15 mm + Acian m² 150.59 1.99% - 0.00% 0.00% 112.94 75.00% 1.49% 112.94 75.00% 1.49%
3 Benangan m² 48.16 0.10% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk. 40x40 cm Motif unpolished m² 6.83 0.25% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 23.92 0.92% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
VI. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pasang Rangka plafon besi hollow 1 x 40.40.0,3 mm m² 146.78 3.73% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pasang Plafond gypsum board, tebal 9 mm m² 94.61 0.80% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
3 Pasang Plafond Kalsi board, tebal 4 mm m² 52.17 0.46% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
4 List Plafond Gypsum Profil m 161.50 0.88% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
VII. PEKERJAAN KUSEN PINTU - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu PJ1 Unit 1.00 1.20% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pekerjaan Pintu PJ2 Unit 1.00 1.14% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
3 Pekerjaan Pintu P1 Unit 6.00 4.48% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
4 Pekerjaan Pintu P2 Unit 2.00 1.14% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
5 Pekerjaan Jendela J1 Unit 1.00 0.62% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
6 Pekerjaan Jendela J2 Unit 5.00 2.50% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
7 Pekerjaan Bouvenlis BV Unit 2.00 0.43% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
8 Pekerjaan Bouvenlis BV2 Unit 1.00 0.15% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
VIII. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pengecatan Plafon baru 3x m² 146.78 0.71% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pengecatan tembok baru dalam m² 150.59 0.73% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
3 Pengecatan tembok lama dalam m² 266.75 0.97% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
4 Penjahitan Dinding Pecah Ls 1.00 0.05% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
IX. PEKERJAAN MEKANIKAL - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 2.00 0.04% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Kran Ø stainless Steel + Knop Penutup m1 2.00 0.03% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 2.00 0.10% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 0.88 0.02% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.04 0.01% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.15 0.01% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
X. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pasang Instalasi Listrik Indoor + Fitting Kabel NGA 1 x 2,5 mm Ttk 13.00 0.33% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pasang Instalasi Stop Kontak Kabel NYA 1 x 2,5 mm Ttk 4.00 0.10% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
3 Pasang Instalasi Listrik Lama Ls 1.00 0.24% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
4 Pasang Stop Kontak bh 4.00 0.11% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
5 Pasang Saklar Tunggal bh 4.00 0.05% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
6 Pasang Lampu LED 14 Watt bh 9.00 0.18% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
7 Pasang Lampu LED 7,5 Watt bh 4.00 0.05% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
A ASRAMA PUTRI 1 - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi, Pembongkaran Plafond Teras Ls 1.00 0.20% - 0.00% 0.00% 0.50 50.00% 0.10% 0.50 50.00% 0.10%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Tambal Sulam kaso 5/7 + reng 2/3 ( kayu kruing ) 10% m² 36.19 0.93% - 0.00% 0.00% 18.10 50.00% 0.46% 18.10 50.00% 0.46%
2 Tambal Sulam Genteng Kodok Karangpilang 10% m² 36.19 0.57% - 0.00% 0.00% 9.05 25.00% 0.14% 9.05 25.00% 0.14%
3 Tambal Sulam Bubungan lokal model Karangpilang ( Kodok ) m 33.48 0.77% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
4 Woodplank L: 30 cm + Pengecatan m 76.50 1.16% - 0.00% 0.00% 19.13 25.00% 0.29% 19.13 25.00% 0.29%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 12.16 0.44% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 54.40 2.10% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
IV. PEKERJAAN PLAFOND - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pek. Plafond Kalsiboard t: 4 mm Teras m² 92.69 0.81% - 0.00% 0.00% 9.27 10.00% 0.08% 9.27 10.00% 0.08%
2 Tambal Sulam rangka langit-langit Teras (1.00 x 1.00) m m² 46.35 0.60% - 0.00% 0.00% 27.81 60.00% 0.36% 27.81 60.00% 0.36%
kayu Meranti 50% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
3 Pasang list langit - langit kayu profil m 71.70 0.26% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
V. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam m² 478.58 1.75% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pengecatan tembok lama luar m² 154.77 0.64% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
3 Pengecatan Plafon baru 3x m² 92.69 0.45% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
0.00%
VI. PEKERJAAN MEKANIKAL 0.00% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Kran Ø 3/4 "Onda stailles teel + Knop Penutup Bh 4.00 0.07% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Pasang Kloset Duduk Ex..Toto Unit 4.00 1.96% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 4.00 0.07% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) Unit 4.00 0.20% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 4 Unit 0.00% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.76 0.04% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.09 0.02% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.290 0.01% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
0.00%
VII. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pasang Instalasi Listrik Lama Ttk 1.00 0.03% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
B GEDUNG ASRAMA PUTRI 2 - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pekerjaan Pembongkaran Kusen & Keramik KM Ls 1.00 0.15% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pasang Keramik Lantai KM Uk.40x40 Motif Unpolished m² 7.47 0.27% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pasang Keramik Dinding 25x40 cm Motif Polished m² 32.88 1.27% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pekerjaan Pintu P2 m² 1.00 1.01% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
IV. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pengecatan tembok lama dalam m² 496.32 1.81% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Pengecatan tembok lama luar m² 178.47 0.74% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
( 1 lapis cat dasar, 2 lapis cat penutup ) - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
3 Pengecatan Plafon lama 2x m² 236.70 0.86% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
( 1 lapis plamir, 1 lapis cat penutup ) - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
4 Pengecatan Kalsiplank Lama m² 27.97 0.21% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
V. PEKERJAAN MEKANIKAL - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Kran Ø 3/4" Stainless Steel + Knop Penutup Bh 6.00 0.10% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Pasang Kloset Duduk Monoblok Unit 3.00 1.47% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Floordrain StainlessSteel Bh 3.00 0.05% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Grab Bar StainlessSteel 𝜙1" Panjang 2m tb: 1 mm (Terpasang) m1 3.00 0.15% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
Tempat Duduk t: 80x 40 x 40 cm 3 Unit - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Pas. Tembok 1/2 bata Cam. 1 Pc : 6 Psr m² 1.32 0.03% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Pengecoran beton mutu f'c=14,5 Mpa (K 175) m³ 0.07 0.01% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Urugan Pasir Tb:30 cm m³ 0.22 0.01% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
PEMELIHARAAN AKSESIBILITAS/SELASAR - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
A. PEKERJAAN PERSIAPAN DAN TANAH - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Persiapan & Pembersihan Lokasi Pekerjaan m² 63.60 0.22% - 0.00% 0.00% 15.90 25.00% 0.06% 15.90 25.00% 0.06%
2 Pengukuran dan Pasang Bouwplank m1 52.00 0.64% - 0.00% 0.00% 52.00 100.00% 0.64% 52.00 100.00% 0.64%
3 Galian Tanah Pondasi m³ 22.36 0.40% - 0.00% 0.00% 20.50 91.67% 0.36% 20.50 91.67% 0.36%
4 Urugan Pasir t:5cm m³ 0.97 0.03% - 0.00% 0.00% 0.89 91.67% 0.03% 0.89 91.67% 0.03%
5 Lantai kerja t:5cm Camp.1:3:5 m³ 0.97 0.15% - 0.00% 0.00% 0.89 91.67% 0.14% 0.89 91.67% 0.14%
0.00%
B. PEKERJAAN STRUKTUR - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Beton Pondasi Footplat 80x80x20 cm - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 3.07 0.58% - 0.00% 0.00% 2.81 91.67% 0.53% 2.81 91.67% 0.53%
Pekerjaan Bekisting 2x Pakai m² 15.36 0.49% - 0.00% 0.00% 14.08 91.67% 0.45% 14.08 91.67% 0.45%
Pekerjaan Pembesian kg 434.65 1.18% - 0.00% 0.00% 398.43 91.67% 1.09% 398.43 91.67% 1.09%
- Tul. Pokok. Ø12-150 - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Beton Kolom Pedestal 20/20cm - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 0.53 0.10% - 0.00% 0.00% 0.49 91.67% 0.09% 0.49 91.67% 0.09%
Pekerjaan Bekisting 2x Pakai m² 10.56 0.35% - 0.00% 0.00% 9.68 91.67% 0.32% 9.68 91.67% 0.32%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 89.49 0.24% - 0.00% 0.00% 82.03 91.67% 0.22% 82.03 91.67% 0.22%
- Beg. Ø8-150 kg 30.93 0.08% - 0.00% 0.00% 28.35 91.67% 0.08% 28.35 91.67% 0.08%
3 Beton Sloof 15/20cm - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 2.46 0.47% - 0.00% 0.00% 2.31 93.75% 0.44% 2.31 93.75% 0.44%
Pekerjaan Bekisting 2x Pakai m² 32.76 0.55% - 0.00% 0.00% 30.71 93.75% 0.52% 30.71 93.75% 0.52%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 303.97 0.83% - 0.00% 0.00% 284.97 93.75% 0.78% 284.97 93.75% 0.78%
- Beg. Ø8-100-150 kg 162.59 0.44% - 0.00% 0.00% 152.43 93.75% 0.42% 152.43 93.75% 0.42%
4 Beton Kolom Praktis - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
Pengecoran beton mutu K.175 m³ 0.75 0.14% - 0.00% 0.00% 0.69 91.67% 0.13% 0.69 91.67% 0.13%
Pekerjaan Bekisting 2x Pakai m² 19.87 0.66% - 0.00% 0.00% 18.21 91.67% 0.61% 18.21 91.67% 0.61%
Pekerjaan Pembesian - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Tul. Pokok. 4Ø12 kg 160.22 0.44% - 0.00% 0.00% 146.87 91.67% 0.40% 146.87 91.67% 0.40%
- Beg. Ø8-150 kg 48.29 0.13% - 0.00% 0.00% 44.27 91.67% 0.12% 44.27 91.67% 0.12%
5 Rabatan t:15cm m³ 24.39 3.82% - 0.00% 0.00% 12.20 50.00% 1.91% 12.20 50.00% 1.91%
6 Tiang Besi Hollow 50X50X2.3 mm + Pengecatan m1 33.60 0.54% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
7 Plat Besi 10mm kg 42.39 0.43% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
Anchor M14 X 200 mm
8 bh 96.00 0.97% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
Rangka Atap Besi Hollow, uk. 40X40X1.6 mm
9 m² 83.94 9.53% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
;20X40X1.6 mm+Pengecatan (terpasang)
10 Penutup Atap Zincalume tebal 0,35mm m² 83.94 2.45% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
11 Pasang atap nok seng plat m1 34.40 0.31% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
12 Woodplank 30cm + Pengecatan m1 68.80 1.05% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Ban-banan Kolom m' 19.20 0.04% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2 Plesteran beton m² 31.87 0.42% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
II. PEKERJAAN PENGECATAN - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1 Pengecatan kolom m² 31.87 0.16% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
D. PEKERJAAN MEP - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
ARMATURE, STOP KONTAK DAN INSTAL - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Titik Penerangan Ttk 27.00 0.69% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- Lampu LED Downlight bulat 12 watt Outbow bh 27.00 0.68% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
0.00%
SIMK3 0.00% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
1) Penyiapan RKK Terdiri Atas: - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
a. Pembuatan prosedur dan instruksi kerja 1.00 0.04% - 0.00% 0.00% 1.00 100.00% 0.04% 1.00 100.00% 0.04%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
2) Sosialisasi, Promosi dan Pelatihan terdiri atas - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
a.Spanduk / Baner 1 bh 1.00 0.02% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
3) Alat Pelindung Kerja Terdiri Atas: - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
a. Pagar Pengaman Sementara; ls 1.00 0.05% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
b. Pembatas Area (Restricted Area). ls 1.00 0.04% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
4) Alat Pelindung Diri Terdiri Atas: - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
a. Topi Pelindung (Safety Helmet); bh 15.00 0.12% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
b. Pelindung Pernafasan Dan Mulut (Masker); bh 149.00 0.06% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
c. Sarung Tangan (Safety Gloves); psng 150.00 0.15% - 0.00% 0.00% 75.00 50.00% 0.08% 75.00 50.00% 0.08%
d. Sepatu Keselamatan (Safety Shoes); psng 15.00 0.15% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
e. Rompi Keselamatan (Safety Vest); bh 15.00 0.09% - 0.00% 0.00% 15.00 100.00% 0.09% 15.00 100.00% 0.09%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
5) Asuransi dan Perijinan terdiri atas : - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
a. BPJS ketenagakerjaan ls 1.00 0.20% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
6) Fasilitas sarana kesehatan; - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
a. Peralatan P3K ( 2 Kotak P3K, Obat Luka, Perban, dll) unit 1.00 0.03% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
b. Wastafel Portabel +lengkap (terpasang) unit 1.00 0.10% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
7) Kegiatan Dan peralatan terkait dengan pengendalian resiko Keselamatan Konstruksi : - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
a.Alat Pemadam Api ringan (APAR) 3 Kg 1 bh, KIP ls 1.00 0.06% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
- 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
8) Rambu - Rambu Terdiri Atas : - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
a. Tongkat Pengatur Lalu Lintas (Warning Lights Stick); bh 1.00 0.02% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
b. Lampu Putar (Rotary Lamp); bh 1.00 0.02% - 0.00% 0.00% - 0.00% 0.00% - 0.00% 0.00%
0.00% - 0.00% 0.00% - 0.00% - 0.00% 0.00%
100.00% 14.71% 14.71%

Mengetahui : Mengetahui, Dibuat Oleh :


Pejabat Pembuat Komitmen (PPK) Kontraktor Pelaksana Konsultan Pengawas
Dinas Sosial CV. SINAR PUTRA MULYA CV. ROUDHOH TEHNIK
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan
0.00
0.00
0.00
0.00
0.00
YUSMANU, SST. ARDIANSYAH CHANDRA YUDHA, ST.
NIP. 19680831 199201 1 001 Pelaksana Lapangan Pengawas Lapangan
REKAPITULASI LAPORAN UMUM

BULAN KE : I (SATU)
PEMELIHARAAN KANTOR REHABILITASI SOSIAL
PERIODE : 28 September - 25 Oktober 2021

KONSULTAN PENGAWAS : PT. MERBABU ARDICON


NOMOR SURAT PERINTAH KERJA (SPK) : 027/ 1788 / 107.6.27 / 2021
NILAI KONTRAK : Rp 546,036,398.80
TANGGAL MULAI PEKERJAAN : 28 September 2021
TANGGAL SELESAI PEKERJAAN : 10 Desember 2021
PRESTASI BOBOT PRESTASI PEKERJAAN
NO. URAIAN PEKERJAAN BOBOT (%) S/D MENURUT CEPAT LAMBAT
BULAN INI SCHEDULE (%) (%)

PEMELIHARAAN ASRAMA PUTRA 1 DAN 2


A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.76% 0.00% 0.38% 0.00% 0.378%
B. PEKERJAAN STRUKTUR ATAP 0.26% 0.00% 0.26% 0.00% 0.257%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00% 0.000%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.13% 0.00% 0.06% 0.00% 0.063%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING 4.14% 0.00% 0.69% 0.00% 0.690%
III. PEKERJAAN KUSEN PINTU DAN JENDELA 7.14% 0.00% 0.00% 0.00% 0.000%
IV. PEKERJAAN PLAFOND 0.73% 0.00% 0.00% 0.00% 0.000%
V. PEKERJAAN PENGECATAN 5.90% 0.59% 1.47% 0.00% 0.885%
D. PEKERJAAN MEP 0.00% 0.00% 0.00% 0.000%
I. PEKERJAAN ELEKTRIKAL 0.36% 0.00% 0.00% 0.00% 0.000%
0.00% 0.00% 0.00% 0.000%
PEMELIHARAAN ASRAMA PUTRA 3 0.00% 0.00% 0.00% 0.000%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.78% 0.40% 0.78% 0.00% 0.373%
II. PEKERJAAN STRUKTUR 0.47% 0.00% 0.47% 0.00% 0.472%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 1.54% 0.00% 0.00% 0.00% 0.000%
IV. PEKERJAAN PASANGAN DAN PLESTERAN 3.76% 2.74% 0.75% 1.99% 0.000%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING 1.17% 0.00% 0.00% 0.00% 0.000%
VI. PEKERJAAN PLAFOND 5.87% 0.00% 0.00% 0.00% 0.000%
VII. PEKERJAAN KUSEN PINTU 11.66% 0.00% 0.00% 0.00% 0.000%
VIII. PEKERJAAN PENGECATAN 2.47% 0.00% 0.00% 0.00% 0.000%
IX. PEKERJAAN MEKANIKAL 0.20% 0.00% 0.00% 0.00% 0.000%
X. PEKERJAAN ELEKTRIKAL 1.07% 0.00% 0.00% 0.00% 0.000%
0.00% 0.00% 0.00% 0.000%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 0.00% 0.00% 0.00% 0.000%
A GEDUNG ASRAMA PUTRI 1 0.00% 0.00% 0.00% 0.000%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.20% 0.10% 0.20% 0.00% 0.101%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 3.43% 0.90% 1.71% 0.00% 0.819%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING 2.54% 0.00% 1.27% 0.00% 1.270%
IV. PEKERJAAN PLAFOND 1.67% 0.44% 0.42% 0.02% 0.000%
V. PEKERJAAN PENGECATAN 2.84% 0.00% 0.00% 0.00% 0.000%
VI. PEKERJAAN MEKANIKAL 2.36% 0.00% 0.00% 0.00% 0.000%
VII. PEKERJAAN ELEKTRIKAL 0.03% 0.00% 0.00% 0.00% 0.000%
B GEDUNG ASRAMA PUTRI 2 0.00% 0.00% 0.00% 0.000%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.15% 0.00% 0.00% 0.00% 0.000%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING 1.54% 0.00% 0.00% 0.00% 0.000%
III. PEKERJAAN KUSEN PINTU 1.01% 0.00% 0.00% 0.00% 0.000%
IV. PEKERJAAN PENGECATAN 3.62% 0.00% 0.00% 0.00% 0.000%
V. PEKERJAAN MEKANIKAL 1.82% 0.00% 0.00% 0.00% 0.000%
0.00% 0.00% 0.00% 0.000%
PEMELIHARAAN AKSESIBILITAS/SELASAR 0.00% 0.00% 0.00% 0.000%
A. PEKERJAAN PERSIAPAN DAN TANAH 0.00% 0.00% 0.00% 0.000%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 1.45% 1.23% 1.16% 0.07% 0.000%
B. PEKERJAAN STRUKTUR 25.81% 8.10% 5.74% 2.36% 0.000%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00% 0.000%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.46% 0.00% 0.00% 0.00% 0.000%
III. PEKERJAAN PENGECATAN 0.16% 0.00% 0.00% 0.00% 0.000%
D. PEKERJAAN MEP 0.00% 0.00% 0.00% 0.000%
I. PEKERJAAN ELEKTRIKAL 1.37% 0.00% 0.00% 0.00% 0.000%
0.00% 0.00% 0.00% 0.000%
SMK3 0.00% 0.00% 0.00% 0.000%
I. SMK3 1.15% 0.21% 0.42% 0.00% 0.213%
0.00% 0.00% 0.00% 0.000%
JUMLAH TOTAL 100.00% 14.71% 15.78% 4.45% 5.521%
KEMAJUAN PEKERJAAN SEBESAR

RENCANA PRESTASI 15.78% %


PRESTASI NYATA S/D BULAN INI 14.71% %
TINGKAT KEMAJUAN PEKERJAAN -1.07% % (LAMBAT)

Mengetahui, Dibuat Oleh :


Kontraktor Pelaksana Konsultan Pengawas
CV. SINAR PUTRA MULYA PT. MERBABU ARDICON
0
0
0
0
0
ARDYO KUSTRIYONO CHANDRA YUDHA, ST.
PELAKSANA Pengawas Lapangan

Mengetahui :
Pejabat Pembuat Komitmen (PPK)
Dinas Sosial
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan

YUSMANU, SST.
NIP. 19680831 199201 1 001
PEMERINTAH PROVINSI JAWA TIMUR
DINAS SOSIAL
UPT REHABILITASI SOSIAL BINA DAKSA PASURUAN
JL RA.KARTINI NO. 292, Telp / Fax. (0343) 741135
BANGIL - PASURUAN

LAPORAN MINGGUAN
I (SATU)
PERIODE
: 28 September - 04 Oktober 2021

PEKERJAAN :
PENGAWASAN PEMELIHARAAN ASRAMA 1 & 2, ASRAMA PUTRA 3, ASRAMA PUTRI 1
& 2, dan AKSESBILITAS (SELASAR) UPT. RSBD PASURUAN
LOKASI :
JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN

TAHUN ANGGARAN :
2021

KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

PT. MERBABU ARDICON CV. SINAR PUTRA MULYA


PEMERINTAH PROVINSI JAWA TIMUR
DINAS SOSIAL
UPT REHABILITASI SOSIAL BINA DAKSA PASURUAN
JL RA.KARTINI NO. 292, Telp / Fax. (0343) 741135
BANGIL - PASURUAN

LAPORAN MINGGUAN
II (DUA)
PERIODE
: 05 Oktober 2021 - 11 Oktober 2021

PEKERJAAN :
PENGAWASAN PEMELIHARAAN ASRAMA 1 & 2, ASRAMA PUTRA 3, ASRAMA PUTRI 1
& 2, dan AKSESBILITAS (SELASAR) UPT. RSBD PASURUAN
LOKASI :
JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN

TAHUN ANGGARAN :
2021

KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

PT. MERBABU ARDICON CV. SINAR PUTRA MULYA


PEMERINTAH PROVINSI JAWA TIMUR
DINAS SOSIAL
UPT REHABILITASI SOSIAL BINA DAKSA PASURUAN
JL RA.KARTINI NO. 292, Telp / Fax. (0343) 741135
BANGIL - PASURUAN

LAPORAN MINGGUAN
III (TIGA)
PERIODE
: 12 Oktober 2021 - 18 Oktober 2021

PEKERJAAN :
PENGAWASAN PEMELIHARAAN ASRAMA 1 & 2, ASRAMA PUTRA 3, ASRAMA PUTRI 1
& 2, dan AKSESBILITAS (SELASAR) UPT. RSBD PASURUAN
LOKASI :
JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN

TAHUN ANGGARAN :
2021

KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA


PT. MERBABU ARDICON CV. SINAR PUTRA MULYA

PEMERINTAH PROVINSI JAWA TIMUR


DINAS SOSIAL
UPT REHABILITASI SOSIAL BINA DAKSA PASURUAN
JL RA.KARTINI NO. 292, Telp / Fax. (0343) 741135
BANGIL - PASURUAN

LAPORAN MINGGUAN
IV (EMPAT)
PERIODE
: 19 Oktober 2021 - 25 Oktober 2021

PEKERJAAN :
PENGAWASAN PEMELIHARAAN ASRAMA 1 & 2, ASRAMA PUTRA 3, ASRAMA PUTRI 1
& 2, dan AKSESBILITAS (SELASAR) UPT. RSBD PASURUAN
LOKASI :
JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN

TAHUN ANGGARAN :
2021
KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

PT. MERBABU ARDICON CV. SINAR PUTRA MULYA


PEMERINTAH PROVINSI JAWA TIMUR
DINAS SOSIAL
UPT REHABILITASI SOSIAL BINA DAKSA PASURUAN
JL RA.KARTINI NO. 292, Telp / Fax. (0343) 741135
BANGIL - PASURUAN

LAPORAN BULANAN
I (SATU)
PERIODE
: 28 September - 25 Oktober 2021

PEKERJAAN :
PENGAWASAN PEMELIHARAAN ASRAMA 1 & 2, ASRAMA PUTRA 3, ASRAMA PUTRI 1
& 2, dan AKSESBILITAS (SELASAR) UPT. RSBD PASURUAN
LOKASI :
JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN

TAHUN ANGGARAN :
2021

KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

PT. MERBABU ARDICON CV. SINAR PUTRA MULYA


PEMERINTAH PROVINSI JAWA TIMUR
DINAS SOSIAL
UPT REHABILITASI SOSIAL BINA DAKSA PASURUAN
JL RA.KARTINI NO. 292, Telp / Fax. (0343) 741135
BANGIL - PASURUAN

LAPORAN BULANAN
II (DUA)
PERIODE
: 05 Oktober 2021 - 11 Oktober 2021

PEKERJAAN :
PENGAWASAN PEMELIHARAAN ASRAMA 1 & 2, ASRAMA PUTRA 3, ASRAMA PUTRI 1
& 2, dan AKSESBILITAS (SELASAR) UPT. RSBD PASURUAN
LOKASI :
JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN

TAHUN ANGGARAN :
2021

KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

PT. MERBABU ARDICON CV. SINAR PUTRA MULYA


PEMERINTAH PROVINSI JAWA TIMUR
DINAS SOSIAL
UPT REHABILITASI SOSIAL BINA DAKSA PASURUAN
JL RA.KARTINI NO. 292, Telp / Fax. (0343) 741135
BANGIL - PASURUAN

PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL

LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN

TAHUN ANGGARAN : 2021

KONSULTAN PENGAWAS : PT. MERBABU ARDICON


Alamat : Jl. Rawan 18 Mangunsuman - Ponorogo

No. SPK : 027/ 1788 / 107.6.27 / 2021


Tanggal : 27 September 2021

KONTRAKTOR PELAKSANA : CV. SINAR PUTRA MULYA


Alamat : PERUM. SIDOKARE ASRI AH-09, SIDOARJO

No. SPK : 027/ 1776 / 107.6.27 / 2021


Tanggal : 27 September 2021

KEMAJUAN FISIK PEKERJAAN

Waktu Pelaksanaan : 75 Hari Kalender


Waktu Yang Sudah Berjalan : 30 Hari
Sisa Waktu : 45 Hari

Rencana Prestasi Pekerjaan : 15.78%


Prestasi Nyata s/d Bulan ini : 14.71%
Tingkat Kemajuan Pekerjaan : -1.07% % (LAMBAT)
JADWAL PELAKSANA KEGIATAN

KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI Konsultan Pengawas : PT. MERBABU ARDICON
PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL Konsultan Pelaksana : CV. SINAR PUTRA MULYA
LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN Periode Minggu : 4 19 Okt s/d 25 Oktober 2021
TAHUN : 2021

BOBOT JANGKA WAKTU PELAKSANAAN 75 HARI KALENDER


NO. URAIAN PEKERJAAN % M-01 M-02 M-03 M-04 M-05 M-06 M-07 M-08 M-09 M-10 M-11 KET
Hari 1-7 Hari 8-14 Hari 15-21 Hari 22-28 Hari 29-35 Hari 36-42 Hari 43-49 Hari 50-56 Hari 57-63 Hari 64-70 Hari 71-75
PEMELIHARAAN ASRAMA PUTRA 1 DAN 2
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.19% 0.19% 0.00% 0.00% 0.00% 0.19% 0.19% 0.00% 0.00% 0.00% 0.00%
0.76%
B. PEKERJAAN STRUKTUR ATAP 0.00% 0.13% 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Tambal Sulam Genteng 10% 0.26%

C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.03% 0.03% 0.00% 0.03% 0.03% 0.00% 0.00% 0.00% 0.00%
1 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps 0.13%

II. PEKERJAAN PELAPIS LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.69% 0.69% 0.69% 0.00% 0.69% 0.69% 0.69% 0.00%
4.14%
III. PEKERJAAN KUSEN PINTU DAN ASSESORIES 0.00% 0.00% 0.00% 0.00% 1.19% 1.19% 1.19% 1.19% 1.19% 1.19% 0.00%
7.14%
IV. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.00% 0.18% 0.00% 0.18% 0.18% 0.18% 0.00% 0.00%
0.73%
V. PEKERJAAN PENGECATAN 0.00% 0.00% 0.74% 0.74% 0.74% 0.74% 0.00% 0.74% 0.74% 0.74% 0.74%
5.90% 0.29% 0.29%
D. PEKERJAAN MEP
I. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.12% 0.00% 0.00% 0.00% 0.00% 0.12% 0.12%
0.36%
PEMELIHARAAN ASRAMA PUTRA 3
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.39% 0.39% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.78% 0.40%
II. PEKERJAAN STRUKTUR 0.00% 0.00% 0.24% 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.47%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.51% 0.00% 0.00% 0.00% 0.00%
1.54%
IV. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.00% 0.75% 0.75% 0.75% 0.75% 0.75% 0.00% 0.00% 0.00%
3.76% 2.74%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.00% 0.29% 0.29% 0.29% 0.29% 0.00% 0.00% 0.00%
1.17%
VI. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.00% 0.00% 1.17% 1.17% 1.17% 1.17% 1.17% 0.00%
5.87%
VII. PEKERJAAN KUSEN PINTU 0.00% 0.00% 0.00% 0.00% 1.94% 1.94% 1.94% 1.94% 1.94% 1.94% 0.00%
11.66%
VIII. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.62% 0.62% 0.62% 0.62%
2.47%
IX. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.07% 0.07% 0.07% 0.00%
0.20%
X. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.36% 0.36% 0.36%
1.07%
PEMELIHARAAN ASRAMA PUTRI 1 & 2
A ASRAMA PUTRI 1
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.10% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi, Pembongkaran Plafond Teras 0.20% 0.10%

II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00% 0.00% 0.86% 0.86% 0.86% 0.86% 0.00% 0.00% 0.00% 0.00% 0.00%
3.43% 0.90%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.64% 0.64% 0.64% 0.64% 0.00% 0.00% 0.00% 0.00% 0.00%
2.54%
IV. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.42% 0.42% 0.42% 0.42% 0.00% 0.00% 0.00% 0.00%
1.67% 0.14% 0.30%
V. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.95% 0.95% 0.95% 0.00% 0.00% 0.00% 0.00%
2.84%
VI. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.79% 0.79% 0.79% 0.00% 0.00% 0.00% 0.00%
2.36%
VII. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.01% 0.01% 0.01% 0.00% 0.00% 0.00% 0.00%
1 Pasang Instalasi Listrik Lama 0.03%

PEMELIHARAAN ASRAMA PUTRI 1 & 2


B GEDUNG ASRAMA PUTRI 2
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.15% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembongkaran Kusen & Keramik KM 0.15%

II. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.51% 0.00% 0.00%
1.54%
III. PEKERJAAN KUSEN PINTU 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.00%
1 Pekerjaan Pintu P2 1.01%

IV. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.91% 0.91% 0.91% 0.91%
4 Pengecatan Kalsiplank Lama 0.21%
3.62%
V. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.61% 0.61% 0.61%
1.82%
PEMELIHARAAN AKSESIBILITAS/SELASAR
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.29% 0.29% 0.29% 0.29% 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.45% 0.42% 0.49% 0.32%
B. PEKERJAAN STRUKTUR 0.00% 0.00% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87%
25.81% 0.38% 1.01% 6.71%
C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.23% 0.23% 0.00%
0.46%
II. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.16%
1 Pengecatan kolom 0.16%

D. PEKERJAAN MEP
I. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.46% 0.46% 0.46% 0.00%
1.37%
I. SIMK3 0.00% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10%
1.15% 0.21%
100.00%
RENCANA KEMAJUAN MINGGUAN 1.07% 1.20% 5.89% 7.62% 13.33% 14.14% 12.06% 12.49% 13.15% 12.57% 6.47%
REALISASI MINGGUAN 1.30% 2.44% 7.03% 3.94%
RENCANA KEMAJUAN MINGGUAN KOMULATIF 1.07% 2.27% 8.16% 15.78% 29.11% 43.25% 55.31% 67.81% 80.95% 93.53% 100.00%
REALISASI MINGGUAN KOMULATIF 1.30% 3.74% 10.77% 14.71% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
KEMAJUAN PEKERJAAN 0.23% 1.46% 2.61% -1.07%

Pasuruan, 25 Oktober 2021


Mengetahui : Mengetahui, Diperiksa Oleh : Dibuat Oleh :
Pejabat Pembuat Komitmen (PPK) Konsultan Pengawas Konsultan Pengawas Konsultan Pengawas
Dinas Sosial PT. MERBABU ARDICON PT. MERBABU ARDICON PT. MERBABU ARDICON
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan

YUSMANU, S.ST. RONI PRAYITNO, ST. FAISOL ABDULLAH FAISOL ABDULLAH


NIP. 19680831 199201 1 001 TEAM LEADER PENGAWAS LAPANGAN TENAGA AHLI
JADWAL PELAKSANA KEGIATAN

KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI Konsultan Pengawas : CV. Roudhoh
PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL Konsultan Pelaksana : CV. Sinar Putra Mulia
LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN Periode Minggu 1 28 Sept s/d 04 Okt 2021
TAHUN : 2021

BOBOT JANGKA WAKTU PELAKSANAAN 75 HARI KALENDER


NO. URAIAN PEKERJAAN % M-01 M-02 M-03 M-04 M-05 M-06 M-07 M-08 M-09 M-10 M-11 KET
Hari 1-7 Hari 8-14 Hari 15-21 Hari 22-28 Hari 29-35 Hari 36-42 Hari 43-49 Hari 50-56 Hari 57-63 Hari 64-70 Hari 71-75
PEMELIHARAAN ASRAMA PUTRA 1 DAN 2
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.19% 0.19% 0.00% 0.00% 0.00% 0.19% 0.19% 0.00% 0.00% 0.00% 0.00%
0.76% 0.00%
B. PEKERJAAN STRUKTUR ATAP 0.00% 0.13% 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Tambal Sulam Genteng 10% 0.26% 0.00%
0.00%
C. PEKERJAAN ARSITEKTUR 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.03% 0.03% 0.00% 0.03% 0.03% 0.00% 0.00% 0.00% 0.00%
1 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps 0.13% 0.00%
0.00%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.69% 0.69% 0.69% 0.00% 0.69% 0.69% 0.69% 0.00%
4.14% 0.00%
III. PEKERJAAN KUSEN PINTU DAN ASSESORIES 0.00% 0.00% 0.00% 0.00% 1.19% 1.19% 1.19% 1.19% 1.19% 1.19% 0.00%
7.14% 0.00%
IV. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.00% 0.18% 0.00% 0.18% 0.18% 0.18% 0.00% 0.00%
0.73% 0.00%
V. PEKERJAAN PENGECATAN 0.00% 0.00% 0.74% 0.74% 0.74% 0.74% 0.00% 0.74% 0.74% 0.74% 0.74%
5.90% 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
D. PEKERJAAN MEP 0.00%
I. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.12% 0.00% 0.00% 0.00% 0.00% 0.12% 0.12%
0.36% 0.00%
PEMELIHARAAN ASRAMA PUTRA 3 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.39% 0.39% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.78% 0.00% 0.00%
II. PEKERJAAN STRUKTUR 0.00% 0.00% 0.24% 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.47% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.51% 0.00% 0.00% 0.00% 0.00%
1.54% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.00% 0.75% 0.75% 0.75% 0.75% 0.75% 0.00% 0.00% 0.00%
3.76% 0.00% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.00% 0.29% 0.29% 0.29% 0.29% 0.00% 0.00% 0.00%
1.17% 0.00%
VI. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.00% 0.00% 1.17% 1.17% 1.17% 1.17% 1.17% 0.00%
5.87% 0.00%
VII. PEKERJAAN KUSEN PINTU 0.00% 0.00% 0.00% 0.00% 1.94% 1.94% 1.94% 1.94% 1.94% 1.94% 0.00%
11.66% 0.00%
VIII. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.62% 0.62% 0.62% 0.62%
2.47% 0.00%
IX. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.07% 0.07% 0.07% 0.00%
0.20% 0.00%
X. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.36% 0.36% 0.36%
1.07% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 0.00%
A ASRAMA PUTRI 1 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.10% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi, Pembongkaran Plafond Teras 0.20% 0.00%
0.00%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00% 0.00% 0.86% 0.86% 0.86% 0.86% 0.00% 0.00% 0.00% 0.00% 0.00%
3.43% 0.00% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.64% 0.64% 0.64% 0.64% 0.00% 0.00% 0.00% 0.00% 0.00%
2.54% 0.00%
IV. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.42% 0.42% 0.42% 0.42% 0.00% 0.00% 0.00% 0.00%
1.67% 0.00% 0.00% 0.00%
V. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.95% 0.95% 0.95% 0.00% 0.00% 0.00% 0.00%
2.84% 0.00%
VI. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.79% 0.79% 0.79% 0.00% 0.00% 0.00% 0.00%
2.36% 0.00%
VII. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.01% 0.01% 0.01% 0.00% 0.00% 0.00% 0.00%
1 Pasang Instalasi Listrik Lama 0.03% 0.00%
0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 0.00%
B GEDUNG ASRAMA PUTRI 2 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.15% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembongkaran Kusen & Keramik KM 0.15% 0.00%
0.00%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.51% 0.00% 0.00%
1.54% 0.00%
III. PEKERJAAN KUSEN PINTU 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.00%
1 Pekerjaan Pintu P2 1.01% 0.00%
0.00%
IV. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.91% 0.91% 0.91% 0.91%
4 Pengecatan Kalsiplank Lama 0.21% 0.00%
3.62% 0.00%
V. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.61% 0.61% 0.61%
1.82% 0.00%
PEMELIHARAAN AKSESIBILITAS/SELASAR 0.00%
A. PEKERJAAN PERSIAPAN DAN TANAH 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.29% 0.29% 0.29% 0.29% 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.45% 0.42% 0.00%
B. PEKERJAAN STRUKTUR 0.00% 0.00% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87%
25.81% 0.38% 0.00%
C. PEKERJAAN ARSITEKTUR 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.23% 0.23% 0.00%
0.46% 0.00%
II. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.16%
1 Pengecatan kolom 0.16% 0.00%
0.00%
D. PEKERJAAN MEP 0.00%
I. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.46% 0.46% 0.46% 0.00%
1.37% 0.00%
I. SIMK3 0.00% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10%
1.15% 0.21%
100.00%
RENCANA KEMAJUAN MINGGUAN 1.07% 1.20% 5.89% 7.62% 13.33% 14.14% 12.06% 12.49% 13.15% 12.57% 6.47%
REALISASI MINGGUAN 1.30%
RENCANA KEMAJUAN MINGGUAN KOMULATIF 1.07% 2.27% 8.16% 15.78% 29.11% 43.25% 55.31% 67.81% 80.95% 93.53% 100.00%
REALISASI MINGGUAN KOMULATIF 1.30% 1.30% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
KEMAJUAN PEKERJAAN 0.23% -0.97%

Pasuruan, 04 Oktober 2021


Mengetahui : Mengetahui, Diperiksa Oleh : Dibuat Oleh :
Pejabat Pembuat Komitmen (PPK) Konsultan Pengawas Konsultan Pengawas Konsultan Pengawas
Dinas Sosial PT. MERBABU ARDICON PT. MERBABU ARDICON PT. MERBABU ARDICON
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan 0.00 0 0
0.00 0.00 0 0
0.00 0.00 0 0
0.00 0.00 0 0
0.00 0.00 0 0
0.00 0.00 0 0
YUSMANU, S.ST. RONI PRAYITNO, ST. FAISOL ABDULLAH FAISOL ABDULLAH
NIP. 19680831 199201 1 001 TEAM LEADER PENGAWAS LAPANGAN TENAGA AHLI
JADWAL PELAKSANA KEGIATAN

KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI Konsultan Pengawas : PT. MERBABU ARDICON
PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL Konsultan Pelaksana : CV. SINAR PUTRA MULYA
LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN Periode Minggu 2 05 Okt s/d 11 Oktober 2021
TAHUN : 2021

BOBOT JANGKA WAKTU PELAKSANAAN 75 HARI KALENDER


NO. URAIAN PEKERJAAN % M-01 M-02 M-03 M-04 M-05 M-06 M-07 M-08 M-09 M-10 M-11 KET
Hari 1-7 Hari 8-14 Hari 15-21 Hari 22-28 Hari 29-35 Hari 36-42 Hari 43-49 Hari 50-56 Hari 57-63 Hari 64-70 Hari 71-75
PEMELIHARAAN ASRAMA PUTRA 1 DAN 2
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.19% 0.19% 0.00% 0.00% 0.00% 0.19% 0.19% 0.00% 0.00% 0.00% 0.00%
0.76% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
B. PEKERJAAN STRUKTUR ATAP 0.00% 0.13% 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Tambal Sulam Genteng 10% 0.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.03% 0.03% 0.00% 0.03% 0.03% 0.00% 0.00% 0.00% 0.00%
1 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.69% 0.69% 0.69% 0.00% 0.69% 0.69% 0.69% 0.00%
4.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU DAN ASSESORIES 0.00% 0.00% 0.00% 0.00% 1.19% 1.19% 1.19% 1.19% 1.19% 1.19% 0.00%
7.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.00% 0.18% 0.00% 0.18% 0.18% 0.18% 0.00% 0.00%
0.73% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENGECATAN 0.00% 0.00% 0.74% 0.74% 0.74% 0.74% 0.00% 0.74% 0.74% 0.74% 0.74%
5.90% 0.29% 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
D. PEKERJAAN MEP 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.12% 0.00% 0.00% 0.00% 0.00% 0.12% 0.12%
0.36% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRA 3 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.39% 0.39% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.78% 0.00% 0.40% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN STRUKTUR 0.00% 0.00% 0.24% 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.47% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.51% 0.00% 0.00% 0.00% 0.00%
1.54% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.00% 0.75% 0.75% 0.75% 0.75% 0.75% 0.00% 0.00% 0.00%
3.76% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.00% 0.29% 0.29% 0.29% 0.29% 0.00% 0.00% 0.00%
1.17% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
VI. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.00% 0.00% 1.17% 1.17% 1.17% 1.17% 1.17% 0.00%
5.87% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
VII. PEKERJAAN KUSEN PINTU 0.00% 0.00% 0.00% 0.00% 1.94% 1.94% 1.94% 1.94% 1.94% 1.94% 0.00%
11.66% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
VIII. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.62% 0.62% 0.62% 0.62%
2.47% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
IX. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.07% 0.07% 0.07% 0.00%
0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
X. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.36% 0.36% 0.36%
1.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
A ASRAMA PUTRI 1 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.10% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi, Pembongkaran Plafond Teras 0.20% 0.00% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00% 0.00% 0.86% 0.86% 0.86% 0.86% 0.00% 0.00% 0.00% 0.00% 0.00%
3.43% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.64% 0.64% 0.64% 0.64% 0.00% 0.00% 0.00% 0.00% 0.00%
2.54% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.42% 0.42% 0.42% 0.42% 0.00% 0.00% 0.00% 0.00%
1.67% 0.00% 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.95% 0.95% 0.95% 0.00% 0.00% 0.00% 0.00%
2.84% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
VI. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.79% 0.79% 0.79% 0.00% 0.00% 0.00% 0.00%
2.36% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
VII. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.01% 0.01% 0.01% 0.00% 0.00% 0.00% 0.00%
1 Pasang Instalasi Listrik Lama 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
B GEDUNG ASRAMA PUTRI 2 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.15% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembongkaran Kusen & Keramik KM 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.51% 0.00% 0.00%
1.54% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.00%
1 Pekerjaan Pintu P2 1.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.91% 0.91% 0.91% 0.91%
4 Pengecatan Kalsiplank Lama 0.21% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3.62% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.61% 0.61% 0.61%
1.82% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PEMELIHARAAN AKSESIBILITAS/SELASAR 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
A. PEKERJAAN PERSIAPAN DAN TANAH 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.29% 0.29% 0.29% 0.29% 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.45% 0.42% 0.49% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
B. PEKERJAAN STRUKTUR 0.00% 0.00% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87%
25.81% 0.38% 1.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.23% 0.23% 0.00%
0.46% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.16%
1 Pengecatan kolom 0.16% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
D. PEKERJAAN MEP 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.46% 0.46% 0.46% 0.00%
1.37% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
I. SIMK3 0.00% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10%
1.15% 0.21% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
RENCANA KEMAJUAN MINGGUAN 1.07% 1.20% 5.89% 7.62% 13.33% 14.14% 12.06% 12.49% 13.15% 12.57% 6.47%
REALISASI MINGGUAN 1.30% 2.44%
RENCANA KEMAJUAN MINGGUAN KOMULATIF 1.07% 2.27% 8.16% 15.78% 29.11% 43.25% 55.31% 67.81% 80.95% 93.53% 100.00%
REALISASI MINGGUAN KOMULATIF 1.30% 3.74% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
KEMAJUAN PEKERJAAN 0.23% 1.46%

Pasuruan, 11 Oktober 2021


Mengetahui : Mengetahui, Diperiksa Oleh : Dibuat Oleh :
Pejabat Pembuat Komitmen (PPK) Konsultan Pengawas Konsultan Pengawas Konsultan Pengawas
Dinas Sosial PT. MERBABU ARDICON PT. MERBABU ARDICON PT. MERBABU ARDICON
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan 0.00 0 0
0.00 0.00 0 0
0.00 0.00 0 0
0.00 0.00 0 0
0.00 0.00 0 0
0.00 0.00 0 0
YUSMANU, S.ST. RONI PRAYITNO, ST. FAISOL ABDULLAH FAISOL ABDULLAH
NIP. 19680831 199201 1 001 TEAM LEADER PENGAWAS LAPANGAN TENAGA AHLI
JADWAL PELAKSANA KEGIATAN

KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI Konsultan Pengawas : PT. MERBABU ARDICON
PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL Konsultan Pelaksana : CV. SINAR PUTRA MULYA
LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN Periode Minggu : 3 12 Okt s/d 18 Oktober 2021
TAHUN : 2021

BOBOT JANGKA WAKTU PELAKSANAAN 75 HARI KALENDER


NO. URAIAN PEKERJAAN % M-01 M-02 M-03 M-04 M-05 M-06 M-07 M-08 M-09 M-10 M-11 KET
Hari 1-7 Hari 8-14 Hari 15-21 Hari 22-28 Hari 29-35 Hari 36-42 Hari 43-49 Hari 50-56 Hari 57-63 Hari 64-70 Hari 71-75
PEMELIHARAAN ASRAMA PUTRA 1 DAN 2
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.19% 0.19% 0.00% 0.00% 0.00% 0.19% 0.19% 0.00% 0.00% 0.00% 0.00%
0.76% 0.00% 0.00% 0.00%
B. PEKERJAAN STRUKTUR ATAP 0.00% 0.13% 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Tambal Sulam Genteng 10% 0.26% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.03% 0.03% 0.00% 0.03% 0.03% 0.00% 0.00% 0.00% 0.00%
1 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps 0.13% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
II. PEKERJAAN PELAPIS LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.69% 0.69% 0.69% 0.00% 0.69% 0.69% 0.69% 0.00%
4.14% 0.00% 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU DAN ASSESORIES 0.00% 0.00% 0.00% 0.00% 1.19% 1.19% 1.19% 1.19% 1.19% 1.19% 0.00%
7.14% 0.00% 0.00% 0.00%
IV. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.00% 0.18% 0.00% 0.18% 0.18% 0.18% 0.00% 0.00%
0.73% 0.00% 0.00% 0.00%
V. PEKERJAAN PENGECATAN 0.00% 0.00% 0.74% 0.74% 0.74% 0.74% 0.00% 0.74% 0.74% 0.74% 0.74%
5.90% 0.29% 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
D. PEKERJAAN MEP 0.00% 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.12% 0.00% 0.00% 0.00% 0.00% 0.12% 0.12%
0.36% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRA 3 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.39% 0.39% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.78% 0.00% 0.40% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN STRUKTUR 0.00% 0.00% 0.24% 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.47% 0.00% 0.00% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.51% 0.00% 0.00% 0.00% 0.00%
1.54% 0.00% 0.00% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.00% 0.75% 0.75% 0.75% 0.75% 0.75% 0.00% 0.00% 0.00%
3.76% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.00% 0.29% 0.29% 0.29% 0.29% 0.00% 0.00% 0.00%
1.17% 0.00% 0.00% 0.00%
VI. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.00% 0.00% 1.17% 1.17% 1.17% 1.17% 1.17% 0.00%
5.87% 0.00% 0.00% 0.00%
VII. PEKERJAAN KUSEN PINTU 0.00% 0.00% 0.00% 0.00% 1.94% 1.94% 1.94% 1.94% 1.94% 1.94% 0.00%
11.66% 0.00% 0.00% 0.00%
VIII. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.62% 0.62% 0.62% 0.62%
2.47% 0.00% 0.00% 0.00%
IX. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.07% 0.07% 0.07% 0.00%
0.20% 0.00% 0.00% 0.00%
X. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.36% 0.36% 0.36%
1.07% 0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 0.00% 0.00% 0.00%
A ASRAMA PUTRI 1 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.10% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi, Pembongkaran Plafond Teras 0.20% 0.00% 0.10% 0.00%
0.00% 0.00% 0.00%
II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00% 0.00% 0.86% 0.86% 0.86% 0.86% 0.00% 0.00% 0.00% 0.00% 0.00%
3.43% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.64% 0.64% 0.64% 0.64% 0.00% 0.00% 0.00% 0.00% 0.00%
2.54% 0.00% 0.00% 0.00%
IV. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.42% 0.42% 0.42% 0.42% 0.00% 0.00% 0.00% 0.00%
1.67% 0.00% 0.14% 0.00% 0.00%
V. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.95% 0.95% 0.95% 0.00% 0.00% 0.00% 0.00%
2.84% 0.00% 0.00% 0.00%
VI. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.79% 0.79% 0.79% 0.00% 0.00% 0.00% 0.00%
2.36% 0.00% 0.00% 0.00%
VII. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.01% 0.01% 0.01% 0.00% 0.00% 0.00% 0.00%
1 Pasang Instalasi Listrik Lama 0.03% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
PEMELIHARAAN ASRAMA PUTRI 1 & 2 0.00% 0.00% 0.00%
B GEDUNG ASRAMA PUTRI 2 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.15% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembongkaran Kusen & Keramik KM 0.15% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
II. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.51% 0.00% 0.00%
1.54% 0.00% 0.00% 0.00%
III. PEKERJAAN KUSEN PINTU 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.00%
1 Pekerjaan Pintu P2 1.01% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
IV. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.91% 0.91% 0.91% 0.91%
4 Pengecatan Kalsiplank Lama 0.21% 0.00% 0.00% 0.00%
3.62% 0.00% 0.00% 0.00%
V. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.61% 0.61% 0.61%
1.82% 0.00% 0.00% 0.00%
PEMELIHARAAN AKSESIBILITAS/SELASAR 0.00% 0.00% 0.00%
A. PEKERJAAN PERSIAPAN DAN TANAH 0.00% 0.00% 0.00%
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.29% 0.29% 0.29% 0.29% 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.45% 0.42% 0.49% 0.32%
B. PEKERJAAN STRUKTUR 0.00% 0.00% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87%
25.81% 0.38% 1.01% 6.71%
C. PEKERJAAN ARSITEKTUR 0.00% 0.00% 0.00%
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.23% 0.23% 0.00%
0.46% 0.00% 0.00% 0.00%
II. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.16%
1 Pengecatan kolom 0.16% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
D. PEKERJAAN MEP 0.00% 0.00% 0.00%
I. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.46% 0.46% 0.46% 0.00%
1.37% 0.00% 0.00% 0.00%
I. SIMK3 0.00% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10%
1.15% 0.21% 0.00% 0.00%
100.00% 0.00% 0.00% 0.00%
RENCANA KEMAJUAN MINGGUAN 1.07% 1.20% 5.89% 7.62% 13.33% 14.14% 12.06% 12.49% 13.15% 12.57% 6.47%
REALISASI MINGGUAN 1.30% 2.44% 7.03% 0.00%
RENCANA KEMAJUAN MINGGUAN KOMULATIF 1.07% 2.27% 8.16% 15.78% 29.11% 43.25% 55.31% 67.81% 80.95% 93.53% 100.00%
REALISASI MINGGUAN KOMULATIF 1.30% 3.74% 10.77% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
KEMAJUAN PEKERJAAN 0.23% 1.46% 2.61%

Pasuruan, 18 Oktober 2021


Mengetahui : Mengetahui, Diperiksa Oleh : Dibuat Oleh :
Pejabat Pembuat Komitmen (PPK) Konsultan Pengawas Konsultan Pengawas Konsultan Pengawas
Dinas Sosial PT. MERBABU ARDICON PT. MERBABU ARDICON PT. MERBABU ARDICON
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
YUSMANU, S.ST. RONI PRAYITNO, ST. FAISOL ABDULLAH FAISOL ABDULLAH
NIP. 19680831 199201 1 001 TEAM LEADER PENGAWAS LAPANGAN TENAGA AHLI
SCHEDULE PROGRES KEMAJUAN
KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI Minggu Ke : 5
SUB PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL Periode : 26 Okt s/d 01 November 2021
LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN Konsultan Pengawas : PT. MERBABU ARDICON
TAHUN : 2021 Kontraktor Pelaksana : CV. SINAR PUTRA MULYA

BOBOT JANGKA WAKTU PELAKSANAAN 75 HARI KALENDER


NO. URAIAN PEKERJAAN % M-01 M-02 M-03 M-04 M-05 M-06 M-07 M-08 M-09 M-10 M-11 KET
H 1-7 H 8-14 H 15-21 H 22-28 H 29-35 H 36-42 H 43-49 H 50-56 H 57-63 H 64-70 H 71-75
PEMELIHARAAN ASRAMA PUTRA 1 DAN 2
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.19% 0.19% 0.00% 0.00% 0.00% 0.19% 0.19% 0.00% 0.00% 0.00% 0.00%
0.76%
B. PEKERJAAN STRUKTUR ATAP 0.00% 0.13% 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Tambal Sulam Genteng 10% 0.26%

C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.03% 0.03% 0.00% 0.03% 0.03% 0.00% 0.00% 0.00% 0.00%
1 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps 0.13%

II. PEKERJAAN PELAPIS LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.69% 0.69% 0.69% 0.00% 0.69% 0.69% 0.69% 0.00%
4.14%
III. PEKERJAAN KUSEN PINTU DAN ASSESORIES 0.00% 0.00% 0.00% 0.00% 1.19% 1.19% 1.19% 1.19% 1.19% 1.19% 0.00%
7.14%
IV. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.00% 0.18% 0.00% 0.18% 0.18% 0.18% 0.00% 0.00%
0.73%
V. PEKERJAAN PENGECATAN 0.00% 0.00% 0.74% 0.74% 0.74% 0.74% 0.00% 0.74% 0.74% 0.74% 0.74%
5.90% 0.29% 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
D. PEKERJAAN MEP
I. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.12% 0.00% 0.00% 0.00% 0.00% 0.12% 0.12%
ARMATURE, STOP KONTAK DAN INSTAL
0.36%
PEMELIHARAAN ASRAMA PUTRA 3
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.39% 0.39% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.78% 0.00% 0.40% 0.00% 0.00% 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN STRUKTUR 0.00% 0.00% 0.24% 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.47% 0.00% 0.00% 0.00% 0.00% 0.47% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.51% 0.00% 0.00% 0.00% 0.00%
1.54% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.00% 0.75% 0.75% 0.75% 0.75% 0.75% 0.00% 0.00% 0.00%
3.76% 2.74% 0.91% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.00% 0.29% 0.29% 0.29% 0.29% 0.00% 0.00% 0.00%
1.17%
VI. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.00% 0.00% 1.17% 1.17% 1.17% 1.17% 1.17% 0.00%
5.87%
VII.PEKERJAAN KUSEN PINTU 0.00% 0.00% 0.00% 0.00% 1.94% 1.94% 1.94% 1.94% 1.94% 1.94% 0.00%
11.66%
VIII.PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.62% 0.62% 0.62% 0.62%
2.47%
IX. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.07% 0.07% 0.07% 0.00%
0.20%
X. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.36% 0.36% 0.36%
1.07%
PEMELIHARAAN ASRAMA PUTRI 1 & 2
A ASRAMA PUTRI 1
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.10% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi, Pembongkaran Plafond Teras 0.20% 0.10%

II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00% 0.00% 0.86% 0.86% 0.86% 0.86% 0.00% 0.00% 0.00% 0.00% 0.00%
3.43% 0.90% 1.47% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.64% 0.64% 0.64% 0.64% 0.00% 0.00% 0.00% 0.00% 0.00%
2.54%
IV. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.42% 0.42% 0.42% 0.42% 0.00% 0.00% 0.00% 0.00%
1.67% 0.14% 0.30% 0.97% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.95% 0.95% 0.95% 0.00% 0.00% 0.00% 0.00%
2.84%
VI. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.79% 0.79% 0.79% 0.00% 0.00% 0.00% 0.00%
2.36%
VII.PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.01% 0.01% 0.01% 0.00% 0.00% 0.00% 0.00%
1 Pasang Instalasi Listrik Lama 0.03%

PEMELIHARAAN ASRAMA PUTRI 1 & 2


B GEDUNG ASRAMA PUTRI 2
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.15% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembongkaran Kusen & Keramik KM 0.15%

II. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.51% 0.00% 0.00%
1.54%
III. PEKERJAAN KUSEN PINTU 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.00%
1 Pekerjaan Pintu P2 1.01%

IV. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.91% 0.91% 0.91% 0.91%
3.62%
V. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.61% 0.61% 0.61%
1.82%
PEMELIHARAAN AKSESIBILITAS/SELASAR
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.29% 0.29% 0.29% 0.29% 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.45% 0.42% 0.49% 0.32%
B. PEKERJAAN STRUKTUR 0.00% 0.00% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87%
25.81% 0.38% 1.01% 6.71%
C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.23% 0.23% 0.00%
0.46%
II. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.16%
1 Pengecatan kolom 0.16%

D. 'PEKERJAAN MEP
I. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.46% 0.46% 0.46% 0.00%
1.37%
SIMK3 0.00% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10%
1.15% 0.21%
100.00%
RENCANA KEMAJUAN MINGGUAN 1.07% 1.20% 5.89% 7.62% 13.33% 14.14% 12.06% 12.49% 13.15% 12.57% 6.47%
REALISASI MINGGUAN 1.30% 2.44% 7.03% 3.94% 3.95% 0.00%
RENCANA KEMAJUAN MINGGUAN KOMULATIF 1.07% 2.27% 8.16% 15.78% 29.11% 43.25% 55.31% 67.81% 80.95% 93.53% 100.00%
REALISASI MINGGUAN KOMULATIF 1.30% 3.74% 10.77% 14.71% 18.66%
KEMAJUAN PEKERJAAN 0.23% 1.46% 2.61% -1.07% -10.45% -43.25%

Pasuruan, 01 November 2021


Mengetahui : Mengetahui, Diperiksa Oleh : Dibuat Oleh :
Pejabat Pembuat Komitmen (PPK) Konsultan Pengawas Konsultan Pengawas Konsultan Pengawas
Dinas Sosial PT. MERBABU ARDICON PT. MERBABU ARDICON PT. MERBABU ARDICON
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
YUSMANU, S.ST. RONI PRAYITNO, ST. FAISOL ABDULLAH FAISOL ABDULLAH
NIP. 19680831 199201 1 001 TEAM LEADER PENGAWAS LAPANGAN TENAGA AHLI
SCHEDULE PROGRES KEMAJUAN
KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI Minggu Ke : 6
SUB PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL Periode : 02 Nov s/d 08 November 2021
LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN Konsultan Pengawas : PT. MERBABU ARDICON
TAHUN : 2021 Kontraktor Pelaksana : CV. SINAR PUTRA MULYA

BOBOT JANGKA WAKTU PELAKSANAAN 75 HARI KALENDER


NO. URAIAN PEKERJAAN % M-01 M-02 M-03 M-04 M-05 M-06 M-07 M-08 M-09 M-10 M-11 KET
H 1-7 H 8-14 H 15-21 H 22-28 H 29-35 H 36-42 H 43-49 H 50-56 H 57-63 H 64-70 H 71-75
PEMELIHARAAN ASRAMA PUTRA 1 DAN 2
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.19% 0.19% 0.00% 0.00% 0.00% 0.19% 0.19% 0.00% 0.00% 0.00% 0.00%
0.76%
B. PEKERJAAN STRUKTUR ATAP 0.00% 0.13% 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Tambal Sulam Genteng 10% 0.26%

C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.03% 0.03% 0.00% 0.03% 0.03% 0.00% 0.00% 0.00% 0.00%
1 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps 0.13%

II. PEKERJAAN PELAPIS LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.69% 0.69% 0.69% 0.00% 0.69% 0.69% 0.69% 0.00%
4.14%
III. PEKERJAAN KUSEN PINTU DAN ASSESORIES 0.00% 0.00% 0.00% 0.00% 1.19% 1.19% 1.19% 1.19% 1.19% 1.19% 0.00%
7.14%
IV. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.00% 0.18% 0.00% 0.18% 0.18% 0.18% 0.00% 0.00%
0.73%
V. PEKERJAAN PENGECATAN 0.00% 0.00% 0.74% 0.74% 0.74% 0.74% 0.00% 0.74% 0.74% 0.74% 0.74%
5.90% 0.29% 0.29% 0.00% 0.00% 0.00% 0.29% 0.00% 0.00% 0.00% 0.00% 0.00%
D. PEKERJAAN MEP
I. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.12% 0.00% 0.00% 0.00% 0.00% 0.12% 0.12%
0.36%
PEMELIHARAAN ASRAMA PUTRA 3
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.39% 0.39% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.78% 0.00% 0.40% 0.00% 0.00% 0.13% 0.13% 0.00% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN STRUKTUR 0.00% 0.00% 0.24% 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.47% 0.00% 0.00% 0.00% 0.00% 0.47% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.51% 0.00% 0.00% 0.00% 0.00%
1.54% 0.00% 0.00% 0.00% 0.00% 0.00% 0.24% 0.00% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.00% 0.75% 0.75% 0.75% 0.75% 0.75% 0.00% 0.00% 0.00%
3.76% 2.74% 0.91% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.00% 0.29% 0.29% 0.29% 0.29% 0.00% 0.00% 0.00%
1.17%
VI. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.00% 0.00% 1.17% 1.17% 1.17% 1.17% 1.17% 0.00%
5.87%
VII.PEKERJAAN KUSEN PINTU 0.00% 0.00% 0.00% 0.00% 1.94% 1.94% 1.94% 1.94% 1.94% 1.94% 0.00%
11.66%
VIII.PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.62% 0.62% 0.62% 0.62%
2.47%
IX. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.07% 0.07% 0.07% 0.00%
0.20%
X. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.36% 0.36% 0.36%
1.07%
PEMELIHARAAN ASRAMA PUTRI 1 & 2
A ASRAMA PUTRI 1
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.10% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi, Pembongkaran Plafond Teras 0.20% 0.10%

II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00% 0.00% 0.86% 0.86% 0.86% 0.86% 0.00% 0.00% 0.00% 0.00% 0.00%
3.43% 0.90% 1.47% 0.29% 0.00% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.64% 0.64% 0.64% 0.64% 0.00% 0.00% 0.00% 0.00% 0.00%
2.54%
IV. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.42% 0.42% 0.42% 0.42% 0.00% 0.00% 0.00% 0.00%
1.67% 0.14% 0.30% 0.97% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.95% 0.95% 0.95% 0.00% 0.00% 0.00% 0.00%
2.84% 0.00% 0.00% 0.00% 0.00% 0.00% 0.15% 0.00% 0.00% 0.00% 0.00% 0.00%
VI. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.79% 0.79% 0.79% 0.00% 0.00% 0.00% 0.00%
2.36%
VII.PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.01% 0.01% 0.01% 0.00% 0.00% 0.00% 0.00%
1 Pasang Instalasi Listrik Lama 0.03%

PEMELIHARAAN ASRAMA PUTRI 1 & 2


B GEDUNG ASRAMA PUTRI 2
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.15% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembongkaran Kusen & Keramik KM 0.15%

II. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.51% 0.00% 0.00%
1.54%
III. PEKERJAAN KUSEN PINTU 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.00%
1 Pekerjaan Pintu P2 1.01%

IV. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.91% 0.91% 0.91% 0.91%
3.62% 0.00% 0.00% 0.00% 0.00% 0.00% 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.61% 0.61% 0.61%
1.82%
PEMELIHARAAN AKSESIBILITAS/SELASAR
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.29% 0.29% 0.29% 0.29% 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.45% 0.42% 0.49% 0.32%
B. PEKERJAAN STRUKTUR 0.00% 0.00% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87%
25.81% 0.38% 1.01% 6.71%
C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.23% 0.23% 0.00%
0.46%
II. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.16%
1 Pengecatan kolom 0.16%

D. 'PEKERJAAN MEP
I. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.46% 0.46% 0.46% 0.00%
1.37%
SIMK3 0.00% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10%
1.15% 0.21% 0.00% 0.00% 0.00% 0.00% 0.40% 0.00% 0.00% 0.00% 0.00% 0.00%
100.00%
RENCANA KEMAJUAN MINGGUAN 1.07% 1.20% 5.89% 7.62% 13.33% 14.14% 12.06% 12.49% 13.15% 12.57% 6.47%
REALISASI MINGGUAN 1.30% 2.44% 7.03% 3.94% 3.95% 1.64%
RENCANA KEMAJUAN MINGGUAN KOMULATIF 1.07% 2.27% 8.16% 15.78% 29.11% 43.25% 55.31% 67.81% 80.95% 93.53% 100.00%
REALISASI MINGGUAN KOMULATIF 1.30% 3.74% 10.77% 14.71% 18.66% 20.30%
KEMAJUAN PEKERJAAN 0.23% 1.46% 2.61% -1.07% -10.45% -22.95%

Pasuruan, 8 November 2021


Mengetahui : Mengetahui, Diperiksa Oleh : Dibuat Oleh :
Pejabat Pembuat Komitmen (PPK) Konsultan Pengawas Konsultan Pengawas Konsultan Pengawas
Dinas Sosial PT. MERBABU ARDICON PT. MERBABU ARDICON PT. MERBABU ARDICON
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
YUSMANU, S.ST. RONI PRAYITNO, ST. FAISOL ABDULLAH FAISOL ABDULLAH
NIP. 19680831 199201 1 001 TEAM LEADER PENGAWAS LAPANGAN TENAGA AHLI
SCHEDULE PROGRES KEMAJUAN
KEGIATAN : REHABILITASI SOSIAL DASAR PENYANDANG DISABILITAS TERLANTAR DI DALAM PANTI Minggu Ke : 6
SUB PEKERJAAN : PEMELIHARAAN KANTOR REHABILITASI SOSIAL Periode : 09 Nov s/d 015 November 2021
LOKASI : JALAN RA.KARTINI NO. 292, BANGIL, PASURUAN Konsultan Pengawas : PT. MERBABU ARDICON
TAHUN : 2021 Kontraktor Pelaksana : CV. SINAR PUTRA MULYA

BOBOT JANGKA WAKTU PELAKSANAAN 75 HARI KALENDER


NO. URAIAN PEKERJAAN % M-01 M-02 M-03 M-04 M-05 M-06 M-07 M-08 M-09 M-10 M-11 KET
H 1-7 H 8-14 H 15-21 H 22-28 H 29-35 H 36-42 H 43-49 H 50-56 H 57-63 H 64-70 H 71-75
PEMELIHARAAN ASRAMA PUTRA 1 DAN 2
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.19% 0.19% 0.00% 0.00% 0.00% 0.19% 0.19% 0.00% 0.00% 0.00% 0.00%
1 Persiapan & Pembersihan Lokasi Pekerjaan 0.06% 0.00% 0.02%
2 Pembongkaran Dinding Bak Toilet 0.10% 0.08%
3 Pembongkaran Keramik 0.06% 0.02%
4 Pembongkaran Kusen 0.48% 0.00%
5 Pembongkaran Plafond + Rangka Plafond 0.06% 0.00%
0.76% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.11% 0.00% 0.00% 0.00% 0.00%
B. PEKERJAAN STRUKTUR ATAP 0.00% 0.13% 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Tambal Sulam Genteng 10% 0.26%

C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.03% 0.03% 0.00% 0.03% 0.03% 0.00% 0.00% 0.00% 0.00%
1 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps 0.13%

II. PEKERJAAN PELAPIS LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.69% 0.69% 0.69% 0.00% 0.69% 0.69% 0.69% 0.00%
4.14%
III. PEKERJAAN KUSEN PINTU DAN ASSESORIES 0.00% 0.00% 0.00% 0.00% 1.19% 1.19% 1.19% 1.19% 1.19% 1.19% 0.00%
7.14%
IV. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.00% 0.18% 0.00% 0.18% 0.18% 0.18% 0.00% 0.00%
0.73%
V. PEKERJAAN PENGECATAN 0.00% 0.00% 0.74% 0.74% 0.74% 0.74% 0.00% 0.74% 0.74% 0.74% 0.74%
5.90% 0.29% 0.29% 0.00% 0.00% 0.00% 0.29% 0.50% 0.00% 0.00% 0.00% 0.00%
D. PEKERJAAN MEP
I. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.12% 0.00% 0.00% 0.00% 0.00% 0.12% 0.12%
0.36%
PEMELIHARAAN ASRAMA PUTRA 3
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.39% 0.39% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.78% 0.00% 0.40% 0.00% 0.00% 0.13% 0.13% 0.06% 0.00% 0.00% 0.00% 0.00%
II. PEKERJAAN STRUKTUR 0.00% 0.00% 0.24% 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.47% 0.00% 0.00% 0.00% 0.00% 0.47% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.51% 0.00% 0.00% 0.00% 0.00%
1.54% 0.00% 0.00% 0.00% 0.00% 0.00% 0.24% 0.00% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.00% 0.75% 0.75% 0.75% 0.75% 0.75% 0.00% 0.00% 0.00%
3.76% 2.74% 0.91% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.00% 0.29% 0.29% 0.29% 0.29% 0.00% 0.00% 0.00%
1.17% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.69% 0.00% 0.00% 0.00% 0.00%
VI. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.00% 0.00% 1.17% 1.17% 1.17% 1.17% 1.17% 0.00%
5.87%
VII.PEKERJAAN KUSEN PINTU 0.00% 0.00% 0.00% 0.00% 1.94% 1.94% 1.94% 1.94% 1.94% 1.94% 0.00%
11.66%
VIII.PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.62% 0.62% 0.62% 0.62%
2.47%
IX. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.07% 0.07% 0.07% 0.00%
0.20%
X. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.36% 0.36% 0.36%
1.07%
PEMELIHARAAN ASRAMA PUTRI 1 & 2
A ASRAMA PUTRI 1
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.10% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembersihan Lokasi, Pembongkaran Plafond Teras 0.20% 0.10%

II. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00% 0.00% 0.86% 0.86% 0.86% 0.86% 0.00% 0.00% 0.00% 0.00% 0.00%
3.43% 0.90% 1.47% 0.29% 0.00% 0.00% 0.00% 0.00% 0.00%
III. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.64% 0.64% 0.64% 0.64% 0.00% 0.00% 0.00% 0.00% 0.00%
2.54% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.58% 0.00% 0.00% 0.00% 0.00%
IV. PEKERJAAN PLAFOND 0.00% 0.00% 0.00% 0.42% 0.42% 0.42% 0.42% 0.00% 0.00% 0.00% 0.00%
1.67% 0.14% 0.30% 0.97% 0.00% 0.13% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.95% 0.95% 0.95% 0.00% 0.00% 0.00% 0.00%
2.84% 0.00% 0.00% 0.00% 0.00% 0.00% 0.15% 0.00% 0.00% 0.00% 0.00% 0.00%
VI. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.79% 0.79% 0.79% 0.00% 0.00% 0.00% 0.00%
2.36%
VII.PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.01% 0.01% 0.01% 0.00% 0.00% 0.00% 0.00%
1 Pasang Instalasi Listrik Lama 0.03%

PEMELIHARAAN ASRAMA PUTRI 1 & 2


B GEDUNG ASRAMA PUTRI 2
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.15% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pembongkaran Kusen & Keramik KM 0.15%

II. PEKERJAAN PENUTUP LANTAI DAN DINDING 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.51% 0.00% 0.00%
1.54%
III. PEKERJAAN KUSEN PINTU 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.51% 0.51% 0.00%
1 Pekerjaan Pintu P2 1.01%

IV. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.91% 0.91% 0.91% 0.91%
3.62% 0.00% 0.00% 0.00% 0.00% 0.00% 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
V. PEKERJAAN MEKANIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.61% 0.61% 0.61%
1.82%
PEMELIHARAAN AKSESIBILITAS/SELASAR
A. PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PEMBERSIHAN LOKASI DAN PERSIAPAN 0.29% 0.29% 0.29% 0.29% 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.45% 0.42% 0.49% 0.32%
B. PEKERJAAN STRUKTUR 0.00% 0.00% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87% 2.87%
25.81% 0.38% 1.01% 6.71% 0.00% 0.00% 0.00% 0.50% 0.00% 0.00% 0.00% 0.00%
C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN PASANGAN DAN PLESTERAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.23% 0.23% 0.00%
0.46%
II. PEKERJAAN PENGECATAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.16%
1 Pengecatan kolom 0.16%

D. PEKERJAAN MEP
I. PEKERJAAN ELEKTRIKAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.46% 0.46% 0.46% 0.00%
1.37%
SIMK3 0.00% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10%
1.15% 0.21% 0.00% 0.00% 0.00% 0.00% 0.40% 0.17% 0.00% 0.00% 0.00% 0.00%
100.00%
RENCANA KEMAJUAN MINGGUAN 1.07% 1.20% 5.89% 7.62% 13.33% 14.14% 12.06% 12.49% 13.15% 12.57% 6.47%
REALISASI MINGGUAN 1.30% 2.44% 7.03% 3.94% 3.95% 1.64% 3.73%
RENCANA KEMAJUAN MINGGUAN KOMULATIF 1.07% 2.27% 8.16% 15.78% 29.11% 43.25% 55.31% 67.81% 80.95% 93.53% 100.00%
REALISASI MINGGUAN KOMULATIF 1.30% 3.74% 10.77% 14.71% 18.66% 20.30% 24.03%
KEMAJUAN PEKERJAAN 0.23% 1.46% 2.61% -1.07% -10.45% -22.95% -31.28%

Pasuruan, 15 November 2021


Mengetahui : Mengetahui, Diperiksa Oleh : Dibuat Oleh :
Pejabat Pembuat Komitmen (PPK) Konsultan Pengawas Konsultan Pengawas Konsultan Pengawas
Dinas Sosial PT. MERBABU ARDICON PT. MERBABU ARDICON PT. MERBABU ARDICON
UPT. Rehabilitasi Sosial Bina Daksa Pasuruan 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
YUSMANU, S.ST. RONI PRAYITNO, ST. FAISOL ABDULLAH FAISOL ABDULLAH