SHOP DRAWING

NAMA PROYEK / PEKERJAAN


Pekerjaan Design and Build Penyiapan
Infrastruktur Dasar dan Fasilitas Umum
Penunjang Pariwisata di Pelabuhan
Benoa (Pekerjaan Jalan, Saluran,
Pedestrian dan Lansekap)
PEMILIK PROYEK

Beyond Port of Indonesia

No Deskripsi PERSETUJUAN TANGGAL

1. Disetujui

2. Direvisi
2%
+3.900

3. Ditolak
+3.900
2%

+3.900
PIMPINAN PROYEK

+3.900
2% PERSETUJUAN TANGGAL
INVESTASI BMTH

+3.900
2%

+3.900
2%

+3.900
2%
2%
ANDI MAWARTA
2%

+3.900

+3.900
2%

+3.900
2% MANAGER PROYEK A
PERSETUJUAN TANGGAL
2%
INVESTASI BMTH

HERU SUBEKTI

MANAGER PROYEK B
0+975

0+950

0+875

0+850

0+775
1+000

0+925

0+900

0+825

0+800
+3.900
PERSETUJUAN TANGGAL
2% INVESTASI BMTH
+3.900

2% 2%

2% 2%
2%
ANDREY YUDHA

2%
KONSULTAN MK

+3.850
+3.550
2% No Deskripsi PERSETUJUAN TANGGAL

+3.550
1. Disetujui

+3.700
2%
2%
2. Direvisi

+3.850
3. Ditolak
+4.100
2%

2% TEAM LEADER PERSETUJUAN TANGGAL


+4.100

0+000"
+4.100

I NYOMAN WIRAJAYA
+4.200

2%

TENAGA AHLI
2% PERSETUJUAN TANGGAL
2% STRUKTUR

RUDI HARIYANTO
2% 2%

0+025"
KONTRAKTOR PELAKSANA

PROJECT MANAGER PERSETUJUAN TANGGAL

DIK AMARTA, ST

SEM DRAFTER

HASPAN LIMRAH N. M. AMIRUDIN

JUDUL GAMBAR

LAYOUT PERKERASAN

SKALA

LAYOUT PERKERASAN STA 0+800 - 1+000 1 : 800


SKALA 1 : 800
JML LEMBAR NO. LEMBAR NO. REV KODE GBR

A1-05 R.5 STR