Anda di halaman 1dari 56

LABORATORIUM SISTEM MANUFAKTUR

PROGRAM STUDI TEKNIK INDUSTRI


UNIVERSITAS HASANUDDIN

BAB III
PENGUMPULAN & PENGOLAHAN DATA

1.1. Pengumpulan Data


Tabel 3.1. Data kebutuhan material
Periode
Material
1 2 3 4 5 6 7 8 9 10 11 12
Aki 40 A 22 25 20 19 21 37 21 17 0 21 22 23
Gear Vixion 27 35 31 22 20 35 21 26 50 22 13 0
Oli Matic 45 52 50 67 53 38 27 0 72 68 54 45

Tabel 3.2 Biaya Pesan / Ordering Cost Setiap Material


Material Biaya

Aki 40 A 15.000

Gear Vixion 9.000

Oli Matic 7.000

Tabel 3.3 Biaya Simpan / Holding Cost Setiap Material


Material Biaya

Aki 40 A 250

Gear Vixion 190

Oli Matic 175

Tabel 3.4 Waktu Operasi Setiap Material


Material Waktu (M) Waktu Kerja

Aki 40 A 4 8.500

Gear Vixion 3 8.500

Oli Matic 2 8.500

Utilitas = 85%
Efisiensi = 85%

1.2. Pengolahan Data

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

1.2.1. MRP
a. Material Oli Matic
1. Fixed Order Quantity (FOQ)
Tabel 3.4 MRP dengan Metode FOQ
PERIODE TOTAL
FOQ
1 2 3 4 5 6 7 8 9 10 11 12  
GR 45 52 50 67 53 38 27 0 72 68 54 45 571
SR 0 0 0 0 0 0 0 0 0 0 0 0 0
13 24 24 16 10
241 189 72 19 267 46 1 1722
POH 9 0 0 8 0
NR
PORE
286 286 572
C
POREL 286 286 572

TC=HC +OC
TC=( 175 ) ( 1.722 )+ ( 2 ) ( 7.000 )
TC=301.350+14.000
TC=315.350

2. Economic Order Quantity (EOQ)


2 xAxD
EOQ=
√ H
2 ( 7.000 )( 571 )
EOQ=
√ 175
EOQ=213,72≈ 214

EOQ Periode

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

1 2 3 4 5 6 7 8 9 10 11 12 Total
GR 45 52 50 67 53 38 27 0 72 68 54 45 571
SR 0 0 0 0 0 0 0 0 0 0 0 0 0
POH 169 117 67 0 161 123 96 96 24 170 116 71 1210
NR
POREC 214 214 214 642
POREL 214 214 214 642
Tabel 3.5 MRP dengan Metode EOQ

TC=HC +OC
TC=( 175 ) ( 1.210 )+ ( 3 )( 7.000 )
TC=211.750+21.000
TC=¿232.750

3. Lot For Lot (LFL)


Tabel 3.6 MRP dengan Metode LFL
Periode Total
LFL
1 2 3 4 5 6 7 8 9 10 11 12
GR 45 52 50 67 53 38 27 0 72 68 54 45 571
SR 0 0 0 0 0 0 0 0 0 0 0 0 0
POH 0 0 0 0 0 0 0 0 0 0 0 0 0
NR
PORE
45 52 50 67 53 38 27 0 72 68 54 45 571
C
POREL 45 52 50 67 53 38 27 0 72 68 54 45 571

TC=HC +OC
TC=( 0 ) ( 0 ) + ( 12 ) (7.000)
TC=84.000

4. Fixed Period Requirements (FPR)

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

Tabel 3.7 MRP dengan Metode FPR


Periode Total
FPR
1 2 3 4 5 6 7 8 9 10 11 12
GR 45 52 50 67 53 38 27 0 72 68 54 45 571
SR 0 0 0 0 0 0 0 0 0 0 0 0 0
POH 102 50 0 91 38 0 72 72 0 99 45 0 569
NR
PORE 15
147 99 167 571
C 8
15
POREL 147         99     167     571
8

TC=HC +OC
TC=( 175 ) ( 569 )+ ( 4 ) (7.000)
TC=99.575+28.000
TC=127.575

5. Period Order Quantity (POQ)


EOQ 214
EOI= = =4,49 ≈ 4
R 47,58
Tabel 3.8 MRP dengan Metode POQ
Periode Total
POQ
1 2 3 4 5 6 7 8 9 10 11 12
GR 45 52 50 67 53 38 27 0 72 68 54 45
SR 0 0 0 0 0 0 0 0 0 0 0 0 0
POH 169 117 67 0 65 27 0 0 167 99 45 0 756
NR
POREC 214 118 239 571
POREL 214       118       239       571

TC=HC +OC
TC=(756) ( 175 ) + ( 3 ) (7.000)
TC=132.300+21.000
TC=153.300

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

6. Least Unit Cost (LUC)


Tabel 3.9 Perhitungan dengan Metode LUC
Kumulatif Lama Carrying
Periode Biaya Pesan TIC Harga/Unit
Kebutuhan Disimpan Cost
1 45 0 0 7000 7000 155.56
1-2 97 1 9100 7000 16100 165.98
2 52 0 0 7000 7000 134.62
2-3 102 1 8750 7000 15750 154.41
3 50 0 0 7000 7000 140
3-4 117 1 11725 7000 18725 160.04
4 67 0 0 7000 7000 104.48
4-5 120 1 9275 7000 16275 135.63
5 53 0 0 7000 7000 132.08
5-6 91 1 6650 7000 13650 150
6 38 0 0 7000 7000 184.21
6-7 65 1 4725 7000 11725 180.38
6-8 65 2 4725 7000 11725 180.38
8 0 0 0 7000 7000 0
8-9 72 1 12600 7000 19600 272.22
9 72 0 0 7000 7000 97.22
9-10 140 1 11900 7000 18900 135
10 68 0 0 7000 7000 102.94
10-11 122 1 9450 7000 16450 134.84
11 54 0 0 7000 7000 129.63
11-12 99 1 7875 7000 14875 150.25
1 45 0 0 7000 7000 155.56

Tabel 3.10 MRP dengan Metode LUC


Periode Total
LUC
1 2 3 4 5 6 7 8 9 10 11 12
GR 45 52 50 67 53 38 27 0 72 68 54 45 571
SR 0 0 0 0 0 0 0 0 0 0 0 0 0
POH 0 0 0 0 0 27 0 0 0 0 45 0 72
NR
PORE
45 52 50 67 53 65 0 0 72 68 99 0 571
C
POREL 45 52 50 67 53 65 0 0 72 68 99 0 571

TC=HC +OC
TC=( 175 ) ( 72 )+ ( 9 ) (7.000)
TC=75.600

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

7. Least Total Cost (LTC)


OC 7000
EPP= = =4
HC 175
Tabel 3.11 Perhitungan dengan Metode LTC
Periode Kebutuhan Lama Disimpan HC Kumulatif HC Total Unit
1 45 0 0 0 45
1-2 52 1 9.100 9.100 97
2 52 0 0 0 52
2-3 50 1 8.750 8.750 102
3 50 0 0 0 50
3-4 67 1 11.725 11.725 117
4 67 0 0 0 67
4-5 53 1 9.275 9.275 120
5 53 0 0 0 53
5-6 38 1 6.650 6.650 91
6 38 0 0 0 38
6-7 27 1 4.725 4.725 65
7 27 0 0 0 27
7-8 0 1 0 0 27
7-9 72 2 25.200 25.200 99
9 72 0 0 0 72
9-10 68 1 11.900 11.900 140
10 68 0 0 0 68
10-11 54 1 9.450 9.450 122
11 54 0 0 0 54
11-12 45 1 7.875 7.875 99
12 45 0 0 0 45

Tabel 3.12 MRP dengan Metode LTC


Periode Total
LTC
1 2 3 4 5 6 7 8 9 10 11 12
GR 45 52 50 67 53 38 27 0 72 68 54 45 571
SR 0 0 0 0 0 0 0 0 0 0 0 0 0
POH 0 0 0 0 0 0 0 0 0 0 0 0 0
NR
POREC 45 52 50 67 53 38 27 0 72 68 54 45 571
POREL 45 52 50 67 53 38 27 0 72 68 54 45 571

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

TC=HC +OC
TC=(175) ( 0 ) + ( 11 ) (7000)
TC=0+77.000
TC=77.000

8. Part Period Balancing (PPB)


OC 7.000
EPP= = =40
HC 175
Tabel 3.13 Perhitungan dengan Metode PPB
Periode Kebutuhan Lama Disimpan Periode Akumulasi Periode
1 45 0 0 0
2 52 1 52 52
2 52 0 0 0
3 50 0 0 0
4 67 1 67 67
4 67 0 0 0
5 53 1 53 53
5 53 0 0 0
6 38 1 38 38
7 27 2 54 92
7 27 0 0 0
8 0 1 0 0
9 72 2 144 144
9 72 0 0 0
10 68 1 68 68
10 68 0 0 0
11 54 1 54 54
11 54 0 0 0
12 45 1 45 45
12 45 0 0 0

Tabel 3.14 MRP dengan Metode PPB

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

Periode Total
PPB
1 2 3 4 5 6 7 8 9 10 11 12
GR 45 52 50 67 53 38 27 0 72 68 54 45 571
SR 0 0 0 0 0 0 0 0 0 0 0 0 0
POH 0 0 0 0 38 0 0 0 0 0 0 0 38
NR
PORE
45 52 50 67 91 0 27 0 72 68 54 45 571
C
POREL 45 52 50 67 91 0 27 0 72 68 54 45 571

TC=HC +OC
TC=(175) ( 38 ) + ( 11 ) (7.000)
TC=6.650+77.000
TC=83.650

9. Silver Meal Algoritm (SMA)


1
Km= ¿
m
1
K 1= {7.000+ (175 X 0 × 45 ) }
1
¿ 7.000
1
K 2= {7.000+ ( 175 X 0× 45 ) + ( 175 X 1 ×52 ) }
2
¿ 11550
1
K 2= {7.000+ ( 175 X 0 × 52 ) }
1
¿ 7.000
1
K 3= {7.000+ ( 175 X 0× 52 )+ ( 175 X 1 ×50 ) }
2
¿ 7.875
1
K 3= {7.000+ ( 175 X 0× 50 ) }
1
¿ 7.000
1
K 4 = {7.000+ ( 175 X 0 ×50 )+ ( 175 X 1 ×67 ) }
2
¿ 9.362,5

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

1
K 4 = {7.000+ ( 175 X 0 ×67 ) }
1
¿ 7.000
1
K 5= {7.000+ ( 175 X 0× 67 ) + ( 175 X 1× 53 ) }
2
¿ 8.137,5
1
K 5= {7.000+ ( 175 X 0× 53 ) }
1
¿ 7.000
1
K 6 = {7.000+ ( 175 X 0 ×53 ) + ( 175 X 1× 38 ) }
2
¿ 6.825

1
K 7= {7.000+ ( 175 X 0× 53 ) + ( 175 X 1× 38 ) + ( 175 X 2× 27 ) }
2
¿ 7.700
1
K 7= {7.000+ ( 175 X 0× 27 ) }
1
¿ 7.000
1
K 8= {7.000+ ( 175 X 0× 27 ) + ( 175 X 1× 0 ) }
2
¿ 3.500
1
K 9 = {7.000+ ( 175 X 0 ×27 ) + ( 175 X 1 ×0 ) + ( 175 X 2 ×72 ) }
2
¿ 10.733,33
1
K 9 = {7.000+ ( 175 X 0× 72 ) }
1
¿ 7.000
1
K 10= {7.000+ (175 X 0 × 72 )+ (175 X 1 ×68 ) }
2
¿ 9.450
1
K 10= {7.000+ (175 X 0 × 68 ) }
1
¿ 7.000

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

1
K 11 = {7.000+ ( 175 X 0 ×68 ) + ( 175 X 1 ×54 ) }
2
¿ 8.225
1
K 11 = {7.000+ ( 175 X 0 ×54 ) }
1
¿ 7.000
1
K 12= {7.000+ ( 175 X 0 ×54 ) + ( 175 X 1× 45 ) }
2
¿ 7.437,5
1
K 12= {7.000+ ( 175 X 0 × 45 ) }
1
¿ 7.000

Tabel 3.15 Perhitungan dengan Metode PPB


Period Biaya Biaya Lama Pembandin
Demand Hasil
e Simpan Pesan Disimpan g
1 45 175 7000 0 1 7000
2 52 175 7000 1 2 11550
2 52 175 7000 0 1 7000
3 50 175 7000 1 2 7875
3 50 175 7000 0 1 7000
4 67 175 7000 1 2 9362.5
4 67 175 7000 0 1 7000
5 53 175 7000 1 2 8137.5
5 53 175 7000 0 1 7000
6 38 175 7000 1 2 6825
7 27 175 7000 2 3 7700
7 27 175 7000 0 1 7000
8 0 175 7000 1 2 3500
9 72 175 7000 2 3 10733.33
9 72 175 7000 0 1 7000
10 68 175 7000 1 2 9450
10 68 175 7000 0 1 7000
11 54 175 7000 1 2 8225
11 54 175 7000 0 1 7000
12 45 175 7000 1 2 7437.5
12 45 175 7000 0 1 7000

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

Tabel 3.16 MRP dengan Metode Silver Meal


Periode Total
SM
1 2 3 4 5 6 7 8 9 10 11 12
GR 45 52 50 67 53 38 27 0 72 68 54 45 571
SR 0 0 0 0 0 0 0 0 0 0 0 0 0
POH 0 0 0 0 38 0 0 0 0 0 0 0 38
NR
PORE
45 52 50 67 91 0 27 0 72 68 54 45 571
C
POREL 45 52 50 67 91 0 27 0 72 68 54 45 571

TC=HC +OC
TC=(175) ( 38 ) + ( 10 ) (7 . 0 00)
TC=6.6 50+70 . 0 00
TC=7 6. 650

10. Algoritm Wagner Whittin (AWW)


Rumus 1
e
Z=A +hp ∑ (Qce−Qci ¿ )¿
i=c

Maka
Z11 =7 . 0 00+175 ( 45−45 )
Z11 =7 . 0 00+0
Z11 =7 . 0 00

Z12=7 . 0 00+175 [ ( 97−45 ) + ( 97−97 ) ]


Z12=7.000+ ¿9100

Z12=16100

Z13=7.000+ 175[ (147−45 ) + ( 147−97 ) + ( 147−147 ) ]


Z13=7.000+ ¿26.600

Z13=33.600

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

Z14 =¿ 7 .0 00+175 ¿¿
+ ( 214−214 ) ¿
Z14 =7.000+61.775
Z14 =68.775

Z15=7 .0 00+175 [ ( 267−45 ) + ( 267−97 ) + ( 267−147 ) + ( 267−214 ) +(267−267)]


Z15=7.000+ 98.875
Z15=105.875

Z16 =7 .0 00+ 175[ (305−45 )+ ( 305−97 )+ ( 305−147 )+ (305−214 )+(305−267)+(305−305)]


Z16 =7.000+132.125
Z16 =139.125

Z17 =7.000+175 ¿
+(332−332)¿
Z17 =7.000+160.475
Z17 =167.475

Z18=7.000+ 175¿
+ ( 332−332 )+(332−332)¿
Z18=7.000+ 160.475
Z18=167.475

Z19=7.000+ 175¿
+ ( 404−332 )+(404−332)+( 404−404)¿
Z19=7.000+ 261.275
Z19=268.275

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

Z110 =7.000+175[ ( 472−45 ) + ( 472−97 )+ ( 472−147 )+ ( 472−214 ) + ( 472−267 ) + ( 472−305 ) + ( 472−33


Z110 =7.000+368.375
Z110 =375.375

Z111=7.000+ 175[ (526−45 ) + ( 526−97 ) + ( 526−147 ) + ( 526−214 ) + ( 526−267 ) + ( 526−305 ) + ( 52


Z111=7.000+ 501.550
Z111=508.550

Z112 =7.000+175[ ( 571−45 ) + ( 571−97 )+ (571−147 ) + ( 571−214 ) + ( 571−267 )+ (571−305 ) + ( 571


Z112 =7.000+549.500
Z112 =556.500

Z22=7.000+ 175[52−52]
Z22=7 . 0 00

Z23=7.000+ 175[ ( 102−52 ) + ( 102−102 ) ]


Z23=7 .0 00+ 8.750
Z23=15.750

Z24 =7 . 0 00+175[ ( 169−52 ) + ( 169−102 ) + ( 169−169 ) ]


Z24 =7.000+32.200
Z24 =39.200

Z25=7 .0 00+175 ¿
+(222−222)¿
Z25=7.000+ 60.025
Z25=67.025
Z26 =7 .0 00+ 175¿

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

+(260−222)+(260−260)¿
Z26 =7.000+118.125
Z26 =125.125

Z27 =7.000+175 ¿
+(287−222)+(287−260)+(287−287)¿
Z27 =7.000+141.750
Z27 =148.750

Z28 =7.000+ 175 ¿


+ ( 287−222 ) + ( 287−260 ) + ( 287−287 )
+(287−287) ¿
Z28 =7.000+ 141.750
Z28 =148.750

Z29=7.000+ 175¿
+ ( 359−222 )+ ( 359−260 ) + ( 359−287 )
+(359−287)+(359−359)¿
Z29=7.000+ 229.950
Z29=236.950

Z210 =7.000+175 ¿
+ ( 427−222 ) + ( 427−260 )+ ( 427−287 )
+(427−287)+( 427−359)+(427−427) ¿
Z210 =7.000+325.150
Z210 =332.150

Z211 =7.000+175 ¿
+ ( 481−222 ) + ( 481−260 ) + ( 481−287 )

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

+(481−287)+(481−359)+(481−481)¿
Z211 =7.000+410.200
Z211 =417.200

Z212 =7.000+175 ¿
+ ( 526−222 ) + ( 526−260 )+ ( 526−287 )
+ ( 526−287 ) + ( 526−359 ) + ( 526−481 )
+(526−526) ¿
Z212 =7.000+ 488.950
Z212 =495.950

Z33=7.000+ 175[ (50−50 ) ]


Z33=7 .0 00+ 0
Z33=7.000

Z34 =7 . 0 00+ 175[ ( 117−50 ) + ( 117−117 )]


Z34 =7.000+11.725
Z34 =18.725

Z35=7 .0 00+175 [ ( 170−50 ) + ( 170−117 ) + ( 170−170 ) ]


Z35=7.000+ 30.275
Z35=37.275

Z36 =7 .0 00+ 175¿


+(208−208)¿
Z36 =7.000+77.525
Z36 =84.525

Z37 =7.000+175 ¿

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

+(235−208)+(235−235) ¿
Z37 =7.000+96.425
Z37 =103.425

Z38=7.000+ 175¿
+(235−208)+(235−235)+(235−235)¿
Z38=7.000+ 96.425
Z38=103.425

Z39=7.000+ 175¿
+ ( 307−208 ) + ( 307−235 ) + ( 307−235 )
+(307−307)¿
Z39=7.000+ 172.025
Z39=179.025

Z310 =7.000+175 ¿
+ ( 375−208 ) + ( 375−235 )+ ( 375−235 )
+(375−307)+(375−375) ¿
Z310 =7.000+255.325
Z310 =262.325

Z311 =7.000+175 ¿
+ ( 429−222 ) + ( 429−260 ) + ( 429−287 )
+(429−287)+( 429−359)+(429−429) ¿
Z311 =7.000+330.925
Z311 =337.925

Z312 =7.000+175 ¿
+ ( 474−222 )+ ( 474−260 ) + ( 474−287 )

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

+(474−287)+( 474−359)+(474−429)
+(474−474)¿
Z312 =7.000+ 401.800
Z312 =408.800

Z 44=7 . 0 00+175[ ( 67−67 ) ]


Z 44=7.000+0
Z 44=7.000

Z 45=7 . 0 00+175[ ( 120−67 )+ (120−120 ) ]


Z 45=7.000+9.275
Z 45=16.275

Z 46=7 . 0 00+175[ ( 158−67 )+ ( 158−120 ) + ( 158−158 ) ]


Z 46=7.000+40.075
Z 46=47.075
Z 47=7.000+175 ¿
+(185−185)¿
Z 47=7.000+54.250
Z 47=61.250

Z 48=7.000+175 ¿
+(185−185)+(185−185)¿
Z 48=7.000+54.250
Z 48=61.250

Z 49=7.000+175 ¿
+(257−185)+(257−185)+ ( 257−257 ) ¿
Z 49=7.000+117.250

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

Z 49=124.250

Z 410 =7.000+ 175¿


+ ( 325−185 ) + ( 325−185 )+ (325−257 )
+(325−325) ¿
Z 410 =7.000+ 188.650
Z 410 =195.650

Z 411=7.000+175 ¿
+ ( 379−185 ) + ( 379−185 ) + ( 379−257 )
+(379−325)+(379−379)¿
Z 411=7.000+245.350
Z 411=252.350

Z 412=7.000+ 175¿
+ ( 424−185 )+ ( 424−185 ) + ( 424−257 )
+(424−325)+( 424−379)¿+(424−424)¿
Z 412=7.000+ 300.475
Z 412=307.475

Z55=7 .0 00+175 [ ( 53−53 ) ]


Z55=7.000+ 0
Z55=7.000

Z56 =7 .0 00+ 175[ ( 91−53 ) + ( 91−91 ) ]


Z56 =7.000+18.375
Z56 =25.375
Z57 =7.000+175[ ( 118−53 )+ ( 118−91 )+ ( 118−118 ) ]

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

Z57 =7.000+27.825
Z57 =34.825

Z58=7.000+ 175¿
+ ( 118−118 ) ¿
Z58=7.000+ 27.825
Z58=34.825

Z59=7.000+ 175¿
+ ( 190−118 ) +(190−190)¿
Z59=7.000+ 78.225
Z59=85.225

Z510 =7.000+175 ¿
+ ( 258−118 ) +(258−190)+ ( 258−258 ) ¿
Z510 =7.000+137.725
Z510 =144.725

Z511 =7.000+175 ¿
+ ( 312−118 ) + ( 312−190 )+ ( 312−258 )
+(312−312)¿
Z511 =7.000+194.425
Z511 =201.425

Z512 =7.000+175 ¿
+ ( 357−118 ) + ( 357−190 ) + ( 357−258 )
+(357−312)+(357−357)¿

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

Z512 =7.000+249.550
Z512 =256.550
Z66 =7 .0 00+ 175[ ( 38−38 ) ]
Z66 =7.000+0
Z66 =7.000

Z67 =7.000+175[ ( 65−38 )+ ( 65−65 ) ]


Z67 =7.000+4725
Z67 =11.725

Z68 =7.000+ 175[ ( 65−38 )+ ( 65−65 ) + ( 65−65 ) ]


Z68 =7.000+ 4.725
Z68 =11.725

Z69=7.000+ 175¿
+ ( 137−137 ) ¿
Z69=7.000+ 42.525
Z69=495.255

Z610 =7.000+175 ¿
+ ( 205−137 ) +( 205−205)¿
Z610 =7.000+ 90.125
Z610 =97.125

Z611 =7.000+175 ¿
+ ( 259−137 ) +(259−205)+ ( 259−259 ) ¿
Z611 =7.000+137.375
Z611 =144.375

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

Z612 =7.000+175 ¿
+ ( 304−137 ) +(304−205)+ ( 304−259 ) ¿
+(304−304)¿
Z612 =7.000+184.625
Z612 =191.625

Z77 =7.000+175[ ( 27−27 ) ]


Z77 =7.000+0
Z77 =7.000

Z78=7.000+ 175[ ( 27−27 )+ ( 27−27 ) ]


Z78=7.000+ 0
Z78=7.000

Z79=7.000+ 175[ ( 99−27 )+ ( 99−27 )+ ( 99−99 ) ]


Z79=7.000+ 25.200
Z79=32.200

Z710 =7.000+175 ¿
+ ( 167−167 ) ¿
Z710 =7.000+60.900
Z710 =67.900

Z711 =7.000+175 ¿
+ ( 221−167 ) +(221−221) ¿
Z711 =7.000+98.700
Z711 =105.700

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

Z712 =7.000+175 ¿
+ ( 266−167 ) +(266−221)+ ( 266−259 ) ¿
Z712 =7.000+138.075
Z712 =145.075

Z 88=7.000+175[ ( 0−0 ) ]
Z 88=7.000+0
Z 88=7.000

Z 89=7.000+ 175[ ( 72−0 ) + ( 72−72 )]


Z 89=7.000+ 12.600
Z 89=19.600

Z 810=7.000+175 [ ( 140−0 ) + ( 140−72 )+ ( 140−140 ) ]


Z 810=7.000+36.400
Z 810=43.400
Z 811=7.000+175 ¿
+ ( 194−194 ) ¿
Z 811=7.000+64.750
Z 811=¿71.750

Z 812=7.000+175 ¿
+ ( 239−194 ) +(239−239) ¿
Z 812=7.000+ 96.250
Z 812=103.250

Z 99=7.000+175[ ( 72−72 ) ]
Z 99=7.000+0
Z 99=7.000

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

Z 910=7.000+ 175[ (140−72 ) + ( 140−140 )]


Z 910=7.000+ 11.900
Z 910=18.900

Z 911=7.000+175[ ( 194−72 ) + ( 194−140 ) + ( 194−194 ) ]


Z 911=7.000+30.800
Z 911=37.800

Z 912=7.000+175 ¿
+ ( 239−239 ) ¿
Z 912=7.000+54.425
Z 912=61.425

Z1010 =7.000+175 [ ( 68−68 ) ]


Z1010 =7.000+0
Z1010 =7.000

Z1011 =7.000+175[ ( 122−68 ) + ( 122−122 ) ]


Z1011 =7.000+9.450
Z1011 =16.450

Z1012 =7.000+175[ ( 167−68 ) + ( 167−122 )+ ( 167−167 ) ]


Z1012 =7.000+25.200
Z1012 =32.200

Z1111 =7.000+175[ ( 54−54 ) ]


Z1111 =7.000+0
Z1111 =7.000

Z1112 =7.000+175 [ ( 99−54 )+ ( 99−99 ) ]

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
LABORATORIUM SISTEM MANUFAKTUR
PROGRAM STUDI TEKNIK INDUSTRI
UNIVERSITAS HASANUDDIN

Z1112 =7.000+7.875
Z1112 =14.875

Z1212 =7.000+175[ ( 45−45 ) ]


Z1212 =7.000+0
Z1212 =7.000

MATERIAL REQUIREMENT PLANNING (MRP)


PUTRI PURNAMA UTAMI H.ALI / D221 16 508
Tabel 3.17 Rumus I AWW
1 2 3 4 5 6 7 8 9 10 11 12
1 7.000 16.100 33.600 68.775 105.875 139.125 167.475 167.475 268.275 375.375 508.550 556.500
2 7.000 15.750 39.200 67.025 125.125 148.750 14.750 236.950 332.150 417.200 495.950
3 7.000 18.725 37.275 84.525 103.425 103.425 179.025 262.325 337.925 408.800
4 7.000 16.275 47.045 61.250 62.250 124.250 195.650 252.350 307.475
5 7.000 25.375 34.825 34.825 85.225 144.725 201.425 256.550
6 7.000 11.725 11.725 49.525 97.125 144.375 191.625
7 7.000 7.000 32.200 67.900 105.700 145.075
8 7.000 19.600 43.400 71.750 103.250
9 7.000 18.900 37.800 61.425
10 7.000 16.450 32.200
11 7.000 14.875
12 7.000
Rumus 2
F 1=Z 11 + F 0
F 1=7.000+0
F 1=7.000

F 2=Z 12 + F0 =16.100+0=16.100
Z22 + F 1=7.0 00+7.000=14.000

F 3=Z 13 + F 0=33.600+0=33.600
Z23 + F 1=15.750+7.000=22.750
Z33 + F 2=7 .000+14.000=21.000

F 4=Z 14+ F0 =68.775+0=68.775


Z24 + F 1=39.200+7.000=46 . 200
Z34 + F 2=18.725+14.000=32. 725
Z 44+ F 3=7.000+ 21.000=2 8.000

F 5=Z 15 + F 0=105.875+0=105.875
Z25 + F 1=67.025+7.000=74.025
Z35 + F 2=37.275+14.000=5 1. 275
Z 45+ F 3=16.275+21 .000=37.275
Z55 + F 4=7.0 00+ 28.000=3 5 .0 00

F 6=Z16 + F 0=139.125+0=139.125
Z26 + F 1=125.125+7.000=132. 125
Z36 + F 2=84.525+14.000=98 .525
Z 46+ F 3=47.045+21.000=68 . 045
Z56 + F 4=25.375+ 28.000=53 . 375
Z66 + F 5=7.000+3 5 .0 00=42.000
F 7=Z17 + F 0=167.475+0=167.475
Z27 + F 1=148.750+7.000=155. 75 0
Z37 + F 2=103.425+14.000=117 . 425
Z 47+ F 3=61.250+ 21.000=82 . 250
Z57 + F 4=34.825+ 28.000=62 . 825
Z67 + F 5=11.725+ 35 .0 00=46 . 725
Z77 + F 6=7.000+ 42.000=49 . 0 00

F 8=Z18 + F 0=167.475+0=167.475
Z28 + F 1=14.750+7.000=21.750
Z38 + F 2=103.425+14.000=1 17.425
Z 48+ F 3=62.250+21.000=83.250
Z58 + F 4=34.825+ 28.000=62.825
Z68 + F 5=11.725+ 35 .0 00=46.725
Z78 + F 6=7.000+ 42.000=49.000
Z 88+ F 7=7.000+ 49 .0 00=56.000

F 9=Z19 + F 0=268.275+0=268.275
Z29 + F 1=236.950+7.000=24 3.950
Z39 + F 2=179.025+14.000=193.025
Z 49+ F 3=124.250+21.000=145.250
Z59 + F 4=85.225+ 28.000=113 . 225
Z69 + F 5=49.525+ 35 .0 00=84.525
Z79 + F 6=32.200+ 42.000=74.200
Z 89+ F 7=19.600+ 49. 0 00=68 .6 00
Z 99+ F 8=7.000+56.000=63.000
F 10=Z 110 + F 0=375.375+0=375.375
Z210 + F1 =332.150+7.000=339.150
Z310 + F2 =262.325+14.000=276.325
Z 410 + F 3=195.650+21.000=216.650
Z510 + F 4=144.725+28.000=172.725
Z610 + F5 =97.125+3 5 .0 00=132.125
Z710 + F6 =67.900+ 42.0 00=109.900
Z 810 + F 7=43.400+ 49 .0 00=92.400
Z 910 + F 8=18.900+56.000=74.900
Z1010 + F9 =7.0 00+63.000=70.000

F 11=Z 111+ F 0=508.550+0=508.550


Z211 + F 1=417.200+7.000=424.200
Z311 + F 2=337.925+14.000=351.925
Z 411 + F3=252.350+ 21.000=273.350
Z511 + F 4 =201.425+28.000=229.425
Z611 + F 5=144.375+35 .0 00=179.375
Z711 + F 6=105.700+ 42.0 00=147.700
Z 811+ F 7=71.750+ 49 .0 00=120.750
Z 911+ F 8=37.800+ 56.000=93.800
Z1011 + F 9=16.450+63.000=79.450
Z1111 + F 10=7.000+70.000=77.000

F 12=Z 112 + F 0=556.500+0=556.500


Z212 + F1=495.950+7.000=502.950
Z312 + F2=408.800+14.000=422.800
Z 412 + F 3=307.475+21.000=328.475
Z512 + F 4=256.550+28.000=284.550
Z612 + F5 =191.625+35.0 00=226.625
Z712 + F6 =145.075+42 .0 00=187.075
Z 812 + F7 =103.250+49 .0 00=152.250
Z 912 + F 8=61.425+56.000=117.425
Z1012 + F 9=32.200+ 63.000=95.200
Z1112 + F10=14.875+ 70.000=84.875
Z1212 + F 11 =7.000+77.000=84 .000
FE 1 2 3 4 5 6 7 8 9 10 11 12
1 7.000 16.100 33.600 68.775 105.875 139.125 167.475 167.475 268.275 375.375 508.550 556.500
2 14.000 22.750 46 .200 74.025 132.125 155.750 21.750 243.950 339.150 424.200 502.950
3 21.000 32 .725 51.275 98.525 117.425 117.425 193.025 276.325 351.925 422.800
4 28.000 37.275 68.045 82.250 83.250 145.250 216.650 273.350 328.475
5 35.000 53.375 62.825 62.825 113.225 172.725 229.425 284.550
6 42.000 46.725 46.725 84.525 132.125 179.375 226.625
7 49.000 49.000 74.200 109.900 147.700 187.075
8 56.000 68.600 92.400 120.750 152.250
9 63.000 74.900 93.800 117.425
10 70.000 79.450 95.200
11 77.000 84.875
12 84.000
Tabel 3.17 Rumus II AWW
Rumus 3:
F 12=Z 1212 + F 11=84.000+77.000=161.000
F 11=Z 1111+ F10=77.000+70.000=147.000
F 10=Z 1010 + F 9=70.000+63.000=133.000
F 9=Z 99+ F 8=63.000+56.000=119.000
F 8=Z88 + F 7=56.000+ 49.000=105.000
F 7=Z77 + F 6=49.000+ 42.000=91.000
F 6=Z66 + F 5=42.000+ 35.000=77.000
F 5=Z 55 + F 4=35.000+28.000=63.000
F 4=Z 34+ F3=28.000+ 21.000=49.000
F 3=Z 34 + F 2=21.000+14.000=35.000
F 2=Z 22 + F1=14.000+ 7.000=21.000
F 1=Z 11 + F 0=7.000+ 0=7.000

Tabel 3.18 MRP dengan Metode AWW

Periode Total
SM
1 2 3 4 5 6 7 8 9 10 11 12
GR 45 52 50 67 53 38 27 0 72 68 54 45 571
SR 0 0 0 0 0 0 0 0 0 0 0 0 0
POH 0 0 0 0 0 0 0 0 0 0 0 0 0
NR 0 0 0 0 0 0 0 0 0 0 0 0 0
PORE
45 52 50 67 53 38 27 0 72 68 54 45 571
C
POREL 45 52 50 67 53 38 27 0 72 68 54 45 571

TC=HC +OC
TC=( 0 ) (175)+ ( 571 ) (7.000)
TC=0+159.500
TC=3.997 .000
3.2.2 Capacity Requirement Planning ( CRP )
a. Fixed Order Quantity (FOQ)
1. Perhitungan CRP metode FOQ
Tabel 3.50 Data Perhitungan FOQ
Periode Waktu Operasi
Material
1 2 3 4 5 6 7 8 9 10 11 12
12
Aki 40 A 124 2
4
Gear
Vixion
Oli Matic

a) Periode 1
Tabel 3.51 Data Periode 1
Lot
Material Waktu Operasi Total Waktu
Size
Oli
124 4 496
Matic

b) Periode 6
Tabel 3.52 Data Periode 6
Lot
Material Waktu Operasi Total Waktu
Size
Oli
124 4 496
Matic

2. Perhitungan Work Center Aki 40 A


Tabel 3.56 Perhitungan Work Center AKI 40 A
Periode
Deskripsi
1 2 3 4 5 6 7 8 9 10 11 12
Waktu Tersedia 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500
Tingkat Utilitas 0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85
Tingkat Efisiensi 0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85
Kapasitas Yang Tersedia 6141 6141 6141 6141 6141 6141 6141 6141 6141 6141 6141 6141
Kebutuhan Aktual 496 0 0 0 0 496 0 0 0 0 0 0
Kelebihan & Kekurangan
5645 0 0 0 0 5645 0 0 0 0 0 0
Material
Grafik Work Center Aki 40 A
7000
6000
5000
Kapasitas

4000
3000 Kapasitas Yang
Tersedia
2000
Kebutuhan Aktual
1000
0
1 2 3 4 5 6 7 8 9 101112
Periode

Gambar 3.1 Grafik Work Center Aki 40 A

b. Economic Order Quantity


1. Perhitungan CRP metode EOQ

Tabel 3.59 Data perhitungan EOQ


Periode Waktu Operasi
Material 1
1 2 3 4 5 6 7 8 9 10 12
1
Aki 40 A 173 0 0 0 173 0 0 0 0 173 0 0 4
Gear
Vixion
Oli Matic

a) Periode 1
Tabel 3.60 Data periode 1
Lot
Material Waktu Operasi Total Waktu
Size
Oli
173 4 346
Matic

b) Periode 5
Tabel 3.61 Data periode 12
Lot
Material Waktu Operasi Total Waktu
Size
Oli 173 4 346
Matic

c) Periode 10
Tabel 3.61 Data periode 12
Material Lot Waktu Operasi Total Waktu
Size
Oli
173 4 346
Matic

2) Perhitungan Work Center Aki 40 A


Tabel 3.62 Perhitungan Work Center Aki 40 A
Periode
Deskripsi
1 2 3 4 5 6 7 8 9 10 11 12
Waktu 850 850 850 850 850 850 850
8500 8500 8500 8500 8500
tersedia 0 0 0 0 0 0 0
Tingkat
0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85
Utilitas
Tingkat
0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85 0,85
Efisiensi
Kapasitas 614 6141 614 6141 614 614 6141 614 6141 614 614 6141
yang 1 1 1 1 1 1 1
tersedia
Kebutuhan
346 346 346
Aktual
Kelebihan
& 579 579 579
             
kekuranan 5 5 5
Material

Grafik Work Center Aki 40 A


7000

6000

5000
Kapasitas

4000

3000 Kapasitas yang


tersedia
2000 Kebutuhan Aktual

1000

0
1 2 3 4 5 6 7 8 9 10 11 12
Periode

Gambar 3.4 Grafik Work Center Woven Sewing


c. Lot For Lot (LFL)
1. Perhitungan CRP metode LFL
Tabel 3.65 Data Perhitungan LFL
Periode Waktu Operasi
Material 1 1
1 2 3 4 5 6 7 8 9 11
0 2
2 2 2 2 2 2
Aki 40 A 25 19 37 17 0 22 4
2 0 1 1 1 3
Gear
Vixion
Oli Matic

a) Periode 1
Tabel 3.66 Data periode 1
Waktu
Material Lot Size Total Waktu
Operasi
Oli
22 4 88
Matic

b) Periode 2
Tabel 3.67 Data periode 2
Lot
Material Waktu Operasi Total Waktu
Size
Oli
25 4 100
Matic

c) Periode 3
Tabel 3.68 Data periode 3
Lot
Material Waktu Operasi Total Waktu
Size
Oli
20 4 80
Matic

d) Periode 4
Tabel 3.69 Data periode 4
Lot
Material Waktu Operasi Total Waktu
Size
Oli
19 4 76
Matic

e) Periode 5
Tabel 3.70 Data periode 5
Lot
Material Waktu Operasi Total Waktu
Size
Oli
21 4 84
Matic

f) Periode 6
Tabel 3.71 Data periode 6
Lot
Material Waktu Operasi Total Waktu
Size
Oli
37 4 148
Matic

g) Periode 7
Tabel 3.72 Data periode 7
Lot
Material Waktu Operasi Total Waktu
Size
Oli
21 4 84
Matic

h) Periode 8
Tabel 3.73 Data periode 8
Lot
Material Waktu Operasi Total Waktu
Size
Oli
17 4 68
Matic

i) Periode 9
Tabel 3.74 Data periode 9
Lot
Material Waktu Operasi Total Waktu
Size
Oli
0 4 0
Matic

j) Periode 10
Tabel 3.75 Data periode 10
Material Lot Waktu Operasi Total Waktu
Size
Oli
21 4 84
Matic

k) Periode 11
Tabel 3.76 Data periode 11
Lot
Material Waktu Operasi Total Waktu
Size
Oli
22 4 88
Matic

l) Periode 12
Tabel 3.77 Data periode 12
Lot
Material Waktu Operasi Total Waktu
Size
Oli
23 4 94
Matic

2. Perhitungan Work Center Oli Matic


Tabel 3.78 Perhitungan Work Center Oli Matic
Periode
Deskripsi
1 2 3 4 5 6 7 8 9 10 11 12
850 850 850 850 850 850 850
Waktu Tersedia 8500 8500 8500 8500 8500
0 0 0 0 0 0 0
Tingkat Utilitas 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Tingkat Efisiensi 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Kapasitas Yang 614 614 614 614 614 614 614
6141 6141 6141 6141 6141
Tersedia 1 1 1 1 1 1 1
Kebutuhan Aktual 88 100 80 76 84 148 84 68 0 84 88 94
Kelebihan & 604 606 605 599 607 605 605
6053 6065 6057 6141 6047
Kekurangan Material 1 1 7 3 3 7 3

Grafik Work Center Aki 40 A


7000

6000

5000

4000
Kapasitas
3000 Kapasitas Yang Tersedia
Kebutuhan Aktual
2000

1000

0
1 2 3 4 5 6 7 8 9 10 11 12
Periode

Gambar 3.7 Grafik Work Center Aki 40 A

d. Fixed Period Requirement


1. Metode CRP untuk perhitungan FPR
Tabel 3.81 Data perhitungan FPR
Waktu
PERIODE
Material Operasi
1 2 3 4 5 6 7 8 9 10 11 12
Aki 40 A 67 77 38 66 4
Gear Vixion
Oli Matic

a) Periode 1
Tabel 3.82 Data periode 1
Material Lot Size Waktu operasi Total waktu
Oli Matic 66 4 264

b) Periode 4
Tabel 3.83 Data periode 4
Material Lot size Waktu operasi Total waktu
Oli Matic 77 4 308

c) Periode 7
Tabel 3.84 Data periode 7
Material Lot size Waktu operasi Total waktu
Oli Matic 38 4 152

d) Periode 10
Tabel 3.84 Data periode 10
Material Lot size Waktu operasi Total waktu
Oli Matic 66 4 264

2. Perhitungan work center Oli Matic


Tabel 3.88 Perhitungan work center woven sewing
PERIODE
Deskripsi
1 2 3 4 5 6 7 8 9 10 11 12
Waktu tersedia 850 850 850 850 850 850 850 850 850 850 850 850
0 0 0 0 0 0 0 0 0 0 0 0
Tingkat Utilitas 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
5 5 5 5 5 5 5 5 5 5 5 5
Tingkat 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
Efisiensi 5 5 5 5 5 5 5 5 5 5 5 5
Kapasitas yang 614 614 614 614 614 614 614 614 614 614 614 614
tersedia 1 1 1 1 1 1 1 1 1 1 1 1
Kebutuhan
264 308 152 264
Aktual
Kelebihan &
587 583 598 587
kekurangan
7 3 9 7
Material

Grafik work center Aki 40 A


7000

6000

5000

Kapasitas 4000

3000 Kapasitas yang tersedia


Kebutuhan Aktual
2000

1000

0
1 2 3 4 5 6 7 8 9 10 11 12
Periode

Gambar 3.10 Grafik work center Aki 40 A

e. Period Order Quantity


1. Metode CRP untuk perhitungan POQ
Tabel 3. 91 Data perhitungan POQ
Waktu
PERIODE
Operasi
WC
1 2 3 4 5 6 7 8 9 10 11 12

Aki 40 A
Gear Vixion
11 23 2
Oli Matic 214
8 9

a) Periode 1
Tabel 3.92 Data periode 1
Material Lot Size Waktu operasi Total waktu
Oli Matic 214 2 428

b) Periode 5
Tabel 3.92 Data periode 5
Material Lot Size Waktu operasi Total waktu
Oli Matic 118 2 236

c) Periode 9
Tabel 3.92 Data periode 9
Material Lot Size Waktu operasi Total waktu
Oli Matic 239 2 478
2. Perhiungan work center Oli Matic
Tabel 3.93 Perhitungan work center Oli Matic
PERIODE
Deskripsi
1 2 3 4 5 6 7 8 9 10 11 12
850 850 850 850 850 850 850 850 850 850 850 850
Waktu tersedia
0 0 0 0 0 0 0 0 0 0 0 0
0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
Tingkat Utilitas
5 5 5 5 5 5 5 5 5 5 5 5
0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
Tingkat Efisiensi
5 5 5 5 5 5 5 5 5 5 5 5
Kapasitas yang 614 604 604 604 604 604 604 604 604 604 604 604
tersedia 1 8 8 8 8 8 8 8 8 8 8 8
Kebutuhan
428 236 479
Aktual
Kelebihan &
571 581 556
kekurangan
3 2 9
Material

Grafik work center Oli Matic


7000

6000

5000
Kapasitas

4000

3000 Kapasitas yang tersedia


Kebutuhan Aktual
2000

1000

0
1 2 3 4 5 6 7 8 9 10 11 12
Periode

Gambar 3.13 Grafik work center Oli Matic

f. Least Unit Cost


1. Metode CRP untuk perhitungan LUC
Tabel 3.96 Data Perhitungan LUC
Waktu
PERIODE Operas
WC
i
1 2 3 4 5 6 7 8 9 10 11 12
Aki 40 A
Gear Vixion
5 6
Oli Matic 45 50 53 65 0 0 72 68 99 0 2
2 7

a) Periode 1
Tabel 3.97 Data periode 1
Material Lot Size Waktu operasi Total waktu
Oli Matic 45 2 90

b) Periode 2
Tabel 3.98 Data periode 2
Material Lot Size Waktu operasi Total waktu
Oli Matic 52 2 104

c) Periode 3
Tabel 3.98 Data periode 3

Material Lot Size Waktu operasi Total waktu


Oli Matic 50 2 100

d) Periode 4
Tabel 3.98 Data periode 4
Material Lot Size Waktu operasi Total waktu
Oli Matic 67 2 134

e) Periode 5
Tabel 3.98 Data periode 5
Material Lot Size Waktu operasi Total waktu
Oli Matic 53 2 106

f) Periode 6
Tabel 3.98 Data periode 6
Material Lot Size Waktu operasi Total waktu
Oli Matic 65 2 130

g) Periode 9
Tabel 3.98 Data periode 9
Material Lot Size Waktu operasi Total waktu
Oli Matic 72 2 144
h) Periode 10
Tabel 3.98 Data periode 10
Material Lot Size Waktu operasi Total waktu
Oli Matic 68 2 136

i) Periode 11
Tabel 3.98 Data periode 11
Material Lot Size Waktu operasi Total waktu
Oli Matic 54 2 108

2. Perhitungan work center Oli Matic


Tabel 3.102 Perhitungan work center Oli Matic
PERIODE
Deskripsi
1 2 3 4 5 6 7 8 9 10 11 12
Waktu 850 850 850 850 850 850 850 850 850 850 850
8500
tersedia 0 0 0 0 0 0 0 0 0 0 0
Tingkat 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
0.85
Utilitas 5 5 5 5 5 5 5 5 5 5 5
Tingkat 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
0.85
Efisiensi 5 5 5 5 5 5 5 5 5 5 5
Kapasitas 614 614 614 614 614 614 614 614 614 614 614
6141
yang tersedia 1 1 1 1 1 1 1 1 1 1 1
Kebutuhan
90 104 100 134 106 130 144 136 108
Aktual
Kelebihan &
603 604 600 603 601 599 600 603
kekurangan 6051
7 1 7 5 1 7 5 3
Material

Grafik work center Oli Matic


7000

6000

5000
Kapasitas

4000

3000 Kapasitas yang tersedia


Kebutuhan Aktual
2000

1000

0
1 2 3 4 5 6 7 8 9 10 11 12
Periode

Gambar 3.16 Grafik work center Oli Matic


g. Least Total Cost
1. Metode CRP untuk perhitungan LTC
Tabel 3.105 Data perhitungan CRP
Waktu
PERIODE
Operasi
WC
1 2 3 4 5 6 7 8 9 10 1 1
1 2
Aki 40 A
Gear Vixion
5 6 3 5 4 2
Oli Matic 45 50 53 27 0 72 68
2 7 8 4 5

a) Periode 1
Tabel 3.117 Data periode 1
Material Lot Size Waktu operasi Total waktu
Oli Matic 45 2 90

b) Periode 2
Tabel 3.118 Data periode 2
Material Lot size Waktu operasi Total waktu
Oli Matic 52 2 104

c) Periode 3
Tabel 3.119 Data periode 3
Material Lot Waktu operasi Total waktu
size
Oli Matic 50 2 100

d) Periode 4
Tabel 3.120 Data periode 4
Material Lot size Waktu operasi Total waktu
Oli Matic 67 2 134
e) Periode 5
Tabel 3.121 Data periode 5
Material Lot size Waktu operasi Total waktu
Oli Matic 53 2 106

f) Periode 6
Tabel 3.121 Data periode 6
Material Lot size Waktu operasi Total waktu
Oli Matic 38 2 76

g) Periode 7
Tabel 3.121 Data periode 7
Material Lot size Waktu operasi Total waktu
Oli Matic 27 2 54

h) Periode 9
Tabel 3.121 Data periode 9
Material Lot size Waktu operasi Total waktu
Oli Matic 72 2 144

i) Periode 10
Tabel 3.121 Data periode 10
Material Lot size Waktu operasi Total waktu
Oli Matic 68 2 136

j) Periode 11
Tabel 3.121 Data periode 11
Material Lot size Waktu operasi Total waktu
Oli Matic 54 2 108

k) Periode 12
Tabel 3.121 Data periode 12
Material Lot size Waktu operasi Total waktu
Oli Matic 45 2 90

2. Perhitungan work center Oli Matic


Tabel 3.113 Perhitungan work center Oli Matic
Deskripsi PERIODE
1 2 3 4 5 6 7 8 9 10 11 12
Waktu tersedia 850 850 850 850 850 850 850 850 850 850 850 850
0 0 0 0 0 0 0 0 0 0 0 0
Tingkat Utilitas 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
5 5 5 5 5 5 5 5 5 5 5 5
Tingkat 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
Efisiensi 5 5 5 5 5 5 5 5 5 5 5 5
Kapasitas yang 614 614 614 614 614 614 614 614 614 614 614 614
tersedia 1 1 1 1 1 1 1 1 1 1 1 1
Kebutuhan
90 104 100 134 106 76 54 144 136 108 90
Aktual
Kelebihan &
605 603 604 600 603 606 608 599 600 603 605
kekurangan  
1 7 1 7 5 5 7 7 5 3 1
Material

Grafik work center Oli Matic


7000

6000

5000
Kapasitas

4000

3000 Kapasitas yang tersedia


Kebutuhan Aktual
2000

1000

0
1 2 3 4 5 6 7 8 9 10 11 12
Periode

Grafik 3.19 work center Oli Matic

h. Part Period Balance


1. Metode CRP untuk perhitungan PBB
Tabel 3.116 Data Perhitungan PPB
Waktu
Periode
Material Operasi
1 2 3 4 5 6 7 8 9 10 11 12
Aki 40 A
Gear Vixion
Oli Matic 45 52 50 67 91 0 27 0 72 68 54 45 2
a) Periode 1
Tabel 3.117 Data periode 1
Material Lot Size Waktu operasi Total waktu
Oli Matic 45 2 90

b) Periode 2
Tabel 3.118 Data periode 2
Material Lot size Waktu operasi Total waktu
Oli Matic 52 2 104

c) Periode 3
Tabel 3.119 Data periode 3
Material Lot Waktu operasi Total waktu
size
Oli Matic 50 2 100

d) Periode 4
Tabel 3.120 Data periode 4
Material Lot size Waktu operasi Total waktu
Oli Matic 67 2 134

e) Periode 5
Tabel 3.121 Data periode 5
Material Lot size Waktu operasi Total waktu
Oli Matic 53 2 106

f) Periode 7
Tabel 3.121 Data periode 7
Material Lot size Waktu operasi Total waktu
Oli Matic 27 2 54

g) Periode 9
Tabel 3.121 Data periode 9
Material Lot size Waktu operasi Total waktu
Oli Matic 72 2 144

h) Periode 10
Tabel 3.121 Data periode 10
Material Lot size Waktu operasi Total waktu
Oli Matic 68 2 136
i) Periode 11
Tabel 3.121 Data periode 11
Material Lot size Waktu operasi Total waktu
Oli Matic 54 2 108

j) Periode 12
Tabel 3.121 Data periode 12
Material Lot size Waktu operasi Total waktu
Oli Matic 45 2 90

2. Perhitungan work center Oli Matic


Tabel 3.122 Perhitungan Work Center Oli Matic
PERIODE
Deskripsi
1 2 3 4 5 6 7 8 9 10 11 12
850 850
Waktu tersedia 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500
0 0
Tingkat Utilitas 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Tingkat Efisiensi 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Kapasitas yang 614 614
6141 6141 6141 6141 6141 6141 6141 6141 6141 6141
tersedia 1 1
Kebutuhan
90 104 100 134 106 54 144 136 108 90
Aktual
Kelebihan &
605
kekurangan 6037 6041 6007 6035   6087   5997 6005 6033 6051
1
Material

Grafik work center Oli Matic


7000

6000

5000

Kapasitas
4000

3000 Kapasitas yang tersedia


Kebutuhan Aktual
2000

1000

0
1 2 3 4 5 6 7 8 9 10 11 12
Periode

Gambar 3.22 Grafik work center Oli Matic

e. Silver Meal Algoritm


1. Perhitungan CRP metode SMA
Tabel 3.117 Data Perhitungan SMA
Waktu
Periode
Operasi
Material
1 2 3 4 5 6 7 8 9 10 11 12
Aki 40 A
Gear Vixion
Oli Matic 45 52 50 67 91 0 27 0 72 68 54 45 2

a) Periode 1
Tabel 3.117 Data periode 1
Material Lot Size Waktu operasi Total waktu
Oli Matic 45 2 90

b) Periode 2
Tabel 3.118 Data periode 2
Material Lot size Waktu operasi Total waktu
Oli Matic 52 2 104

c) Periode 3
Tabel 3.119 Data periode 3
Material Lot Waktu operasi Total waktu
size
Oli Matic 50 2 100

d) Periode 4
Tabel 3.120 Data periode 4
Material Lot size Waktu operasi Total waktu
Oli Matic 67 2 134

e) Periode 5
Tabel 3.121 Data periode 5
Material Lot Waktu operasi Total waktu
size
Oli Matic 53 2 106

f) Periode 7
Tabel 3.121 Data periode 7
Material Lot Waktu operasi Total waktu
size
Oli Matic 27 2 54

g) Periode 9
Tabel 3.121 Data periode 9
Material Lot Waktu operasi Total waktu
size
Oli Matic 72 2 144

h) Periode 10
Tabel 3.121 Data periode 10
Material Lot Waktu operasi Total waktu
size
Oli Matic 68 2 136

i) Periode 11
Tabel 3.121 Data periode 11
Material Lot Waktu operasi Total waktu
size
Oli Matic 54 2 108

j) Periode 12
Tabel 3.121 Data periode 12
Material Lot Waktu operasi Total waktu
size
Oli Matic 45 2 90

2. Perhitungan work center Oli Matic


Tabel 3.122 Perhitungan Work Center Oli Matic
PERIODE
Deskripsi
1 2 3 4 5 6 7 8 9 10 11 12
850 850
Waktu tersedia 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500
0 0
Tingkat Utilitas 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Tingkat Efisiensi 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Kapasitas yang 614 614
6141 6141 6141 6141 6141 6141 6141 6141 6141 6141
tersedia 1 1
Kebutuhan
90 104 100 134 106 0 54 0 144 136 108 90
Aktual
Kelebihan &
605
kekurangan 6037 6041 6007 6035 0  6087  0 5997 6005 6033 6051
1
Material

Grafik work center Oli Matic


7000

6000

5000
Kapasitas

4000

3000 Kapasitas yang tersedia


Kebutuhan Aktual
2000

1000

0
1 2 3 4 5 6 7 8 9 10 11 12
Periode

Gambar 3.22 Grafik work center Oli Matic

f. Algorithm Wagner Whittin AWW


1. Perhitungan CRP metode AWW
Tabel 3.137 Data perhitungan AWW
Waktu
PERIODE
WC Operasi
1 2 3 4 5 6 7 8 9 10 11 12
Aki 40 A
Gear Vixion
Oli Matic 45 52 50 67 91 38 27 0 72 68 54 45 2

a) Periode 1
Tabel 3.117 Data periode 1
Material Lot Size Waktu operasi Total waktu
Oli Matic 45 2 90

b) Periode 2
Tabel 3.118 Data periode 2
Material Lot size Waktu operasi Total waktu
Oli Matic 52 2 104

c) Periode 3
Tabel 3.119 Data periode 3
Material Lot size Waktu operasi Total waktu
Oli Matic 50 2 100

d) Periode 4
Tabel 3.120 Data periode 4
Material Lot size Waktu operasi Total waktu
Oli Matic 67 2 134

e) Periode 5
Tabel 3.121 Data periode 5
Material Lot size Waktu operasi Total waktu
Oli Matic 53 2 106

f) Periode 6
Tabel 3.121 Data periode 6
Material Lot size Waktu operasi Total waktu
Oli Matic 38 2 76

g) Periode 7
Tabel 3.121 Data periode 7
Material Lot size Waktu operasi Total waktu
Oli Matic 27 2 54

h) Periode 9
Tabel 3.121 Data periode 9
Material Lot size Waktu operasi Total waktu
Oli Matic 72 2 144

i) Periode 10
Tabel 3.121 Data periode 10
Material Lot size Waktu operasi Total waktu
Oli Matic 68 2 136

j) Periode 11
Tabel 3.121 Data periode 11
Material Lot size Waktu operasi Total waktu
Oli Matic 54 2 108

k) Periode 12
Tabel 3.121 Data periode 12
Material Lot size Waktu operasi Total waktu
Oli Matic 45 2 90

2. Perhitungan work center Oli Matic


Tabel 3.146 Perhitungan Work Center Oli Matic
Periode
Deskripsi
1 2 3 4 5 6 7 8 9 10 11 12
850 850 850 850 850 850 850
Waktu tersedia 8500 8500 8500 8500 8500
0 0 0 0 0 0 0
Tingkat Utilitas 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Tingkat Efisiensi 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Kapasitas yang 614 614 614 614 614 614 614
6141 6141 6141 6141 6141
tersedia 1 1 1 1 1 1 1
Kebutuhan Aktual 90 104 100 134 106 76 54 0 144 136 108 90
Kelebihan & 603 600 603 608 599 600 605
6051 6041 6065 0 6033
kekurangan Material 7 7 5 7 7 5 1

Grafik work center Oli Matic


7000

6000

5000
Kapasitas

4000

3000 Kapasitas yang tersedia


Kebutuhan Aktual
2000

1000

0
1 2 3 4 5 6 7 8 9 10 11 12
Periode

Gambar 3.27 Grafik work center Oli Matic

BAB V
PENUTUP
A. Kesimpulan
1. Material Requirement Plaining (MRP) adalah sebuah metode pemesanan
material yang digunakan sebagai alat perencanaan dan pengawasan dalam
fungsi manajemen. Sedangkan Capacity Requirements Planning (CPR)
adalah metode yang digunakan untuk mengontrol kapasitas dari pesanan
agar pesanan tidak overload (melebihi) dan undeload(dibawah kapasitas)
sehingga perencana dapat mengambil tindakan dengan tepat.
2. Persediaan adalah material atau alat yang tidak dipakai dan disimpan dalam
gudang (storage) yang nantinya akan digunakan pada sistem produksi
lanjutan. Persediaan yang baik adalah persediaan yang mendekati atau
smaa dengan nol karena dapat meminimalkan holding cost atau biaya
simpan.
3. Teknik Lotting adalah teknik yang digunakan dalam menentukan ukuran
lot atau ukuan pemesanan yang optimalnya berdasakan pada hasil dan
perhitungan kebutuhan bersih. Teknik lotting yang umum dipakai adalah
teknik lotting yang ukuran lotnya sesuai dengan kebutuhan produksi.
4. Perencanaan bahan adalah

DAFTAR PUSTAKA
Baroto, T.2002. Perencanaan Dan Pengendalian Produksi. Ghalia Indonesia :
Jakarta.
Budiarto, slamet. 2009. Mengenal dan menghayati proses-proses manufaktur.
http://slametbudiarto.weebly.com/proses-manufaktur.html. Diakses pada
tanggal 18 September 2016.
Gaspersz, Vincent. 1998.Production Planning And Inventory Control
Berdasarkan Pendekatan Sistem Terintegrasi MRP II dan JIT Menuju
Manufacturing 2. Gramedia Pustaka Utama : Jakarta.
Nasution, Arman Hakim.2003.Perencanaan dan Pengendalian Produksi, Edisi 1.
Guna Widya : Surabaya.
Nasution ,Arman Hakim.2008.Perencanaan dan Pengendalian Produksi. Graha
Ilmu : Yogyakarta.
Sofyan, Diana Khairani. 2013.Perencanaan dan Pengendalian Produksi. Graha
Ilmu : Yogyakarta.
Vincent, Gaspersz. 2001.Desain Sistem Manufaktur menggunakan ERP System:
Suatu Pendekatan Praktis,JSB Vol 6 No. 1.

Anda mungkin juga menyukai